STEEL BARS
A193 WWF
A252 WWF
GROUND SLAB
CONCRETE
HSC 400MM
HSC 200MM
LEAN CONCRETE
POLYTHENE SHEET
ANTITERMITE TREATMENT
50MM THICK SCREED (Above HCS Slab)
50.96
2,933.35
1,609.42
467.29
1,566.44
1,276.42
333.00
158.42
3,194.17
3,194.17
80.47
Tons
M2
M2
M3
M3
M2
M2
M3
M2
M2
M3
57.28
899.51
176.18
1,559.11
1,250.22
1,096.16
2,465.58
Tons
m3
m3
m2
m2
m2
lm
74.59
685.76
6,254.52
500.50
Tons
m3
m2
m2
Blockworks
100mm Block external wall
200mmmBlock
150mm Block
100mm Block
Fire Rated 200mm block
Backing rod
12mm Bar
2,342.73
2,187.16
222.66
105.73
386.88
1,960.06
8.70
m2
m2
m2
m2
m2
Lm
Tons
Plaster works
100mm Block external wall
200mmmBlock
150mm Block
100mm Block
Fire Rated 200mm block
2,108.01
3,037.69
445.32
253.57
791.39
m2
m2
m2
m2
m2
Concrete Works
Lean concrete for foundation
Lean concrete for grade slab
Foundation concrete
Grade slab concrete
Column, wall, beam concrete
Solid slab concrete
50mm thk screed (above HCS)
176.18
158.42
899.51
467.29
685.76
1566.44
80.47
M3
M3
M3
M3
M3
M3
M3
1559.11
3194.17
M2
M2
1,096.16
3,194.17
500.50
M2
M2
M2
57.28
50.96
76.77
2,933.35
1,609.42
Tons
Tons
Tons
M2
M2
HSC 400MM
HSC 200MM
1,276.42
333.00
M2
M2
Blockworks
1,846.92
60.00
m2
m2
200mmmBlock
2,187.16
m2
150mm Block
222.66
m2
100mm Block
105.73
m2
386.88
m2
2,108.01
3,037.69
445.32
253.57
791.39
m2
m2
m2
m2
m2
Plaster works
100mm Block external wall
200mmmBlock
150mm Block
100mm Block
Fire Rated 200mm block
Summary*
STEEL BARS
CONCRETE
LEAN CONCRETE
POLYTHENE SHEET
SURFACE AREA FOR SHUTTERING
ANTITERMITE TREATMENT
SHUTTERING FOR LEAN CONCRETE
57.28
899.51
176.18
1,559.11
1,250.22
1,096.16
2,465.58
Tons
m3
m3
m2
m2
m2
lm
Summary*
STEEL BARS
A193 WWF
A252 WWF
GROUND SLAB
CONCRETE
HSC 400MM
HSC 200MM
LEAN CONCRETE
POLYTHENE SHEET
ANTITERMITE TREATMENT
50MM THICK SCREED (Above HCS Slab)
50.96
2,933.35
1,609.42
467.29
1,566.44
1,276.42
333.00
158.42
3,194.17
3,194.17
80.47
Tons
M2
M2
M3
M3
M2
M2
M3
M2
M2
M3
Summary*
STEEL BARS
CONCRETE
SURFACE AREA FOR SHUTTERING
ANTITERMITE TREATMENT
74.59
685.76
6,254.52
500.50
Tons
m3
m2
m2
DESCRPITION
CONCRETE WORKS
Foundation concrete
POLYTHENE SHEET
A
WATER PROOFING
A
STEEL WORKS
A
Page 7
SHUTTERING WORKS
A
250mmmBlock
200mmmBlock
150mm Block
100mm Block
PLASTER WORK
A
200mmmBlock
150mm Block
100mm Block
Page 8
TOTAL AMOUNT
176.18
M3
255
44,925.90
158.42
M3
255
40,397.10
899.51
M3
291
261,757.41
467.29
M3
291
135,981.39
685.76
M3
281
192,698.56
1,566.44
M3
281
440,169.64
80.47
M3
281
22,612.07
3,387.95
M2
2.50
8,469.88
3,194.17
M2
2.50
7,985.43
1,828.84
M2
12
21,946.08
1,329.00
M2
12
15,948.00
57.28
Tons
3,264
186,955.53
50.96
Tons
3,264
166,323.28
76.77
Tons
3,264
250,577.28
2,933.35
M2
18.80
55,146.96
1,609.42
M2
18.80
30,257.14
Page 9
AMOUNT
10,500.00
M2
42.00
441,000.00
1,846.92
M2
27.99
51,695.29
60.00
M2
36.65
2,199.00
2,187.16
M2
29.72
65,002.52
222.66
M2
28.57
6,361.40
105.73
M2
27.99
2,959.27
386.88
M2
59.75
23,116.15
2,108.01
M2
5.70
12,015.67
3,037.69
M2
5.70
17,314.86
445.32
M2
5.70
2,538.32
253.57
M2
5.70
1,445.36
791.39
M2
5.70
4,510.94
SAR
AREA(M2)
RATE/M2
Page 10
2,512,310.43
3,860.00
650.86
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
CONCRETE WORKS
1
71
M3
366.00
126
M3
350.00
5% Micro Silica
M3
40.00
