San Joaquin

Apartments
May 6, 2015
Group #12:

CAE 470 Spring 2015

Hailey Kunkel
Elizabeth Pierce
Emma Ghariana

Table&of&Contents:&
!
Executive!Summary!of!Project!Estimate3!
Resumes..496!
Summary.7!
Estimate!by!Section!(Includes!Line!Estimates)!
Division!00!and!01..8!
Square!Foot.9912!
Electrical13917!
Mechanical/Plumbing.18923!
Site!Work.24927!
Structural.28931!
Building!
System.32936!
Conclusion...37!
Appendix:!Presentation!Given!to!Clients38951!

Executive)Summary:)
)
The$San$Joaquin$Apartments$build,$located$at$University$of$California$Santa$Barbra$consists$of$
the$construction$of$two,$six$story,$buildings.$The$estimate$for$these$apartments$is$based$on$33$
divisions,$but$is$presented$so$that$the$divisions$are$grouped$into$the$categories$of$Structural,$
Electrical,$Mechanical/Plumbing,$Building$System,$and$Site$Work.$
$
For$each$of$these$groups,$the$counting$software$used$was$On$Screen$Takeoff$and$the$provided$
electronic$plans.$After$the$counting$was$finished,$each$of$the$items$were$cost$using$the$RS$
Means$database.$Some$Items$were$grouped$together$due$to$their$similarity$to$each$other$when$
inputted$into$RS$Means.$
$
The$Initial$parametric$estimate$for$this$apartment$was$computed$using$RS$Means$to$be$
$17,130,915.67.$
$
From$each$group,$the$cost$without$adding$a$10%$error$contingency$and$the$general$
requirements$was$$13,383,500.$Making$the$total$final$cost$of$the$apartments$to$be$
$16,194,030.$
$
The$division$of$work$consisted$of:$
$
1. Hailey$Kunkel$
a. Mechanical$
b. Site$Work$
c. Structural$
2. Emma$Ghariani$
a. Electrical$
3. Elizabeth$Pierce$
a. Building$Systems$
$
Our$team$is$composed$of$professionals$from$different$backgrounds,$which$ensures$a$high$
quality$service,$confidence,$and$innovation.$Furthermore,$this$firms$commitment$is$not$only$
with$respect$to$quality$of$construction,$but$also$with$the$environment,$health$and$safety,$
employees$and$contractors,$and$all$business$activities$and$processes.$
$
We$firmly$believe$that$our$projected$bid$for$the$San$Joaquin$Apartments$is$aligned$with$the$
values$and$expectations$of$the$firm.$Our$highly$prepared$and$hardworking$team$has$taken$into$
account$all$the$possibilities$in$order$to$achieve$the$highest$quality$possible$for$this$project.$
$
The$resumes$of$our$team$members$are$provided$in$the$following$pages.$
$
$
$

Hailey Kunkel
Permanent: 55 Barr Farm Rd, Bedford, NH 03110
School: 3201 South State St, Chicago, IL 60616
Phone: 603-714-8486(c), 603-472-4021(h) E-Mail: hbkunkel21@yahoo.com

Objective
To attain an entry level engineering position with a successful civil engineering firm to enhance my knowledge of
engineering and construction to contribute to the employers continued accomplishments.

Education
Illinois Institute of Technology
Bachelor of Science
Concentration: Civil Engineering

Expected Graduation:
Cumulative GPA: 3.0
Major GPA: 3.0

May 2015

Related Coursework

Geodetic Science (surveying)


Engineering Drawing and Design (AutoCAD)
Hydrology and Fluid Mechanics
Soil Mechanics

Reinforcement Concrete
Structural Design and Analysis
Engineering System Analysis
Materials of Construction and Geology

Skills

Computer: AutoCAD Inventor and Revit, Bluebeam Revu, Microsoft Word, PowerPoint, Excel, RS Means, OST
Surveying, OSHA 10HR certified

Employment History
Engineering Intern with The Walsh Group (Project: Taxiway K&L at OHare Airport- 214026) May 2014- August 2014

Assist Project Manager and Superintendent with:


o Managing material and trucking documentation and vendor invoicing.
o Coordinate Subcontractors and escort them onto the airfield.
o Help complete material documents and submittals for previous job at OHare (10C-211065)
Secretary (IIT, OTS Department)

Responsible for ensuring:


o Help management with daily tasks
o Cleanliness of facility
o Customer service

January 2014-present

Keating Sports Center Staff Member (IIT, Chicago)

Responsible for ensuring:


o Safety of customers
o Cleanliness of facility
o Customer service

August 2012-August 2014

Research Assistant (IIT, Chicago)


March 2013-May 2013

Assist graduate students with research topic:


o Assisted more than one graduate student with different civil engineering topics such as energy systems in
houses and how it can be improved with different duct systems.

Awards/Honors

Deans List Fall 2011 Semester and Spring 2014 Semester


CCAC (Chicagoland Collegiate Athletic Conference) All-Academic Team 2012- Women Soccer

Activities

Civil Engineering Honor Society (Chi Epsilon)


Student Athlete Advisory Committee (SAAC)
American Society of Civil Engineering (ASCE)

Volunteer Experience

Relay for Life


Our Promise to Nicholas
The Big Event

August 2013-present
August 2012-August 2014
August 2012- present

Liz Pierce
16500 VanBuren St, West Olive, MI 49460
3340 S. Michigan Ave. Chicago, IL 60616
[616]848 8738
epierce@hawk.iit.edu

Objective

Seeking an internship in an international related to Architectural Engineering using analytical skills to solve
problems and work with others.

Education

Bachelors of Science in Architectural Engineering


Illinois Institute of Technology, Chicago, IL
GPA 3.16
Cost Estimating/Construction Methods, HVAC Systems Design, Building Science,
AutoCAD, Structural design and Analysis, Materials of Construction, Electronic
Circuits, Geotechnical Eng., Thermo-Fluids, Hand Drafting, Land Surveying

May 2016

Professional Experience
Student Worker, Galvin Library-Ill Department
Sort lending and borrowing requests
Managing electronic documents and database changes

Feb-Present

Engineering Intern, DeLeeuw Lumber Company


Developed a comprehensive knowledge of building codes and implementing them
Completed comprehensive materials lists and quotes for a variety of residential projects
Completed residential proposals for the approval of the building inspector
Communicated between builder, clients, architects, truss manufactures, product reps and
suppliers
Used REScheck and Forte programs to ensure code compliance and stability of projects

May 2014Aug 2014

Day Care Provider, Saunders Family


Provided quality activities- Library, Zoo, Nature Center, Beach
Provided transportation to and from summer camps
Prepared meals and snacks
Ensure childrens safety

June 2013Aug 2013


June 2012Aug 2012

Memberships & Affiliations

Alpha Sigma Alpha Sorority: Executive Board: Current Vice President of Alumnae and Heritage & Previous
Resident Advisor (Housing Manager) & previous Programming Chairmen
ASCE Student Chapter: Executive Board Member: Events Coordinator, 2016 Student Conference Planning
Committee: Logistics
IIT Varsity Womens Soccer Team: 2013-2014 Season
Boy Scouts of America: Venture Scout Crew Executive Board, Leadership Training
Girl Scouts of America: Bronze Award

IIT IPRO (Inter-Professional Project): Process Management Track Winner, January-May 2014
Volunteer Work: Stem outreach for girls and young kids, Special Olympics

Projects

3340 S. Michigan Ave.


Chicago, IL 60616

Emma Ghariani

eghariani1@gmail.com
305.801.5305

Objective: Looking for a part time or full time internship in Business related or Construction
Management fields. I work diligently to find solutions to problems in creative ways, whether big
or small. In addition to working well in teams, I strive to be efficient independently and am
constantly learning new ways to enhance my strong work ethic.
Education:
Illinois Institute of Technology, Chicago, IL
BS Business Administration
Present
o Minors: Construction Management, Entrepreneurship and Engineering Graphics
o GPA: 3.04/4.0
International School of Indiana, Indianapolis, IN
May 2013
o Bilingual International Baccalaureate Diploma
o GPA: 3.87/4.0
Experience:
Illinois Institute of Technology (IIT)
Student Affairs Assistant
Facilitator for Chicago Transit Authority UPASS distribution program
Responsibilities include technical support and assistance
with daily office operations
Illinois Institute of Technology
Community Desk Assistant
Concierge
Responsibilities include welcoming residents and guests and
enforcing security measures within residential buildings
Mrs. Fields Cookies
Sales/Cashier/Baker
Sales associate and cashier
Responsibilities included inventory, baking, cleanliness of
store, and customer service
Skills:

February 2014-Present

August 2014-Present

August 2013-March 2014

Computers: PC, Mac, Microsoft Office, iWork, Pages, standard Mac applications,
Matlab, POS systems including Square, specialized in AutoCAD, Quicken, and SPSS
Languages: Fluency in French, conversational Spanish

Awards/Activities:
Alpha Sigma Alpha Sorority Vice President of Public Relations & Recruitment
Present
Alpha Sigma Alpha Sorority Finance and Social Chairman
2014
Illinois Institute of Technology A Cappella Public Relations Chairman
Present
Illinois Institute of Technology Greek Council Social Chairman
Present
Illinois Institute of Technology Collegiate Entrepreneurs Org. Member
Present
IIT Construction Management Association of America, Member
Present
Alternative Spring Break for Habitat for Humanity, Volunteer/Member
Present
PAWS Chicago, Volunteer
Present
IIT Greek Council Outstanding New Member in the Greek Community Award
2014
IIT Undergraduate Business Council Investment Competition First Place Winner
2014
Recipient Henry T. Heald Scholarship
2013
Timmy Global Health International School of Indiana Chapter, President
2010-2013

