Академический Документы
Профессиональный Документы
Культура Документы
Profile elevation
Side slope
0+000
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
-100
-50
0
50
100
Existing Ground:
Lt pt on cut slope
Lt pt on fill slope
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
Rt pt on fill slope
Rt pt on cut slope
-330
-207.12
-213.12
0
198
195.12
390.72
Lt intersection point
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
-28.78
-22
-12
-12
0
12
12
22
18
3
15
15
15
15
15
34.52
0
17.26
17.76
16.26
16.5
16.26
17.76
17.26
0
34.52
15
17.26
17.76
16.26
16.5
16.26
17.76
17.26
496.7428
0
-431.7
Rt intersection point
Existing Ground
Lt intersection point
98.6428
Sum
Area
28.78
0
-28.78
15
15
15
Sum
98.6428
FILL
20
18
16
14
12
10
8
6
4
2
0
-150
-100
-50
50
m1
C1
0.33333333 24.5933333
m2
0
C2
15
Area of Fill
-496.7428
-390.72
-195.12
-198
0
213.12
207.12
18
17.5
17
16.5
16
15.5
15
14.5
14
13.5
100
16.5
16
15.5
15
330
431.7
0
14.5
14
13.5
-98.6428
-40
-30
-20
-10
10
20
Proposed
Existing
50
100
150
Area of Fill
Area of Fill
5
Area of Fill
5
0
10
20
30
40
Station
Profile elevation
Side slope
0+050
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
-100
-50
0
50
100
Existing Ground:
Lt pt on cut slope
Lt pt on fill slope
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
Rt pt on fill slope
Rt pt on cut slope
-330
-207.12
-213.12
0
198
195.12
390.72
Lt intersection point
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
-28.78
-22
-12
-12
0
12
12
22
18
3
15
15
15
15
15
34.52
0
17.26
17.76
16.26
16.5
16.26
17.76
17.26
0
34.52
15
17.26
17.76
16.26
16.5
16.26
17.76
17.26
496.7428
0
-431.7
Rt intersection point
Existing Ground
Lt intersection point
98.6428
Sum
Area
28.78
0
-28.78
15
15
15
Sum
98.6428
FILL
20
18
16
14
12
10
8
6
4
2
0
-150
-100
-50
50
m1
C1
0.33333333 24.5933333
m2
0
C2
15
Area of Fill
-496.7428
-390.72
-195.12
-198
0
213.12
207.12
18
17.5
17
16.5
16
15.5
15
14.5
14
13.5
100
16.5
16
15.5
15
330
431.7
0
14.5
14
13.5
-98.6428
-40
-30
-20
-10
10
20
Proposed
Existing
50
100
150
Area of Fill
Area of Fill
Area of Fill
10
20
30
40
Station
Profile elevation
Side slope
0+100
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
-70
-50
0
50
100
Existing Ground:
Lt pt on fill slope
Lt pt on cut slope
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
Rt pt on cut slope
Rt pt on fill slope
Lt intersection point
-315.1268357222 Lt shoulder
-147.12
Lt edge pvt
-153.12
Lt bot. edge
0
Ctr bot. edge
138
Rt bot. edge
135.12
Rt edge pvt
280.72
Rt shoulder
516.4550247117 Rt intersection point
0
Existing Ground
-379.1802646086 Lt intersection point
13
3
15
15
13.45
20
20
0
24.52
12.26
12.76
11.26
11.5
11.26
12.76
12.26
24.52
0
-28.1918412348 14.32394708
-22
12.26
-12
12.76
-12
11.26
0
11.5
12
11.26
12
12.76
22
12.26
42.1252059308 18.96840198
0
13.45
-28.1918412348 14.32394708
75.7479243809
Sum
Area
Sum
154.4545
CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 4.92666667
m2
-0.031
C2
13.45
Area of Cut
-345.6319735
-280.72
-135.12
-138
0
153.12
147.12
417.30484349
566.58401977
0
20
15
10
5
0
-40
-30
-20
-10
10
20
30
5
0
-40
384.65688972
-30
-20
-10
10
20
30
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
10
20
30
40
50
10
20
30
40
50
Station
Profile elevation
Side slope
0+150
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt intersection point
-394.2853939886 Lt shoulder
-195.12
Lt edge pvt
-201.12
Lt bot. edge
0
Ctr bot. edge
186
Rt bot. edge
183.12
Rt edge pvt
368.72
Rt shoulder
17
3
16.15
20
15
0
32.52
16.26
16.76
15.26
15.5
15.26
16.76
16.26
32.52
0
-26.986190089 17.92206336
-22
16.26
-12
16.76
-12
15.26
0
15.5
12
15.26
12
16.76
22
16.26
Area
25.5538461538 17.44461538
0
20
-26.986190089 17.92206336
Sum
145.683334 CUT
35
30
25
20
15
10
5
0
-80
-60
-40
-20
20
m1
C1
-0.3333333 8.92666667
m2
0.077
C2
20
-438.7954509
-368.72
-183.12
-186
0
201.12
195.12
Area of Cut
25
20
15
10
5
40
15
10
383.78153846
511.07692308
0
114.46301069
5
0
-30
-20
-10
10
20
Proposed
Existing
20
40
60
80
a of Cut
Area of Cut
Area of Cut
10
20
30
-330
-183.12
-189.120857344
-341.7
Station
Profile elevation
Side slope
0+200
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
16
3
15
15
15
30.52
0
15.26
15.76
14.26
14.5
14.26
15.76
15.26
0
30.52
Lt intersection point
Lt shoulder
Lt edge pvt
Lt inner intersection
Lt intersection point
15
15.26
15.76
15
15
-1043.940857344 Sum
Area
-22.78
-22
-12
-12.0000544
-22.78
Sum
5.201379328 FILL
330
183.12
189.120876256
341.7
Rt intersection point
Rt shoulder
Rt edge pvt
Rt inner intersection
Rt intersection point
22.78
22
12
12.0000556
22.78
1043.940876256 Sum
Area
-180
0
174
171.120792856
0
-180.000816
Lt inner intersection
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt inner intersection
Existing Ground
Lt intersection point
-14.880023144
Sum
Area
15
15.26
15.76
15
15
Sum
5.201378872 FILL
-12.0000544
-12
0
12
12.0000556
0
-12.0000544
15
14.26
14.5
14.26
15
15
15
Sum
14.8800407 CUT
18
16
14
12
10
8
6
4
2
0
-80
-60
-40
-20
20
40
m1
C1
0.33333333 22.5933333
m2
0
C2
15
Area of Fill
-347.6228
-346.72
-180
-180.000816
Area of Fill
-1054.343616
-24
-22
-20
-18
-16
-14
-12
-10
347.6228
346.72
180
180.000834
1054.343634
Area of Fill
16
15.5
Area of Fill
15
14.5
10
12
14
16
18
20
22
24
Area of Cut
-171.1207757
-174
0
180
180.000834
0
15.2
15
14.8
Area of Cut
14.6
14.4
14.2
14.880058256
14
13.8
-15
-10
-5
10
15
Proposed
Existing
20
40
80
Area of Fill
-10
60
Area of Fill
24
Area of Cut
15
m1
C1
14.26 -16666.667 200015.927
15.76
y2
m2
C2
0
15
15
15
m1
C1
-16666.667
-199985.91
15.76
14.26
y2
m2
15
15
C2
0
15
Station
Profile elevation
Side slope
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
0+600
-100
-50
-10
0
50
60
Lt intersection point
-233.5080496054 Lt shoulder
-147.12
Lt edge pvt
-153.12
Lt bot. edge
0
Ctr bot. edge
138
Rt bot. edge
135.12
Rt edge pvt
13
3
12.04
11.45
10
10
10
10
24.52
0
12.26
12.76
11.26
11.5
11.26
12.76
12.26
0
24.52
-26.937993236 10.61400225
-22
12.26
-12
12.76
-12
11.26
0
11.5
12
11.26
12
12.76
280.72
352.8428
0
-100
-269.3799323563
3.5548180383
Rt shoulder
Rt intersection point
Existing Ground
Existing Ground
Lt intersection point
Sum
Area
22
12.26
28.78
10
0
10
-10
10
-26.937993236 10.61400225
Sum
92.87731883 FILL
14
12
10
8
6
4
2
0
-120
-100
-80
-60
-40
-20
20
m1
C1
0.33333333 19.5933333
m2
-0.03625
C2
9.6375
Area of Fill
-330.2597971
-280.72
-135.12
-138
0
153.12
14
12
10
8
6
4
40
12
10
8
147.12
220
287.8
0
-106.1400225
-182.1998196
6
4
2
0
-30
-20
-10
10
20
30
14
12
10
8
Proposed
Existing
6
4
2
0
0
20
40
60
80
a of Fill
Area of Fill
Area of Fill
10
20
30
40
Station
Profile elevation
Side slope
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt pt on cut slope
Lt pt on fill slope
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
Rt pt on fill slope
Rt pt on cut slope
-220
-171.12
-177.12
0
162
159.12
324.72
0+300
Lt intersection point
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
-34.78
-22
-12
-12
0
12
12
22
15
3
10
10
12.5
28.52
0
14.26
14.76
13.26
13.5
13.26
14.76
14.26
0
28.52
10
14.26
14.76
13.26
13.5
13.26
14.76
14.26
