Вы находитесь на странице: 1из 3

LEED 2009 for Commercial Interiors

Project Scorecard
Project Name:
Project Address:
Yes

No

SUSTAINABLE SITES
Credit 1

Site Selection
OR

Yes

No

0
Y
Y
Y

1 to 5

Option 1: Select a LEED Certified Building


Option 2: Locate in a Building That Meets:
Path 1: Brownfield Redevelopment

5
Up to 5
1

Path 2: Stormwater Design - Quantity Control

Path 3: Stormwater Design - Quality Control

Path 4: Heat Island Effect - Nonroof

Path 5: Heat-Island Effect - Roof


Path 6: Light Pollution Reduction

1
1

Credit 2
Credit 3.1
Credit 3.2

Path 7: Water Efficient Landscaping -Reduce by 50%


Path 8: Water Efficient Landscaping - No Potable Water Use or Irrigation
Path 9: Innovative Wastewater Technologies
Path 10: Water Use Reduction: 30% reduction
Path 11: On-site Renewable Energy
Path 12: Other Quantifiable Environmental Performance
Development Density and Community Connectivity
Alternative Transportation - Public Transportation Access
Alternative Transportation - Bicycle Storage and Changing Rooms

2
2
2
1
2
1
6
6
2

Credit 3.3

Alternative Transportation - Parking Availability

WATER EFFICIENCY
Prereq 1
Credit 1

21 Points

Water Use Reduction


Water Use Reduction
30% Reduction
35% Reduction
40% Reduction

ENERGY & ATMOSPHERE


Prereq 1
Prereq 2
Prereq 3
Credit 1.1

Credit 1.2

Credit 1.3

Credit 1.4

Credit 2
Credit 3

Fundamental Commissioning of Building Energy Systems


Minimum Energy Performance
Fundamental Refrigerant Management
Optimize Energy Performance - Lighting Power
15% Reduction
20% Reduction
25% Reduction
30% Reduction
35% Reduction
Optimize Energy Performance - Lighting Controls
Daylight Controls for Daylit Areas
Daylight Controls for 50% of the Lighting Load
Occupancy Sensors for 75% of the Connected Lighting Load
Optimize Energy Performance - HVAC
Equipment Efficiency
Zoning Controls
OR
Reduce Design Energy Cost and 15% Improvement
Reduce Design Energy Cost and 30% Improvement
Optimize Energy Performance - Equipment and Appliances
70% ENERGY STAR
77% ENERGY STAR
84% ENERGY STAR
90% ENERGY STAR
Enhanced Commissioning
Measurement and Verification
Install Sub-Metering Equipment
Tenant Pays for Energy
OR

11 Points
Required
6 to 11
6
8
11

37 Points
Required
Required
Required
1 to 5
1
2
3
4
5
1 to 3
1
1
1
5 to 10
5
5
5
10
1 to 4
1
2
3
4
5
2 to 5
2
3

Metering, Measurement and Payment Accountability


Credit 4

Green Power

5
5

Yes

No

MATERIALS & RESOURCES


Prereq 1

Storage and Collection of Recyclables

Credit 1.1

Tenant Space - Long-Term Commitment

Credit 1.2

Building Reuse - Maintain Interior Nonstructural Components


40% Reuse
60% Reuse

Credit 2

No

Y
Y

No

Credit 3.2

Materials Reuse - Furniture and Furnishings

Credit 4

Recycled Content

No

Credit 5

2
1 to 2

Credit 6
Credit 7

20% of Materials Manufactured


20% of Materials Manufactured and 10% Extracted
Rapidly Renewable Materials
Certified Wood

INDOOR ENVIRONMENTAL QUALITY

No

Minimum Indoor Air Quality Performance


Environmental Tobacco Smoke (ETS) Control
Outdoor Air Delivery Monitoring
Increased Ventilation
Construction Indoor Air Quality Management Plan - During Construction
Construction Indoor Air Quality Management Plan - Before Occupancy
Low-Emitting Materials - Adhesives and Sealants
Low-Emitting Materials - Paints and Coatings
Low-Emitting Materials - Flooring Systems
Low-Emitting Materials - Composite Wood and Agrifiber Products
Low-Emitting Materials - Systems Furniture and Seating
Indoor Chemical and Pollutant Source Control
Controllability of Systems - Lighting
Controllability of Systems - Thermal Comfort
Thermal Comfort - Design
Thermal Comfort - Verification
Daylight and Views - Daylight
75% of Spaces
90% of Spaces
Daylight and Views - Views for Seated Spaces

INNOVATION IN DESIGN
Innovation in Design
Innovation or Exemplary Performance
Innovation or Exemplary Performance
Innovation or Exemplary Performance
Innovation
Innovation
LEED Accredited Professional

REGIONAL PRIORITY
Credit 1

Yes

1
1 to 2

20% of Content
Regional Materials

Credit 2
?

2
1 to 2
1
2

10% of Content

Credit 1

Yes

1
2
1 to 2

Materials Reuse
5% Reuse
10% Reuse

Credit 8.2
?

1
1 to 2

Divert 50% from Disposal


Credit 3.1

Prereq 1
Prereq 2
Credit 1
Credit 2
Credit 3.1
Credit 3.2
Credit 4.1
Credit 4.2
Credit 4.3
Credit 4.4
Credit 4.5
Credit 5
Credit 6.1
Credit 6.2
Credit 7.1
Credit 7.2
Credit 8.1

Yes

Required

Construction Waste Management


Divert 75% from Disposal

Yes

14 Points

Regional Priority
Regionally Defined Credit Achieved
Regionally Defined Credit Achieved
Regionally Defined Credit Achieved
Regionally Defined Credit Achieved

PROJECT TOTALS (Certification Estimates)


Certified: 40-49 points Silver: 50-59 points Gold: 60-79 points Platinum: 80+ points

1
2
1
1

17 Points
Required
Required
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1 to 2
1
2
1

6 Points
1 to 5
1
1
1
1
1
1

4 Points
1 to 4
1
1
1
1

110 Points

Вам также может понравиться