Summary:)
$

The$final$cost$of$the$San$Joaquin$Apartments$is$summarized$in$the$following$table.$
$

All$obtained$results$will$be$explained$in$the$corresponding$following$reports.$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

Division)00:)
$

In$this$section$we$have$estimated$all$different$fees.$These$fees$are$for$the$architect,$all$the$
engineers,$the$construction$management$as$well$as$the$financial$costs.$We$have$considered$
that$15%$of$the$total$estimation$is$a$fair$amount$for$division$00.$

)
Division)01:)
$

The$site$for$the$San$Joaquin$Apartments$is$considered$a$greenfield$because$there$has$not$been$
previous$construction.$There$is$no$demolition$needed$on$the$site$from$the$plans$that$we$were$
given.$There$are$not$any$known$utilities$under$the$site,$so$they$will$need$to$be$brought$to$the$
building$locations.$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

Square)foot)Estimate:)
$

This$part$of$the$estimate$gave$us$an$idea$of$how$much$the$estimation$of$each$building$should$
be.$Just$with$the$area$of$the$building$and$location,$RS$Means$gives$us$the$estimation.$$
$

)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)

Square Foot Cost Estimate Report

Estimate Name:

UCSB

Building Type:

Apartment, 4-7 Story with Decorative Concrete Block / R/Conc. Frame

Location:

SANTA BARBARA, CA

Stories Count (L.F.):

6.00

Stories Height

10.00

Floor Area (S.F.):

105,428.00

LaborType

STD

Basement Included:

No

Data Release:

Year 2011

Cost Per Square Foot

$162.49

Total Building Cost

$17,130,915.67

Date:

Costs are derived from a building model with basic components. Scope
differences and market conditions can cause costs to vary significantly.

% of
Total
2.6%

A1030

A2010

A2020

B1020

B2010

B2020

Cost

$336,999.41

Standard Foundations

$1.53

$161,086.58

Strip footing, concrete, reinforced, load 22.0 KLF, soil bearing capacity 6 KSF, 16" deep x
48" wide

$0.64

$67,146.71

Spread footings, 3000 PSI concrete, load 500K, soil bearing capacity 6 KSF, 9' - 6" square x
30" deep

$0.89

$93,939.87

Slab on Grade

$1.13

$119,350.29

Slab on grade, 4" thick, light industrial, reinforced

$1.13

$119,350.29

Basement Excavation

$0.05

$5,593.48

Excavate and fill, 100,000 SF, 4' deep, sand, gravel, or common earth, on site storage

$0.05

$5,593.48

Basement Walls

$0.48

$50,969.06

Foundation wall, CIP, 4' wall height, direct chute, .148 CY/LF, 7.2 PLF, 12" thick

$0.48

$50,969.06

$28.06

$2,958,680.38

Floor Construction

$16.54

$1,743,967.82

Cast-in-place concrete column, 12" square, tied, 200K load, 10' story height, 140 lbs/LF,
4000PSI

$0.26

$27,171.67

Cast-in-place concrete beam and slab, 8" slab, one way, 16" column, 30'x35' bay, 40 PSF
superimposed load, 158 PSF total load

$14.42

$1,519,910.67

Cast-in-place concrete beam and slab, 8" slab, one way, 22" column, 30'x35' bay, 125 PSF
superimposed load, 254 PSF total load

$1.87

$196,885.48

Roof Construction

$3.20

$337,757.92

Floor, concrete, beam and slab, 30'x35' bay, 40 PSF superimposed load, 16" deep beam, 8"
slab, 158 PSF total load

$3.20

$337,757.92

Exterior Walls

$4.40

$463,682.10

Concrete block (CMU) wall, split rib, 8 ribs, hollow, regular weight, 8x8x16, reinforced,
vertical #5@32", grouted

$4.40

$463,682.10

Exterior Windows

$2.44

$257,057.54

Windows, aluminum, sliding, standard glass, 5' x 3'

$2.44

$257,057.54

23.1%

B Shell
B1010

Cost Per
SF
$3.20

A Substructure
A1010

4/27/2015

2015

1-800-334-3509 customersupport@rsmeans.com

% of
Total
B2030

B3010

C1020

C1030

C2010

C3010

C3020

C3030

$0.43

$44,933.67

Door, aluminum & glass, without transom, wide stile, hardware, 3'-0" x 7'-0" opening

$0.21

$21,890.70

Door, aluminum & glass, without transom, non-standard, double door, hardware, 6'-0" x
7'-0" opening

$0.22

$23,042.97

Roof Coverings

$1.06

$111,281.33

Roofing, asphalt flood coat, gravel, base sheet, 3 plies 15# asphalt felt, mopped

$0.47

$50,047.20

Insulation, rigid, roof deck, composite with 2" EPS, 1" perlite

$0.34

$35,748.00

Roof edges, aluminum, duranodic, .050" thick, 6" face

$0.15

$15,405.21

Flashing, aluminum, no backing sides, .019"

$0.03

$3,022.24

Gravel stop, aluminum, extruded, 4", mill finish, .050" thick

$0.07

$7,058.68

$34.29

$3,615,231.52

Partitions

28.2%

$7.72

$813,874.96

Metal partition, 5/8"fire rated gypsum board face, 1/4" sound deadening gypsum board,
2-1/2" @ 24", same opposite face, no insulation

$6.43

$677,918.91

1/2" fire ratedgypsum board, taped & finished, painted on metal furring

$1.29

$135,956.05

Interior Doors

$7.18

$756,628.37

Door, single leaf, wood frame, 3'-0" x 7'-0" x 1-3/8", birch, solid core

$1.21

$127,393.59

Door, single leaf, wood frame, 3'-0" x 7'-0" x 1-3/8", birch, hollow core

$5.97

$629,234.78

Fittings

$3.62

$381,278.14

Cabinets, residential, wall, two doors x 48" wide

$3.62

$381,278.14

Stair Construction

$2.86

$301,373.65

Stairs, steel, cement filled metal pan & picket rail, 12 risers, with landing

$2.86

$301,373.65

Wall Finishes

$3.00

$316,721.73

Painting, interior on plaster and drywall, walls & ceilings, roller work, primer & 2 coats

$1.22

$128,184.00

Vinyl wall covering, fabric back, medium weight

$1.02

$107,694.70

Ceramic tile, thin set, 4-1/4" x 4-1/4"

$0.77

$80,843.03

Floor Finishes

$5.51

$580,434.06

Carpet tile, nylon, fusion bonded, 18" x 18" or 24" x 24", 24 oz

$1.33

$140,066.37

Carpet tile, nylon, fusion bonded, 18" x 18" or 24" x 24", 35 oz

$1.54

$161,943.10

Carpet, padding, add to above, minimum

$0.30

$31,513.91

Carpet, padding, add to above, maximum

$0.42

$44,441.06

Vinyl, composition tile, minimum

$0.33

$34,297.20

Vinyl, composition tile, maximum

$0.46

$48,881.69

Tile, ceramic natural clay

$1.13

$119,290.73

Ceiling Finishes

$4.41

$464,920.61

Gypsum board ceilings, 1/2" fire rated gypsum board, painted and textured finish,
7/8"resilient channel furring, 24" OC support

$4.41

$464,920.61

$55.94

$5,897,249.94

Elevators and Lifts

$7.57

$798,507.30

Traction, geared passenger, 3500 lb, 6 floors, 10' story height, 2 car group, 200 FPM

$7.57

$798,507.30

Plumbing Fixtures

$13.52

$1,425,025.83

Kitchen sink w/trim, countertop, PE on CI, 24" x 21", single bowl

$2.20

$231,451.84

Laundry sink w/trim, PE on CI, black iron frame, 24" x 20", single compt

$0.14

$14,615.19

Service sink w/trim, PE on CI, corner floor, 28" x 28", w/rim guard

$0.51

$53,269.73

Bathroom, lavatory & water closet, 2 wall plumbing, stand alone

$2.82

$297,031.80

Bathroom, three fixture, 2 wall plumbing, lavatory, water closet & bathtub, stand alone

$7.86

$828,657.27

Domestic Water Distribution

$4.49

$473,449.58

Gas fired water heater, residential, 100< F rise, 30 gal tank, 32 GPH

$4.49

$473,449.58

Rain Water Drainage

$0.23

$24,696.23

Roof drain, DWV PVC, 4" diam, diam, 10' high

$0.11

$11,654.94

Roof drain, DWV PVC, 4" diam, for each additional foot add

$0.12

$13,041.29

46.0%

D Services
D1010

D2010

D2020

D2040

Cost

Exterior Doors

C Interiors
C1010

Cost Per
SF

2015

1-800-334-3509 customersupport@rsmeans.com

% of
Total
D3010

D3030

D4010

D4020

D5010

D5020

D5030

D5090

Cost

Energy Supply

$7.94

$837,486.30

Apartment building heating system, fin tube radiation, forced hot water, 30,000 SF
area,300,000 CF vol

$7.94

$837,486.30

Cooling Generating Systems

$8.66

$913,476.69

Packaged chiller, air cooled, with fan coil unit, medical centers, 40,000 SF, 93.33 ton

$8.66

$913,476.69

Sprinklers

$2.93

$308,905.77

Wet pipe sprinkler systems, steel, light hazard, 1 floor, 10,000 SF

$0.58

$60,931.14

Wet pipe sprinkler systems, steel, light hazard, each additional floor, 10,000 SF

$2.35

$247,974.63

Standpipes

$0.47

$49,678.78

Wet standpipe risers, class III, steel, black, sch 40, 6" diam pipe, 1 floor

$0.12

$12,830.88

Wet standpipe risers, class III, steel, black, sch 40, 6" diam pipe, additional floors