Mass concrete > 100mm below footings & ground beams (truck measured)
M3
280.00
SUB-TOTAL
SAR
606
193
13
M3
M3
M3
M3
620.00
620.00
900.00
1,125.00
13
M3
1,100.00
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
252
M3
455.00
M2
3.00
Damp Proofing
M2
6.00
5% Micro Silica
M3
50.00
SUB-TOTAL
SAR
Page 12 of 76
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
Super-structure works 30 MPA-OPC (Height as per drawings & spec max 4.5M)
1
Column/Beams/Walls
388
M3
1,050.00
M3
1,250.00
471
M3
975.00
15
M3
1,200.00
Fair face finish for Concrete Ramps, Steps & Landing (Saeled Concrete)
M2
135.00
Concrete Screed
M3
550.00
Concrete Parapet
M3
1,050.00
LM
130.00
Mechanical Pad
M3
600.00
3
SUB-TOTAL
SAR
Page 13 of 76
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
Supply, Cut, Bend & Install of Straight Reinf bars For 8 & 10,12,14,16mm & above
Ton
3,850.00
Ton
825.00
Ton
675.00
4*
Ton
3,175.00
SUB-TOTAL
SAR
3,405
M2
95.00
1,599
M2
90.00
1,626
M2
85.00
Page 14 of 76
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
M2
20.00
Supply & Apply Backing rod (3cm thick) and fire rated seleant above block walls.
LM
55.00
PLASTER WORKS, including materials, angle beds, wire mesh & all related
accessories and curing.Etc.
1
M2
42.00
M2
46.00
LM
15.00
SUB-TOTAL
SAR
GRAND TOTAL
SAR
Page 15 of 76
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
Current
Total
Amount(SAR)
Total
26,000.64
44,096.50
70,097.14
375,906.00
173,646.00
14,681.25
14,168.00
Page 16 of 76
Remarks
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
114,705.50
Current
Total
Amount(SAR)
Total
-
693,106.75
Page 17 of 76
Remarks
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
407,736.00
Current
Total
Amount(SAR)
Total
459,147.00
18,444.00
1,842.00
887,169.00
Page 18 of 76
Remarks
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
Current
Total
Amount(SAR)
Total
323,496.85
143,866.80
138,189.60
Page 19 of 76
Remarks
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
Current
Total
Amount(SAR)
Total
605,553.25
2,255,926.14
Page 20 of 76
Remarks
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
CONCRETE WORKS
1
81
M3
366.00
91
M3
350.00
5% Micro Silica
M3
40.00
Mass concrete > 100mm below footings & ground beams (truck measured)
M3
280.00
SUB-TOTAL
SAR
86
157
78
8
M3
M3
M3
M3
620.00
620.00
900.00
1,125.00
60
M3
1,100.00
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
289
M3
455.00
M2
3.00
Damp Proofing
M2
6.00
5% Micro Silica
M3
50.00
SUB-TOTAL
SAR
Page 22 of 76
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
Super-structure works 30 MPA-OPC (Height as per drawings & spec max 4.5M)
1
Column/Beams/Walls
334
M3
1,050.00
M3
1,250.00
395
M3
975.00
29
M3
1,200.00
Fair face finish for Concrete Ramps, Steps & Landing (Saeled Concrete)
M2
135.00
Concrete Screed
M3
550.00
Concrete Parapet
M3
1,050.00
LM
130.00
Mechanical Pad
M3
600.00
8
SUB-TOTAL
SAR
Page 23 of 76
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
Supply, Cut, Bend & Install of Straight Reinf bars For 8 & 10,12,14,16mm & above
Ton
3,850.00
Ton
825.00
Ton
675.00
4*
Ton
3,175.00
SUB-TOTAL
SAR
M2
95.00
M2
90.00
M2
85.00
Page 24 of 76
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
M2
20.00
Supply & Apply Backing rod (3cm thick) and fire rated seleant above block walls.
