Вы находитесь на странице: 1из 141

Celcom 3G Project

NodeB Project File

Celcom 3G Project
NodeB Project File

Site Code:

NW 40054

Site Name:

IGEAST

Equipment Type:

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

BTS3812A

Huawei
Confidential

Date
06/11/2007

Page
Page 1 of 51

Celcom 3G Project
NodeB Project File

COPYRIGHT for Huawei


All rights reserved.
No part of this document may be copied, distributed, transmitted, transcribed, stored in a retrieval system or translated into any human or
computer language without the prior written permission of Huawei. The manufacturer will if necessary explain issue which may not be
covered by the documents. The manufacturers liability for any errors in the documents is limited to the correction of errors services.
The documents have been prepared to be used by professional and properly trained personnel and the customer assumes full responsibility
when using them. The manufacturer welcomes customer comments as part of the process of continual development and improvement of the
documentation in the best way possible from the users viewpoint.
Any trademarks mentioned in the documents are the property of their respective owners.

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 2 of 51

Celcom 3G Project
NodeB Project File

Table of Contents
Chapter 1

Map Reference ..........................................................................................01-01

Chapter 2

SDP ............................................................................................................02-01

Chapter 3

Project Description
Project Description .....................................................................................03-01
Node B cell parameter and data configuration............................................03-02

Chapter 4

Project Responsibility Interface .............................................................04-01

Chapter 5

Equipment Location
Node B Installed .........................................................................................05-01
AC/DC Power Tapping Point ......................................................................05-02
E1 Connection Point ...................................................................................05-03

Chapter 6

Antenna Location
Antenna Location........................................................................................06-01
Sector Beam width View.............................................................................06-02
Panoramic View..........................................................................................06-03

Chapter 7

Feeder Cable Routing


Feeder Cable Routing.................................................................................07-01
Earth Point..................................................................................................07-02

Chapter 8

Engineering Drawing................................................................................08-01

Chapter 9

Material Request & BOQ .........................................................................09-01

Chapter 10

Hardware Configuration
Cabinet Board Layout .................................................................................10-01
Board Information .......................................................................................10-02
Host Version Information List......................................................................10-03

Chapter 11

External Cable Connection ......................................................................11-01

Chapter 12

DTF & VSWR Plots....................................................................................12-01

Chapter 13

Commissioning & Integration Checklist.................................................13-01

Chapter 14

Equipment Installation Report.................................................................14-01

Chapter 15

Node B Hardware Installation Acceptance .............................................15-01

Chapter 16

User Acceptance Report ..........................................................................16-01

Chapter 17

Single Site Verification Report ................................................................17-01

Chapter 18

Punch List ................................................................................................18-01

Chapter 19

Certification of Acceptance .....................................................................19-01

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 3 of 51

Celcom 3G Project
NodeB Project File

1
MAP REFERENCE

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 4 of 51

Celcom 3G Project
NodeB Project File

1 Map Reference

MAP AND SQUARE


MAP REFERENCE: IGEAST

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 5 of 51

Celcom 3G Project
NodeB Project File

2
SDP

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 6 of 51

3G SITE DESIGN PACKAGE


IG EAST
IPOH
PERAK DARUL RIDZUAN
NORTHERN REGION

G 2554

SITE PICTURE

PEMBINAAN
SDN BHD

CELCOM (M) BHD.


NORTHERN REGION

SITE DESIGN PACKAGE

SITE ID

: G 2554

SITE NAME

: IG EAST

SITE CONFIGURATION :
FREQ. BAND

1 +1 +1

: 3G
Prepared by ;

PEMBINAAN
SDN BHD

CELCOM (M) BHD

1 Site Information

NORTHERN REGION
PERAK

2 RF Design
3 Existing 2G Information
4 New 3G Information
5 Site Picture
6 Mobile Checklist / BOQ
7 Transmission Check List

G 2554

8 CME BOQ

IG EAST

9 INSTALLATION PLAN

1 + 1 +1

10 SMU

CELCOM (M) BHD.


NORTHERN REGION

Site Informations

SITE ID

: G 2554

SITE NAME

: IG EAST

SITE CONFIGURATION :

1 +1 +1

Site Informations
Survey Date : 7 March 2006
Project:

Celcom 3G, Northern Region, Malaysia


Celcom (M) Bhd.

Site:

G 2554 IG EAST

SITE INFORMATIONS

1.0
1.1

Site Location and Access

Legend
Site Location
GPS Position

1.2

Latitude:

N 04 37' 06"

Longitude :

E 101 7' 30"

Altitude :

18m

Address

Water Tank Tower


Jalan Perajurit 11,T.Ipoh Timur
31400 Ipoh Perak

14(33)

Site Informations
Survey Date : 7 March 2006
Project:

Celcom 3G, Northern Region, Malaysia


Celcom (M) Bhd.

Site:

G 2554 IG EAST

1.3

1.4

Site Details (Existing)


Type of Site

Land Outdoor

Height of Building

N/A

Equipment Location

Plinth Outdoor

Plinth Dimension

4000mm(L) x 900mm(w) x 400mm(H)

Air Conditioning

NA

Cable Ladder

300mm cable Ladder

Lightning Protection

Good Condition

Type of Tower

3m Tripod floor Mount

Type of terrain

Flat

Access road

Tar / Good / Car

Distance to main road

1Km

Site Access Information

J.Tasek--> Jalan Perajurit 119(behind jusco) --> Menara Air

Contact Information
Celcom

Mizazuddin b Muhiyuddin

Telephone No.

04-3973030

Fax No.

04-3974040

Mobile No.

019-5713060

Contractor Name

Mohd Yazid B md Yunus

Telephone No.

03-4252 9589

Fax No.

03-4252 5313

Mobile No.

019-3555014

15(33)

CELCOM (M) BHD.