431.272
0
-347.8
Rt intersection point
Existing Ground
Lt intersection point
161.072
Sum
Area
30.2434782609 11.51217391
0
10
-34.78
10
Sum
199.4660957 FILL
16
14
12
10
8
6
4
2
0
-80
-60
-40
-20
20
m1
C1
0.33333333 21.5933333
m2
0
C2
10
-495.9628
-324.72
-159.12
-162
0
177.12
171.12
Area of Fill
16
14
12
10
8
6
4
40
12
10
8
253.26782609
302.43478261
0
6
4
2
-237.8601913
0
-40
-30
-20
-10
10
20
Proposed
Existing
20
40
60
80
a of Fill
Area of Fill
Area of Fill
10
20
30
40
Station
Profile elevation
Side slope
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt pt on cut slope
Lt pt on fill slope
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
Rt pt on fill slope
Rt pt on cut slope
-220
-171.12
-177.12
0
162
159.12
324.72
0+350
Lt intersection point
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
-34.78
-22
-12
-12
0
12
12
22
15
3
10
10
12.5
28.52
0
14.26
14.76
13.26
13.5
13.26
14.76
14.26
0
28.52
10
14.26
14.76
13.26
13.5
13.26
14.76
14.26
431.272
0
-347.8
Rt intersection point
Existing Ground
Lt intersection point
161.072
Sum
Area
30.2434782609 11.51217391
0
10
-34.78
10
Sum
199.4660957 FILL
16
14
12
10
8
6
4
2
0
-80
-60
-40
-20
20
m1
C1
0.33333333 21.5933333
m2
0
C2
10
-495.9628
-324.72
-159.12
-162
0
177.12
171.12
Area of Fill
16
14
12
10
8
6
4
40
12
10
8
253.26782609
302.43478261
0
6
4
2
-237.8601913
0
-40
-30
-20
-10
10
20
Proposed
Existing
20
40
60
80
a of Fill
Area of Fill
Area of Fill
10
20
30
40
Station
Profile elevation
Side slope
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt pt on cut slope
Lt pt on fill slope
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
Rt pt on fill slope
Rt pt on cut slope
-220
-171.12
-177.12
0
162
159.12
324.72
0+400
Lt intersection point
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
-34.78
-22
-12
-12
0
12
12
22
15
3
10
10
15
28.52
0
14.26
14.76
13.26
13.5
13.26
14.76
14.26
0
28.52
10
14.26
14.76
13.26
13.5
13.26
14.76
14.26
Area
26.7538461538 12.67538462
0
10
-34.78
10
Sum
179.2378615 FILL
16
14
12
10
8
6
4
2
0
-80
-60
-40
-20
20
m1
C1
0.33333333 21.5933333
m2
0
C2
10
-495.9628
-324.72
-159.12
-162
0
177.12
171.12
Area of Fill
16
14
12
10
8
6
4
40
12
10
8
278.85846154
267.53846154
0
6
4
2
-247.1658769
0
-40
-30
-20
-10
10
20
Proposed
Existing
20
40
60
80
a of Fill
Area of Fill
Area of Fill
10
20
30
40
Station
Profile elevation
Side slope
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt pt on cut slope
Lt pt on fill slope
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
Rt pt on fill slope
Rt pt on cut slope
-220
-171.12
-177.12
0
162
159.12
324.72
0+450
Lt intersection point
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
-34.78
-22
-12
-12
0
12
12
22
15
3
10
10
18.75
28.52
0
14.26
14.76
13.26
13.5
13.26
14.76
14.26
0
28.52
10
14.26
14.76
13.26
13.5
13.26
14.76
14.26
Sum
Area
22.806557377 13.99114754
0
10
-34.78
10
Sum
156.3567443 FILL
20
18
16
14
12
10
8
6
4
2
0
-80
-60
-40
-20
20
m1
C1
0.33333333 21.5933333
m2
0
C2
10
-495.9628
-324.72
-159.12
-162
0
177.12
171.12
Area of Fill
16
14
12
10
8
6
4
40
12
10
8
307.8052459
228.06557377
0
6
4
2
-257.6919803
0
-40
-30
-20
-10
10
20
Proposed
Existing
20
40
60
80
a of Fill
Area of Fill
Area of Fill
0
0
10
20
30
Station
Profile elevation
Side slope
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt pt on cut slope
Lt pt on fill slope
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
Rt pt on fill slope
Rt pt on cut slope
-220
-171.12
-177.12
0
162
159.12
324.72
0+500
Lt intersection point
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
-34.78
-22
-12
-12
0
12
12
22
15
3
10
10
15
28.52
0
14.26
14.76
13.26
13.5
13.26
14.76
14.26
0
28.52
10
14.26
14.76
13.26
13.5
13.26
14.76
14.26
Area
26.7538461538 12.67538462
0
10
-34.78
10
Sum
179.2378615 FILL
16
14
12
10
8
6
4
2
0
-80
-60
-40
-20
20
m1
C1
0.33333333 21.5933333
m2
0
C2
10
-495.9628
-324.72
-159.12
-162
0
177.12
171.12
Area of Fill
16
14
12
10
8
6
4
40
12
10
8
278.85846154
267.53846154
0
6
4
2
-247.1658769
0
-40
-30
-20
-10
10
20
Proposed
Existing
20
40
60
80
a of Fill
Area of Fill
Area of Fill
10
20
30
40
Station
Profile elevation
Side slope
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt pt on cut slope
Lt pt on fill slope
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
Rt pt on fill slope
Rt pt on cut slope
-220
-171.12
-177.12
0
162
159.12
324.72
0+550
Lt intersection point
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
-34.78
-22
-12
-12
0
12
12
22
15
3
10
10
10
28.52
0
14.26
14.76
13.26
13.5
13.26
14.76
14.26
0
28.52
10
14.26
14.76
13.26
13.5
13.26
14.76
14.26
495.9628
0
-347.8
Rt intersection point
Existing Ground
Lt intersection point
225.7628
Sum
Area
34.78
0
-34.78
10
10
10
Sum
225.7628
FILL
16
14
12
10
8
6
4
2
0
-80
-60
-40
-20
20
m1
C1
0.33333333 21.5933333
m2
0
C2
10
-495.9628
-324.72
-159.12
-162
0
177.12
171.12
Area of Fill
16
14
12
10
8
6
4
40
12
10
8
220
347.8
0
6
4
2
-225.7628
0
-40
-30
-20
-10
10
20
Proposed
Existing
20
40
60
80
a of Fill
Area of Fill
Area of Fill
10
20
30
40
Station
Profile elevation
Side slope
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt pt on cut slope
Lt pt on fill slope
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
Rt pt on fill slope
Rt pt on cut slope
-220
-171.12
-177.12
0
162
159.12
324.72
0+600
Lt intersection point
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
-34.78
-22
-12
-12
0
12
12
22
15
3
10
10
10
28.52
0
14.26
14.76
13.26
13.5
13.26
14.76
14.26
0
28.52
10
14.26
14.76
13.26
13.5
13.26
14.76
14.26
495.9628
0
-347.8
Rt intersection point
Existing Ground
Lt intersection point
225.7628
Sum
Area
34.78
0
-34.78
10
10
10
Sum
225.7628
FILL
16
14
12
10
8
6
4
2
0
-80
-60
-40
-20
20
m1
C1
0.33333333 21.5933333
m2
0
C2
10
-495.9628
-324.72
-159.12
-162
0
177.12
171.12
Area of Fill
16
14
12
10
8
6
4
40
12
10
8
220
347.8
0
6
4
2
-225.7628
0
-40
-30
-20
-10
10
20
Proposed
Existing
20
40
60
80
a of Fill
Area of Fill
Area of Fill
10
20
30
40
Station
Profile elevation
Side slope
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt pt on cut slope
Lt pt on fill slope
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
Rt pt on fill slope
Rt pt on cut slope
-253.267826087
-171.12
-177.12
0
162
159.12
324.72
0+650
Lt intersection point
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
15
3
12.5
10
10
28.52
0
14.26
14.76
13.26
13.5
13.26
14.76
14.26
0
28.52
-30.243478261 11.51217391
-22
14.26
-12
14.76
-12
13.26
0
13.5
12
13.26
12
14.76
22
14.26
495.9628
Rt intersection point
0
Existing Ground
-302.4347826087 Lt intersection point
237.8601913043 Sum
Area
34.78
10
0
10
-30.243478261 11.51217391
Sum
199.4660957 FILL
16
14
12
10
8
6
4
2
0
-80
-60
-40
-20
20
m1
C1
0.33333333 21.5933333
m2
-0.05
C2
10
-431.272
-324.72
-159.12
-162
0
177.12
171.12
Area of Fill
16
14
12
10
8
6
4
40
12
10
8
220
347.8
0
6
4
2
-161.072
0
-40
-30
-20
-10
10
20
Proposed
Existing
20
40
60
80
a of Fill
Area of Fill
Area of Fill
10
20
30
40
Station
Profile elevation
Side slope
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt pt on cut slope
Lt pt on fill slope
