PUERTO RICO
Atitoridad do Carreteras y 'Fransportacion
ACO.
Respondent's contact information for those responsible for the development and implementation of
the Compliance Plan
Respondent contact information responsible for the development and implementation of the Compliance
Plan are:
Mr. Javier Arroyo Rosario, P.E., Deputy Executive Director for Infrastructure., Telephone
787-721-8787 X-1055; Jarroyodtop.qov.pr
Mr. Noel Rosario Hemandez P.E. Construction Area Director. Mr. Rosario was designated by
Mr. Arroyo to act on his behalf. Telephone 787- 721-8787 X-1101, nrosario(@Atop.qov.pr
Implementation dates (initiation and completion) for each of the actions to be taken, which shall not
exceed one hundred eighty (180) calendar days of the receipt of this order, unless otherwise
specified
As we have previously informed you the scope of the original project was substantially completed. The
additional construction phases have been agreed upon by the PRHTA and Del Valle Group SP (GC);
therefore, a new project schedule including dates for the commencement and completion of the described
actions has been developed. Major tasks include:
Providing temporary stabilization to areas where clearing, grading, and excavation
activities has temporarily ceased;
Providing final stabilization to areas where clearing, grading and excavation activities will
no longer be performed;
Implementing erosion and sediment controls, and Best Management Practices (BMP's)
at the site;
Providing Maintenance for the existing and future BMP's and
Installation and maintenance of sediment and erosion controls required by the Puerto
Rico Environmental Quality Board (provided that a written notification is submitted to
EPA no later than five (5) calendar days before the commencement of such activity. The
notifications shall include a description and itinerary of implementation of the activities to
be undertaken.
The implementation of the temporary erosion and sediment control measures will be accomplished within
the thirty (30) calendar-day period established in the Order. Despite some of the permanent stabilization
activities already begun, such as the installation of stone revetment (i.e. breakwater reshaping), the same
are intended for completion within a four (4) month period. The termination date will be on June 17, 2016. A
copy of the Project Stabilization Plans as included as Attachment #1 of this report.
A copy of the revised itinerary has been included in Appendix A- Project Schedule of the SWPPP and as
Attachment #2 of this letter. However, it shall be noted that installation of temporary as well as permanent
soil stabilization BMP's have already started in the project as authorized under the original NPDES Permit
PRR12A825 granted on June 20, 2015. The permit was modified to include the additional stabilization
works and it was re-authorized on March 4, 2016.
The development/selection, implementation and maintenance of the soil stabilization practices for the
project has been taken based on the current conditions of the project, as required by EPA. For the
stabilization practices have been divided in two (2) broad categories. They are:
Temporary Measures
Temporary measures selected for its use in the project include:
The location for the mentioned measures can be observed in the erosion Control
Measures Drawings, (Temporary and Permanent) for the slope stabilization works as
they were incorporated in the Modified SWPPP and also attached to this letter.
Permanent Measures
Permanent measures for slope stabilization were designed in-house by PRHTA Design
Area personnel. Those measures include:
The reason to designate two (2) persons is to maintain a resource available in the event that one of them is
unavailable due to unforeseen conditions. Both engineers have experience in the construction of highway
projects; and although already having experience in site inspections, were also trained in the specific
requirements of compliance with the 2012 CGP conditions. They will interact with the Del Valle Group SP
designated inspector.
The new forms will be used to document the project inspections and will be performed
indicated by qualified personnel from both the contractor and the PRHTA.
as
previously
Cost estimates to implement the Compliance Plan and each erosion and sediment control.
Stabilization practice and pollution prevention activity
Detailed cost estimates of the erosion and sediment control stabilization practices and pollution prevention
activities have been prepared. They are included in Attachment #3 of this report.
Modified as needed and implement the SWPPP to comply with the terms and requirements of 20112
CGP
The PRHTA has modified the SWPPP jointly developed with Del Valle Group SP (GC) for the Original
project. The SWPPP was revised by the PRHTA to incorporate erosion controls, stabilizations practices and
pollution preventions measures, which can be identified in the slope stabilization plans, for the purpose of
improving the actual conditions of the project. Such measures include:
Improved temporary and final soil stabilization BMP's based on existing project conditions
Updated time schedule for the additional works based on actual project conditions
Measures to control run-on across the completed slopes
Revised inspections forms
As required by the 2012 CGP, the revised SWPPP incorporates the PRHTA solutions to address the
deficiencies identified in your Reconnaissance Inspection Report of March 17, 2016
We look forward that the submitted information complies with the ACO requirements, however, if there is a need to
provide additional information don't hesitate to contact us, at (787) 721-8787 X -1105, 1158, 1167
Cord'
ATTACHMENTS
Attachment 1
Cost of implementation of BMP on the Project
PUERTO RICO
Avieridad de Carrot
Transportaeicrni
UNIT
DESCRIPTION
QTY
UNIT PRICE
AMOUNT
CuM
Borrow Calss B
3,950.00
$20.00
$79,000.00
SqM
1,818.00
$5.00
$9,090.00
14
CuM
1,790.00
$60.00
$107,400.00
21
CuM
165.74
$400.00
$66,296.00
22
CuM
203.75
$280.00
$57,050.00
36
CuM
Non-Woven Geotextile
1,270.00
$5.00
$6,350.00
40
Each
6,200.00
$8.00
$49,600.00
DESCRIPTION
QTY
U NIT PRICE
AMOUNT
Each
Straw Bales
320.00
$12.00
$3,840.00
LnM
Silt Fence
1,200.00
$8.00
$9,600.00
SqM
2,732.00
$5.00
$13,660.00
35
LS
100.00
$62.24
$6,224.00
41
Each
1.00
$2,500.00
$2,500.00
42
LS
100.00
$25.00
$2,500.00
44
SqM
Plastic Liner
1,700.00
$8.00
$13,600.00
TOTAL
$426,710.00
AVOCIODID Of tfiNbffetaf
rrwwPavdtatw
Attachment 2
Project Schedule
0,
zasTIVM
F in al Clean ing
Vetiver G rass
Fin al Backlit!
Backfill
Stone R evetmen t
I nstallatio n
g
04.Elihitkiri-
30
30
General Activities
M obilization
Constructio n Activities
GC-000
anteu 30 NOIDDMI
Ew
CA-99-999
P11-070
PII-070
PII-070
PD-070
PII-070
PII-070
PII-070
.,
.1,
ii1
'"
ACT-174
(Rev. 6/92)
HOJA DE TRAMITE
RECIBIDO
FECHA:
15 de marzo de 2016
A: 1er.
A: 2do.
A: 3ro.
= ri ..,,,c
A: 4to.
....
70
A: 5to.
C.,,
C)
DE:
ASUNTO:
Corres. Fechada:
Corres./De:
Necmi
MO
OBSERVACIONES:
pertinente.
6512/Iir
Anexo
Someter recomendaciones
Investigar e Informal*
Preparar opini6n
Enterarse y enviar a archivo
Enterarse y devolver
Estudiar y radicar la alegaciOn
correspondiente