NORTHERN REGION

RF DESIGN

SITE ID

: G 2554

SITE NAME

: IG EAST

SITE CONFIGURATION :

1 +1 +1

RSCP Coverage Prediction Plots


RSCP Coverage with G2554

RSCP Coverage without G2554

Legend :

10

Site Nodes :

RSCP Coverage Prediction Plots


Single Site RSCP Coverage with G2554

Legend :

10

Site Nodes :

Technical Site Survey Report (Proposed Antenna Location)


IGEAST

Site Name:
Site ID :
Existing 2G Site Name:

6-Mac-2006

Survey Date:

G2554

Building Height(m):

IGEAST

Structure Height(m):

Existing 2G Site ID:

G2554

Co-locate Operator:

No

18
3
Ipoh

Area:
Cluster No:

Candidate:

Lat (N-WGS 84-Decimal):

4.61828

101 7" 30'

Long (E-WGS 84-Decimal):

101.125

4 37" 5'

Node B room Type:

Outdoor

Node B Configuration:

S1+1+1

Transmission Type on site:

Alcatel

Phase:

Version:

Amsl(m):

Outdoor

Node B Type:

Reason for Node B type:


3G System

Cell Site RF Configuration


Sector 1

Sector 2

Sector 3

Singleband
65
20
80

Singleband
65
20
200

Singleband
65
20
320

Electrical Tilt

Mech. Tilt

Cable Length (m)

62

57

25

Cable Type (inch)

15/8"

15/8"

7/8"

Bipod

Bipod

Bipod

Cell ID
Antenna Type

Manufacturer Kathrein

Beam width (deg)


Antenna Height (mid. of ant)
Antenna Direction (deg)

Structure type

Mount

Type

Pole

Pole

Pole

Height (m)

No of Pole/ Tripod

MHA (Y/N)

Comment/ Problem:
Sector 1 cover housing and shoplot area. Proposed using new 3m boom at height 20m.
Sector 1 :
Sector 1 cover housing, shoplot area, main road and commercial area.Proposed using new 3m boom at height 20m.
Sector 2 :
Sector 3 cover housing, shoplot, apartment and commercial area.Proposed using new 3m boom at height 20m.
Sector 3 :
Proposed 3G antennae for all sectors. Using new 3m boom at height 20m.Azimuth for new sectors same as existing sectors.
Others:

Technical Site Surveyor :


Contact No:
RF Planner
Contact No:
TM/Celcom Reviewer :

Aircom Confidential

Mohd Faizal Aziz


013-4566019

Company :
Company :

11/7/2007

Signature
Aircom International

Signature

Page 1

Technical Site Survey Report (Existing Antenna System Locations)


IGEAST

Site Name:
Site ID :
Existing 2G Site Name:

Survey Date:

6-Mac-2006

G2554

Building Height(m):

IGEAST

Structure Height(m):

Existing 2G Site ID:

G2554

Co-locate Operator:

No

18
3

Area:

Ipoh

Cluster No:

Lat (N-WGS 84- Decimal):

101.125

101 7" 30'

Long (E-WGS 84-Decimal):

4.61828

4 37" 5'

BTS room Type:

Outdoor

BTS Configuration:

S2+2+2

Transmission Type on site:

Alcatel

Phase:

Version:

Amsl(m):

BTS Type:

GSM 1800

Cell Site RF Configuration


Sector 1

Sector 2

Sector 3

Kathrein
65
20
80

Kathrein
65
20
190

Kathrein
65
20
320

Electrical Tilt

Mech. Tilt

Cable Length (m)

52

44

22

Cell ID
Antenna Type

Model Number
Beam width (deg)

Antenna Height (mid. of ant)


Antenna Direction (deg)

Cable Type (inch)


Structure type

Mount

7/8"

7/8'

7/8"

Bipod

Bipod

Bipod

Type

Pole

Pole

Pole

Height (m)

No of Pole/ Tripod

MHA (Y/N)

Comment/ Problem:
Sector 1 cover housing and shoplot area.
Sector 1 :
Sector 1 cover housing, shoplot area, main road and commercial area.
Sector 2 :
Sector 3 cover housing, shoplot, apartment and commercial area.
Sector 3 :

Others:

Technical Site Surveyor :


Contact No:
RF Planner
Contact No:
TM/Celcom Reviewer :

Aircom Confidential

Mohd Faizal Aziz


013-4566019

Company :
Company :

11/7/2007

Signature
Aircom International

Signature

Page 2

Technical Site Survey Drawing

SIDE VIEW

Technical Site Surveyor :


Contact No:
RF Planner
Contact No:
TM/Celcom Reviewer :

Aircom Confidential

Company :
Company :

11/7/2007

Signature
Aircom International

Signature

Page 3

Technical Site Survey Drawing

PLAN VIEW

Technical Site Surveyor :


Contact No:
RF Planner
Contact No:
TM/Celcom Reviewer :

Aircom Confidential

Company :
Company :

11/7/2007

Signature
Aircom International

Signature

Page 4

Technical Site Survey Photograph

Site Photograph (Size 6" x 6")

Please Do not "Zoom in" on the photo

Site View

Aircom Confidential

11/7/2007

Page 5

Technical Site Survey Photograph


Sectorial RF View (size 3.2" x 4.2")
Sector 1

80

Degree

Please Do not "Zoom in" on the photo

Shoplot
Housing Area

Sector 2

200

Degree
Commercial Area

Housing Area

Shoplot

Main Road

Sector 3

320

Degree

Commercial Area

Housing Area

Apartment Area

Shoplot

Aircom Confidential

11/7/2007

Page 6

Technical Site Survey Photograph


Panoramic View (size 3.2" x 4.2")
0 degree

Please Do not "Zoom in" on the photo

40 degree

80 degree

Aircom Confidential

11/7/2007

Page 7

Technical Site Survey Photograph


120 degree

160 degree

200 degree

Aircom Confidential

11/7/2007

Page 8

Technical Site Survey Photograph


240 degree

280 degree

320 degree

Aircom Confidential

11/7/2007

Page 9

CELCOM (M) BHD.


NORTHERN REGION

2G Info

SITE ID

: G 2554

SITE NAME

: IG EAST

SITE CONFIGURATION :

2 + 2+ 2

Existing 2G
Survey Date : 7 March 2006
Project:

Celcom 3G, Northern Region, Malaysia


Celcom (M) Bhd.

Site:

G 2554 IG EAST

EXISTING 2G

2.0
2.1

Exiting Equipment
Alcatel Evolium MBO2

Existing Equipment Type


No Of Cabinet

Configuration

1800 (2 + 2 + 2)

Comments :

2.2

Cell 1

Cell 2

Cell 3

Khaterine

Khaterine

Khaterine

Height AGL (m)

20

20

20

Gain (dBi)

15

15

15

GSM1800

GSM1800

GSM1800

X-pol

X-pol

X-pol

Existing Antenna Data 2G


Make

Antenna Band
Polarization

Sect. 1: M-tilt=0 ; E-tilt= 0 ;Sect. 2: M-tilt=0 ; E-tilt= 0

Comments :

Sect. 3: M-tilt=0 ; E-tilt= 0


Sect 1=80 ; Sect.2=190; Sect.3=320

2.3

Cell 1

Feeder Data 2G

Cell 3

TOTAL
6

7/8"

7/8"

7/8"

Tx

52

44

22

118

Rx

52

44

22

118

TOTAL

104

88

44

236

Total no. of feeders (pcs)


Type of feeders
Feeder lengths (m)

Cell 2

Comments :

2.4

Antenna Support Detail


Type of antenna support

3.0 m Tripod Floor Mount

No. of H-Boom

NA

No. of G.I. Pipe

NA

Length of G.I. Pipes (m)

NA

Comments :

16(33)

CELCOM (M) BHD.