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
Rt pt on fill slope
Rt pt on cut slope
-220
-171.12
-177.12
0
162
159.12
324.72
0+700
Lt intersection point
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
-34.78
-22
-12
-12
0
12
12
22
15
3
10
10
10
28.52
0
14.26
14.76
13.26
13.5
13.26
14.76
14.26
0
28.52
10
14.26
14.76
13.26
13.5
13.26
14.76
14.26
495.9628
0
-347.8
Rt intersection point
Existing Ground
Lt intersection point
225.7628
Sum
Area
34.78
0
-34.78
10
10
10
Sum
225.7628
FILL
16
14
12
10
8
6
4
2
0
-80
-60
-40
-20
20
m1
C1
0.33333333 21.5933333
m2
0
C2
10
-495.9628
-324.72
-159.12
-162
0
177.12
171.12
Area of Fill
16
14
12
10
8
6
4
40
12
10
8
220
347.8
0
6
4
2
-225.7628
0
-40
-30
-20
-10
10
20
Proposed
Existing
20
40
60
80
a of Fill
Area of Fill
Area of Fill
10
20
30
40
Station
Profile elevation
Side slope
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt pt on cut slope
Lt pt on fill slope
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
Rt pt on fill slope
Rt pt on cut slope
-220
-171.12
-177.12
0
162
159.12
324.72
0+750
Lt intersection point
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
-34.78
-22
-12
-12
0
12
12
22
15
3
10
10
10
28.52
0
14.26
14.76
13.26
13.5
13.26
14.76
14.26
0
28.52
10
14.26
14.76
13.26
13.5
13.26
14.76
14.26
495.9628
0
-347.8
Rt intersection point
Existing Ground
Lt intersection point
225.7628
Sum
Area
34.78
0
-34.78
10
10
10
Sum
225.7628
FILL
16
14
12
10
8
6
4
2
0
-80
-60
-40
-20
20
m1
C1
0.33333333 21.5933333
m2
0
C2
10
-495.9628
-324.72
-159.12
-162
0
177.12
171.12
Area of Fill
16
14
12
10
8
6
4
40
12
10
8
220
347.8
0
6
4
2
-225.7628
0
-40
-30
-20
-10
10
20
Proposed
Existing
20
40
60
80
a of Fill
Area of Fill
Area of Fill
10
20
30
40
Station
Profile elevation
Side slope
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt pt on cut slope
Lt pt on fill slope
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
Rt pt on fill slope
Rt pt on cut slope
0+800
Lt intersection point
-240.6723984562 Lt shoulder
-171.12
Lt edge pvt
-177.12
Lt bot. edge
0
Ctr bot. edge
162
Rt bot. edge
159.12
Rt edge pvt
324.72
Rt shoulder
15
3
11.47
10
10
28.52
0
14.26
14.76
13.26
13.5
13.26
14.76
14.26
0
28.52
-31.961036574 10.93965448
-22
14.26
-12
14.76
-12
13.26
0
13.5
12
13.26
12
14.76
22
14.26
495.9628
Rt intersection point
0
Existing Ground
-319.6103657416 Lt intersection point
233.2800358022 Sum
Area
34.78
10
0
10
-31.961036574 10.93965448
Sum
209.4222087 FILL
16
14
12
10
8
6
4
2
0
-80
-60
-40
-20
20
m1
C1
0.33333333 21.5933333
m2
-0.0294
C2
10
-455.7643815
-324.72
-159.12
-162
0
177.12
171.12
Area of Fill
16
14
12
10
8
6
4
40
12
10
8
220
347.8
0
6
4
2
-185.5643815
0
-40
-30
-20
-10
10
20
Proposed
Existing
20
40
60
80
a of Fill
Area of Fill
Area of Fill
10
20
30
40
Station
Profile elevation
Side slope
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt pt on cut slope
Lt pt on fill slope
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
Rt pt on fill slope
Rt pt on cut slope
0+850
Lt intersection point
-255.5582099828 Lt shoulder
-171.12
Lt edge pvt
-177.12
Lt bot. edge
0
Ctr bot. edge
162
Rt bot. edge
159.12
Rt edge pvt
324.72
Rt shoulder
15
3
12.7
10
10
28.52
0
14.26
14.76
13.26
13.5
13.26
14.76
14.26
0
28.52
-29.9311531842 11.61628227
-22
14.26
-12
14.76
-12
13.26
0
13.5
12
13.26
12
14.76
22
14.26
495.9628
Rt intersection point
0
Existing Ground
-299.3115318417 Lt intersection point
238.6930581756 Sum
Area
34.78
10
0
10
-29.9311531842 11.61628227
Sum
197.6556513 FILL
16
14
12
10
8
6
4
2
0
-80
-60
-40
-20
20
m1
C1
0.33333333 21.5933333
m2
-0.054
C2
10
-426.8182444
-324.72
-159.12
-162
0
177.12
171.12
Area of Fill
16
14
12
10
8
6
4
40
12
10
8
220
347.8
0
6
4
2
-156.6182444
0
-40
-30
-20
-10
10
20
Proposed
Existing
20
40
60
80
a of Fill
Area of Fill
Area of Fill
10
20
30
40
Station
Profile elevation
Side slope
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt pt on cut slope
Lt pt on fill slope
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
Rt pt on fill slope
Rt pt on cut slope
0+900
Lt intersection point
-268.3650567261 Lt shoulder
-171.12
Lt edge pvt
-177.12
Lt bot. edge
0
Ctr bot. edge
162
Rt bot. edge
159.12
Rt edge pvt
324.72
Rt shoulder
15
3
13.9
10
10
28.52
0
14.26
14.76
13.26
13.5
13.26
14.76
14.26
0
28.52
-28.184764992 12.19841167
-22
14.26
-12
14.76
-12
13.26
0
13.5
12
13.26
12
14.76
22
14.26
495.9628
0
-281.847649919
Rt intersection point
Existing Ground
Lt intersection point
243.3500933549 Sum
Area
34.78
10
0
10
-28.184764992 12.19841167
Sum
187.5324211 FILL
16
14
12
10
8
6
4
2
0
-80
-60
-40
-20
20
m1
C1
0.33333333 21.5933333
m2
-0.078
C2
10
-401.9147488
-324.72
-159.12
-162
0
177.12
171.12
Area of Fill
16
14
12
10
8
6
4
40
12
10
8
220
347.8
0
6
4
2
-131.7147488
0
-40
-30
-20
-10
10
20
Proposed
Existing
20
40
60
80
a of Fill
Area of Fill
Area of Fill
10
20
30
40
Station
Profile elevation
Side slope
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt pt on cut slope
Lt pt on fill slope
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
Rt pt on fill slope
Rt pt on cut slope
-253.267826087
-171.12
-177.12
0
162
159.12
324.72
0+950
Lt intersection point
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
15
3
12.5
10
10
28.52
0
14.26
14.76
13.26
13.5
13.26
14.76
14.26
0
28.52
-30.243478261 11.51217391
-22
14.26
-12
14.76
-12
13.26
0
13.5
12
13.26
12
14.76
22
14.26
495.9628
Rt intersection point
0
Existing Ground
-302.4347826087 Lt intersection point
237.8601913043 Sum
Area
34.78
10
0
10
-30.243478261 11.51217391
Sum
199.4660957 FILL
16
14
12
10
8
6
4
2
0
-80
-60
-40
-20
20
m1
C1
0.33333333 21.5933333
m2
-0.05
C2
10
-431.272
-324.72
-159.12
-162
0
177.12
171.12
Area of Fill
16
14
12
10
8
6
4
40
12
10
8
220
347.8
0
6
4
2
-161.072
0
-40
-30
-20
-10
10
20
Proposed
Existing
20
40
60
80
a of Fill
Area of Fill
Area of Fill
10
20
30
40
Station
Profile elevation
Side slope
1+000
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
0
-297.728583691
-171.12
-177.1202988606
-324.7654469531
-970.7343295048 Sum
Area
15
3
13.75
13.33
13.67
28.52
0
14.26
14.76
13.26
13.5
13.26
14.76
14.26
0
28.52
-24.180647679 13.53311744
-22
14.26
-12
14.76
-12.000020248 13.43080017
-24.180647679 13.53311744
Sum
11.18449587 FILL
Rt intersection point
296.8944413955 Rt shoulder
171.12
Rt edge pvt
177.1213417425 Rt inner intersection (1)
325.8267143511 Rt intersection point
970.9624974891 Sum
0
85.6343283582
0
-79.7922535211
5.8420748371
0
-161.169602041
-79.3732394366
-160.5636512058
Sum
Area
11.53921139 FILL
-5.985915493 13.38028169
0
13.5
6.3432835821 13.37313433
0
13.33
-5.985915493 13.38028169
Sum
Sum
Area
1.047981921 FILL
-12.000020248 13.43080017
-12
13.26
-5.985915493 13.38028169
-12.000020248 13.43080017
-401.1064926834 Sum
0
160.9392074178
84.1119402985
160.4788276112
24.2943943552 13.49520188
22
14.26
12
14.76
12.000090904 13.41160062
24.2943943552 13.49520188
Sum
Area
0.513604546 CUT
12.000090904 13.41160062
12
13.26
6.3432835821 13.37313433
12.000090904 13.41160062
405.5299753275 Sum
Area
Sum
0.428785995 CUT
16
14
12
10
8
6
4
2
0
-80
-60
-40
-20
