ZONING
PREDOMINANT USES
Residential with
Commercial at 1st
storey only
Residential
Commercial
At 1st storey
only
Commercial &
Residential
Residential
Commercial
Max 40%
Business 1 /
Business 2
- Ancillary uses
(including ancillary
office use)
Max 40%
Business 1-White /
5
Business 2-White
Types of ancillary
uses are subject to
evaluation
Max 40% of
total gross
floor area for
B1/B2 uses
Business Park/
3
BP-White
Min 60% of
remaining 85%
Examples:
- Ancillary office
- Childcare centre
- Security facilities
- Showroom
- Industrial canteen
Max 40% of
remaining
85%
Hotel
Hotel room
Hotel Related Uses
Min 60%
Max 40%
Place of Worship
Praying area
Min 50%
Manufacturing
Production, assembly
Servicing, repair, workshop
Industrial training
2
E-business
Core media activities
Warehousing, storage
4
Utilities
4
Telecommunication
Min 60%
(For B1 zone,
uses cannot
impose nuisance
buffer greater
than 50m on the
surrounding site)
Columbarium
Max 20%
Max 10%
- Ancillary religious
uses
Remaining
GFA
NOTES:
1
2
3
4
5
Commercial uses that cause or are likely to cause disamenity to the residents are not allowed.
E-business activities include telecommunications, call centre, data farm/data centre and Internet Service Provider. Call centre can be
located in Business Park and Business 1, but not Business 2 zones.
For Business Park-White, the allowable quantum of white uses is dependent on locational criteria.
Strategic utilities and telecommunication infrastructure cannot be integrated or sited in B1 and B2 zones. Such uses (eg. Water works,
sewage disposal works and power station) should be located on sites zoned Utility.
For B1-W/B2-W zone, the site must achieve a minimum plot ratio for the B1/B2 uses before White uses can be allowed (eg. a site
zoned as "4.2[B-2W", the permissible B1/B2 uses must achieve a minimum plot ratio of 2.5 before White uses can be allowed up to
the maximum prescribed for the whole development). For proposals under the Warehouse Retail Scheme, sites will be rezoned from
B1 or B2 to B1-W/B2-W zone and the GPR will be based on the actual proposal.
Figure 2:
PROPOSED USE/DEVELOPMENT
Category 1
Category 2
Category 3
ROAD BUFFER
(MINIMUM)
GREEN
2
BUFFER
(WITHIN
ROAD
BUFFER)
30 m
5m
24 m
5m
Commercial/Industrial/Institutional/Multi-storey
carpark(MSCP)/Place of worship
15 m
5m
15 m
5m
12 m
5m
Commercial/Industrial/Institutional/Multi-storey
carpark(MSCP)/Place of worship
7.5 m
3m
10 m
3m
7.5 m
3m
Commercial/Industrial/Institutional/Place of worship
5m
3m
Residential /Educational
7.5 m
3m
Commercial/Industry/Institution/Place of Worship
5m
3m
MSCP
Category 4 5 & Slip
Roads
MSCP
NOTES:
1
3
4
5
6
For the Central Area, the buffer standard for residential developments in the River Valley/Orchard/Newton Planning Area is 7.5m
(minimum, of which 3m is for the green buffer). The buffer standard for residential developments outside these three Planning Areas
as well as other types of developments within the Central Area will be determined by urban design considerations.
The following definitions are adopted for the interpretation of buffer zones
*A buffer is defined as a strip or an area of land which falls either between the road reserve and the building line or between the
building lines of neighbouring structures.
*A physical buffer is a buffer within which car park, driveway, cycle tracks, jogging tracks, walkway and small ancillary structures e.g.
guardhouses, flag-poles/ lamp posts, sign posts/ boards, bin centres, gas pressure regulator kiosks, gas governor houses-types A &
B, overground (electricity) boxes, ring main compact units-reinforced concrete structure/ fenced-up area, below-ground-level
structures and canopies for pump islands within petrol service stations may be permitted.
*A green buffer is the segment within the road buffer that is meant for tree planting and turfing only. Small structures e.g. guardhouse,
flag poles, lamp posts may be permitted.
The road buffer for MSCPs facing a Category 3-5 road is based on that for the predominant use of the development
For landed housing with the sides/rear fronting a Category 5 road, the buffer standard is the same as the minimum boundary
clearance requirement. There is no need to provide any green buffer.