NORTHERN REGION

NEW 3G REQUIREMENT

SITE ID

: G 2554

SITE NAME

: IG EAST

SITE CONFIGURATION :

1+1+1

Site Requirements
Survey Date : 7 March 2006
Project:

Celcom 3G, Northern Region, Malaysia


Celcom (M) Bhd.

Site:

G 2554 IG EAST

NEW SITE REQUIREMENTS

3.0
3.1

Cell 1

Feeder Data

Comments :

TOTAL
6

1 5/8"

1 5/8"

62

57

25

Tx

Feeder lengths (m)

Cell 3

1 5/8"

Total no. of feeders (pcs)


Type of feeders

Cell 2

144

Rx

62

57

25

144

TOTAL

124

114

50

288

1. New 3 x 3m tripod floor mount


2.New 3 x MGB 10 holes c/w isolator
3. Azimuth : Sect 1=80 ; Sect.2=200; Sect.3=320

3.2

CABLING
Cable required
Cable

Cable type / size

Connector type / size

Length Needed

Coax/3C2.5V

Siemens (male)

3E1 x 15m

Node B E1 to DF

NA

NA

NA

Grounding / 35mm

Cable Lug / 35mm

15m

10mm

Cable Lug / 10mm

15m

DDF to DF
Node B to MGB
Node B to Breaker

DDF free space (ports) :

YES

Comments :

3.3

Antenna Support Detail


Type of antenna support

3m Tripod Floor Mount

No. of H-Boom

NA

No. of G.I. Pipe

NA

Length of G.I. Pipes (m)

NA

Other Special Bracket

NA

Comments :

1. New 3m Tripod floor mount 3 pcs

17(33)

Site Requirements
Survey Date : 7 March 2006
Project:

Celcom 3G, Northern Region, Malaysia


Celcom (M) Bhd.

Site:

G 2554 IG EAST

3.4

OTHERS
Existing

Required

Comment

Outdoor

NA

1m x 1m reserved for node-B

Good condition

NA

See CME Photo

NA

NA

NA

AC Earthing Busbar

NA

NA

DC Earthing Busbar

NA

NA

BTS Location
Lightning Protection
Cable Inlet
MGB

antenna
NA
NA

NA
NA
4000mm(L) x 900mm(w) x 4000mm(L) x 2000mm(w)

Cabin Size
Plinth Size
Cable Gantry

Comments :

Inlet,near bending and near

400mm(H)

x 500mm(H)

Good condition

300mm x 25m

NA
NA
Refer to cme picture

1. Re-construct and extend existing Fencing to cover new Node B(see CME picture)
2. Require Lorry Crane upon Delivery

3.5

POWER SUPPLY SYSTEM

Rectifier
Make

Link

Model

Vout

Iout

Capacity

NA

NA

Breaker
Used:
Free: Required:
Used:
Free:
Required:

Capacity

NA

Banks

NA

Type / Model

NA

Comments :

18(33)

Site Requirements
Survey Date : 7 March 2006
Project:

Celcom 3G, Northern Region, Malaysia


Celcom (M) Bhd.

Site:

G 2554 IG EAST
3.6

SITE APPROVAL
Prepared by

3.6

( Contractor )

MOHD YAZID B MD YUNUS


AS Pembinaan Sdn. Bhd.

Date

Mobile Access - GN

Date

Site Approved
( Celcom )

Prepared by
( Contractor )

CME - GN

Date

Site Approved
( Celcom )

TRANSMISSION - GN

Date

19(33)

CELCOM (M) BHD.


NORTHERN REGION

Site Pictures

SITE ID

: G 2554

SITE NAME

: IG EAST

SITE CONFIGURATION :

1 +1 +1

Existing Site Pictures


Survey Date : 7 March 2006

SITE PICTURES
Site:

G 2554

IG EAST

Ant Hgt:
20 m agl

Photo 1.

Site View

Photo 3.

Existing BTS Location

Comment :

MBO2

Ant Hgt:
18m agl

20(33)

Existing Site Pictures


Survey Date : 7 March 2006

SITE PICTURES
Site:

G 2554

Photo 4.

IG EAST

Existing Feeder Route

Comment:
Photo 6.

Existing Feeder Route

Comment :

Feeder Route sector to sector 1

21(33)

Existing Site Pictures


Survey Date : 7 March 2006

SITE PICTURES
Site:

G 2554

Photo 7.

IG EAST

Existing Feeder Route


Cell 1 = 80'

Comment :

Sector 1

Photo 8.

Existing Antenna Location


Cell 2 = 190'
Cell 3 = 320'

Ant.
Height:
20m AGL

Comment:

3m boom wall mount

22(33)

Existing Transmission
Survey Date : 7 March 2006

SITE PICTURES
Site: G 2554
Photo 1.

IG EAST

Microwave Location

Antenna Dish
Height: 34m

Comment :

Shoot to Jusco Ipoh

Photo. 2

Re-Use existing Free E1

Comment

23(33)

Existing Transmission
Survey Date : 7 March 2006

SITE PICTURES
Site: G 2554

IG EAST

Photo 3.

DDF Location

Comment:

New DDF Location

Photo 4.

Line Of sight(link to Taman perpaduan)

Comment:

24(33)

New Requrement
Survey Date : 7 March 2006

SITE PICTURES
Site: G 2554
Photo 1

IG EAST

Propose Node B

New MGB
Comment :

Extend And Modified Fencing

Photo 2

Propose New Feeder Route

New MGB

Comment :

New feeder route

25(33)

New Requrement
Survey Date : 7 March 2006

SITE PICTURES
Site: G 2554
Photo 3

IG EAST

Propose Antena Sector 1

20m agl

NA

Comment :

New 3m Boom Tripod c/w air terminal and MGB

Photo 4.

Antenne Location Sector 3

Cell 3 = 340'

20m agl

Comment :

New 3m Boom Tripod c/w air terminal and MGB

26(33)

New Requrement
Survey Date : 7 March 2006

SITE PICTURES
Site: G 2554
Photo 5.

IG EAST

Antenna Location Sector 2


Cell 2 = 220'

20m agl

Comment :
Photo 6.