LM
55.00
PLASTER WORKS, including materials, angle beds, wire mesh & all related
accessories and curing.Etc.
1
M2
42.00
M2
46.00
LM
15.00
SUB-TOTAL
SAR
GRAND TOTAL
SAR
Page 25 of 76
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
Current
Total
Amount(SAR)
Total
29,726.52
31,703.00
61,429.52
53,580.40
97,333.80
69,822.00
8,640.00
66,220.00
Page 26 of 76
Remarks
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
131,399.45
Current
Total
Amount(SAR)
Total
-
426,995.65
Page 27 of 76
Remarks
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
350,794.50
Current
Total
Amount(SAR)
Total
385,076.25
34,836.00
4,632.00
775,338.75
Page 28 of 76
Remarks
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
Current
Total
Amount(SAR)
Total
Page 29 of 76
Remarks
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
Current
Total
Amount(SAR)
Total
1,263,763.92
Page 30 of 76
Remarks
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
CONCRETE WORKS
1
74
M3
366.00
79
M3
350.00
5% Micro Silica
M3
40.00
Mass concrete > 100mm below footings & ground beams (truck measured)
M3
280.00
SUB-TOTAL
SAR
158
169
13
M3
M3
M3
M3
620.00
640.00
950.00
1,250.00
M3
1,150.00
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
279
M3
480.00
M2
3.00
Damp Proofing
M2
6.00
5% Micro Silica
M3
60.00
SUB-TOTAL
SAR
Page 32 of 76
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
Super-structure works 30 MPA-OPC (Height as per drawings & spec max 4.5M)
1
Column/Beams/Walls
190
M3
1,150.00
M3
1,400.00
250
M3
1,050.00
42
M3
1,350.00
Fair face finish for Concrete Ramps, Steps & Landing (Saeled Concrete)
M2
135.00
Concrete Screed
M3
600.00
Concrete Parapet
M3
1,150.00
LM
140.00
Mechanical Pad
M3
600.00
23
SUB-TOTAL
SAR
Page 33 of 76
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
Supply, Cut, Bend & Install of Straight Reinf bars For 8 & 10,12,14,16mm & above
Ton
4,300.00
Ton
915.00
Ton
750.00
4*
Ton
3,550.00
SUB-TOTAL
SAR
M2
95.00
M2
90.00
M2
85.00
Page 34 of 76
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
M2
20.00
Supply & Apply Backing rod (3cm thick) and fire rated seleant above block walls.
LM
55.00
PLASTER WORKS, including materials, angle beds, wire mesh & all related
accessories and curing.Etc.
