Вы находитесь на странице: 1из 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
###

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

0.00
11.04
23.91
34.95
45.99
57.03
68.07
79.11
90.15
101.19
112.23
123.27
134.31
145.35
156.39
167.43
178.47
189.51
200.55
211.59
222.63
233.67
244.71
255.75
266.79
277.83
288.87
299.91
310.95
321.99
331.19
340.39
349.59
358.79
367.99
377.19
386.39
395.59
404.79

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

0.00
11.04
23.91
34.95
45.99
57.03
68.07
79.11
90.15
101.19
112.23
123.27
134.31
145.35
156.39
167.43
178.47
189.51
200.55
211.59
222.63
233.67
244.71
255.75
266.79
277.83
288.87
299.91
310.95
321.99
331.19
340.39
349.59
358.79
367.99
377.19
386.39
395.59
404.79

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

0.00
17.74
38.44
56.18
73.92
91.66
109.40
127.14
144.88
162.62
180.36
198.10
215.84
233.58
251.32
269.06
286.80
304.54
322.28
340.02
357.76
375.50
393.24
410.98
428.72
446.46
464.20
481.94
499.68
517.42
532.21
547.00
561.79
576.58
591.37
606.16
620.95
635.74
650.53

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

0.00
15.65
36.60
52.83
69.06
85.29
101.52
117.75
133.98
150.21
166.44
182.67
198.90
215.13
231.36
247.59
263.82
280.05
296.28
312.51
328.74
344.97
361.20
377.43
393.66
409.89
426.12
442.35
458.58
474.81
488.34
501.87
515.40
528.93
542.46
555.99
569.52
583.05
596.58

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

0.00
6.66
15.56
22.46
29.36
36.26
43.16
50.06
56.96
63.86
70.76
77.66
84.56
91.46
98.36
105.26
112.16
119.06
125.96
132.86
139.76
146.66
153.56
160.46
167.36
174.26
181.16
188.06
194.96
201.86
207.61
213.36
219.11
224.86
230.61
236.36
242.11
247.86
253.61

311891749.xls

CONVEYANCE

1 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78

413.99
423.19
432.39
441.59
450.79
459.99
469.19
478.39
487.59
496.79
505.99
515.19
524.39
533.59
542.79
551.99
561.19
570.39
579.59
588.79
597.99
607.19
616.39
625.59
634.79
643.99
653.19
662.39
671.59
680.79
689.99
699.19
708.39
717.59
726.79
735.99
745.19
754.39
763.59

40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78

413.99
423.19
432.39
441.59
450.79
459.99
469.19
478.39
487.59
496.79
505.99
515.19
524.39
533.59
542.79
551.99
561.19
570.39
579.59
588.79
597.99
607.19
616.39
625.59
634.79
643.99
653.19
662.39
671.59
680.79
689.99
699.19
708.39
717.59
726.79
735.99
745.19
754.39
763.59

40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78

665.32
680.11
694.90
709.69
724.48
739.27
754.06
768.85
783.64
798.43
813.22
828.01
842.80
857.59
872.38
887.17
901.96
916.75
931.54
946.33
961.12
975.91
990.70
1005.49
1020.28
1035.07
1049.86
1064.65
1079.44
1094.23
1109.02
1123.81
1138.60
1153.39
1168.18
1182.97
1197.76
1212.55
1227.34

40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78

610.11
623.64
637.17
650.70
664.23
677.76
691.29
704.82
718.35
731.88
745.41
758.94
772.47
786.00
799.53
813.06
826.59
840.12
853.65
867.18
880.71
894.24
907.77
921.30
934.83
948.36
961.89
975.42
988.95
1002.48
1016.01
1029.54
1043.07
1056.60
1070.13
1083.66
1097.19
1110.72
1124.25

40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78

259.36
265.11
270.86
276.61
282.36
288.11
293.86
299.61
305.36
311.11
316.86
322.61
328.36
334.11
339.86
345.61
351.36
357.11
362.86
368.61
374.36
380.11
385.86
391.61
397.36
403.11
408.86
414.61
420.36
426.11
431.86
437.61
443.36
449.11
454.86
460.61
466.36
472.11
477.86

311891749.xls

CONVEYANCE

2 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117

772.79
781.99
791.19
800.39
809.59
818.79
827.99
837.19
846.39
855.59
864.79
873.99
883.19
892.39
901.59
910.79
919.99
929.19
938.39
947.59
956.79
965.99
975.19
984.39
993.59
1002.79
1011.99
1021.19
1030.39
1039.59
1048.79
1057.99
1067.19
1076.39
1085.59
1094.79
1103.99
1113.19
1122.39

79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117

772.79
781.99
791.19
800.39
809.59
818.79
827.99
837.19
846.39
855.59
864.79
873.99
883.19
892.39
901.59
910.79
919.99
929.19
938.39
947.59
956.79
965.99
975.19
984.39
993.59
1002.79
1011.99
1021.19
1030.39
1039.59
1048.79
1057.99
1067.19
1076.39
1085.59
1094.79
1103.99
1113.19
1122.39

79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117

1242.13
1256.92
1271.71
1286.50
1301.29
1316.08
1330.87
1345.66
1360.45
1375.24
1390.03
1404.82
1419.61
1434.40
1449.19
1463.98
1478.77
1493.56
1508.35
1523.14
1537.93
1552.72
1567.51
1582.30
1597.09
1611.88
1626.67
1641.46
1656.25
1671.04
1685.83
1700.62
1715.41
1730.20
1744.99
1759.78
1774.57
1789.36
1804.15

79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117

1137.78
1151.31
1164.84
1178.37
1191.90
1205.43
1218.96
1232.49
1246.02
1259.55
1273.08
1286.61
1300.14
1313.67
1327.20
1340.73
1354.26
1367.79
1381.32
1394.85
1408.38
1421.91
1435.44
1448.97
1462.50
1476.03
1489.56
1503.09
1516.62
1530.15
1543.68
1557.21
1570.74
1584.27
1597.80
1611.33
1624.86
1638.39
1651.92

79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117

483.61
489.36
495.11
500.86
506.61
512.36
518.11
523.86
529.61
535.36
541.11
546.86
552.61
558.36
564.11
569.86
575.61
581.36
587.11
592.86
598.61
604.36
610.11
615.86
621.61
627.36
633.11
638.86
644.61
650.36
656.11
661.86
667.61
673.36
679.11
684.86
690.61
696.36
702.11

311891749.xls

CONVEYANCE

3 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156

1131.59
1140.79
1149.99
1159.19
1168.39
1177.59
1186.79
1195.99
1205.19
1214.39
1223.59
1232.79
1241.99
1251.19
1260.39
1269.59
1278.79
1287.99
1297.19
1306.39
1315.59
1324.79
1333.99
1343.19
1352.39
1361.59
1370.79
1379.99
1389.19
1398.39
1407.59
1416.79
1425.99
1435.19
1444.39
1453.59
1462.79
1471.99
1481.19

118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156

1131.59
1140.79
1149.99
1159.19
1168.39
1177.59
1186.79
1195.99
1205.19
1214.39
1223.59
1232.79
1241.99
1251.19
1260.39
1269.59
1278.79
1287.99
1297.19
1306.39
1315.59
1324.79
1333.99
1343.19
1352.39
1361.59
1370.79
1379.99
1389.19
1398.39
1407.59
1416.79
1425.99
1435.19
1444.39
1453.59
1462.79
1471.99
1481.19

118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156

1818.94
1833.73
1848.52
1863.31
1878.10
1892.89
1907.68
1922.47
1937.26
1952.05
1966.84
1981.63
1996.42
2011.21
2026.00
2040.79
2055.58
2070.37
2085.16
2099.95
2114.74
2129.53
2144.32
2159.11
2173.90
2188.69
2203.48
2218.27
2233.06
2247.85
2262.64
2277.43
2292.22
2307.01
2321.80
2336.59
2351.38
2366.17
2380.96

118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156

1665.45
1678.98
1692.51
1706.04
1719.57
1733.10
1746.63
1760.16
1773.69
1787.22
1800.75
1814.28
1827.81
1841.34
1854.87
1868.40
1881.93
1895.46
1908.99
1922.52
1936.05
1949.58
1963.11
1976.64
1990.17
2003.70
2017.23
2030.76
2044.29
2057.82
2071.35
2084.88
2098.41
2111.94
2125.47
2139.00
2152.53
2166.06
2179.59

118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156

707.86
713.61
719.36
725.11
730.86
736.61
742.36
748.11
753.86
759.61
765.36
771.11
776.86
782.61
788.36
794.11
799.86
805.61
811.36
817.11
822.86
828.61
834.36
840.11
845.86
851.61
857.36
863.11
868.86
874.61
880.36
886.11
891.86
897.61
903.36
909.11
914.86
920.61
926.36

311891749.xls

CONVEYANCE

4 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195

1490.39
1499.59
1508.79
1517.99
1527.19
1536.39
1545.59
1554.79
1563.99
1573.19
1582.39
1591.59
1600.79
1609.99
1619.19
1628.39
1637.59
1646.79
1655.99
1665.19
1674.39
1683.59
1692.79
1701.99
1711.19
1720.39
1729.59
1738.79
1747.99
1757.19
1766.39
1775.59
1784.79
1793.99
1803.19
1812.39
1821.59
1830.79
1839.99

157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195

1490.39
1499.59
1508.79
1517.99
1527.19
1536.39
1545.59
1554.79
1563.99
1573.19
1582.39
1591.59
1600.79
1609.99
1619.19
1628.39
1637.59
1646.79
1655.99
1665.19
1674.39
1683.59
1692.79
1701.99
1711.19
1720.39
1729.59
1738.79
1747.99
1757.19
1766.39
1775.59
1784.79
1793.99
1803.19
1812.39
1821.59
1830.79
1839.99

157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195

2395.75
2410.54
2425.33
2440.12
2454.91
2469.70
2484.49
2499.28
2514.07
2528.86
2543.65
2558.44
2573.23
2588.02
2602.81
2617.60
2632.39
2647.18
2661.97
2676.76
2691.55
2706.34
2721.13
2735.92
2750.71
2765.50
2780.29
2795.08
2809.87
2824.66
2839.45
2854.24
2869.03
2883.82
2898.61
2913.40
2928.19
2942.98
2957.77

157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195

2193.12
2206.65
2220.18
2233.71
2247.24
2260.77
2274.30
2287.83
2301.36
2314.89
2328.42
2341.95
2355.48
2369.01
2382.54
2396.07
2409.60
2423.13
2436.66
2450.19
2463.72
2477.25
2490.78
2504.31
2517.84
2531.37
2544.90
2558.43
2571.96
2585.49
2599.02
2612.55
2626.08
2639.61
2653.14
2666.67
2680.20
2693.73
2707.26

157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195

932.11
937.86
943.61
949.36
955.11
960.86
966.61
972.36
978.11
983.86
989.61
995.36
1001.11
1006.86
1012.61
1018.36
1024.11
1029.86
1035.61
1041.36
1047.11
1052.86
1058.61
1064.36
1070.11
1075.86
1081.61
1087.36
1093.11
1098.86
1104.61
1110.36
1116.11
1121.86
1127.61
1133.36
1139.11
1144.86
1150.61

311891749.xls

CONVEYANCE

5 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234

1849.19
1858.39
1867.59
1876.79
1885.99
1895.19
1904.39
1913.59
1922.79
1931.99
1941.19
1950.39
1959.59
1968.79
1977.99
1987.19
1996.39
2005.59
2014.79
2023.99
2033.19
2042.39
2051.59
2060.79
2069.99
2079.19
2088.39
2097.59
2106.79
2115.99
2125.19
2134.39
2143.59
2152.79
2161.99
2171.19
2180.39
2189.59
2198.79

196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234

1849.19
1858.39
1867.59
1876.79
1885.99
1895.19
1904.39
1913.59
1922.79
1931.99
1941.19
1950.39
1959.59
1968.79
1977.99
1987.19
1996.39
2005.59
2014.79
2023.99
2033.19
2042.39
2051.59
2060.79
2069.99
2079.19
2088.39
2097.59
2106.79
2115.99
2125.19
2134.39
2143.59
2152.79
2161.99
2171.19
2180.39
2189.59
2198.79

196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234

2972.56
2987.35
3002.14
3016.93
3031.72
3046.51
3061.30
3076.09
3090.88
3105.67
3120.46
3135.25
3150.04
3164.83
3179.62
3194.41
3209.20
3223.99
3238.78
3253.57
3268.36
3283.15
3297.94
3312.73
3327.52
3342.31
3357.10
3371.89
3386.68
3401.47
3416.26
3431.05
3445.84
3460.63
3475.42
3490.21
3505.00
3519.79
3534.58

196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234

2720.79
2734.32
2747.85
2761.38
2774.91
2788.44
2801.97
2815.50
2829.03
2842.56
2856.09
2869.62
2883.15
2896.68
2910.21
2923.74
2937.27
2950.80
2964.33
2977.86
2991.39
3004.92
3018.45
3031.98
3045.51
3059.04
3072.57
3086.10
3099.63
3113.16
3126.69
3140.22
3153.75
3167.28
3180.81
3194.34
3207.87
3221.40
3234.93

196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234

1156.36
1162.11
1167.86
1173.61
1179.36
1185.11
1190.86
1196.61
1202.36
1208.11
1213.86
1219.61
1225.36
1231.11
1236.86
1242.61
1248.36
1254.11
1259.86
1265.61
1271.36
1277.11
1282.86
1288.61
1294.36
1300.11
1305.86
1311.61
1317.36
1323.11
1328.86
1334.61
1340.36
1346.11
1351.86
1357.61
1363.36
1369.11
1374.86

311891749.xls

CONVEYANCE

6 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273

2207.99
2217.19
2226.39
2235.59
2244.79
2253.99
2263.19
2272.39
2281.59
2290.79
2299.99
2309.19
2318.39
2327.59
2336.79
2345.99
2355.19
2364.39
2373.59
2382.79
2391.99
2401.19
2410.39
2419.59
2428.79
2437.99
2447.19
2456.39
2465.59
2474.79
2483.99
2493.19
2502.39
2511.59
2520.79
2529.99
2539.19
2548.39
2557.59

235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273

2207.99
2217.19
2226.39
2235.59
2244.79
2253.99
2263.19
2272.39
2281.59
2290.79
2299.99
2309.19
2318.39
2327.59
2336.79
2345.99
2355.19
2364.39
2373.59
2382.79
2391.99
2401.19
2410.39
2419.59
2428.79
2437.99
2447.19
2456.39
2465.59
2474.79
2483.99
2493.19
2502.39
2511.59
2520.79
2529.99
2539.19
2548.39
2557.59

235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273

3549.37
3564.16
3578.95
3593.74
3608.53
3623.32
3638.11
3652.90
3667.69
3682.48
3697.27
3712.06
3726.85
3741.64
3756.43
3771.22
3786.01
3800.80
3815.59
3830.38
3845.17
3859.96
3874.75
3889.54
3904.33
3919.12
3933.91
3948.70
3963.49
3978.28
3993.07
4007.86
4022.65
4037.44
4052.23
4067.02
4081.81
4096.60
4111.39

235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273

3248.46
3261.99
3275.52
3289.05
3302.58
3316.11
3329.64
3343.17
3356.70
3370.23
3383.76
3397.29
3410.82
3424.35
3437.88
3451.41
3464.94
3478.47
3492.00
3505.53
3519.06
3532.59
3546.12
3559.65
3573.18
3586.71
3600.24
3613.77
3627.30
3640.83
3654.36
3667.89
3681.42
3694.95
3708.48
3722.01
3735.54
3749.07
3762.60

235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273

1380.61
1386.36
1392.11
1397.86
1403.61
1409.36
1415.11
1420.86
1426.61
1432.36
1438.11
1443.86
1449.61
1455.36
1461.11
1466.86
1472.61
1478.36
1484.11
1489.86
1495.61
1501.36
1507.11
1512.86
1518.61
1524.36
1530.11
1535.86
1541.61
1547.36
1553.11
1558.86
1564.61
1570.36
1576.11
1581.86
1587.61
1593.36
1599.11

311891749.xls

CONVEYANCE

7 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312

2566.79
2575.99
2585.19
2594.39
2603.59
2612.79
2621.99
2631.19
2640.39
2649.59
2658.79
2667.99
2677.19
2686.39
2695.59
2704.79
2713.99
2723.19
2732.39
2741.59
2750.79
2759.99
2769.19
2778.39
2787.59
2796.79
2805.99
2815.19
2824.39
2833.59
2842.79
2851.99
2861.19
2870.39
2879.59
2888.79
2897.99
2907.19
2916.39

274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312

2566.79
2575.99
2585.19
2594.39
2603.59
2612.79
2621.99
2631.19
2640.39
2649.59
2658.79
2667.99
2677.19
2686.39
2695.59
2704.79
2713.99
2723.19
2732.39
2741.59
2750.79
2759.99
2769.19
2778.39
2787.59
2796.79
2805.99
2815.19
2824.39
2833.59
2842.79
2851.99
2861.19
2870.39
2879.59
2888.79
2897.99
2907.19
2916.39

274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312

4126.18
4140.97
4155.76
4170.55
4185.34
4200.13
4214.92
4229.71
4244.50
4259.29
4274.08
4288.87
4303.66
4318.45
4333.24
4348.03
4362.82
4377.61
4392.40
4407.19
4421.98
4436.77
4451.56
4466.35
4481.14
4495.93
4510.72
4525.51
4540.30
4555.09
4569.88
4584.67
4599.46
4614.25
4629.04
4643.83
4658.62
4673.41
4688.20

274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312

3776.13
3789.66
3803.19
3816.72
3830.25
3843.78
3857.31
3870.84
3884.37
3897.90
3911.43
3924.96
3938.49
3952.02
3965.55
3979.08
3992.61
4006.14
4019.67
4033.20
4046.73
4060.26
4073.79
4087.32
4100.85
4114.38
4127.91
4141.44
4154.97
4168.50
4182.03
4195.56
4209.09
4222.62
4236.15
4249.68
4263.21
4276.74
4290.27

274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312

1604.86
1610.61
1616.36
1622.11
1627.86
1633.61
1639.36
1645.11
1650.86
1656.61
1662.36
1668.11
1673.86
1679.61
1685.36
1691.11
1696.86
1702.61
1708.36
1714.11
1719.86
1725.61
1731.36
1737.11
1742.86
1748.61
1754.36
1760.11
1765.86
1771.61
1777.36
1783.11
1788.86
1794.61
1800.36
1806.11
1811.86
1817.61
1823.36

311891749.xls

CONVEYANCE

8 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351

2925.59
2934.79
2943.99
2953.19
2962.39
2971.59
2980.79
2989.99
2999.19
3008.39
3017.59
3026.79
3035.99
3045.19
3054.39
3063.59
3072.79
3081.99
3091.19
3100.39
3109.59
3118.79
3127.99
3137.19
3146.39
3155.59
3164.79
3173.99
3183.19
3192.39
3201.59
3210.79
3219.99
3229.19
3238.39
3247.59
3256.79
3265.99
3275.19

313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351

2925.59
2934.79
2943.99
2953.19
2962.39
2971.59
2980.79
2989.99
2999.19
3008.39
3017.59
3026.79
3035.99
3045.19
3054.39
3063.59
3072.79
3081.99
3091.19
3100.39
3109.59
3118.79
3127.99
3137.19
3146.39
3155.59
3164.79
3173.99
3183.19
3192.39
3201.59
3210.79
3219.99
3229.19
3238.39
3247.59
3256.79
3265.99
3275.19

313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351

4702.99
4717.78
4732.57
4747.36
4762.15
4776.94
4791.73
4806.52
4821.31
4836.10
4850.89
4865.68
4880.47
4895.26
4910.05
4924.84
4939.63
4954.42
4969.21
4984.00
4998.79
5013.58
5028.37
5043.16
5057.95
5072.74
5087.53
5102.32
5117.11
5131.90
5146.69
5161.48
5176.27
5191.06
5205.85
5220.64
5235.43
5250.22
5265.01

313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351

4303.80
4317.33
4330.86
4344.39
4357.92
4371.45
4384.98
4398.51
4412.04
4425.57
4439.10
4452.63
4466.16
4479.69
4493.22
4506.75
4520.28
4533.81
4547.34
4560.87
4574.40
4587.93
4601.46
4614.99
4628.52
4642.05
4655.58
4669.11
4682.64
4696.17
4709.70
4723.23
4736.76
4750.29
4763.82
4777.35
4790.88
4804.41
4817.94

313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351

1829.11
1834.86
1840.61
1846.36
1852.11
1857.86
1863.61
1869.36
1875.11
1880.86
1886.61
1892.36
1898.11
1903.86
1909.61
1915.36
1921.11
1926.86
1932.61
1938.36
1944.11
1949.86
1955.61
1961.36
1967.11
1972.86
1978.61
1984.36
1990.11
1995.86
2001.61
2007.36
2013.11
2018.86
2024.61
2030.36
2036.11
2041.86
2047.61

311891749.xls

CONVEYANCE

9 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390

3284.39
3293.59
3302.79
3311.99
3321.19
3330.39
3339.59
3348.79
3357.99
3367.19
3376.39
3385.59
3394.79
3403.99
3413.19
3422.39
3431.59
3440.79
3449.99
3459.19
3468.39
3477.59
3486.79
3495.99
3505.19
3514.39
3523.59
3532.79
3541.99
3551.19
3560.39
3569.59
3578.79
3587.99
3597.19
3606.39
3615.59
3624.79
3633.99

352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390

3284.39
3293.59
3302.79
3311.99
3321.19
3330.39
3339.59
3348.79
3357.99
3367.19
3376.39
3385.59
3394.79
3403.99
3413.19
3422.39
3431.59
3440.79
3449.99
3459.19
3468.39
3477.59
3486.79
3495.99
3505.19
3514.39
3523.59
3532.79
3541.99
3551.19
3560.39
3569.59
3578.79
3587.99
3597.19
3606.39
3615.59
3624.79
3633.99

352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390

5279.80
5294.59
5309.38
5324.17
5338.96
5353.75
5368.54
5383.33
5398.12
5412.91
5427.70
5442.49
5457.28
5472.07
5486.86
5501.65
5516.44
5531.23
5546.02
5560.81
5575.60
5590.39
5605.18
5619.97
5634.76
5649.55
5664.34
5679.13
5693.92
5708.71
5723.50
5738.29
5753.08
5767.87
5782.66
5797.45
5812.24
5827.03
5841.82

352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390

4831.47
4845.00
4858.53
4872.06
4885.59
4899.12
4912.65
4926.18
4939.71
4953.24
4966.77
4980.30
4993.83
5007.36
5020.89
5034.42
5047.95
5061.48
5075.01
5088.54
5102.07
5115.60
5129.13
5142.66
5156.19
5169.72
5183.25
5196.78
5210.31
5223.84
5237.37
5250.90
5264.43
5277.96
5291.49
5305.02
5318.55
5332.08
5345.61

352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390

2053.36
2059.11
2064.86
2070.61
2076.36
2082.11
2087.86
2093.61
2099.36
2105.11
2110.86
2116.61
2122.36
2128.11
2133.86
2139.61
2145.36
2151.11
2156.86
2162.61
2168.36
2174.11
2179.86
2185.61
2191.36
2197.11
2202.86
2208.61
2214.36
2220.11
2225.86
2231.61
2237.36
2243.11
2248.86
2254.61
2260.36
2266.11
2271.86

311891749.xls

CONVEYANCE

10 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429

3643.19
3652.39
3661.59
3670.79
3679.99
3689.19
3698.39
3707.59
3716.79
3725.99
3735.19
3744.39
3753.59
3762.79
3771.99
3781.19
3790.39
3799.59
3808.79
3817.99
3827.19
3836.39
3845.59
3854.79
3863.99
3873.19
3882.39
3891.59
3900.79
3909.99
3919.19
3928.39
3937.59
3946.79
3955.99
3965.19
3974.39
3983.59
3992.79

391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429

3643.19
3652.39
3661.59
3670.79
3679.99
3689.19
3698.39
3707.59
3716.79
3725.99
3735.19
3744.39
3753.59
3762.79
3771.99
3781.19
3790.39
3799.59
3808.79
3817.99
3827.19
3836.39
3845.59
3854.79
3863.99
3873.19
3882.39
3891.59
3900.79
3909.99
3919.19
3928.39
3937.59
3946.79
3955.99
3965.19
3974.39
3983.59
3992.79

391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429

5856.61
5871.40
5886.19
5900.98
5915.77
5930.56
5945.35
5960.14
5974.93
5989.72
6004.51
6019.30
6034.09
6048.88
6063.67
6078.46
6093.25
6108.04
6122.83
6137.62
6152.41
6167.20
6181.99
6196.78
6211.57
6226.36
6241.15
6255.94
6270.73
6285.52
6300.31
6315.10
6329.89
6344.68
6359.47
6374.26
6389.05
6403.84
6418.63

391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429

5359.14
5372.67
5386.20
5399.73
5413.26
5426.79
5440.32
5453.85
5467.38
5480.91
5494.44
5507.97
5521.50
5535.03
5548.56
5562.09
5575.62
5589.15
5602.68
5616.21
5629.74
5643.27
5656.80
5670.33
5683.86
5697.39
5710.92
5724.45
5737.98
5751.51
5765.04
5778.57
5792.10
5805.63
5819.16
5832.69
5846.22
5859.75
5873.28

391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429

2277.61
2283.36
2289.11
2294.86
2300.61
2306.36
2312.11
2317.86
2323.61
2329.36
2335.11
2340.86
2346.61
2352.36
2358.11
2363.86
2369.61
2375.36
2381.11
2386.86
2392.61
2398.36
2404.11
2409.86
2415.61
2421.36
2427.11
2432.86
2438.61
2444.36
2450.11
2455.86
2461.61
2467.36
2473.11
2478.86
2484.61
2490.36
2496.11

311891749.xls

CONVEYANCE

11 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468

4001.99
4011.19
4020.39
4029.59
4038.79
4047.99
4057.19
4066.39
4075.59
4084.79
4093.99
4103.19
4112.39
4121.59
4130.79
4139.99
4149.19
4158.39
4167.59
4176.79
4185.99
4195.19
4204.39
4213.59
4222.79
4231.99
4241.19
4250.39
4259.59
4268.79
4277.99
4287.19
4296.39
4305.59
4314.79
4323.99
4333.19
4342.39
4351.59

430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468

4001.99
4011.19
4020.39
4029.59
4038.79
4047.99
4057.19
4066.39
4075.59
4084.79
4093.99
4103.19
4112.39
4121.59
4130.79
4139.99
4149.19
4158.39
4167.59
4176.79
4185.99
4195.19
4204.39
4213.59
4222.79
4231.99
4241.19
4250.39
4259.59
4268.79
4277.99
4287.19
4296.39
4305.59
4314.79
4323.99
4333.19
4342.39
4351.59

430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468

6433.42
6448.21
6463.00
6477.79
6492.58
6507.37
6522.16
6536.95
6551.74
6566.53
6581.32
6596.11
6610.90
6625.69
6640.48
6655.27
6670.06
6684.85
6699.64
6714.43
6729.22
6744.01
6758.80
6773.59
6788.38
6803.17
6817.96
6832.75
6847.54
6862.33
6877.12
6891.91
6906.70
6921.49
6936.28
6951.07
6965.86
6980.65
6995.44