New 3m Boom Tripod c/w air terminal and MGB

Lorry crane

Need to closed drain

Comment:

27(33)

Existing CME
Survey Date: 7 March 2006

SITE PICTURES
Site:

G 2554

Photo 1.

IG EAST

Existing ACPDB

Comment : Exiting ACPDB- sufficient to supply the voltage for Node B


Photo 2.

Exiting ACPDB / DCPDB

3 X 20A free Breaker

Comment : Remain Existing and re-use existing DB

28(33)

Existing CME
Survey Date: 7 March 2006

SITE PICTURES
Site:

G 2554

Photo 3.

IG EAST

Existing Breaker AC or DC

Re-Use
existing
3 X 20A
Breaker

Comment:

Re-Use existing Breaker

Photo 5.

Existing MGB

Comment :

Existing MGB for BTS grounding(closed view)

29(33)

Existing CME
Survey Date: 7 March 2006

SITE PICTURES
Site:

G 2554

IG EAST

Photo 6.

Existing MGB 2

Comment :

Un sufficient For new 3G feeder cable

Photo.8

Existing Structure (Closed Up)

3.0m

Comment:

3m Tripod Floor Mounted

30(33)

CELCOM (M) BHD.


NORTHERN REGION

Mobile Checklist / BOQ

SITE ID

: G 2554

SITE NAME

: IG EAST

SITE CONFIGURATION :

1 +1 +1

NO

TYPE

1
2
3
4

SITE

ITEMS
IRON WORK

ART NO.

SPECIAL BRACKET
6m Tripod
6m BOOM
WALL BRACKET
POWER / RF CABLES & ACCESSORIES
Power Cable

1
2
3
4
5
6
7
8
9
10
11
12
1
2
3

ANDREW
ANDREW

1
2
3
4
5
6
7
8

RFS
H+S
RFS
H+S
H+S
H+S
H+S
RFS

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

BILL OF QUANTITY

3M
3M
3M

SYW
SYW
SYW

AC ARMOURED CABLE, 4CORE, 16mm


PVC/PVC AC CABLE 5 CORE, BLACK, 10mm
CABLE TIE 4" (WHITE)
CABLE TIE 8" (WHITE)
CABLE TIE 14" (WHITE)
CABLE TIE 14" (BLACK)
7/8" COAXIAL CABLE
1/2" COAXIAL CABLE
TX JUMPER CABLE (716M - 716M), 2 MTR
RX JUMPER CABLE (716M - NM), 2 MTR
EARTHING SYSTEM
COPPER BARE WIRE, 35MM, MULTI STRAND
CONNECTOR EARTHING KIT (INDOOR)
FEEDER EARTHING KIT (OUTDOOR)
CONNECTORS
ANGLE ADAPTER N-TYPE (MALE TO FEMALE)
BNC CONN. (JACK FULL), 75 OHM, FOR RG59
7/16 FEMALE CONNECTOR FOR 7/8" CABLE
N-MALE CONNECTOR FOR 7/8" CABLE
N-MALE CONNECTOR FOR 1/2" CABLE
TNC-MALE TO BNC FEMALE ADAPTOR
N-MALE TO N-MALE ADAPTOR
FEEDER COUPLING (SPLICER)
MISCELLANEOUS ITEMS
AC TRUNKING, 2" X 2", ORANGE C/W ACCESS
METAL CABLE TRAY, 4" X 1", H.D.G., C/W ACCESS
CABLE LUG 35MM
CABLE LUG 150MM
C-CLAMP (C-TYPE) COMPRESSED FOR 35MM
COOL SHRINK
CABLE GLAND (FEEDER THROUGH)
ELECTRICAL TAPE, SUPER 33+, 3/4 X 66'
ELECTRICAL PUTTY , SCOTCHFILL, 1 1/2" X 60"
FEEDER CLAMP (2 IN 1)
FEEDER CLAMP (3 IN 1)
PVC TRUNKING (GREY), 4" X 2" X 1.8M
RAWL PLUG (M6X450MM)
RAWL PLUG (M12) with rod
RAWL PLUG (M12) w/o rod

NA
N/A
N/A

G 2554

IG EAST

PACKING REQUEST
SUPPLY
Fill in your requested item(s)
SET
3
SET
PC
SET

AC.ARM.4C.16mm
5C/10mm
CBL. TIE -W-IND-4"
CBL. TIE -W-IND-8"
CBL. TIE -W-IND-14"
CBL. TIE -W-OUD-14"
EC5-50
LDF4-50A
F4A-PDMDM-2M
F4A-PNMDM-2M

METER
METER
METER
METER
PC
PC
PC
PC
METER
METER
PC
PC

N/A
244495
SGL5-06B1

METER
PC
PC

15852401
21BNC-75-4-4
15570560
11N-50-23-10
11N-50-12-10
33-TNC-BNC50-1
32N-50-0-2
155 730 60

PC
PC
PC
PC
PC
PC
PC
PC

N/A
N/A
N/A
N/A
N/A
N/A
N/A
6132
15140
N/A
N/A
7

PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
LENGTH
PC
PC
PC
TOTAL COST (FOR INSURANCE PURPOSES)

Requester: _________________________

Checked By: _________________________

(SIGNED & STAMPED)

(SIGNED & STAMPED)

CELCOM (M) BHD.


NORTHERN REGION

Transmission Checklist

SITE ID

: G 2554

SITE NAME

: IG EAST

SITE CONFIGURATION :

1 +1 +1

TSS TRANSMISSION CHECKLIST FOR 3G

A. SITE DETAILS
SITE NAME
SITE ID
RNC HOME
NODE B TYPE

REGION
NORTHERN
SURVEY BY
AS Pembinaan
SURVEY DATE 2-Mar-06

IG East
G 2554
(Not Known)

B . TRANSMISSION MEDIA FOR NODE-B CONNECTION.


1.

X OWN TRANSMISSION SOLUTION


X

MICROWAVE

VSAT

FIBER OPTIC

SITE A

SITE B

INSTALLED

USED

FREE

RESERVED

IG East

Jusco Ipoh

NA

REMARKS :

2.

LEASED LINE
TM LEASED LINE

POI/POP :

E1 SHARING ( MAXIS / DIGI) POI/POP :

2 E1
3 E1

REMARKS :

C . ADDITIONAL REQUIREMENT FOR TRANSMISSION SOLUTION.


1 . CME
TRM/TOC

DC POWER SUPPLY ( Pls specify :

TRIPOD

SHELTER ( Pls specify :

PLINTH

DDF

)
)

REMARKS :

Prepared by,
(Mohd Yazid B Md Yunus;019-3555014)

Verify by,
(Name, TX Region. HP num)

REMARKS

CELCOM (M) BHD.


