United States Department of the Interior

National Park Service

Class A Construction Cost Estimate

BASIS OF ESTIMATE

PROJECT INFORMATION
Project:

Project Name

Park:
Park Apha:
PMIS:
Estimate Date:
Prepared By:
Company:
Address:
City, State Zip:
Phone:

Park Name
Park Alpha Code
TBD or PMIS number if known
Estimate Date
Estimator Name
Company
Address
City
Phone

BACKGROUND SUPPORTING MATERIAL (Scope of Work):


Briefly describe scope of work included in the estimate, plan dates, exclusions, etc. List any Government Furnished Property
(GFP)

SOURCE OF COST DATA:


Document all sources of cost information used in the estimate. (Attach additional information if necessary)

ESTIMATE ASSUMPTIONS:
Describe any assumptions made to prepare estimate and highlight areas needing clarification for future estimates.

MAJOR CHANGES FROM PREVIOUS ESTIMATE:


Describe any major changes in scope of work, materials, systems, assumptions, etc. from the previous estimate version.

309532934.xls
Basis of Estimate

Page 1 of 86

Print Date: 03/13/2016

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

BASIS OF ESTIMATE

PROJECT INFORMATION
Project:

Project Name

Park:
Park Name
Describe any major changes
in scope of work, materials, systems, assumptions, etc. from the previous estimate version.
Park Apha:
Park Alpha Code
PMIS:
TBD or PMIS number if known
Estimate Date: Estimate Date

309532934.xls
Basis of Estimate

Page 2 of 86

Print Date: 03/13/2016

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

BASIS OF ESTIMATE

PROJECT INFORMATION
Project:

Project Name

Park:
Park Apha:
PMIS:
Estimate Date:

Park Name
Park Alpha Code
TBD or PMIS number if known
Estimate Date

DESCRIPTION OF MARK-UP & ADD-ONS:


Design Contingency:

0.00%

Explain & Justify

Standard. General Conditions:

0.00%

Explain & Justify

Government General Conditions:

0.00%

Explain & Justify

Contractor Overhead:

0.00%

Explain & Justify

Contractor Profit:

0.00%

Explain & Justify

Contracting Method Adjustment:

0.00%

Describe anticipated contract method and justify value used.

Annual Inflation Escalation Factor:

0.00%

Projected annual inflation rate.

Time Until Project Midpoint (Months)

Number of months from estimate (or data) date until the projects
midpoint of construction.

OTHER COMMENTS:
Provide any additional information, qualifications, etc.

309532934.xls
Basis of Estimate

Page 3 of 86

Print Date: 03/13/2016

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

PROJECT COST SUMMARY


Project: Project Name
Park: Park Name

Estimate By:
Date:

Park Alpha: Park Alpha Code


PMIS Number: TBD or PMIS number if known

Bid Item No.

Bid Item Description

Reviewed By:
Date:

Total Material
Cost

Total Labor
Cost

Total
Equipment
Cost

Total Direct
Construction
Costs

Design
Contingency

Total - Bid Item


Bid Item:
2

Total - Bid Item


Bid Item:
3

Total - Bid Item


Bid Item:
4

Total - Bid Item


Bid Item:
5

Total - Bid Item

309532934.xls
Project Cost Summary

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

1 Asset / Project Element 1


Asset / Project Element 2
WBS L2

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

Asset / Project Element 2


Asset / Project Element 3
2

WBS L2

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

Asset / Project Element 3


Asset / Project Element 4
3

WBS L2

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

Asset / Project Element 4


Asset / Project Element 5
4

WBS L2

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

Asset / Project Element 5

General
Contractor
Profit

Contracting
Method
Adjustment

Inflation
Escalation
APR

Month
s

0.00%
0
0.00%
0.00%
0.00%
TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any):

0.00%

Asset / Project Element 1


WBS L2

General
Contractor
Overhead

General
Conditions

0.00%

Bid Item:

Estimator Name
Estimate Date

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any):

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any):

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any):

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any):

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
$
$

Page 4 of 86

Print Date: 03/13/2016, 02:26:22

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

PROJECT COST SUMMARY


Project: Project Name
Park: Park Name

Estimate By:
Date:

Park Alpha: Park Alpha Code


PMIS Number: TBD or PMIS number if known

Bid Item No.

Bid Item Description

Reviewed By:
Date:

Total Material
Cost

Total Labor
Cost

Total
Equipment
Cost

Total Direct
Construction
Costs

Design
Contingency

Total - Bid Item


Bid Item:
7

Total - Bid Item


Bid Item:
8

Total - Bid Item


Bid Item:
9

Total - Bid Item


Bid Item:
10

Total - Bid Item

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

6 Asset / Project Element 6


Asset / Project Element 7
WBS L2

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

Asset / Project Element 7


Asset / Project Element 8
7

WBS L2

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

Asset / Project Element 8


Asset / Project Element 9
8

WBS L2

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

Asset / Project Element 9


Asset / Project Element 10
9

WBS L2

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

WBS L2

WBS Description

10 Asset / Project Element 10

Total Bid Items 1-10

309532934.xls
Project Cost Summary

General
Contractor
Profit

Contracting
Method
Adjustment

Inflation
Escalation
APR

Month
s

0.00%
0
0.00%
0.00%
0.00%
TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any):

0.00%

Asset / Project Element 6


WBS L2

General
Contractor
Overhead

General
Conditions

0.00%

Bid Item:

Estimator Name
Estimate Date

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any):

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any):

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any):

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any):

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
$
$

Page 5 of 86

Print Date: 03/13/2016, 02:26:22

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

PROJECT COST SUMMARY


Estimator Name
Estimate Date

Bid Item Total

309532934.xls
Project Cost Summary

Page 6 of 86

Print Date: 03/13/2016, 02:26:22

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

PROJECT COST SUMMARY


Estimator Name
Estimate Date

Bid Item Total

309532934.xls
Project Cost Summary

Page 7 of 86

Print Date: 03/13/2016, 02:26:22

United States Department of the Interior


National Park Service
Class A Construction Cost Estimate

BID ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS Number:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known
Bid Item Number
BID ITEM 1

Item
No.