430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468

5886.81
5900.34
5913.87
5927.40
5940.93
5954.46
5967.99
5981.52
5995.05
6008.58
6022.11
6035.64
6049.17
6062.70
6076.23
6089.76
6103.29
6116.82
6130.35
6143.88
6157.41
6170.94
6184.47
6198.00
6211.53
6225.06
6238.59
6252.12
6265.65
6279.18
6292.71
6306.24
6319.77
6333.30
6346.83
6360.36
6373.89
6387.42
6400.95

430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468

2501.86
2507.61
2513.36
2519.11
2524.86
2530.61
2536.36
2542.11
2547.86
2553.61
2559.36
2565.11
2570.86
2576.61
2582.36
2588.11
2593.86
2599.61
2605.36
2611.11
2616.86
2622.61
2628.36
2634.11
2639.86
2645.61
2651.36
2657.11
2662.86
2668.61
2674.36
2680.11
2685.86
2691.61
2697.36
2703.11
2708.86
2714.61
2720.36

311891749.xls

CONVEYANCE

12 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507

4360.79
4369.99
4379.19
4388.39
4397.59
4406.79
4415.99
4425.19
4434.39
4443.59
4452.79
4461.99
4471.19
4480.39
4489.59
4498.79
4507.99
4517.19
4526.39
4535.59
4544.79
4553.99
4563.19
4572.39
4581.59
4590.79
4599.99
4609.19
4618.39
4627.59
4636.79
4645.99
4655.19
4664.39
4673.59
4682.79
4691.99
4701.19
4710.39

469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507

4360.79
4369.99
4379.19
4388.39
4397.59
4406.79
4415.99
4425.19
4434.39
4443.59
4452.79
4461.99
4471.19
4480.39
4489.59
4498.79
4507.99
4517.19
4526.39
4535.59
4544.79
4553.99
4563.19
4572.39
4581.59
4590.79
4599.99
4609.19
4618.39
4627.59
4636.79
4645.99
4655.19
4664.39
4673.59
4682.79
4691.99
4701.19
4710.39

469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507

7010.23
7025.02
7039.81
7054.60
7069.39
7084.18
7098.97
7113.76
7128.55
7143.34
7158.13
7172.92
7187.71
7202.50
7217.29
7232.08
7246.87
7261.66
7276.45
7291.24
7306.03
7320.82
7335.61
7350.40
7365.19
7379.98
7394.77
7409.56
7424.35
7439.14
7453.93
7468.72
7483.51
7498.30
7513.09
7527.88
7542.67
7557.46
7572.25

469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507

6414.48
6428.01
6441.54
6455.07
6468.60
6482.13
6495.66
6509.19
6522.72
6536.25
6549.78
6563.31
6576.84
6590.37
6603.90
6617.43
6630.96
6644.49
6658.02
6671.55
6685.08
6698.61
6712.14
6725.67
6739.20
6752.73
6766.26
6779.79
6793.32
6806.85
6820.38
6833.91
6847.44
6860.97
6874.50
6888.03
6901.56
6915.09
6928.62

469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507

2726.11
2731.86
2737.61
2743.36
2749.11
2754.86
2760.61
2766.36
2772.11
2777.86
2783.61
2789.36
2795.11
2800.86
2806.61
2812.36
2818.11
2823.86
2829.61
2835.36
2841.11
2846.86
2852.61
2858.36
2864.11
2869.86
2875.61
2881.36
2887.11
2892.86
2898.61
2904.36
2910.11
2915.86
2921.61
2927.36
2933.11
2938.86
2944.61

311891749.xls

CONVEYANCE

13 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546

4719.59
4728.79
4737.99
4747.19
4756.39
4765.59
4774.79
4783.99
4793.19
4802.39
4811.59
4820.79
4829.99
4839.19
4848.39
4857.59
4866.79
4875.99
4885.19
4894.39
4903.59
4912.79
4921.99
4931.19
4940.39
4949.59
4958.79
4967.99
4977.19
4986.39
4995.59
5004.79
5013.99
5023.19
5032.39
5041.59
5050.79
5059.99
5069.19

508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546

4719.59
4728.79
4737.99
4747.19
4756.39
4765.59
4774.79
4783.99
4793.19
4802.39
4811.59
4820.79
4829.99
4839.19
4848.39
4857.59
4866.79
4875.99
4885.19
4894.39
4903.59
4912.79
4921.99
4931.19
4940.39
4949.59
4958.79
4967.99
4977.19
4986.39
4995.59
5004.79
5013.99
5023.19
5032.39
5041.59
5050.79
5059.99
5069.19

508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546

7587.04
7601.83
7616.62
7631.41
7646.20
7660.99
7675.78
7690.57
7705.36
7720.15
7734.94
7749.73
7764.52
7779.31
7794.10
7808.89
7823.68
7838.47
7853.26
7868.05
7882.84
7897.63
7912.42
7927.21
7942.00
7956.79
7971.58
7986.37
8001.16
8015.95
8030.74
8045.53
8060.32
8075.11
8089.90
8104.69
8119.48
8134.27
8149.06

508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546

6942.15
6955.68
6969.21
6982.74
6996.27
7009.80
7023.33
7036.86
7050.39
7063.92
7077.45
7090.98
7104.51
7118.04
7131.57
7145.10
7158.63
7172.16
7185.69
7199.22
7212.75
7226.28
7239.81
7253.34
7266.87
7280.40
7293.93
7307.46
7320.99
7334.52
7348.05
7361.58
7375.11
7388.64
7402.17
7415.70
7429.23
7442.76
7456.29

508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546

2950.36
2956.11
2961.86
2967.61
2973.36
2979.11
2984.86
2990.61
2996.36
3002.11
3007.86
3013.61
3019.36
3025.11
3030.86
3036.61
3042.36
3048.11
3053.86
3059.61
3065.36
3071.11
3076.86
3082.61
3088.36
3094.11
3099.86
3105.61
3111.36
3117.11
3122.86
3128.61
3134.36
3140.11
3145.86
3151.61
3157.36
3163.11
3168.86

311891749.xls

CONVEYANCE

14 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585

5078.39
5087.59
5096.79
5105.99
5115.19
5124.39
5133.59
5142.79
5151.99
5161.19
5170.39
5179.59
5188.79
5197.99
5207.19
5216.39
5225.59
5234.79
5243.99
5253.19
5262.39
5271.59
5280.79
5289.99
5299.19
5308.39
5317.59
5326.79
5335.99
5345.19
5354.39
5363.59
5372.79
5381.99
5391.19
5400.39
5409.59
5418.79
5427.99

547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585

5078.39
5087.59
5096.79
5105.99
5115.19
5124.39
5133.59
5142.79
5151.99
5161.19
5170.39
5179.59
5188.79
5197.99
5207.19
5216.39
5225.59
5234.79
5243.99
5253.19
5262.39
5271.59
5280.79
5289.99
5299.19
5308.39
5317.59
5326.79
5335.99
5345.19
5354.39
5363.59
5372.79
5381.99
5391.19
5400.39
5409.59
5418.79
5427.99

547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585

8163.85
8178.64
8193.43
8208.22
8223.01
8237.80
8252.59
8267.38
8282.17
8296.96
8311.75
8326.54
8341.33
8356.12
8370.91
8385.70
8400.49
8415.28
8430.07
8444.86
8459.65
8474.44
8489.23
8504.02
8518.81
8533.60
8548.39
8563.18
8577.97
8592.76
8607.55
8622.34
8637.13
8651.92
8666.71
8681.50
8696.29
8711.08
8725.87

547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585

7469.82
7483.35
7496.88
7510.41
7523.94
7537.47
7551.00
7564.53
7578.06
7591.59
7605.12
7618.65
7632.18
7645.71
7659.24
7672.77
7686.30
7699.83
7713.36
7726.89
7740.42
7753.95
7767.48
7781.01
7794.54
7808.07
7821.60
7835.13
7848.66
7862.19
7875.72
7889.25
7902.78
7916.31
7929.84
7943.37
7956.90
7970.43
7983.96

547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585

3174.61
3180.36
3186.11
3191.86
3197.61
3203.36
3209.11
3214.86
3220.61
3226.36
3232.11
3237.86
3243.61
3249.36
3255.11
3260.86
3266.61
3272.36
3278.11
3283.86
3289.61
3295.36
3301.11
3306.86
3312.61
3318.36
3324.11
3329.86
3335.61
3341.36
3347.11
3352.86
3358.61
3364.36
3370.11
3375.86
3381.61
3387.36
3393.11

311891749.xls

CONVEYANCE

15 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624

5437.19
5446.39
5455.59
5464.79
5473.99
5483.19
5492.39
5501.59
5510.79
5519.99
5529.19
5538.39
5547.59
5556.79
5565.99
5575.19
5584.39
5593.59
5602.79
5611.99
5621.19
5630.39
5639.59
5648.79
5657.99
5667.19
5676.39
5685.59
5694.79
5703.99
5713.19
5722.39
5731.59
5740.79
5749.99
5759.19
5768.39
5777.59
5786.79

586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624

5437.19
5446.39
5455.59
5464.79
5473.99
5483.19
5492.39
5501.59
5510.79
5519.99
5529.19
5538.39
5547.59
5556.79
5565.99
5575.19
5584.39
5593.59
5602.79
5611.99
5621.19
5630.39
5639.59
5648.79
5657.99
5667.19
5676.39
5685.59
5694.79
5703.99
5713.19
5722.39
5731.59
5740.79
5749.99
5759.19
5768.39
5777.59
5786.79

586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624

8740.66
8755.45
8770.24
8785.03
8799.82
8814.61
8829.40
8844.19
8858.98
8873.77
8888.56
8903.35
8918.14
8932.93
8947.72
8962.51
8977.30
8992.09
9006.88
9021.67
9036.46
9051.25
9066.04
9080.83
9095.62
9110.41
9125.20
9139.99
9154.78
9169.57
9184.36
9199.15
9213.94
9228.73
9243.52
9258.31
9273.10
9287.89
9302.68

586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624

7997.49
8011.02
8024.55
8038.08
8051.61
8065.14
8078.67
8092.20
8105.73
8119.26
8132.79
8146.32
8159.85
8173.38
8186.91
8200.44
8213.97
8227.50
8241.03
8254.56
8268.09
8281.62
8295.15
8308.68
8322.21
8335.74
8349.27
8362.80
8376.33
8389.86
8403.39
8416.92
8430.45
8443.98
8457.51
8471.04
8484.57
8498.10
8511.63

586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624

3398.86
3404.61
3410.36
3416.11
3421.86
3427.61
3433.36
3439.11
3444.86
3450.61
3456.36
3462.11
3467.86
3473.61
3479.36
3485.11
3490.86
3496.61
3502.36
3508.11
3513.86
3519.61
3525.36
3531.11
3536.86
3542.61
3548.36
3554.11
3559.86
3565.61
3571.36
3577.11
3582.86
3588.61
3594.36
3600.11
3605.86
3611.61
3617.36

311891749.xls

CONVEYANCE

16 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663

5795.99
5805.19
5814.39
5823.59
5832.79
5841.99
5851.19
5860.39
5869.59
5878.79
5887.99
5897.19
5906.39
5915.59
5924.79
5933.99
5943.19
5952.39
5961.59
5970.79
5979.99
5989.19
5998.39
6007.59
6016.79
6025.99
6035.19
6044.39
6053.59
6062.79
6071.99
6081.19
6090.39
6099.59
6108.79
6117.99
6127.19
6136.39
6145.59

625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663

5795.99
5805.19
5814.39
5823.59
5832.79
5841.99
5851.19
5860.39
5869.59
5878.79
5887.99
5897.19
5906.39
5915.59
5924.79
5933.99
5943.19
5952.39
5961.59
5970.79
5979.99
5989.19
5998.39
6007.59
6016.79
6025.99
6035.19
6044.39
6053.59
6062.79
6071.99
6081.19
6090.39
6099.59
6108.79
6117.99
6127.19
6136.39
6145.59

625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663

9317.47
9332.26
9347.05
9361.84
9376.63
9391.42
9406.21
9421.00
9435.79
9450.58
9465.37
9480.16
9494.95
9509.74
9524.53
9539.32
9554.11
9568.90
9583.69
9598.48
9613.27
9628.06
9642.85
9657.64
9672.43
9687.22
9702.01
9716.80
9731.59
9746.38
9761.17
9775.96
9790.75
9805.54
9820.33
9835.12
9849.91
9864.70
9879.49

625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663

8525.16
8538.69
8552.22
8565.75
8579.28
8592.81
8606.34
8619.87
8633.40
8646.93
8660.46
8673.99
8687.52
8701.05
8714.58
8728.11
8741.64
8755.17
8768.70
8782.23
8795.76
8809.29
8822.82
8836.35
8849.88
8863.41
8876.94
8890.47
8904.00
8917.53
8931.06
8944.59
8958.12
8971.65
8985.18
8998.71
9012.24
9025.77
9039.30

625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663

3623.11
3628.86
3634.61
3640.36
3646.11
3651.86
3657.61
3663.36
3669.11
3674.86
3680.61
3686.36
3692.11
3697.86
3703.61
3709.36
3715.11
3720.86
3726.61
3732.36
3738.11
3743.86
3749.61
3755.36
3761.11
3766.86
3772.61
3778.36
3784.11
3789.86
3795.61
3801.36
3807.11
3812.86
3818.61
3824.36
3830.11
3835.86
3841.61

311891749.xls

CONVEYANCE

17 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702

6154.79
6163.99
6173.19
6182.39
6191.59
6200.79
6209.99
6219.19
6228.39
6237.59
6246.79
6255.99
6265.19
6274.39
6283.59
6292.79
6301.99
6311.19
6320.39
6329.59
6338.79
6347.99
6357.19
6366.39
6375.59
6384.79
6393.99
6403.19
6412.39
6421.59
6430.79
6439.99
6449.19
6458.39
6467.59
6476.79
6485.99
6495.19
6504.39

664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702

6154.79
6163.99
6173.19
6182.39
6191.59
6200.79
6209.99
6219.19
6228.39
6237.59
6246.79
6255.99
6265.19
6274.39
6283.59
6292.79
6301.99
6311.19
6320.39
6329.59
6338.79
6347.99
6357.19
6366.39
6375.59
6384.79
6393.99
6403.19
6412.39
6421.59
6430.79
6439.99
6449.19
6458.39
6467.59
6476.79
6485.99
6495.19
6504.39

664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702

9894.28
9909.07
9923.86
9938.65
9953.44
9968.23
9983.02
9997.81
10012.60
10027.39
10042.18
10056.97
10071.76
10086.55
10101.34
10116.13
10130.92
10145.71
10160.50
10175.29
10190.08
10204.87
10219.66
10234.45
10249.24
10264.03
10278.82
10293.61
10308.40
10323.19
10337.98
10352.77
10367.56
10382.35
10397.14
10411.93
10426.72
10441.51
10456.30

664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702

9052.83
9066.36
9079.89
9093.42
9106.95
9120.48
9134.01
9147.54
9161.07
9174.60
9188.13
9201.66
9215.19
9228.72
9242.25
9255.78
9269.31
9282.84
9296.37
9309.90
9323.43
9336.96
9350.49
9364.02
9377.55
9391.08
9404.61
9418.14
9431.67
9445.20
9458.73
9472.26
9485.79
9499.32
9512.85
9526.38
9539.91
9553.44
9566.97

664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702

3847.36
3853.11
3858.86
3864.61
3870.36
3876.11
3881.86
3887.61
3893.36
3899.11
3904.86
3910.61
3916.36
3922.11
3927.86
3933.61
3939.36
3945.11
3950.86
3956.61
3962.36
3968.11
3973.86
3979.61
3985.36
3991.11
3996.86
4002.61
4008.36
4014.11
4019.86
4025.61
4031.36
4037.11
4042.86
4048.61
4054.36
4060.11
4065.86

311891749.xls

CONVEYANCE

18 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741

6513.59
6522.79
6531.99
6541.19
6550.39
6559.59
6568.79
6577.99
6587.19
6596.39
6605.59
6614.79
6623.99
6633.19
6642.39
6651.59
6660.79
6669.99
6679.19
6688.39
6697.59
6706.79
6715.99
6725.19
6734.39
6743.59
6752.79
6761.99
6771.19
6780.39
6789.59
6798.79
6807.99
6817.19
6826.39
6835.59
6844.79
6853.99
6863.19

703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741

6513.59
6522.79
6531.99
6541.19
6550.39
6559.59
6568.79
6577.99
6587.19
6596.39
6605.59
6614.79
6623.99
6633.19
6642.39
6651.59
6660.79
6669.99
6679.19
6688.39
6697.59
6706.79
6715.99
6725.19
6734.39
6743.59
6752.79
6761.99
6771.19
6780.39
6789.59
6798.79
6807.99
6817.19
6826.39
6835.59
6844.79
6853.99
6863.19

703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741

10471.09
10485.88
10500.67
10515.46
10530.25
10545.04
10559.83
10574.62
10589.41
10604.20
10618.99
10633.78
10648.57
10663.36
10678.15
10692.94
10707.73
10722.52
10737.31
10752.10
10766.89
10781.68
10796.47
10811.26
10826.05
10840.84
10855.63
10870.42
10885.21
10900.00
10914.79
10929.58
10944.37
10959.16
10973.95
10988.74
11003.53
11018.32
11033.11

703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741

9580.50
9594.03
9607.56
9621.09
9634.62
9648.15
9661.68
9675.21
9688.74
9702.27
9715.80
9729.33
9742.86
9756.39
9769.92
9783.45
9796.98
9810.51
9824.04
9837.57
9851.10
9864.63
9878.16
9891.69
9905.22
9918.75
9932.28
9945.81
9959.34
9972.87
9986.40
9999.93
10013.46
10026.99
10040.52
10054.05
10067.58
10081.11
10094.64

703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741

4071.61
4077.36
4083.11
4088.86
4094.61
4100.36
4106.11
4111.86
4117.61
4123.36
4129.11
4134.86
4140.61
4146.36
4152.11
4157.86
4163.61
4169.36
4175.11
4180.86
4186.61
4192.36
4198.11
4203.86
4209.61
4215.36
4221.11
4226.86
4232.61
4238.36
4244.11
4249.86
4255.61
4261.36
4267.11
4272.86
4278.61
4284.36
4290.11

311891749.xls

CONVEYANCE

19 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780

6872.39
6881.59
6890.79
6899.99
6909.19
6918.39
6927.59
6936.79
6945.99
6955.19
6964.39
6973.59
6982.79
6991.99
7001.19
7010.39
7019.59
7028.79
7037.99
7047.19
7056.39
7065.59
7074.79
7083.99
7093.19
7102.39
7111.59
7120.79
7129.99
7139.19
7148.39
7157.59
7166.79
7175.99
7185.19
7194.39
7203.59
7212.79
7221.99

742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780

6872.39
6881.59
6890.79
6899.99
6909.19
6918.39
6927.59
6936.79
6945.99
6955.19
6964.39
6973.59
6982.79
6991.99
7001.19
7010.39
7019.59
7028.79
7037.99
7047.19
7056.39
7065.59
7074.79
7083.99
7093.19
7102.39
7111.59
7120.79
7129.99
7139.19
7148.39
7157.59
7166.79
7175.99
7185.19
7194.39
7203.59
7212.79
7221.99

742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780

11047.90
11062.69
11077.48
11092.27
11107.06
11121.85
11136.64
11151.43
11166.22
11181.01
11195.80
11210.59
11225.38
11240.17
11254.96
11269.75
11284.54
11299.33
11314.12
11328.91
11343.70
11358.49
11373.28
11388.07
11402.86
11417.65
11432.44
11447.23
11462.02
11476.81
11491.60
11506.39
11521.18
11535.97
11550.76
11565.55
11580.34
11595.13
11609.92

742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780

10108.17
10121.70
10135.23
10148.76
10162.29
10175.82
10189.35
10202.88
10216.41
10229.94
10243.47
10257.00
10270.53
10284.06
10297.59
10311.12
10324.65
10338.18
10351.71
10365.24
10378.77
10392.30
10405.83
10419.36
10432.89
10446.42
10459.95
10473.48
10487.01
10500.54
10514.07
10527.60
10541.13
10554.66
10568.19
10581.72
10595.25
10608.78
10622.31

742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780

4295.86
4301.61
4307.36
4313.11
4318.86
4324.61
4330.36
4336.11
4341.86
4347.61
4353.36
4359.11
4364.86
4370.61
4376.36
4382.11
4387.86
4393.61
4399.36
4405.11
4410.86
4416.61
4422.36
4428.11
4433.86
4439.61
4445.36
4451.11
4456.86
4462.61
4468.36
4474.11
4479.86
4485.61
4491.36
4497.11
4502.86
4508.61
4514.36

311891749.xls

CONVEYANCE

20 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819

7231.19
7240.39
7249.59
7258.79
7267.99
7277.19
7286.39
7295.59
7304.79
7313.99
7323.19
7332.39
7341.59
7350.79
7359.99
7369.19
7378.39
7387.59
7396.79
7405.99
7415.19
7424.39
7433.59
7442.79
7451.99
7461.19
7470.39
7479.59
7488.79
7497.99
7507.19
7516.39
7525.59
7534.79
7543.99
7553.19
7562.39
7571.59
7580.79

781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819

7231.19
7240.39
7249.59
7258.79
7267.99
7277.19
7286.39
7295.59
7304.79
7313.99
7323.19
7332.39
7341.59
7350.79
7359.99
7369.19
7378.39
7387.59
7396.79
7405.99
7415.19
7424.39
7433.59
7442.79
7451.99
7461.19
7470.39
7479.59
7488.79
7497.99
7507.19
7516.39
7525.59
7534.79
7543.99
7553.19
7562.39
7571.59
7580.79

781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819

11624.71
11639.50
11654.29
11669.08
11683.87
11698.66
11713.45
11728.24
11743.03
11757.82
11772.61
11787.40
11802.19
11816.98
11831.77
11846.56
11861.35
11876.14
11890.93
11905.72
11920.51
11935.30
11950.09
11964.88
11979.67
11994.46
12009.25
12024.04
12038.83
12053.62
12068.41
12083.20
12097.99
12112.78
12127.57
12142.36
12157.15
12171.94
12186.73

781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819

10635.84
10649.37
10662.90
10676.43
10689.96
10703.49
10717.02
10730.55
10744.08
10757.61
10771.14
10784.67
10798.20
10811.73
10825.26
10838.79
10852.32
10865.85
10879.38
10892.91
10906.44
10919.97
10933.50
10947.03
10960.56
10974.09
10987.62
11001.15
11014.68
11028.21
11041.74
11055.27
11068.80
11082.33
11095.86
11109.39
11122.92
11136.45
11149.98

781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819

4520.11
4525.86
4531.61
4537.36
4543.11
4548.86
4554.61
4560.36
4566.11
4571.86
4577.61
4583.36
4589.11
4594.86
4600.61
4606.36
4612.11
4617.86
4623.61
4629.36
4635.11
4640.86
4646.61
4652.36
4658.11
4663.86
4669.61
4675.36
4681.11
4686.86
4692.61
4698.36
4704.11
4709.86
4715.61
4721.36
4727.11
4732.86
4738.61

311891749.xls

CONVEYANCE

21 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858

7589.99
7599.19
7608.39
7617.59
7626.79
7635.99
7645.19
7654.39
7663.59
7672.79
7681.99
7691.19
7700.39
7709.59
7718.79
7727.99
7737.19
7746.39
7755.59
7764.79
7773.99
7783.19
7792.39
7801.59
7810.79
7819.99
7829.19
7838.39
7847.59
7856.79
7865.99
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858

7589.99
7599.19
7608.39
7617.59
7626.79
7635.99
7645.19
7654.39
7663.59
7672.79
7681.99
7691.19
7700.39
7709.59
7718.79
7727.99
7737.19
7746.39
7755.59
7764.79
7773.99
7783.19
7792.39
7801.59
7810.79
7819.99
7829.19
7838.39
7847.59
7856.79
7865.99
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858

12201.52
12216.31
12231.10
12245.89
12260.68
12275.47
12290.26
12305.05
12319.84
12334.63
12349.42
12364.21
12379.00
12393.79
12408.58
12423.37
12438.16
12452.95
12467.74
12482.53
12497.32
12512.11
12526.90
12541.69
12556.48
12571.27
12586.06
12600.85
12615.64
12630.43
12645.22
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36

820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858

11163.51
11177.04
11190.57
11204.10
11217.63
11231.16
11244.69
11258.22
11271.75
11285.28
11298.81
11312.34
11325.87
11339.40
11352.93
11366.46
11379.99
11393.52
11407.05
11420.58
11434.11
11447.64
11461.17
11474.70
11488.23
11501.76
11515.29
11528.82
11542.35
11555.88
11569.41
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14

820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858

4744.36
4750.11
4755.86
4761.61
4767.36
4773.11
4778.86
4784.61
4790.36
4796.11
4801.86
4807.61
4813.36
4819.11
4824.86
4830.61
4836.36
4842.11
4847.86
4853.61
4859.36
4865.11
4870.86
4876.61
4882.36
4888.11
4893.86
4899.61
4905.36
4911.11
4916.86
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63

311891749.xls

CONVEYANCE

22 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897

-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36

859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897

-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14

859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897

-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63

311891749.xls

CONVEYANCE

23 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936

-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36

898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936

-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14

898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936

-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63

311891749.xls

CONVEYANCE

24 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975

-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36

937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975

-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14

937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975

-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63

311891749.xls

CONVEYANCE

25 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014

-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36

976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014

-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14

976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014

-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63

311891749.xls

CONVEYANCE

26 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053

-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36

1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053

-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14

1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053

-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63

311891749.xls

CONVEYANCE

27 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
1054
1055
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066
1067
1068
1069
1070
1071
1072
1073
1074
1075
1076
1077
1078
1079
1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
1090
1091
1092

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

1054
1055
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066
1067
1068
1069
1070
1071
1072
1073
1074
1075
1076
1077
1078
1079
1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
1090
1091
1092

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

1054
1055
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066
1067
1068
1069
1070
1071
1072
1073
1074
1075
1076
1077
1078
1079
1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
1090
1091
1092

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

1054
1055
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066
1067
1068
1069
1070
1071
1072
1073
1074
1075
1076
1077
1078
1079
1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
1090
1091
1092

-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36

1054
1055
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066
1067
1068
1069
1070
1071
1072
1073
1074
1075
1076
1077
1078
1079
1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
1090
1091
1092

-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14

1054
1055
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066
1067
1068
1069
1070
1071
1072
1073
1074
1075
1076
1077
1078
1079
1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
1090
1091
1092

-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63

311891749.xls

CONVEYANCE

28 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
1093
1094
1095
1096
1097
1098
1099
1100
1101
1102
1103
1104
1105
1106
1107
1108
1109
1110
1111
1112
1113
1114
1115
1116
1117
1118
1119
1120
1121
1122
1123
1124
1125
1126
1127
1128
1129
1130
1131

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

1093
1094
1095
1096
1097
1098
1099
1100
1101
1102
1103
1104
1105
1106
1107
1108
1109
1110
1111
1112
1113
1114
1115
1116
1117
1118
1119
1120
1121
1122
1123
1124
1125
1126
1127
1128
1129
1130
1131

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

1093
1094
1095
1096
1097
1098
1099
1100
1101
1102
1103
1104
1105
1106
1107
1108
1109
1110
1111
1112
1113
1114
1115
1116
1117
1118
1119
1120
1121
1122
1123
1124
1125
1126
1127
1128
1129
1130
1131

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

1093
1094
1095
1096
1097
1098
1099
1100
1101
1102
1103
1104
1105
1106
1107
1108
1109
1110
1111
1112
1113
1114
1115
1116
1117
1118
1119
1120
1121
1122
1123
1124
1125
1126
1127
1128
1129
1130
1131