NORTHERN REGION

CME BOQ

SITE ID

: G 2554

SITE NAME

: IG EAST

SITE CONFIGURATION :

1 +1 +1

CELCOM (M) BHD.


NORTHERN REGION

Installation Plan

SITE ID

: G 2554

SITE NAME

: IG EAST

SITE CONFIGURATION :

1 +1 +1

CELCOM (M) BHD.


NORTHERN REGION

SMU

SITE ID

: G 2554

SITE NAME

: IG EAST

SITE CONFIGURATION :

1 +1 +1

Celcom 3G Project
NodeB Project File

3
PROJECT DESCRIPTION

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 7 of 51

Celcom 3G Project
NodeB Project File

3.1 Project Description


General introduction:
NodeB name
Address
Project type
NodeB type
Equipment type
Diversity mode
Coordinate scale

IGEAST
Jalan Perajurit 11, T.Ipoh Timur, 31400 Ipoh
3G macro
S1/1/1
NodeB 3812A
2antenna diversity
N 04 37 5.8
E 101 07 30

Antenna system
Antenna type
Number of antennas
Antenna gain (dBi)
Antenna polarization mode
Antenna semi-wave angle
Azimuth
Antenna weight (kg)
Antenna Height
TTA presented or not
Feeder type
Length of a single feeder
E. Tilt
M. Tilt

Sector 1

Sector 2

Sector 3

AGINIT
RUST

AGINIT
RUST

AGINIT
RUST

1
18.3
Dual
polarizat
ion
63
80
5.3
20
N/A
1 5/8
63
2
0

1
18.3
Dual
polarizat
ion
63
200
5.3
20
N/A
1 5/8
52
2
0

1
18.3
Dual
polarizat
ion
63
320
5.3
20
N/A
7/8
26
2
0

Sector 4

Sector 5

Sector 6

Corollary equipment:
Power supply(V)
Battery capacity(Ah)
Transmission mode
No. of E1
Transmission Vendor
No. of Battery Bank
DC power supply

-48V DC
160
E1
2
Existing MW
1
Existing ACPDB

User information
Person in charge
Celcom

Jason Stephen Nayagam

Telephone

Email

jstephen@tm.com.my

Fax

Participants of the project


Survey personnel

Celcom

Telephone
Email

Design personnel

Celcom

Telephone
Email

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 8 of 51

Celcom 3G Project
NodeB Project File

3.2 NodeB Cell parameter and data configuration


Cell information

Cell 1

Cell 2

Cell 3

Cell Name

NW400541_1_1

NW400542_1_2

NW400543_1_3

Cell ID

11121

11122

11123

Max Transmit Power (dBm)

44

44

44

DL primary scrambling code

180

188

196

Time offset

256

512

768

UL Frequency

9812

9812

9812

DL Frequency

10762

10762

10762

LAC

3022

3022

3022

SAC

34054

34054

34054

RAC

URA

3022

3022

3022

CPICH (dBm)

33

33

33

Neighboring Cell
Neighboring Cell 1
Neighboring Cell 2
Neighboring Cell 3

NodeB Data Configuration Info


Version No.

BTS3812E&3812A V100R006C01B080

Local IP Address

17.21.2.15

Local Cell ID

0, 1, 2

IMA Link No.

0, 1

UNI Link No.

Note: Please input the cell parameter.

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 9 of 51

Celcom 3G Project
NodeB Project File

4
PROJECT RESPONSIBILITY INTERFACE

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 10 of 51

Celcom 3G Project
NodeB Project File

4. Project Responsibility Interface

PROJECT RESPONSIBILITY INTERFACE

R&A TELECOMMUNICATION
SDN BHD

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 11 of 51

Celcom 3G Project
NodeB Project File

5
EQUIPMENT LOCATION

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 12 of 51

Celcom 3G Project
NodeB Project File

5. Equipment Location
5.1 Node B Installed

5.2 AC/DC Power Tapping Point

AC Power
Taping Point

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 13 of 51

Celcom 3G Project
NodeB Project File

5.3 E1 Connection Point

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 14 of 51

Celcom 3G Project
NodeB Project File

6
ANTENNA LOCATION

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 15 of 51

Celcom 3G Project
NodeB Project File

6.1 Antenna Location

Sector 1

Sector 2

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 16 of 51

Celcom 3G Project
NodeB Project File

Sector 3

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 17 of 51

Celcom 3G Project
NodeB Project File

6.2 Sector Beam width View


a. Sector 1

b. Sector 2

c. Sector 3

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 18 of 51

Celcom 3G Project
NodeB Project File

6.3 Panoramic View


a. 0 degree

b. 40 degree

c. 80 degree

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 19 of 51

Celcom 3G Project
NodeB Project File

d. 120 degree

e. 160 degree

f.

200 degree

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 20 of 51

Celcom 3G Project
NodeB Project File

g. 240 degree

h. 280 degree

i.

320 degree

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 21 of 51

Celcom 3G Project
NodeB Project File

7
FEEDER CABLE ROUTING

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 22 of 51

Celcom 3G Project
NodeB Project File

7.1 Feeder Cable Routing

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 23 of 51

Celcom 3G Project
NodeB Project File

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 24 of 51

Celcom 3G Project
NodeB Project File

7.2 Earth Point

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 25 of 51

Celcom 3G Project
NodeB Project File

8
ENGINEERING DRAWING

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 26 of 51

Celcom 3G Project
NodeB Project File

9
MATERIAL REQUEST
&
BOQ

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 27 of 51

Celcom 3G Project
NodeB Project File

9. BTS 3812A BOQ


BOM NO.

