Вы находитесь на странице: 1из 22

TX Expansion Project

Khulshi Mart
Mart_IBS
IBS
Chittagong

LOS
SURVEY
REPORT

LOS summary
Prepared (also subject responsible if other)

Document No

EBL/FG/KC Md. Mobakkher Habib


Doc respons/Approved

Checked

EBL/FD/B Syed Ahmed Mahin Hossain

Date

Rev.

11/1/2011

File

TX Expansion Project

Near End: Khulshi Mart_IBS


#

Far End

Khulshi

South Khulshi 2

South Khulshi

Coordinate
(WGS84)

22 21' 48.5"
91 48' 35.2"
22 21' 27.6"
91 48' 43.2"
22 21' 34.0"
91 48
91
48' 33.0
33 0"

3
4
5
6
7
8
9
10
* Azimuth & Height informations are for near-end

PathLength
(km)

Azimuth*
()

Height*
(m)

0.31

318

15

0.41

178

15

0.35

232

15

LOS Comments

Not Clear
Not Clear
Not Clear

LOS SURVEY REPORT FORM


Prepared (also subject responsible if other)

Document No

EBL/FG/KC Md. Mobakkher Habib


Doc respons/Approved

Checked

EBL/FD/B Syed Ahmed Mahin Hossain

Date

Rev
Rev.

11/1/2011

File

TX Expansion Project

Link Name:

Khulshi Mart_IBS to Khulshi


0.31

Path Length :

Km

Line of Sight Confirmation:


Line-of-Sight

Site Name A:
Site Type:
Address:

YES

Site Name B:
Site Type:
Address:

Khulshi Mart_IBS
Rooftop
Zakir Hossain Road, Khulshi,
Chittagong

NO

Khulshi
Rooftop
Engr: Abul Quasem Chowd, H#110 Rd#4
Khulshi RA, Ctg

WGS84 Coordinates: Lat


Long
AGL Elevation
Proposed Antenna Height
Proposed Minimum Height:

15

m.

Lat
Long
AGL Elevation
Proposed Antenna Height
Proposed Minimum Height:

23

m.

Bearing :

318

deg.

Bearing :

138

deg.

Camera Height taken :


Tower Height :

13.5

m.
m.

Camera Height taken :


Tower Height :

19.5
6

m.
m.

18

Building Height:
Survey Location :

22
22 21
21' 40.9
40 9"

91 48' 42.6"
31
15
m.

E
M

12

Chittagong

Path Comments from this site to SITE B :

WGS84 Coordinates:

Building Height:
Survey Location :

22
22 21
21' 48.5
48 5"

91 48' 35.2"
34
m.
23

E
M

Chittagong

Path Comments from this site to SITE A :

Enclosure: (a)Photo of Site Location, (b) Photo of the In-the-direction from Site A-to-B and from Site B-to-A (both Far End and Near End Picture),
(c) Photo and position of obstructions, (d)Path Profile with possible obstruction (based on terrain sampling)

Name of Surveyor(s) :
Company :

Contact no:

Md. Anwar Hossain


UCE Telecom Solution Ltd
Ltd.
Mobile-01922110817

ENCLOSURE: Site photos


Prepared (also subject responsible if other)

Document No

EBL/FG/KC Md. Mobakkher Habib


Doc respons/Approved

Checked

EBL/FD/B Syed Ahmed Mahin Hossain

Date

Rev.

11/1/2011

File

TX Expansion Project

LOS picture (with zoom) :

From

Khulshi Mart_IBS to Khulshi


Direction: 318

Obstacle

LOS picture (without zoom) :

From

Khulshi Mart_IBS to Khulshi


Direction: 318

ENCLOSURE: Site photos


Prepared (also subject responsible if other)

Document No

EBL/FG/KC Md. Mobakkher Habib


Doc respons/Approved

Checked

EBL/FD/B Syed Ahmed Mahin Hossain

Date

Rev.

11/1/2011

File

TX Expansion Project

LOS picture (with zoom) :

From

Khulshi to Khulshi Mart_IBS


Direction: 138

Obstacle

LOS picture (without zoom) :

From

Khulshi to Khulshi Mart_IBS


Direction: 138

ENCLOSURE: Terrain Sampling


Prepared (also subject responsible if other)

Document No

EBL/FG/KC Md. Mobakkher Habib


D respons/Approved
/A
d
Doc

Ch k d
Checked

EBL/FD/B Syed Ahmed Mahin Hossain

D t
Date

R
Rev.