WBS

Description

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

A10
A20
B10
B20
B30
C10
C20
C30
D10
D20
D30
D40
D50
E10
E20
F10
F20
G10
G20
G30
G40
G50
XX
XX
XX

Foundations
Basement Construction
Superstructure
Exterior Enclosure
Roofing
Interior Construction
Stairs
Interior Finishes
Conveying Systems
Plumbing Systems
HVAC
Fire Protection
Electrical
Equipment
Furnishings
Special Construction
Selective Building Demolition
Site Preparation
Site Improvements
Site Mechanical Utilities
Site Electrical Utilities
Other Site Construction
Special Use - 1
Special Use - 2
Special Use - 3
Subtotal Direct Construction Costs

Estimate By:
Date:
Reviewed By:
Date:
Asset / Project Element / Description
Asset / Project Element / Description

Material
Cost/Unit
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

Total Material
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

Size/Count
0

Estimator Name
Estimate Date

Units
Unit

Labor Cost/Unit Total Labor Cost


#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

Total Value of Government Furnished Property (GFP) Inc. in Direct Cost .


$0.00
$
Direct Cost Subtotal without GFP . $
$
Design Contingency
0.00%
Total Direct Construction Costs
Standard General Conditions
0.00%
Applied to Total Direct Construction Cost less GFP
Government General Conditions
0.00%
Applied to Total Direct Construction Cost less GFP
Subtotal NET Construction Cost
Overhead
0.00%
Profit
0.00%
Estimated NET Construction Cost
Contracting Method Adjustment
0.00%
Annual Rate =
Inflation Escalation
0
Months

Total Estimated NET Cost of Construction

0.00%

Equipment
Cost/Unit
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

Total Equipment
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

$
$

Direct
Cost/Unit

Total Direct
Costs

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
$

Inc. Bonds & CMA

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

NET Cost/Unit
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0

Total NET Costs

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

In most cases GFP is normally zero see footnote-

$0
$0

GFP costs only apply when the Government pre-purchases items, or provides other materials out of Government inventory, to be installed by contractor. Adjustments and Markup on GFP only include Inflation Escalation; No other
adjustment factors or O&P markup have been applied.
309532934.xls
Bid Item 1 Summary

Page 8 of 86

Print Date: 03/13/2016, 02:26:22

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: A10 Foundations

Total Cost:
MATERIAL

Uniformat II WBS
Code
A1010
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

STANDARD FOUNDATIONS
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

STANDARD FOUNDATIONS

Unit

Quantity

Unit

Material
Cost/Unit

SPECIAL FOUNDATIONS
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

SPECIAL FOUNDATIONS

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

A1020
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

309532934.xls, Item 1 - A10 - Foundations

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

9 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:22

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: A10 Foundations

Total Cost:
MATERIAL

Uniformat II WBS
Code
A1030
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

SLAB ON GRADE
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

SLAB ON GRADE

Unit

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

309532934.xls, Item 1 - A10 - Foundations

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

10 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: A10 Foundations

Total Cost:
MATERIAL

Uniformat II WBS
Code
BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

$0

TOTALS

Total
Equipment
Cost

Total Cost

#DIV/0!

EQUIPMENT

Total Labor
Cost

TOTALS

Total
Equipment
Cost

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

Summary Item: A10 Foundations


MATERIAL
Uniformat II WBS
Code

A10

Description

Foundations

309532934.xls, Item 1 - A10 - Foundations

Quantity

Unit

Unit

Material
Cost/Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

#DIV/0!

11 of 86

$0

#DIV/0!

EQUIPMENT

Total Labor
Cost
$0

Equipment
Cost/Unit
#DIV/0!

TOTALS

Total
Equipment
Cost
$0

Total
Cost/Unit
#DIV/0!

Total Cost

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: A20 Basement Construction

Total Cost:
MATERIAL

Uniformat II WBS
Code
A2010
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASEMENT EXCAVATION
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASEMENT EXCAVATION

Unit

Quantity

Unit

Material
Cost/Unit

BASEMENT WALLS
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASEMENT WALLS

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

A2020
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

309532934.xls, Item 1-A20 Basement

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

12 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS
Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: A20 Basement Construction

Total Cost:
MATERIAL

Uniformat II WBS
Code
BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

309532934.xls, Item 1-A20 Basement

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

13 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: A20 Basement Construction

Total Cost:
MATERIAL

Uniformat II WBS
Code
BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

$0

TOTALS

Total
Equipment
Cost

Total Cost

#DIV/0!

EQUIPMENT

Total Labor
Cost

TOTALS

Total
Equipment
Cost

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

Summary Item: A20 Basement Construction


MATERIAL
Uniformat II WBS
Code

A20

Description

Basement Construction

309532934.xls, Item 1-A20 Basement

Quantity

Unit

Unit

Material
Cost/Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

#DIV/0!

14 of 86

$0

#DIV/0!

EQUIPMENT

Total Labor
Cost
$0

Equipment
Cost/Unit
#DIV/0!

TOTALS

Total
Equipment
Cost
$0

Total
Cost/Unit
#DIV/0!

Total Cost

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: B10 Superstructure

Total Cost:
MATERIAL

Uniformat II WBS
Code
B1010
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

1000

Unit

Quantity

Unit

Material
Cost/Unit

ROOF CONSTRUCTION
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

ROOF CONSTRUCTION

Unit

FLOOR CONSTRUCTION
Description
Description
Description
Description
Description
Description
Description
Description

FLOOR CONSTRUCTION

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

$
$
$
$
$
$
$
$

$0 $

MATERIAL
Uniformat II WBS
Code
B1020
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

309532934.xls, Item 1-B10 Superstructure

15 of 86

Equipment
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

$
$
$
$
$
$
$
$

$0 $

LABOR

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

Total Labor
Cost

Total Material
Labor
Cost
Cost/Unit

EQUIPMENT

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

Total
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

$
$
$
$
$
$
$
$

$0 $

EQUIPMENT

Total Labor
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

$0

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: B10 Superstructure

Total Cost:
MATERIAL

Uniformat II WBS
Code
BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

309532934.xls, Item 1-B10 Superstructure

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

16 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: B10 Superstructure

Total Cost:
MATERIAL

Uniformat II WBS
Code
BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

$0

TOTALS

Total
Equipment
Cost

Total Cost

#DIV/0!

EQUIPMENT

Total Labor
Cost

TOTALS

Total
Equipment
Cost

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

Summary Item: B10 Superstructure


MATERIAL
Uniformat II WBS
Code

B10

Description

Superstructure

309532934.xls, Item 1-B10 Superstructure

Quantity

Unit

Unit

Material
Cost/Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

#DIV/0!