DESCRIPTION

QTY

UOM

02130608

Power module,-33~65degC,90~290Vac,-53.5V/30A

PCS

02313069

Power System Monitor Module-EPMU01

PCS

31070026

Huawei License Certificate

PCS

02313078

Multicarrier Antenna Filter Unit

PCS

02313078

Multicarrier Antenna Filter Unit

PCS

02313078

Multicarrier Antenna Filter Unit

PCS

NodeB band 1 Multi-Carrier Transceiver Unit


38W,Band1,RX1920-1980/TX2110-2170MHz)
NodeB band 1 Multi-Carrier Transceiver Unit
(38W,Band1,RX1920-1980/TX2110-2170MHz)
NodeB band 1 Multi-Carrier Transceiver Unit
(38W,Band1,RX1920-1980/TX2110-2170MHz)

PCS

PCS

PCS

03039105

HSDPA supported baseband processing and interface unit

PCS

03039105

HSDPA supported baseband processing and interface unit

PCS

03030ATX

NodeB Digital Trunk Interface unit

PCS

03030CPM

NodeB Main Processing & Timing unit without GPS

PCS

02111720

Battery Cabinet

PCS

02112092

3812A Outdoor 220V Hot-Exchange Assembly Cabinet

PCS

02234487

Filler Panels for WCDMA NodeB BTS3812A Power

PCS

21150495

BTS3812A Mount Base Kit

PCS

21150429

battery cabinet mount set component

PCS

27010236

Directional antenna,1710~2170M,18dBi,65deg,dual
polarization,250W,2deg,,DIN/Female,With downtilts

PCS

27010236

Directional antenna,1710~2170M,18dBi,65deg,dual
polarization,250W,2deg,,DIN/Female,With downtilts

PCS

27010236

Directional antenna,1710~2170M,18dBi,65deg,dual
polarization,250W,2deg,,DIN/Female,With downtilts

PCS

02210177

Conductive Material-ESD Glove, With Chinese/English Manual

PCS

04040653

Trunk Cable,20m,75ohm,4E1,3.9mm,D25M,
SYVP75-2/0.34*8(S),BTS3612

PCS

04040795

Single Cable, Self-loop Cable,D25F,12*18UL1015BL,BTS3812

PCS

04044187

Single Cable, Temperature Sensor External Cable,10m, H2(2.5),


16SJTW(4C)B, BTS3806A Auxiliary Storage Battery Cabinet

PCS

14040137

Coaxial Connector,7/16 DIN,50ohm,Plug/Straight,


Male, Matching Superflexible 1/2" Cable

12

PCS

14040166

Coaxial Connector, SMB Connector,


75ohm/Straight/Female,Matching SYV-75-2-2 Cable

PCS

02312783
02312783
02312783

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 28 of 51

Celcom 3G Project
NodeB Project File

14180219

Termi-Blok Stacking Connector,6PIN,Top Screw, Horizontal


Leading Wire, AWG13-2,Commissioning Before Choice

PCS

21100015

Wire Clip,GT-150I,150*3.6mm,Strength 18.2kg

200

PCS

21100144

Nonmetallic parts-GT-300I-cable fastener300*3.6mm-strength 18.2kg

200

PCS

21101259

Cable Tie-GT-300IUV3.6*300

100

PCS

21120291

Grounding Hardware Combination

SET

21200708

Label Type Harness

12

PCS

26010496

Standard Parts-bolt with cross head, combination of spring


washer and plain washer-(GB9074.4-88)-M4*10-zinc plated

PCS

28010212

GE TSE382C insulated fixing adhesives, translucence, manually


applying, single component room temperature vulcanization,
Silicone Sealant

PCS

28040013

Heat Shrink Tube/D18/Radial Shrink Rate>50%/Black

50

CM

28040015

Heat-Shrink Tube,D25,Radial Shrinkage Ratio>50%,Black

50

CM

28040017

Heat-Shrink Tube,D30,Radial Shrinkage Ratio>50%,Black

50

CM

28040023

Heat-Shrink Tube/D8.0/Radial Shrinkage Ratio %>50%/Black

50

CM

28050001

Wrist Strap

PCS

29040316

Blank Label,DB0699, Huawei D Blank Cable Label,40 Groups 40Pcs,


4 Columns*10 Rows, Height 17.8 Width 48.0,1Pcs Each Group,
White

PCS

29041038

Outdoor Label

PCS

29041060

Signal Cable label

PCS

29041061

Power Cable label

PCS

63120038

small metal parts

PCS

63200065

DKBA0.480.0238,Cable Tie,GT-300HDUV,7.6X300,
Anti-Ultraviolet And Anti-Freeze, Black, For BTS3001C

150

PCS

24020329

Rechargeable Battery, VRLA Battery,48V,200Ah,


Battery Group, Single Cell 94*176*394mm

SET

24020329

Rechargeable Battery, VRLA Battery,48V,200Ah,


Battery Group, Single Cell 94*176*394mm

SET

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 29 of 51

Celcom 3G Project
NodeB Project File

10
HARDWARE CONFIGURATION

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 30 of 51

Celcom 3G Project
NodeB Project File

10. Hardware Configuration


10.1 Cabinet Board Layout

Cabinet Board Layout

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 31 of 51

Celcom 3G Project
NodeB Project File

10.2 Board Information List ( BTS3812A)


Board
category
Outdoor
3812A
Cabinet
QW-BNMAC
Heatexchanger220V
Outdoor
KM-BATStorage
RACK
Battery
Cabinet
Board name

QW-FAN
PMU

PSU

FAN
Power
Monitor
Module
Power
Supply
Module for
Macro BTS

NMPT

HBBI

NDTI

MAFU

MTRU

SCC
Interface
Processing
Board
HSDPA
Supported
Digital trunk
Interface
board
Multicarrier
Antenna
Filter Unit

Multi-Carrier
Transceiver

Document
Telekom Group 3G
ProjectReport.doc

Board version

Quantity

Board serial NO.

N/A

210212316N064000093

N/A

210212315N0640001111

Node B Fan Box

V100R006

2958820

2957741

3014038

3013738

V100R006

030CPM106100028

V100R006

0391051067000093

V100R006

0391051067000072

V100R006

030DEF1064000476

V100R006

21023130781061000655

V100R006

21023130781061000644

V100R006

21023130781061000508

V100R006

2199011478E063000029

V100R006

2199011478E063000005

V100R006

2199011478E063000009

V100R006

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 32 of 51

Celcom 3G Project
NodeB Project File

10.3 Host Version Information List


1. BTS3812 Version:
Version used by the local BS
Host version

Remarks

Description
(mark in the relevant column)

BTS3812E

Document
Telekom Group 3G
ProjectReport.doc

ID of the Node B
version

Version
Ver1.0

V100R006C02B080

Huawei
Confidential

Date
06/11/2007

Page
Page 33 of 51

Celcom 3G Project
NodeB Project File

11
EXTERNAL CABLE CONNECTION

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 34 of 51

Celcom 3G Project
NodeB Project File

11. External Cable Connection


Antenna Connection Table
Antenna connection table
NDDL
No.

