NEELUM JHELUM CONSULTANTS

[JV between MWH-Int, NORPLAN, NESPAK, ACE & NDC]


Malik House, Lower Chatter
Muzaffarabad

Tel: (+92) 58224 33653


Fax: (+92) 58224 32978
e-mail: njc@njproject.com

Date:

31 December 2014

Our ref:
Your ref:

PO-16492
GZBZJ-NJC-7536 (R-14459) dated 03 December 2014

Authorized Project Manager


CGGC-CMEC Consortium
(Office at Site C3), Chatter Kalas,
Muzaffarabad

DELIVERY: BY HAND

ATTENTION: MR HU QUANGUANG
NEELUM JHELUM HYDRO-ELECTRIC PROJECT
C3/E1: OVERALL LAYOUT OF 525KV SWITCHYARD

Dear Sir
This is with reference to your letter mentioned above under Your Ref.
We have reviewed your submittal and we have given our comments on the following drawings:
Sr.
No.

Drawing No.

Drawing Title

Rev.

278E54-C3-2001 (1/4)

Overall Layout of 525kV Switchyard (1/4)

13

278E54-C3-2001 (2/4)

Overall Layout of 525kV Switchyard (2/4)

13

278E54-C3-2001 (3/4)

Overall Layout of 525kV Switchyard (3/4)

10

278E54-C3-2001 (4/4)

Overall Layout of 525kV Switchyard (4/4)

Status
Approved Except
as Noted
Approved Except
as Noted
Approved Except
as Noted
Approved Except
as Noted

The status of each drawing is also indicated in the above Table. Please incorporate our comments and
resubmit your submittal at the earliest.
Further, we have attached a Sample Sheet wherein NJCs comments and Contractors responses are
indicated. Please provide a similar sheet.

Yours faithfully
for NEELUM JHELUM CONSULTANTS

(for) WILLIAM B. DOBBS, P.E.


Project Manager

Encl:
Filing
Owner:
Printed:
Author:

Status:

As stated
130, 560
Neelum Jhelum Consultants
31 December 2014
PE Electrical

Final

Distribution:

Addressee
CEO(NJHPC);GM&PD
PM / DTL
CMEC Group
CRE-E&M / CRE-C3
Electrical
File
Doc ref: PO 16492 C3-E1 Overall Layout of 525kV Switchyard

Agreed that it is no more present.


Please remove it from this drawing.

For the Revenue Metering Panel House. Please submit the


Drawings for Layout of Equipment, Trenches and Cable Trays,
Lighting and Small Power, Fire Alarm and Communication,
Grounding Conductor Layout, Lightning Protection, Ventilation and
Air-conditioning at the earliest.

Whey have you have again sent the


drawings without correcting the size of
this symbol. Please correct the same in
your next Revision of this Drawing.

Submit Trenches
Details of this Room.
Also submit
Electrical Panels and
Conduits layout
Drawings

Please coordinate the trench size and


requirement with Control Building
cable trench layout Drawing No.
278E55-C3-20-030 Rev.5. Please
note only Single Trench of width
1200mm is shown in the above said
Drawing.

DISCLAIMER

CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT
AND COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND
SUBSEQUENT AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING
AND SELECTION IN ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS,
AND ITS OWN CALCULATIONS; FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS;
FOR PHYSICAL DIMENSIONS TO BE CONFIRMED AND CORRELATED AT THE JOB SITE; FOR
INFORMATION THAT PERTAINS SOLELY TO THE FABRICATION PROCESS AND TO TECHNIQUES OF
CONSTRUCTION; AND FOR COORDINATION OF ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

31.12.14
___________
Clause SP 6.2.4 refers

Refer. PO # 16492

Approximate

Indicate material and Dimensions of the items here (Typ.)

APPROVED EXCEPT
AS NOTED
DISCLAIMER

CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT
AND COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND
SUBSEQUENT AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING
AND SELECTION IN ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS,
AND ITS OWN CALCULATIONS; FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS;
FOR PHYSICAL DIMENSIONS TO BE CONFIRMED AND CORRELATED AT THE JOB SITE; FOR
INFORMATION THAT PERTAINS SOLELY TO THE FABRICATION PROCESS AND TO TECHNIQUES OF
CONSTRUCTION; AND FOR COORDINATION OF ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

Reviewed

___________

Checked

___________

Date

31.12.14
_
__________
Clause SP 6.2.4 refers

Refer. PO # 16492

Please note that a mesh of overhead Lightning Protection Shield Wires and Lightning Rods are installed on the Lightning Masts on Top of the Substations (Gantry) Frames Columns. These Shield wires and
Lightning Rods need to be earthed with a direct connection to the buried Earthing Grid of the Switchyard. Therefore, one leg of Each Column must have a Copper Grounding Conductor with one end connected to
the Overhead Shield Wire and Lightning Rod using a bimetallic connector and the other end connected to the Earthing Grid by CADWELD. (Typical for all the Gantry Steel Columns)
Contractor to follow the following Contract (Volume 2D, Part D) Clauses:
Clause 11.3.3 - "The Contractor Shall Provide ---- Drawings showing the overhead earth conductor system for the 525kV Switchyard. The drawings shall also comprise information about the connection between
overhead and underground system."
Clause 11.4.3 - " Each item shall be directly connected to an earthing conductor and not with a series connection through other metallic parts"

Show the Foundation


Slab (Typical)

DISCLAIMER

CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE


PROJECT AND COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS
AND SUBSEQUENT AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR
EQUIPMENT SIZING AND SELECTION IN ACCORDANCE WITH TECHNICAL GUARANTEES,
APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS; FOR LOGIC AND ACCURACY OF
SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE CONFIRMED AND
CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION
OF ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

31.12.14
_
__________
Clause SP 6.2.4 refers

Refer. PO # 16492

DISCLAIMER

CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE


PROJECT AND COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS
AND SUBSEQUENT AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR
EQUIPMENT SIZING AND SELECTION IN ACCORDANCE WITH TECHNICAL GUARANTEES,
APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS; FOR LOGIC AND ACCURACY OF
SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE CONFIRMED AND
CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION
OF ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

31.12.14
_
__________
Clause SP 6.2.4 refers

Refer. PO # 16492