20
40
m1
C1
0.33333333 21.5933333
m2
-0.0084
C2
13.33
Area of Fill
0
-344.8160359
-324.72
-161.169602
-162.3976833
15
14
13
-993.1033212
-26
-24
-22
-20
-18
-16
-14
Area of Fill
15
-12
12
-10
Area o
346.4380635
324.72
160.93920742
161.94364935
994.04092027
Area of Fill
15
Area o
14
13
12
10
12
14
16
18
20
22
24
26
Area of Fill
-80.80985915
0
84.555970149
0
Area of
3.7461109943
-8
-6
-4
-2
Area of Cut
0
-159.1202685
-160.5633803
-80.39563482
Area of
-400.0792836
-13
-12
-11
-10
0
159.12120539
160.47761194
85.073586011
-9
-8
-7
-6
-5
Area of Cut
Area of
404.67240334
6
10
11
12
13
Proposed
Existing
20
40
60
ll
15
14
13
-12
ll
14
80
12
-10
Area of Fill
ll
22
Area of Fill
24
26
ll
Area of Fill
ut
Area of Cut
-6
-5
ut
Area of Cut
12
13
m1
C1
14.76 -16666.667 -199986.91
13.26
y2
m2
13.75 -0.0084
13.33
C2
13.33
y1
m1
C1
-16666.667
200014.927
13.26
14.76
y2
13.33
13.67
right cut slope
12.0000909
13.4116006
m2
0.0068
C2
13.33
C1
13.5
C2
13.33
C1
13.5
C2
13.33
Station
Profile elevation
Side slope
1+050
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt intersection point
-354.2891318328 Lt shoulder
-171.12
Lt edge pvt
-177.12
Lt bot. edge
0
Ctr bot. edge
162
Rt bot. edge
159.12
Rt edge pvt
324.72
Rt shoulder
15
3
16.14
16.06
16.16
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
-27.532154341 16.10405145
-22
14.26
-12
14.76
-12
13.26
0
13.5
12
13.26
12
14.76
22
14.26
Area
27.5653923541 16.11513078
0
16.06
-27.532154341 16.10405145
Sum
106.3987966 CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
-0.0016
C2
16.06
Area of Cut
-392.6085209
-324.72
-159.12
-162
0
177.12
171.12
18
16
14
12
10
8
6
4
2
0
-40
-30
-20
-10
10
20
12
10
8
6
4
2
0
354.53287726
442.70020121
0
-40
107.02455757
-30
-20
-10
10
20
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
10
20
30
40
Area of Cut
10
20
30
40
Station
Profile elevation
Side slope
1+100
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt intersection point
-387.3702946955 Lt shoulder
-171.12
Lt edge pvt
-177.12
Lt bot. edge
0
Ctr bot. edge
162
Rt bot. edge
159.12
Rt edge pvt
324.72
Rt shoulder
15
3
17.5
17.8
17.4
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
-32.043222004 17.60774067
-22
14.26
-12
14.76
-12
13.26
0
13.5
12
13.26
12
14.76
22
14.26
Area
31.85546875 17.54515625
0
17.8
-32.043222004 17.60774067
Sum
202.1825487 CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
0.006
C2
17.8
Area of Cut
-456.9363458
-324.72
-159.12
-162
0
177.12
171.12
20
15
10
5
0
-40
-30
-20
-10
10
20
10
5
385.9934375
567.02734375
0
0
-40
198.48443547
-30
-20
-10
10
20
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
10
20
30
40
Area of Cut
10
20
30
40
Station
Profile elevation
Side slope
1+150
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt intersection point
-401.0794176524 Lt shoulder
-171.12
Lt edge pvt
-177.12
Lt bot. edge
0
Ctr bot. edge
162
Rt bot. edge
159.12
Rt edge pvt
324.72
Rt shoulder
15
3
17.7
19.35
18.75
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
-33.912647862 18.23088262
-22
14.26
-12
14.76
-12
13.26
0
13.5
12
13.26
12
14.76
22
14.26
Sum
Area
35.9749034749 18.91830116
0
19.35
-33.912647862 18.23088262
Sum
288.9048397 CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
0.033
C2
19.35
Area of Cut
-483.5943585
-324.72
-159.12
-162
0
177.12
171.12
25
20
15
10
5
0
-40
-30
-20
-10
10
20
15
10
416.20262548
696.11438224
0
5
0
-40
331.12264921
-30
-20
-10
10
20
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
10
20
30
40
Area of Cut
10
20
30
40
Station
Profile elevation
Side slope
1+200
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt intersection point
-425.2645920304 Lt shoulder
-171.12
Lt edge pvt
-177.12
Lt bot. edge
0
Ctr bot. edge
162
Rt bot. edge
159.12
Rt edge pvt
324.72
Rt shoulder
15
3
19.1
20
20
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
-37.210626186 19.33020873
-22
14.26
-12
14.76
-12
13.26
0
13.5
12
13.26
12
14.76
22
14.26
559.2772
Rt intersection point
0
Existing Ground
-744.2125237192 Lt intersection point
-312.5999157495 Sum
Area
39.22
20
0
20
-37.210626186 19.33020873
Sum
354.3881932 CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
0.018
C2
20
Area of Cut
-530.6235294
-324.72
-159.12
-162
0
177.12
171.12
25
20
15
10
5
0
-50
-40
-30
-20
-10
10
20
30
15
10
440
784.4
0
5
0
-50
396.17647059
-40
-30
-20
-10
10
20
30
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
10
20
30
40
50
Area of Cut
10
20
30
40
50
-440
-171.12
-177.12
0
162
159.12
324.72
Station
Profile elevation
Side slope
1+250
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
15
3
20
20
22.5
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
Lt intersection point
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
20
14.26
14.76
13.26
13.5
13.26
14.76
14.26
-39.22
-22
-12
-12
0
12
12
22
Area
46.1411764706 22.30705882
0
20
-39.22
20
Sum
412.7642235 CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
0
C2
20
Area of Cut
-559.2772
-324.72
-159.12
-162
0
177.12
171.12
25
20
15
10
5
0
-60
-40
-20
20
40
15
10
490.75529412
922.82352941
0
5
0
-60
556.70162353
-40
-20
20
40
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
20
40
60
Area of Cut
20
40
60
Station
Profile elevation
Side slope
1+300
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt intersection point
-490.7552941176 Lt shoulder
-171.12
Lt edge pvt
-177.12
Lt bot. edge
0
Ctr bot. edge
162
Rt bot. edge
159.12
Rt edge pvt
324.72
Rt shoulder
15
3
22.5
20
24
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
-46.1411764706 22.30705882
-22
14.26
-12
14.76
-12
13.26
0
13.5
12
13.26
12
14.76
22
14.26
Area
51.6052631579 24.12842105
0
20
-46.1411764706 22.30705882
Sum
493.7225604 CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
-0.05
C2
20
Area of Cut
-657.9731765
-324.72
-159.12
-162
0
177.12
171.12
30
25
20
15
10
5
0
-60
-40
-20
20
40
20
15
10
530.82526316
1032.1052632
0
5
0
-60
607.35734985
-40
-20
20
40
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
20
40
60
Area of Cut
20
40
60
Station
Profile elevation
Side slope
1+350
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
-426.98408249
-171.12
-177.12
0
162
159.12
324.72
Lt intersection point
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
15
3
19.21
20
22.5
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
-37.445102158 19.40836739
-22
14.26
-12
14.76
-12
13.26
0
13.5
12
13.26
12
14.76
22
14.26
Area
46.1411764706 22.30705882
0
20
-37.445102158 19.40836739
Sum
401.162308 CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
0.0158
C2
20
Area of Cut
-533.9671568
-324.72
-159.12
-162
0
177.12
171.12
25
20
15
10
5
0
-60
-40
-20
20
40
15
10
490.75529412
922.82352941
0
5
0
-60
582.01166676
-40
-20
20
40
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
20
40
60
Area of Cut
20
40
60
Station
Profile elevation
Side slope
1+400
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
-396.126779661
-171.12
-177.12
0
162
159.12
324.72
Lt intersection point
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
15
3
17
20
19.25
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
-33.237288136 18.00576271
