CORPORATE PROFILE

SKILLED POWER DEVELOPMENT

Company Overview
Skilled Power Development - SPD (Formerly S.S. Enterprises) was established in
the year 1998. The company covers of engineering activity and has also been engaged
in the field of

Fabrication and Erection of steel structure and pressure vessels.


H.V.A.C. System
Utility Piping and Distribution System
Fire Fighting System

S.S. Enterprises have their own godown, metrical and equipment store and work shop
facility. All facilities are available here for off-site fabrication and store of items, which
are deliver to job site as and when required.
workers has been both type of jobs project designed supply fabrication and system
operation and maintenance.
S.S. Enterprises have a very good team of qualified, well experienced and trend engineers and have vast experience in the field of H.V.A.C., Fire Fighting, Fabrication and
Erection Steel Structure and pressure vessel, and Utility Piping. We have latest and
heavy type equipment for fabrication, erection, operation and maintenance.

Fabrication & Erection of Steel Structure


and Pressure Vessels

Installation & Commissioning of Heat Exchanger


Fabrication & Erection of Heavy Steel Structure
Fabrication & Erection of Canvear
Fabrication & Erection of Iron Platform.
Fabrication & Erection of Shade
Fabrication & Erection of Textile Machine Structure
Installation of Gantry
Fabrication & Installation of Water Sand Filter
Fabrication & Installation of Water Softener
Fabrication & Installation of Hot Water Tank
Fabrication & Installation of Water Deaerator
Fabrication & Installation of Condensate Tank
Fabrication & Installation of Water Tank

Heating Ventilation and Air Conditioning


System
Installation of Chillers
Installation of Cooling Tower
Installation of Chill Water Piping
Installation of Cooling Water Line
Installation of Hot Water Line
Installation of Chilled Water Pumps,
Condenser Water Pumps & Hot Water Pumps.
Ducting & Insulation Works

SKILLED POWER DEVELOPMENT

Utility Piping and System Distribution


System
Installation and Commissioning of Boiler
Installation of Steam Line
Installation of Condensate Line
Installation of Hot-water Line
Installation of Air & Gas Line
Installation and Commissioning of Water Deaerator
Installation and Commissioning of Economizer
Installation and Commissioning of Condensate Tank
Installation and Commissioning of Blow Down Tank
Installation and Commissioning of Pressurized Water
System
Insulation & Jacketing for Steam, Condensate Line

Fire Fighting System


Installation & Commissioning of
Fire Hydrant System
Installation & Commissioning of
Fire Sprinkler System
Installation & Commissioning of
Suppression System
Installation & Commissioning of
Foam System

SKILLED POWER DEVELOPMENT

References of Fabrication & Erection of Steel


Structure And Pressure Vessel
Client
City
Year
Scope

MNJ
Karachi
1998
Fabrication of LPG Bowsers

Client
City
Year
Scope

Mobilink Askari
Hub Balochistan
1999
Fabrication of Oil Tank

Client
City
Year
Scope

Wall Ice Cream


Hub Balochistan
2000
Fabrication, erection of shade Fabrication, erection of Cold Storage

Client
City
Year
Scope

Adamjee Enterprises
Karachi
2000
Fabrication, installation and commissioning of water, sand filters, water
softening plant, water dearator and condensate tank

Client
City
Year
Scope

Polygal Habib Gum


Export Processing Zone
2000
Fabrication, installation and commissioning of Heat Exchanger

Client
City
Year
Scope

Thatta Cement Company


Thatta
1999-2000
Fabrication, erection of structure, flue duct, expansion joints, bucket,
hopper

Client
City
Year
Scope

Eastern Gresham Pakistan


Karachi
2000-2002
Fabrication of water tube boiler, fire tube boiler, economizer, heat
exchanger, water softener, water sand fitter, dearators.