1
M2
42.00
M2
46.00
LM
15.00
SUB-TOTAL
SAR
GRAND TOTAL
SAR
Page 35 of 76
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
Current
Total
Amount(SAR)
Total
27,219.42
27,594.00
54,813.42
98,040.60
160,341.00
16,812.50
-
Page 36 of 76
Remarks
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
133,728.00
Current
Total
Amount(SAR)
Total
-
408,922.10
Page 37 of 76
Remarks
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
218,327.50
Current
Total
Amount(SAR)
Total
262,206.00
56,929.50
13,518.00
550,981.00
Page 38 of 76
Remarks
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
Current
Total
Amount(SAR)
Total
Page 39 of 76
Remarks
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
Current
Total
Amount(SAR)
Total
1,014,716.52
Page 40 of 76
Remarks
COST SUMMARY
Installation
unit
SI.NO
DESCRPITION
Qty
Unit
rate
SAR
CONCRETE WORKS
1 Plain Concrete 20 MPA-SRC-thick = 50mm
2 Plain Concrete 20 MPA-SRC-thick = 100mm
3 5% Micro Silica
4 Mass concrete > 100mm below footings & ground beams (truck measured)
SUB-TOTAL
Sub-structure Concrete works 30 MPA-SRC (W/o S.O.G)
1 Isolated Footing
2 Strip Footing
3 Tie Beams/Grade Beam
4 Column Neck
5 Wall Neck (vary thick)
6 Slab on grade (20 MPA)-SRC
7 Vapour Barrier 300 micron Poly Ethylene under slab on grade
8 Damp Proofing
9 5% Micro Silica
SUB-TOTAL
Super-structure works 30 MPA-OPC (Height as per drawings & spec max
4.5M)
1 Column/Beams/Walls
2 (Column/Beams/Walls) with Corbel
3 Suspended Slab (vary thick)
4 Concrete Ramps, Steps & Landing
Total
Installation
Amount(SAR)
57
61
M3
M3
M3
M3
366.00
350.00
40.00
280.00
SAR
20,770.50
21,476.00
42,246.50
44
115
58
5
48
203
M3
M3
M3
M3
M3
M3
M2
M2
M3
620.00
640.00
950.00
1,250.00
1,150.00
480.00
3.00
6.00
60.00
SAR
27,497.00
73,747.20
55,166.50
6,012.50
54,694.00
97,507.20
314,624.40
210
M3
M3
M3
M3
1,150.00
1,400.00
1,050.00
1,350.00
241,109.00
258,037.50
26,001.00
246
19
5
6
7
8
9
Fair face finish for Concrete Ramps, Steps & Landing (Saeled Concrete)
Concrete Screed
Concrete Parapet
Concrete Coping (Galvanized Accessories)
Mechanical Pad
SUB-TOTAL
Steel Reinforcement (3% allowable wastage)
1 Supply, Cut, Bend & Install of Straight Reinf bars For 8 & 10,12,14,16mm & above
2 Unit Price for Cut, Bend & Installation
3 Unit Price for Installation only
4* Unit Price for Supply,Cut and bend only
SUB-TOTAL
BLOCK WORKS AND PLASTER WORKS
BLOCK WORKS, including mortar tools / reinforcement dia 10mm & filling
all height around openings curing.Etc.
1 Supply & Installation of blocks 200mm(CMU), (Non Fire Rated)
2 Supply & Installation of blocks 150mm(CMU), (Non Fire Rated)
3 Supply & Installation of blocks 100mm(CMU), (Non Fire Rated)
4 Additional Rate for Fire Rated Solid Block
5 Supply & Apply Backing rod (3cm thick) and fire rated seleant above block walls.
PLASTER WORKS, including materials, angle beds, wire mesh & all related
accessories and curing.Etc.
1 Supply & Installation of Cement Plaster (Internal)
2 Supply & Installation of Cement Plaster (External)
3 Galvanized Steel Grooves in Plaster
SUB-TOTAL
GRAND TOTAL
M2
M3
M3
LM
M3
135.00
600.00
1,150.00
140.00
600.00
SAR
Ton
Ton
Ton
Ton
4,300.00
915.00
750.00
3,550.00
SAR
M2
M2
M2
M2
LM
95.00
90.00
85.00
20.00
55.00
M2
M2
LM
42.00
46.00
15.00
SAR
SAR
1,950.00
527,097.50
883,968.40
LDING PROJECT
82
RY
Works Executed
Previous Current Total
Total
Amount(S Remarks
AR)
SI.NO
DESCRPITION
CONCRETE WORKS
1
Plain Concrete 20 MPA-SRC-thick = 50mm
2
Plain Concrete 20 MPA-SRC-thick = 100mm
3
5% Micro Silica
4
Mass concrete > 100mm below footings & ground beams (truck measured)
SUB-TOTAL
Sub-structure Concrete works 30 MPA-SRC (W/o S.O.G)
1
Isolated Footing
2
Strip Footing
3
Tie Beams/Grade Beam
4
Column Neck
5
Wall Neck (vary thick)
6
Slab on grade (20 MPA)-SRC
7
Vapour Barrier 300 micron Poly Ethylene under slab on grade
8
Damp Proofing
9
5% Micro Silica
SUB-TOTAL
Super-structure works 30 MPA-OPC (Height as per drawings & spec max
4.5M)
1
Column/Beams/Walls
2
(Column/Beams/Walls) with Corbel
3
Suspended Slab (vary thick)
4
Concrete Ramps, Steps & Landing
5
Fair face finish for Concrete Ramps, Steps & Landing (Saeled Concrete)
6
Concrete Screed
7
Concrete Parapet
8
Concrete Coping (Galvanized Accessories)
9
Mechanical Pad
SUB-TOTAL
Steel Reinforcement (3% allowable wastage)
1
Supply, Cut, Bend & Install of Straight Reinf bars For 8 & 10,12,14,16mm & above
2
Unit Price for Cut, Bend & Installation
3
Unit Price for Installation only
4*
Unit Price for Supply,Cut and bend only
SUB-TOTAL
BLOCK WORKS AND PLASTER WORKS
BLOCK WORKS, including mortar tools / reinforcement dia 10mm & filling all
height around openings curing.Etc.