-22
14.26
-12
14.76
-12
13.26
0
13.5
12
13.26
12
14.76
22
14.26
Area
37.5311004785 19.43703349
0
20
-33.237288136 18.00576271
Sum
317.3760336 CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
0.06
C2
20
Area of Cut
-473.9637288
-324.72
-159.12
-162
0
177.12
171.12
25
20
15
10
5
0
-40
-30
-20
-10
10
20
30
15
10
427.61473684
750.62200957
0
5
0
-40
406.6730176
-30
-20
-10
10
20
30
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
10
20
30
40
50
Area of Cut
10
20
30
40
50
Station
Profile elevation
Side slope
1+450
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt intersection point
-345.6099082569 Lt shoulder
-171.12
Lt edge pvt
-177.12
Lt bot. edge
0
Ctr bot. edge
162
Rt bot. edge
159.12
Rt edge pvt
324.72
Rt shoulder
15
3
15
16.5
18
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
-26.348623853 15.70954128
-22
14.26
-12
14.76
-12
13.26
0
13.5
12
13.26
12
14.76
22
14.26
Sum
Area
31.5604395604 17.44681319
0
16.5
-26.348623853 15.70954128
Sum
131.9780502 CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
0.03
C2
16.5
Area of Cut
-375.7313761
-324.72
-159.12
-162
0
177.12
171.12
20
15
10
5
0
-30
-20
-10
10
20
30
10
5
383.82989011
520.74725275
0
0
-30
231.24576671
-20
-10
10
20
30
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
10
20
30
40
Area of Cut
10
20
30
40
Station
Profile elevation
Side slope
1+500
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt intersection point
-345.6099082569 Lt shoulder
-171.12
Lt edge pvt
-177.12
Lt bot. edge
0
Ctr bot. edge
162
Rt bot. edge
159.12
Rt edge pvt
324.72
Rt shoulder
15
3
15
16.5
19.1
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
-26.348623853 15.70954128
-22
14.26
-12
14.76
-12
13.26
0
13.5
12
13.26
12
14.76
22
14.26
Sum
Area
34.028436019 18.26947867
0
16.5
-26.348623853 15.70954128
Sum
143.7915266 CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
0.03
C2
16.5
Area of Cut
-375.7313761
-324.72
-159.12
-162
0
177.12
171.12
20
15
10
5
0
-30
-20
-10
10
20
30
10
5
401.92853081
561.46919431
0
0
-30
290.06634897
-20
-10
10
20
30
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
10
20
30
40
Area of Cut
10
20
30
40
Station
Profile elevation
Side slope
1+550
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt intersection point
-354.6591304348 Lt shoulder
-171.12
Lt edge pvt
-177.12
Lt bot. edge
0
Ctr bot. edge
162
Rt bot. edge
159.12
Rt edge pvt
324.72
Rt shoulder
15
3
15
17.5
20
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
-27.582608696 16.12086957
-22
14.26
-12
14.76
-12
13.26
0
13.5
12
13.26
12
14.76
22
14.26
Sum
Area
37.3176470588 19.36588235
0
17.5
-27.582608696 16.12086957
Sum
197.8926854 CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
0.05
C2
17.5
Area of Cut
-393.328
-324.72
-159.12
-162
0
177.12
171.12
25
20
15
10
5
0
-40
-30
-20
-10
10
20
30
15
10
426.04941176
653.05882353
0
5
0
-40
388.18023529
-30
-20
-10
10
20
30
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
10
20
30
40
50
Area of Cut
10
20
30
40
50
Station
Profile elevation
Side slope
1+600
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt intersection point
-345.6099082569 Lt shoulder
-171.12
Lt edge pvt
-177.12
Lt bot. edge
0
Ctr bot. edge
162
Rt bot. edge
159.12
Rt edge pvt
324.72
Rt shoulder
15
3
15
16.5
19.46
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
-26.348623853 15.70954128
-22
14.26
-12
14.76
-12
13.26
0
13.5
12
13.26
12
14.76
22
14.26
Sum
Area
34.9221789883 18.567393
0
16.5
-26.348623853 15.70954128
Sum
148.0695763 CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
0.03
C2
16.5
Area of Cut
-375.7313761
-324.72
-159.12
-162
0
177.12
171.12
20
15
10
5
0
-30
-20
-10
10
20
30
10
5
408.48264591
576.21595331
0
0
-30
311.36722308
-20
-10
10
20
30
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
10
20
30
40
Area of Cut
10
20
30
40
Station
Profile elevation
Side slope
1+650
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt intersection point
-370.5980487805 Lt shoulder
-171.12
Lt edge pvt
-177.12
Lt bot. edge
0
Ctr bot. edge
162
Rt bot. edge
159.12
Rt edge pvt
324.72
Rt shoulder
15
3
16.4
17.5
17.76
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
-29.756097561 16.84536585
-22
14.26
-12
14.76
-12
13.26
0
13.5
12
13.26
12
14.76
22
14.26
Area
32.2226737099 17.6675579
0
17.5
-29.756097561 16.84536585
Sum
182.4477708 CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
0.022
C2
17.5
Area of Cut
-424.3219512
-324.72
-159.12
-162
0
177.12
171.12
20
15
10
5
0
-40
-30
-20
-10
10
20
10
5
388.68627387
563.89678992
0
0
-40
230.66111258
-30
-20
-10
10
20
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
10
20
30
40
Area of Cut
10
20
30
40
Station
Profile elevation
Side slope
1+700
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt intersection point
-348.4704911591 Lt shoulder
-171.12
Lt edge pvt
-177.12
Lt bot. edge
0
Ctr bot. edge
162
Rt bot. edge
159.12
Rt edge pvt
324.72
Rt shoulder
15
3
15.7
16
16
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
-26.73870334 15.83956778
-22
14.26
-12
14.76
-12
13.26
0
13.5
12
13.26
12
14.76
22
14.26
388.1572
Rt intersection point
0
Existing Ground
-427.8192534381 Lt intersection point
-90.5325445972
Sum
Area
27.22
16
0
16
-26.73870334 15.83956778
Sum
99.57931749 CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
0.006
C2
16
Area of Cut
-381.2939096
-324.72
-159.12
-162
0
177.12
171.12
18
16
14
12
10
8
6
4
2
0
-30
-20
-10
10
20
30
12
10
8
6
4
2
0
352
435.52
0
-30
108.62609037
-20
-10
10
20
30
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
10
20
30
40
Area of Cut
10
20
30
40
-330
-171.12
-177.12
0
162
159.12
324.72
Station
Profile elevation
Side slope
1+750
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
15
3
15
15
15
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
Lt intersection point
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
15
14.26
14.76
13.26
13.5
13.26
14.76
14.26
-24.22
-22
-12
-12
0
12
12
22
345.3772
0
-363.3
Rt intersection point
Existing Ground
Lt intersection point
-50.3228
Sum
Area
24.22
0
-24.22
15
15
15
Sum
50.3228
CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
0
C2
15
Area of Cut
-345.3772
-324.72
-159.12
-162
0
177.12
171.12
15.5
15
14.5
14
13.5
13
12.5
12
-30
-20
-10
10
20
14.5
14
13.5
13
330
363.3
0
12.5
12
-30
50.3228
-20
-10
10
20
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
10
20
30
Area of Cut
10
20
30
-330
-171.12
-177.12
0
162
159.12
324.72
Station
Profile elevation
Side slope
1+800
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
15
3
15
15
15
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
Lt intersection point
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
15
14.26
14.76
13.26
13.5
13.26
14.76
14.26
-24.22
-22
-12
-12
0
12
12
22
345.3772
0
-363.3
Rt intersection point
Existing Ground
Lt intersection point
-50.3228
Sum
Area
24.22
0
-24.22
15
15
15
Sum
50.3228
CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
0
C2
15
Area of Cut
-345.3772
-324.72
-159.12
-162
0
177.12
171.12
15.5
15
14.5
14
13.5
13
12.5
12
-30
-20
-10
10
20
14.5
14
13.5
13
330
363.3
0
12.5