17 of 86

$0

#DIV/0!

EQUIPMENT

Total Labor
Cost
$0

Equipment
Cost/Unit
#DIV/0!

TOTALS

Total
Equipment
Cost
$0

Total
Cost/Unit
#DIV/0!

Total Cost

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

OP

Summary Item: B20 Exterior Enclosure

Total Cost:
MATERIAL

Uniformat II WBS
Code
B2010
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

EXTERIOR WALLS
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

EXTERIOR WALLS

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

B2020
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

EXTERIOR WINDOWS
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

EXTERIOR WINDOWS

Unit

309532934.xls, Item 1-B20 Exterior Enclosure

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

18 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

OP

Summary Item: B20 Exterior Enclosure

Total Cost:
MATERIAL

Uniformat II WBS
Code
B2030
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

EXTERIOR DOORS
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

EXTERIOR DOORS

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

309532934.xls, Item 1-B20 Exterior Enclosure

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

19 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

OP

Summary Item: B20 Exterior Enclosure

Total Cost:
MATERIAL

Uniformat II WBS
Code
BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

$0

TOTALS

Total
Equipment
Cost

Total Cost

#DIV/0!

EQUIPMENT

Total Labor
Cost

TOTALS

Total
Equipment
Cost

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

Summary Item: B20 Exterior Enclosure


MATERIAL
Uniformat II WBS
Code

B20

Description

Exterior Enclosure

309532934.xls, Item 1-B20 Exterior Enclosure

Quantity

Unit

Unit

Material
Cost/Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

#DIV/0!

20 of 86

$0

#DIV/0!

EQUIPMENT

Total Labor
Cost
$0

Equipment
Cost/Unit
#DIV/0!

TOTALS

Total
Equipment
Cost
$0

Total
Cost/Unit
#DIV/0!

Total Cost

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: B30 Roofing

Total Cost:
MATERIAL

Uniformat II WBS
Code
B3010
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

ROOF COVERINGS
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

ROOF COVERINGS

Unit

Quantity

Unit

Material
Cost/Unit

ROOF OPENINGS
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

ROOF OPENINGS

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

B3020
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

309532934.xls, Item 1-B30 Roofing

Description

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

21 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: B30 Roofing

Total Cost:
MATERIAL

Uniformat II WBS
Code
BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

309532934.xls, Item 1-B30 Roofing

Description

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

22 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: B30 Roofing

Total Cost:
MATERIAL

Uniformat II WBS
Code
BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

$0

TOTALS

Total
Equipment
Cost

Total Cost

#DIV/0!

EQUIPMENT

Total Labor
Cost

TOTALS

Total
Equipment
Cost

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

Summary Item: B30 Roofing


MATERIAL
Uniformat II WBS
Code

B30

309532934.xls, Item 1-B30 Roofing

Description

Roofing

Quantity

Unit

Unit

Material
Cost/Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

#DIV/0!

23 of 86

$0

#DIV/0!

EQUIPMENT

Total Labor
Cost
$0

Equipment
Cost/Unit
#DIV/0!

TOTALS

Total
Equipment
Cost
$0

Total
Cost/Unit
#DIV/0!

Total Cost

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: C10 Interior Construction

Total Cost:
MATERIAL

Uniformat II WBS
Code
C1010
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

INTERIOR PARTITIONS
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

INTERIOR PARTITIONS

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

C1020
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

INTERIOR DOORS
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

INTERIOR DOORS

Unit

309532934.xls, Item 1-C10 Interior Construct.

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

24 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: C10 Interior Construction

Total Cost:
MATERIAL

Uniformat II WBS
Code
C1030
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

FITTINGS
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

FITTINGS

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

309532934.xls, Item 1-C10 Interior Construct.

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

25 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: C10 Interior Construction

Total Cost:
MATERIAL

Uniformat II WBS
Code
BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

$0

TOTALS

Total
Equipment
Cost

Total Cost

#DIV/0!

EQUIPMENT

Total Labor
Cost

TOTALS

Total
Equipment
Cost

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

Summary Item: C10 Interior Construction


MATERIAL
Uniformat II WBS
Code

C10

Description

Interior Construction

309532934.xls, Item 1-C10 Interior Construct.

Quantity

Unit

Unit

Material
Cost/Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

#DIV/0!

26 of 86

$0

#DIV/0!

EQUIPMENT

Total Labor
Cost
$0

Equipment
Cost/Unit
#DIV/0!

TOTALS

Total
Equipment
Cost
$0

Total
Cost/Unit
#DIV/0!

Total Cost

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: C20 Stairs

Total Cost:
MATERIAL

Uniformat II WBS
Code
C2010
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

STAIR CONSTRUCTION
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

STAIR CONSTRUCTION

Unit

Quantity

Unit

Material
Cost/Unit

STAIR FINISHES
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

STAIR FINISHES

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

C2020
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

309532934.xls, Item 1-C20 Stairs

Description

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

27 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: C20 Stairs

Total Cost:
MATERIAL

Uniformat II WBS
Code
BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

309532934.xls, Item 1-C20 Stairs

Description

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

28 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: C20 Stairs

Total Cost:
MATERIAL

Uniformat II WBS
Code
BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

$0

TOTALS

Total
Equipment
Cost

Total Cost

#DIV/0!

EQUIPMENT

Total Labor
Cost

TOTALS

Total
Equipment
Cost

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

Summary Item: C20 Stairs


MATERIAL
Uniformat II WBS
Code

C20

309532934.xls, Item 1-C20 Stairs

Description

Stairs

Quantity

Unit

Unit

Material
Cost/Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

#DIV/0!

29 of 86

$0

#DIV/0!

EQUIPMENT

Total Labor
Cost
$0

Equipment
Cost/Unit
#DIV/0!

TOTALS

Total
Equipment
Cost
$0

Total
Cost/Unit
#DIV/0!