$0.16

$16,734.50

Fire pump, electric, with controller, 4" pump, 30 HP, 500 GPM

$0.19

$20,113.40

Electrical Service/Distribution

$1.36

$143,748.68

Service installation, includes breakers, metering, 20' conduit & wire, 3 phase, 4 wire,
120/208 V, 1600 A

$0.33

$34,773.20

Feeder installation 600 V, including RGS conduit and XHHW wire, 1600 A

$0.67

$70,408.50

Switchgear installation, incl switchboard, panels & circuit breaker, 1600 A

$0.37

$38,566.98

Lighting and Branch Wiring

$7.02

$740,225.22

Receptacles incl plate, box, conduit, wire, 10 per 1000 SF, 1.2 watts per SF

$2.96

$311,879.22

Wall switches, 2.5 per 1000 SF

$0.58

$60,635.86

Miscellaneous power, 2 watts

$0.53

$55,975.94

Central air conditioning power, 3 watts

$0.43

$45,491.13

Motor installation, three phase, 200 V, 15 HP motor size

$0.07

$7,311.90

Incandescent fixtures recess mounted, type A, 1 watt per SF, 8 FC, 6 fixtures per 1000 SF

$2.46

$258,931.17

Communications and Security

$1.55

$163,395.46

Communication and alarm systems, fire detection, addressable, 50 detectors, includes


outlets, boxes, conduit and wire

$0.86

$90,565.29

Fire alarm command center, addressable with voice, excl. wire & conduit

$0.10

$10,913.25

Internet wiring, 2 data/voice outlets per 1000 S.F.

$0.59

$61,916.92

Other Electrical Systems

$0.18

$18,654.10

Generator sets, w/battery, charger, muffler and transfer switch, gas/gasoline operated, 3
phase, 4 wire, 277/480 V, 11.5 kW

$0.17

$17,846.43

Generator sets, w/battery, charger, muffler and transfer switch, diesel engine with fuel
tank, 30 kW

$0.01

$807.67

$0.00

$0.00

$0.00

$0.00

0.0%

E Equipment & Furnishings


E1090

Cost Per
SF

Other Equipment

F Special Construction

0.0%

$0.00

$0.00

G Building Sitework

0.0%

$0.00

$0.00

Sub Total

100%

$121.49

$12,808,161.25

Contractor's Overhead & Profit

25.0 %

$30.37

$3,202,040.31

Architectural Fees

7.0 %

$10.63

$1,120,714.11

User Fees

0.0 %

$0.00

$162.49

Total Building Cost


**

$0.00

$17,130,915.67

Indicates Assemblies or Components have been customized.

2015

1-800-334-3509 customersupport@rsmeans.com

Electrical:)
Estimated$by$Emma$Ghariani$
$
Scope:$
$
This$section$includes$light$fixtures,$receptacle$outlets,$switches,$fan$coil$units,$and$equipment$
hookeups.$Also$included$is$power$equipment$including$but$not$limited$to$switchgear,$
transformers,$panel$boards,$generators,$and$a$transfer$switches.$All$associated$conduit,$conduit$
fittings$and$supports,$junction$boxes,$and$wiring$are$also$included,$regardless$of$the$
specification$listing$NOTE:$All$conduits$described$under$symbol$legend$below$should$be$priced$
as$add$alternate.$The$base$pricing$should$not$include$conduits,$per$UCSB$request.$This$section$
also$included$the$telecommunications$and$data$system$throughout$the$building.$$
$
Method:$
$
On$Screen$Takeoff$Software$was$used$to$count$each$individual$device,$as$well$as$the$lengths$of$
conduit$and$wiring$required$to$accommodate$these$devices.$Pricing$for$lighting$fixtures$was$
determined$by$matching$fixtures$up$to$the$nearest$comparable$fixture$that$had$available$
pricing.$Feeders$and$conduits$for$panels,$transformers,$and$gears$were$determined$by$studying$
the$power$risers$diagram$and$the$feeder$schedule.$On$Screen$Takeoff$3$Software$was$also$used$
to$count$individual$items$as$well$as$learning$details$of$all$that$was$required.$Cable$tray$lengths$
were$determined$on$the$software$and$conduit$lengths$were$determined$using$judgment$of$
whether$there$would$be$stubeups$out$of$the$wall$to$the$cable$tray$or$run$back$to$the$nearest$
communications$room.$
$
Total$Cost:$
$
$1,683,608.18$
$
General$Condition:$
$
$168,360.82$
$
Overhead$&$Profit:$
$
$185,196.90$
$
Grand$Total:$
$
$2,037,165.90$
$
Once$the$main$representative$information$about$Electrical$has$been$provided,$in$the$following$
section$it$is$going$to$explain$how$the$solution$has$been$obtained.$

$
$
$
$
$
$

)
)
)
)
)
)
)
)
)
)
)
)
)

1. The$low$voltage,$fire$alarm,$and$telecommunications$are$all$part$of$the$electrical$
estimate$and$On$Screen$Takeoff$3$Software$will$be$used$to$find$the$takeoffs.$
2. On$pdf$page$275,$it$has$the$panel$name$and$the$items$that$make$up$the$circuit$
connected$to$that$panel.$
3. There$are$also$electrical$symbols,$like$light$switch,$outlets,$GFI$outlets,$and$light$fixtures$
that$are$shown$to$indicate$location$that$will$be$connected$to$and$mounted$into$an$
electrical$box,$usually$a$4"$by$4"$or$as$known$in$the$trade$as$a$"1900's"$box.$
4. The$arrows$indicate$what$service$panel$number,$(circuit$breaker$panel)$and$what$circuit$
that$that$fixture,$outlet$or$switch$is$connect$within$that$circuit.$One$circuit$make$up$of$
several$items$are$connect$to$only$one$circuit$breaker$(fuse).$
5. The$panels$are$located$on$the$electrical$floor$plan$drawings.$They$will$be$shown$as$
mounted$into$or$on$a$wall.$The$symbol$for$a$panel$can$be$a$rectangle$against$a$wall$or$a$
rectangle$with$a$line$drawn$from$one$corner$of$the$rectangle$at$like$a$30$degree$angle$to$
indicate$the$cover$door$partially$open$and$it$will$have$a$leader$line$drawn$to$it$at$90$
degree$angle$from$the$text.$$
6. Once$the$panels$are$found,$they$will$then$be$counted.$$
7. Each$bedroom$included$receptacles,$switches,$and$conduits.$RS$Means$was$used$to$find$
the$appropriate$items$with$the$pricing.$Also$included$were$kitchen$items$and$bathroom$
items.$
8. Wire$lengths$and$sizes$were$added$in$for$the$devices$and$lighting$at$this$point.$$

UNIVERSITY OF CALIFORNIA SANTA BARBARA


750 STORKE ROAD
GOLETA, California, 93106
Date: 04/26/2015
Final Electrical - Gateway Towers
Year 2011
Unit Detail Report with Subcontracted Lines
Line Number

Description

Prepared By:
Emma Ghariani
Illinois Institute of Technology
Quantity

Unit

Total Incl.

Ext. Total Incl.

Ext. Total Incl. O&P

O&P

O&P

(Sub-Contracted)

00

002

003

004

005

006

007

20A, 125V, DUPLEX


RECEPTACLE, WITH GROUND
FAULT CIRCUIT INTERRUPTER,
NEMA 5-20R.
20A, 125V, COUNTERTOP
MOUNTED, DUPLEX
RECEPTACLE, WITH GROUND
FAULT CIRCUIT INTERRUPTER,
NEMA 5-20R
120V WALL / CEILING MOUNTED
JUNCTION BOX. PROVIDE
EXTENSION WHEN USED FOR
FLEX CONNECTION.
WEATHERPROOF WHEN
INSTALLED OUTSIDE. PROVIDE
DISCONNECT SWITCH WHERE
INDICATED OR REQUIRED BY
CODE. Includes Hand Driers, Fire
curtains, ceiling fans, card readers
HARD WIRED CONNECTION TO
MOTORIZED EQUIPMENT
(MOTOR / FAN / PUMP / FAN
COIL UNIT)
UL LISTED DISCONNECT
(UNFUSED) 30A, 3 POLES, NEMA
1 U.O.N.
Light Fixtures - F and U series
Light Fixture - F1, F10a, F11, F12,
F13, F13a, F15, F16, F17b, F17t,
F18, F19, F19a, F1a, F22, F7a, F8,
F8a, LT-4, U1, U2, U3

59.00

Ea.

$74.50

4,395.50

0.00

325.00

Ea.

$74.50

24,212.50

0.00

249.00

Ea.

$74.21

18,478.29

0.00

113.00

Ea.

$195.27

22,065.51

0.00

54.00

Ea.

$184.46

9,960.84

0.00

722.00

Ea.

$111.41

80,438.02

0.00

159,550.66

0.00

68,404.60

0.00

68,404.60

0.00

00
08 Openings

087413600540

Access Control Equipment, entrance


card reader, proximity

85.00

Ea.

$804.76

08 Openings Subtotal
11 Equipment

112613101500

113113332750

Unit kitchen, combination range,


refrigerator and sink, 30" wide,
minimum
Dishwasher, residential appliances,
built-in, 2 cycles, minimum

65.00

Ea.

$1,710.10

111,156.50

0.00

65.00

Ea.

$585.55

38,060.75

0.00

149,217.25

0.00

117,807.00

0.00

11 Equipment Subtotal
14 Conveying Equipment

142133207300

Electric traction residential elevators,


cab type, 2 floor, 3 stop, max
2015

2.00

1-800-334-3509 customersupport@rsmeans.com

Ea.

$58,903.50

Line Number

Description

Quantity

Unit

Total Incl.