12
-30
50.3228
-20
-10
10
20
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
10
20
30
Area of Cut
10
20
30
Station
Profile elevation
Side slope
1+850
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt intersection point
-352.8531828442 Lt shoulder
-171.12
Lt edge pvt
-177.12
Lt bot. edge
0
Ctr bot. edge
162
Rt bot. edge
159.12
Rt edge pvt
324.72
Rt shoulder
15
3
16.9
15
15
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
-27.3363431151 16.03878104
-22
14.26
-12
14.76
-12
13.26
0
13.5
12
13.26
12
14.76
22
14.26
345.3772
Rt intersection point
0
Existing Ground
-410.0451467269 Lt intersection point
-119.9211295711 Sum
Area
24.22
15
0
15
-27.3363431151 16.03878104
Sum
62.90243837 CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
-0.038
C2
15
Area of Cut
-389.8162528
-324.72
-159.12
-162
0
177.12
171.12
18
16
14
12
10
8
6
4
2
0
-30
-20
-10
10
20
12
10
8
6
4
2
0
330
363.3
0
-30
5.8837471783
-20
-10
10
20
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
10
20
30
Area of Cut
10
20
30
-330
-171.12
-177.12
0
162
159.12
324.72
Station
Profile elevation
Side slope
1+900
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
15
3
15
15
15
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
Lt intersection point
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
15
14.26
14.76
13.26
13.5
13.26
14.76
14.26
-24.22
-22
-12
-12
0
12
12
22
345.3772
0
-363.3
Rt intersection point
Existing Ground
Lt intersection point
-50.3228
Sum
Area
24.22
0
-24.22
15
15
15
Sum
50.3228
CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
0
C2
15
Area of Cut
-345.3772
-324.72
-159.12
-162
0
177.12
171.12
15.5
15
14.5
14
13.5
13
12.5
12
-30
-20
-10
10
20
14.5
14
13.5
13
330
363.3
0
12.5
12
-30
50.3228
-20
-10
10
20
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
10
20
30
Area of Cut
10
20
30
-330
-171.12
-177.12
0
162
159.12
324.72
Station
Profile elevation
Side slope
1+950
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
15
3
15
15
15
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
Lt intersection point
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
15
14.26
14.76
13.26
13.5
13.26
14.76
14.26
-24.22
-22
-12
-12
0
12
12
22
345.3772
0
-363.3
Rt intersection point
Existing Ground
Lt intersection point
-50.3228
Sum
Area
24.22
0
-24.22
15
15
15
Sum
50.3228
CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
0
C2
15
Area of Cut
-345.3772
-324.72
-159.12
-162
0
177.12
171.12
15.5
15
14.5
14
13.5
13
12.5
12
-30
-20
-10
10
20
14.5
14
13.5
13
330
363.3
0
12.5
12
-30
50.3228
-20
-10
10
20
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
10
20
30
Area of Cut
10
20
30
-406.12
-171.12
-177.12
0
162
159.12
324.72
Station
Profile elevation
Side slope
2+000
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
15
3
20
15
15
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
Lt intersection point
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
18.46
14.26
14.76
13.26
13.5
13.26
14.76
14.26
-34.6
-22
-12
-12
0
12
12
22
345.3772
0
-519
Rt intersection point
Existing Ground
Lt intersection point
-282.1428
Sum
Area
24.22
0
-34.6
15
15
18.46
Sum
92.2234
CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
-0.1
C2
15
Area of Cut
-493.396
-324.72
-159.12
-162
0
177.12
171.12
20
15
10
5
0
-40
-30
-20
-10
10
20
10
5
330
363.3
0
0
-40
-97.696
-30
-20
-10
10
20
Proposed
Existing
20
40
60
80
ea of Cut
20
15
Area of Cut
10
5
0
0
10
20
30
Area of Cut
10
5
0
0
10
20
30
Station
Profile elevation
Side slope
0+550
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
-100
-50
0
50
100
Existing Ground:
Lt pt on cut slope
Lt pt on fill slope
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
Rt pt on fill slope
Rt pt on cut slope
Lt intersection point
-263.6752424368 Lt shoulder
-147.12
Lt edge pvt
-153.12
Lt bot. edge
0
Ctr bot. edge
138
Rt bot. edge
135.12
Rt edge pvt
280.72
Rt shoulder
13
3
13.09
11.67
12.25
15.5
20
24.52
0
12.26
12.76
11.26
11.5
11.26
12.76
12.26
0
24.52
-22.824285122 11.98523829
-22
12.26
-12
12.76
-12
11.26
0
11.5
12
11.26
12
12.76
22
12.26
Sum
Area
18.4351464435 13.44828452
0
12.25
-22.824285122 11.98523829
Sum
25.96245377 FILL
30
25
20
15
10
5
0
-80
-60
-40
-20
20
m1
C1
0.33333333 19.5933333
m2
0.0116
C2
12.25
-279.8257356
-280.72
-135.12
-138
0
153.12
147.12
Area of Fill
40
295.86225941
225.83054393
0
-11.73293225
-24
-22
-20
-18
-16
-14
-12
Area of Cut
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
-15
-10
-5
10
15
20
25
Proposed
Existing
20
40
60
80
a of Fill
13
12.8
12.6
12.4
12.2
12
11.8
11.6
Area of Fill
12.6
12.4
Area of Fill
12.2
12
11.8
11.6
-16
-14
-12
11.4
-10
of Cut
Area of Cut
15
20
25
30
Station
Profile elevation
Side slope
2+100
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt intersection point
-282.8126365796 Lt shoulder
-171.12
Lt edge pvt
-177.12
Lt bot. edge
0
Existing Ground
-347.6061325848 Lt intersection point
-978.6587691643 Sum
Area
15
3
12.27
13.5
14.26
28.52
0
14.26
14.76
13.26
13.5
13.26
14.76
14.26
0
28.52
-26.214640466 12.85511984
-22
14.26
-12
14.76
-12
13.26
0
13.5
-26.214640466 12.85511984
Sum
97.63172101 FILL
Rt intersection point
304.7651415455 Rt shoulder
171.12
Rt edge pvt
177.1211019216 Rt inner intersection
317.7206384394 Rt intersection point
970.7268819065 Sum
0
162
159.1209899377
0
23.221117062 13.85296098
22
14.26
12
14.76
12.0000746559 13.68240113
23.221117062 13.85296098
Sum
Area
7.775813486 FILL
0
13.5
12
13.26
12.0000746559 13.68240113
0
13.5
321.1209899377 Sum
Area
Sum
2.534415767 CUT
16
14
12
10
8
6
4
2
0
-80
-60
-40
-20
20
40
m1
C1
0.33333333 21.5933333
m2
0.0246
C2
13.5
Area of Fill
-373.8207731
-324.72
-159.12
-162
-154.2614381
-1173.922211
15
14
Area of F
13
12
11
-30
-25
-20
-15
-10
-5
331.1331293
324.72
164.18881362
166.23656596
Area of Fill
15
14.5
Area of Fill
14
986.27850888
13.5
13
10
0
0
164.18881362
162.00100786
326.18982147
12
14
16
18
20
22
24
Area of Cut
13.8
13.6
Area of Cu
13.4
13.2
13
0
10
12
14
Proposed
Existing
20
40
60
15
14
Area of Fill
13
12
11
-5
80
Area of Fill
22
24
t
Area of Cut
12
14
m1
C1
13.26 -16666.667 200014.927
14.76
y2
m2
13.5 0.0152
14.26
C2
13.5
m1
C1
-16666.667
-199986.91
14.76
13.26
y2
13.5
12.27
right cut slope
-12.000007
13.2047998
m2
0.0246
C2
13.5
Station
Profile elevation
Side slope
2+150
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt intersection point
-320.6129721538 Lt shoulder
-171.12
Lt edge pvt
-177.12
Lt bot. edge
0
Ctr bot. edge
162
Rt bot. edge
159.12
Rt edge pvt
324.72
Rt shoulder
15
3
14.07
15
16.43
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
-22.939950748 14.57331692
-22
14.26
-12
14.76
-12
13.26
0
13.5
12
13.26
12
14.76
22
14.26
Sum
Area
26.4931087289 15.75770291
0
15
-22.939950748 14.57331692
Sum
54.33145009 CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
0.0186
C2
15
Area of Cut
-327.1236977
-324.72
-159.12
-162
0
177.12
171.12
16
15.5
15
14.5
14
13.5
13
12.5
12
-30
-20
-10
10
20
14.5
14
13.5
13
346.66946401
397.39663093
0
12.5
12
-30
119.34239728
-20
-10
10
20
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
10
20
30
Area of Cut
10