-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36

1093
1094
1095
1096
1097
1098
1099
1100
1101
1102
1103
1104
1105
1106
1107
1108
1109
1110
1111
1112
1113
1114
1115
1116
1117
1118
1119
1120
1121
1122
1123
1124
1125
1126
1127
1128
1129
1130
1131

-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14

1093
1094
1095
1096
1097
1098
1099
1100
1101
1102
1103
1104
1105
1106
1107
1108
1109
1110
1111
1112
1113
1114
1115
1116
1117
1118
1119
1120
1121
1122
1123
1124
1125
1126
1127
1128
1129
1130
1131

-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63

311891749.xls

CONVEYANCE

29 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
1132
1133
1134
1135
1136
1137
1138
1139
1140
1141
1142
1143
1144
1145
1146
1147
1148
1149
1150
1151
1152
1153
1154
1155
1156
1157
1158
1159
1160
1161
1162
1163
1164
1165
1166
1167
1168
1169
1170

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

1132
1133
1134
1135
1136
1137
1138
1139
1140
1141
1142
1143
1144
1145
1146
1147
1148
1149
1150
1151
1152
1153
1154
1155
1156
1157
1158
1159
1160
1161
1162
1163
1164
1165
1166
1167
1168
1169
1170

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

1132
1133
1134
1135
1136
1137
1138
1139
1140
1141
1142
1143
1144
1145
1146
1147
1148
1149
1150
1151
1152
1153
1154
1155
1156
1157
1158
1159
1160
1161
1162
1163
1164
1165
1166
1167
1168
1169
1170

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

1132
1133
1134
1135
1136
1137
1138
1139
1140
1141
1142
1143
1144
1145
1146
1147
1148
1149
1150
1151
1152
1153
1154
1155
1156
1157
1158
1159
1160
1161
1162
1163
1164
1165
1166
1167
1168
1169
1170

-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36

1132
1133
1134
1135
1136
1137
1138
1139
1140
1141
1142
1143
1144
1145
1146
1147
1148
1149
1150
1151
1152
1153
1154
1155
1156
1157
1158
1159
1160
1161
1162
1163
1164
1165
1166
1167
1168
1169
1170

-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14

1132
1133
1134
1135
1136
1137
1138
1139
1140
1141
1142
1143
1144
1145
1146
1147
1148
1149
1150
1151
1152
1153
1154
1155
1156
1157
1158
1159
1160
1161
1162
1163
1164
1165
1166
1167
1168
1169
1170

-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63

311891749.xls

CONVEYANCE

30 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
1171
1172
1173
1174
1175
1176
1177
1178
1179
1180
1181
1182
1183
1184
1185
1186
1187
1188
1189
1190
1191
1192
1193
1194
1195
1196
1197
1198
1199
1200
1201
1202
1203
1204
1205
1206
1207
1208
1209

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

1171
1172
1173
1174
1175
1176
1177
1178
1179
1180
1181
1182
1183
1184
1185
1186
1187
1188
1189
1190
1191
1192
1193
1194
1195
1196
1197
1198
1199
1200
1201
1202
1203
1204
1205
1206
1207
1208
1209

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

1171
1172
1173
1174
1175
1176
1177
1178
1179
1180
1181
1182
1183
1184
1185
1186
1187
1188
1189
1190
1191
1192
1193
1194
1195
1196
1197
1198
1199
1200
1201
1202
1203
1204
1205
1206
1207
1208
1209

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

1171
1172
1173
1174
1175
1176
1177
1178
1179
1180
1181
1182
1183
1184
1185
1186
1187
1188
1189
1190
1191
1192
1193
1194
1195
1196
1197
1198
1199
1200
1201
1202
1203
1204
1205
1206
1207
1208
1209

-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36

1171
1172
1173
1174
1175
1176
1177
1178
1179
1180
1181
1182
1183
1184
1185
1186
1187
1188
1189
1190
1191
1192
1193
1194
1195
1196
1197
1198
1199
1200
1201
1202
1203
1204
1205
1206
1207
1208
1209

-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14

1171
1172
1173
1174
1175
1176
1177
1178
1179
1180
1181
1182
1183
1184
1185
1186
1187
1188
1189
1190
1191
1192
1193
1194
1195
1196
1197
1198
1199
1200
1201
1202
1203
1204
1205
1206
1207
1208
1209

-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63

311891749.xls

CONVEYANCE

31 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
1210
1211
1212
1213
1214
1215
1216
1217
1218
1219
1220
1221
1222
1223
1224
1225
1226
1227
1228
1229
1230
1231
1232
1233
1234
1235
1236
1237
1238
1239
1240
1241
1242
1243
1244
1245
1246
1247
1248

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

1210
1211
1212
1213
1214
1215
1216
1217
1218
1219
1220
1221
1222
1223
1224
1225
1226
1227
1228
1229
1230
1231
1232
1233
1234
1235
1236
1237
1238
1239
1240
1241
1242
1243
1244
1245
1246
1247
1248

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

1210
1211
1212
1213
1214
1215
1216
1217
1218
1219
1220
1221
1222
1223
1224
1225
1226
1227
1228
1229
1230
1231
1232
1233
1234
1235
1236
1237
1238
1239
1240
1241
1242
1243
1244
1245
1246
1247
1248

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

1210
1211
1212
1213
1214
1215
1216
1217
1218
1219
1220
1221
1222
1223
1224
1225
1226
1227
1228
1229
1230
1231
1232
1233
1234
1235
1236
1237
1238
1239
1240
1241
1242
1243
1244
1245
1246
1247
1248

-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36

1210
1211
1212
1213
1214
1215
1216
1217
1218
1219
1220
1221
1222
1223
1224
1225
1226
1227
1228
1229
1230
1231
1232
1233
1234
1235
1236
1237
1238
1239
1240
1241
1242
1243
1244
1245
1246
1247
1248

-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14

1210
1211
1212
1213
1214
1215
1216
1217
1218
1219
1220
1221
1222
1223
1224
1225
1226
1227
1228
1229
1230
1231
1232
1233
1234
1235
1236
1237
1238
1239
1240
1241
1242
1243
1244
1245
1246
1247
1248

-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63

311891749.xls

CONVEYANCE

32 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
1249
1250
1251
1252
1253
1254
1255
1256
1257
1258
1259
1260
1261
1262
1263
1264
1265
1266
1267
1268
1269
1270
1271
1272
1273
1274
1275
1276
1277
1278
1279
1280
1281
1282
1283
1284
1285
1286
1287

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

1249
1250
1251
1252
1253
1254
1255
1256
1257
1258
1259
1260
1261
1262
1263
1264
1265
1266
1267
1268
1269
1270
1271
1272
1273
1274
1275
1276
1277
1278
1279
1280
1281
1282
1283
1284
1285
1286
1287

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

1249
1250
1251
1252
1253
1254
1255
1256
1257
1258
1259
1260
1261
1262
1263
1264
1265
1266
1267
1268
1269
1270
1271
1272
1273
1274
1275
1276
1277
1278
1279
1280
1281
1282
1283
1284
1285
1286
1287

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

1249
1250
1251
1252
1253
1254
1255
1256
1257
1258
1259
1260
1261
1262
1263
1264
1265
1266
1267
1268
1269
1270
1271
1272
1273
1274
1275
1276
1277
1278
1279
1280
1281
1282
1283
1284
1285
1286
1287

-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36

1249
1250
1251
1252
1253
1254
1255
1256
1257
1258
1259
1260
1261
1262
1263
1264
1265
1266
1267
1268
1269
1270
1271
1272
1273
1274
1275
1276
1277
1278
1279
1280
1281
1282
1283
1284
1285
1286
1287

-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14

1249
1250
1251
1252
1253
1254
1255
1256
1257
1258
1259
1260
1261
1262
1263
1264
1265
1266
1267
1268
1269
1270
1271
1272
1273
1274
1275
1276
1277
1278
1279
1280
1281
1282
1283
1284
1285
1286
1287

-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63

311891749.xls

CONVEYANCE

33 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
1288
1289
1290
1291
1292
1293
1294
1295
1296
1297
1298
1299
1300
1301
1302
1303
1304
1305
1306
1307
1308
1309
1310
1311
1312
1313
1314
1315
1316
1317
1318
1319
1320
1321
1322
1323
1324
1325
1326

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

1288
1289
1290
1291
1292
1293
1294
1295
1296
1297
1298
1299
1300
1301
1302
1303
1304
1305
1306
1307
1308
1309
1310
1311
1312
1313
1314
1315
1316
1317
1318
1319
1320
1321
1322
1323
1324
1325
1326

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

1288
1289
1290
1291
1292
1293
1294
1295
1296
1297
1298
1299
1300
1301
1302
1303
1304
1305
1306
1307
1308
1309
1310
1311
1312
1313
1314
1315
1316
1317
1318
1319
1320
1321
1322
1323
1324
1325
1326

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

1288
1289
1290
1291
1292
1293
1294
1295
1296
1297
1298
1299
1300
1301
1302
1303
1304
1305
1306
1307
1308
1309
1310
1311
1312
1313
1314
1315
1316
1317
1318
1319
1320
1321
1322
1323
1324
1325
1326

-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36

1288
1289
1290
1291
1292
1293
1294
1295
1296
1297
1298
1299
1300
1301
1302
1303
1304
1305
1306
1307
1308
1309
1310
1311
1312
1313
1314
1315
1316
1317
1318
1319
1320
1321
1322
1323
1324
1325
1326

-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14

1288
1289
1290
1291
1292
1293
1294
1295
1296
1297
1298
1299
1300
1301
1302
1303
1304
1305
1306
1307
1308
1309
1310
1311
1312
1313
1314
1315
1316
1317
1318
1319
1320
1321
1322
1323
1324
1325
1326

-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63

311891749.xls

CONVEYANCE

34 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
1327
1328
1329
1330
1331
1332
1333
1334
1335
1336
1337
1338
1339
1340
1341
1342
1343
1344
1345
1346
1347
1348
1349
1350
1351
1352
1353
1354
1355
1356
1357
1358
1359
1360
1361
1362
1363
1364
1365

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

1327
1328
1329
1330
1331
1332
1333
1334
1335
1336
1337
1338
1339
1340
1341
1342
1343
1344
1345
1346
1347
1348
1349
1350
1351
1352
1353
1354
1355
1356
1357
1358
1359
1360
1361
1362
1363
1364
1365

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

1327
1328
1329
1330
1331
1332
1333
1334
1335
1336
1337
1338
1339
1340
1341
1342
1343
1344
1345
1346
1347
1348
1349
1350
1351
1352
1353
1354
1355
1356
1357
1358
1359
1360
1361
1362
1363
1364
1365

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

1327
1328
1329
1330
1331
1332
1333
1334
1335
1336
1337
1338
1339
1340
1341
1342
1343
1344
1345
1346
1347
1348
1349
1350
1351
1352
1353
1354
1355
1356
1357
1358
1359
1360
1361
1362
1363
1364
1365

-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36

1327
1328
1329
1330
1331
1332
1333
1334
1335
1336
1337
1338
1339
1340
1341
1342
1343
1344
1345
1346
1347
1348
1349
1350
1351
1352
1353
1354
1355
1356
1357
1358
1359
1360
1361
1362
1363
1364
1365

-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14

1327
1328
1329
1330
1331
1332
1333
1334
1335
1336
1337
1338
1339
1340
1341
1342
1343
1344
1345
1346
1347
1348
1349
1350
1351
1352
1353
1354
1355
1356
1357
1358
1359
1360
1361
1362
1363
1364
1365

-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63

311891749.xls

CONVEYANCE

35 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
1366
1367
1368
1369
1370
1371
1372
1373
1374
1375
1376
1377
1378
1379
1380
1381
1382
1383
1384
1385
1386
1387
1388
1389
1390
1391
1392
1393
1394
1395
1396
1397
1398
1399
1400
1401
1402
1403
1404

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

1366
1367
1368
1369
1370
1371
1372
1373
1374
1375
1376
1377
1378
1379
1380
1381
1382
1383
1384
1385
1386
1387
1388
1389
1390
1391
1392
1393
1394
1395
1396
1397
1398
1399
1400
1401
1402
1403
1404

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

1366
1367
1368
1369
1370
1371
1372
1373
1374
1375
1376
1377
1378
1379
1380
1381
1382
1383
1384
1385
1386
1387
1388
1389
1390
1391
1392
1393
1394
1395
1396
1397
1398
1399
1400
1401
1402
1403
1404

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

1366
1367
1368
1369
1370
1371
1372
1373
1374
1375
1376
1377
1378
1379
1380
1381
1382
1383
1384
1385
1386
1387
1388
1389
1390
1391
1392
1393
1394
1395
1396
1397
1398
1399
1400
1401
1402
1403
1404

-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36

1366
1367
1368
1369
1370
1371
1372
1373
1374
1375
1376
1377
1378
1379
1380
1381
1382
1383
1384
1385
1386
1387
1388
1389
1390
1391
1392
1393
1394
1395
1396
1397
1398
1399
1400
1401
1402
1403
1404

-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14

1366
1367
1368
1369
1370
1371
1372
1373
1374
1375
1376
1377
1378
1379
1380
1381
1382
1383
1384
1385
1386
1387
1388
1389
1390
1391
1392
1393
1394
1395
1396
1397
1398
1399
1400
1401
1402
1403
1404

-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63

311891749.xls

CONVEYANCE

36 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
1405
1406
1407
1408
1409
1410
1411
1412
1413
1414
1415
1416
1417
1418
1419
1420
1421
1422
1423
1424
1425
1426
1427
1428
1429
1430
1431
1432
1433
1434
1435
1436
1437
1438
1439
1440
1441
1442
1443

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

1405
1406
1407
1408
1409
1410
1411
1412
1413
1414
1415
1416
1417
1418
1419
1420
1421
1422
1423
1424
1425
1426
1427
1428
1429
1430
1431
1432
1433
1434
1435
1436
1437
1438
1439
1440
1441
1442
1443

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

1405
1406
1407
1408
1409
1410
1411
1412
1413
1414
1415
1416
1417
1418
1419
1420
1421
1422
1423
1424
1425
1426
1427
1428
1429
1430
1431
1432
1433
1434
1435
1436
1437
1438
1439
1440
1441
1442
1443

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

1405
1406
1407
1408
1409
1410
1411
1412
1413
1414
1415
1416
1417
1418
1419
1420
1421
1422
1423
1424
1425
1426
1427
1428
1429
1430
1431
1432
1433
1434
1435
1436
1437
1438
1439
1440
1441
1442
1443

-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36

1405
1406
1407
1408
1409
1410
1411
1412
1413
1414
1415
1416
1417
1418
1419
1420
1421
1422
1423
1424
1425
1426
1427
1428
1429
1430
1431
1432
1433
1434
1435
1436
1437
1438
1439
1440
1441
1442
1443

-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14

1405
1406
1407
1408
1409
1410
1411
1412
1413
1414
1415
1416
1417
1418
1419
1420
1421
1422
1423
1424
1425
1426
1427
1428
1429
1430
1431
1432
1433
1434
1435
1436
1437
1438
1439
1440
1441
1442
1443

-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63

311891749.xls

CONVEYANCE

37 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
1444
1445
1446
1447
1448
1449
1450
1451
1452
1453
1454
1455
1456
1457
1458
1459
1460
1461
1462
1463
1464
1465
1466
1467
1468
1469
1470
1471
1472
1473
1474
1475
1476
1477
1478
1479
1480
1481
1482

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

1444
1445
1446
1447
1448
1449
1450
1451
1452
1453
1454
1455
1456
1457
1458
1459
1460
1461
1462
1463
1464
1465
1466
1467
1468
1469
1470
1471
1472
1473
1474
1475
1476
1477
1478
1479
1480
1481
1482

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

1444
1445
1446
1447
1448
1449
1450
1451
1452
1453
1454
1455
1456
1457
1458
1459
1460
1461
1462
1463
1464
1465
1466
1467
1468
1469
1470
1471
1472
1473
1474
1475
1476
1477
1478
1479
1480
1481
1482

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

1444
1445
1446
1447
1448
1449
1450
1451
1452
1453
1454
1455
1456
1457
1458
1459
1460
1461
1462
1463
1464
1465
1466
1467
1468
1469
1470
1471
1472
1473
1474
1475
1476
1477
1478
1479
1480
1481
1482

-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36

1444
1445
1446
1447
1448
1449
1450
1451
1452
1453
1454
1455
1456
1457
1458
1459
1460
1461
1462
1463
1464
1465
1466
1467
1468
1469
1470
1471
1472
1473
1474
1475
1476
1477
1478
1479
1480
1481
1482

-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14

1444
1445
1446
1447
1448
1449
1450
1451
1452
1453
1454
1455
1456
1457
1458
1459
1460
1461
1462
1463
1464
1465
1466
1467
1468
1469
1470
1471
1472
1473
1474
1475
1476
1477
1478
1479
1480
1481
1482

-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63

311891749.xls

CONVEYANCE

38 of 194

CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016

Sl.No
1483
1484
1485
1486
1487
1488
1489
1490
1491
1492
1493
1494
1495
1496
1497
1498
1499
1500

Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum

PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum

Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT

Km

Charges

Km

Charges

Km

Charges

Km

Charges

Km

Charges

1483
1484
1485
1486
1487
1488
1489
1490
1491
1492
1493
1494
1495
1496
1497
1498
1499
1500

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

1483
1484
1485
1486
1487
1488
1489
1490
1491
1492
1493
1494
1495
1496
1497
1498
1499
1500

-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59

1483
1484
1485
1486
1487
1488
1489
1490
1491
1492
1493
1494
1495
1496
1497
1498
1499
1500

-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36

1483
1484
1485
1486
1487
1488
1489
1490
1491
1492
1493
1494
1495
1496
1497
1498
1499
1500

-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14

1483
1484
1485
1486
1487
1488
1489
1490
1491
1492
1493
1494
1495
1496
1497
1498
1499
1500

-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63

311891749.xls

CONVEYANCE

39 of 194

GOVERNMENT OF TELANGANA
TRIBAL WELFARE ENGINEERING DEPARTMENT
DETAILED CUM ABSTRACT ESTIMATE
NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL
TO AHS (G) AT KAMEPALLY (V&M) IN KHAMMAM(Dist.)
Name of the District

Khammam

Name of the Division

Bhadrachalam

Name of the Sub Division :

Sudimalla

Name of the Mandal

Kamepally

Estimate Cost

19.00

Grant

Lakhs

GENERAL ABSTRACT
NAME OF THE WORK : CONSTRUCTION OF COMPOUND
WALL TO AHS (G) AT KAMEPALLY (V&M) IN
KHAMMAM(Dist.)
Sl.
No.

Description of item

Amount

1) Dormitory Halls 2 No.s - Second Floor

1234326.00

2) Kitchen Shed

100000.00

3) Electrification

84877.00

4) Compound Wall

460154.00
Sub Total :

5) Add VAT @ 5%

###
93968.00

6) LS Amount for Unfore seen Items

575.00

Total :

Assistant Engineer
TW- Manuguru

Deputy Exe. Engineer


TWSD-Palvancha

Executive Engineer,
T. W. Division, Bhadrachalam.

###

DETAILED ABSTRACT ESTIMATE


NAME OF THE WORK :- CONSTRUCTION OF BNRGSK (MANDALA SAMAKHYA) BUILDING AT
LAXMIDEVIPALLY(V) PALVANCHA (M) IN KHAMMAM DISTRICT
GROUND FLOOR
Sl.
No.

Description of Item

No.s

Measurements
L

Qty.

Rate

Amount

1) Earth work excavation and depositing on bank with initial lead of 10m and
initial lift of 2m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary
Gravelly Soils ( SS 20-B) including shoring, strutting, sheeting, planking and
dewatering including cost of hire charges of T & P, labour charges etc.,
complete for finished item of work for Foundation of Building.(APSS No.
308).

Main Columns
Varandah Colums

1
1

X 12
X 6

1.80
1.65

1.80
1.65

2.00
2.00

77.76
32.67

Steps

1.83

0.90

0.45

0.74

Long walls under Plinth Beam C/C 18.3

18.75 0.45

0.30

7.59

Cross walls C/C 6.68

6.23

0.45

0.30

3.36
122.12 Cum

247.70 /Cum

30249.00

2.04
19.83 Cum 3268.95 /Cum

64823.00

2) Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent


to (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse
aggregate) using 40mm size Hard Broken Granite (IS383, 1970) machine
crushed metal from approved quarry including cost and conveyance of all
materials like cement, sand, coarse aggregate, water etc. to site, including
seigniorage charges, sales & other taxes on all materials, all operational,
incidental, and labour charges such as mixing, laying and ramming concrete
in layers in position not exceeding 15cm, finishing top surface, curing
concrete, etc., complete for finished item of work for Flooring Bed (APSS No.
402).

Main Columns

X 12

1.80

1.80

0.10

3.89

Varandah Colums

1.65

1.65

0.10

1.63

Steps

1.83

0.90

0.10

0.16

Long walls under Plinth Beam C/C 18.3

18.75 0.45

Cross walls C/C 6.68

Hall Flooring
MMS Room

1
1

X
X

1
1

Stair case room

Varendah

0.10

2.53

0.45

0.10

1.12

10.94 4.26
3.65 5.00

0.10
0.10

4.66
1.83

6.46

0.10

1.97

10.95 1.86

0.10

6.23

3.05

3) Filling with useful available excavated earth (excluding rock) in trenches,


sides of foundations and basement with initial lead in layers not exceeding
15cm thick, consolidating each deposited layer by watering and ramming
including all operational, incidental, labour charges, hire charges of T & P
etc., complete for finished item of work. (APSS NO. 309 & 310)

Earth work Qty.


Deduct footings Qty.

122.12
-18.34

Deduct Pedastals Qty.

-3.89

Deduct Columns Qty. Upto GL


Deduct PCC (1:5:10) Qty.

-1.45
-5.68
92.76 Cum

20.05 /Cum

1860.00

Sl.
No.

Description of Item

No.s

Measurements
L
4

B
5

D
6

Qty.

Rate

Amount

4) Filling with Gravel in trenches, sides of foundations and basement with


initial lead in layers not exceeding 15cm thick, consolidating each deposited
layer by watering and ramming including all operational, incidental, labour
charges, seignorage charges, hire charges of T & P etc., complete for
finished item of work. (APSS NO. 309 & 310)

Hall Basement
Back side hall
Varandah Inside basement
"
"
Toilet block area

1
1
1
1
1

1
1
1
1
2

3.66
4.27
###
7.78
3.66

9.07
10.98
1.60
1.60
4.27

0.90
0.90
0.85
0.85
0.85

59.75
42.19
30.27
10.58
26.56
246.25 /Cum

41702.00

4.73
18.34 Cum 7671.25 /Cum

140691.00

3.89
3.89 Cum 7671.25 /Cum

29841.00

169.35 Cum
5) Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456
using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc.,
to site and including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges such as
weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work
(APSS No. 402) with minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department including centering,
shuttering, laying concrete, vibrating, curing etc.

A) Footings
Col. Footings FT1 (Main)
Col. Footings FT2 (Verandah)

X 12

1.80

1.80

0.35

1.50

1.50

0.35

13.61

B) Peadastals
1

x 18

0.60

0.60

0.60

C) Columns
Up to Ground Level
Main Columns

X 12

0.23

0.35

1.00

0.97

Verandah Columns
Above Ground Level

0.23

0.35

1.00

0.48

Main Columns

1
1

X 12
X 6

0.23
0.23

0.35
0.35

3.60
3.60

3.48
1.74

Verandah Columns

6.67 Cum 9063.40 /Cum


D) Plinth Beam
L/Walls
C/Walls
C/Walls

1
1

X
X

4
2

18.54 0.23
6.45
4.20

0.23
0.23

0.30

3.84

0.30
0.30

1.78
0.58
6.20 Cum 7671.25 /Cum

E) Floor Roof Beams


L/Walls

47562.00

0.35

4.48

C/Walls

1
1

X
X

4
2

6.45
4.20

0.23
0.23

0.35
0.35

2.08
0.68

Mid Landing

2.44

0.23

0.35

0.20
7.44 Cum 9204.95 /Cum

68485.00

110.18
110.18 Sqm 1077.35 /Sqm

118702.00

C/Walls

18.54 0.23

60453.00

F) Roof Slab 125mm thick GF


1
G) Roof Slab 180mm thick Waist Slab
Ist flight
1
2nd Flight
1
Mid Landing

15.74 7.00

3.70

1.20

4.44

X
X

1
1

3.70
2.44

1.20
1.50

4.44
3.66
12.54 Sqm 1476.05 /Sqm

18510.00

Sl.
No.
1

Description of Item

Measurements

No.s

L
4

2
H) Sun Shades 0.60 Mts Wide
Fornt Verandah

3
1

Over Windows W1

B
5

10.95 0.60
1.80

0.60

D
6
-

Qty.

Rate

Amount

6.57
9.72
16.29 Sqm

752.75 /Sqm

12262.00

7004.00

I) Lintels
Doors
Windows

1.50

0.23

0.10

0.14

1.80

0.23

0.15

0.56

Toilets Doors

1.00

0.23

0.10

0.09
0.79 Cum 8865.35 /Cum

6) Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion


(cement: fine aggregate: Coarse aggregate) using 20mm size Hard Broken
Granite (IS383, 1970) Machine Crushed graded metal from from approved
quarry including cost and conveyance of all materials like cement, sand,
coarse aggregate, water etc. to site, including seigniorage charges, sales &
other taxes on all materials, all operational, incidental and labour charges
such as mixing, laying, curing concrete, etc., complete for finished item of
work for Bed Blocks and Hold Fasts (APSS No. 402)

Doors

0.23

0.23

0.15

0.38

Windows

0.23

0.23

0.15

0.29
0.67 Cum 5356.40 /Cum

3589.00

7) Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as
per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to
required sizes and shapes placing in position with cover blocks of approved
size and binding wire of 20SWG, forming grills for reinforcement work as per
approved designs and drawings including cost and conveyance of bars from
approved sources to site of work, including cost and conveyance of binding
wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all
operational, incidental, and labour charges such as cutting, bending,
placing in position, tying etc., and sales & other taxes,on cost of all
materials complete for finished item of work (APSS No.126) in all floors

Footings FT1
Plinth Beam

18.34
3.89

X 70
X 100

Kgs
Kgs

1283.80
389.00

Columns GF

6.67

X 120

Kgs

800.40

Roof Beams
Lintels

7.44

X 120

Kgs

892.80

0.79

X 70

Kgs

Sunshades
125 mm Thick Slab
180 mm Thick Slab

55.30

16.29 X 8
Kgs
110.18 X 60 Kgs/ 10Sqm
12.54

130.32
661.08

X 60 Kgs/ 10Sqm

75.24
### Kg
Or Say

5.25 M.T.

### /M.T.

237382.00

Sl.
No.

Description of Item

No.s

Measurements
L
4

B
5

D
6

Qty.