Ext. Total Incl.

Ext. Total Incl. O&P

O&P

O&P

(Sub-Contracted)

14 Conveying Equipment Subtotal

117,807.00

0.00

51,171.48

0.00

51,171.48

0.00

23 Heating, Ventilating, and Air Conditioning (HVAC)

238219100100

Fan coil A.C., cabinet mounted, chilled


water, 1/2 ton cooling, includes filters
and controls
23 Heating, Ventilating, and Air Conditioning (HVAC) Subtotal

54.00

Ea.

$947.62

26 Electrical

260505100120

260519133720
260519550400

260519550500

260519551650
260533135100

260533135180

260533171530
260590101100

260590102110

260590102410

260590104100

260590104670

260590107050
262213100100

262416100200

Conduit, rigid galvanized steel, 1-1/4"


to 2" diameter, electrical demolition,
remove conduit to 15' high, incl
fittings & hangers
Underecarpet, data cable-bulk, dual
lead
Non-metallic sheathed cable, copper
with ground wire, 600 V, 3 conductor,
#10, (Romex)
Non-metallic sheathed cable, copper
with ground wire, 600 V, 3 conductor,
#6, (Romex)
Underground feeder cable, copper
with ground, #12, 3 wire, type UF
Electric metallic tubing (EMT), 2"
diameter, to 15' high, incl 2
terminations, 2 elbows, 11 beam
clamps, and 11 couplings per 100 LF
Electric metallic tubing (EMT), 4"
diameter, to 15' high, incl 2
terminations, 2 elbows, 11 beam
clamps, and 11 couplings per 100 LF
Outlet boxes, PVC, weatherproof
duplex receptacle cover, FS, 1 gang
Service & panel, resi, w/10 branch
breakers, 100 amp, incl 24' SE-AL
cable, service eye, meter socket
Switch devices, resi, single pole, ivory,
type NM (Romex) cable, 20', 15 amp,
incl box & cover plate
Switch devices, resi, interval timer
wall switch, 1-30 min., #12/2, type
NM cable, 20', 20 amp, incl box &
cover plate
Receptacle devices, resi, duplex outlet,
ivory, w/#12/2, type NM cable, 20',
20 amp, incl box & cover plate
Dryer outlet, resi, 30' of #10/3, 2 pole
circuit breaker, type NM cable, 30
amp, 240 V, incl box & ext cover plate
Smoke detectors, resi, box, #14/3,
type NM cable, 20'
Transformer, dry-type, single phase
240/480 V primary 120/240 V
secondary, 1 kVA
Load centers, 1 phase, 3 wire, main
lugs, indoor, 120/240 V, 100 amp, 8
circuits, incl 20 A 1 pole plug-in
breakers
2015

55,430.00

L.F.

$3.29

182,364.70

0.00

878.00

L.F.

$3.91

3,432.98

0.00

510.00

C.L.F.

$451.01

230,015.10

0.00

10.00

C.L.F.

$692.34

6,923.40

0.00

140.00

C.L.F.

$283.53

39,694.20

0.00

8,778.00

L.F.

$12.96

113,762.88

0.00

240.00

L.F.

$35.09

8,421.60

0.00

35.00

Ea.

$30.28

1,059.80

0.00

82.00

Ea.

$1,116.08

91,518.56

0.00

698.00

Ea.

$49.36

34,453.28

0.00

120.00

Ea.

$98.49

11,818.80

0.00

1,681.00

Ea.

$74.50

125,234.50

0.00

14.00

Ea.

$170.49

2,386.86

0.00

338.00

Ea.

$80.31

27,144.78

0.00

11.00

Ea.

$611.08

6,721.88

0.00

66.00

Ea.

$653.25

43,114.50

0.00

1-800-334-3509 customersupport@rsmeans.com

Line Number

Description

Quantity

Unit

Total Incl.

Ext. Total Incl.

Ext. Total Incl. O&P

O&P

O&P

(Sub-Contracted)

262419400080

Motor starter, magnetic, FVNR, size

109.00

Ea.

$398.74

43,462.66

0.00

262713102600

00, 480 volt, 2 HP, NEMA 1, incl


enclosure & heater
Meter center, basic meter device, 4
jaw 125A socket, 1P 3W 120/240 V, 3
meter

69.00

Ea.

$2,007.75

138,534.75

0.00

28.00

Ea.

$750.71

21,019.88

0.00

1,131,085.11

0.00

6,372.08

0.00

6,372.08

0.00

1,683,608.18

0.00

265313100120

Exit lighting, incandescent, explosion


proof, ceiling or wall mount

26 Electrical Subtotal
28 Electronic Safety and Security

283146505200

Detection Systems, heat detector,


smoke detector, ceiling type, excl.
wires & conduit
28 Electronic Safety and Security Subtotal

26.00

Ea.

Subtotal
10.00%

General Contractor's Markup on Subs

Subtotal
10.00%

General Conditions
Subtotal

10.00%

General Contractor's Overhead and Profit

Subtotal

$245.08

$0.00

$0.00

$1,683,608.18

$0.00

$168,360.82

$0.00

$1,851,969.00

$0.00

$185,196.90

$0.00

$2,037,165.90

$0.00
$2,037,165.90

Grand Total

2015

1-800-334-3509 customersupport@rsmeans.com

Mechanical/Plumbing:)
Estimated$by$Hailey$Kunkel$
$
Scope:$
$
This$section$includes$all$of$the$ductwork,$air$outlets$and$inlets,$insulation$of$the$ductwork,$and$
installation$methods$and$requirements$for$HVAC$system$in$the$building.$The$actual$HVAC$units$
such$as$boilers,$furnaces,$VAV$systems,$heat$exchangers,$and$air$conditioning$units$were$also$
included.$This$section$also$includes$all$domestic,$sanitary,$and$storm$piping$and$valves$and$
fixtures$associated$with$plumbing$including$lavatories,$water$closets,$and$sinks.$The$boilers,$
pumping$systems,$and$controls$for$the$liquids$are$also$included.$
$
Method:$
$
On$Screen$Software$was$used$to$count$the$number$of$individual$items$and$lengths$of$ductwork.$
Then,$assuming$ducts$are$made$of$24$Gauge$metal,$and$using$the$provided$conversion$charts,$
unit$weights$of$each$of$the$different$perimeter$sizes$of$the$ducts$was$found$and$then$multiplied$
by$the$respective$lengths$into$gross$weights$to$input$into$RS$Means.$Some$items$were$
condensed$into$just$one$line$item$based$on$their$similarity$to$other$fixtures$of$their$type,$such$
as$overall$output$and$size,$such$as$diffusers,$registers,$grills,$and$fans.$Additionally,$the$majority$
items$were$researched$further$based$on$the$given$model$in$the$schedule$to$ensure$the$closest$
match$possible$to$the$line$items$in$the$estimating$software.$On$Screen$Software$was$also$used$
to$count$the$number$of$fixtures$and$lengths$of$piping$of$each$size$and$function.$Some$fixtures,$
such$as$lavatories$and$sinks$of$similar$sizes$were$condensed$into$just$one$line$item$based$on$the$
similarity$of$other$fixtures.$
$
Total$Cost:$
$
$3,549,338.19$
$
General$Condition:$
$
$354,933.82$
$
Overhead$&$Profit:$
$
$390,427.20$
$
Grand$Total:$
$
$4,294,699.21$
$

Once$the$main$representative$information$about$Mechanical/Plumbing$has$been$provided,$in$
the$following$section$it$is$going$to$explain$how$the$solution$has$been$obtained.$
$
1. On$Screen$Software$was$used$to$measure$the$lengths$of$all$the$different$conducts$and$
was$all$used$to$count$all$the$equipment$used.$Using$HVAC$Ductwork$Conversion$Chart,$
the$Galvanized$Ductwork$Total$Price$was$estimated.$
2. With$circular$sections,$the$length$was$measured$in$LF.$The$diameter$of$the$ductwork$is$
given.$Using$the$chart$given,$compare$the$diameter$in$inches$with$the$gauge$assumed$
(24).$This$will$then$give$the$pounds$per$foot.$You$take$this$number$and$multiply$it$by$the$
length$measured.$
3. Insulation$for$the$ductwork$also$needs$to$be$estimated.$This$measured$in$SF.$
4. Some$items$were$condensed$into$just$one$line$item$based$on$their$similarity$to$other$
fixtures$of$their$type,$such$as$overall$output$and$size,$such$as$diffusers,$registers,$grills,$
and$fans.$
5. On$Screen$Software$was$then$used$to$measure$the$pipes,$drain$fittings,$valve$
assemblies,$and$devices$installed$in$a$building$for$the$distribution$of$water$for$drinking,$
heating,$and$washing.$
6. The$pipes$were$measured$linearly$and$had$different$material,$such$as,$cast$iron,$steel,$
copper,$and$PVC$schedule$40.$
7. All$other$material$used$was$counted$individually$and$put$into$RS$Means$to$find$the$cost.$
$
$
$
$
$
$
$
$
$
$

)
)
)
)
)
)
)
)
)
)

UCSB
Santa Barbra, California
Date: 04/22/2015
Mechanical Final
Year 2011
Unit Detail Report

Prepared By:
Hailey Kunkel
IIT Raymond M. Lemming

LineNumber

Description

Quantity

Unit

Total Incl.

Ext. Total Incl.

O&P

O&P

Division 07 Thermal and Moisture Protection

078413100130

Firestopping, metallic piping, non


insulated, through walls, 6" dia
Firestopping, metallic piping, non
insulated, through walls, 12" dia

078413100140

800.00

Ea.

$75.00

$60,000.00

6,200.00

Ea.