20
30
m1
C1
-16666.667
-199986.91
14.76
13.26
y2
15
14.07
right cut slope
-12.000101
14.7767981
m2
0.0186
C2
15
-330
-171.12
-177.12
0
162
159.12
324.72
Station
Profile elevation
Side slope
2+200
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
15
3
15
15
20
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
Lt intersection point
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
15
14.26
14.76
13.26
13.5
13.26
14.76
14.26
-24.22
-22
-12
-12
0
12
12
22
493.396
0
-363.3
Rt intersection point
Existing Ground
Lt intersection point
97.696
Sum
Area
34.6
0
-24.22
18.46
15
15
Sum
92.2234
CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
0
C2
15
Area of Cut
-345.3772
-324.72
-159.12
-162
0
177.12
171.12
20
15
10
5
0
-30
-20
-10
10
20
30
10
5
406.12
519
0
0
-30
282.1428
-20
-10
10
20
30
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
10
20
30
40
Area of Cut
10
20
30
40
Station
Profile elevation
Side slope
2+250
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt intersection point
-354.6591304348 Lt shoulder
-171.12
Lt edge pvt
-177.12
Lt bot. edge
0
Ctr bot. edge
162
Rt bot. edge
159.12
Rt edge pvt
324.72
Rt shoulder
15
3
15
17.5
22
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
-27.582608696 16.12086957
-22
14.26
-12
14.76
-12
13.26
0
13.5
12
13.26
12
14.76
22
14.26
Sum
Area
43.4520547945 21.41068493
0
17.5
-27.582608696 16.12086957
Sum
230.3232543 CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
0.05
C2
17.5
Area of Cut
-393.328
-324.72
-159.12
-162
0
177.12
171.12
25
20
15
10
5
0
-40
-30
-20
-10
10
20
30
15
10
471.03506849
760.4109589
0
5
0
-40
540.5180274
-30
-20
-10
10
20
30
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
10
20
30
40
50
Area of Cut
10
20
30
40
50
Station
Profile elevation
Side slope
2+300
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt intersection point
-344.9390090256 Lt shoulder
-171.12
Lt edge pvt
-177.12
Lt bot. edge
0
Ctr bot. edge
162
Rt bot. edge
159.12
Rt edge pvt
324.72
Rt shoulder
15
3
15
16.43
18.21
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
-26.257137594 15.67904586
-22
14.26
-12
14.76
-12
13.26
0
13.5
12
13.26
12
14.76
22
14.26
Sum
Area
31.9189431258 17.56631438
0
16.43
-26.257137594 15.67904586
Sum
131.2200102 CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
0.0286
C2
16.43
Area of Cut
-374.4267821
-324.72
-159.12
-162
0
177.12
171.12
20
15
10
5
0
-30
-20
-10
10
20
30
10
5
386.45891626
524.42823556
0
0
-30
238.86036972
-20
-10
10
20
30
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
10
20
30
40
Area of Cut
10
20
30
40
-330
-171.12
-177.12
0
162
159.12
324.72
Station
Profile elevation
Side slope
2+350
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
15
3
15
15
16.15
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
Lt intersection point
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
15
14.26
14.76
13.26
13.5
13.26
14.76
14.26
-24.22
-22
-12
-12
0
12
12
22
Sum
Area
26.015037594 15.59834586
0
15
-24.22
15
Sum
57.56876842 CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
0
C2
15
Area of Cut
-345.3772
-324.72
-159.12
-162
0
177.12
171.12
16
15.5
15
14.5
14
13.5
13
12.5
12
-30
-20
-10
10
20
14.5
14
13.5
13
343.16360902
390.22556391
0
12.5
12
-30
90.411972932
-20
-10
10
20
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
10
20
30
Area of Cut
10
20
30
-330
-171.12
-177.12
0
162
159.12
324.72
Station
Profile elevation
Side slope
2+400
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
15
3
15
15
15
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
Lt intersection point
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
15
14.26
14.76
13.26
13.5
13.26
14.76
14.26
-24.22
-22
-12
-12
0
12
12
22
345.3772
0
-363.3
Rt intersection point
Existing Ground
Lt intersection point
-50.3228
Sum
Area
24.22
0
-24.22
15
15
15
Sum
50.3228
CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
0
C2
15
Area of Cut
-345.3772
-324.72
-159.12
-162
0
177.12
171.12
15.5
15
14.5
14
13.5
13
12.5
12
-30
-20
-10
10
20
14.5
14
13.5
13
330
363.3
0
12.5
12
-30
50.3228
-20
-10
10
20
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
10
20
30
Area of Cut
10
20
30
Station
Profile elevation
Side slope
2+450
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-60
0
50
Lt intersection point
-581.9433856894 Lt shoulder
-171.12
Lt edge pvt
-177.12
Lt bot. edge
0
Ctr bot. edge
162
Rt bot. edge
159.12
Rt edge pvt
324.72
Rt shoulder
15
3
26.7
16.25
15.5
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
-58.57591623 26.45197208
-22
14.26
-12
14.76
-12
13.26
0
13.5
12
13.26
12
14.76
22
14.26
Area
26.7655502392 15.84851675
0
16.25
-58.57591623 26.45197208
Sum
252.6201362 CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
-0.1741667
C2
16.25
Area of Cut
-835.2925654
-324.72
-159.12
-162
0
177.12
171.12
30
25
20
15
10
5
0
-80
-60
-40
-20
20
20
15
10
348.66736842
434.94019139
0
5
0
-80
-349.2850056
-60
-40
-20
20
Proposed
Existing
20
40
60
80
ea of Cut
30
25
20
Area of Cut
15
10
5
0
0
20
40
20
Area of Cut
15
10
5
0
0
20
40
Station
Profile elevation
Side slope
2+500
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-120
0
50
Lt intersection point
-623.2178723404 Lt shoulder
-171.12
Lt edge pvt
-177.12
Lt bot. edge
0
Ctr bot. edge
162
Rt bot. edge
159.12
Rt edge pvt
324.72
Rt shoulder
15
3
36
19.5
17
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
-64.204255319 28.32808511
-22
14.26
-12
14.76
-12
13.26
0
13.5
12
13.26
12
14.76
22
14.26
467.728
Rt intersection point
0
Existing Ground
-1251.9829787234 Lt intersection point
-1109.8728510638 Sum
Area
32.8
17.86
0
19.5
-64.204255319 28.32808511
Sum
464.6200851 CUT
40
35
30
25
20
15
10
5
0
-150
-100
-50
50
m1
C1
-0.3333333 6.92666667
m2
-0.1375
C2
19.5
Area of Cut
-915.5526809
-324.72
-159.12
-162
0
177.12
171.12
30
25
20
15
10
5
0
-80
-60
-40
-20
20
20
15
10
392.92
639.6
0
5
0
-80
-180.6326809
-60
-40
-20
20
5
Proposed
Existing
0
0
50
100
ea of Cut
30
25
20
Area of Cut
15
10
5
0
0
20
40
20
Area of Cut
15
10
5
0
0
20
40
Station
Profile elevation
Side slope
2+550
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-60
0
50
Lt intersection point
-637.3644444444 Lt shoulder
-171.12
Lt edge pvt
-177.12
Lt bot. edge
0
Ctr bot. edge
162
Rt bot. edge
159.12
Rt edge pvt
324.72
Rt shoulder
15
3
28
18.5
18.3
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
-66.133333333 28.97111111
-22
14.26
-12
14.76
-12
13.26
0
13.5
12
13.26
12
14.76
22
14.26
Area
34.3083003953 18.3627668
0
18.5
-66.133333333 28.97111111
Sum
436.0089205 CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
-0.1583333
C2
18.5
Area of Cut
-943.0613333
-324.72
-159.12
-162
0
177.12
171.12
35
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
25
20
15
10
403.98086957
634.70355731
0
5
0
-80
-201.9769065
-60
-40
-20
20
40
Proposed
Existing
20
40
60
80
ea of Cut
35
30
25
Area of Cut
20
15
10
5
0
0
20
40
60
25
Area of Cut
20
15
10
5
0
0
20
40
60
Station
Profile elevation
Side slope
2+600
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt intersection point
-530.8252631579 Lt shoulder
-171.12
Lt edge pvt