Total Cost

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: C30 Interior Finishes

Total Cost:
MATERIAL

Uniformat II WBS
Code
C3010
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

WALL FINISHES
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

WALL FINISHES

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

C3020
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

FLOOR FINISHES
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

FLOOR FINISHES

Unit

309532934.xls, Item 1-C30 Interior Finishes

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

30 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS
Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: C30 Interior Finishes

Total Cost:
MATERIAL

Uniformat II WBS
Code
C3030
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

CEILING FINISHES
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

CEILING FINISHES

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

309532934.xls, Item 1-C30 Interior Finishes

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

31 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: C30 Interior Finishes

Total Cost:
MATERIAL

Uniformat II WBS
Code
BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

$0

TOTALS

Total
Equipment
Cost

Total Cost

#DIV/0!

EQUIPMENT

Total Labor
Cost

TOTALS

Total
Equipment
Cost

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

Summary Item: C30 Interior Finishes


MATERIAL
Uniformat II WBS
Code

C30

Description

Interior Finishes

309532934.xls, Item 1-C30 Interior Finishes

Quantity

Unit

Unit

Material
Cost/Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

#DIV/0!

32 of 86

$0

#DIV/0!

EQUIPMENT

Total Labor
Cost
$0

Equipment
Cost/Unit
#DIV/0!

TOTALS

Total
Equipment
Cost
$0

Total
Cost/Unit
#DIV/0!

Total Cost

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: D10 Conveying Systems

Total Cost:
MATERIAL

Uniformat II WBS
Code
D1010
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

ELEVATORS
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

ELEVATORS

Unit

Quantity

Unit

Material
Cost/Unit

ESCALATORS & MOVING WALKS


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

ESCALATORS & MOVING WALKS

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

D1020
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

309532934.xls, Item 1-D10 Conveying Systems

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

33 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: D10 Conveying Systems

Total Cost:
MATERIAL

Uniformat II WBS
Code
D1030
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

MATERIAL HANDLING SYSTEMS


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

MATERIAL HANDLING SYSTEMS

Unit

Quantity

Unit

Material
Cost/Unit

OTHER CONVEYING SYSTEMS


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

OTHER CONVEYING SYSTEMS

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

D1090
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

309532934.xls, Item 1-D10 Conveying Systems

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

34 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: D10 Conveying Systems

Total Cost:
MATERIAL

Uniformat II WBS
Code
BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

$0

TOTALS

Total
Equipment
Cost

Total Cost

#DIV/0!

EQUIPMENT

Total Labor
Cost

TOTALS

Total
Equipment
Cost

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

Summary Item: D10 Conveying Systems


MATERIAL
Uniformat II WBS
Code

D10

Description

Conveying Systems

309532934.xls, Item 1-D10 Conveying Systems

Quantity

Unit

Unit

Material
Cost/Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

#DIV/0!

35 of 86

$0

#DIV/0!

EQUIPMENT

Total Labor
Cost
$0

Equipment
Cost/Unit
#DIV/0!

TOTALS

Total
Equipment
Cost
$0

Total
Cost/Unit
#DIV/0!

Total Cost

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: D20 Plumbing Systems

Total Cost:
MATERIAL

Uniformat II WBS
Code
D2010
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

PLUMBING FIXTURES
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

PLUMBING FIXTURES

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

D2020
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

DOMESTIC WATER DISTRIBUTION


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

DOMESTIC WATER DISTRIBUTION

Unit

309532934.xls, Item 1-D20 Plumbing

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

36 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: D20 Plumbing Systems

Total Cost:
MATERIAL

Uniformat II WBS
Code
D2030
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

SANITARY WASTE
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

SANITARY WASTE

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

D2040
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

RAIN WATER DRAINAGE


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

RAIN WATER DRAINAGE

Unit

309532934.xls, Item 1-D20 Plumbing

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

37 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: D20 Plumbing Systems

Total Cost:
MATERIAL

Uniformat II WBS
Code
D2050
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

SPECIAL PLUMBING SYSTEMS


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

SPECIAL PLUMBING SYSTEMS

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

D2090
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

OTHER PLUMBING SYSTEMS


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

OTHER PLUMBING SYSTEMS

Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

$0

TOTALS

Total
Equipment
Cost

Total Cost

#DIV/0!

EQUIPMENT

Total Labor
Cost

TOTALS

Total
Equipment
Cost

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

Summary Item: D20 Plumbing Systems


MATERIAL
Uniformat II WBS
Code

D20

Description

Plumbing Systems

309532934.xls, Item 1-D20 Plumbing

Quantity

Unit

Unit

Material
Cost/Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

#DIV/0!

38 of 86

$0

#DIV/0!

EQUIPMENT

Total Labor
Cost
$0

Equipment
Cost/Unit
#DIV/0!

TOTALS

Total
Equipment
Cost
$0

Total
Cost/Unit
#DIV/0!

Total Cost

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: D30 HVAC

Total Cost:
MATERIAL

Uniformat II WBS
Code
D3010
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

ENERGY SUPPLY
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

ENERGY SUPPLY

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

D3020
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

309532934.xls, Item 1-D30 HVAC

Description

Quantity

Unit

Material
Cost/Unit

HEAT GENERATING SYSTEMS


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

HEAT GENERATING SYSTEMS

Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

39 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: D30 HVAC

Total Cost:
MATERIAL

Uniformat II WBS
Code
D3030
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

COOLING GENERATING SYSTEMS


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

COOLING GENERATING SYSTEMS

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

D3040
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

309532934.xls, Item 1-D30 HVAC

Description

Quantity

Unit

Material
Cost/Unit

DISTRIBUTION SYSTEMS (HVAC)


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

DISTRIBUTION SYSTEMS (HVAC)

Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

40 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: D30 HVAC

Total Cost:
MATERIAL

Uniformat II WBS
Code
D3050
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

TERMINAL & PACKAGE UNITS


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

TERMINAL & PACKAGE UNITS

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

G3060
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

309532934.xls, Item 1-D30 HVAC

Description

Quantity

Unit

Material
Cost/Unit

CONTROLS & INSTRUMENTATION


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

CONTROLS & INSTRUMENTATION

Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

41 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: D30 HVAC

Total Cost:

MATERIAL
Uniformat II WBS
Code
G3070
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

SPECIAL HVAC SYSTEMS & EQUIPMENT


Description
Description
Description
Description
Description
Description
Description
Description
SPECIAL HVAC SYSTEMS &

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

EQUIPMENT

Unit

Quantity

Unit

Material
Cost/Unit

SYSTEM TESTING & BALANCING


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

SYSTEM TESTING & BALANCING

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

G3080
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

309532934.xls, Item 1-D30 HVAC

Description

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

42 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: D30 HVAC

Total Cost:
MATERIAL

Uniformat II WBS
Code
G3090
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

OTHER HVAC SYSTEMS & EQUIPMENT


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

OTHER HVAC SYSTEMS & EQUIPMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

$
$
$
$
$
$
$
$

EQUIPMENT

Total Labor
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

Summary Item: D30 HVAC


MATERIAL
Uniformat II WBS
Code

Description

Quantity

Unit

D30

HVAC

Unit

309532934.xls, Item 1-D30 HVAC

Material
Cost/Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

#DIV/0!

