CB NO.
ASYA-PPP-AR-CB-001-15MAR15
ASYA-PPP-AR-CB-002-15MAR15
ASYA-PPP-AR-CB-004-15MAR15
ASYA-PPP-AR-CB-005-21MAY15
ASYA-PPP-AR-CB-006-29JUNE15
PPP-DMCI-C15-023
THE PRINCEVIEW PA
SUMMARY OF IS
AS OF 15TITLE
Relocation of pipe chase at 8th floor
ATTACHMENT
8TH Floor amenity key plan w/ blow-up.
Keyplan reflected on FCD.
Roof deck key plan w/ blow-up.
Machine room and service room key plan w/ blow-up.
Blow-up reflected of FCD.
Mezzanine key plan w/ blow-up plans
1st floor key plan w/ blow-up plans.
2nd floor key plan w/ blow-up plans.
3rd floor key plan w/ blow-up plans.
4th floor key plan w/ blow-up plans.
5th floor key plan w/ blow-up plans.
6th floor key plan w/ blow-up plans.
Substructure key plan.
Substructure section.
Architectural key plan
Section
Structural details and schedule
DATE ISSUED
10-Apr-15
7-Apr-15
10-Apr-15
27-May-15
7-Jul-15
ITEM NO.
CB NO.
ASYA-PPP-ST-CB-001-21MAY15
PPP-DMCI-C15-005
PPP-DMCI-C15-007
PPP-DMCI-C15-010
ASYA-PPP-AR-CB-005A-8JUNE15
TITLE
Slab on grade change to suspended
slab.
Mistake in Building Setting Lay-out
Chipping the existing retaining wall and removal
of dowel.
Remedial structural rectification details for the
mispositioned columns
Backfilling removal for V.E.
Error in the actual location of casted columns. We therefore require you to submit your methodolo
Some of existing retaining wall and dowels were removed/cut especially at gridline k and
Slab on grade change to suspended slab at ground floor area backfilling for V.E. Ple
ATTACHMENT
S-PV01-702
S-PV01-702A
DATE ISSUED
28-Apr-15
1-Jun-15
27-May-15
11-Jun-15
ITEM NO.
1
2
CB NO.
ASYA-PPP-EE-CB-002-15MAY15
ASYA-PPP-EE-CB-002-23JUN15
ASYA-PPP-EE-CB-004-15MAY15
DESCRIPTION
Relocation of grounding layout as per site condition this must be consdered by the b
Relocation of grounding layout as per site condition this must be consdered by
Relocation of grounding layout as per site condition this must be consdered by the b
ATTACHMENT
DATE ISSUED
1-Jun-15
23-Jun-15
ITEM NO.
1
CB NO.
ASYA-PPP-FP-CB-002-23APR15
ASYA-PPP-FP-CB-003-15MAR15
ASYA-PPP-FP-CB-001-15MAR15
ASYA-PPP-FP-CB-003-23APR15
PPP-DMCI-C15-022
ATTACHMENT
Roofdeck plan w/ blow-up detail.
8th floor key plan reflected to FCD.
8th floor key plan.
8th floor key plan reflected to FCD.
8th floor key plan.
Ground floor plan
Pipe routing layout
DATE ISSUED
26-Jun-15
10-Apr-15
5-Oct-15
30-Jun-15
ITEM NO.
1
CB NO.
ASYA-PPP-PS-CB-004-15MAY15
PPP-DMCI-C15-012
ATTACHMENT
Ground floor plan.
Blow-up plan and section.
DATE ISSUED
11-Jun-15
ITEM NO.
CB NO.
ASYA-PPP-ME-CB-001-14APR15
THE P
SU
TITLE
Provision of gooseneck at 9th floor utility deck.
Provision of gooseneck at 9th floor from the EAD at ground floor commercial a
ATTACHMENT
DATE ISSUED
26-Jun-15