-177.12
Lt bot. edge
0
Ctr bot. edge
162
Rt bot. edge
159.12
Rt edge pvt
324.72
Rt shoulder
15
3
24
20
20
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
-51.605263158 24.12842105
-22
14.26
-12
14.76
-12
13.26
0
13.5
12
13.26
12
14.76
22
14.26
559.2772
Rt intersection point
0
Existing Ground
-1032.1052631579 Lt intersection point
-706.0533263158 Sum
Area
39.22
20
0
20
-51.605263158 24.12842105
Sum
448.4811368 CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
-0.08
C2
20
Area of Cut
-735.8910526
-324.72
-159.12
-162
0
177.12
171.12
30
25
20
15
10
5
0
-60
-40
-20
20
40
20
15
10
440
784.4
0
5
0
-60
190.90894737
-40
-20
20
40
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
20
40
60
Area of Cut
20
40
60
Station
Profile elevation
Side slope
2+650
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt intersection point
-444.4747169811 Lt shoulder
-171.12
Lt edge pvt
-177.12
Lt bot. edge
0
Ctr bot. edge
162
Rt bot. edge
159.12
Rt edge pvt
324.72
Rt shoulder
15
3
20
21
22.5
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
-39.830188679 20.20339623
-22
14.26
-12
14.76
-12
13.26
0
13.5
12
13.26
12
14.76
22
14.26
Sum
Area
46.3956043956 22.39186813
0
21
-39.830188679 20.20339623
Sum
461.5288306 CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
0.02
C2
21
Area of Cut
-567.9784906
-324.72
-159.12
-162
0
177.12
171.12
25
20
15
10
5
0
-60
-40
-20
20
40
15
10
492.6210989
974.30769231
0
5
0
-60
601.35030064
-40
-20
20
40
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
20
40
60
Area of Cut
20
40
60
Station
Profile elevation
Side slope
2+700
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt intersection point
-444.4747169811 Lt shoulder
-171.12
Lt edge pvt
-177.12
Lt bot. edge
0
Ctr bot. edge
162
Rt bot. edge
159.12
Rt edge pvt
324.72
Rt shoulder
15
3
20
21
22.5
0
28.52
14.26
14.76
13.26
13.5
13.26
14.76
14.26
28.52
0
-39.830188679 20.20339623
-22
14.26
-12
14.76
-12
13.26
0
13.5
12
13.26
12
14.76
22
14.26
Sum
Area
46.3956043956 22.39186813
0
21
-39.830188679 20.20339623
Sum
461.5288306 CUT
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 6.92666667
m2
0.02
C2
21
Area of Cut
-567.9784906
-324.72
-159.12
-162
0
177.12
171.12
25
20
15
10
5
0
-60
-40
-20
20
40
15
10
492.6210989
974.30769231
0
5
0
-60
601.35030064
-40
-20
20
40
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
20
40
60
Area of Cut
20
40
60
Station
Profile elevation
Side slope
2+750
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt intersection point
-405.2826043406 Lt shoulder
-183.12
Lt edge pvt
-189.12
Lt bot. edge
0
Ctr bot. edge
174
Rt bot. edge
171.12
Rt edge pvt
346.72
Rt shoulder
16
3
17.2
20.5
21.4
0
30.52
15.26
15.76
14.26
14.5
14.26
15.76
15.26
30.52
0
-31.485809683 18.42193656
-22
15.26
-12
15.76
-12
14.26
0
14.5
12
14.26
12
15.76
22
15.26
Sum
Area
39.8731501057 21.2177167
0
20.5
-31.485809683 18.42193656
Sum
303.3966605 CUT
35
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 7.92666667
m2
0.066
C2
20.5
Area of Cut
-480.4734558
-346.72
-171.12
-174
0
189.12
183.12
25
20
15
10
5
0
-40
-30
-20
-10
10
20
30
15
10
466.78976744
817.39957717
0
5
0
-40
484.11588885
-30
-20
-10
10
20
30
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
10
20
30
40
50
Area of Cut
10
20
30
40
50
Station
Profile elevation
Side slope
2+800
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt intersection point
-360.3982608696 Lt shoulder
-195.12
Lt edge pvt
-201.12
Lt bot. edge
0
Ctr bot. edge
186
Rt bot. edge
183.12
Rt edge pvt
368.72
Rt shoulder
17
3
15
17.5
21
0
32.52
16.26
16.76
15.26
15.5
15.26
16.76
16.26
32.52
0
-22.365217391 16.38173913
-22
16.26
-12
16.76
-12
15.26
0
15.5
12
15.26
12
16.76
22
16.26
Area
32.5569620253 19.77898734
0
17.5
-22.365217391 16.38173913
Sum
90.21974243 CUT
35
30
25
20
15
10
5
0
-80
-60
-40
-20
20
40
m1
C1
-0.3333333 8.92666667
m2
0.05
C2
17.5
Area of Cut
-363.6584348
-368.72
-183.12
-186
0
201.12
195.12
25
20
15
10
5
0
-30
-20
-10
10
20
30
15
10
435.13772152
569.74683544
0
5
0
-30
299.62612218
-20
-10
10
20
30
Proposed
Existing
20
40
60
80
ea of Cut
Area of Cut
10
20
30
40
Area of Cut
10
20
30
40
m1
C1
-16666.667
-199984.91
16.76
15.26
y2
m2
17.5
15
C2
0.05
17.5
Station
Profile elevation
Side slope
2+850
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt intersection point
-380.7045094664 Lt shoulder
-207.12
Lt edge pvt
-213.12
Lt bot. edge
0
Ctr bot. edge
198
Rt bot. edge
195.12
Rt edge pvt
390.72
Rt shoulder
18
3
15.8
18.5
22.8
0
34.52
17.26
17.76
16.26
16.5
16.26
17.76
17.26
34.52
0
-22.134251291 17.30475043
-22
17.26
-12
17.76
-12
16.26
0
16.5
12
16.26
12
17.76
22
17.26
Area
34.6630727763 21.48102426
0
18.5
-22.134251291 17.30475043
Sum
98.2578625 CUT
40
35
30
25
20
15
10
5
0
-100
-80
-60
-40
-20
20
40
60
m1
C1
-0.3333333 9.92666667
m2
0.054
C2
18.5
Area of Cut
-382.0371773
-390.72
-195.12
-198
0
213.12
207.12
25
20
15
10
5
0
-30
-20
-10
10
20
30
15
10
472.58253369
641.26684636
0
5
0
-30
368.21220277
-20
-10
10
20
30
Proposed
Existing
20
40
60
80
100
ea of Cut
Area of Cut
10
20
30
40
Area of Cut
10
20
30
40
m1
C1
-16666.667
-199983.91
17.76
16.26
y2
m2
18.5
15.8
C2
0.054
18.5
Station
Profile elevation
Side slope
2+900
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
50
Lt intersection point
-420.5886131387 Lt shoulder
-207.12
Lt edge pvt
-213.12
Lt bot. edge
0
Ctr bot. edge
198
Rt bot. edge
195.12
Rt edge pvt
390.72
Rt shoulder
18
3
18.4
20
26
0
34.52
17.26
17.76
16.26
16.5
16.26
17.76
17.26
34.52
0
-27.572992701 19.11766423
-22
17.26
-12
17.76
-12
16.26
0
16.5
12
16.26
12
17.76
22
17.26
814.995625
Rt intersection point
0
Existing Ground
-551.4598540146 Lt intersection point
206.5471578467 Sum
Area
47.21875
25.66625
0
20
-27.572992701 19.11766423
Sum
231.4877441 CUT
40
35
30
25
20
15
10
5
0
-100
-80
-60
-40
-20
20
40
60
m1
C1
-0.3333333 9.92666667
m2
0.032
C2
20
Area of Cut
-475.909854
-390.72
-195.12
-198
0
213.12
207.12
30
25
20
15
10
5
0
-40
-30
-20
-10
10
20
30
40
20
15
10
564.6575
944.375
0
5
0
-40
669.52264599
-30
-20
-10
10
20
30
40
Proposed
Existing
20
40
60
80
100
ea of Cut
Area of Cut
20
30
40
50
60
Area of Cut
20
30
40
50
60
Station
Profile elevation
Side slope
2+945
0
X:1
Shrinkage
Road width (m)
Depth of road pavement (m)
Road shoulder (m)
Road reserve (m)
10%
12
1.5
10
30
Existing Ground:
-50
0
60
-479.303497053
-207.12
-213.12
0
198
195.12
390.72
Lt intersection point
Lt shoulder
Lt edge pvt
Lt bot. edge
Ctr bot. edge
Rt bot. edge
Rt edge pvt
Rt shoulder
18
3
21.7
22
28.7
0
34.52
17.26
17.76
16.26
16.5
16.26
17.76
17.26
34.52
0
-35.57956778 21.78652259
-22
17.26
-12
17.76
-12
16.26
0
16.5
12
16.26
12
17.76
22
17.26
Sum
Area
54.4661654135 28.08205514
0
22
-35.57956778 21.78652259
Sum
398.3627427 CUT
40
35
30
25
20
15
10
5
0
-100
-80
-60
-40
-20
20
40
60
m1
C1
-0.3333333 9.92666667
m2
0.006
C2
22
Area of Cut
-614.1033399
-390.72
-195.12
-198
0
213.12
207.12
30
25
20
15
10
5
0
-60
-40
-20
20
40
60
20
15
10
617.80521303
1198.2556391
0
5
0
-60
838.35751225
-40
-20
20
40
60
Proposed
Existing
20
40
60
80
100
ea of Cut
Area of Cut
20
40
60
80
Area of Cut
20
40
60
80