Rate

Amount

8) Brick Masonry in superstructure with CM (1:8) prop: using second class


bricks from approved source having minimum crushing strength of 40
Kg/Sqcm. including cost and conveyance of all materials like cement, sand,
bricks, water etc., to site, including seigniorage charges, sales & other taxes
on all materials, all operational, incidental and labour charges such as
mixing cement mortar, constructing masonry, scaffolding charges, lift
charges, curing, etc., complete for finished item of work. (APSS No. 501 &
504). for panel walls in super structure

Long walls
Cross walls

1
1

X
X

2
4

18.54 0.23
6.45 0.23

3.60
3.60

30.70
21.36

Verandah above Bressumere

10.95 0.23

1.60

4.03

Deductions
Doors

1.20

0.23

-2.10

-2.32

Windows

1.50

0.23

-1.35

-4.19
-0.67

Deduct Bed Bocks Qty


Deduct Lintels Qty

-0.79
48.12 Cum 4754.45 /Cum

228784.00

9) Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using 2nd class bricks
having a crushing strength of not less than 35.00kg/cm2 and using two mild
steel bars of 6m dia in every third layer of brick masory, with free joints of
the main block work including cost and seignorage charges and conveyance
of all materials and water from approved sources to work site and all
operational, incidental, labour charges such as scaffolding mixing mortor
constructing masonary lift charges, curing etc. complete but excluding the
cost of steel and its fabrication charges.

Long walls
Cross walls

3.65

2.40

17.52

1.20

2.40

5.76

Hand Railing

3.70

0.90

6.66
29.94 Sqm 6679.15 /10 Sqm

19997.00

10) Ceiling Plastering with CM(1:5) Prop: 12mm thick in single coat including
cost and conveyance of all materials like cement, sand, water etc., to site,
including seigniorage charges, sales & other taxes on all materials, all
operational, incidental charges and labour charges such as mixing mortar,
finishing, curing, etc., complete for finished item of work. (APSS 901,906)

Hall
MMS Room

Verandah

10.95 4.25

46.54

6.65

24.27

10.95 1.80

3.65

19.71
90.52 Sqm 1424.60 /10 Sqm

12895.00

11) Plastering with CM(1:5) Prop: 12mm thick in single coat including cost and
conveyance of all materials like cement, sand, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all operational,
incidental charges and labour charges such as mixing mortar, finishing,
curing, etc., complete for finished item of work. (APSS 901,906)

Hall
MMS Room

1
1

X
X

2
2

Stair case room

Verandah Entablature wall

Verandah C/W

1
4

Doors
Windows
Toilets Doors

WC

(10.94+4.25)
(3.65+5.00)

3.00
3.00

91.14
51.90

4.25

3.00

25.50

2.40

3.00

7.20

13.00

3.00

39.00

X
X

2
2

1.80
(1.20+1.20)

3.00
3.00

10.80
57.60

1.20

-2.10

-10.08

1.50

-1.35

-18.23

0.75

-2.10

Deductins

-6.30
248.53 Sqm 1222.50 /10 Sqm

30383.00

Sl.
No.

Description of Item

No.s

Measurements
L
4

B
5

D
6

Qty.

Rate

Amount

12) Plastering 20mm thick in two coats with base coat of 8mm thick in CM (1:6)
and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost
and conveyance of all materials like cement, sand, water etc., to site,
seigniorage charges, sales & other taxes on all materials,all operational,
incidental and labour charges such as mixing mortar, scaffolding charges,
lift charges, including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, finishing, curing, etc., complete for finished item of
work to uneven surface of walls inside of the building (APSS 901,903 & 904)

L/walls

18.55

3.35

62.14

L/walls
C/Walls

1
1

X
X

1
2

18.55
6.95

1.35
3.35

25.04
46.57
133.75 Sqm 3150.80 /10 Sqm

42142.00

13) Flooring and Treads with Polished Bethamcherla coloured stone minimum 25
mm thick (0.254M x0.254M) set over base coat of CM (1:8) over already laid
CC bed / RCC Roof Slab, including neat cement slurry of honey like
consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full
depth including cost of all materials like cement, sand, and water and
flooring stones etc., complete, including seigniorage charges, labour
charges for dressing of flooring stones etc., complete for finished item of
work, .

MMS Room

1
1

X
X

1
1

Verandah

Steps
Landing

X 22

1.20

0.30

2.40

1.50

Hall
Staicase room

10.95 4.25

46.54

4.25
6.45

10.20
23.54

13.00 1.80

23.40

7.92

2.40
3.65

3.60
115.20 Sqm

### /10 Sqm 122642.00

14) Providing Skirting to internal walls and Risers of Steps to 15 cm height with
Polished Bethamcherla coloured stone minimum 25 mm thick (0.254M
x0.254M) length equal to flooring stones, set over base coat of CM (1:3) 12
mm thick with cement slurry of honey like consistency spread at the rate of
3.30 kgs per sqm and jointed with white cement paste mixed with pigment
of matching shade to full depth, including cost of all materials like tiles,
cement, sand and water etc., complete including seigniorage charges, etc.,
complete for finished item of work,

Hall
Staicase room

1
1

X
X

1
1

10.95
2.40

0.10
0.10

1.10
0.24

MMS Room

Verandah
Steps

3.65

0.10

0.37

13.00

0.10

X 22

1.30

1.20

0.15

Landing

3.96

2.4

0.1

0.24
7.21 Sqm

### /10 Sqm

7990.00

5.76 Sqm 8024.80 /10 Sqm

4622.00

15) Flooring with Ceramic Tiles of 7.3mm thick 1st. quality of any shade as
approved by Engineer - in - charge set over a base coat of CM (1:8), 12mm
thick laid over flooring bed / V.R.C.C. slab, with neat grey cement slurry of
honey like consistency spread at the rate of 3.3 Kgs of cement per Sq.m
and jointed with neat white cement paste mixed with pigment of matching
shade including cost and conveyance of all materials like cement, sand,
water, ceramic tiles etc. to site, seigniorage charges, sales and other taxes
on all materials, all operational, incidental and labour charges such as
mixing of cement mortar, laying, curing, lift charges etc., complete for
finished item of work.(APSS No.701 & 707) in All Floors

In Toilets

1.20

1.20

5.76

Sl.
No.

Description of Item

No.s

Measurements
L
4

B
5

D
6

Qty.

Rate

Amount

16) Painting to New External Walls with two coats of Plastic Emulsion paint of
Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved
brand and shade as approved by the Engineer - in - Charge over base coat
of cement primer water base grade -II exterior making three coats in all to
give an even shade after thoroughly brushing the surface to remove all
loose powdered materials, including cost and conveyance of all materials,
including cost and conveyance of all materials, cost of brushes, water to
site, etc., sales & other taxes, all operational, incidental and labour charges
such as scaffolding charges, lift charges, curing etc., complete for finished
item of work in all floors for external Walls.(APSS No. 911)

L/walls

18.55

3.35

62.14

L/walls
C/Walls

1
1

X
X

1
2

18.55
6.95

1.35
3.35

25.04
46.57
133.75 Sqm 1314.90 /10 Sqm

17587.00

16) Painting to new internal walls with two (2) coats of ready mixed oil bound
washable distemper acrylic base of approved brand and shade over a base
coat of cement primer water base interior Grade-I of approved brand,
makind three (3) coats in all to give an even shade after thourughly
brushing the surface to remove all dirt and remains of loose powdered
materials, including cost and conveyance of all materials to work site and
all operational, incidental, labour charges etc., complete for finished item of
work in all floors for internal walls (SS 911)

Hall

(10.94+4.25)

3.00

91.14

MMS Room
Stair case room

(3.65+5.00)

3.00

51.90

4.25

3.00

25.50

1
1

X
X

1
1

2.40
13.00

3.00
3.00

7.20
39.00

1.80

3.00

10.80

3.00

57.60

Doors

1.20

-2.10

-10.08

Windows

1.50

-1.35

-18.23

Toilets Doors

0.75

-2.10

Verandah Entablature wall


Verandah C/W
WC

(1.20+1.20)

Deductins

-6.30
248.53 Sqm 1077.90 /10 Sqm

26789.00

18) Painting to new Iron work with two coats of ready mixed syinthetic eanmel
paint first quality all shades over a base coat of wood primer making three
coats in all to give an even shade after throughly brushing the surface to
remove all remains of loose powdered materials, including C/C of all
materials, site and other taxes all operational incidental and labour charges
etc., complete for finished item of work. ( APSS NO. 1201,1207 & 1212)

Door D1

2.25

1.20

2.10

22.68

D2
W1

2.25

0.75

2.10

14.18

2.75

1.50

1.35

50.12
86.98 Sqm

974.55 /10 Sqm

8477.00

19) Supply and fixing of Mild Steel Door of size 1.22m x 2.13 m (double leaf
shutter) with door frame of Mild Steel Square hollow section of size 80mm x
80mm x 4mm (TATA make or equivalent), Hold Fast - 6 Nos. of MS equal
angle of ISA 2525 of size 25mm x 25mm x 4mm,Labour charges including
welding charges etc., complete for finished item of work.etc., complete for
finished item of work.

Hall & MMS Room

4.00
4.00 No.s 7699.00 Each

30796.00

Sl.
No.

Description of Item

No.s

Measurements
L
4

B
5

D
6

Qty.

Rate

Amount

20) Supply and fixing of M.S. WINDOW of size 1.50 M x 1.37 M with outer
angular frame of rolled steel equal angle ISA 4040 of size 40mm x40mm x
6mm and inner shutter angular frame of rolled steel equal angle ISA 2525
of size 25mm x25mm x4mm and rolled steel Tee Bars of size 40mmx
40mmx 6mm, sales and other taxes ,cost and conveyance of all materials to
site, all labour cahrges etc.,complete for finished item of work.

Hall & MMS Room

4.00
4.00 No.s 7949.00 Each

31796.00

4.00
4.00 No.s 4061.00 Each

16244.00

21) Supply and fixing of Mild Steel Door of size 0.75m x 2.10 m (double leaf
shutter) with door frame of Mild Steel Square hollow section of size 80mm x
80mm x 4mm (TATA make or equivalent), Hold Fast - 6 Nos. of MS equal
angle of ISA 2525 of size 25mm x 25mm x 4mm,Labour charges including
welding charges etc., complete for finished item of work.etc., complete for
finished item of work.

Toilets Doors

Total:

Asst.Engineer

Deputy Exe. Engineer

Executive Engineer

TW Section- Palvancha

TWSD - Palvancha

Tribal Welfare, Bhadhrachalam

###

DETAILED ABSTRACT ESTIMATE


NAME OF THE WORK :- CONSTRUCTION OF BNRGSK (MANDALA SAMAKHYA) BUILDING AT
LAXMIDEVIPALLY(V) PALVANCHA (M) IN KHAMMAM DISTRICT
FIRST FLOOR
Sl.
No.

Description of Item

Measurements

No.s

2
3
4
5
6
1
1) Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456
using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as weigh
batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work
(APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including centering, shuttering,
laying concrete, vibrating, curing etc. complete.

Qty.

Rate

Amount

A) Columns
Main Columns

X 12

0.23

0.35

3.00

2.90

Verandah Columns

0.23

0.35

3.00

1.45
4.35 Cum

B) Roof Beams
L/Walls
C/Walls
C/Walls
Mid Landing

### /Cum

47172.00

7.44 Cum

9608.60 /Cum

71488.00

142.42
142.42 Sqm

1124.85 /Sqm

160201.00

1529.05 /Sqm

19174.00

797.95 /Sqm

12999.00

### /Cum

8311.00

5471.95 /Cum

3174.00

1
1

X
X

3
4

18.54
6.45

0.23
0.23

0.35
0.35

4.48
2.08

1
1

X
x

2
1

4.20
2.44

0.23
0.23

0.35
0.35

0.68
0.20

C) Roof Slab 125mm thick GF


1

18.74

7.60

D) Roof Slab 180mm thick Waist Slab


Ist flight
2nd Flight
Mid Landing

3.70

1.20

4.44

1
1

X
X

1
1

3.70
2.44

1.20
1.50

4.44
3.66
12.54 Sqm

E) Sun Shades 0.60 Mts Wide


Fornt Verandah
Over Windows W1

1
1

X
X

1
9

10.95
1.80

0.60
0.60

6.57
9.72
16.29 Sqm

F) Lintels
Doors
Windows
Toilets Doors

1
1

X
X

4
9

1.50
1.80

0.23
0.23

0.10
0.15

0.14
0.56

1.00

0.23

0.10

0.09
0.79 Cum

2) Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion (cement:
fine aggregate: Coarse aggregate) using 20mm size Hard Broken Granite
(IS383, 1970) Machine Crushed graded metal from from approved quarry
including cost and conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, including seigniorage charges, sales & other
taxes on all materials, all operational, incidental and labour charges such as
mixing, laying, curing concrete, etc., complete for finished item of work for
Bed Blocks and Hold Fasts (APSS No. 402)

Doors

0.23

0.23

0.15

0.29

Windows

0.23

0.23

0.15

0.29
0.58 Cum

Sl.
No.

Description of Item

No.s

Measurements
L

Qty.

Rate

Amount

3) Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as
per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required
sizes and shapes placing in position with cover blocks of approved size and
binding wire of 20SWG, forming grills for reinforcement work as per
approved designs and drawings including cost and conveyance of bars from
approved sources to site of work, including cost and conveyance of binding
wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all
operational, incidental, and labour charges such as cutting, bending, placing
in position, tying etc., and sales & other taxes,on cost of all materials
complete for finished item of work (APSS No.126) in all floors

Columns GF
Roof Beams
Lintels
Sunshades
125 mm Thick Slab
180 mm Thick Slab

4.35

X 120

Kgs

522.00

7.44
0.79

X 120
X 70

Kgs
Kgs

892.80
55.30

16.29 X 8
Kgs
### X 60 Kgs/ 10Sqm

130.32
854.52

12.54 X 60 Kgs/ 10Sqm

75.24
### Kg
Or Say

3.00 M.T.

### /M.T.

135647.00

5690.20 /Cum

216398.00

4) Brick Masonry in superstructure with CM (1:8) prop: using second class


bricks from approved source having minimum crushing strength of 40
Kg/Sqcm. including cost and conveyance of all materials like cement, sand,
bricks, water etc., to site, including seigniorage charges, sales & other taxes
on all materials, all operational, incidental and labour charges such as
mixing cement mortar, constructing masonry, scaffolding charges, lift
charges, curing, etc., complete for finished item of work. (APSS No. 501 &
504). for panel walls in super structure

Long walls
Cross walls
Verandah above Bressumere
Deductions
Doors
Windows
Deduct Bed Bocks Qty

1
1

X
X

2
4

18.54
6.45

0.23
0.23

3.00
3.00

25.59
17.80

10.95

0.23

1.00

2.52

1
1

X
X

4
9

1.20
1.50

0.23
0.23

-2.10
-1.35

-2.32
-4.19
-0.58
-0.79

Deduct Lintels Qty

38.03 Cum
5) Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using 2nd class bricks
having a crushing strength of not less than 35.00kg/cm2 and using two mild
steel bars of 6m dia in every third layer of brick masory, with free joints of
the main block work including cost and seignorage charges and conveyance
of all materials and water from approved sources to work site and all
operational, incidental, labour charges such as scaffolding mixing mortor
constructing masonary lift charges, curing etc. complete but excluding the
cost of steel and its fabrication charges.

Long walls
Cross walls

1
1

X
X

2
2

3.65
1.20

2.40
2.40

Hand Railing

3.70

0.90

17.52
5.76
6.66
29.94 Sqm

7268.30 /10 Sqm

21761.00

1766.35 /10 Sqm

15989.00

6) Ceiling Plastering with CM(1:5) Prop: 12mm thick in single coat including
cost and conveyance of all materials like cement, sand, water etc., to site,
including seigniorage charges, sales & other taxes on all materials, all
operational, incidental charges and labour charges such as mixing mortar,
finishing, curing, etc., complete for finished item of work. (APSS 901,906)

Hall
MMS Room
Verandah

1
1

X
X

1
1

10.95
3.65

4.25
6.65

10.95

1.80

46.54
24.27
19.71
90.52 Sqm

Sl.
No.

Description of Item

No.s

Measurements
L

Qty.

Rate

Amount

7) Plastering with CM(1:5) Prop: 12mm thick in single coat including cost and
conveyance of all materials like cement, sand, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all operational,
incidental charges and labour charges such as mixing mortar, finishing,
curing, etc., complete for finished item of work. (APSS 901,906)

Hall

1
1

X
X

2
2

1
1

X
X

2
1

Verandah Entablature wall


Verandah C/W

1
1

X
X

WC
Deductins

Doors
Windows

MMS Room
Stair case room

Toilets Doors

(10.94+4.25)
(3.65+5.00)

3.00
3.00

91.14
51.90

4.25
2.40

3.00
3.00

25.50
7.20

1
2

13.00
1.80

3.00
3.00

39.00
10.80

(1.20+1.20)

3.00

57.60

1.20

-2.10

-10.08

1
1

X
X

9
4

1.50
0.75

-1.35
-2.10

-18.23
-6.30
248.53 Sqm

1493.85 /10 Sqm

37127.00

3851.40 /10 Sqm

51512.00

### /10 Sqm

125208.00

### /10 Sqm

8169.00

8) Plastering 20mm thick in two coats with base coat of 8mm thick in CM (1:6)
and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost
and conveyance of all materials like cement, sand, water etc., to site,
seigniorage charges, sales & other taxes on all materials,all operational,
incidental and labour charges such as mixing mortar, scaffolding charges, lift
charges, including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, finishing, curing, etc., complete for finished item of
work to uneven surface of walls inside of the building (APSS 901,903 & 904)

L/walls

18.55

3.35

62.14

L/walls
C/Walls

1
1

X
X

1
2

18.55
6.95

1.35
3.35

25.04
46.57
133.75 Sqm

9) Flooring and Treads with Polished Bethamcherla coloured stone minimum 25


mm thick (0.254M x0.254M) set over base coat of CM (1:8) over already laid
CC bed / RCC Roof Slab, including neat cement slurry of honey like
consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full
depth including cost of all materials like cement, sand, and water and
flooring stones etc., complete, including seigniorage charges, labour charges
for dressing of flooring stones etc., complete for finished item of work, .

Hall
Staicase room
MMS Room
Verandah
Steps
Landing

1
1

X
X

1
1

10.95
2.40

4.25
4.25

46.54
10.20

1
1

X
X

1
1

3.65
13.00

6.45
1.80

23.54
23.40

1
1

X 22
X 1

1.20
2.40

0.30
1.50

7.92
3.60
115.20 Sqm

10) Providing Skirting to internal walls and Risers of Steps to 15 cm height with
Polished Bethamcherla coloured stone minimum 25 mm thick (0.254M
x0.254M) length equal to flooring stones, set over base coat of CM (1:3) 12
mm thick with cement slurry of honey like consistency spread at the rate of
3.30 kgs per sqm and jointed with white cement paste mixed with pigment
of matching shade to full depth, including cost of all materials like tiles,
cement, sand and water etc., complete including seigniorage charges, etc.,
complete for finished item of work,

Hall

10.95

0.10

1.10

Staicase room
MMS Room

1
1

X
X

1
1

2.40
3.65

0.10
0.10

0.24
0.37

Verandah
Steps

1
1
1

X 1 13.00
X 22 1.20
X 1
2.4

0.10
0.15
0.1

1.30
3.96
0.24

Landing

7.21 Sqm

Sl.
No.

Description of Item

No.s

Measurements
L

Qty.

Rate

Amount

11) Flooring with Ceramic Tiles of 7.3mm thick 1st. quality of any shade as
approved by Engineer - in - charge set over a base coat of CM (1:8), 12mm
thick laid over flooring bed / V.R.C.C. slab, with neat grey cement slurry of
honey like consistency spread at the rate of 3.3 Kgs of cement per Sq.m and
jointed with neat white cement paste mixed with pigment of matching shade
including cost and conveyance of all materials like cement, sand, water,
ceramic tiles etc. to site, seigniorage charges, sales and other taxes on all
materials, all operational, incidental and labour charges such as mixing of
cement mortar, laying, curing, lift charges etc., complete for finished item of
work.(APSS No.701 & 707) in All Floors

In Toilets

1.20

1.20

2.88
2.88 Sqm

9372.35 /10 Sqm

2699.00

1314.90 /10 Sqm

17587.00

1077.90 /10 Sqm

27129.00

974.55 /10 Sqm

7786.00

12) Painting to New External Walls with two coats of Plastic Emulsion paint of
Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved
brand and shade as approved by the Engineer - in - Charge over base coat of
cement primer water base grade -II exterior making three coats in all to give
an even shade after thoroughly brushing the surface to remove all loose
powdered materials, including cost and conveyance of all materials,
including cost and conveyance of all materials, cost of brushes, water to
site, etc., sales & other taxes, all operational, incidental and labour charges
such as scaffolding charges, lift charges, curing etc., complete for finished
item of work in all floors for external Walls.(APSS No. 911)

L/walls
L/walls
C/Walls

1
1

X
X

1
1

18.55
18.55

3.35
1.35

6.95

3.35

62.14
25.04
46.57
133.75 Sqm

13) Painting to new internal walls with two (2) coats of ready mixed oil bound
washable distemper acrylic base of approved brand and shade over a base
coat of cement primer water base interior Grade-I of approved brand,
makind three (3) coats in all to give an even shade after thourughly brushing
the surface to remove all dirt and remains of loose powdered materials,
including cost and conveyance of all materials to work site and all
operational, incidental, labour charges etc., complete for finished item of
work in all floors for internal walls (SS 911)

Hall
MMS Room
Stair case room
Verandah Entablature wall
Verandah C/W
WC
Deductins
Doors
Windows
Toilets Doors

1
1

X
X

2
2

1
1

X
X

2
1

1
1

X
X

(10.94+4.25)
(3.65+5.00)

3.00
3.00

91.14
51.90

4.25
2.40

3.00
3.00

25.50
7.20

1
2

13.00
1.80

3.00
3.00

39.00
10.80

(1.20+1.20)

3.00

57.60

1
1

X
X

4
9

1.20
1.50

-2.10
-1.35

-10.08
-18.23

0.75

-2.10

-3.15
251.68 Sqm

14) Painting to new Iron work with two coats of ready mixed syinthetic eanmel
paint first quality all shades over a base coat of wood primer making three
coats in all to give an even shade after throughly brushing the surface to
remove all remains of loose powdered materials, including C/C of all
materials, site and other taxes all operational incidental and labour charges
etc., complete for finished item of work. ( APSS NO. 1201,1207 & 1212)

Door D1
D2
W1

2.25

1.20

2.10

22.68

1
1

X
X

2
9

2.25
2.75

0.75
1.50

2.10
1.35

7.09
50.12
79.89 Sqm

Sl.
No.

Description of Item

No.s

Measurements
L

Qty.

Rate

Amount

15) Supply and fixing of Mild Steel Door of size 1.22m x 2.13 m (double leaf
shutter) with door frame of Mild Steel Square hollow section of size 80mm x
80mm x 4mm (TATA make or equivalent), Hold Fast - 6 Nos. of MS equal
angle of ISA 2525 of size 25mm x 25mm x 4mm,Labour charges including
welding charges etc., complete for finished item of work.etc., complete for
finished item of work.
Hall & MMS Room

4.00
4.00 No.s

7699.00 Each

30796.00

4.00
4.00 No.s

7949.00 Each

31796.00

16) Supply and fixing of M.S. WINDOW of size 1.50 M x 1.37 M with outer
angular frame of rolled steel equal angle ISA 4040 of size 40mm x40mm x
6mm and inner shutter angular frame of rolled steel equal angle ISA 2525
of size 25mm x25mm x4mm and rolled steel Tee Bars of size 40mmx
40mmx 6mm, sales and other taxes ,cost and conveyance of all materials to
site, all labour cahrges etc.,complete for finished item of work.

Hall & MMS Room

Sl.
No.

Description of Item

No.s

Measurements
L

Qty.

Rate

Amount

17) Supply and fixing of Mild Steel Door of size 0.75m x 2.10 m (double leaf
shutter) with door frame of Mild Steel Square hollow section of size 80mm x
80mm x 4mm (TATA make or equivalent), Hold Fast - 6 Nos. of MS equal
angle of ISA 2525 of size 25mm x 25mm x 4mm,Labour charges including
welding charges etc., complete for finished item of work.etc., complete for
finished item of work.
Toilets Doors

4.00
4.00 No.s

4061.00 Each

16244.00

142.42
142.42 Sqm

4114.55 /Sqm

58599.00

18) Providing impervious coat to exposed RCC roof slab surface with CM(1:3),
20mm thick with 1kg of water proof compound per bag of cement laid over
roof when it is green including cost of all materials, seigniorage charges,
excluding conveyance charges of materials and including all operational,
incidental and labour charges for mixing mortar, laying, rendering smooth
and thread lining, curing, rounding off junctions of wall and slab etc,,
complete for finished item of work

18.74

7.60

Total: 1126966.00

Asst.Engineer

Deputy Exe. Engineer

Executive Engineer

TW Section- Palvancha

TWSD - Palvancha

Tribal Welfare, Bhadhrachalam

DETAILED CUM ABSTRACT ESTIMATE

NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY


(V&M) IN KHAMMAM(Dist.)

Sl.N
o

Description of item

Nos.
3

GROUND FLOOR
Measurements
L
B
D
4
5
6

QTY

Unit

Per
Unit

Rate
9

Amount
10

1) Earth work excavation and depositing on bank with initial lead of 10m and
initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary
Gravelly Soils ( SS 20-B) including all operational incidental labour charges
such as shoring, strutting, sheeting, planking and dewatering including cost
of hire charges of T & P, labour charges etc., complete for finished item of
work including seignerage charges excluding dewatering charges etc.,
complete for Foundation of Building.(APSS No. 308).

F1
F2
F3
F4
F5
F6
F7

25 to 30
11 to 13
1, 15
5,6
2,4,16,18
3,17
19,20

1
1
1
1
1
1
1

x
x
x
x
x
x
x

9
3
2
2
4
2
2

1.55
1.85
1.85
2.25
2.25
2.40
2.50

1.55
1.85
1.85
2.25
2.25
2.40
2.50

2.40
2.40
2.40
2.40
2.40
2.40
2.40

C1-2
C2-3
C2-4
C4-5
C5-6
C1-11
C11-15
C15-25
C25-34

1
1
1
1
1
1
1
1
1

x
x
x
x
x
x
x
x
x

1
1
1
1
1
1
1
1
5

1.11
0.84
0.84
0.92
0.42
1.32
1.32
1.04
1.610

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60

0.25
0.25
0.20
0.20
0.20
0.20
0.15
0.25
0.15

Entrance steps

1 x
1 x

1
1

3.00
1.75

0.75
0.75

0.30
0.30

51.89
24.64
16.43
24.30
48.60
27.65
30.00
223.51
0.17
0.13
0.10
0.11
0.05
0.16
0.12
0.16
0.72
1.72
0.68
0.39
1.07
226.30

Cum

Cum

Cum
Cum

247.70

1 Cum

56055.00

1 Cum

3596.00

2) Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent


to (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse
aggregate) using 40mm size Hard Broken Granite (IS383, 1970) machine
crushed metal from approved quarry including cost and conveyance of all
materials like cement, sand, coarse aggregate, water etc. to site, mixing
concrete in concrete mixer including seigniorage charges, sales & other
taxes on all materials, all operational, incidental, and labour charges such
as laying and ramming concrete in layers in position not exceeding 15cm,
finishing top surface, curing concrete, etc., complete for finished item of
work. (APSS No. 402) for flooring bed.

Entrance side
stage side
Entrance side

1 x
1 x
1 x

1
1
1

3.00
1.75
8.35

0.75
0.75
0.45

Dormitory GF

0.15
0.15
0.15

0.34
0.20
0.56
1.10 Cum 3268.95

NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY


(V&M) IN KHAMMAM(Dist.)