43 of 86

$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

Equipment
Cost/Unit

#DIV/0!

TOTALS

Total
Equipment
Cost
$0

Total
Cost/Unit

#DIV/0!

Total Cost

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: D40 Fire Protection

Total Cost:
MATERIAL

Uniformat II WBS
Code
D4010
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

FIRE PROTECTION SPRINKLERS SYSTEMS


Description
Description
Description
Description
Description
Description
Description
Description
FIRE PROTECTION SPRINKLERS

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

SYSTEMS

Unit

Quantity

Unit

Material
Cost/Unit

STANDPIPE & HOSE SYSTEMS


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

STANDPIPE & HOSE SYSTEMS

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

D4020
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

309532934.xls, Item 1-D40 Fire Protection

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

44 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: D40 Fire Protection

Total Cost:
MATERIAL

Uniformat II WBS
Code
D4030
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

FIRE PROTECTION SPECIALTIES


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

FIRE PROTECTION SPECIALTIES

Unit

Quantity

Unit

Material
Cost/Unit

OTHER FIRE PROTECTION SYSTEMS


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

OTHER FIRE PROTECTION SYSTEMS

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

D4090
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

309532934.xls, Item 1-D40 Fire Protection

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

45 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: D40 Fire Protection

Total Cost:
MATERIAL

Uniformat II WBS
Code
BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

Quantity

Unit

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

$0

TOTALS

Total
Equipment
Cost

Total Cost

#DIV/0!

EQUIPMENT

Total Labor
Cost

TOTALS

Total
Equipment
Cost

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

Summary Item: D40 Fire Protection


MATERIAL
Uniformat II WBS
Code

D40

Description

Fire Protection

309532934.xls, Item 1-D40 Fire Protection

Material
Cost/Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

#DIV/0!

46 of 86

$0

#DIV/0!

EQUIPMENT

Total Labor
Cost
$0

Equipment
Cost/Unit
#DIV/0!

TOTALS

Total
Equipment
Cost
$0

Total
Cost/Unit
#DIV/0!

Total Cost

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: D50 Electrical

Total Cost:
MATERIAL

Uniformat II WBS
Code

Quantity

Unit

Material
Cost/Unit

ELECTRICAL SERVICE & DISTRIBUTION


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

SUBTOTAL

ELECTRICAL SERVICE & DISTRIBUTION

Unit

Uniformat II WBS
Code

Description

Quantity

Unit

Material
Cost/Unit

LIGHTING & BRANCH WIRING


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

LIGHTING & BRANCH WIRING

Unit

D5010
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

Description

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

D5020
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

309532934.xls, Item 1-D50 Electrical

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

47 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: D50 Electrical

Total Cost:
MATERIAL

Uniformat II WBS
Code
D5030
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

COMMUNICATIONS & SECURITY


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

COMMUNICATIONS & SECURITY

Unit

Quantity

Unit

Material
Cost/Unit

SPECIAL ELECTRICAL SYSTEMS


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

SPECIAL ELECTRICAL SYSTEMS

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

D5040
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

309532934.xls, Item 1-D50 Electrical

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

48 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:23

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: D50 Electrical

Total Cost:
MATERIAL

Uniformat II WBS
Code
D5090
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

OTHER ELECTRICAL SYSTEMS


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

OTHER ELECTRICAL SYSTEMS

Unit

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

Quantity

Unit

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

$0

TOTALS

Total
Equipment
Cost

Total Cost

#DIV/0!

EQUIPMENT

Total Labor
Cost

TOTALS

Total
Equipment
Cost

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

Summary Item: D50 Electrical


MATERIAL
Uniformat II WBS
Code

D50

Description

Electrical

309532934.xls, Item 1-D50 Electrical

Material
Cost/Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

#DIV/0!

49 of 86

$0

#DIV/0!

EQUIPMENT

Total Labor
Cost
$0

Equipment
Cost/Unit
#DIV/0!

TOTALS

Total
Equipment
Cost
$0

Total
Cost/Unit
#DIV/0!

Total Cost

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: E10 Equipment

Total Cost:
MATERIAL

Uniformat II WBS
Code
E1010
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

COMMERCIAL EQUIPMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

COMMERCIAL EQUIPMENT

Unit

Quantity

Unit

Material
Cost/Unit

INSTITUTIONAL EQUIPMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

INSTITUTIONAL EQUIPMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

E1020
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

309532934.xls, Item 1-E10 Equipment

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

50 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: E10 Equipment

Total Cost:
MATERIAL

Uniformat II WBS
Code
E1030
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

VEHICULAR EQUIPMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

VEHICULAR EQUIPMENT

Unit

Quantity

Unit

Material
Cost/Unit

OTHER EQUIPMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

OTHER EQUIPMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

E1090
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

309532934.xls, Item 1-E10 Equipment

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

51 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: E10 Equipment

Total Cost:
MATERIAL

Uniformat II WBS
Code
BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

Quantity

Unit

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

$0

TOTALS

Total
Equipment
Cost

Total Cost

#DIV/0!

EQUIPMENT

Total Labor
Cost

TOTALS

Total
Equipment
Cost

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

Summary Item: E10 Equipment


MATERIAL
Uniformat II WBS
Code

E10

Description

Equipment

309532934.xls, Item 1-E10 Equipment

Material
Cost/Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

#DIV/0!

52 of 86

$0

#DIV/0!

EQUIPMENT

Total Labor
Cost
$0

Equipment
Cost/Unit
#DIV/0!

TOTALS

Total
Equipment
Cost
$0

Total
Cost/Unit
#DIV/0!