$108.00

$669,600.00

Division 07 Thermal and Moisture Protection Subtotal

$729,600.00

Division 1

298.00

Exhaust Branch to Main Riser


Connection
Elevator System

2.00

Passive Air Intake Assembly

86.00

Range Hood Connection (3.25X10 to


6in Diameter)

62.00

Division 1

Ea.

$20.00

$5,960.00

$58,000.00

$116,000.00

Ea.

$79.94

$6,874.84

Ea.

$275.00

$17,050.00

Subtotal

$145,884.84

Division 14 Conveying Equipment

142133207200

Electric traction residential elevators,


cab type, 2 floor, 3 stop, min

2.00

Ea.

$31,300.00

Division 14 Conveying Equipment Subtotal

$62,600.00

$62,600.00

Division 21 Fire Suppression

210523506280

Sprinkler System Valve Alarm, 4"


size, includes retard chamber, trim,
gauges & alarm line strainer

36.00

Ea.

$2,070.00

Division 21 Fire Suppression Subtotal

$74,520.00

$74,520.00

Division 22 Plumbing

221113231180

Pipe, copper, tubing, solder, 3/4"


diameter, type K, includes coupling &
clevis hanger assembly 10' O.C.
Pipe, copper, tubing, solder, 1-1/2"
diameter, type K, includes coupling &
clevis hanger assembly 10' O.C.
Pipe, copper, tubing, solder, 2-1/2"
diameter, type K, includes coupling &
clevis hanger assembly 10' O.C.
Pipe, copper, tubing, solder, 3"
diameter, type K, includes coupling &
clevis hanger assembly 10' O.C.
Pipe, copper, tubing, solder, 1/2"
diameter, type M, includes coupling
& clevis hanger assembly 10' O.C.

221113231240

221113231280

221113231300

221113233140

2015

3,000.00

L.F.

$18.40

$55,200.00

1,500.00

L.F.

$33.80

$50,700.00

800.00

L.F.

$67.20

$53,760.00

240.00

L.F.

$88.00

$21,120.00

1,500.00

L.F.

$11.00

$16,500.00

1-800-334-3509 customersupport@rsmeans.com

LineNumber

Description

Quantity

Unit

Total Incl.
O&P

221113233180

Pipe, copper, tubing, solder, 3/4"


diameter, type M, includes coupling
& clevis hanger assembly 10' O.C.
Pipe, copper, tubing, solder, 1"
diameter, type M, includes coupling
& clevis hanger assembly 10' O.C.
Pipe, copper, tubing, solder, 1-1/4"
diameter, type M, includes coupling
& clevis hanger assembly 10' O.C.
Pipe, copper, tubing, solder, 2"
diameter, type M, includes coupling
& clevis hanger assembly 10' O.C.
Pipe, copper, tubing, solder, 2-1/2"
diameter, type M, includes coupling
& clevis hanger assembly 10' O.C.
Elbow, 90 Deg., copper, wrought,
copper x copper, 1-1/4"
Elbow, 90 Deg., copper, wrought,
copper x copper, 2"
Tee, copper, wrought, copper x
copper, 1-1/4"
Tee, copper, wrought, copper x
copper, 2"
Pipe, steel, black, welded, 6"
diameter, schedule 40, Spec. A-53,
includes yoke & roll hanger assembly,
sized for covering, 10' OC
Pipe, plastic, PVC, 2-1/2" diameter,
schedule 40, includes couplings 10'
OC, and hangers 3 per 10'
Pipe, plastic, PVC, 3" diameter,
schedule 40, includes couplings 10'
OC, and hangers 3 per 10'
Pipe, plastic, PVC, 4" diameter,
schedule 40, includes couplings 10'
OC, and hangers 3 per 10'
Water supply meter,
domestic/commercial, bronze,
threaded/flanged, to 160 GPM, 2"
diameter
Pipe, cast iron soil, one hub, service
weight, 3" diameter, lead and oakum
joints 10' O.C., includes clevis hanger
assemblies 5' O.C.
Pipe, cast iron soil, one hub, service
weight, 4" diameter, lead and oakum
joints 10' OC, includes clevis hanger
assemblies 5' OC
Interceptor, grease, fabricated steel,
15 GPM, 30 lb. fat capacity
Water heater, commercial, electric,
100 Deg. rise, 36 kW, 148 GPH, 208
V, 120 gallon, note: for each size tank
a range of heaters between the ones
shown are available

221113233200

221113233220

221113233260

221113233280

221113250140
221113250160
221113250520
221113250540
221113442130

221113741920

221113741930

221113741940

221119382360

221316202140

221316202160

221323101040
223333104240

Ext. Total Incl.


O&P

2,000.00

L.F.

$13.20

$26,400.00

630.00

L.F.

$17.20

$10,836.00

100.00

L.F.

$22.10

$2,210.00

200.00

L.F.

$38.05

$7,610.00

775.00

L.F.

$53.50

$41,462.50

110.00

Ea.

$61.10

$6,721.00

110.00

Ea.

$111.00

$12,210.00

110.00

Ea.

$110.00

$12,100.00

110.00

Ea.

$185.00

$20,350.00

565.00

L.F.

$78.49

$44,346.85

2,000.00

L.F.

$30.45

$60,900.00

1,400.00

L.F.

$34.20

$47,880.00

2,000.00

L.F.

$39.60

$79,200.00

Ea.

$547.00

$14,222.00

1,000.00

L.F.

$32.65

$32,650.00

2,000.00

L.F.

$38.05

$76,100.00

26.00

2.00

Ea.

$2,635.00

$5,270.00

4.00

Ea.

$7,810.00

$31,240.00

Division 22 Plumbing Subtotal

$728,988.35

2015

1-800-334-3509 customersupport@rsmeans.com

LineNumber

Description

Quantity

Unit

Total Incl.

Ext. Total Incl.

O&P

O&P

Division 23 Heating, Ventilating, and Air Conditioning (HVAC)

230943108600

64.00

Ea.

$2,025.00

$129,600.00

15.00

Ea.

$114.00

$1,710.00

2.00

Ea.

$4,416.00

$8,832.00

22,500.00

Lb.

$7.03

$158,175.00

215.00

Ea.

$51.50

$11,072.50

3.00

Ea.

$50.00

$150.00

S.F.

$7.80

$1,092,000.00

233713301000

Pneumatic Control Systems, VAV


boxes, incl. thermostat, damper
motor, reheat coil & tubing
Control Components, thermostats,
electric, timed, 1 set back
Expansion tanks, steel, liquid
expansion, rubber diaphragm, size is
acceptable capacity, 119 gallon
capacity, ASME
Metal Ductwork, fabricated
rectangular, galvanized steel, 2000 to
5000 lb., includes fittings, joints,
supports and allowance for a flexible
connection, excludes insulation
Duct accessories, multi-blade
dampers, opposed blade, 8" x 8"
Duct accessories, fire damper, curtain
type, vertical, 6" x 6", U.L. label,
1-1/2 hour rated
Insulation, ductwork, board type,
fiberglass liner, fire resistant,black
pigmented 1 side, 3 lb. density, 1"
thick
Fans, ceiling fan, right angle, extra
quiet, 0.10" S.P., 95 CFM
Fans, ceiling fan, right angle, extra
quiet, 0.10" S.P., 210 CFM
Fans, roof exhauster, centrifugal,
aluminum housing, bird screen, back
draft damper, direct drive, 1/4" S.P.,
600 CFM, 12" galvanized curb, 11"
sq. damper
Fans, propeller exhaust, wall shutter,
direct drive, 1/4" S.P., two speed, 375
CFM, 1/10 H.P.
Fans, residential, bath exhaust, grille,
back draft damper, 50 CFM
Fans, residential, bath exhaust, grille,
back draft damper, 110 CFM
Diffuser, steel, ceiling, round, 6"
diameter, includes butterfly damper
Diffuser, steel, ceiling, round, 8"
diameter, includes butterfly damper
Diffuser, aluminum , ceiling, T-bar
mounting, 24" x 24" lay-in frame, 6" x
6", includes opposed blade damper
Grille, aluminum, air return, 6" x 6"

233713301080

Grille, aluminum, air return, 16" x 8"

15.00

Ea.

$53.00

$795.00

233713301100

Grille, aluminum, air return, 12" x 12"

10.00

Ea.

$54.50

$545.00

233713301120

Grille, aluminum, air return, 24" x 12"

5.00

Ea.

$70.50

$352.50

235223202080

Boiler, gas fired, natural or propane,


cast iron, steam, gross output, 203
MBH, includes standard controls and
insulated jacket, packaged

6.00

Ea.

$6,275.00

$37,650.00

230953105040
232120463080

233113130570

233313135994
233313163000

233353103520

233414102520
233414102540
233416107120

233423106100

233423106660
233423106670
233713101500
233713101520
233713102000

2015

140,000.00

6.00

Ea.

$348.00

$2,088.00

3.00

Ea.

$400.00

$1,200.00

32.00

Ea.

$1,072.00

$34,304.00

10.00

Ea.

$617.00

$6,170.00

20.00

Ea.

$111.50

$2,230.00

10.00

Ea.

$151.00

$1,510.00

20.00

Ea.

$61.00

$1,220.00

2.00

Ea.

$67.00

$134.00

10.00

Ea.

$87.50

$875.00

40.00

Ea.

$43.30

$1,732.00

1-800-334-3509 customersupport@rsmeans.com

LineNumber

Description

Quantity

Unit

Total Incl.
O&P

235223202180

Boiler, gas fired, natural or propane,


cast iron, steam, gross output, 400
MBH, includes standard controls and
insulated jacket, packaged
Space heater, cabinet, grilles, fan, gas
fired, rooftop mounted, gravity vent
stainless steel exchanger, 1200 MBH
input, includes controls, burner and
thermostat, excludes piping
Heating and ventilating unit,
classroom type, heating/cooling coils,
1250 CFM, 3 tons cooling, includes
filter and standard controls

235533161760

238219200120

Ext. Total Incl.