SKILLED POWER DEVELOPMENT

References of Fabrication & Erection of Steel


Structure And Pressure Vessel
Client
City
Year
Scope

Najma Sugar Mills


Jhaddo
2002
Fabrication, erection of Hydraulic Tupler and Hooper

Client
City
Year
Scope

Adamjee Enterprises
Karachi
2003
Installation and commissioning of preserved water system.
Fabrication erection of shade
Fabrication erection of structure

Client
City
Year
Scope

K-3 Karachi Water and Sewerage Board


Dhabeji
2003
Fabrication and installation of 72 water line 2 x 2 kilometer

Client
City
Year
Scope

Hino Pak Motors Ltd.


Karachi
2004
Installation of overhead crane
Fabrication, erection of structure

Client
City
Year
Scope

American Consulate Karachi


Karachi
2004
Fabrication, installation and commissioning of Heat Exchanger
Fabrication, erection of structure

Client
City
Year
Scope

Sonex Steel
Nooriabad
2005
Installation of overhead crane 35 Ton, 25 Ton, 15 Ton and 10 Ton

Client
City
Year
Scope

Siemens Pakistan (Pvt.) Ltd.


Karachi
2006
Installation of 30 ton overhead crane

SKILLED POWER DEVELOPMENT

References of Fabrication & Erection of Steel


Structure And Pressure Vessel
Client
City
Year
Scope

Al-Abbas Cement
Nooriabad
2006-2007
Fabrication and erection of structure, conveyor, hoper, shade

Client
City
Year
Scope

Pakistan National Shipping Corporation (Building)


Karachi
2008
Structural work for building reinforcing

SKILLED POWER DEVELOPMENT

References of Heating Ventilation and Air Conditioning System


Client
City
Year
Scope

Pakistan National Shipping Corporation (Building)


Karachi
1998
Replacement and Installation of chilled water line
Replacement and Installation of air handling units

Client
City
Year
Scope

M.S.D. Pharmaceutical
Karachi
2002-2004
Operational Contact of H.V.A.C. System

Client
City
Year
Scope

Sandoz Pakistan
Jamshoro
2000
Installation, testing & commissioning of chiller, cooling tower & boiler

Client
City
Year
Scope

Hakeem Sons Chemical Industries (Pvt.) Ltd.


Karachi
2002
Installation of ducting and insulation

Client
City
Year
Scope

P.C. Gawadar
Gawadar
2005-2006
Installation and commissioning of chilled water line, condense water
line with insulation

Client
City
Year
Scope

Philips Electrical Company


Karachi
2006
Installation of Fresh Air Ducting

Client
City
Year
Scope

Hino Pak Motors Limited


Karachi
2006
Installation, Testing and Commissioning of Fresh Air System

Client
City
Year
Scope

Rehman Medical College


Peshawar
2008
Installation, Testing and Commissioning of H.V.A.C. Piping Work
SKILLED POWER DEVELOPMENT

References of Utility, Piping and Steam


Distribution System
Client
City
Year
Scope

Thatta Cement Company


Thatta
1998
Installation, Testing and Commissioning of Steam Distribution System
and Oil Firing System.
Installation, Testing and Commissioning of Heat Exchanger, Shifting,
Testing and Commissioning of Boiler.

Client
City
Year
Scope

Walls Ice Cream


Hub Balochistan
1999
Installation of steam, condensate line and insulation works.
Replacement of Boiler Tubes

Client
City
Year
Scope

J & P Coats Pakistan


Karachi
2000
Installation of steam, condensate, hot water, air and water line.
Installation, testing and Commissioning of boiler.

Client
City
Year
Scope

Adamjee Enterprises
Karachi
2000
Complete Installation and Commissioning of Boiler, Steam,
Condensate, Hot Water, Water Gas and Oil Boiler Systems.

Client
City
Year
Scope

Ahmed Dyeing
Karachi
2002
Installation, testing and commissioning of Oil Boiler.
Installation of Oil Piping System.