Total Cost

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: E20 Furnishings

Total Cost:
MATERIAL

Uniformat II WBS
Code
E2010
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

FIXED FURNISHINGS
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

FIXED FURNISHINGS

Unit

Quantity

Unit

Material
Cost/Unit

MOVABLE FURNISHINGS
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

MOVABLE FURNISHINGS

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

E2020
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

309532934.xls, Item 1-E20 Furnishings

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

53 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS
Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: E20 Furnishings

Total Cost:
MATERIAL

Uniformat II WBS
Code
E2090
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

OTHER FURNISHINGS
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

OTHER FURNISHINGS

Unit

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

309532934.xls, Item 1-E20 Furnishings

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

54 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: E20 Furnishings

Total Cost:
MATERIAL

Uniformat II WBS
Code
BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

Quantity

Unit

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

$0

TOTALS

Total
Equipment
Cost

Total Cost

#DIV/0!

EQUIPMENT

Total Labor
Cost

TOTALS

Total
Equipment
Cost

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

Summary Item: E20 Furnishings


MATERIAL
Uniformat II WBS
Code

E20

Description

Furnishings

309532934.xls, Item 1-E20 Furnishings

Material
Cost/Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

#DIV/0!

55 of 86

$0

#DIV/0!

EQUIPMENT

Total Labor
Cost
$0

Equipment
Cost/Unit
#DIV/0!

TOTALS

Total
Equipment
Cost
$0

Total
Cost/Unit
#DIV/0!

Total Cost

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: F10 Special Construction

Total Cost:
MATERIAL

Uniformat II WBS
Code
F1010
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

SPECIAL STRUCTURES
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

SPECIAL STRUCTURES

Unit

Quantity

Unit

Material
Cost/Unit

INTEGRATED CONSTRUCTION
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

INTEGRATED CONSTRUCTION

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

F1020
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

309532934.xls, Item 1-F10 Special Construction

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

56 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: F10 Special Construction

Total Cost:
MATERIAL

Uniformat II WBS
Code
F1030
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

SPECIAL CONSTRUCTION SYSTEMS


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

SPECIAL CONSTRUCTION SYSTEMS

Unit

Quantity

Unit

Material
Cost/Unit

SPECIAL FACILITIES
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

SPECIAL FACILITIES

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

F1040
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

309532934.xls, Item 1-F10 Special Construction

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

57 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: F10 Special Construction

Total Cost:
MATERIAL

Uniformat II WBS
Code
F1050
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

SPECIAL CONTROLS & INSTRUMENTATION


Description
Description
Description
Description
Description
Description
Description
Description
SPECIAL CONTROLS &

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

INSTRUMENTATION

Unit

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

Quantity

Unit

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

$0

TOTALS

Total
Equipment
Cost

Total Cost

#DIV/0!

EQUIPMENT

Total Labor
Cost

TOTALS

Total
Equipment
Cost

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

Summary Item: F10 Special Construction


MATERIAL
Uniformat II WBS
Code

F10

Description

Special Construction

309532934.xls, Item 1-F10 Special Construction

Material
Cost/Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

#DIV/0!

58 of 86

$0

#DIV/0!

EQUIPMENT

Total Labor
Cost
$0

Equipment
Cost/Unit
#DIV/0!

TOTALS

Total
Equipment
Cost
$0

Total
Cost/Unit
#DIV/0!

Total Cost

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: F20 Selective Building Demolition

Total Cost:
MATERIAL

Uniformat II WBS
Code
F2010
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BUILDING ELEMENTS DEMOLITION


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BUILDING ELEMENTS DEMOLITION

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

F2020
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

HAZARDOUS COMPONENTS ABATEMENT


Description
Description
Description
Description
Description
Description
Description
Description
HAZARDOUS COMPONENTS

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

ABATEMENT

Unit

309532934.xls, Item 1-F20 Selective Demo.

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

59 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: F20 Selective Building Demolition

Total Cost:
MATERIAL

Uniformat II WBS
Code
BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

309532934.xls, Item 1-F20 Selective Demo.

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

60 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: F20 Selective Building Demolition

Total Cost:
MATERIAL

Uniformat II WBS
Code
BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

Quantity

Unit

Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

$0

TOTALS

Total
Equipment
Cost

Total Cost

#DIV/0!

EQUIPMENT

Total Labor
Cost

TOTALS

Total
Equipment
Cost

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

Summary Item: F20 Selective Building Demolition


MATERIAL
Uniformat II WBS
Code

F20

Description

Selective Building Demolition

309532934.xls, Item 1-F20 Selective Demo.

Material
Cost/Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

#DIV/0!

61 of 86

$0

#DIV/0!

EQUIPMENT

Total Labor
Cost
$0

Equipment
Cost/Unit
#DIV/0!

TOTALS

Total
Equipment
Cost
$0

Total
Cost/Unit
#DIV/0!

Total Cost

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: G10 Site Preparation

Total Cost:
MATERIAL

Uniformat II WBS
Code
G1010
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

SITE CLEARING
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

SITE CLEARING

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

G1020
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

SITE DEMOLITION & RELOCATIONS


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

SITE DEMOLITION & RELOCATIONS

Unit

309532934.xls, Item 1-G10 Site Preparation

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

62 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: G10 Site Preparation

Total Cost:
MATERIAL

Uniformat II WBS
Code
G1030
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

SITE EARTHWORK
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

SITE EARTHWORK

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

G1040
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

HAZARDOUS WASTE REMEDIATION


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

HAZARDOUS WASTE REMEDIATION

Unit

309532934.xls, Item 1-G10 Site Preparation

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

63 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: G10 Site Preparation

Total Cost:
MATERIAL

Uniformat II WBS
Code
G1090
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

OTHER SITE PREPARATION


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

OTHER SITE PREPARATION

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

Quantity

Unit

Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

$0

TOTALS

Total
Equipment
Cost

Total Cost

#DIV/0!

EQUIPMENT

Total Labor
Cost

TOTALS

Total
Equipment
Cost

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

Summary Item: G10 Site Preparation


MATERIAL
Uniformat II WBS
Code

G10

Description

Site Preparation

309532934.xls, Item 1-G10 Site Preparation

Material
Cost/Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

#DIV/0!

64 of 86

$0

#DIV/0!

EQUIPMENT

Total Labor
Cost
$0

Equipment
Cost/Unit
#DIV/0!

TOTALS

Total
Equipment
Cost
$0

Total
Cost/Unit
#DIV/0!