1
Supply & Installation of blocks 200mm(CMU), (Non Fire Rated)
2
Supply & Installation of blocks 150mm(CMU), (Non Fire Rated)
3
Supply & Installation of blocks 100mm(CMU), (Non Fire Rated)
4
Additional Rate for Fire Rated Solid Block
5
Supply & Apply Backing rod (3cm thick) and fire rated seleant above block walls.
PLASTER WORKS, including materials, angle beds, wire mesh & all related
accessories and curing.Etc.
1
Supply & Installation of Cement Plaster (Internal)
2
Supply & Installation of Cement Plaster (External)
3
Galvanized Steel Grooves in Plaster
SUB-TOTAL
GRAND TOTAL
COST SUMMARY
Installation
unit
Qty
Unit
rate
SAR
Total
Installation
Amount(SAR)
Works Executed
Previous Current
Total
24
25
M3
M3
M3
M3
366.00
350.00
40.00
280.00
SAR
8,659.56
8,676.50
17,336.06
45
M3
M3
M3
M3
M3
M3
M2
M2
M3
620.00
620.00
900.00
1,125.00
1,100.00
455.00
3.00
6.00
50.00
SAR
27,720.20
35,982.00
5,512.50
38,129.00
107,343.70
M3
M3
M3
M3
M2
M3
M3
LM
M3
1,050.00
1,250.00
975.00
1,200.00
135.00
550.00
1,050.00
130.00
600.00
SAR
48,384.00
88,705.50
7,440.00
144,529.50
Ton
Ton
Ton
Ton
3,850.00
825.00
675.00
3,175.00
SAR
40
5
84
46
91
6
ve block walls.
M2
M2
M2
M2
LM
95.00
90.00
85.00
20.00
55.00
M2
M2
LM
42.00
46.00
15.00
SAR
SAR
269,209.26
Total
Amount( Remarks
SAR)
SI.NO
DESCRPITION
CONCRETE WORKS
1
Plain Concrete 20 MPA-SRC-thick = 50mm
2
Plain Concrete 20 MPA-SRC-thick = 100mm
3
5% Micro Silica
4
Mass concrete > 100mm below footings & ground beams (truck measured)
SUB-TOTAL
Sub-structure Concrete works 30 MPA-SRC (W/o S.O.G)
1
Isolated Footing
2
Strip Footing
3
Tie Beams/Grade Beam
4
Column Neck
5
Wall Neck (vary thick)
6
Slab on grade (20 MPA)-SRC
7
Vapour Barrier 300 micron Poly Ethylene under slab on grade
8
Damp Proofing
9
5% Micro Silica
SUB-TOTAL
Super-structure works 30 MPA-OPC (Height as per drawings & spec max
4.5M)
1
Column/Beams/Walls
2
(Column/Beams/Walls) with Corbel
3
Suspended Slab (vary thick)
4
Concrete Ramps, Steps & Landing
5
Fair face finish for Concrete Ramps, Steps & Landing (Saeled Concrete)
6
Concrete Screed
7
Concrete Parapet
8
Concrete Coping (Galvanized Accessories)
9
Mechanical Pad
SUB-TOTAL
Steel Reinforcement (3% allowable wastage)
1
Supply, Cut, Bend & Install of Straight Reinf bars For 8 & 10,12,14,16mm & above
2
Unit Price for Cut, Bend & Installation
3
Unit Price for Installation only
4*
Unit Price for Supply,Cut and bend only
SUB-TOTAL
BLOCK WORKS AND PLASTER WORKS
BLOCK WORKS, including mortar tools / reinforcement dia 10mm & filling all
height around openings curing.Etc.