O&P

6.00

Ea.

$10,325.00

$61,950.00

10.00

Ea.

$17,725.00

$177,250.00

12.00

Ea.

$6,350.00

$76,200.00

Division 23 Heating, Ventilating, and Air Conditioning (HVAC) Subtotal

$1,807,745.00

Subtotal

$3,549,338.19
0.00%

General Contractor's Markup on Subs

$0.00
$3,549,338.19

Subtotal
10.00%

General Conditions

$354,933.82
$3,904,272.01

Subtotal
10.00%

General Contractor's Overhead and Profit

$390,427.20

$4,294,699.21

Grand Total

2015

1-800-334-3509 customersupport@rsmeans.com

Site)Work:)
Estimated$by$Hailey$Kunkel$
$
Scope:$
$
This$section$includes$all$of$relative$work$towards$the$excavation$and$backfill$of$utilities$outside$
of$the$building.$The$most$important$parts$covered$for$this$part$of$the$work$is$related$to$
excavating,$placing$utilities,$and$backfilling.$The$excavation$and$backfill$were$measured$in$cubic$
yards,$while$the$utilities$were$measured$in$linear$feet.$The$utilities$that$were$put$in$the$ground$
were$plumbing$pipes$and$electrical$wire.$$
$
Method:$
$
On$Screen$Software$was$used$to$calculate$areas$to$be$excavated$and$backfilled$for$utilities$
outside$of$the$building.$Compression$was$also$considered$for$the$backfill.$Since$the$civil$plans$
were$not$given,$estimations$for$landscaping,$demolish/new$concrete$for$new$building,$and$the$
excavation$and$fill$needed$for$the$whole$building,$were$not$performed.$Once$the$take$off$was$
done,$the$process$of$pricing$was$taken$with$RS$Means$Online.$If$not$all$aspects$were$found;$
matching$with$the$closest$one$in$RS$Means$did$the$pricing$
$
Total$Cost:$
$
$1,043,372.15$
$
General$Condition:$
$
$104,337.22$
$
Overhead$&$Profit:$
$
$114,770.94$
$
Grand$Total:$
$
$1,262,480.31$
$
Once$the$main$representative$information$about$the$Site$Work$has$been$provided,$in$the$
following$section$it$is$going$to$explain$how$the$solution$has$been$obtained.$
$
1. Electrical$power$cables$are$fed$through$a$4"$diameter$grey$PVC$pipe$used$for$buried$
electrical$only.$The$utility$company$transformer,$placed$somewhere$on$the$property,$to$
the$building$where$it$is$fed$to$the$main$panel$distribution$for$the$building$will$be$
measured.$The$measurement$will$stop$when$is$hits$the$spot$next$to$the$building.$The$

measurement$will$be$in$lineal$feet$for$this$distance.$Then$take$that$measurement$and$
see$if$there$is$a$spec$for$the$depth$of$excavation$(since$is$was$not$found,$a$depth$of$3ft$
was$used).$$
2. Take$the$depth$of$3$feet$down$and$figure$out$how$many$cubic$yards$there$are$in$a$1efoot$
length$by$a$3efoot$depth.$This$will$give$the$cubic$yards$excavated$for$a$1efoot$lineal$
distance.$This$will$be$multiplied$by$the$total$distance,$which$will$give$the$amount$that$
needs$to$be$excavated$in$cubic$yards.$$

$
Plumbing$is$a$little$different;$there$will$be$2$pipelines$that$will$have$to$dealt$with.$Supply$water$
and$sewer$water$(sanitary).$
$
1. The$distance$from$the$municipal$water$supply$line,$which$is$usually$located$in$the$
parkway$near$the$street,$to$the$just$inside$the$building$by$2$feet$will$be$measured.$(That$
is$where$the$water$meter$is$usually$mounted,$then$the$inside$plumbing$takes$over$from$
there.)$
2. The$diameter$of$this$pipe$is$given$in$the$specs$on$the$1st$plumbing$drawing$page.$(It$is$
normally$of$copper$pipe$and$should$be$no$less$that$a$2"$diameter,$but$it$could$be$PVC$
Schedule$40.)$
3. The$frost$line$depth$then$needs$to$be$found$for$the$location$of$the$building.$$
4. Now$add$1$foot$to$that$depth$and$this$is$the$distance$down$in$feet,$then$take$that$a$
figure$a$cubic$yard$measure$for$that$depth$by$a$1efoot$length$and$that$is$how$to$get$the$
cubic$yards$for$excavation.$
5. The$next$pipe$is$for$sanitary$sewer$from$the$building$to$the$connection$near$the$street.$
Looking$at$the$drawings$it$shows$the$location$at$the$building$for$the$supply$and$sewer$
line$connections$and$go$from$there$to$the$street.$That$size$pipe$should$be$4"$PVC$
Schedule$40$coming$out$of$the$building$and$increasing$to$6"$or$larger$from$the$building$
to$the$sewer$line$connection.$(They$must$be$kept$separate$by$at$least$10$feet$in$parallel$
distance.)$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

Date: 04/28/2015
Site Work-Hailey
Year 2011
Unit Detail Report

Prepared By:
Hailey Kunkel
IIT Raymond M. Lemming

LineNumber

Description

Quantity

Unit

Total Incl.

Ext. Total Incl.

O&P

O&P

Division 22 Plumbing

221113232340

Pipe, copper, tubing, solder, 4"


diameter, type L, includes coupling &
clevis hanger assembly 10' O.C.
Pipe, plastic, PVC, 4" diameter,
schedule 40, includes couplings 10'
OC, and hangers 3 per 10'
Pipe, plastic, PVC, 4" diameter,
schedule 40, includes couplings 10'
OC, and hangers 3 per 10'
Interceptor, grease, fabricated steel,
20 GPM, 40 lb. fat capacity

221113741940

221113741940

221323101060

355.00

L.F.

$123.50

$43,842.50

2,233.00

L.F.

$39.60

$88,426.80

229.00

L.F.

$39.60

$9,068.40

$3,263.00

$3,263.00

1.00

Ea.

Division 22 Plumbing Subtotal

$144,600.70

Division 27 Communications

271323130070

Fiber optic cable, bulk simplex,


minimum

8,952.00

C.L.F.

$100.00

Division 27 Communications Subtotal

$895,200.00

$895,200.00

Division 31 Earthwork

312316130050

Excavating, trench or continuous


footing, common earth, 3/8 C.Y.
excavator, 1' to 4' deep, excludes
sheeting or dewatering
Fill by borrow and utility bedding, for
pipe and conduit, sand, dead or bank,
excludes compaction
Compaction, structural, 5 tons, steel
wheel tandem roller

312323160200

312323240020

94.88

B.C.Y.

$8.75

$830.20

94.00

L.C.Y.

$27.95

$2,627.30

$113.95

$113.95

1.00

Division 31 Earthwork Subtotal

Hr.

$3,571.45

2015

1-800-334-3509 customersupport@rsmeans.com

LineNumber

Description

Quantity

Unit

Subtotal

Total Incl.

Ext. Total Incl.

O&P

O&P
$1,043,372.15

0.00%

General Contractor's Markup on Subs

$0.00
$1,043,372.15

Subtotal
10.00%

General Conditions

$104,337.22
$1,147,709.37

Subtotal
10.00%

General Contractor's Overhead and Profit

$114,770.94

$1,262,480.31

Grand Total

2015

1-800-334-3509 customersupport@rsmeans.com

Structural:)
Estimated$by$Hailey$Kunkel$
$
Scope:$
$
This$section$includes$all$of$relative$work$towards$the$concrete$and$steel$used$to$build$the$
building.$The$most$important$parts$covered$for$this$part$of$the$work$is$related$to$all$the$
concrete$and$steel$used.$The$concrete$was$measures$in$cubic$yards,$while$the$steel$is$measured$
in$tons.$There$are$several$types$of$steel,$such$as,$beams,$columns,$and$reinforcing$steel$(rebar).$
Concrete$also$has$several$types,$such$as,$foundation$and$slabs.$$
$
Method:$
$
On$Screen$Software$was$used$to$measure$the$total$concrete$and$steel$used$in$walls$and$
foundation.$All$of$the$concrete$was$added$together$and$the$steel$was$also$put$together.$
$
Final$Cost:$
$
$6,371,944.79$
$
General$Condition:$
$
$637,194.48$
$
Overhead$&$Profit:$
$
$700,913.93$
$
Total$Cost:$
$
$7,710,053.20$
$
Once$the$main$representative$information$about$Structural$has$been$provided,$in$the$following$
section$it$is$going$to$explain$how$the$solution$has$been$obtained.$
$
1. First$look$at$the$drawing$sheets$S0.00$to$S.21$and$read$over$all$the$notes$and$symbols$to$
determine$what$type$of$system$it$is.$(it$will$be$both$concrete$and$steel)$
2. The$foundation$was$measured$and$was$totaled$up$into$cubic$yards$of$concrete$and$all$
the$rebar$that$was$used$in$the$foundation$was$counted.$
3. Next$measure$and$calculate$the$concrete$floor$slab$at$grade$and$also$add$in$the$steel$
reinforcing$mesh$and$any$rebar$used$in$the$slab.$
4. Also$look$for$any$concrete$footings;$these$are$pads$that$support$either$steel$columns$or$
concrete$columns.$

5. Then$take$a$look$at$the$2nd$floor$slab$to$the$last$floor$slab$to$see$if$they$are$the$same$
size$as$the$ground$floor$slab$and$if$they$are$then$multiply$by$the$number$of$floors,$which$
will$cover$all$the$floors.$(Add$that$to$your$concrete$total$cubic$yards)$
6. Use$the$square$footage$to$figure$out$the$steel$decking$sheets$that$are$used$to$span$the$
beams$and$pour$the$concrete$on$to.$
7. Look$at$the$roof$and$see$what$holds$that$up,$see$if$the$roof$beams$are$Ke$Style$joists$of$
some$other$type$of$steel$beams.$
8. Find$the$steel$structural$drawing$sheet$and$count$all$the$beams$and$columns$and$any$
other$steel$items$such$as$HSS.$Steel$is$sold$by$the$pound,$which$will$be$converted$into$
tons.$Use$that$total$to$find$the$right$price$in$RS$Means.$$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

University of California
Santa Barbra
Date: 04/30/2015
Structural Final
Year 2011
Unit Detail Report

Prepared By:
Hailey Kunkel
IIT Raymond M. Lemming

LineNumber

Description

Quantity

Unit

Total Incl.