Client
City
Year
Scope

Nakshbandi Industries Limited


Karachi
2003
Installation, testing and commissioning of Boiler, Economizer,
Installation of Steam, Condensate, Hot Water, Water and Gas Line

SKILLED POWER DEVELOPMENT

References of Utility, Piping and Steam


Distribution System
Client
City
Year
Scope

Knoll Pharma
Karachi
2003
Installation, testing and commissioning of Boiler, Installation of Steam,
condensate line and gas piping

Client
City
Year
Scope

M.Y Industries Ltd.


Karachi
2004
Installation, testing and commissioning of Boiler, Economizer, Water
Softener and Water Dearator.
Installation of Steam, Condensate and Gas Line.

Client
City
Year
Scope

Hino Pak Motors Ltd.


Karachi
2005
Installation, testing and commissioning of Boiler and operational
contract of boiler.

Client
City
Year
Scope

Al-Munnaf Industries
Karachi
2005
Installation of steam, condensate, hot water, water, air and gas line.

Client
City
Year
Scope

International Automotive Limited


Karachi
2008
Installation of compressor and Air, Gas and Line

SKILLED POWER DEVELOPMENT

References of Fire Fighting System


Client
City
Year
Scope

Kohat Tunnel Project


Kohat
2001
Installation of Fire hydrant system with electric driven pump, diesel
driven pump and jockey pump

Client
City
Year
Scope

Adamjee Enterprises
Karachi
2002
Installation of Fire hydrant system with electric driven pump, diesel
driven pump and jockey pump

Client
City
Year
Scope

A.Q. Khan Institute Karachi University


Kohat
2003
Installation of Fire hydrant system with electric driven pump, diesel
driven pump and jockey pump

Client
City
Year
Scope

Hino Pak Motors Limited


Karachi
2004
Installation of Fire hydrant system with electric driven pump, diesel
driven pump and jockey pump and Installation of Fire Spinkler System.

Client
City
Year
Scope

Atlas Honda
Karachi
2005
Installation of Fire hydrant system with electric driven pump, diesel
driven pump and jockey pump

Client
City
Year
Scope

Roche Pharmaceuticals
Karachi
2005
Installation of Fire Energen System Cylinder Extinguishing System

Client
City
Year
Scope

NFT
Karachi
2005
Installation of Fire Energen System Cylinder Extinguishing System

SKILLED POWER DEVELOPMENT

10

References of Fire Fighting System


Client
City
Year
Scope

Custom Container Terminal


Port Qasim Karachi
2006
Installation of Fire hydrant system and Fire Sprinkler System with
Electric Driven Pump, Diesel Driven Pump and jockey pump 500 GPM

Client
City
Year
Scope

Eli Lilly Pakistan


Karachi
2006
Installation of Fire Sprinkler System with commissioning

Client
City
Year
Scope

Soorty Denim
Karachi
2006
Installation and Commissioning of Fire Hydrant System with Electric
Driven Pump, Diesel Driven Pump and Jockey Pump 500 GPM

Client
City
Year
Scope

Dolmen City
Karachi
2007
Installation of Fire Sprinkler System in Angro Chemical Floors.

Client
City
Year
Scope

City Tower
Karachi
2007
Installation and Commissioning of Fire Sprinkler System with
750 GPM.

Client
City
Year
Scope

Faisal Bank (Emirates Office)


Karachi
2007
Installation and Commissioning of Fire Sprinkler System in Emirates
Office

Client
City
Year
Scope

Dolmen Mall
Karachi
2008
Installation of Fire Pump Room with Electric Driven Pump, Diesel
Driven Pump and Jockey Pump 500 GPM

SKILLED POWER DEVELOPMENT

11

SKILLED POWER DEVELOPMENT


A-23, Momin Square, Block-6, Near NIPA, Gulshan-e-Iqbal, Karachi-Pakistan.
Tel: +92-21-34981479 | Email: info@spd.com.pk
www.spd.com.pk