1
Supply & Installation of blocks 200mm(CMU), (Non Fire Rated)
2
Supply & Installation of blocks 150mm(CMU), (Non Fire Rated)
3
Supply & Installation of blocks 100mm(CMU), (Non Fire Rated)
4
Additional Rate for Fire Rated Solid Block
5
Supply & Apply Backing rod (3cm thick) and fire rated seleant above block walls.
PLASTER WORKS, including materials, angle beds, wire mesh & all related
accessories and curing.Etc.
1
Supply & Installation of Cement Plaster (Internal)
2
Supply & Installation of Cement Plaster (External)
3
Galvanized Steel Grooves in Plaster
SUB-TOTAL
GRAND TOTAL
COST SUMMARY
Installation
unit
Qty
rate
SAR
Total
Installation
Amount(SAR)
Works Executed
Previous Current
Total
112
165
M3
M3
M3
M3
366.00
350.00
40.00
280.00
SAR
40,827.30
57,655.50
98,482.80
638
M3
M3
M3
M3
M3
M3
M2
M2
M3
620.00
620.00
900.00
1,125.00
1,100.00
455.00
3.00
6.00
50.00
SAR
395,405.00
262,044.00
27,213.75
10,263.00
185,835.65
880,761.40
M3
M3
M3
M3
M2
M3
M3
LM
M3
1,050.00
1,250.00
975.00
1,200.00
135.00
550.00
1,050.00
130.00
600.00
SAR
490,329.00
1,120,362.75
65,436.00
1,676,127.75
Ton
Ton
Ton
Ton
3,850.00
825.00
675.00
3,175.00
SAR
291
24
9
408
467
1,149
55
Unit
ve block walls.
M2
M2
M2
M2
LM
95.00
90.00
85.00
20.00
55.00
M2
M2
LM
42.00
46.00
15.00
SAR
SAR
2,655,371.95
Total
Amount( Remarks
SAR)
SI.NO
DESCRPITION
CONCRETE WORKS
1
Plain Concrete 20 MPA-SRC-thick = 50mm
2
Plain Concrete 20 MPA-SRC-thick = 100mm
3
5% Micro Silica
4
Mass concrete > 100mm below footings & ground beams (truck measured)
SUB-TOTAL
Sub-structure Concrete works 30 MPA-SRC (W/o S.O.G)
1
Isolated Footing
2
Strip Footing
3
Tie Beams/Grade Beam
4
Column Neck
5
Wall Neck (vary thick)
6
Slab on grade (20 MPA)-SRC
7
Vapour Barrier 300 micron Poly Ethylene under slab on grade
8
Damp Proofing
9
5% Micro Silica
SUB-TOTAL
Super-structure works 30 MPA-OPC (Height as per drawings & spec max
4.5M)
1
Column/Beams/Walls
2
(Column/Beams/Walls) with Corbel
3
Suspended Slab (vary thick)
4
Concrete Ramps, Steps & Landing
5
Fair face finish for Concrete Ramps, Steps & Landing (Saeled Concrete)
6
Concrete Screed
7
Concrete Parapet
8
Concrete Coping (Galvanized Accessories)
9
Mechanical Pad
SUB-TOTAL
Steel Reinforcement (3% allowable wastage)
1
Supply, Cut, Bend & Install of Straight Reinf bars For 8 & 10,12,14,16mm & above
2
Unit Price for Cut, Bend & Installation
3
Unit Price for Installation only
4*
Unit Price for Supply,Cut and bend only
SUB-TOTAL
BLOCK WORKS AND PLASTER WORKS
BLOCK WORKS, including mortar tools / reinforcement dia 10mm & filling all
height around openings curing.Etc.
