Вы находитесь на странице: 1из 4

10/18/2015

Civil At Work: Basic estimation and quantity of materials for brick wall, U.C.R. masonry, plastering and tiles.

devarajansuresh@gmail.com

Civil At Work
tech to know

About Me

SEARCH INFO

Civil At Wo
106 likes

Search

Rahul Kharat
Follow

54

Concrete Waterproofing

Like Page

A more economical alternative to Vandex, Xypex, Kryton, and Penetron

Be the first of your frien

View my complete
profile

Wednesday, November 20, 2013


Total
Pageviews

240,952

12
quarries
for you
Different
colours, free
consultancy
expertise.
Try our high
quality

Basic estimation and quantity of materials for brick wall, U.C.R. masonry,
plastering and tiles.
Calculate the quantity of material for load bearing wall with length 6 m
thickness 40 cm and height 3.5 m preparation of mortar (1:6)

Refractory Lini

Volume of wall = base quantity


=bxdxt=lxhxt
= 6 x 3.5 x 0.4
= 8.4 m 3

UK Manufacturer of R
Castable,Alumina Cem

Standard diamension of brick with mortar = 0.2 x 0.1 x 0.1 = 0.002 m 3

Concrete Mixer

Number of bricks = 8.4 / 0.002 = 42.00 nos.

Buy Colosseum

Actual volume of one brick = 0.19 x 0.9 x 0.9 = 1.539 x 10-3

Concrete pavin
treatment

vitcas.com

Concrete Mixer

Total volume of bricks = 4200 x 1.539 x 10-3 = 6.46 m 3

Fire Rated Enc

Training Materi

Volume of mortar = 8.4 6.46 = 1.94


Actual volume of water required will 25 % more due to losses
= 1.94 + 25 % = 2.42 m 3
Quantity of cement required
= 2.42 / 7 = 0.34 m 3

Concrete Mixer
Jobs in Oman
Mouthplast

1 m 3 = 30 bag
0.35 x 30 = 10.5 bags say 11 bags

Popular Posts

Basic estimation and qu


brick wall, U.C.R. mason

Quantity of sand required


= 0.35 x 6 = 2.1 m 3
1 truck = 5.87 m 3
Therefore 0.08 m 3 = 0.35 trucks

Calculations Of Shutteri
By Quick Method Estima
sft) Of Slab Area

STANDARD CEMENT C

STANDARD MATERIAL C

Sr. no. Item


Quantity
http://civilatwork.blogspot.com/2013/11/basic-estimation-and-quantity-of.html

Rate

Total

CONSTANTS ON BUILT

1/4

10/18/2015

Civil At Work: Basic estimation and quantity of materials for brick wall, U.C.R. masonry, plastering and tiles.

Building
Materials
Top Deals
at Factory
Price.
Contact
Directly &
Get Live
Quotes!

Sr. no.
1
2
3

Item
Bricks
Sand
cement

Quantity
4200 Nos.
1 Brick
11 bag

Rate
750/100 nos.
2000/truck
110/bag

Total
3150
1000
1210
5,360 Rs.

CONSTANTS ON BUILT
Procedure and method

CHECK LIST FOR INTE

CONSUMPTION OF STE
SFT OF WORK

Profile levelling and cros

Asbestos cement corrug

Partition wall with bricks

Septic Tank And Soak P

Find the estimation of material required for building partition wall


with brick work second class, cement mortar 1:6 and base quantity 10
m3

CIVIL AT WORK
2015 ( 98 )

Total volume = base quantity = 10

m3

2014 ( 235 )
2013 ( 232 )
December

Volume of one brick with mortar


= 0.2 x 0.1 x 0.1 = 0.002 m 3

November

Core testing of colum

No. of bricks required = 10 / 0.002 = 5000 nos.

Flooring is an aspect
the l...
The fundamentals of
residential...

Actual volume of one brick


= 0.10 x 0.9 x 0.9
= 1.539 x 10-3 x 5000
= 7.69 m 3 say 7.7 m 3

The art of negotiating

How you can get bette


the n...

Investing at the pre-la


residential...

Revamp your residen


at a ti...

Actual volume of mortar = 10 7.7 = 2.3 m 3

Steps to balance elem

Physical properties o

Considering 25 % more for losses.

Protection against wh
trea...

Actual volume of mortar required


= 2.3 + 25 % 2.3 = 2.87 m 3

Basic estimation and


bri...

Asbestos cement cor


Layering of carpets

Quantity of cement required


=2.87 / 7 = 0.41 m 3
= 0.41 x 30 = 12.3 bags say 13 bags

Transform your home


base and...

How to balance the e

Let the energy flow th


feng sh...