N-ports on MAFU
panel

No. of the ports on the top of the


cabinet

Corresponding sector

MAFU_TXM

ANT_0A

Sector 1

MAFU_TXD

ANT_0B

Sector 1

MAFU_TXM

ANT_1A

MAFU_TXD

ANT_1B

MAFU_TXM

ANT_2A

Sector 2

MAFU_TXD

ANT_2B

Sector 2

MAFU_TXM

ANT_3A

MAFU_TXD

ANT_3B

MAFU_TXM

ANT_4A

Sector 3

MAFU_TXD

ANT_4B

Sector 3

MAFU_TXM

ANT_5A

MAFU_TXD

ANT_5B

Remarks

MAFU

MAFU

MAFU

MAFU

MAFU

MAFU

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 35 of 51

Celcom 3G Project
NodeB Project File

Trunk Cable Connection Table


E1 transmission mode E1 port No. Characteristic impedance
NDTI No. of DB25 on E1
Characteristic
Port No. of
port
No.
cabinet top
impedance
DDF rack

Used or
Unused

Peer
equipment

Remarks

75

Used

SYRN1

75

Used

SYRN1

75

75

Optical type

Port No. of
ODF rack

Used or
unused

Peer
equipment

Remarks

Characteristic impedance

Port No. of
DDF rack

Used or
unused

Peer
equipment

Remarks

E1_0
NDTI0

4
5

E1_1

6
7
8
9

E1_2

10
11

NDTI1

12
13

E1_3

14
15

Optical transmission mode


NAOI
No.

STM-1 port
No.
0

NAOI0

1
2

NAOI1
NAOI
No.

3
E1 port No.
0

NAOI1

1
2
3
4

NAOI1

5
6

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 36 of 51

Celcom 3G Project
NodeB Project File

12
DTF & VSWR PLOTS

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 37 of 51

Celcom 3G Project
NodeB Project File

1. Sector 1 Tx/RxA DTF


Distance-to-fault
IG EAST TX1/RX1A

1.5

M1: 1.004 @2.02 Meter

M2: 1.043 @4.65 Meter

M4: 1.047 @67.75 Meter

M5: 1.144 @69.61 Meter

M3: 1.039 @65.43 Meter

1.4

VSWR

1.3

1.2

1.1
M1 M2

M3 M4 M5

1.0
0

10

20

30
40
50
Distance (0.0 - 80.0 Meter)
CAL:ON(COAX)
Output Power: 6.00 dBm
Channel: 0
Time: 15:35:02
Serial #: 00112098

Resolution: 517
BiasTee: OFF
Std:
Date: 09/29/2006
Model: S251B

60

70

80

CW: ON
Ins.Loss:0.043dB/m
Prop.Vel:0.890

2. Sector 1 Tx/RxA VSWR


VSWR
IG EAST TX1/RX1A
M1: 1.25 @1816.98 MHz

1.6

1.5

M2: 1.245 @2112.95 MHz

Limit : 1.5

VSWR

1.4

1.3

1.2

1.1
M1

M2

1.0
1750

1800

Resolution: 517
BiasTee: OFF
Std:
Date: 09/29/2006
Model: S251B

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

1850
1900
1950
2000
2050
Frequency (1710.0 - 2170.0 MHz)
CAL:ON(COAX)
Output Power: 6.00 dBm
Channel: 0
Time: 15:33:31
Serial #: 00112098

Huawei
Confidential

2100

2150

CW: ON

Date
06/11/2007

Page
Page 38 of 51

Celcom 3G Project
NodeB Project File

3. Sector 1 RxB DTF


Distance-to-fault
IG EAST RX1B

1.5

M1: 1.018 @2.33 Meter

M2: 1.033 @4.50 Meter

M4: 1.022 @67.29 Meter

M5: 1.047 @68.84 Meter

M3: 1.033 @64.96 Meter

1.4

VSWR

1.3

1.2

1.1
M1 M2

M3 M4
M5

1.0
0

10

20

Resolution: 517
BiasTee: OFF
Std:
Date: 09/29/2006
Model: S251B

30
40
50
Distance (0.0 - 80.0 Meter)
CAL:ON(COAX)
Output Power: 6.00 dBm
Channel: 0
Time: 15:36:00
Serial #: 00112098

60

70

80

CW: ON
Ins.Loss:0.043dB/m
Prop.Vel:0.890

4. Sector 1 RxB VSWR


VSWR
IG EAST RX1B
M1: 1.167 @1715.35 MHz

1.6

1.5

M2: 1.2 @2094.22 MHz

Limit : 1.5

VSWR

1.4

1.3

1.2

1.1
M1

M2

1.0
1750

1800

Resolution: 517
BiasTee: OFF
Std:
Date: 09/29/2006
Model: S251B

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

1850
1900
1950
2000
2050
Frequency (1710.0 - 2170.0 MHz)
CAL:ON(COAX)
Output Power: 6.00 dBm
Channel: 0
Time: 15:36:21
Serial #: 00112098

Huawei
Confidential

2100

2150

CW: ON

Date
06/11/2007

Page
Page 39 of 51

Celcom 3G Project
NodeB Project File

5. Sector 2 Tx/RxA DTF


Distance-to-fault
IG EAST TX2/RX2A

1.5

M1: 1.012 @2.31 Meter

M2: 1.02 @4.61 Meter

M4: 1.035 @56.71 Meter

M5: 1.128 @58.60 Meter

M3: 1.035 @54.40 Meter

1.4

VSWR

1.3

1.2

1.1
M1 M2

M3 M4 M5

1.0
0

10

20

Resolution: 517
BiasTee: OFF
Std:
Date: 09/29/2006
Model: S251B

30
40
Distance (0.0 - 70.0 Meter)
CAL:ON(COAX)
Output Power: 6.00 dBm
Channel: 0
Time: 15:25:25
Serial #: 00112098

50

60

70

CW: ON
Ins.Loss:0.043dB/m
Prop.Vel:0.890

6. Sector 2 Tx/RxA VSWR


VSWR
IG EAST TX2/RX2A
M1: 1.24 @1778.64 MHz

1.6

1.5

M2: 1.22 @2038.95 MHz

Limit : 1.5

VSWR

1.4

1.3

1.2

1.1
M1

M2

1.0
1750

1800

Resolution: 517
BiasTee: OFF
Std:
Date: 09/29/2006
Model: S251B

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

1850
1900
1950
2000
2050
Frequency (1710.0 - 2170.0 MHz)
CAL:ON(COAX)
Output Power: 6.00 dBm
Channel: 0
Time: 15:26:58
Serial #: 00112098