1
Supply & Installation of blocks 200mm(CMU), (Non Fire Rated)
2
Supply & Installation of blocks 150mm(CMU), (Non Fire Rated)
3
Supply & Installation of blocks 100mm(CMU), (Non Fire Rated)
4
Additional Rate for Fire Rated Solid Block
5
Supply & Apply Backing rod (3cm thick) and fire rated seleant above block walls.
PLASTER WORKS, including materials, angle beds, wire mesh & all related
accessories and curing.Etc.
1
Supply & Installation of Cement Plaster (Internal)
2
Supply & Installation of Cement Plaster (External)
3
Galvanized Steel Grooves in Plaster
SUB-TOTAL
GRAND TOTAL
COST SUMMARY
Installation
unit
Qty
Unit
rate
SAR
Total
Installation
Amount(SAR)
Works Executed
Previous Current
Total
65
67
M3
M3
M3
M3
366.00
350.00
40.00
280.00
SAR
23,925.42
23,520.00
47,445.42
134
M3
M3
M3
M3
M3
M3
M2
M2
M3
620.00
620.00
900.00
1,125.00
1,100.00
455.00
3.00
6.00
50.00
SAR
83,377.60
111,942.00
11,868.75
104,458.90
311,647.25
M3
M3
M3
M3
M2
M3
M3
LM
M3
1,050.00
1,250.00
975.00
1,200.00
135.00
550.00
1,050.00
130.00
600.00
SAR
159,600.00
245,222.25
28,704.00
433,526.25
Ton
Ton
Ton
Ton
3,850.00
825.00
675.00
3,175.00
SAR
124
11
230
152
252
24
ve block walls.
M2
M2
M2
M2
LM
95.00
90.00
85.00
20.00
55.00
M2
M2
LM
42.00
46.00
15.00
SAR
SAR
792,618.92
Total
Amount( Remarks
SAR)
SI.NO
CONCRETE WORKS
1
2
3
4
SUB-TOTAL
Sub-structure Concrete works 30 MPA-SRC (W/o S.O.G)
1
2
3
4
5
6
7
8
9
SUB-TOTAL
Super-structure works 30 MPA-OPC (Height as per drawings & spec max 4.5M)
1
2
3
4
5
6
7
8
9
SUB-TOTAL
Steel Reinforcement (3% allowable wastage)
1
2
3
4*
SUB-TOTAL
BLOCK WORKS AND PLASTER WORKS
BLOCK WORKS, including mortar tools / reinforcement dia 10mm & filling all
height around openings curing.Etc.
1
2
3
4
5
PLASTER WORKS, including materials, angle beds, wire mesh & all related
accessories and curing.Etc.
1
2
3
SUB-TOTAL
GRAND TOTAL
DESCRPITION
ONCRETE WORKS
Plain Concrete 20 MPA-SRC-thick = 50mm
Plain Concrete 20 MPA-SRC-thick = 100mm
5% Micro Silica
Mass concrete > 100mm below footings & ground beams (truck measured)
SUB-TOTAL
ub-structure Concrete works 30 MPA-SRC (W/o S.O.G)
Isolated Footing
Strip Footing
Tie Beams/Grade Beam
Column Neck
Wall Neck (vary thick)
Slab on grade (20 MPA)-SRC
Vapour Barrier 300 micron Poly Ethylene under slab on grade
Damp Proofing
5% Micro Silica
SUB-TOTAL
uper-structure works 30 MPA-OPC (Height as per drawings & spec max 4.5M)
Column/Beams/Walls
(Column/Beams/Walls) with Corbel
Suspended Slab (vary thick)
Concrete Ramps, Steps & Landing
Fair face finish for Concrete Ramps, Steps & Landing (Saeled Concrete)
Concrete Screed
Concrete Parapet
Concrete Coping (Galvanized Accessories)
Mechanical Pad
SUB-TOTAL
teel Reinforcement (3% allowable wastage)
Supply, Cut, Bend & Install of Straight Reinf bars For 8 & 10,12,14,16mm & above
Unit Price for Cut, Bend & Installation
Unit Price for Installation only
Unit Price for Supply,Cut and bend only
SUB-TOTAL
LOCK WORKS AND PLASTER WORKS
LOCK WORKS, including mortar tools / reinforcement dia 10mm & filling all
eight around openings curing.Etc.