11/1/2011

Fil
File

TX Expansion Project

If direct photo from A to B v.v. is possible, terrain sampling is not applicable

FROM:

Khulshi Mart_IBS
_

TO:

Khulshi

DISTANCE ELEVATION(m) ELEVATION(m) OBSTRUCTION OBSTRUCTION


from A (km)

0.09

(from Altimeter)

(from GPS)

Height (m)

30

Coordinates

22 21' 42.8"
91 48' 41.0"

REMARKS
terrain comments from the last point to next point

Building

ENCLOSURE: Obstacle Pie Chart


Prepared (also subject responsible if other)

Document No

EBL/FG/KC Md. Mobakkher Habib


D respons/Approved
/A
d
Doc

Ch k d
Checked

EBL/FD/B Syed Ahmed Mahin Hossain

D t
Date

R
Rev.

11/1/2011

Fil
File

TX Expansion Project

Site Name: Khulshi Mart_IBS


Radio Link Chart:

2
Obstacle
FarEnd

Obstacle Information:
#

Azimuth

Distance (m)

Height (m)

Description

318
178
232

90
105

30
27
15

Building
Building
Average Tree

2
3
4
5
6
7
8
9
10

ENCLOSURE: Pathloss Result


Prepared (also subject responsible if other)

Document No

EBL/FG/KC Md. Mobakkher Habib


Doc respons/Approved

Checked

EBL/FD/B Syed Ahmed Mahin Hossain

Date

Rev.

11/1/2011

File

TX Expansion Project

PATHLOSS PROFILE :

65

60

Elevation (m)

55

50

45

40

35

30
0

0.02

0.04

0.06

0.08

0.10

0.12

0.14

0.16

0.18

0.20

0.22

0.24

0.26

0.28

0.30

Path length (0.31 km)


Khulshi Mart_IBS
Latitude
Longitude
Azimuth
Elevation
Antenna CL

Khulshi

Frequency (MHz) = 15000.0


K = 1.33
%F1 = 100.00

22 21 40.90 N
091 48 42.60 E
317.84
31 m ASL
15.0 m AGL

Latitude
Longitude
Azimuth
Elevation
Antenna CL

22 21 48.50 N
091 48 35.20 E
137.83
34 m ASL
22.0 m AGL

Jan 11 11

LOSisnotclearatheight15m,it willbeclearatnearendheight36mandfarendheight32m
Near End:
Khulshi Mart_IBS
Minimum Antenna Height:
15
Proposed Antenna Height:
15

m
m

Far End: Khulshi


Minimum Antenna Height:
Proposed Antenna Height:

23
23

m
m

ENCLOSURE: Antenna Position


Prepared (also subject responsible if other)

Document No

EBL/FG/KC Md. Mobakkher Habib


Doc respons/Approved

Checked

EBL/FD/B Syed Ahmed Mahin Hossain


TX Expansion Project

Proposed Antenna Position at Khulshi Mart_IBS

N/A
Comments :
Proposed Antenna Position at Khulshi

N/A
Comments :

Date

Rev.

11/1/2011

File

ENCLOSURE: Site Photos


Prepared (also subject responsible if other)

Document No

EBL/FG/KC Md. Mobakkher Habib


Doc respons/Approved

Checked

EBL/FD/B Syed Ahmed Mahin Hossain

Date

Rev.

11/1/2011

TX Expansion Project

Panoramic photos :
0 DEG

30 DEG

Khulshi Mart_IBS

File

ENCLOSURE: Site Photos


Prepared (also subject responsible if other)

Document No

EBL/FG/KC Md. Mobakkher Habib


Doc respons/Approved

Checked

EBL/FD/B Syed Ahmed Mahin Hossain

Date

Rev.

11/1/2011

TX Expansion Project

Panoramic photos :
60 DEG

90 DEG

Khulshi Mart_IBS

File

ENCLOSURE: Site Photos


Prepared (also subject responsible if other)

Document No

EBL/FG/KC Md. Mobakkher Habib


Doc respons/Approved

Checked

EBL/FD/B Syed Ahmed Mahin Hossain

Date

Rev.

