The first step in activity price calculation is planning the activity dependent cost in the system. This is done based on
primary cost element groups. Based on the planned capacity we specify for the above activity, price gets
automatically calculated.
In BSNL business model only one type of activities are used.
10001 Labour activity
The labour activity is a logical activity in minutes, which is quantitatively equal to labour time.
Input - Required Fields
Cost Centre
Activity Type
Cost Element
Output Results
Comments
Activity Price
Version: 1.0
Release: ECC 6.0
Page:
1 of 10
Procedural Steps
FI10.04.01 - Access to Enter plan capacity for activity by:
Via Menus
From the main menu SAP Easy Access screen as shown below
Version: 1.0
Release: ECC 6.0
Page:
2 of 10
Field Name
Version
From period
To period
Fiscal year
Cost center
Activity type
Entry
Description
Plan Version
Starting period
End period
Fiscal year
Cost center from and to or group
Activity type from and to or group
Entry selection radio button
R/O/C
R
R
R
R
C
C
C
Select Form-based
Click
Version: 1.0
Release: ECC 6.0
Page:
3 of 10
Comments
Field Name
Capacity
Description
Capacity of the order
R/O/C
R
SAVE
Procedural Steps
FI10.04.02 - Access to Enter planned cost for activity by:
Last changed on:
10-Jun-10
Version: 1.0
Release: ECC 6.0
Page:
4 of 10
Comments
Total labour hours
require for the
given work order
at Telecom Factory
Via Menus
From the main menu SAP Easy Access screen as shown below
Version: 1.0
Release: ECC 6.0
Page:
5 of 10
Field Name
Version
From period
To period
Fiscal year
Cost center
Activity type
Cost element
Entry
Description
Plan Version
Starting period
End period
Fiscal year
Cost center from and to or group
Activity type from and to or group
Cost element code from and to or
group
Entry selection radio button
R/O/C
R
R
R
R
C
C
C
C
Select Form-based
Click
Last changed on:
10-Jun-10
Version: 1.0
Release: ECC 6.0
Page:
6 of 10
Comments
Field Name
Plan Fixed Cost
Fixed Cost
Description
Variable Cost
R/O/C
O
SAVE
Version: 1.0
Release: ECC 6.0
Page:
7 of 10
Comments
These cost
element are GL
Account
These cost
element are GL
Account
Procedural Steps
FI10.04.03 - Access to Price Calculation by:
Via Menus
From the main menu SAP Easy Access screen as shown below
Version: 1.0
Release: ECC 6.0
Page:
8 of 10
Field Name
Cost Centre Group
Version
Period
Description
Enter Cost Centre Group
Version
Applicable Period
R/O/C
R
R
R
Fiscal Year
Test Run
Test mode
Enter 0
Enter Period From and two for which
calculation will be done
Enter the fiscal year for calculating
the plan price
tick
Detail lists
Detail
EXECUTE
Version: 1.0
Release: ECC 6.0
Page:
9 of 10
Comments
-------------------------------------------------------------End of Document----------------------------------------------------
Version: 1.0
Release: ECC 6.0
Page:
10 of 10