Вы находитесь на странице: 1из 16

RONTO'S BILL of MATERIAL (B

MATERIAL PRICE PER SQUARE INCH

cardboard $2
clothe $3
metal $6
paper $1
plastic $5
wood $4

MATERIAL PRICE PER INCH

wire (electrical) $4
wire (metal) $3
rubber band $2
ribbon $3
string $2
thread $1

NOTES: If your construction material is not on the list, contact RONTO for pricing.

1) all material such as glue, tape, staples etc. needed to assemble the Flying Toy is free of cost.

2) all paints, stickers, or markers needed to decorate the Flying Toy is free of cost.

3) Prices are noted in 1-3 dollar digits to simplify cost-calculations.


NTO'S BILL of MATERIAL (BOM)

PRE-ASSEMBLED PART PRICE per UNIT

Ballon (rubber) $100


Battery (any sjize) $200
Box (wood) $100
Box (metal) $200
Box (paper) $50
Box (plastic) $150
Candle $100
Motor (electric) $500
Nuts & Bolts $20
Engine (chemicals; including gunpower) $400
Engine (liquids; including alcohol) $200
Fuselage (wood) $200
Fuselage (plastic) $300
Fuselage (paper) $100
Hellium (or any other gas) $100
Parachute $300
Propellors (airplane) $100
Rotors (helicoptor) $100
Screws, Pins, Clips $50
Tube (plastic) $300
Tube (wood) $200
Tube (paper) $100
Wheel $50
Wings (plastic) $300
Wings (paper) $100
Wings (wood) $200

is not on the list, contact RONTO for pricing.

ble the Flying Toy is free of cost.

Toy is free of cost.

ns.
PA
Team & Class:
ITEM
PART
PARTS & MATERIAL INVOICE

ITEM
MATERIAL
PARTS & MATERIAL INVOICE
Product Brand Name: F-kite

DESCRIPTION QUANTITY
paper to make a main body 2 square inch
wood to make legs 0.17 spuare inch
wire(mental) 1.7 inch
pin 6
Date: 4/20/2010

PRICE (from BOM) $SUB-TOTAL


$1 per square inch $2
$4 per square inch $0.68
$3 per inch $5.10
$50 per unit $300

TOTAL PRODUCTION
COST $3.08
BUSCOM1.0/S10/TEAM_PROJECT_TASK_SHEET/project#3
 
TEAM NAME: F-girls CLASS NAME:
PROJECT NAME: #3 FLYING TOY PROTOTYPE DATE SUMITTED: 2010-4

Explain what each team member contributed to the development & constr
flying toy prototype.
 
TASK DESCRIPTION:
1 Talk with team members about the model and the prototype. Together w
2 Purchase the materials
3 Improve our prototype after other team members test it.

TEAM MEMBER’S NAME: LI YURU 이옥여 20075776


 
TASK DESCRIPTION:
1 Talk with team members about the model and the prototype. Together w
2 Purchase the materials
3 Improve our prototype after other team members test it.
4 Count the sub-price of our product.
 
TEAM MEMBER’S NAME: MIAO JUAN 묘연 20075747
 
TASK DESCRIPTION:
 1 Talk with team member about the model and the prototype. Together w
2 Draw the blueprint.
3 Test the prototype and found the problems.
 
TEAM MEMBER’S NAME: HOU SHANSHAN 후산산 20075794
 
TASK DESCRIPTION:
1 Talk with team member about the model and the prototype. Together w
2 Draw the blueprint.
3 Test the prototype and found the problems.
4 Count the sub-price of our product.

TEAM MEMBER’S NAME: SUN XIAOCHENG 손효쟁 20075751


CLASS NAME: B.C 1.0 ALPHA
SUMITTED: 2010-4-20

elopment & construction of your team's

ototype. Together with team member to make and complete our prototype.

t it.

ototype. Together with team member to make and complete our prototype.

st it.

ototype. Together with team member to make and complete our prototype.

94

totype. Together with team member to make and complete our prototype.

751

Вам также может понравиться