Академический Документы
Профессиональный Документы
Культура Документы
Conclusion,
For the conclusion, the sand casting process were successfully done. The top riser
mold is shaped according to the pattern size. The pattern also suffers no damage from the
compacting process. The process were done solely according to the procedure and the time
taken for sand hardening is about 10 second for each holes punched on the sand. The use
of CO2 gas is passed through a sand mix containing sodium silicate as a result of which, the
sand immediately becomes extremely hard and strongly bonded as sodium silicate becomes
a stiff gel. This process were carefully done and tested the sand hardening before the
pattern taken out from the sand and the results are brilliant. This sand casting should be fully
prepared for moulding process as they are completely precise on shape and size.
Refferences
Books
Campbell, John (1993). Castings. Butterworth-Heinemann. p. 49. ISBN 0-7506-16962.
Website
Metal Casting Techniques - Vacuum ("V") Process Molding,
http://www.engineershandbook.com/MfgMethods/vacuumprocessmolding.htm
retrieved 2015-10-25.
Ebooks
"Beneficial Reuse Of Spent Foundry Sand" (PDF). 1996.
http://www.cwc.org/industry/ibp951fs.pdf