m & above
COST SUMMARY
Installation
unit
Qty
Unit
rate
SAR
Total
Installation
Amount(SAR)
Works Executed
Previous Current
Total
74
66
M3
M3
M3
M3
366.00
350.00
40.00
280.00
SAR
27,094.98
23,082.50
50,177.48
144
M3
M3
M3
M3
M3
M3
M2
M2
M3
620.00
620.00
900.00
1,125.00
1,100.00
455.00
3.00
6.00
50.00
SAR
89,118.80
125,046.00
17,347.50
115,615.50
347,127.80
M3
M3
M3
M3
M2
M3
M3
LM
M3
1,050.00
1,250.00
975.00
1,200.00
135.00
550.00
1,050.00
130.00
600.00
SAR
172,053.00
215,455.50
26,568.00
4,146.00
418,222.50
Ton
Ton
Ton
Ton
3,850.00
825.00
675.00
3,175.00
SAR
139
15
254
164
221
22
M2
M2
M2
M2
LM
95.00
90.00
85.00
20.00
55.00
M2
M2
LM
42.00
46.00
15.00
SAR
SAR
815,527.78
Total
Amount( Remarks
SAR)
SI.NO
DESCRPITION
CONCRETE WORKS
1
Plain Concrete 20 MPA-SRC-thick = 50mm
2
Plain Concrete 20 MPA-SRC-thick = 100mm
3
Plain Concrete 20 MPA-SRC-thick = 150mm
4
5% Micro Silica
5
Mass concrete > 100mm below footings & ground beams (truck measured)
SUB-TOTAL
Sub-structure Concrete works 30 MPA-SRC (W/o S.O.G)
1
Isolated Footing
2
Strip Footing
3
Tie Beams/Grade Beam
4
Column Neck
5
Wall Neck (vary thick)
6
Slab on grade (20 MPA)-SRC
7
Vapour Barrier 300 micron Poly Ethylene under slab on grade
8
Damp Proofing
9
5% Micro Silica
SUB-TOTAL
Super-structure works 30 MPA-OPC (Height as per drawings & spec max 4.5M)
1
Column/Beams/Walls
2
(Column/Beams/Walls) with Corbel
3
Suspended Slab (vary thick)
4
Concrete Ramps, Steps & Landing
5
Fair face finish for Concrete Ramps, Steps & Landing (Saeled Concrete)
6
Concrete Screed
7
Concrete Parapet
8
Concrete Coping (Galvanized Accessories)
9
Mechanical Pad
SUB-TOTAL
Steel Reinforcement (3% allowable wastage)
1
Supply, Cut, Bend & Install of Straight Reinf bars For 8 & 10,12,14,16mm & abo
2
Unit Price for Cut, Bend & Installation
3
Unit Price for Installation only
4*
Unit Price for Supply,Cut and bend only
SUB-TOTAL
COST SUMMARY
Installation
unit
Qty
Unit
37
71
884
1,470
2
400
M3
M3
M3
M3
M3
Works Executed
rate
SAR
29
11
906
Total Installation
Amount(SAR)
366.00
350.00
10,562.76
3,825.50
40.00
280.00
SAR
14,388.26
M3
M3
M3
M3
M3
M3
M2
M2
M3
620.00
620.00
900.00
1,125.00
1,100.00
455.00
3.00
6.00
50.00
SAR
23,175.60
32,487.00
55,662.60
M3
M3
M3
M3
M2
M3
M3
LM
M3
1,050.00
1,250.00
975.00
1,200.00
135.00
550.00
1,050.00
130.00
600.00
SAR
927,958.50
1,433,250.00
2,880.00
2,364,088.50
Ton
Ton
Ton
Ton
3,850.00
825.00
675.00
3,175.00
SAR
1,540,000.00
1,540,000.00
Previous
lock walls.
M2
M2
M2
M2
LM
95.00
90.00
85.00
20.00
55.00
M2
M2
LM
42.00
46.00
15.00
SAR
SAR
3,974,139.36
Works Executed
Current
Total
Total
Amount( Remarks
SAR)