Task (Steps)
Potential Hazard
Sharp edges of tools and equipment that
are not easily spotted.
Preparation and
hauling of tools and
equipment prior to
start of work.
Positioning of
equipment:
Trailer trucks,
Boom truck and
Cranes.
Existing Control
Secure approve and appropriate
work permit prior to start of work.
Safe access and walk ways shall be
provide and free from any
obstruction.
Provide proper personal protective
equipment to all employees as per
project requirement assigned for the
activity.
Current Risk
Prob. Risk
Cons.
Additional Control
All employees that will be mobilize/assign at site must be inducted by
SAMSUNG C&T HSE Dept.
Good housekeeping must be maintained at the work area.
Sharp and pointed edged materials and equipment will be segregated and
stored properly.
Adequate lighting will be provided during night time works and in low
visibility areas.
Directional signboards shall be provided and appropriate access
illumination shall maintain at dark areas or during night works.
Sharp and pointed edges of equipment that are not possible to remove
shall be provided with softener, protection or to be barricaded.
Cons.
Final Risk
Prob. Risk
Task (Steps)
Potential Hazard
Existing Control
Current Risk
Prob. Risk
Cons.
Additional Control
Cons.
Final Risk
Prob. Risk
Unsecured load.
Over speeding.
Transport of
Electrical Testing
Equipment:
High voltage testing
equipment.
Low voltage testing
equipment
Crane outriggers shall be position for at least 2 meters away from the
edge of excavation.
Underground utilities/facilities shall be identified and mark with
necessary additional protection when positioning the crane.
Locking pins for outriggers shall be utilized during crane operations.
Provide additional softener for sharp edged materials prior for securing
the load.
All tools must be inspected, color coded and in good condition prior to
use.
No one shall pass or stay underneath of suspended load.
Operator must aware with the appropriate rigging hardware and chain
blocks or pullers to be use.
Operators must conduct visual inspection with their respective units prior
to operate.
Issues regarding unauthorized operating of equipment shall be discuss
during tool box meeting with the corresponding disciplinary rules/action.
Wind speed monitoring shall be log or posted on site for the awareness
of other equipments without anemometer or wind meter device.
Use minimum of two (2) taglines to control load movement.
Ensure all cranes are retracted every end of shift and to be park in a
designated equipment parking area.\
Rigging in charge shall be responsible to disseminate the winds velocity
monitoring to all lifting equipment.
Task (Steps)
Potential Hazard
Unsecured tools, materials
Electrical
equipment/instrument
/tools for testing:
Housekeeping/Use
of hand tools for
Testing.
Existing Control
Current Risk
Prob. Risk
Additional Control
Cons.
Use lifting equipment if the load to be carried is too heavy for manual
lifting.
Proper communication must be maintained between working groups and
discipline.
Access ways and walk ways must be free from any obstruction and
spills.
Material management and housekeeping shall be maintained on, before
and during the execution of work.
Use mechanical aid (e.g. forklift, wheelbarrow, pallet truck, cranes, etc.)
Cons.
Final Risk
Prob. Risk
Task (Steps)
Potential Hazard
Existing Control
Current Risk
Prob. Risk
Unsafe condition.
or
Use of scaffold
structure.
Final Risk
Prob. Risk
Cons.
electrical
Testing of electrical
cables and Busbar.
6
Only qualified/competent
electricians to inspect all electrical
system prior to work.
Damaged equipment shall be
immediately removed at work area.
Wear appropriate PPEs for the job.
Faulty / exposed
connections.
Additional Control
Cons.
Task (Steps)
Potential Hazard
Existing Control
Current Risk
Prob. Risk
Cons.
Additional Control
Cons.
Final Risk
Prob. Risk
Workers/employees/staff to be
assigned in work at heights must be
trained by Samsung C&T HSE
department.
Working at Heights.
Task (Steps)
Potential Hazard
Existing Control
Current Risk
Prob. Risk
Additional Control
Cons.
Cons.
Final Risk
Prob. Risk
Task (Steps)
Potential Hazard
Prepared By:
A - Architect (Architect engaged by Samsung C&T)
PM Project Manager
CM Construction Manager
LM Logistics Manager
PLM Plant Manager
HSEM HSE Manager
PS Project Supervisor (Samsung C&T / Subcontractor)
SC Subcontractor
Severity (S)
1
2
3
4
5
Current Risk
Prob. Risk
Existing Control
Minor Injury
Major Single Injury
Major Multiple Injuries
Single Death
Multiple Deaths
Frequency (F)
1
2
3
4
5
Additional Control
Cons.
Improbable
Possible
Occasional
Frequent
Regular
Cons.
Very High
15-25
S
5
4
3
2
1
5
25
20
15
10
5
High
8-12
4
20
16
12
8
4
Medium
4-6
3
15
12
9
6
3
Johnson M Joseph
NAME
HSSE ENGR. II
Designation
Signature
Date
Signature
Date
Signature
Date
Signature
Date
HSE Department
Management
John M Bosco
CONSTRUCTION MANAGER
NAME
Designation
Varun S Nath
HSSE ENGR. II
NAME
Designation
S. Baskaran
Managing Director
NAME
Designation
Final Risk
Prob. Risk
2
10
8
6
4
2
Low
1-3
1
5
4
3
2
1