Quantity of sand required


= 0.41 x 6 = 2.46 m 3
1 truck = 5.87 m 3
2.46 m 3 = truck

Add a new dimension

Designing green inte

Attractive flooring by d
finishes...

Prestressed concrete

Sr. no.
1
2
3

Items
Bricks
Sand
Cement

Quantity
5000
truck
1/13 bag

Rate
750/1000
2000/truck
110/bag

Total
3750
1000
1430
6,180 Rs.

October ( 12
September
August ( 19
July ( 28 )
June ( 3 )
May ( 3 )
March ( 10

Estimate for the material required for load bearing wall of U.C.R.
masonry consider base quantity 10m3 and proportion of mortar (1:6)

February (
January ( 2

Quantity of stones required = 125 % of base


Quantity = 12.5 m 3
Quantity of mortar required
Considering all stones.
42 % of base quantity = 4.2 m 3
Quantity of cement required
http://civilatwork.blogspot.com/2013/11/basic-estimation-and-quantity-of.html

2/4

10/18/2015

Civil At Work: Basic estimation and quantity of materials for brick wall, U.C.R. masonry, plastering and tiles.

= 4.2/7 = 0.6 m 3
1m 3 = 30 bags
0.6m 3 = 18 bags
Quantity of sand required
= 0.6 x 6 = 3.6 m 3
1 truck = 5.87 m 3
Therefore 3.6 m 3 = 0.6 trucks = 1 truck
Sr. no. Items
1
Stone
2
3

Quantity Rate
m3

13
Sand
1 truck
Cement 18 bags

275/m 3

Total
3575

2000/truck 2000
110/bag
1980
7,555 Rs.

Estimate the quantity of material required for plastering the area 100
m2. Mix proportion used 1:5. Thickness of plaster is 12 mm.
Volume of mortars = 100 x 12 / 10 x 100 = 1.2 m 3
Considering 25 % more due to losses
= 1.2 + 2.5 % . 12 = 1.5 m 3
Quantity of cement required
= 1.5 / 6
=0.25 m 3
0.25 m 3 = 0.25 x 30
7.5 bags = 8 bags
Quantity of sand = 0.25 x 5 = 1.25 m 3
1 truck = 5.87 m 3
1.25 m 3 = 0.21 truck
= truck
Sr. no. Items
Quantity Rate
Total
1
Cement 8 bags
110/bag
880
2
Sand
truck 2000/truck 1000
1,880 Rs.
Calculate the estimate for mosaic tiles flooring over an area of 100 m2
with 20 mm thick lime.
Size of tile = 20 cm x 20 cm
Proportion of mortar = (1:2:4)
Base quantity = area = 100 m 2
Size of tile = 20 cm x 20 cm
Thickness of lime base = 20 mm
Area of one tile = 20 cm x 20 cm
= 400 cm 2 = 0.004 m 2
Total no. of tiles required = 100 /0.04 = 25 00 nos.
Volume of lime base = 100 x (20 / 10 x 100) = 2 m 3
Considering 25 % more due to looses = 2 + 25 % .2 = 2.5 m 3
Quantity of cement required = 2.5 / 7 = 0.35 m 3
http://civilatwork.blogspot.com/2013/11/basic-estimation-and-quantity-of.html

3/4

10/18/2015

Civil At Work: Basic estimation and quantity of materials for brick wall, U.C.R. masonry, plastering and tiles.

1 m 3 = 30 bags
0.35 x 30 = 10.5 bags say 11 bags
Consider 6 bags of cement for 100 m 2 surface for slurry
= total quantity = 10.5 +6 = 16.5 say 17 bags
Quantity of lime required = 0.35 x 2 = 0.7 m 3
1 m 3 = 30 bags
7 m 3 = 21 bags
Quantity of sand required = 0.35 x 4 = 1.4 m 3 = truck
Sr.no.
1
2
3
4

Items
Tiles
Cement
Sand
Lime

Quantity
2500
17 bags
truck
21 bags

Rate
750/brass
110/bag
2000/truck

Total
13020
1870
1000
840
16730 Rs.

1 brass = 144 tiles


2500 / 144 = 17.36 brass

Newer Post

Home

Older Post

Labels
Construction Chemicals & Coating ( 66 ) Project Management ( 50 ) Buidling
Maintenance & Chemical Treatments ( 49 ) Project Management I ( 42 ) Surveying

( 34 ) Soil Mechanics ( 25 ) Building Construction ( 22 ) Engineering Data ( 19 ) Concrete Technology ( 12 )


Mechanics Of Structure ( 12 ) Painting ( 12 ) Specification for Repairing Structure ( 10 ) Vaastu Shastra & feng shui ( 9 ) Check List ( 6

Powered by Blogger.

http://civilatwork.blogspot.com/2013/11/basic-estimation-and-quantity-of.html

4/4

Вам также может понравиться