Huawei
Confidential

2100

2150

CW: ON

Date
06/11/2007

Page
Page 40 of 51

Celcom 3G Project
NodeB Project File

7. Sector 2 RxB DTF


Distance-to-fault
IG EAST RX2B

1.5

M1: 1.012 @2.17 Meter

M2: 1.049 @4.61 Meter

M4: 1.045 @57.93 Meter

M5: 1.06 @59.96 Meter

M3: 1.041 @55.76 Meter

1.4

VSWR

1.3

1.2

1.1
M1

M2

M3 M4 M5

1.0
0

10

20

Resolution: 517
BiasTee: OFF
Std:
Date: 09/29/2006
Model: S251B

30
40
Distance (0.0 - 70.0 Meter)
CAL:ON(COAX)
Output Power: 6.00 dBm
Channel: 0
Time: 15:28:46
Serial #: 00112098

50

60

70

CW: ON
Ins.Loss:0.043dB/m
Prop.Vel:0.890

8. Sector 2 RxB VSWR


VSWR
IG EAST RX2B
M1: 1.225 @1883.84 MHz

1.6

1.5

M2: 1.273 @2001.51 MHz

Limit : 1.5

VSWR

1.4

1.3

1.2

1.1
M1

M2

1.0
1750

1800

Resolution: 517
BiasTee: OFF
Std:
Date: 09/29/2006
Model: S251B

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

1850
1900
1950
2000
2050
Frequency (1710.0 - 2170.0 MHz)
CAL:ON(COAX)
Output Power: 6.00 dBm
Channel: 0
Time: 15:29:08
Serial #: 00112098

Huawei
Confidential

2100

2150

CW: ON

Date
06/11/2007

Page
Page 41 of 51

Celcom 3G Project
NodeB Project File

9. Sector 3 Tx/RxA DTF


Distance-to-fault
IG EAST TX3/RX3A

1.5

M1: 1.043 @2.35 Meter

M2: 1.02 @5.23 Meter

M4: 1.024 @30.26 Meter

M5: 1.141 @32.18 Meter

M3: 1.02 @28.08 Meter

1.4

VSWR

1.3

1.2

1.1
M1

M2

M3

M4

M5

1.0
0

10

15

20
25
30
Distance (0.0 - 45.0 Meter)
CAL:ON(COAX)
Output Power: 6.00 dBm
Channel: 0
Time: 15:18:30
Serial #: 00112098

Resolution: 517
BiasTee: OFF
Std:
Date: 09/29/2006
Model: S251B

35

40

45

CW: ON
Ins.Loss:0.069dB/m
Prop.Vel:0.890

10. Sector 3 Tx/RxA VSWR


VSWR
IG EAST TX3/RX3A
M1: 1.252 @1813.41 MHz

1.6

1.5

M2: 1.24 @2104.92 MHz

Limit : 1.5

VSWR

1.4

1.3

1.2

1.1
M1

M2

1.0
1750

1800

Resolution: 517
BiasTee: OFF
Std:
Date: 09/29/2006
Model: S251B

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

1850
1900
1950
2000
2050
Frequency (1710.0 - 2170.0 MHz)
CAL:ON(COAX)
Output Power: 6.00 dBm
Channel: 0
Time: 15:18:51
Serial #: 00112098

Huawei
Confidential

2100

2150

CW: ON

Date
06/11/2007

Page
Page 42 of 51

Celcom 3G Project
NodeB Project File

11. Sector 3 RxB DTF


Distance-to-fault
IG EAST RX3B

1.5

M1: 1.018 @2.53 Meter

M2: 1.066 @5.06 Meter

M4: 1.033 @30.26 Meter

M5: 1.058 @32.27 Meter

M3: 1.026 @27.99 Meter

1.4

VSWR

1.3

1.2

1.1
M1

M2

M3

M4

M5

1.0
0

10

15

20
25
30
Distance (0.0 - 45.0 Meter)
CAL:ON(COAX)
Output Power: 6.00 dBm
Channel: 0
Time: 15:21:02
Serial #: 00112098

Resolution: 517
BiasTee: OFF
Std:
Date: 09/29/2006
Model: S251B

35

40

45

CW: ON
Ins.Loss:0.069dB/m
Prop.Vel:0.890

12. Sector 3 RxB VSWR


VSWR
IG EAST RX3B
M1: 1.172 @1821.43 MHz

1.6

1.5

M2: 1.227 @2085.31 MHz

Limit : 1.5

VSWR

1.4

1.3

1.2

1.1
M1

M2

1.0
1750

1800

Resolution: 517
BiasTee: OFF
Std:
Date: 09/29/2006
Model: S251B

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

1850
1900
1950
2000
2050
Frequency (1710.0 - 2170.0 MHz)
CAL:ON(COAX)
Output Power: 6.00 dBm
Channel: 0
Time: 15:20:31
Serial #: 00112098

Huawei
Confidential

2100

2150

CW: ON

Date
06/11/2007

Page
Page 43 of 51

Celcom 3G Project
NodeB Project File

13 Antenna System Test Result

VSWR (Peak)
DTF (Peak)
DTF at End Jumper
DTF at Indoor
Jumper
Indoor jumper (m)
End jumper (m)
Feeder length (m)
Total length (m)

Document
Telekom Group 3G
ProjectReport.doc

Sector 1
Tx/RxA
RxB
1.25
1.200
1.144
1.047
1.047
1.022
1.043
2.5
2.5
62.93
32.13

Version
Ver1.0

1.033
2.5
2.5
62.46
32.10

Sector 2
Tx/RxA
RxB
1.24
1.273
1.128
1.06
1.035
1.045
1.02
2.5
2.5
51.90
31.55

Huawei
Confidential

1.049
2.5
2.5
52.76
31.55

Sector 3
Tx/RxA
RxB
1.252
1.227
1.141
1.058
1.024
1.033
1.043
2.5
2.5
25.26
31.94

1.066
2.5
2.5
2526
31.94

Date
06/11/2007

Page
Page 44 of 51

Celcom 3G Project
NodeB Project File

13
COMMISSIONING & INTEGRATION
CHECKLIST

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 45 of 51

Celcom 3G Project
NodeB Project File

14
EQUIPMENT INSTALLATION REPORT

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 46 of 51

Celcom 3G Project
NodeB Project File

15
NODE B HARDWARE INSTALLATION
ACCEPTANCE

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 47 of 51

Celcom 3G Project
NodeB Project File

16
NODE B USER ACCEPTANCE REPORT

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 48 of 51

Celcom 3G Project
NodeB Project File

17
SINGLE SITE VERIFICATION REPORT

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 49 of 51

Celcom 3G Project
NodeB Project File

18
PUNCH LIST

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 50 of 51

Celcom 3G Project
NodeB Project File

19
CERTIFICATE OF ACCEPTANCE

Document
Telekom Group 3G
ProjectReport.doc

Version
Ver1.0

Huawei
Confidential

Date
06/11/2007

Page
Page 51 of 51

Вам также может понравиться