Ext. Total Incl.

O&P

O&P

Division 03 Concrete

032110600500

Reinforcing Steel, in place, footings,


#4 to #7, A615, grade 60, incl labor
for accessories, excl material for
accessories
Structural concrete, in place,
foundation mat (3000 psi), over 20
C.Y., includes forms(4 uses),
reinforcing steel, concrete, placing and
finishing
Structural concrete, in place, slab on
grade (3000 psi), 6" thick, includes
concrete, placing and textured finish,
excludes forms and reinforcing
Structural concrete, ready mix, normal
weight, 5000 psi, includes local
aggregate, sand, Portland cement and
water, delivered, excludes all additives
and treatments
Structural concrete, placing,
continuous footing, shallow, pumped,
includes strike off & consolidation,
excludes material

033053404050

033053405010

033105350400

033105701950

600.00

Ton

$2,115.00

$1,269,000.00

2,200.00

C.Y.

$312.46

$687,412.00

94,755.00

S.F.

$3.45

$326,904.75

6,800.00

C.Y.

$122.00

$829,600.00

6,500.00

C.Y.

$29.75

$193,375.00

Division 03 Concrete Subtotal

$3,306,291.75

Division 04 Masonry

040519050020

Anchor bolts, hooked type, 1/2"


diameter x 8" long, installed in fresh
grout in CMU bond beam or filled
core, includes nut and washer,
excludes template

2,800.00

Ea.

$5.41

Division 04 Masonry Subtotal

$15,148.00

$15,148.00

Division 07 Thermal and Moisture Protection

070150100210

Roof Coatings, asphalt aluminum


coating
Reglet, galvanized steel, in concrete
parapet, 24 gauge

077126100400

1,050.00

S.F.

$0.36

$378.00

8.00

L.F.

$3.38

$27.04

Division 07 Thermal and Moisture Protection Subtotal

$405.04

Division 1

Steel (W8,W10,W12,C8,C10)

1
1

2015

1,000.00

Ton

$2,880.00

$2,880,000.00

HSS Steel

4.00

Ton

$2,700.00

$10,800.00

Roof Terrace Galvanized Steel

6.00

Ton

$2,550.00

$15,300.00

1-800-334-3509 customersupport@rsmeans.com

LineNumber

Description

Quantity

Unit

Total Incl.
O&P

Post Tension Slab

Division 1

48.00

Ton

$3,000.00

Subtotal

Ext. Total Incl.


O&P

$144,000.00

$3,050,100.00

Subtotal

$6,371,944.79
0.00%

General Contractor's Markup on Subs

$0.00
$6,371,944.79

Subtotal
10.00%

General Conditions

$637,194.48
$7,009,139.27

Subtotal
10.00%

General Contractor's Overhead and Profit

$700,913.93

$7,710,053.20

Grand Total

2015

1-800-334-3509 customersupport@rsmeans.com

Building)System:)
Estimated$by$Elizabeth$Pierce$
$
Scope:$
$
This$section$includes$all$of$the$Fire$and$Life$Safety$systems$in$the$building.$The$water$hook$ups$
for$the$fire$department,$the$smoke$detectors$and$alarms,$and$heat$detector$are$a$part$of$the$
fire$safety.$The$fire$sprinklers$for$the$building$are$also$included$as$well$as$the$fire$panels$for$fire$
safety.$Other$safety$items$include$video$surveillance$and$key$card$access$to$the$building$along$
with$the$general$automation$of$those$systems.$
$
Method:$
$
The$estimating$software$Blue$Beam$was$used$as$well$as$print$outs$of$plans$to$do$item$counts.$
Blue$Beam$was$primarily$used$to$measure$lengths$where$as$item$counts$and$general$scope$was$
derived$from$paper$copies$of$the$plans.$Some$of$the$Fire$Life$Safety$aspects$were$not$
represented$properly$in$RS$Means$and$so$a$custom$line$item$was$created$based$on$RS$Means$
and$market$value$of$the$item.$Other$items$not$represented$in$the$plans$were$based$on$market$
value$prices$for$the$line$item.$If$prices$for$a$specified$item$were$not$available$on$RS$Means$or$
online$then$a$comparable$item$was$used$in$its$place$for$the$line$item.$
$
Final$Cost:$
$
$735,232.76$
$
General$Condition:$
$
$73,523.28$
$
Overhead$&$Profit:$
$
$80,875.60$
$
Total$Cost:$
$
$889.631.64$
$
Once$the$main$representative$information$about$Building$System$has$been$provided,$in$the$
following$section$it$is$going$to$explain$how$the$solution$has$been$obtained.$
$
1. The$individual$items$for$sprinkler$heads$were$counted$and$inputted$into$RS$Means.$A$
15%$variance$was$taken$into$account$because$the$fire$sprinklers$were$not$the$final$plans$
required$by$code.$

$
$
$
$
$
$
$
$
$

)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)

2. The$lengths$for$the$pipes$in$between$the$sprinkler$heads$had$to$be$inferred$because$the$
drawings$did$not$depict$the$path.$The$plans$were$not$the$final$requirements$for$the$
building$to$meet$code.$
3. Individual$smoke$and$heat$detectors$with$and$without$strobes$and$sounder$bases$were$
counted$and$that$was$translated$to$RS$Means$as$best$as$possible.$Changes$to$those$
values$were$made$based$on$what$was$missing$or$needed$to$be$added$to$those$
detectors.$Market$values$were$also$taken$into$account$for$these$prices.$
4. Fire$Life$Safety$plans$were$the$main$source$of$my$line$items$and$so$were$the$Fire$Alarm$
plans.$Some$aspects$were$inferred$from$Low$Voltage$plans$and$Architectural$ceiling$
plan.$
5. Wiring$and$conduit$for$the$alarms$were$included$in$this$estimate.$
6. Exit$signs$and$items$utilized$by$fire$fighters$like$the$KnoxeBox$were$included.$

Date: 05/03/2015
Final Project Fire Alarms & Safety
Year 2011
Unit Detail Report
LineNumber

Prepared By:
Liz Pierce
Illinois Institute of Technology - Mr. Lemming
Description

Quantity

Unit

Total Incl.

Ext. Total Incl.

O&P

O&P

Division 00

001

Smoke detector with sounder base

310.00

Ea.

$0.00

$0.00

002

Ceiling mounted Strobe

88.00

Ea.

$175.00

$15,400.00

003

Knox-Box

2.00

Ea.

$718.00

$1,436.00

004
0051

Wall mounted sprinkler head (brass


155 degrees)
Extended Ceiling mount Fire

220.00

Ea.

$109.52

$24,094.40

0052

sprinklers
Extended wall mounted fire sprinklers

110.00

Ea.

$66.50

$7,315.00

50.00

Ea.

$137.20

$6,860.00

006

Duct Smoke Detector

1.00

Ea.

$349.00

$349.00

007

Security System with 9 cameras and


viewing station

1.00

Ea.

$3,550.00

$3,550.00

Division 00 Subtotal

$59,004.40

Division 08 Openings

087413600500

Access Control Equipment, entrance


card reader, barium ferrite

83.00

Ea.

$669.82

Division 08 Openings Subtotal

$55,595.06

$55,595.06

Division 10 Specialties

104413531000

Fire equipment cabinets, portable


extinguisher, single, steel box,
recessed, D.S. glass in door, aluminum
door & frame, 8" x 12" x 27", excludes
equipment
Fire equipment cabinets, portable
extinguisher, single, steel box,
recessed, D.S. glass in door, steel door
& frame, 8" x 12" x 27", excludes
equipment
Fire equipment cabinets, hose rack
assembly, steel box, recessed, D.S.
glass in door, steel door & frame, 24"
x 40" x 5-1/2", 1-1/2" valve & 100'
hose, excludes equipment

104413531100

104413533200

30.00

Ea.

$295.02

$8,850.60

30.00

Ea.

$260.02

$7,800.60

10.00

Ea.

$619.95

$6,199.50

Division 10 Specialties Subtotal

$22,850.70

Division 21 Fire Suppression

210523506280

Sprinkler System Valve Alarm, 4"


size, includes retard chamber, trim,
gauges & alarm line strainer

2015

32.00

1-800-334-3509 customersupport@rsmeans.com

Ea.

$2,117.88

$67,772.16

LineNumber

Description

Quantity

Unit

Total Incl.
O&P

211119508820

Standpipe connections, with plugs &


chains, sidewalk siamese unit,
polished brass, 2 way, 2-1/2" x 2-1/2"
x 4"
Sprinkler System Components,
sprinkler heads, standard spray,
pendent or upright, brass, 135 to 286
degrees F, 1/2" NPT, 7/16" orifice,
(4.2 K-factor), excludes supply
piping
Automatic Fire Suppression Systems,
manual pull station

211313503730

212116503400

Ext. Total Incl.