11/1/2011

TX Expansion Project

Panoramic photos :
120 DEG

150 DEG

Khulshi Mart_IBS

File

ENCLOSURE: Site Photos


Prepared (also subject responsible if other)

Document No

EBL/FG/KC Md. Mobakkher Habib


Doc respons/Approved

Checked

EBL/FD/B Syed Ahmed Mahin Hossain

Date

Rev.

11/1/2011

TX Expansion Project

Panoramic photos :

Khulshi Mart_IBS

180 DEG

ToSouth Khulshi2

210 DEG

ToSouthKhulshi

File

ENCLOSURE: Site Photos


Prepared (also subject responsible if other)

Document No

EBL/FG/KC Md. Mobakkher Habib


Doc respons/Approved

Checked

EBL/FD/B Syed Ahmed Mahin Hossain

Date

Rev.

11/1/2011

TX Expansion Project

Panoramic photos :
240 DEG

270 DEG

Khulshi Mart_IBS

File

ENCLOSURE: Site Photos


Prepared (also subject responsible if other)

Document No

EBL/FG/KC Md. Mobakkher Habib


Doc respons/Approved

Checked

EBL/FD/B Syed Ahmed Mahin Hossain

Date

Rev.

11/1/2011

TX Expansion Project

Panoramic photos :

Khulshi Mart_IBS

300 DEG

ToKhulshi

330 DEG

File

ENCLOSURE: Site Photos


Prepared (also subject responsible if other)

Document No

EBL/FG/KC Md. Mobakkher Habib


Doc respons/Approved

Checked

EBL/FD/B Syed Ahmed Mahin Hossain

Date

Rev.

11/1/2011

TX Expansion Project

Panoramic photos :
0 DEG

30 DEG

Khulshi

File

ENCLOSURE: Site Photos


Prepared (also subject responsible if other)

Document No

EBL/FG/KC Md. Mobakkher Habib


Doc respons/Approved

Checked

EBL/FD/B Syed Ahmed Mahin Hossain

Date

Rev.

11/1/2011

TX Expansion Project

Panoramic photos :
60 DEG

90 DEG

Khulshi

File

ENCLOSURE: Site Photos


Prepared (also subject responsible if other)

Document No

EBL/FG/KC Md. Mobakkher Habib


Doc respons/Approved

Checked

EBL/FD/B Syed Ahmed Mahin Hossain

Date

Rev.

11/1/2011

TX Expansion Project

Panoramic photos :

Khulshi

120 DEG

ToKhulshiMart_IBS

150 DEG

File

ENCLOSURE: Site Photos


Prepared (also subject responsible if other)

Document No

EBL/FG/KC Md. Mobakkher Habib


Doc respons/Approved

Checked

EBL/FD/B Syed Ahmed Mahin Hossain

Date

Rev.

11/1/2011

TX Expansion Project

Panoramic photos :
180 DEG

210 DEG

Khulshi

File

ENCLOSURE: Site Photos


Prepared (also subject responsible if other)

Document No

EBL/FG/KC Md. Mobakkher Habib


Doc respons/Approved

Checked

EBL/FD/B Syed Ahmed Mahin Hossain

Date

Rev.

11/1/2011

TX Expansion Project

Panoramic photos :
240 DEG

270 DEG

Khulshi

File

ENCLOSURE: Site Photos


Prepared (also subject responsible if other)

Document No

EBL/FG/KC Md. Mobakkher Habib


Doc respons/Approved

Checked

EBL/FD/B Syed Ahmed Mahin Hossain

Date

Rev.

11/1/2011

TX Expansion Project

Panoramic photos :
300 DEG

330 DEG

Khulshi

File

ENCLOSURE: Site Sketch


Prepared
p
(also
(
subject
j
responsible
p
if other))

Document No

EBL/FG/KC Md. Mobakkher Habib


Doc respons/Approved

EBL/FD/B Syed Ahmed Mahin Hossain


TX Expansion Project

Khulshi Mart_IBS

Khulshi

Checked

Date

Rev.

11/1/2011

File

Вам также может понравиться