Site
RISK ASSESSMENT
Attachments
H&S Site Survey Report
Y/N
Date of Implementati
Yes
Lifting Plan
na
No
Yes
EHS Manager:
Supervisor:
2 of 109
General N
The building fixed ladder will be used
Rigger will use double lanyard while c
Only Two riggers can work on this tow
1. Any Activity Must be suspended when it
2. All working at height activities and cran
3. Do not access site without the required
3 of 109
Site Ph
4 of 109
Risk Assess
5 of 109
HAZARD
RISK
6 of 109
Transportation
HAZARD
Driving/Traffic
Hazards
RISK
atality,Injury,
Property Damage
F
7 of 109
HAZARD
RISK
Weight or/and
back injury, foot
Dimensions of the
injury
material
8 of 109
Working at height
HAZARD
Height, Falling
Objects
RISK
Fatality,Injury,
Property
Damage
9 of 109
HAZARD
falling/object
dropping
RISK
fatality/injury
10 of 109
Using Of Hantools.
HAZARD
RISK
injury, property
Cut, Puncture, Abbra
damage
11 of 109
RF Exposure
HAZARD
Radiations
RISK
Bad health
effects, cancer
12 of 109
Dismantling of
anntennas & Cables
(Working at Height)
HAZARD
Falling
RISK
Injury, Fatality,
Property
Damage
13 of 109
HAZARD
RISK
RIGGING (Discending
Material
material from Tower Falling of object/S
damage/Injury
to ground )
14 of 109
HAZARD
Electricity
RISK
Electric
Shock/Injury,
15 of 109
Dismantling of cables
from cable tray
HAZARD
trip/fall
RISK
injury
16 of 109
HAZARD
House
Waste Collecting/site
keeping/sharp
Cleaning and transfer to
edges/tripping
waste disposal area
hazard/dust
RISK
injury/infection
17 of 109
HAZARD
RISK
18 of 109
HAZARD
RISK
19 of 109
24 - 02 - 2016
20 of 109
General Notes
adder will be used by riggers to get acces
ble lanyard while climbing the tower.
n work on this tower at the same time.
e suspended when it gets dark
t activities and crane operations are prohibited
without the required mandatory PPE (Helmet, S
Site Photos
22 of 109
Risk Assessment
23 of 109
24 of 109
Passengers
/General Public
25 of 109
Technician &
Rigger
26 of 109
All operatives
27 of 109
All operatives
28 of 109
employees
29 of 109
employees
30 of 109
All operatives
31 of 109
All operatives
32 of 109
All operatives
33 of 109
workers on site
34 of 109
site Workers
35 of 109
36 of 109
37 of 109
074 RT
24 - 02 - 2016
Scope of w
Contractor
Sign: ____
Sign: ____
38 of 109
he same time.
rk
39 of 109 are prohibited between sunset and sunrise
ions
ory PPE (Helmet, Safety Shoes and VIS Jacket) a
the below risk assessment based on the require
ty passport
40 of 109
41 of 109
42 of 109
43 of 109
44 of 109
45 of 109
46 of 109
47 of 109
48 of 109
49 of 109
50 of 109
51 of 109
52 of 109
53 of 109
54 of 109
55 of 109
of work - MW Installation
Contractor:
JAIDAH
Sign: _________________
Sign: _________________
56 of 109
Sie
Specific
Risk
sunrise (from 6:30 PM - 5:40 AM)
cket) and doAssemssent
not remove them when inside the
required activity
57 of 109
ers.
risk assessment
Abnormal Situa
58 of 109
of Site (Photos
59 of 109
RISK ASSESS
S
RV
Risk Level
Action required
60 of 109
RISK ASSESS
S
RV
Risk Level
Action required
Additional control
measures required
61 of 109
RISK ASSESS
S
RV
Risk Level
Action required
Additional control
measures required
Medium
62 of 109
RISK ASSESS
S
RV
Risk Level
Action required
Additional control
measures required
63 of 109
RISK ASSESS
S
RV
Risk Level
Action required
Additional control
measures required.