Reserves for drains sewers and minor roads bordering along expressways or major arterials may be considered as part of required
buffers for expressways and major arterials.
For a drainage reserve with a width greater than that of the buffer and bordering along expressways of major arterials, a planting strip
is to be provided within the site nearer to the building line. An additional buffer zone will not be required. However; the Drainage
Department, ENV may impose such requirements from time to time for technical reasons.
The classification of the road category is obtainable from LTA through the purchase of the Road Interpretation Plan (RIP).
Figure 3:
QUANTUM
CONTROL
USE TYPE
SINGLE-USER INDUSTRIAL /
WAREHOUSE / UTILITIES /
TELECOMMUNICATION
DEVELOPMENTS
MULTI-USER INDUSTRIAL /
WAREHOUSE / UTILITIES /
TELECOMMUNICATION
DEVELOPMENTS
60%(MINIMUM)
Predominant Use
Manufacturing,
production,
assembly, servicing, repair,
workshop,
storage,
e1
business and core media
activities
The
predominant
industry/
warehouse/utilities/telecommunication/
e-business/core media activities use
shall be at least 60% of the total GFA.
This may include ancillary store/ancillary
warehouse which are used as storage
for raw materials and work in progress.
Ancillary/
Secondary Use
NOTES:
1 E-business activities include telecommunications, call centre, data farm/data centre and Internet Service Provider. Call centre can be located
in Business Park and Business 1, but not Business 2 zones.
2 Industrial canteens are capped at a size of 700sqm or 5% of the total proposed GFA per development, whichever is lower.
3 Showroom is confined to the 1st storey of the development.
4 Childcare centre is levied Group E Civic & Community Institution (C&CI) rates for the purposes of computing development charge/differential
premium.
5 Selected commercial uses are subject to locational criteria.
6 Other ancillary uses which are not specified under predominant use column are to be treated as part of the 40% quantum.
Figure 4:
PERMITTED
1
Upgrading of software
Industrial training
Ships design
10
11
12
13
14
15
16
17
18
19
20
21
22
23
Tooling design
24
Prototype making
25
26
27
28
29
30
31
32
Publishing
33
CAD/CAM/CAE Support
34
35
36
Product demonstration
37
38
39
R&D laboratory
40
Figure 4:
Agricultural services
10
Air transport
11
12
13
Postal services
14
Communication services
15
16
Medical and health services(except veterinary services and environmental health services)
17
18
Computer system integration including servicing and repair assembly of computer equipment
19
Electronic workshop for repair and system integration of data communication equipment and
consultancy services
20
21
22
23
Figure 5:
LOCATION OF PW-ZONED
GROSS PLOT RATIO
SITE
CONTROL
Within landed and low-density
Up to 1.0
housing areas with residential
GPR 1.4
At the fringe of landed and
Up to 1.4*
low-density housing areas with
residential GPR 1.4
Within HDB estates and in
Up to 1.6*
areas with residential GPRs >
1.4**
Up to 1.6*
Subject to evaluation
NOTES:
*
**
Figure 6:
Maximum Allowable Plot Ratio/Storey Height and Allowable Columbarium Quantum
for Civic & Community Institution Developments (except for home for the aged, home for the
disabled and community club/centre) and Educational Institutions (except for special education
school)
LOCATION OF C&CI AND EDUCATIONAL
INSTITUTION ZONED SITE
Within landed housing estates
Up to 1.4
Up to 4 storeys
Up to 1.4
Up to 4 storeys*
Subject to evaluation
Subject to evaluation
NOTES:
*
1
Existing C&CI developments with approved gross plot ratios exceeding the above plot ratio bands, are allowed to redevelop up to the
previous approved gross plot ratio.
Figure 7:
QUANTUM CONTROL
60%(min)
36%
(min)
24%
(max)
40%(max)
USE TYPE
Predominant
Warehouse/Industrial
Use
Ancillary
Warehouse/Industrial
Use
Independent retail
industrial use
unrelated
to
the
warehouse/
NOTES:
WRS is applicable to sites zoned B1 or B2 in the outlying area (Refer to EDB press release - Annex 1). Other sites proposed for the scheme will