Sl.N
o

Description of item

Nos.
3

GROUND FLOOR
Measurements
L
B
D
4
5
6

QTY

Unit

Per
Unit

Rate
9

Amount
10

3) Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent


to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse
aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from
approved quarry including cost and conveyance of all materials like cement,
sand, coarse aggregate, water etc. to site, including seigniorage charges,
sales & other taxes on all materials, all operational, incidental, and labour
charges such as mixing, laying and ramming concrete in layers in position
not exceeding 15cm, finishing top surface, curing concrete, etc., complete
for finished item of work for Foundations and Flooring Bed (APSS No. 402)

F1
F2
F3
F4
F5
F6
F7

1
1
1
1
1
1
1

x
x
x
x
x
x
x

6
3
2
2
4
2
2

1.55
1.85
1.85
2.25
2.25
2.40
2.50

1.55
1.85
1.85
2.25
2.25
2.40
2.50

0.15
0.15
0.15
0.15
0.15
0.15
0.15

Hall
Stircase
Verandah

1 x
1 x
1 x

2
1
1

6.10
6.33
15.60

6.10
2.44
1.83

0.10
0.10
0.10

Dormitory GF

2.16
1.54
1.03
1.52
3.04
1.73
1.88
12.90 Cum
7.44
1.54
2.85
11.83 Cum
24.73 Cum

3932.55

1 Cum

97252.00

NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY


(V&M) IN KHAMMAM(Dist.)

Sl.N
o

Description of item

Nos.
3

GROUND FLOOR
Measurements
L
B
D
4
5
6

QTY

Unit

Per
Unit

Rate
9

Amount
10

4) Filling with Gravel in trenches, sides of foundations and basement with initial
lead in layers not exceeding 15cm thick, consolidating each deposited layer
by watering and ramming including cost and conveyence of water to the
work site and all operational, incidental, labour charges, seignorage
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310)
F1
F2
F3
F4
F5
F6
F7

1
1
2
1
1
1
1

x
x
x
x
x
x
x

6
3
2
2
4
2
2

1.55
1.85
1.85
2.25
2.25
2.40
2.50

1.55
1.85
1.85
2.25
2.25
2.40
2.50

0.35
0.40
0.35
0.40
0.40
0.35
0.35

1
1
1
1
1
-1

x
x
x
x
x
x

1
1
1
1
1
4

6.10
6.10
8.16
6.10
6.10
0.23

6.10
6.10
2.44
1.83
1.83
0.22

1.30
1.20
1.05
1.25
1.20
1.00

Qty Of Earth work


Deduct Gravel Filling
Deduct PCC
Deduct Footings
Deduct Pedestals
Deduct Columns upto gl
C1-3-17-15
C3-5-19-17
C5-6-30-29
Verandah C15-17-25-27
Verandah C17-19-29-27
Deduct Columns

5.05
4.11
4.79
4.05
8.10
4.03
4.38
34.51 Cum
223.51
-34.51
-12.90
-27.51
-2.58
-1.87
144.14 Cum
48.37
44.65
20.91
13.95
13.40
-0.20
141.08 Cum
319.73 Cum 246.25

1 Cum

78734.00

1 Cum

32406.00

5) Plain Cement Concrete corresponding to M10 grade as per IS 456 equivalent


to (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse
aggregate) using 40mm size Hard Broken Granite (IS383, 1970) machine
crushed metal from approved quarry including cost and conveyance of all
materials like cement, sand, coarse aggregate, water etc. to site, mixing
concrete in concrete mixer including seigniorage charges, sales & other
taxes on all materials, all operational, incidental, and labour charges such
as laying and ramming concrete in layers in position not exceeding 15cm,
finishing top surface, curing concrete, etc., complete for finished item of
work (APSS No. 402) for Foundation bed.

2 x

15.56

0.45

0.15

2.10

1 x

13.32

0.45

0.15

0.90

Left side

1 x

2.05

0.45

0.15

0.14

Right side

6 x

7.94

0.45

0.15

3.22

Deduct Columns

-1 x 20

0.45

0.23

0.15

-0.31
6.05 Cum 5356.40

Dormitory GF

NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY


(V&M) IN KHAMMAM(Dist.)

Sl.N
o

Description of item

Nos.
3

GROUND FLOOR
Measurements
L
B
D
4
5
6

QTY

Unit

Per
Unit

Rate
9

Amount
10

6) VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate)


corresponding to Table 9 of IS 456 using 20mm size machine crushed hard
granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales &
other taxes on all materials including all operational, incidental and labour
charges such as machine mixing, laying concrete, curing etc., including hire
charges and labour charges for centering and scaffolding with steel
centering plates, foot plates complete but excluding cost of steel and its
fabrication charges complete for finished item of work.

A) For Columns footings: FT1 Type Flat

FT2 Type Flat

FT3 Type Flat

FT4 Type Flat

FT5 Type Flat

FT6 Type Flat

FT7 Type Flat

6 x

6 x

3 x

3 x

2 x

2 x

2 x

2 x

4 x

4 x

2 x

2 x

2 x

2 x

B) For Pedestals: F1
F2
F3
F4
F5
F6
F7
C) For Columns : Columns upto Ground Level
C11,C14
C12,C13
C26,C27,C28,C29,C30,C25
C1,C15
C2,C6
C7,C9
C19,C20
C3

6
3
2
2
4
2
1

x
x
x
x
x
x
x

1
1
1
1
1
1
2

1.25

1.25

0.275

0.125/3(1.25*1.25+.55*.4
8+1.25*1.25*.55*.48
1.55

1.55

0.300

0.125/3(1.55*1.55+.63*.4
8+1.55*1.55*.63*.48
1.55

1.55

0.300

0.125/3(1.55*1.55+0.70*0
.48+1.55*1.55*0.70*0.48
1.95

1.95

0.300

0.125/3(1.95*1.95+0.63*0
.48+1.95*1.95*0.63*0.48
1.95

1.95

0.300

0.125/3(1.95*1.95+0.70*0
.48+1.95*1.95*0.70*0.48
2.10

2.10

0.325

0.125/3(2.1*2.1+0.70*0.4
8+2.10*2.10*0.70*0.48
2.20

2.20

0.325

0.125/3(2.2*2.2+0.70*0.4
8+2.20*2.20*0.70*0.48

0.45
0.53
0.60
0.53
0.60
0.60
0.60

0.38
0.38
0.38
0.38
0.38
0.38
0.38

0.60
0.60
0.60
0.60
0.60
0.60
0.60

2.58
1.03
2.16
0.30
1.44
0.61
2.28
0.60
4.56
2.46
2.87
2.39
3.15
1.08
27.51 Cum

7671.25

1 Cum

###

0.62
0.36
0.27
0.24
0.55
0.27
0.27
2.58 Cum

9148.90

1 Cum

23604.00

1
1
1
1
1
1
1
1

x
x
x
x
x
x
x
x

1
2
6
2
2
2
2
1

0.38
0.38
0.30
0.45
0.45
0.45
0.45
0.45

0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23

0.60
0.55
0.70
0.60
0.60
0.63
0.67
0.61

0.05
0.10
0.29
0.12
0.12
0.13
0.14
0.06
1.01 Cum

1
1
1
1

x
x
x
x

2
1
1
6

0.45
0.45
0.38
0.30

0.23
0.23
0.23
0.23

1.20
2.15
2.15
2.15

0.25
0.22
0.19
0.89

Columns basement level to Roof


Level
C5,C6
C15
C11
Verandah Columns

Dormitory GF

NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY


(V&M) IN KHAMMAM(Dist.)

Sl.N
o

Description of item

2
C1
C2,C3,C4,C16,C17
C19,C20
C12,C13,C14

D) For Plinth Beam : GL Plinth Beam


Left Side Beam
Middle Beam
Middle Beam
Middle Beam

Nos.
3
1 x 1
1 x 5
1 x 2
1 x 3

2
3
2
1

x
x
x
x

1
1
1
1

GROUND FLOOR
Measurements
L
B
D
4
5
6
0.45
0.23
2.94
0.45
0.23
2.79
0.45
0.23
2.94
0.38
0.23
2.94

8.61
8.92
15.86
13.10

0.23
0.23
0.23
0.23

0.30
0.30
0.30
0.30

E) For Roof Beams : Verandah Beam Front


Right side Beam
Landing Beam

1 x
1 x
1 x

1
1
1

15.86
2.58
2.90

0.23
0.23
0.23

0.30
0.30
0.30

Side Beam
Middle Beam
Beam at stair case
Beam at stair case
Back and middle
B1 at stair case

1
1
1
1
2
1

3
5
2
2
4
1

8.92
6.78
3.47
3.31
2.94
2.44

0.23
0.23
0.23
0.23
0.23
0.23

0.30
0.45
0.30
0.30
0.30
0.30

x
x
x
x
x
x

F) For Waist Slab 180mm thick : 1 St Flight


Landing

1 x
1 x

1
1

3.65
2.90

1.22
1.53

---

2nd Flight

1 x

3.80

1.22

--

Dormitory GF

QTY

Unit

Per
Unit

Rate
9

Amount
10

0.30
1.44
0.61
0.77
4.67 Cum
5.68 Cum

9063.40

1 Cum

51480.00

1.19
1.85
2.19
0.90
6.13 Cum

9564.25

1 Cum

58629.00

1.09
0.18
0.20
1.47 Cum
1.85
3.51
0.48
0.46
1.62
0.17
8.09 Cum
9.56 Cum

9204.95

1 Cum

87999.00

4.45
4.44
8.89 Sqm
4.64
4.64 Sqm
13.53 Sqm

1476.05

1 Sqm

19971.00

NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY


(V&M) IN KHAMMAM(Dist.)

Sl.N
o
1

Description of item

Nos.
3

2
G) For Slab 115mm thick : Stiar case Verandah
H) For Lintels : At Door
At Window

1 x
1 x

1
1

1 x 2
1 x 10

GROUND FLOOR
Measurements
L
B
D
4
5
6
12.89
3.93

1.65
2.13

8.62
2.44

0.23
0.23

---

0.15
0.15

I) For Sunshades 0.60m wide: Front side


Left side

1 x
1 x

1
1

15.86
2.28

0.60
0.60

---

Back side

1 x

1.83

0.60

--

QTY

Unit

Per
Unit

Rate
9

Amount
10

111.11
9.59
120.70 Sqm

847.20

1 Sqm

###

0.11
0.73
0.85 Cum

8865.35

1 Cum

7524.00

9.52
1.37
10.89 Sqm
4.39
4.39 Sqm
15.28 Sqm

752.75

1 Sqm

11502.00

75.76
23.15
8.32
10.98
118.21 Sqm

1424.60

1 Sqm

###

1 MT

###

7) Ceiling Plastering 12mm thick in two coats with base coat of 8mm thick in
CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish
including cost and conveyance of all materials like cement, sand, water etc.,
to site, seigniorage charges, sales & other taxes on all materials,all
operational, incidental and labour charges such as mixing mortar,
scaffolding charges, lift charges, including cutting of Grooves wherever
necessary as directed by Engineer - in - charge, finishing, curing, etc.,
complete for finished item of work. (APSS 901,903 & 904) for Ground floor
Rooms
Verandah
Staircase room
T'Beams

1
1
1
2

x
x
x
x

1
1
1
2

12.42
12.65
3.41
6.10

6.10
1.83
2.44

--

0.45

8) Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as
per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required
sizes and shapes placing in position with cover blocks of approved size and
binding wire of 20SWG, forming grills for reinforcement work as per
approved designs and drawings including cost and conveyance of bars from
approved sources to site of work, including cost and conveyance of binding
wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all
operational, incidental, and labour charges such as cutting, bending, placing
in position, tying etc., and sales & other taxes,on cost of all materials
complete for finished item of work (APSS No.126) in all floors.

10.00
10.00 MT
9) Brick Masonry in superstructure with CM (1:8) prop with Flyash Cement solid
blocks of size 290 x 225 x 140 mm, for manufacturing of flyash solid blocks
using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust
with a compresive strength not lessthan 50 kg/sqm including cost and
conveyance of all materials, labour charges, seiniorage charges, scaffolding
and curing etc., for Superstructure Walls

At Basement level
Back side
Left side
Right side
Front side
Staircase front and back
Above Verandah beam to Roof
Level
Front
Existing Building side
Left side and Right side

1
1
1
1
1
1
1

x
x
x
x
x
x
x

8
2
1
2
1
7
2

2.94
2.86
1.83
2.86
1.83
2.94
2.44

0.30
0.30
0.30
0.30
0.30
0.30
0.30

0.70
0.70
0.70
0.70
0.70
0.70
0.70

1
1
1
1

x
x
x
x

7
1
1
2

2.94
2.44
1.12
1.83

0.23
0.23
0.23
0.23

0.75
0.75
0.75
0.75

Dormitory GF

4.94
1.20
0.38
1.20
0.38
4.32
1.02
13.44 Cum
3.55
0.42
0.19
0.63

60915.30

NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY


(V&M) IN KHAMMAM(Dist.)

Sl.N
o

Description of item

Nos.
3

GROUND FLOOR
Measurements
L
B
D
4
5
6

QTY

Unit

8
4.79 Cum

Base ment level to Lintel Level


Back and Middle
Left side and Right side
Staircase side
Stir case Back side
Doors
Windows
Slab and staircase landing beam

4
1
1
1
-1
-1
-1

x
x
x
x
x
x
x

2
1
2
1
2
6
1

2.94
5.50
5.50
2.44
1.05
1.53
2.44

0.23
0.23
0.23
0.23
0.23
0.23
0.23

2.18
2.94
2.94
2.94
2.13
1.37
0.49

11.79
3.72
7.44
1.65
-1.03
-2.89
-0.27
20.41 Cum

Lintel Level to Roof Level


Back and Middle
Deduct Lintels
Windows
Ventilators

2
-1
-1
-1

x
x
x
x

4
4
6
4

2.94
1.65
2.13
1.05

0.23
0.23
0.23
0.23

0.76
0.15
0.15
0.45

4.11
-0.23
-0.44
-0.43
3.01 Cum

1 x
1 x
1 x

4
1
1

2.94
2.44
1.80

0.23
0.23
0.23

0.90
0.90
0.90

2.43
0.51
0.37
3.31 Cum

2
1
1
1
1

x
x
x
x
x

8
3
4
1
1

0.45
0.45
0.48
12.40
9.10

0.23
0.23
0.23
0.45
0.45

0.75
0.75
0.75
0.10
0.10

1
1
1
1
1

x
x
x
x
x

1
1
1
1
2

2.90
2.90
1.75
1.75
3.50

0.60
0.30
0.60
0.30
0.23

0.30
0.15
0.30
0.15
0.28

1.24
0.23
0.33
0.56
0.41
2.77 Cum
0.52
0.13
0.32
0.08
0.44
1.49 Cum
49.22 Cum

Per
Unit

Rate
9

Amount
10

Dwarf wall

For Shelves

Stage entrance 1st step


2nd step
Stage 1st step
For Ramp

Dormitory GF

4754.45

1 Cum

###

NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY


(V&M) IN KHAMMAM(Dist.)

Sl.N
o

Description of item

Nos.
3

GROUND FLOOR
Measurements
L
B
D
4
5
6

QTY

Unit

Per
Unit

Rate
9

Amount
10

10) Reinforced Brick Masonary partition walls 7 cm in CM(1:4) usingan


50.00kg/cm2 from approved source and using two mild steel bars of 6m dia
in every third layer of brick masory, with free joints of the main block work
including cost and seignorage charges and conveyance of all materials and
water from approved sources to work site and all operational, incidental,
labour charges such as scaffolding mixing mortor constructing masonary lift
charges, curing etc. complete but excluding the cost of steel and its
fabrication charges.

For Shelves
Left side

1 x
1 x

2
1

3.65
0.10

0.90
0.90

6.57
0.09
6.66 Sqm

6679.15

1 Sqm

44483.00

22.32
18.20
40.52 Sqm

663.00

1 Sqm

26865.00

2.00
1.00
3.00 Each

2539.50

1 Each

7619.00

0.36
0.09
0.87
1.74
1.05
0.53
0.36
0.09
1.05
6.14 Sqm

1222.50 10 Sqm

751.00

11) Reinforced Cement Concrete M25 Grade corresponding to IS 456 using


20mm size graded machine crushed hard granite metal (coarse aggregate)
from approved quarry including cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including
all operational, incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete but excluding cost of
steel and its fabrication charges for finished item of work (APSS No. 402)
with minimum cement content @ 380Kgs/Cum from standard suppliers
approved by the department including
centering, shuttering, laying
concrete, curing etc. complete for Shelves of 25mm thick
Ground Floor

2 x
2 x

2
2

12.40
9.10

0.45
0.50

12) Making Green Chalk Board of size 3.00 x 1.20 Mts including border with
plastering in CM(1:2) 12mm thick as base coat and 3mm top coat with
cement green oxide powder (1:1) and making border in CM (1:2) of 50 x
20mm thick allround the chalk board over existing plastered surface and
painting the chalk board surface with chalk board paint as per direction of
Enginer-in-Charge including cost, conveyance of all materials, sales and
other taxes on cost of all materials and all operational, incidental and labour
charges etc. complete for finished item of work (APSS No: 1603).

Room No.1
Carridor

1 x
1 x

2
1

2.44
2.44

1.22
1.22

13) Plastering with CM(1:5) Prop: 20mm thick in single coat including cost and
conveyance of all materials like cement, sand, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all operational,
incidental charges and labour charges such as mixing mortar, finishing,
curing, etc., complete for finished item of work. (APSS 901,906) for Ground
floor.
Staircase entrance 1st step

Stage side

1
1
1
1
1
1
1
1
1

x
x
x
x
x
x
x
x
x

2
2
2
2
2
2
2
2
2

0.60
0.30
2.90
2.90
1.75
1.75
0.60
0.30
3.50

0.30
0.15
0.15
0.30
0.30
0.15
0.30
0.15
0.15

14) Plastering 20mm thick in two coats with base coat of 16mm thick in CM
(1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including
cost and conveyance of all materials like cement, sand, water etc., to site,
seigniorage charges, sales & other taxes on all materials, all operational,
incidental and labour charges such as mixing mortar,scaffolding charges,
lift charges, finishing,including cutting of Grooves wherever necessary as
directed by Engineer - in - charge, curing, etc., complete for Uneven
Surfaces of Brick Wall for finished item of work. (APSS 901,903 & 904).

Dormitory GF

NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY


(V&M) IN KHAMMAM(Dist.)

Sl.N
o

Description of item

2
Carridor wall
at staircase wall
Backside

Verandah dwarf wall


Carridor pillars allround
Staircase railing
Staircase railing
pillar sides
Basement
Basement

GROUND FLOOR
Measurements
Nos.
L
B
D
3
4
5
6
1 x 1
12.66
3.10
1 x 2
6.65
3.35
1 x 1
12.66
3.35
1 x 1
2.81
3.35
1 x 1
6.51
3.35
1 x 2
2.00
1.00
1 x 1
15.17
1.00
1 x 9
1.20
1.23
2 x 2
3.65
0.90
2 x 2
3.65
0.10
2 x 2
0.10
0.90
2 x 10
0.23
3.35
1 x 1
15.47
0.67
1 x 2
6.51
0.90

QTY

Unit

Per
Unit

Rate
9

Amount
10

39.25
44.56
42.41
9.41
21.81
4.00
15.17
13.28
13.14
1.46
0.36
15.41
10.36
11.72
242.34 Sqm

3150.80 10 Sqm

76356.00

153.76
75.02
9.90
7.90
1.62
-2.24
-25.15
-2.77
8.56
11.34
4.05
5.76
31.82
4.21
2.35
286.13 Sqm

3464.40 10 Sqm

99127.00

6745.00

13490.00

15) Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6)
and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost
and conveyance of all materials like cement, sand, water etc., to site,
seigniorage charges, sales & other taxes on all materials,all operational,
incidental and labour charges such as mixing mortar, scaffolding charges,
lift charges, including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of
Wall for finished item of work. (APSS 901,903 & 904).

Room l/s and R/s Long wall


Cross walls
Front R/s
Front L/s
Deduction Door
Deduction Windows
Deduction Ventilators
pillar sides
Shelves

inside verandah wall


Shelves
staircase

2
2
1
1
1
-1
-1
-1
6
4
4
4
1
1
1

x 2
x 2
x 1
x 1
x 1
x 1
x 12
x 8
x 2
x 9
x 3
x 4
x 1
x 2
x 1

12.40
6.05
11.00
8.78
1.80
1.05
1.53
0.91
0.23
0.45
0.45
0.48
27.67
1.83
2.35

3.10
3.10
0.90
0.90
0.90
2.13
1.37
0.38
3.10
0.70
0.75
0.75
1.15
1.15
1.00

16) Supply and fixing of MILD Steel Door of size 1.06m x2.13 m (Double leaf
shutter) with door frame of Mild Steel square hollow section of
80mmx80mmx4mm (TATA make or equivalent). Hold fast - 6 Nos of MS
equal angle of ISA 2525 of size 25mm x25mmx4mm, Door frame embedded
in the flooring to a depth of 50mm connecting the bottom of two vertical of
door frame with MS Flat 25mm wise - 4mm (TATA make or equivalent) with
styles and planks of MS sheet 1.25 mm thick, Towe Bolts - 2 Nos of MS
12mm round bars including hardware fixtures 1) MSPC Butt Ginges IS: 205
150mm long - 3 Nos. 2) MSPC Aldrops IS : 2681 300mm long - 2 Nos, 3)
MSPC Door handles IS: 208 125mm long - 2 Nos including cost and
conveyance of all materials to site, Fabrication charges of MS Door frame
and shutter including welding of hard ware fixtures to Door frame and
shutters, labour charges for fixing of door in position, Red oxide paint of
Grade - I wuality to MS Door Rame and shutters, Sales and other taxes,
operational and incidental charges. Labour charges including welding
charges etc comple for finished item of work.

(1.06 x 2.13 M)

1 x

2.00
2.00 No

Dormitory GF

1 No

NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY


(V&M) IN KHAMMAM(Dist.)

Sl.N
o

Description of item

Nos.
3

GROUND FLOOR
Measurements
L
B
D
4
5
6

Per
Unit

Rate

Amount

QTY

Unit

6.00
6.00 No

6155

1 No

36930.00

4.00
4.00 No

1000

1 No

4000.00

10

17) Supply and fixing of Mild Steel Window of size 1.53m x 1.37 m (six leaf
shutter) with window frame of Mild Steel Square hollow section of size
40mm x40mm x 3.20mm (TATA make or equivalent), Hold Fast - 4 Nos. of
MS equal angle of ISA 2525 of size 25mm x 25mm x 4mm, Window
Shutter :- Shutter frame of Mild Steel square hollow section of size 25mm x
25mm x 2.60mm (TATA make or equivalent), with styles and planks of MS
sheet 1.25mm thick, including hardware fixtures 1) MS PC Butt Hinges IS :
205 100mm long - 8 Nos, 2) MSPC window handles IS : 208 125mm long - 4
Nos MSPC Tower Bolts IS : 204 100mm long - 8 Nos, Safety bars of 12mm
square rods @ 100mm centre to centre welded horizontally to full width of
windows including cost and conveyance of all materials to site, Fabrication
charges of MS Window frame and shutter including welding of hardware
fixtures to window frame and shutters, labour charges for fixing of window
in position, Red oxide paint of Grade-I quality to MS Window Frame and
shutters, Sales and other taxes, operational and incidental charges, labour
charges including welding charges Subject to variation in the weight of
window the rate will be adjusted based on the final approval of plan of
window and its total weight by the Engineer incharge etc., complete for
finished item of work.

(1.53 x 1.37 M)

1 x

18) Supply and fixing of M.S.Grill Ventilators of size 0.90x0.38 m with outer
angular frame of rolled steel equal angle of ISA 2525 of size 25mm x 25mm
x 4mm welded with safety bars of 10mm square rods at 100mm centre to
centre horizontally and verticlally including red oxide primer of grade-I
quality, sales and other taxes, cost and conveyance of all materials to site,
all labour charges, and fixing in position etc., complete for finished item of
work.
(0.90 x 0.38 M)
1 x 4
19) Flooring with high polished granite stones 16 to 18mm thick other tan block
and regular colour set over base coat of cement mortar (1:8) 12mm thick
(joints of stone must be flushed) over CC bed already laid or RCC roof slab,
including near cement slurry of honey like consistency spread @ 3.30 Kgs
per sqm. Jointed with neat cement to full depth mixed with pigment of
matching shade, including cost of all materials like flooring stone, cement,
sand and water etc., complete, including seigniorage charges and labour
charges for cutting, dressing and laying etc., complete for finished item of
work.(APSS 701) for Ground floor.

shelves top
staircase landing
Landing 2nd
Landing 2nd

2
2
1
1
1
1

x
x
x
x
x
x

1
1
1
1
1
1

12.40
9.10
0.56
2.40
0.85
1.73

0.48
0.48
1.08
1.23
1.10
2.40

11.90
8.73
0.60
2.95
0.93
4.15
29.26 Sqm

45081.75 10 Sqm

###

75.64
19.69
-0.85
45.14
139.62 Sqm

8024.80 10 Sqm

###

20) Flooring with ceramic tiles 7.3mm thick, set over base coat of cement
mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab,
including neat cement slurry of honey like consistency spread @ 3.3.kgs per
sqm & jointed neatly with white cement paste to full depth mixed with
pigment of matching shade, including cost of all materials like cement, sand
water and tiles etc., complete, including seigniorage charges, etc., complete
for finished item of work.

Room1
Entrance staircase
Deduct staircase step
Carridor

1
1
-1
1

x
x
x
x

1
1
1
2

12.40
8.38
1.22
12.68

6.10
2.35
0.70
1.78

Dormitory GF

NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY


(V&M) IN KHAMMAM(Dist.)

Sl.N
o

Description of item

Nos.
3

GROUND FLOOR
Measurements
L
B
D
4
5
6

QTY

Unit

Per
Unit

Rate
9

Amount
10

21) Providing Skirting to internal walls to 15 cm height with Ceramic tiles of


7.5mm thickness regular finish and normal colours of make Jhonson &
Jhonson, Kajaria, Nitco, Marbonite set over base coat of cement mortar (1:5),
12mm thick with cement slurry of honey like consistency spread @ 3.3 Kgs
per sqm & joined neatly with white cement paste to full depth mixed with
pigment of matching shade, including cost and conveyance of all materials
like cement, sand, water and tiles etc., to site including seigniorage
charges, etc., complete for finished item of work.

Room1 and 2 long walls


Cross walls
Deduct door

1 x
1 x
-1 x

2
2
2

12.40
5.68
1.05

Dormitory GF

0.10
0.10
0.10

2.48
1.13
-0.21
3.40 Sqm

7138.40 10 Sqm

2427.00

NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY


(V&M) IN KHAMMAM(Dist.)