64 of 109
RISK ASSESS
S
RV
Risk Level
Action required
Additional control
measures required
65 of 109
RISK ASSESS
S
RV
Risk Level
Action required
Review at next
opportunity
2
2
Low
66 of 109
RISK ASSESS
S
RV
Risk Level
Action required
Additional control
measures required
Medium
67 of 109
RISK ASSESS
S
RV
Risk Level
Action required
Addition control
measures to be taken.
68 of 109
RISK ASSESS
S
RV
Risk Level
Action required
Additional control
measures required.
Medium
69 of 109
RISK ASSESS
S
RV
Risk Level
Action required
Additional Control
measures required
70 of 109
RISK ASSESS
S
RV
Risk Level
Action required
71 of 109
RISK ASSESS
S
RV
Risk Level
Action required
72 of 109
RISK ASSESS
S
RV
Risk Level
Action required
73 of 109
74 of 109
de the site.
al Situation
Additional Controls /
Photos)
77 of 109
ADDITIONAL CONTROLS
RV
78 of 109
ADDITIONAL CONTROLS
RV
79 of 109
ADDITIONAL CONTROLS
Max. 5 kg can be lifted by one
person at one time.
Ensure Rolling of cables must be
performed by two person or
more.
Ensure nip and pinch points are
identified.
RV
80 of 109
ADDITIONAL CONTROLS
4 Double Lanyards must be taken.
( Riggers MUST fix the two hooks
on two different anchor points )
4 Positioning Lanyards must be
taken.
1 Material Fall Arrestor
1 Fall Arrestor
1 Rescue Kit ( is a MUST )
2 Ropes ( each one is at least 40m.
RV
81 of 109
ADDITIONAL CONTROLS
Site engineer will not allow
anyone to go near tower if he has
no work.
Ensure trip hazards are identified
and walking area on roof top will
be identified.
Ensure trip hazards are identified
or removed.
RV
82 of 109
ADDITIONAL CONTROLS
RV
83 of 109
ADDITIONAL CONTROLS
RV
84 of 109
ADDITIONAL CONTROLS
Riggers must be careful
while dismantling of anntena
to prevent from hitting to
other working anntenas.
Anntenna will be secured
with material fall arrestor.
Rigger will use double
lanyard, positioning lanyard
and fall arrester.
RV
85 of 109
ADDITIONAL CONTROLS
Ensure standard Pulley will
be installed.
Ensure rope length will be
twice according to height of
tower.
1 meter sling will be used to
hold the material.
Rigger will use double
lanyard, positioning lanyard
RV
86 of 109
ADDITIONAL CONTROLS
RV
87 of 109
ADDITIONAL CONTROLS
RV
88 of 109
ADDITIONAL CONTROLS
All waste material will be stored
at one place and area will be
barricaded by caution tape.
After completion of work, all
waste materials must be
removed from site.
RV
89 of 109
ADDITIONAL CONTROLS
RV
90 of 109
ADDITIONAL CONTROLS
RV
91 of 109
92 of 109
93 of 109
94 of 109
95 of 109
Action required
96 of 109
low
Action required
97 of 109
Action required
Low
98 of 109
Action required
99 of 109
Action required
100 of 109
Action required
101 of 109
Action required
102 of 109
Action required
Low
103 of 109
Action required
104 of 109
Action required
Low
105 of 109
Action required
106 of 109
Action required
107 of 109
Action required
108 of 109
Action required
E.R. Plan
Site ID - 1179
Date 02/12/2015
Emergency
Scope of work - MW
Dismantling
Response Steps
S. Supervisor: Naiem
S.P Number: HWQR07004
Fire Emergency
999
Site Evacuation
Others
Comments:
Page 1 of 1