Total Cost

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: G20 Site Improvements

Total Cost:
MATERIAL

Uniformat II WBS
Code
G2010
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

ROADWAYS
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

ROADWAYS

Unit

Quantity

Unit

Material
Cost/Unit

PARKING LOTS
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

PARKING LOTS

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

G2020
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

309532934.xls, Item 1-G20 Site Improvements

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

65 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: G20 Site Improvements

Total Cost:
MATERIAL

Uniformat II WBS
Code
G2030
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

PEDESTRIAN PAVING
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

PEDESTRIAN PAVING

Unit

Quantity

Unit

Material
Cost/Unit

SITE DEVELOPMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

SITE DEVELOPMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

G2040
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

309532934.xls, Item 1-G20 Site Improvements

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

66 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: G20 Site Improvements

Total Cost:
MATERIAL

Uniformat II WBS
Code
G2050
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

LANDSCAPING
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

LANDSCAPING

Unit

Quantity

Unit

Material
Cost/Unit

SITE FURNISHINGS
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

SITE FURNISHINGS

Unit

Quantity

Unit

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

G2060
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

$0

TOTALS

Total
Equipment
Cost

Total Cost

#DIV/0!

EQUIPMENT

Total Labor
Cost

TOTALS

Total
Equipment
Cost

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

Summary Item: G20 Site Improvements


MATERIAL
Uniformat II WBS
Code

G20

Description

Site Improvements

309532934.xls, Item 1-G20 Site Improvements

Material
Cost/Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

#DIV/0!

67 of 86

$0

#DIV/0!

EQUIPMENT

Total Labor
Cost
$0

Equipment
Cost/Unit
#DIV/0!

TOTALS

Total
Equipment
Cost
$0

Total
Cost/Unit
#DIV/0!

Total Cost

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: G30 Site Mechanical Utilities

Total Cost:
MATERIAL

Uniformat II WBS
Code
G3010
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

WATER SUPPLY
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

WATER SUPPLY

Unit

Quantity

Unit

Material
Cost/Unit

SANITARY SEWER
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

SANITARY SEWER

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

G3020
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

309532934.xls, Item 1-G30 Site Mechanical

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

68 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: G30 Site Mechanical Utilities

Total Cost:
MATERIAL

Uniformat II WBS
Code
G3030
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

STORM SEWER
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

STORM SEWER

Unit

Quantity

Unit

Material
Cost/Unit

HEATING DISTRIBUTION
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

HEATING DISTRIBUTION

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

G3040
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

309532934.xls, Item 1-G30 Site Mechanical

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

69 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: G30 Site Mechanical Utilities

Total Cost:
MATERIAL

Uniformat II WBS
Code
G3050
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

COOLING DISTRIBUTION
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

COOLING DISTRIBUTION

Unit

Quantity

Unit

Material
Cost/Unit

FUEL DISTRIBUTION
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

FUEL DISTRIBUTION

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

G3060
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

309532934.xls, Item 1-G30 Site Mechanical

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

70 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: G30 Site Mechanical Utilities

Total Cost:

MATERIAL
Uniformat II WBS
Code
G3090
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

OTHER SITE MECHANICAL UTILITIES


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

OTHER SITE MECHANICAL UTILITIES

Unit

Quantity

Unit

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

$
$
$
$
$
$
$
$

EQUIPMENT

Total Labor
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

Summary Item: G30 Site Mechanical Utilities


MATERIAL
Uniformat II WBS
Code

G30

Description

Site Mechanical Utilities

309532934.xls, Item 1-G30 Site Mechanical

Material
Cost/Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

#DIV/0!

71 of 86

$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

Equipment
Cost/Unit

#DIV/0!

TOTALS

Total
Equipment
Cost
$0

Total
Cost/Unit

#DIV/0!

Total Cost

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: G40 Site Electrical Utilities

Total Cost:
MATERIAL

Uniformat II WBS
Code
G4010
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

ELECTRICAL DISTRIBUTION
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

ELECTRICAL DISTRIBUTION

Unit

Quantity

Unit

Material
Cost/Unit

SITE LIGHTING
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

SITE LIGHTING

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

G4020
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

309532934.xls, Item 1-G40 Site Electrical

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

72 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: G40 Site Electrical Utilities

Total Cost:
MATERIAL

Uniformat II WBS
Code
G4030
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

SITE COMMUNICATIONS & SECURITY


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

SITE COMMUNICATIONS & SECURITY

Unit

Quantity

Unit

Material
Cost/Unit

OTHER SITE ELECTRICAL UTILITIES


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

OTHER SITE ELECTRICAL UTILITIES

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

G4090
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

309532934.xls, Item 1-G40 Site Electrical

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

73 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: G40 Site Electrical Utilities

Total Cost:
MATERIAL

Uniformat II WBS
Code
BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

Quantity

Unit

Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

$0

TOTALS

Total
Equipment
Cost

Total Cost

#DIV/0!

EQUIPMENT

Total Labor
Cost

TOTALS

Total
Equipment
Cost

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

Summary Item: G40 Site Electrical Utilities


MATERIAL
Uniformat II WBS
Code

G40

Description

Site Electrical Utilities

309532934.xls, Item 1-G40 Site Electrical

Material
Cost/Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

#DIV/0!

74 of 86

$0

#DIV/0!

EQUIPMENT

Total Labor
Cost
$0

Equipment
Cost/Unit
#DIV/0!

TOTALS

Total
Equipment
Cost
$0

Total
Cost/Unit
#DIV/0!

Total Cost

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: G50 Other Site Construction

Total Cost:
MATERIAL

Uniformat II WBS
Code
G5010
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

SERVICE & PEDESTRIAN TUNNELS


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

SERVICE & PEDESTRIAN TUNNELS

Unit

Quantity

Unit

Material
Cost/Unit

OTHER SITE SYSTEMS & EQUIPMENT


Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

OTHER SITE SYSTEMS & EQUIPMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

G5090
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

309532934.xls, Item 1-G50 Other Site Const.

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

75 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: G50 Other Site Construction

Total Cost:
MATERIAL

Uniformat II WBS
Code
BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

309532934.xls, Item 1-G50 Other Site Const.

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

76 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Summary Item: G50 Other Site Construction

Total Cost:
MATERIAL

Uniformat II WBS
Code
BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

Quantity

Unit

Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

$0

TOTALS

Total
Equipment
Cost

Total Cost

#DIV/0!

