Date:
31 December 2014
Our ref:
Your ref:
PO-16492
GZBZJ-NJC-7536 (R-14459) dated 03 December 2014
DELIVERY: BY HAND
ATTENTION: MR HU QUANGUANG
NEELUM JHELUM HYDRO-ELECTRIC PROJECT
C3/E1: OVERALL LAYOUT OF 525KV SWITCHYARD
Dear Sir
This is with reference to your letter mentioned above under Your Ref.
We have reviewed your submittal and we have given our comments on the following drawings:
Sr.
No.
Drawing No.
Drawing Title
Rev.
278E54-C3-2001 (1/4)
13
278E54-C3-2001 (2/4)
13
278E54-C3-2001 (3/4)
10
278E54-C3-2001 (4/4)
Status
Approved Except
as Noted
Approved Except
as Noted
Approved Except
as Noted
Approved Except
as Noted
The status of each drawing is also indicated in the above Table. Please incorporate our comments and
resubmit your submittal at the earliest.
Further, we have attached a Sample Sheet wherein NJCs comments and Contractors responses are
indicated. Please provide a similar sheet.
Yours faithfully
for NEELUM JHELUM CONSULTANTS
Encl:
Filing
Owner:
Printed:
Author:
Status:
As stated
130, 560
Neelum Jhelum Consultants
31 December 2014
PE Electrical
Final
Distribution:
Addressee
CEO(NJHPC);GM&PD
PM / DTL
CMEC Group
CRE-E&M / CRE-C3
Electrical
File
Doc ref: PO 16492 C3-E1 Overall Layout of 525kV Switchyard
Submit Trenches
Details of this Room.
Also submit
Electrical Panels and
Conduits layout
Drawings
DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT
AND COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND
SUBSEQUENT AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING
AND SELECTION IN ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS,
AND ITS OWN CALCULATIONS; FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS;
FOR PHYSICAL DIMENSIONS TO BE CONFIRMED AND CORRELATED AT THE JOB SITE; FOR
INFORMATION THAT PERTAINS SOLELY TO THE FABRICATION PROCESS AND TO TECHNIQUES OF
CONSTRUCTION; AND FOR COORDINATION OF ELECTRICAL DESIGN WITH OTHER DISCIPLINES.
APPROVED EXCEPT
AS NOTED
Reviewed
___________
Checked
___________
Date
31.12.14
___________
Clause SP 6.2.4 refers
Refer. PO # 16492
Approximate
APPROVED EXCEPT
AS NOTED
DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT
AND COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND
SUBSEQUENT AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING
AND SELECTION IN ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS,
AND ITS OWN CALCULATIONS; FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS;
FOR PHYSICAL DIMENSIONS TO BE CONFIRMED AND CORRELATED AT THE JOB SITE; FOR
INFORMATION THAT PERTAINS SOLELY TO THE FABRICATION PROCESS AND TO TECHNIQUES OF
CONSTRUCTION; AND FOR COORDINATION OF ELECTRICAL DESIGN WITH OTHER DISCIPLINES.
Reviewed
___________
Checked
___________
Date
31.12.14
_
__________
Clause SP 6.2.4 refers
Refer. PO # 16492
Please note that a mesh of overhead Lightning Protection Shield Wires and Lightning Rods are installed on the Lightning Masts on Top of the Substations (Gantry) Frames Columns. These Shield wires and
Lightning Rods need to be earthed with a direct connection to the buried Earthing Grid of the Switchyard. Therefore, one leg of Each Column must have a Copper Grounding Conductor with one end connected to
the Overhead Shield Wire and Lightning Rod using a bimetallic connector and the other end connected to the Earthing Grid by CADWELD. (Typical for all the Gantry Steel Columns)
Contractor to follow the following Contract (Volume 2D, Part D) Clauses:
Clause 11.3.3 - "The Contractor Shall Provide ---- Drawings showing the overhead earth conductor system for the 525kV Switchyard. The drawings shall also comprise information about the connection between
overhead and underground system."
Clause 11.4.3 - " Each item shall be directly connected to an earthing conductor and not with a series connection through other metallic parts"
DISCLAIMER
APPROVED EXCEPT
AS NOTED
Reviewed
___________
Checked
___________
Date
31.12.14
_
__________
Clause SP 6.2.4 refers
Refer. PO # 16492
DISCLAIMER
APPROVED EXCEPT
AS NOTED
Reviewed
___________
Checked
___________
Date
31.12.14
_
__________
Clause SP 6.2.4 refers
Refer. PO # 16492