Sl.N
o

Description of item

Nos.
3

GROUND FLOOR
Measurements
L
B
D
4
5
6

QTY

Unit

Per
Unit

Rate
9

Amount
10

22) Painting to new internal walls with two (2) coats of ready mixed oil bound
washable distemper acrylic base of approved brand and shade over a base
coat of appropriate cement primer of approved brand, makind three (3)
coats in all to give an even shade after thourughly brushing the surface to
remove all dirt and remains of loose powdered materials, including cost and
conveyance of all materials to work site and all operational, incidental,
labour charges etc., complete for finished item of work in all floors for
internal walls (SS 911)
Ceiling Room 1
T'Beams
Verandah
T'Beams
Staircase room
Waist slab
2nd flight
Landing
Room long walls
Cross walls
Stair case side walls
Verandah walls
Side toilet block
Staircase bottom wall
Hand Railing
Verandah walls
Deduction:
Door
Windows
Ventilators
Shelves bottom
Grill
Brick fins
Shelves room 1
Fins

1
2
2
2
1
1
1
1
2
2
2
1
1
1
1
1

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

1
2
1
2
1
1
1
1
2
2
1
2
1
1
2
2

-1
-1
-1
2
2
4
4
4

x 4
x 12
x 8
x 1
x 1
x 9
x 3
x 4

12.42
6.10
12.65
1.83
3.41
3.65
3.70
2.90
12.42
6.10
6.30
12.66
2.35
2.35
3.65
3.65
1.05
1.53
0.90
12.40
9.10
0.45
0.45
0.48

6.10
0.45
1.83
0.23
2.44
1.22
1.22
1.30
3.00
3.00
2.00
2.10
1.20
1.20
0.75
0.90
2.13
1.37
0.38
0.45
0.45
0.60
0.60
0.60

75.76
10.98
46.29
1.68
8.32
4.45
4.51
3.77
149.04
73.20
25.20
53.17
2.82
2.82
5.47
6.57
-8.94
-25.15
-2.73
11.16
8.19
9.72
3.24
4.60
474.14 Sqm

1077.90 10 Sqm

51108.00

10.06
34.58
1.36
46.00 Sqm

974.55 10 Sqm

4483.00

23) Painting to New Iron work with two coats of ready mixed synthetic enamel
paint first quality all shades over red oxide primer Grade-I making three (3)
coats in all to given and even shade after thourughly brushing the surface to
remove all dirt and remains of loose powered materials, including cost and
conveyance of all materials to site, sales & other taxes, incidental,
operational and all labour charges etc., complete for finished item of work.
(APSS No. 1201, 1207 & 1212).in All Floors

Doors
Windows
Ventilators

2 x ###
6 x ###
1 x 4

1.05
1.53
0.90

2.13
1.37
0.38

24) Painting to New External Walls with two coats of Plastic Emulsion paint of
Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved
brand and shade as approved by the Engineer - in - Charge over base coat
of cement primer grade -I making three coats in all to give an even shade
after thoroughly brushing the surface to remove all loose powdered
materials, including cost and conveyance of all materials, including cost and
conveyance of all materials, cost of brushes, water to site, etc., sales &
other taxes, all operational, incidental and labour charges such as
scaffolding charges, lift charges, curing etc., complete for finished item of
work in all floors for external Walls.(APSS No. 911).

Long walls
Cross walls
Cross walls
Dwarf Long walls
Front

1
1
2
2
1

x
x
x
x
x

1
1
1
1
2

12.87
2.44
6.65
2.00
15.87

Dormitory GF

3.35
3.35
3.35
1.00
1.00

43.11
8.17
44.55
4.00
31.74

NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY


(V&M) IN KHAMMAM(Dist.)

Sl.N
o
1

Description of item
2
Sunshades
Front side sunshade
Cross walls
Patti
Front patti
Cross walls
Top
Pillars
Circular columns
Front sunshade patti alround
Column projection sides

Nos.
3
1 x 4
1 x 1
1 x 1
2 x 8
1 x 1
1 x 1
1 x 1
1 x 9
1 x 9
2 x 9
1 x 1

GROUND FLOOR
Measurements
L
B
D
4
5
6
1.83
0.60
15.87
0.60
2.28
0.60
0.60
0.08
15.87
0.08
2.28
0.08
0.60
0.08
1.20
1.22
0.30
1.13
0.08
1.13
2.06
1.13

QTY

Unit

4.39
9.52
1.36
0.76
1.26
0.18
0.04
13.17
3.05
1.62
2.32
169.24 Sqm

Per
Unit

Rate
9

1314.90 10 Sqm

Amount
10

22253.00

###

Dormitory GF

DETAILED CUM ABSTRACT ESTIMATE

NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY


(V&M) IN KHAMMAM(Dist.)

Sl.N
o

Description of item

First floor Floor


Measurements
Nos.

QTY

Unit

Per
Unit

Rate
9

Amount
10

1) Dismantling old Brick masonary in cement mortor including cost and


conveyance of all materials etc., complete.

Parapet wall

32.30

0.25

0.60

Varandah parapet wall

20.00

0.25

0.60

4.85
3.00
7.85 Cum

361.00 1 Cum

2834.00

2) VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate)


corresponding to Table 9 of IS 456 using 20mm size machine crushed hard
granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales &
other taxes on all materials including all operational, incidental and labour
charges such as machine mixing, laying concrete, curing etc., including hire
charges and labour charges for centering and scaffolding with steel centering
plates, foot plates complete but excluding cost of steel and its fabrication
charges complete for finished item of work.

A) For Columns : 7

0.23

0.23

3.30

1.22
1.22 Cum

###

1 Cum

13230.00

1 Cum

22388.00

B) For Roof Beams : Verandah Bressure

20.00

0.23

0.35

1.61

4.50

0.23

0.35

0.72
2.33 Cum 9608.60

C) For Waist Slab 185mm thick : 1 St Flight

3.60

1.20

--

Landing

3.00

1.80

--

10.80
19.44 Sqm

2nd Flight

3.80

1.22

--

4.64
4.64 Sqm
24.08 Sqm 1529.05

1 Sqm

36820.00

243.87
243.87 Sqm 1124.85

1 Sqm

###

8.64

D) For Slab 125mm thick : 1

32.30

7.55

--

E) For Lintels : At Door


At Window

1.20

0.35

0.15

0.25

17 x

1.20

0.35

0.15

1.07
1.32 Cum

###

1 Cum

13918.00

10.08
10.08 Sqm

797.95

1 Sqm

8043.00

F) For Sunshades 0.60m wide: 14 x

1.20

0.60

Dormitory FF

--

NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY


(V&M) IN KHAMMAM(Dist.)

Sl.N
o

Description of item

First floor Floor


Measurements
Nos.

QTY

Unit

Per
Unit

Rate
9

Amount
10

3) Ceiling Plastering 12mm thick in two coats with base coat of 8mm thick in CM
(1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including
cost and conveyance of all materials like cement, sand, water etc., to site,
seigniorage charges, sales & other taxes on all materials,all operational,
incidental and labour charges such as mixing mortar, scaffolding charges, lift
charges, including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, finishing, curing, etc., complete for finished item of
work. (APSS 901,903 & 904) for.

2
End room
Sunshades

10.00

4.50

2 x
14 x

1
2

5.80
1.20

4.50
0.60

--

90.00
52.20
20.16

Columns

0.96

2.10

Bressure bottom

20.00

0.23

4.60

Verandah Sunshade

20.00

0.60

24.00

Waist Slab

3.60

1.20

3.00

1.80

14.11

8.64
10.80
224.51 Sqm 388.595

1 Sqm

87243.00

4) Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as
per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required
sizes and shapes placing in position with cover blocks of approved size and
binding wire of 20SWG, forming grills for reinforcement work as per approved
designs and drawings including cost and conveyance of bars from approved
sources to site of work, including cost and conveyance of binding wire, cover
blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational,
incidental, and labour charges such as cutting, bending, placing in position,
tying etc., and sales & other taxes,on cost of all materials complete for
finished item of work (APSS No.126) in all floors.

4.00
4.00 MT

###

1 MT

###

1 Cum

###

5) Brick Masonry in superstructure with CM (1:8) prop: using second class bricks
from approved source having minimum crushing strength of 40 Kg/Sqcm.
including cost and conveyance of all materials like cement, sand, bricks,
water etc., to site, including seigniorage charges, sales & other taxes on all
materials, all operational, incidental and labour charges such as mixing
cement mortar, constructing masonry, scaffolding charges, lift charges,
curing, etc., complete for finished item of work.

L/W

32.30

0.35

3.30

74.61

C/W

4.50

0.35

3.30

31.19

Verandha L/W

20.00

0.35

1.30

9.10

Dwar wall

20.00

0.23

1.10

5.06

Deduct Columns

0.23

0.23

-1.30

-0.48

1.20

0.35

-2.10

-3.53

17 x

0.90

0.35

-1.35

0.23

0.35

-0.20

-7.23
-0.39

17 x

Door
Windows

0.23

0.35

-0.20

-1.09

Ventilators

0.90

0.35

-0.30

-0.66

Staircase

2.40

0.35

-3.30

-2.77

Lintels

1.50

0.35

-0.15

-0.32

17 x

1.20

0.35

-0.15

Dormitory FF

-1.07
102.42 Cum 5690.20

NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY


(V&M) IN KHAMMAM(Dist.)

Sl.N
o

Description of item

First floor Floor


Measurements
Nos.

QTY

Unit

Per
Unit

Rate
9

Amount
10

6) Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6)
and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and
conveyance of all materials like cement, sand, water etc., to site, seigniorage
charges, sales & other taxes on all materials, all operational, incidental and
labour charges such as mixing mortar,scaffolding charges, lift charges,
finishing,including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick
Wall for finished item of work. (APSS 901,903 & 904).

Outside L/W

32.30

3.30

106.59

Verandah Bressure

20.00

1.30

26.00

6.50

3.30

42.90
175.49 Sqm 3851.40 10 Sqm

67588.00

7) Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6)
and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and
conveyance of all materials like cement, sand, water etc., to site, seigniorage
charges, sales & other taxes on all materials,all operational, incidental and
labour charges such as mixing mortar, scaffolding charges, lift charges,
including cutting of Grooves wherever necessary as directed by Engineer - in charge, finishing, curing, etc., complete for Even Surfaces of Wall for
finished item of work. (APSS 901,903 & 904).

inside verandah wall

(10.00+4.50)

3.30

95.70

End Room

(4.20+5.8)

3.30

132.00

Stair case C/W

4.50

3.30

59.40

Verandah Entablature wall

20.00

3.30

66.00

Deduct Door

1.20

-2.10

-10.08

17 x
7 x

1
1

0.90
0.90

-1.20
-0.30

-18.36

Windows
Ventilators

-1.89
322.77 Sqm 3737.20 10 Sqm

###

8) Manufacturing, Supply, delivery and fixing of plain MS sheet door of size 1.20
x 2.13 with frame made of L Angular section of 40 X 40 X 6mm and inner
frame of double leave shutters with MS "L"angle of 35 X 35 X 4mm welded
with 2 nos of 25 X 25 X 3 angle and 3 No.s of 30x4mm each leaf and welded
with powder coated fixtures including red oxide paint including cost and
conveyance of all materials and labour charges etc., complete for finished
item of work. (Ground Floor & First floor) weight not less than 75 Kgs

(1.20x 2.13 M)

4.00
4.00 No

6745.00

1 No

26980.00

17.00
17.00 No

6155.00

1 No

###

7.00
7.00 No

626.00

1 No

4382.00

9) Supply and fixing of 18 guage M.S plain sheet Window with three leaves
shutter of size 0.90mx1.37m with outer angular frame of rolled steel equal
angle ISA 4040 of size 40x40x6mm and inner shutter angular frame of rolled
steel equal angle ISA 3535 of size 35x4mm on MS Flat of size 30x4mm 2 Nos
welded horizontally to each of leaf and also welded with fixtures such as M.S
powder coated tower bolts IS204 250mm long 2 Nos, M.S powder coated Bolt
hinges IS 205 125mm long 3 Nos, M.S powder coated handles IS 208 125mm
long 2 Nos, M.S powder coated Aldrop IS 268 250mm long 1 No including Red
oxide primer of grade-I quality, sales and other taxes, cost and conveyance of
all materiasl to site all labour charges etc., complete for finished item of work.

(0.90 x 1.35 M)

17 x

10) Supply and fixing of M.S.Grill Ventilators of size 0.90x0.38 m with outer
angular frame of rolled steel equal angle of ISA 2525 of size 25mm x 25mm x
4mm welded with safety bars of 10mm square rods at 100mm centre to
centre horizontally and verticlally including red oxide primer of grade-I
quality, sales and other taxes, cost and conveyance of all materials to site, all
labour charges, and fixing in position etc., complete for finished item of work.

(0.90 x 0.38 M)

Dormitory FF

NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY


(V&M) IN KHAMMAM(Dist.)

Sl.N
o

Description of item

First floor Floor


Measurements
Nos.

QTY

Unit

Per
Unit

Rate
9

Amount
10

11) Flooring with ceramic tiles 7.3mm thick, set over base coat of cement mortar
(1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat
cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed
neatly with white cement paste to full depth mixed with pigment of matching
shade, including cost of all materials like cement, sand water and tiles etc.,
complete, including seigniorage charges, etc., complete for finished item of
work.

End room

Verandah

14.00

4.50

126.00

5.80

4.50

52.20

8.50

4.50

76.50

20.00

2.10

42.00

14.00

2.10

58.80
355.50 Sqm 9372.35 10 Sqm

###

12) Providing Skirting to internal walls to 15 cm height with Ceramic tiles of


7.5mm thickness regular finish and normal colours of make Jhonson &
Jhonson, Kajaria, Nitco, Marbonite set over base coat of cement mortar (1:5),
12mm thick with cement slurry of honey like consistency spread @ 3.3 Kgs
per sqm & joined neatly with white cement paste to full depth mixed with
pigment of matching shade, including cost and conveyance of all materials
like cement, sand, water and tiles etc., to site including seigniorage charges,
etc., complete for finished item of work.

End room
Verandah

(5.80+4.50)

0.10

4.12

(8.50+4.50)

0.10

5.20

20.00

Dormitory FF

0.10

4.00
13.32 Sqm 7202.90 10 Sqm

9594.00

NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY


(V&M) IN KHAMMAM(Dist.)

Sl.N
o

Description of item

First floor Floor


Measurements
Nos.

QTY

Unit

Per
Unit

Rate
9

Amount
10

13) Painting to new internal walls with two (2) coats of ready mixed oil bound
washable distemper acrylic base of approved brand and shade over a base
coat of appropriate cement primer of approved brand, makind three (3) coats
in all to give an even shade after thourughly brushing the surface to remove
all dirt and remains of loose powdered materials, including cost and
conveyance of all materials to work site and all operational, incidental, labour
charges etc., complete for finished item of work in all floors for internal walls
(SS 911)

610.00 Sqm 1077.90 10 Sqm

65752.00

14) Painting to New Iron work with two coats of ready mixed synthetic enamel
paint first quality all shades over red oxide primer Grade-I making three (3)
coats in all to given and even shade after thourughly brushing the surface to
remove all dirt and remains of loose powered materials, including cost and
conveyance of all materials to site, sales & other taxes, incidental, operational
and all labour charges etc., complete for finished item of work. (APSS No.
1201, 1207 & 1212).in All Floors

Doors

Windows

x ###

1.20

2.10

22.68

17 x ###

0.90

1.35

56.80
79.48 Sqm

974.55 10 Sqm

7746.00

175.49 Sqm 1314.90 10 Sqm

23075.00

15) Painting to New External Walls with two coats of Plastic Emulsion paint of
Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved
brand and shade as approved by the Engineer - in - Charge over base coat of
cement primer grade -I making three coats in all to give an even shade after
thoroughly brushing the surface to remove all loose powdered materials,
including cost and conveyance of all materials, including cost and conveyance
of all materials, cost of brushes, water to site, etc., sales & other taxes, all
operational, incidental and labour charges such as scaffolding charges, lift
charges, curing etc., complete for finished item of work in all floors for
external Walls.(APSS No. 911).

###

Assistant Engineer,

Deputy Executive Engineer,

Executive Engineer

TW Section Paloncha

TWSD Paloncha

TW Divn, Bhadrachalam.

Dormitory FF

DETAILED CUM ABSTRACT ESTIMATE

NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY (V&M)
IN KHAMMAM(Dist.)

Sl.N
o

Description of item

Terrace Floor
Measurements
Nos.
3

L
4

B
5

D
6

QTY

Unit

Per
Unit

Rate
9

Amount
10

1) Brick Masonry in superstructure with CM (1:8) prop: using second class bricks
from approved source having minimum crushing strength of 40 Kg/Sqcm.
including cost and conveyance of all materials like cement, sand, bricks, water
etc., to site, including seigniorage charges, sales & other taxes on all materials,
all operational, incidental and labour charges such as mixing cement mortar,
constructing masonry, scaffolding charges, lift charges, curing, etc., complete for
finished item of work.

L/W

22.30

0.23

0.90

9.23

C/W

5.90

0.23

0.90

2.44
7.77
11.55

Staircase L/W

3.70

0.35

(3.30+2.70
)/2

C/W

5.50

0.35

(3.30+2.70
)/2

Deduct Door

1.20

0.23

-2.10

-0.58
30.41 Cum 5982.45

1 Cum

###

2.67
114.09 Sqm 3737.20 10 Sqm

42638.00

2) Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and
top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and
conveyance of all materials like cement, sand, water etc., to site, seigniorage
charges, sales & other taxes on all materials,all operational, incidental and
labour charges such as mixing mortar, scaffolding charges, lift charges, including
cutting of Grooves wherever necessary as directed by Engineer - in - charge,
finishing, curing, etc., complete for Even Surfaces of Wall for finished item of
work. (APSS 901,903 & 904).

Outside L/W

22.30

0.90

80.28

Top
C/W

2
2

x
x

1
2

22.30
5.80

0.23
0.90

10.26
20.88

Top

5.80

0.23

3) Supply and fixing of 18 guage M.S plain sheet Window with three leaves shutter
of size 0.90mx1.37m with outer angular frame of rolled steel equal angle ISA
4040 of size 40x40x6mm and inner shutter angular frame of rolled steel equal
angle ISA 3535 of size 35x4mm on MS Flat of size 30x4mm 2 Nos welded
horizontally to each of leaf and also welded with fixtures such as M.S powder
coated tower bolts IS204 250mm long 2 Nos, M.S powder coated Bolt hinges IS
205 125mm long 3 Nos, M.S powder coated handles IS 208 125mm long 2 Nos,
M.S powder coated Aldrop IS 268 250mm long 1 No including Red oxide primer of
grade-I quality, sales and other taxes, cost and conveyance of all materiasl to
site all labour charges etc., complete for finished item of work.
(1.20x 2.13 M)
1 x
1

1.00
1.00 No

6745.00

1 No

6745.00

###

Assistant Engineer,
TW Section Paloncha

Deputy Executive Engineer,


TWSD Paloncha

Dormitory TF

Executive Engineer
TW Divn, Bhadrachalam.

NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT


KAMEPALLY (V&M) IN KHAMMAM(Dist.)
DETAILED CUM ABSTRACT ESTIMATE
DOMITORY HALLS 2 No.S SECOND FLOOR
Sl.
No.

DESCRIPTION OF ITEM

No's

D/H

Qty.

Unit
8

Rate

Amount

10

1 Vibrated Reinforced Cement Concrete M25 Grade corresponding to


IS 456 using 20mm size graded machine crushed hard granite metal
(coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine
mixing, laying concrete, curing etc.,complete but excluding cost of
steel and its fabrication charges for finished item of work (APSS No.
402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including
centering,
shuttering, laying concrete, vibrating, curing etc. complete for
Columns.

C1

0.30

0.300

3.05

0.27

C1a

0.30

0.300

3.05

0.27

C1b

0.30

0.300

3.05

0.27

C2

0.30

0.375

3.05

1.03

C3

0.30

0.400

3.05

0.73
2.57 Cum

11829.65

30402.00

11407.80

6274.00

2 Reinforced Cement Concrete M25 Grade corresponding to IS 456


using 20mm size graded machine crushed hard granite metal
(coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine
mixing, laying concrete, curing etc.,complete but excluding cost of
steel and its fabrication charges for finished item of work (APSS No.
402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including
centering,
shuttering, laying concrete, curing etc. complete for Lintels.
Lintals

1.50

0.23

0.15

0.10

windows

10

1.30

0.23

0.15

0.45
0.55 Sqm

3 Vibrated Reinforced Cement Concrete M25 Grade corresponding to


IS 456 using 20mm size graded machine crushed hard granite metal
(coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine
mixing, laying concrete, curing etc.,complete but excluding cost of
steel and its fabrication charges for finished item of work (APSS No.
402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including
centering,
shuttering, laying concrete, vibrating, curing etc. complete for
Beams.

Roof beam B1

5.95

0.23

0.45

1.23

B2

9.68

0.23

0.30

0.67

B3

7.90

0.23

0.45

1.64

B3

3.50

0.23

0.30

0.24

B4

5.95

0.23

0.45

1.23

B5

3.66

0.23

0.30

0.25

B7

4.57

0.23

0.45

0.47

B7

3.12

0.23

0.30

0.22

B8

4.57

0.23

0.45

0.47

B8

3.12

0.23

0.30

0.22

B9

7.85

0.23

0.45

0.81

B10

7.85

0.23

0.45

0.81
8.26 Cum

10443.25

86261.00

5 Vibrated Reinforced Cement Concrete M25 Grade corresponding to


IS 456 using 20mm size graded machine crushed hard granite metal
(coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine
mixing, laying concrete, curing etc.,complete but excluding cost of
steel and its fabrication charges for finished item of work (APSS No.
402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including
centering,
shuttering, laying concrete, vibrating, curing etc. complete for Slab of
125mm thick.

Roof slab
Slab

9.00

8.39

75.51
75.51 Sqm

1224.85

92488.00

7 Vibrated Reinforced Cement Concrete M25 Grade corresponding to


IS 456 using 20mm size graded machine crushed hard granite metal
(coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine
mixing, laying concrete, curing etc.,complete but excluding cost of
steel and its fabrication charges for finished item of work (APSS No.
402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including centering, shuttering,
laying concrete, vibrating, curing etc. complete for Slab of 140mm
thick.

Roof slab
S3

9.00

6.25

56.25
56.25 Sqm

1423.05

80047.00

841.75

6061.00

743.25

18552.00

8 Reinforced Cement Concrete M25 Grade corresponding to IS 456


using 20mm size graded machine crushed hard granite metal
(coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine
mixing, laying concrete, curing etc.,complete but excluding cost of
steel and its fabrication charges for finished item of work (APSS No.
402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including
centering,
shuttering, laying concrete, curing etc. complete for Sunshades /
Chajjas for 75mm thick at Fixed end and 50mm thick at Free end
and for a width of 0.60 Mts. etc complete for finished item of work.

Sunshade of window

1.50

0.60

7.20
7.20 Sqm

9 Reinforced Cement Concrete M20 Grade corresponding to IS 456


using 20mm size graded machine crushed hard granite metal
(coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine
mixing, laying concrete, curing etc.,complete but excluding cost of
steel and its fabrication charges for finished item of work (APSS No.
402) with minimum cement content @ 350Kgs/Cum from standard
suppliers approved by the department including centering,
shuttering, laying concrete, curing etc. complete for Shelves of
50mm thick.
Shelves

5.20

0.60

24.96
24.96 Sqm

10 Brick Masonry in superstructure with CM (1:8) prop: using second


class bricks of size 23 x 11 x 7 Cm from approved source having
minimum crushing strength of 40 Kg/Sqcm. including cost and
conveyance of all materials like cement, sand, bricks, water etc., to
site, including seigniorage charges, sales & other taxes on all
materials, all operational, incidental and labour charges such as
mixing cement mortar, constructing masonry, scaffolding charges, lift
charges, curing, etc., complete for finished item of work.
In between columns

5.45

0.23

2.00

5.01

In between columns

7.90

0.23

2.00

7.27

Doors

1.05

0.23

-2.00

-0.97

Windows

0.90

0.23

-1.20

-1.99

Columns

0.23

0.23

-2.00

-0.85

In between columns

5.45

0.23

1.10

2.76

In between columns

7.90

0.23

1.10

7.99

Ventilatars

0.60

0.23

-0.45

-0.25

Dwarf Wall

9.65

0.23

1.00

2.22

Parapet wall

14.50

0.23

1.00

6.67

9.00

0.23

1.00

2.07
21.19 Cum

5982.45

126768.00

7.20 Sqm

7857.60

5657.00

5.00 M.T

45215.55

226078.00

11 Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using


second class bricks of size 23 x 11 x 7 Cm having a crushing
strength of not less than 35.00kg/cm2 and using two mild steel bars
of 6m dia in every third layer of brick masory, with free joints of the
main block work including cost and seignorage charges and
conveyance of all materials and water from approved sources to
work site and all operational, incidental, labour charges such as
scaffolding mixing mortor constructing masonary lift charges, curing
etc. complete but excluding the cost of steel and its fabrication
charges.
Pedestal under shelevs

0.60

0.75

7.20

12 Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500
grade as per IS 1786-1979) of different diameters for RCC works,
including labour charges for straightening, cutting, bending to
required sizes and shapes, placing in position with cover blocks of
approved materials and size and tying and lapsplicing with binding
wire of 18 SWG, forming grills for reinforcement work as per
approved designs and drawings, including cost and conveyance of
steel bars, including all wastages such as overlaps, couplings, chairs,
spacer bars including cost and conveyance of binding wire, cover
blocks and all incidental, operational, laour charges such as cutting,
bending placing in position, tying including sales and other taxes on
all materials etc., complete for finished item of work in all floors.
(APSS No.126).

Or in MT

13 Plastering 12mm thick in two coats with base coat of 8mm thick in
CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish
including cost and conveyance of all materials like cement, sand,
water etc., to site, seigniorage charges, sales & other taxes on all
materials,all operational, incidental and labour charges such as
mixing mortar, scaffolding charges, lift charges, including cutting of
Grooves wherever necessary as directed by Engineer - in - charge,
finishing, curing, etc., for Even Surfaces of brick wall complete for
finished item of work. (APSS 901,903 & 904).

Domitory Halls

13.42

3.50

93.94

Verandah Long wall

9.65

3.50

33.78

Dwarf Wall

9.65

1.00

9.65

Top

9.65

0.23

2.22

Dwarf wall beam

9.65

0.50

4.83

Parapet wall

14.50

1.00

29.00

9.00

1.00

18.00

Deduction door

1.05

2.00

-4.20

Window

10

0.90

1.20

-10.80

Ventilater

0.60

0.45

-1.08
175.34 Sqm

4009.85

70309.00

4124.10

124373.00

1915.00

36638.00

14 Plastering 20mm thick in two coats with base coat of 16mm thick in
CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish
including cost and conveyance of all materials like cement, screened
sand, water etc., to site, seigniorage charges, sales & other taxes on
all materials, all operational, incidental and labour charges such as
mixing mortar,scaffolding charges, lift charges, finishing,including
cutting of Grooves wherever necessary as directed by Engineer - in charge, curing, etc., for Uneven Surfaces of Brick Wall complete
for finished item of work. (APSS 901,903 & 904).
Dormitory halls

9.00

4.60

82.80

6.00

4.60

55.20

9.00

4.60

82.80

Verandah Long wall

9.65

3.50

33.78

Parapet wall

14.50

1.00

29.00

9.00

1.00

18.00
301.58 Sqm

15 Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat


spong finish including cost and conveyance of all materials like
cement, sand, water etc., to site, including seigniorage charges,
sales & other taxes on all materials, all operational, incidental
charges and labour charges such as mixing mortar, finishing, curing,
etc., complete for finished item of work. (APSS 901,906)
Dormitory left right

5.50

7.90

86.90

Corridor

9.65

2.20

21.23

Beam side

5.50

Sunshades

1.50

0.60

7.20

Shelevs

5.20

0.60

49.92

Slab Projection

9.00

0.30

5.40

8.35

0.30

5.01

9.60

0.30

5.76

Veranda Beams

0.45

9.90

191.32 Sqm

17 Flooring and Treads with Polished Bethamcherla coloured stone


minimum 25 mm thick (0.254M x0.254M) set over base coat of CM
(1:8) over already laid CC bed / RCC Roof Slab, including neat
cement slurry of honey like consistency spread @ 3.3 kgs per sqm. &
Jointed with neat cement to full depth including cost of all materials
like cement, sand, and water and flooring stones etc., complete,
including seigniorage charges, labour charges for dressing of flooring
stones etc., complete for finished item of work,
in room

5.50

7.90

base

9.65

1.60

86.90
15.44
102.34 Sqm

11091.45

113510.00

11579.35

13218.00

1077.90

39522.00

1314.90

39654.00

17 Providing Skirting to internal walls and Risers of Steps to 15 cm


height with Polished Bethamcherla coloured stone minimum 25 mm
thick (0.254M x0.254M) length equal to flooring stones, set over base
coat of CM (1:3) 12 mm thick with cement slurry of honey like
consistency spread at the rate of 3.30 kgs per sqm and jointed with
white cement paste mixed with pigment of matching shade to full
depth, including cost of all materials like tiles, cement, sand and
water etc., complete including seigniorage charges, etc., complete
for finished item of work.
in room

13.40

0.15

base

11.25

0.15

8.04
3.38
11.42 Sqm

18 Painting to new internal walls with two (2) coats of ready mixed oil
bound washable distemper acrylic base of approved brand and
shade over a base coat of cement primer water base interior Grade-I
of approved brand, makind three (3) coats in all to give an even
shade after thourughly brushing the surface to remove all dirt and
remains of loose powdered materials, including cost and conveyance
of all materials to work site and all operational, incidental, labour
charges etc., complete for finished item of work in all floors for
internal walls (SS 911).
Celing 12mm Qty.