EQUIPMENT

Total Labor
Cost

TOTALS

Total
Equipment
Cost

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

Summary Item: G50 Other Site Construction


MATERIAL
Uniformat II WBS
Code

G50

Description

Other Site Construction

309532934.xls, Item 1-G50 Other Site Const.

Material
Cost/Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

#DIV/0!

77 of 86

$0

#DIV/0!

EQUIPMENT

Total Labor
Cost
$0

Equipment
Cost/Unit
#DIV/0!

TOTALS

Total
Equipment
Cost
$0

Total
Cost/Unit
#DIV/0!

Total Cost

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Summary Item: XX

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Special Use - 1

Total Cost:
MATERIAL

Uniformat II WBS
Code
BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

309532934.xls, Item 1-Special Use 1

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

78 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Summary Item: XX

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Special Use - 1

Total Cost:
MATERIAL

Uniformat II WBS
Code
BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

309532934.xls, Item 1-Special Use 1

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

79 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Summary Item: XX

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Special Use - 1

Total Cost:
MATERIAL

Uniformat II WBS
Code

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

SUBTOTAL

BASE ELEMENT

Unit

Summary Item: XX

Special Use - 1

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

Description

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

XX

Description

Special Use - 1

309532934.xls, Item 1-Special Use 1

Quantity

Unit

Unit

Material
Cost/Unit

$0

$
$
$
$
$
$
$
$

80 of 86

$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

LABOR

$0

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

EQUIPMENT

Total Labor
Cost
$0

Equipment
Cost/Unit
#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

$0

TOTALS

Total
Equipment
Cost

Total Cost

#DIV/0!

EQUIPMENT

Total Labor
Cost

Total Material
Labor
Cost
Cost/Unit

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit

LABOR

MATERIAL
Uniformat II WBS
Code

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

TOTALS

Total
Equipment
Cost
$0

Total
Cost/Unit
#DIV/0!

Total Cost

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Summary Item: XX

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Special Use - 2

Total Cost:
MATERIAL

Uniformat II WBS
Code
BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

309532934.xls, Item 1-Special Use 2

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

81 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Summary Item: XX

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Special Use - 2

Total Cost:
MATERIAL

Uniformat II WBS
Code
BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

309532934.xls, Item 1-Special Use 2

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

82 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Summary Item: XX

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Special Use - 2

Total Cost:
MATERIAL

Uniformat II WBS
Code

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

SUBTOTAL

BASE ELEMENT

Unit

Summary Item: XX

Special Use - 2

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

Description

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

XX

Description

Special Use - 2

309532934.xls, Item 1-Special Use 2

Quantity

Unit

Unit

Material
Cost/Unit

$0

$
$
$
$
$
$
$
$

83 of 86

$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

LABOR

$0

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

EQUIPMENT

Total Labor
Cost
$0

Equipment
Cost/Unit
#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

$0

TOTALS

Total
Equipment
Cost

Total Cost

#DIV/0!

EQUIPMENT

Total Labor
Cost

Total Material
Labor
Cost
Cost/Unit

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit

LABOR

MATERIAL
Uniformat II WBS
Code

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

TOTALS

Total
Equipment
Cost
$0

Total
Cost/Unit
#DIV/0!

Total Cost

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Summary Item: XX

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Special Use - 3

Total Cost:
MATERIAL

Uniformat II WBS
Code
BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

309532934.xls, Item 1 -Special Use 3

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

84 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Summary Item: XX

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Special Use - 3

Total Cost:
MATERIAL

Uniformat II WBS
Code
BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

309532934.xls, Item 1 -Special Use 3

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

85 of 86

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0

$
$
$
$
$
$
$
$

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

LABOR

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

EQUIPMENT

Total Labor
Cost

$0

$0

TOTALS

Total
Equipment
Cost
$0
$0
$0
$0
$0
$0
$0
$0

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

#DIV/0!

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

$0

03/13/2016 02:26:24

United States Department of the Interior


National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project:
Park:
Park Alpha:
PMIS:

Project Name
Park Name
Park Alpha Code
TBD or PMIS number if known

Summary Item: XX

Estimate By: Estimator Name


Date: Estimate Date
Reviewed By:
Date:

Special Use - 3

Total Cost:
MATERIAL

Uniformat II WBS
Code
BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

SUBTOTAL

Description

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

BASE ELEMENT

Unit

LABOR

Total Material
Labor
Cost
Cost/Unit

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$
$
$
$
$
$
$
$

$0

Quantity

Unit

Material
Cost/Unit

BASE ELEMENT
Description
Description
Description
Description
Description
Description
Description
Description

0
0
0
0
0
0
0
0

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

$
$
$
$
$
$
$
$

SUBTOTAL

BASE ELEMENT

Unit

Summary Item: XX

Special Use - 3
Quantity

Unit

Unit

BASE CODE
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code
MF-2004 Code

Description

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

XX

Description

Special Use - 3

309532934.xls, Item 1 -Special Use 3

Material
Cost/Unit

$0

$
$
$
$
$
$
$
$

86 of 86

$
$
$
$
$
$
$
$

$0

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

LABOR

$0

#DIV/0!

TOTALS

Total
Equipment
Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

Total
Cost/Unit
$
$
$
$
$
$
$
$

$0

Equipment
Cost/Unit
$
$
$
$
$
$
$
$

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

EQUIPMENT

Total Labor
Cost
$0

Equipment
Cost/Unit
#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

$0

TOTALS

Total
Equipment
Cost

Total Cost

#DIV/0!

EQUIPMENT

Total Labor
Cost

Total Material
Labor
Cost
Cost/Unit

#DIV/0!

$0
$0
$0
$0
$0
$0
$0
$0

Equipment
Cost/Unit

LABOR

MATERIAL
Uniformat II WBS
Code

Total Material
Labor
Cost
Cost/Unit

Total Labor
Cost

#DIV/0!

MATERIAL
Uniformat II WBS
Code

EQUIPMENT

$0

Total
Cost/Unit
$
$
$
$
$
$
$
$

Total Cost

$0
$0
$0
$0
$0
$0
$0
$0

#DIV/0!

$0

TOTALS

Total
Equipment
Cost
$0

Total
Cost/Unit
#DIV/0!

Total Cost

$0

03/13/2016 02:26:24

Вам также может понравиться