O&P

2.00

Ea.

$1,013.22

$2,026.44

420.00

Ea.

$56.02

$23,528.40

2.00

Ea.

$171.49

$342.98

Division 21 Fire Suppression Subtotal

$93,669.98

Division 22 Plumbing

221113481040

Pipe, fittings and valves, steel, black,


grooved joint, 3/4" diameter, schedule
40, includes coupling & clevis type
hanger 10' O.C.

5,840.00

L.F.

$16.20

Division 22 Plumbing Subtotal

$94,608.00

$94,608.00

Division 26 Electrical

260519900020

Wire, copper solid, 600 volt, #14,


type THW, in raceway
Intermediate metal conduit, 1/2"
diameter, to 15' high, incl 2
terminations, 2 elbows, 11 beam
clamps, and 11 couplings per 100 LF
Exit lighting, fluorescent, single face,
ceiling or wall mount
Exit lighting, fluorescent, double face,
ceiling or wall mount

260533132500

265313100150
265313100160

5,250.00

C.L.F.

5,000.00

L.F.

$58.69

$308,122.50

$8.30

$41,500.00

15.00

Ea.

$147.31

$2,209.65

15.00

Ea.

$171.07

$2,566.05

Division 26 Electrical Subtotal

$354,398.20

Division 28 Electronic Safety and Security

283123505600

Detection Systems, strobe & horn,


excluding wires & conduits
Detection Systems, fire alarm horn,
excluding wires & conduits
Detection Systems, master box,
excluding wires & conduits
Detection Systems, annunciator
panel, 16 zone lamp, excluding wires
& conduits
Detection Systems, heat detector,
smoke detector, ceiling type, excl.
wires & conduit
Detection Systems, heat detector,
smoke detector, ceiling type, excl.
wires & conduit

283123505800
283123506800
283123508200

283146505200

283146505200

45.00

Ea.

$284.76

$12,814.20

40.00

Ea.

$162.85

$6,514.00

2.00

Ea.

$7,044.21

$14,088.42

2.00

Ea.

$1,041.70

$2,083.40

50.00

Ea.

$245.08

$12,254.00

30.00

Ea.

$245.08

$7,352.40

Division 28 Electronic Safety and Security Subtotal

2015

$55,106.42

1-800-334-3509 customersupport@rsmeans.com

LineNumber

Description

Quantity

Unit

Subtotal

Total Incl.

Ext. Total Incl.

O&P

O&P
$735,232.76

10.00%

General Contractor's Markup on Subs

$0.00
$735,232.76

Subtotal
10.00%

General Conditions

$73,523.28
$808,756.04

Subtotal
10.00%

General Contractor's Overhead and Profit

$80,875.60

$889,631.64

Grand Total

2015

1-800-334-3509 customersupport@rsmeans.com

Conclusion:)
$
The$total$estimation$of$the$project$is$$16,194,030.$The$project$has$been$divided$in$the$following$
divisions:$
$
1. Site$Work$
2. Mechanical/Plumbing$
3. Electrical$
4. Structural$
5. Building$Systems$
$
We$are$proud$to$say$that$trained$professionals$in$the$field$have$estimated$each$division$with$no$
other$objective$that$to$ensure$excellent$quality$and$high$results$accordance$to$the$values$of$our$
company.$
$
Our$goal$has$always$been$to$impress$our$clients$and$exceed$their$needs.$What$makes$us$a$good$
firm$is$not$only$that,$also$that$we$take$care$of$our$employees.$We$think$that$the$best$way$to$
provide$excellent$services$to$the$client$is$if$the$people$providing$such$services$are$happy$and$
excited$with$their$jobs.$
$
Because$of$this$philosophy,$we$are$distinguished$as$one$of$the$best$construction$companies.$
$
We$want$to$warranty$that$our$future$generations$have$the$best$installations$to$work.$We$do$not$
try$to$get$the$less$budget$possible,$but$to$provide$the$best$design,$environment,$distribution,$
and$comfort.$
$
In$conclusion,$these$apartments$are$the$beginning$of$the$renovation$of$University$of$California$
Santa$Barbra$and$have$been$designed$as$a$look$ahead$to$its$changing$future.$

5/4/15%

SAN JOAQUIN APARTMENTS


CAE 470- Cost Estimating

Introduction
2

San Joaquin Apartments Gateway Towers


Location: University of California Santa Barbara
Architect: Skidmore, Owings, and Merrill LLP

Front St
San Francisco, CA 94111
U.S.A
415.981.1555

1%

5/4/15%

Team Layout
3

Electrical Estimate: Emma Ghariana


Mechanical Estimate: Hailey Kunkel
Site Work Estimate: Hailey Kunkel
Structural Estimate: Hailey Kunkel
Building Systems Estimate: Elizabeth Pierce

Summary
4

Estimate Division

Estimator

Total Cost

Electrical

Emma Ghariani

$1,683,608.18

Mechanical

Hailey Kunkel

$3,549,338.19

Site Work

Hailey Kunkel

$1,043,372.15

Structural

Hailey Kunkel

$6,371,944.79

Building Systems

Elizabeth Pierce

$735,232.76

Subtotal
General Condition

Team

10% Total Cost

Overhead & Profit

Team

10% Total Cost

Grand Total

$16,194,030

2%

5/4/15%

MECHANICAL ESTIMATE
Hailey Kunkel

Outline
6

HVAC equipment and duct work


Plumbing
External sanity sewer, water, gas hookup

3%

5/4/15%

Method
7

Plumbing
On

Screen Software was used to count the number of


fixtures and lengths of piping of each size and function.
Pipes measured in LF

Mechanical:
On

Screen Software was used to count the number of


individual items and lengths of ductwork. Then,
assuming ducts are made of 24 gauge metal, convert
the lengths and exterior dimensions into gross weights.
Ductwork measured in pounds

Final Cost
8

Total Cost: $3,549,338.19


General Condition: $354,933.82
Overhead and Profit: $390,427.20
Grand Total: $4,294,699.21

4%

5/4/15%

SITE WORK ESTIMATE


Hailey Kunkel

Outline
10

Excavation
Back filling
Compression
Electrical power cables
Plumbing pipe lines

Sanitary

sewer
Supply water

5%

5/4/15%

Method
11

On Screen Software was used to calculate areas to


be excavated and backfilled. Compression was also
considered along with utilities.
Excavation and fill measured in CY
Piping measured in LF

Final Cost
12

Total Cost: $1,043,372.15


General Condition: $104,337.22
Overhead and Profit: $114,770.94
Grand Total: $1,262,480.31

6%

5/4/15%

13

STRUCTURAL ESTIMATE
Hailey Kunkel

Outline
14

Foundation
Slabs
Columns and Beams
Roof Beams
HSS
Footings

7%

5/4/15%

Method
15

On Screen Software was used to measure the total


concrete and steel used in walls and foundation. All
of the concrete was added together and the steel was
also put together.
Concrete meaured in CY

Convert

from SF to CY

Steel measured in tons


Convert

from pounds to tons

Final Cost
16

Total Cost: $6,371,944.79


General Condition: $637,194.48
Overhead and Profit: $700,913.93
Grand Total: $7,710,053.20

8%

5/4/15%

17

ELECTRICAL ESTIMATE
Emma Ghariani

Outline
18

Communication system
Lighting/ outlets
Generators
Fire lights
Power equipment
MCC
Switch gear

9%

5/4/15%

Method
19

On Screen Software was used to count


individual lighting fixtures, receptacles,
switches, panels and other equipment, conduit
runs, and required wiring. Individual lighting
fixtures were matched up with the closest type
that pricing could be found for.
Communications:

On

Screen Software was used to count Telephone,


Data, and Intercom devices as well as all
associated conduits and cable tray.

Final Cost
20

Total Cost: $1,683,608.18


General Condition: $168,360.82
Overhead and Profit: $185,196.90
Grand Total: $2,037,165.90

10%

5/4/15%

21

BUILDING SYSTEMS
Elizabeth Pierce

Outline
22

BCS- building control system


LSS- life safety system
Security system
Fire suppression
Sprinklers
Pumps

11%

5/4/15%

Method
23

The estimating software Blue Beam was used as well as


print outs of plans to do item counts. Blue Beam was
primarily used to measure lengths where as item counts
and general scope was derived from paper copies of
the plans. Some of the Fire Life Safety aspects were not
represented properly in RS Means and so a custom line
item was created based on RS Means and market value
of the item. Other items not represented in the plans
were based on market value prices for the line item. If
prices for a specified item were not available on RS
Means or online then a comparable item was used in its
place for the line item.

Final Cost
24

Total Cost: $735,232.76


General Condition: $73,523.28

Overhead and Profit: $80,875.60


Grand Total: $889,631.64

12%

5/4/15%

25

COST ANALYSIS & CONCLUSION

Summary
26

Estimate Division

Estimator

Total Cost

Electrical

Emma Ghariani

$1,683,608.18

Mechanical

Hailey Kunkel

$3,549,338.19

Site Work

Hailey Kunkel

$1,043,372.15

Structural

Hailey Kunkel

$6,371,944.79

Building Systems

Elizabeth Pierce

$735,232.76

Subtotal
General Condition

Team

10% Total Cost

Overhead & Profit

Team

10% Total Cost

Grand Total

$16,194,030

13%

5/4/15%

Outline
27

Estimate

5%

13%

48%

28

26%

8%

Mechanical
Site Work
Structural
Building System
Electrical

Questions?

Thank you
Hailey Kunkel
Elizabeth Pierce
Emma Ghariani