191.32

Inside Plastering 12mm thick Qty.

175.34
366.66 Sqm

19 Painting to New External Walls with two coats of Polymer Plastic


Emulsion paint of Asian / Berger / Nerolac / Saicoat / Endocem or
equalent quality of approved brand and shade as approved by the
Engineer - in - Charge over base coat of cement primer water base
grade -II exterior making three coats in all to give an even shade
after thoroughly brushing the surface to remove all loose powdered
materials, including cost and conveyance of all materials, including
cost and conveyance of all materials, cost of brushes, water to site,
etc., sales & other taxes, all operational, incidental and labour
charges such as scaffolding charges, lift charges, curing etc.,
complete for finished item of work in all floors for external Walls.
(APSS No. 911).
Outside Plastering 20mm Qty.

301.58
301.58 Sqm

DOORS AND WINDOWS


20 Supply and fixing of Door size 1.05 x 2 m Single Leaf with Door
Frame of Medium Teak wood Section 100 mm x 75 mm and shutter
of 35mm thick of solid bond wood block board type with commercial
play on both faces, Hardware fixtures ie., MSPC Butt Hinges 150mm
Long 6 nos, MSPC Handles 150 mm Long 2 Nos MSPC Tower Bolt
300mm long 1 Nos,MSPC Aldrop 300 mm long 1 no, MS Hold Fast
6 Nos including Including Labour charges for making of door, fixing
of fixtures etc., and cost and conveyance of all materials to site,
taxes extra for finished item of work.
Second floor
(D1)

1.05

2.00

4.20
4.20 Sqm

3571.00

14998.00

4253.00

45932.00

4340.75

57584.00

TOTAL

1234326.00

21 Supply and fixing of Window of Size 0.90 x 1.22 M Six Leaf shutter
with window frame of Medium Teak wood of Section 100 mm x 65
mm and shutter frame of Medium Teak wood of section 100mm x
32 mm thick and window planks of medium fiber board exterior both
sides laminated 12mm thick and safety bars of 10 mm square bars
at 100mm center to center distance horizantally and Hardware
fixtures ie., MSPC Butt Hinges 100mm Long 12nos, MSPC Handles
125 mm Long 6 Nos MSPC Tower Bolt 150mm long 6 Nos, MS Hold
Fast 4 Nos Including Labour charges for making Window frame and
shutter, fixing of Fixtures etc., and cost and conveyance of all
materials to site, taxes extra complete for finished item of work.

Second Floor
Windows

10

0.90

1.20

10.80
10.80 Sqm

22 Providing impervious coat to exposed RCC roof slab surface with


CM(1:3), 20mm thick with 1kg of water proof compound per bag of
cement laid over roof when it is green including cost of all materials,
seigniorage charges, excluding conveyance charges of materials and
including all operational, incidental and labour charges for mixing
mortar, laying, rendering smooth and thread lining, curing, rounding
off junctions of wall and slab etc,, complete for finished item of work
Over Roof Slab

9.00

8.39

75.51

9.00

6.35

57.15
132.66 Sqm

Asst. Engineer
TW : Manuguru

Dy.Executive Engineer
TWSD : Palvancha

Executive Engineer
TW Divn. : Bhadrachalam

NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G)


AT KAMEPALLY (V&M) IN KHAMMAM(Dist.)
Detailed cum Abstract estimate - Compound Wall
Sl.
No.

DESCRIPTION OF
ITEM

No.s

D/H

Qty.

Unit

Rate

Amount

10

39.60
8.10
47.70

Cum

247.70

11815.00

Cum

3268.95

13010.00

Cum

7671.25

45721.00

1) Earth work excavation for foundations and depositing on bank for all
lifts and with an initial lead of 10m including all operational, incidental,
seigniorage charges, labour charges such as shoring ,sheeting,
planking, strutting, dewatering etc. complete for finished item of work
as per SS - 20 B (APSS 308). for Foundation.
For Column footings
For Combind footings

1
1

x
x

33
3

1.00
1.50

1.00
1.50

1.20
1.20

2) Plain Cement Concrete (1:5:10) proportion (cement: fine aggregate:


Coarse aggregate) using 40mm size Hard Broken Granite (IS383,
1970) machine crushed metal from approved quarry including cost and
conveyance of all materials like cement, sand, coarse aggregate, water
etc. to site, mixing concrete in concrete mixer including seigniorage
charges, sales & other taxes on all materials, all operational, incidental,
and labour charges such as laying and ramming concrete in layers in
position not exceeding 15cm, finishing top surface, curing concrete,
etc., complete for finished item of work. (APSS No. 402).
For Column footings
For Combind footings

1
1

x
x

33
3

1.00
1.50

1.00
1.50

0.10
0.10

3.30
0.68
3.98

3) Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS


456 using 20mm size graded machine crushed hard granite metal
(coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales
& other taxes on all materials including all operational, incidental and
labour charges such as weigh batching, machine mixing, laying
concrete, curing etc.,complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers
approved by the department including centering, shuttering, laying
concrete, vibrating, curing etc.

a) Footings

b) Columns

c) Plinth Beam

1
1

x
x

33
3

1.00
1.50

1.00
1.50

0.15
0.15

4.95
1.01
5.96
3.49

33

0.23

0.23

2.00

0.23

0.23

2.00

0.63
4.12

Cum

9063.40

37341.00

100.00

0.23

0.30

6.90
6.90

Cum

9564.25

65993.00

Cum

4754.45

180526.00

4) Brick Masonry in superstructure with CM (1:8) prop: using second class


bricks from approved source having minimum crushing strength of 40
Kg/Sqcm. including cost and conveyance of all materials like cement,
sand, bricks, water etc., to site, including seigniorage charges, sales &
other taxes on all materials, all operational, incidental and labour
charges such as mixing cement mortar, constructing masonry,
scaffolding charges, lift charges, curing, etc., complete for finished item
of work.
For Compound wall
Deduction for Columns

1
1

x
x

1
36

100.00
0.23

0.23
0.23

1.80
-1.80

41.40
-3.43
37.97

311891749.xlsComp Wall

82

Sl.
No.

DESCRIPTION OF
ITEM

No.s

D/H

Qty.

Unit

Rate

Amount

Sqm

1222.50

57091.00

447.00

Sqm

279.30

12485.00

0.80
0.80

M.T.

45215.55

36172.00

5) Plastering to even surfaces of wall with CM(1:4) Prop: 12mm thick in


single coat including cost and conveyance of all materials like cement,
sand, water etc., to site, including seigniorage charges, sales & other
taxes on all materials, all operational, incidental charges and labour
charges such as mixing mortar, finishing, curing, etc., complete for
finished item of work. (APSS 901,906)
For Compound wall Both
sides
"
"
Top
Bottom sides offset

100.00

2.10

420.00

100.00

0.35

35.00

100.00

0.06

12.00
467.00

6) White washing two coats with paint grade white lime for wash or
equivalent quality to give an even shade after thoroughly brushing the
surface to remove all dirt and remains of loose powdered materials
including cost of all materials, labour charges and incidental such as
scaffolding, lift charges etc., complete for finished item of work in all
floors for walls
For Compound wall Both
"
"
Top
Bottom sides offset

100.00

2.00

400.00

1
1

x
x

1
2

100.00
100.00

0.35
0.06

35.00
12.00

7) Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500
grade as per IS 1786-1979) of different diameters for RCC works,
including labour charges for straightening, cutting, bending to required
sizes and shapes, placing in position with cover blocks of approved
materials and size and tying and lapsplicing with binding wire of 18
SWG, forming grills for reinforcement work as per approved designs
and drawings, including cost and conveyance of steel bars, including all
wastages such as overlaps, couplings, chairs, spacer bars including
cost and conveyance of binding wire, cover blocks and all incidental,
operational, laour charges such as cutting, bending placing in position,
tying including sales and other taxes on all materials etc., complete for
finished item of work in all floors. (APSS No.126)

8)

Supply and fixing of Iron gate including all cost and conveyance of all materials etc

Total :-

Asst. Engineer,
TW Manuguru

311891749.xlsComp Wall

Dy. Executive Engineer,


TW SD: Paloncha

Executive Engineer,
TW Divn., Bhadrachalam

83

460154.00

NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY (V&M) IN
KHAMMAM(Dist.)
DETAIL CUM ABSTRACT ESTIMATE - SECOND FLOOR
Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Qty.

Unit

Rate

Amount

10

cum

11829.65

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456


using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as weigh
batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work
(APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including centering, shuttering,
laying concrete, vibrating, curing etc. complete for Columns
SECOND FLOOR
Columns
c1 to C 40

40

0.23

0.40

3.35

12.33

T1 to T10
c2Ver C 1 to C14

1
1

X
X

10
14

0.23
0.23

0.40
0.300

3.35
3.35

3.08
3.24
18.65
19.00

311891749.xlsSF-Est F

84

224763

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Unit

Rate

Amount

Reinforced Cement Concrete M25 Grade corresponding to IS 456 using


20mm size graded machine crushed hard granite metal (coarse aggregate)
from approved quarry including cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including
all operational, incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete but excluding cost of
steel and its fabrication charges for finished item of work (APSS No. 402)
with minimum cement content @ 380Kgs/Cum from standard suppliers
approved by the department including
centering, shuttering, laying
concrete, curing etc. complete for Lintels
SECOND FLOOR
D1
W1
for cupboards

1
1
16

X
X
X

16
48
3

1.65
1.35
1.35

0.23
0.23
0.23

0.15
0.15
0.15
or say

Qty.

0.91
2.24
2.24
5.39 Cu.M.
5.40 Cu.M. 11407.80

61602

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456


using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as weigh
batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work
(APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including centering, shuttering,
laying concrete, vibrating, curing etc. complete for Beams
SECOND FLOOR
External Long beams

Main beams
conecting passage
Toilet Block
main beams

Verandah Tie beam


at staircase mid landing
connecting beams in ver

14
2
1
1
1
2
2
1
1
1
1
1
1
1
1
1

X
X
x
x
x
x
x
x
x
x
x
x
x
x
x
x

2
2
1
20
2
2
2
5
2
4
4
2
1
1
1
8

4.26
4.88
4.26
5.34
4.57
3.65
4.12
5.34
8.47
1.22
1.52
20.47
27.31
4.72
4.26
1.88

0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23

0.300
0.300
0.300
0.450
0.450
0.300
0.300
0.450
0.300
0.300
0.300
0.400
0.400
0.400
0.400
0.300
or say

311891749.xlsSF-Est F

85

8.23
1.35
0.29
11.05
0.95
1.01
1.14
2.76
1.17
0.34
0.42
3.77
2.51
0.43
0.39
1.04
36.85 Cu.M.
37.00 Cu.M. 10443.25

386400

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Qty.

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456


using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as weigh
batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work
(APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including centering, shuttering,
laying concrete, vibrating, curing etc. complete

311891749.xlsSF-Est F

86

Unit

Rate

Amount

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Qty.

Unit

Rate

Amount

for Slab of 125mm thick


SECOND FLOOR Slab with all
round 0.30 proj
over central rooms

42.70

8.00

341.60

over side rooms

17.96

8.00

287.36

over connecting passage

4.57

3.26

14.90

over toilet block

17.29

5.94

102.70
or say

1224.85

914963

841.75

57239

Reinforced Cement Concrete M25 Grade corresponding to IS 456 using


20mm size graded machine crushed hard granite metal (coarse aggregate)
from approved quarry including cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including
all operational, incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete but excluding cost of
steel and its fabrication charges for finished item of work (APSS No. 402)
with minimum cement content @ 380Kgs/Cum from standard suppliers
approved by the department including
centering, shuttering, laying
concrete, curing etc. complete for Sunshades / Chajjas for 75mm thick at
Fixed end and 50mm thick at Free end and for a width of 0.60 Mts. etc
complete for finished item of work.
SECOND FLOOR
Window
ver sunshade at ends

1
1
1
1

X
x
x
x

32
2
2
1

1.35
3.11
17.96
27.99

0.6
0.6
0.6
0.6
orsay

746.56 Sqm
747.00 Sqm

25.92
3.73
21.55
16.79
67.99 Sqm
68.00 Sqm

Brick Masonry in superstructure with CM(1:6)/ (1:8) prop: using second


class bricks from approved source having minimum crushing strength of 40
Kg/Sqcm. including cost and conveyance of all materials like cement, sand,
bricks, water etc., to site, including seigniorage charges, sales & other taxes
on all materials, all operational, incidental and labour charges such as mixing
cement mortar, constructing masonry, scaffolding charges, lift charges,
curing, etc., complete for finished item of work.
SECOND FLOOR
For superstructure

above ver beam


Ver Entra blature wall

toilet block c passage


toilet block

311891749.xlsSF-Est F

1
14
2
1
1
2
1
1
1
1
2
2
1
1
1
1

X
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

20
2
2
2
1
4
3
2
1
2
2
2
2
2
7
7

4.54
4.26
4.88
1.88
1.88
4.26
4.26
6.69
4.26
4.57
3.65
4.12
4.54
8.93
1.53
1.22
87

0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23

3.20
3.35
3.20
1.12
3.35
1.12
1.12
1.12
3.35
1.20
3.35
3.35
3.20
2.45
2.45
2.45

66.83
91.91
14.37
0.97
1.45
8.78
3.29
3.45
3.28
2.52
11.25
12.70
6.68
10.06
6.04
4.81

Sl.
No.

DESCRIPTION OF ITEM
DEDUCTIONS
D1
W1
ventilators
in toilet block

311891749.xlsSF-Est F

NO'S

1
1
1
1

X
X
X
x

16
48
32
8

1.22
0.90
0.90
3.00

0.23
0.23
0.23
0.23

88

D/H

Qty.

Unit

2.10
-9.43
1.35 -13.41
0.30
-1.99
0.45
-2.48
221.08 Cu.M.
or say 221.10 Cu.M.

Rate

5982.45

Amount

1322720

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Unit

Rate

Amount

Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion (cement:
fine aggregate: Coarse aggregate) using 20mm size Hard Broken Granite
(IS383, 1970) Machine Crushed graded metal from from approved quarry
including cost and conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, including seigniorage charges, sales & other
taxes on all materials, all operational, incidental and labour charges such as
mixing, laying, curing concrete, etc., complete for finished item of work for
Bed Blocks and Hold Fasts (APSS No. 402)
SECOND FLOOR
D1
W1

16
48

X
X

6
4

0.23
0.23

0.23
0.23

0.15
0.15
or say

Qty.

0.76
1.52
2.280 Cu.M.
3.00 Cu.M.

5965.50

17897

45215.55

768664

Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as
per IS 1786-1979) of different diameters for RCC works, including labour
charges for straightening, cutting, bending to required sizes and shapes,
placing in position with cover blocks of approved materials and size and
tying and lapsplicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost
and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding wire,
cover blocks and all incidental, operational, laour charges such as cutting,
bending placing in position, tying including sales and other taxes on all
materials etc., complete for finished item of work in all floors. (APSS No.126)
SECOND FLOOR
for coloumns
for roof beams
for roof slab of 125mm thick
for lintals
for sunshades of
600x65mmthick

1
1
1
1
1

X
X
X
X
X

1
1
1
1
1

19.00
37.00
747.00
5.40
68.00

0.125
0.075

100
120
100
80
80

or say

311891749.xlsSF-Est F

89

1900
4440
9338
432
408
16518
16.52
17.00

Mts
Mts

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Qty.

Unit

Rate

Amount

Plastering 20mm thick in two coats with base coat of 16mm thick in CM
(1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including
cost and conveyance of all materials like cement, screened sand, water etc.,
to site, seigniorage charges, sales & other taxes on all materials, all
operational, incidental and labour charges such as mixing mortar,scaffolding
charges, lift charges, finishing,including cutting of Grooves wherever
necessary as directed by Engineer - in - charge, curing, etc., for Uneven
Surfaces of Brick Wall complete for finished item of work. (APSS 901,903 &
904)
SECOND FLOOR- External
Superstructure
For Walls

staircase sides
deduction for ver opening
deduction for ver opening
deduction for doors
deduction for windows
deduction for ventilators
deduction for ventilators
add for passage
add for passage top
toilet block allround
toilet block allround

1
1
1
1
1
1
1
1
2
2
2
1
1
1
1
1
1
1
1
1
1
1

X
X
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

1
2
2
2
1
2
2
2
1
1
1
2
1
2
16
48
8
32
2
2
2
2

42.10
25.81
7.52
17.96
27.99
16.81
5.46
4.57
17.96
18.81
4.88
17.96
27.99
1.88
1.22
0.90
3.00
0.90
4.57
4.57
16.69
5.34

3.65
3.65
3.65
3.65
3.65
3.65
3.65
3.65
3.65
3.65
3.65
2.13
2.13
2.13
2.13
1.37
0.45
0.30
0.23
0.23
3.65
3.65

153.67
188.41
54.90
131.11
102.16
122.71
39.86
33.36
131.11
137.31
35.62
-76.51
-59.62
-8.01
-41.58
-59.18
-10.80
-8.64
2.10
2.10
121.84
38.98
3.09
### Sqm

Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6)
and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost
and conveyance of all materials like cement, sand, water etc., to site,
seigniorage charges, sales & other taxes on all materials,all operational,
10
incidental and labour charges such as mixing mortar, scaffolding charges, lift
charges, including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, finishing, curing, etc., for Even Surfaces of brick wall
complete for finished item of work. (APSS 901,903 & 904)
SECOND FLOOR -Internal
Rooms

inside ver
deduction for ver opening
deduction for ver opening
add for toilet connecting
passage

311891749.xlsSF-Est F

1
1
1
1
1
1
1
2
2

X
X
X
x
x
x
x
x
x

14
2
2
2
1
2
1
1
1

18.28
19.52
5.11
17.96
27.99
17.96
27.99
4.57
4.57
90

3.65
3.65
3.65
3.65
3.65
2.13
2.13
1.00
0.23

934.11
142.50
37.30
131.11
102.16
-76.51
-59.62
9.14
2.10

4124.10

426431

Sl.
No.

DESCRIPTION OF ITEM
toilet

inside WC
top of walls
deduction for toilets doors

311891749.xlsSF-Est F

NO'S
1
1
1
1
1
1
1
2

x
x
x
x
x
x
x
x

L
1
1
1
6
6
1
1
6

42.22
11.83
12.43
4.88
5.50
11.83
12.43
0.75

91

D/H

Qty.

Unit

3.65 154.10
2.45 28.98
2.45 30.45
2.45 71.74
2.45 80.85
0.23
2.72
0.23
2.86
2.13 -19.17
### Sqm
or say
### Sqm

Rate

4009.85

Amount

631551

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Qty.

Unit

Ceiling Plastering with CM (1:3) Prop: 12mm thick in single coat spong
finish including cost and conveyance of all materials like cement, sand,
water etc., to site, including seigniorage charges, sales & other taxes on all
11
materials, all operational, incidental charges and labour charges such as
mixing mortar, finishing, curing, etc., complete for finished item of work.
(APSS 901,906)
SECOND FLOOR
rooms
1
X 14
4.26
4.88
291.04
1
X 2
4.88
4.88
47.63
Stair case
1
X 1
4.26
4.88
20.79
Verandah
1
x
2
17.96
1.88
67.53
1
x
1
27.99
1.88
52.62
connecting passage
1
x
1
4.57
1.88
8.59
toilets
1
x
1
4.88 16.23
79.20
2
x
1
5.11
1.88
19.21
1
X 32
1.35
0.60
25.92
1
x
2
3.11
0.60
3.73
1
x
2
17.96
0.60
21.55
1
x
1
27.99
0.60
16.79
slab projection
1
x
1
42.70
0.30
12.81
1
x
2
25.81
0.30
15.49
1
x
2
17.96
0.30
10.78
1
x
1
27.99
0.30
8.40
1
x
2
7.40
0.30
4.44
toilets slab projection
1
x
2
3.97
0.30
2.38
1
x
2
17.29
0.30
10.37
1
x
2
5.34
0.30
3.20
722.49 Sq.M.
or say 723.00 Sq.M.
Providing impervious coat to exposed RCC roof slab surface with CM(1:3),
20mm thick with 1kg of water proof compound per bag of cement laid over
roof when it is green including cost of all materials, seigniorage charges,
12 excluding conveyance charges of materials and including all operational,
incidental and labour charges for mixing mortar, laying, rendering smooth
and thread lining, curing, rounding off junctions of wall and slab etc,,
complete for finished item of work
over central rooms
1
X 1
42.70
8.00
341.60
over side rooms
1
x
2
17.96
8.00
287.36
over connecting passage
1
x
1
4.57
3.26
14.90
over toilet block
1
x
1
17.29
5.94
102.70
746.56 Sqm
or say 747.00 Sqm

Flooring and Treads with Polished Bethamcherla coloured stone minimum


25 mm thick (0.254M x0.254M) set over base coat of CM (1:8) over already
laid CC bed / RCC Roof Slab, including neat cement slurry of honey like
13 consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full
depth including cost of all materials like cement, sand, and water and
flooring stones etc., complete, including seigniorage charges, labour charges
for dressing of flooring stones etc., complete for finished item of work, .
SECOND FLOOR
Class rooms

311891749.xlsSF-Est F

1
1

X
X

14
2

4.26
4.88
92

4.88
4.88

291.04
47.63

Rate

1915.00

Amount

138455

Sl.
No.

DESCRIPTION OF ITEM
Staircase
Verandah
connecting passage
SECOND FLOOR- Treads
Stair Case
Mid Landing
SECOND FLOOR

NO'S

1
1
1
1
2

X
x
x
x
x

1
2
1
1
1

D/H

4.26
17.96
27.99
4.57
5.11

4.88
1.88
1.88
1.88
1.88

20.79
67.53
52.62
8.59
19.21

21

2.10

0.30

13.23

4.26

1.52
or say

311891749.xlsSF-Est F

Qty.

93

Unit

Rate

6.48
527.12 Sq.M.
528.00 Sq.M. 11091.45

Amount

585629

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Qty.

Unit

Rate

Amount

Providing Skirting to internal walls and Risers of Steps to 15 cm height


with Polished shabad / Tandur stone minimum 15 to 18 mm thick of size
(0.254M x0.254M) length equal to flooring stones, set over base coat of CM
(1:3) 12 mm thick with cement slurry of honey like consistency spread at the
144
rate of 3.30 kgs per sqm and jointed with white cement paste mixed with
pigment of matching shade to full depth, including cost of all materials like
tiles, cement, sand and water etc., complete including seigniorage charges,
etc., complete for finished item of work,
SECOND FLOOR
rooms
corner rooms
staircase sides
ver

deduction for doors


connecting passage
a ) SECOND FLOOR- Risers
Stair Case

1
1
1
1
1
1
1
1
1

X
X
X
X
x
x
X
X
x

14
2
2
1
2
1
2
16
2

18.28
19.52
5.11
4.26
17.96
42.10
5.11
1.22
4.57

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

22

2.10

0.15
or say

38.39
5.86
1.53
0.64
5.39
6.32
1.53
-2.93
1.37
6.93
65.03 Sqmt
66.00 Sqmt

11579.35

76424

79.20
-1.20
78.00 sqmts

9628.00

75101

64.60
40.11
54.45
### sqmts 10309.75

164090

Flooring with ceramic tiles 7.3mm thick of 1st quality all


shades of makes Jhonson & Jhonson, Kajaria, Nitco and
Marbonite, set over base coat of cement mortar (1:8), 12
mm thick over CC bed already laid or RCC roof slab,
including neat cement slurry of honey like consistency
spread @ 3.3.kgs per sqm & jointed neatly with white
cement paste to full depth mixed with pigment of matching
shade, including cost of all materials like cement, sand
water and tiles etc., complete, including seigniorage
charges, etc., complete for finished item of work.
GF
deduction for WC

1
1

x
x

1
6

16.23
0.40

4.88
0.50

Dadooing to walls with Decorated white back ground glazed


tiles 200mm x 152mm 1st. quality of any bramd as
approved by Engineer - in - charge and set over a base coat
of CM (1:5), 12mm thick and neat cement paste at the rate
of 3.3 Kg/Sqmt. and jointed with white cement paste mixed
with pigment of matching shade including cost and
conveyance of all materials like cement, sand, water, tiles,
etc. to site, seigniorage charges, sales and other taxes on all
materials, C921 such as mixing of cement mortar, laying in
position, curing, lift charges etc., complete for finished item
of work
1
x
1
42.22
WC
1
x
6
4.88
For Bath
1
x
6
5.50

311891749.xlsSF-Est F

94

1.53
1.37
1.65

Sl.
No.

DESCRIPTION OF ITEM
NO'S
L
B
D/H
Qty.
Painting to external walls with Water Proof Cement Paint two (2) coats all
colours and shade as approved by Engineer in charge over a base coat of a
cement primer water base exterior Grade-II of approved brand, makind
three (3) coats in all to give an even shade after thourughly brushing the
15
surface to remove all dirt and remains of loose powdered materials, including
cost and conveyance of all materials to work site and all operational,
incidental, labour charges etc., complete for finished item of work in all
floors
for item
external
walls (SS 911)
qty vide
no.18
722.49
qty vide item no.17
or say

311891749.xlsSF-Est F

95

Unit

###
###
### Sqm

Rate

279.30

Amount

43990

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Qty.

Unit

Rate

Amount

Painting to New External Walls with two coats of Polymer Plastic Emulsion
paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of
approved brand and shade as approved by the Engineer - in - Charge over
base coat of cement primer water base grade -II exterior making three coats
in all to give an even shade after thoroughly brushing the surface to remove
16
all loose powdered materials, including cost and conveyance of all materials,
including cost and conveyance of all materials, cost of brushes, water to site,
etc., sales & other taxes, all operational, incidental and labour charges such
as scaffolding charges, lift charges, curing etc., complete for finished item of
work in all floors for external Walls.(APSS No. 911)
SECOND FLOOR- External
qty vide item no.16 b
or say

###
###
###

1314.90

135961

7699.00

320106

#REF!

#REF!

DOORS AND WINDOWS


Manufacturing, Supply, delivery and fixing of plain MS sheet door of size 1.20
x 2.13 with frame made of L Angular section of 40 X 40 X 6mm and inner
frame of double leave shutters with MS "L"angle of 35 X 35 X 4mm welded
17 with 2 nos of 25 X 25 X 3 angle and 3 No.s of 30x4mm each leaf and welded
with powder coated fixtures including red oxide paint including cost and
conveyance of all materials and labour charges etc., complete for finished
item of work. (Ground Floor & First floor) weight not less than 75 Kgs
SECOND FLOOR
(D1)

16

1.22

2.13

41.58
or say

Sqm
41.58 Sqm

WINDOWS
Supply and fixing of Window of Size 0.90 x 1.20 M Four Leaf shutter with
window frame of Medium Teak wood of Section 100 mm x 75 mm and
shutter frame of Medium Teak wood of section 100mm x 32 mm thick and
window planks of medium fiber board exterior both sides laminated 12mm
thick and safety bars of 10 mm square bars at 100mm center to center
18
distance horizantally and Hardware fixtures ie., MSPC Butt Hinges 100mm
Long 12nos, MSPC Handles 125 mm Long 6 Nos MSPC Tower Bolt 150mm
long 6 Nos, MS Hold Fast 4 Nos Including Labour charges for making Window
frame and shutter, fixing of Fixtures etc., and cost and conveyance of all
materials to site, taxes extra complete for finished item of work.
SECOND FLOOR
Windows

48

0.91

1.37
or say

311891749.xlsSF-Est F

96

59.84
59.84 Sqm

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Qty.

Unit

Rate

Amount

Supply and fixing of MS Ventilators of size 1.22 M x 1.22 M with out angular
frame of rolled steel equal angle of ISA 2525 opf size 25 mm x 25mm x 4mm
(2 Nos. horizontally and 2 Nos. vertically) weleded with safety bars of 10 mm
square rods at 100 mm centre to centre horizontally and vertically as per
approved drawing of Enginer-in-Charge including red oxide primer of grade-I
quality, sales and other taxes cost and conveyuance of all materials to site
all labour charges etc complete for finished item of work.
1

3.05

0.45

10.98 Sqm

19 Supply and fixing of PVC doors with all costs,all incidental labour charges etc complete
for toilets main door
1
x
1
1.22
2.13
2.60
for toilet doors
1
x 12
0.75
2.13 19.17
21.77 Sqm
or say
22.00 Sqm

1591.30

17472

3500

77000

974.55

25241

Painting to New Iron work with two coats of ready mixed synthetic enamel
paint first quality all shades over red oxide primer Grade-I making three (3)
coats in all to given and even shade after thourughly brushing the surface to
20 remove all dirt and remains of loose powered materials, including cost and
conveyance of all materials to site, sales & other taxes, incidental,
operational and all labour charges etc., complete for finished item of work.
(APSS No. 1201, 1207 & 1212).in All Floors
DOORS
WINDOWS

16
48

X ###
X 2.75

1.22
0.91

2.13
1.37

#REF!

Asst. Executive Engineer,


TW Section: Chntoor

311891749.xlsSF-Est F

93.55
164.56
258.11
259.00

Sqm
Sqm
Sqm
Sqm

#REF!

Dy. Executive Engineer,


TW SD: Bhadrachalam

97

NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY


(V&M) IN KHAMMAM(Dist.)
DETAIL CUM ABSTRACT ESTIMATE - FIRST FLOOR
Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Qty.

Unit

Rate

Amount

10

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456


using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges such as
weigh batching, machine mixing, laying concrete, curing etc.,complete
but excluding cost of steel and its fabrication charges for finished item of
work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department including centering,
shuttering, laying concrete, vibrating, curing etc. complete for Columns
FIRST FLOOR
Columns
c1 to C 40
T1 to T10
c2Ver C 1 to C14

1
1
1

X
X
X

40
10
14

0.23
0.23
0.23

0.40
0.40
0.300

3.35
3.35
3.35

206040

Reinforced Cement Concrete M25 Grade corresponding to IS 456 using


20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges such as
weigh batching, machine mixing, laying concrete, curing etc.,complete
but excluding cost of steel and its fabrication charges for finished item of
work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department including centering,
shuttering, laying concrete, curing etc. complete for Lintels
First Floor
D1
W1
for cupboards

1
1
16

X
X
X

16
48
3

1.65
1.35
1.35

0.23
0.23
0.23

0.15
0.15
0.15
or say

12.33
3.08
3.24
18.65
19.00 cum 10844.20

0.91
2.24
2.24
5.39Cu.M.
5.40Cu.M. 10520.05

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456


using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges such as
weigh batching, machine mixing, laying concrete, curing etc.,complete
but excluding cost of steel and its fabrication charges for finished item of
work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department including centering,
shuttering, laying concrete, vibrating, curing etc. complete for Beams
First Floor
External Long beams

Main beams
conecting passage
Toilet Block
311891749.xlsFF-Est F

14
2
1
1
1
2

X
X
x
x
x
x

2
2
1
20
2
2

4.26
4.88
4.26
5.34
4.57
3.65
98

0.23
0.23
0.23
0.23
0.23
0.23

0.300
0.300
0.300
0.450
0.450
0.300

8.23
1.35
0.29
11.05
0.95
1.01

56808

Sl.
No.

DESCRIPTION OF ITEM

NO'S
2

311891749.xlsFF-Est F

D/H

4.12

0.23

0.300

99

Qty.
1.14

Unit

Rate

Amount

Sl.
No.

DESCRIPTION OF ITEM
main beams

Verandah Tie beam


at staircase mid landing
connecting beams in ver

NO'S
1
1
1
1
1
1
1
1
1

x
x
x
x
x
x
x
x
x

L
5
2
4
4
2
1
1
1
8

5.34
8.47
1.22
1.52
20.47
27.31
4.72
4.26
1.88

D/H

Qty.

0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23

0.450
0.300
0.300
0.300
0.400
0.400
0.400
0.400
0.300

2.76
1.17
0.34
0.42
3.77
2.51
0.43
0.39
1.04
36.85Cu.M.
37.00Cu.M. 9608.60

or say

a)

Unit

Rate

Amount

355518

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456


using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges such as
weigh batching, machine mixing, laying concrete, curing etc.,complete
but excluding cost of steel and its fabrication charges for finished item of
work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department including centering,
shuttering, laying concrete, vibrating, curing etc. complete
for Slab of 125mm
thick
First Floor Slab with all
round 0.30 proj
over central rooms

42.70

8.00

341.60

Ded Stair case

-1

4.26

5.11

-21.77

over side rooms

17.96

8.00

287.36

over connecting passage

4.57

3.26

14.90

over toilet block

17.29

5.94

102.70

724.79
or say 725.00
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456
using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges such as
weigh batching, machine mixing, laying concrete, curing etc.,complete
but excluding cost of steel and its fabrication charges for finished item of
work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department including centering,
shuttering, laying concrete, vibrating, curing etc. complete for Slab of
150mm thick
Staircase I flight
1
X 1
3.85
2.10
8.09
Landing
1
X 1
4.26
2.10
8.95
Staircase II flight
1
X 1
3.85
2.10
8.09
25.13
or say
25.50

311891749.xlsFF-Est F

100

Sqm
Sqm

1124.85

815516

Sqm
Sqm

1529.05

38991

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

1
1
1
1

X
x
x
x

32
2
2
1

1.35
3.11
17.96
27.99

0.6
0.6
0.6
0.6
orsay

Rate

Amount

25.92
3.73
21.55
16.79
67.99 Sqm
68.00 Sqm

797.95

54261

8063.15

16126

Plain Cement Concrete M25 Grade of Concrete corresponding to IS 456


using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges such as
weigh batching, machine mixing, laying concrete, curing etc.,complete
but excluding cost of steel and its fabrication charges for finished item of
work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department including centering,
shuttering, laying concrete, curing etc. complete for Steps
First Floor
for stair case

Unit

Reinforced Cement Concrete M25 Grade corresponding to IS 456 using


20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges such as
weigh batching, machine mixing, laying concrete, curing etc.,complete
but excluding cost of steel and its fabrication charges for finished item of
work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department including centering,
shuttering, laying concrete, curing etc. complete for Sunshades /
Chajjas for 75mm thick at Fixed end and 50mm thick at Free end and for
a width of 0.60 Mts. etc complete for finished item of work.
First Floor
Window W1
ver sunshade at ends

Qty.

1.04
1.04 Cum
orsay
2.00 Cum
Brick Masonry in superstructure with CM(1:6)/ (1:8) prop: using second
class bricks from approved source having minimum crushing strength of
40 Kg/Sqcm. including cost and conveyance of all materials like cement,
sand, bricks, water etc., to site, including seigniorage charges, sales &
other taxes on all materials, all operational, incidental and labour
charges such as mixing cement mortar, constructing masonry,
scaffolding charges, lift charges, curing, etc., complete for finished item
of work.
First Floor
For superstructure
1
X 20
4.54
0.23
3.20 66.83
14
x 2
4.26
0.23
3.35 91.91
2
x 2
4.88
0.23
3.20 14.37
above ver beam
1
x 2
1.88
0.23
1.12
0.97
1
x 1
1.88
0.23
3.35
1.45
Ver Entra blature wall
2
x 4
4.26
0.23
1.12
8.78
1
x 3
4.26
0.23
1.12
3.29
1
x 2
6.69
0.23
1.12
3.45
1
x 1
4.26
0.23
3.35
3.28
toilet block c passage
1
x 2
4.57
0.23
1.20
2.52
toilet block
2
x 2
3.65
0.23
3.35 11.25
2
x 2
4.12
0.23
3.35 12.70
1
x 2
4.54
0.23
3.20
6.68
1
x 2
8.93
0.23
2.45 10.06
1
x 7
1.53
0.23
2.45
6.04

311891749.xlsFF-Est F

22

2.10

101

0.30

0.075

Sl.
No.

DESCRIPTION OF ITEM

NO'S
1

311891749.xlsFF-Est F

L
7

1.22

102

B
0.23

D/H
2.45

Qty.
4.81

Unit

Rate

Amount

Sl.
No.

DESCRIPTION OF ITEM
DEDUCTIONS
D1
W1
ventilators
in toilet block

NO'S

Superstructure
For Walls

311891749.xlsFF-Est F

1
1
1
1
1
1
1

X
X
X
x

X
X
x
x
x
x
x

16
48
32
8

1.22
0.90
0.90
3.00

0.23
0.23
0.23
0.23

D/H

Qty.

Unit

Rate

2.10
-9.43
1.35 -13.41
0.30
-1.99
0.45
-2.48
221.08Cu.M.
or say 221.10Cu.M. 5690.20
Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion
(cement: fine aggregate: Coarse aggregate) using 20mm size Hard
Broken Granite (IS383, 1970) Machine Crushed graded metal from from
approved quarry including cost and conveyance of all materials like
9 cement, sand, coarse aggregate, water etc. to site, including seigniorage
charges, sales & other taxes on all materials, all operational, incidental
and labour charges such as mixing, laying, curing concrete,
etc.,
complete for finished item of work for Bed Blocks and Hold Fasts
(APSS No. 402)
First Floor
D1
16 X 6
0.23
0.23
0.15
0.76
W1
48 X 4
0.23
0.23
0.15
1.52
2.280Cu.M.
or say
3.00Cu.M. 5471.95
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500
grade as per IS 1786-1979) of different diameters for RCC works,
including labour charges for straightening, cutting, bending to required
sizes and shapes, placing in position with cover blocks of approved
materials and size and tying and lapsplicing with binding wire of 18 SWG,
forming grills for reinforcement work as per approved designs and
10
drawings, including cost and conveyance of steel bars, including all
wastages such as overlaps, couplings, chairs, spacer bars including cost
and conveyance of binding wire, cover blocks and all incidental,
operational, laour charges such as cutting, bending placing in position,
tying including sales and other taxes on all materials etc., complete for
finished item of work in all floors. (APSS No.126)
First Floor
for coloumns
1
X 1
19.00
100
1900
for roof beams
1
X 1
37.00
120
4440
for roof slab of 125mm
1
X 1 725.00 0.125
100
9063
thick
for Waist slab of 150mm
1
x
1
25.50 0.150
100
383
thick
for lintals
1
X 1
5.40
80
432
for sunshades of
1
X 1
68.00 0.075
80
408
600x65mmthick
16625
16.63 Mts
or say
17.00 Mts 45215.55
Plastering 20mm thick in two coats with base coat of 16mm thick in
CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish
including cost and conveyance of all materials like cement, screened
sand, water etc., to site, seigniorage charges, sales & other taxes on all
11 materials, all operational, incidental and labour charges such as mixing
mortar,scaffolding charges, lift charges, finishing,including cutting of
Grooves wherever necessary as directed by Engineer - in - charge,
curing, etc., for Uneven Surfaces of Brick Wall complete for finished
item of work. (APSS 901,903 & 904)
FIRST FLOOR- External
a

1
1
1
1

1
2
2
2
1
2
2

42.10
25.81
7.52
17.96
27.99
16.81
5.46
103

3.65
3.65
3.65
3.65
3.65
3.65
3.65

153.67
188.41
54.90
131.11
102.16
122.71
39.86

Amount

1258103

16416

768664

Sl.
No.

DESCRIPTION OF ITEM

staircase sides
deduction for ver
opening
deduction for ver
opening
deduction for doors
deduction for windows
deduction for ventilators
deduction for ventilators
add for passage
add for passage top
toilet block allround
toilet block allround

NO'S
1
2
2
2
1
1
1
1
1
1
1
1
1
1
1

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

L
2
1
1
1
2
1
2
16
48
8
32
2
2
2
2

D/H

4.57
17.96
18.81
4.88
17.96
27.99
1.88
1.22
0.90
3.00
0.90
4.57
4.57
16.69
5.34

3.65
3.65
3.65
3.65
2.13
2.13
2.13
2.13
1.37
0.45
0.30
0.23
0.23
3.65
3.65

Qty.

Unit

33.36
131.11
137.31
35.62
-76.51
-59.62
-8.01
-41.58
-59.18
-10.80
-8.64
2.10
2.10
121.84
38.98
3.09
### Sqm

Rate

Amount

3851.40

398234

3737.20

588609

Plastering 12mm thick in two coats with base coat of 8mm thick in CM
(1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish
including cost and conveyance of all materials like cement, sand, water
etc., to site, seigniorage charges, sales & other taxes on all materials,all
12 operational, incidental and labour charges such as mixing mortar,
scaffolding charges, lift charges, including cutting of Grooves wherever
necessary as directed by Engineer - in - charge, finishing, curing, etc.,
for Even Surfaces of brick wall complete for finished item of work. (APSS
901,903 & 904)
FIRST FLOOR -Internal
Rooms

inside ver
deduction for ver
opening
deduction for ver
opening
add for toilet connecting
passage
toilet

inside WC
top of walls
deduction for toilets
doors

1
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
2

X
X
X
x
x
x
x
x
x
x
x
x
x
x
x
x
x

14
2
2
2
1
2
1
1
1
1
1
1
6
6
1
1
6

18.28
19.52
5.11
17.96
27.99
17.96
27.99
4.57
4.57
42.22
11.83
12.43
4.88
5.50
11.83
12.43
0.75

3.65
3.65
3.65
3.65
3.65
2.13
2.13
1.00
0.23
3.65
2.45
2.45
2.45
2.45
0.23
0.23
2.13
or say

311891749.xlsFF-Est F

104

934.11
142.50
37.30
131.11
102.16
-76.51
-59.62
9.14
2.10
154.10
28.98
30.45
71.74
80.85
2.72
2.86
-19.17
### Sqm
### Sqm

Sl.
No.

13

14

a)
a)

DESCRIPTION OF ITEM

NO'S

D/H

Qty.

Unit

Rate

Ceiling Plastering with CM (1:3) Prop: 12mm thick in single coat spong
finish including cost and conveyance of all materials like cement, sand,
water etc., to site, including seigniorage charges, sales & other taxes on
all materials, all operational, incidental charges and labour charges such
as mixing mortar, finishing, curing, etc., complete for finished item of
work. (APSS 901,906)
FIRST FLOOR
rooms
1
X 14
4.26
4.88
291.04
1
X 2
4.88
4.88
47.63
Stair case
1
X 1
4.26
4.88
20.79
Verandah
1
x
2
17.96
1.88
67.53
1
x
1
27.99
1.88
52.62
connecting passage
1
x
1
4.57
1.88
8.59
toilets
1
x
1
4.88 16.23
79.20
2
x
1
5.11
1.88
19.21
1
X 32
1.35
0.60
25.92
1
x
2
3.11
0.60
3.73
1
x
2
17.96
0.60
21.55
1
x
1
27.99
0.60
16.79
slab projection
1
x
1
42.70
0.30
12.81
1
x
2
25.81
0.30
15.49
1
x
2
17.96
0.30
10.78
1
x
1
27.99
0.30
8.40
1
x
2
7.40
0.30
4.44
toilets slab projection
1
x
2
3.97
0.30
2.38
1
x
2
17.29
0.30
10.37
1
x
2
5.34
0.30
3.20
722.49Sq.M.
or say 723.00Sq.M. 1766.35
Flooring and Treads with Polished Bethamcherla coloured stone
minimum 25 mm thick (0.254M x0.254M) set over base coat of CM (1:8)
over already laid CC bed / RCC Roof Slab, including neat cement slurry of
honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat
cement to full depth including cost of all materials like cement, sand, and
water and flooring stones etc., complete, including seigniorage charges,
labour charges for dressing of flooring stones etc., complete for finished
item of work, .
FIRST FLOOR
Class rooms
1
X 14
4.26
4.88
291.04
1
X 2
4.88
4.88
47.63
Staircase
1
X 1
4.26
4.88
20.79
Verandah
1
x
2
17.96
1.88
67.53
1
x
1
27.99
1.88
52.62
connecting passage
1
x
1
4.57
1.88
8.59
2
x
1
5.11
1.88
19.21
FIRST FLOOR- Treads
Stair Case
1
X 21
2.10
0.30
13.23
Mid Landing
FIRST FLOOR
1
X 1
4.26
1.52
6.48
527.12Sq.M.
or say 528.00Sq.M. 10868.75

311891749.xlsFF-Est F

105

Amount

127707

573870

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Qty.

Unit

Rate

Amount

Providing Skirting to internal walls and Risers of Steps to 15 cm height


with Polished shabad / Tandur stone minimum 15 to 18 mm thick of size
(0.254M x0.254M) length equal to flooring stones, set over base coat of
CM (1:3) 12 mm thick with cement slurry of honey like consistency
15
spread at the rate of 3.30 kgs per sqm and jointed with white cement
paste mixed with pigment of matching shade to full depth, including cost
of all materials like tiles, cement, sand and water etc., complete
including seigniorage charges, etc., complete for finished item of work,
FIRST FLOOR
rooms
corner rooms
staircase sides
ver

1
1
1
1
1
1
1
1
1

X
X
X
X
x
x
X
X
x

14
2
2
1
2
1
2
16
2

18.28
19.52
5.11
4.26
17.96
42.10
5.11
1.22
4.57

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

deduction for doors


connecting passage
a ) FIRST FLOOR- Risers
Stair Case
1
Xthick
22 of 1st
2.10
0.15
Flooring
with ceramic tiles 7.3mm
quality all
shades of makes Jhonson & Jhonson, Kajaria, Nitco and
Marbonite, set over base coat of cement mortar (1:8),
or say
12 mm thick over CC bed already laid or RCC roof slab,
including neat cement slurry of honey like consistency
Dadooing
to walls per
withsqm
Decorated
white
back
ground
spread @ 3.3.kgs
& jointed
neatly
with
white
glazed
tiles
200mm
x
152mm
1st.
quality
of
any
cement
paste to full depth mixed
with1pigment
ofbramd
GF
1
x
16.23
4.88
as
approved
by Engineer
- charge
and set over
matching
shade,
including- in
cost
of all materials
like a
deduction
forCM
WC(1:5), 12mm1thick
x and
6 neat 0.40
0.50
base
coatsand
of
cement
cement,
water and tiles etc., complete,
including
paste
at
the
rate
of
3.3
Kg/Sqmt.
and
jointed
with
white
seigniorage charges, etc., complete for finished item of
cement
work. paste mixed with pigment of matching shade
including cost and conveyance of all materials like
1 toxsite,1 seigniorage
42.22
1.53
cement, sand, water, tiles, etc.
charges,
sales and other taxes
WC
1 onxall materials,
6
4.88C921
1.37
such
as
mixing
of
cement
mortar,
laying
in
position,
For Bath
1
x
6
5.50
1.65
curing, lift charges etc., complete for finished item of
work

38.39
5.86
1.53
0.64
5.39
6.32
1.53
-2.93
1.37
6.93
65.03 Sqmt
66.00 Sqmt 11330.75

74783

79.20
-1.20
78.00sqmts 9372.35

73107

64.60
40.11
54.45
###sqmts10309.75

164090

Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using 2nd class


bricks having a crushing strength of not less than 35.00kg/cm2 and using
two mild steel bars of 6m dia in every third layer of brick masory, with
free joints of the main block work including cost and seignorage charges
16
and conveyance of all materials and water from approved sources to
work site and all operational, incidental, labour charges such as
scaffolding mixing mortor constructing masonary lift charges, curing etc.
complete but excluding the cost of steel and its fabrication charges
Stair case railing

7.65
7.65 Sqm
or say
8.00 Sqm
Painting to external walls with Water Proof Cement Paint two (2) coats all
colours and shade as approved by Engineer in charge over a base coat
of a cement primer water base exterior Grade-II of approved brand,
makind three (3) coats in all to give an even shade after thourughly
17
brushing the surface to remove all dirt and remains of loose powdered
materials, including cost and conveyance of all materials to work site and
all operational, incidental, labour charges etc., complete for finished item
of work in all floors for external walls (SS 911)
qty vide item no.18
722.49
qty vide item no.17
###
###
or say
### Sqm

311891749.xlsFF-Est F

7.29

106

1.050

7268.30

5815

279.30

43990

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Qty.

Unit

Rate

Amount

Painting to New External Walls with two coats of Polymer Plastic Emulsion
paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality
of approved brand and shade as approved by the Engineer - in - Charge
over base coat of cement primer water base grade -II exterior making
three coats in all to give an even shade after thoroughly brushing the
18 surface to remove all loose powdered materials, including cost and
conveyance of all materials, including cost and conveyance of all
materials, cost of brushes, water to site, etc., sales & other taxes, all
operational, incidental and labour charges such as scaffolding charges,
lift charges, curing etc., complete for finished item of work in all floors for
external Walls.(APSS No. 911)
FIRST FLOOR- External
qty vide item no.16 b
or say

###
###
###

1314.90

135961

Sqm
41.58 Sqm

7699.00

320106

WINDOWS
Supply and fixing of Window of Size 0.90 x 1.20 M Four Leaf shutter
with window frame of Medium Teak wood of Section 100 mm x 75 mm
and shutter frame of Medium Teak wood of section 100mm x 32 mm
thick and window planks of medium fiber board exterior both sides
laminated 12mm thick and safety bars of 10 mm square bars at 100mm
20 center to center distance horizantally and Hardware fixtures ie., MSPC
Butt Hinges 100mm Long 12nos, MSPC Handles 125 mm Long 6 Nos
MSPC Tower Bolt 150mm long 6 Nos, MS Hold Fast 4 Nos Including
Labour charges for making Window frame and shutter, fixing of Fixtures
etc., and cost and conveyance of all materials to site, taxes extra
complete for finished item of work.
FIRST FLOOR
Windows
1
X 48
0.91
1.37
59.84
or say
59.84 Sqm

#REF!

#REF!

Supply and fixing of MS Ventilators of size 1.22 M x 1.22 M with out


angular frame of rolled steel equal angle of ISA 2525 opf size 25 mm x
25mm x 4mm (2 Nos. horizontally and 2 Nos. vertically) weleded with
safety bars of 10 mm square rods at 100 mm centre to centre
horizontally and vertically as per approved drawing of Enginer-in-Charge
including red oxide primer of grade-I quality, sales and other taxes cost
and conveyuance of all materials to site all labour charges etc complete
for finished item of work.
1
x
8
3.05
0.45 10.98 Sqm

1591.30

17472

21 Supply and fixing of PVC doors with all costs,all incidental labour charges etc complete
for toilets main door
1
x
1
1.22
2.13
2.60
for toilet doors
1
x 12
0.75
2.13 19.17
21.77 Sqm
or say
22.00 Sqm
3500

77000

DOORS AND WINDOWS


Manufacturing, Supply, delivery and fixing of plain MS sheet door of size
1.20 x 2.13 with frame made of L Angular section of 40 X 40 X 6mm and
inner frame of double leave shutters with MS "L"angle of 35 X 35 X 4mm
welded with 2 nos of 25 X 25 X 3 angle and 3 No.s of 30x4mm each leaf
19
and welded with powder coated fixtures including red oxide paint
including cost and conveyance of all materials and labour charges etc.,
complete for finished item of work. (Ground Floor & First floor) weight not
less than 75 Kgs
FIRST FLOOR
(D1)

16

1.22

2.13

41.58
or say

311891749.xlsFF-Est F

107

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Qty.

Unit

Rate

Sqm
Sqm
Sqm
Sqm

974.55

Amount

Painting to New Iron work with two coats of ready mixed synthetic
enamel paint first quality all shades over red oxide primer Grade-I
making three (3) coats in all to given and even shade after thourughly
22 brushing the surface to remove all dirt and remains of loose powered
materials, including cost and conveyance of all materials to site, sales &
other taxes, incidental, operational and all labour charges etc., complete
for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors
DOORS
WINDOWS

16
48

X ###
X 2.75

1.22
0.91

2.13
1.37

93.55
164.56
258.11
259.00

#REF!

Asst. Engineer,
TW Bhadrachalam

311891749.xlsFF-Est F

25241
#REF!

Dy. Executive Engineer,


TW SD: Bhadrachalam

108

Executive Engineer
TWD: Bhadrachalam

NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY (V&M) IN
KHAMMAM(Dist.)
DETAIL CUM ABSTRACT ESTIMATE - GROUND FLOOR
Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Qty.

Unit

Rate

Amount

10

Earth work excavation for foundations and depositing on bank for all lifts and
with an initial lead of 10m including all operational, incidental, seigniorage
charges, labour charges such as shoring ,sheeting, planking, strutting,
dewatering etc. complete for finished item of work as per SS - 20 B (APSS
308). for Foundation
for Footing F1 to F40

40

2.80

2.80

2.00 627.20

for Footing T1 To T10


for Ver Footing

1
1

X
X

10
14

2.80
2.20

2.80
2.20

2.00 156.80
2.00 135.52

Under P/B long wall external

1
2

X
X

18
3

4.66
20.47

0.45
0.45

0.450
0.450

16.99
24.87

For Connecting passage


For Toilet Block
Cross walls

1
1
1

x
x
x

2
2
5

4.35
16.91
4.66

0.45
0.45
0.45

0.450
0.450
0.450

1.76
6.85
4.72

1
1

x
x

2
4

8.25
1.00

0.45
0.45

0.450
0.450

3.34
0.81

1
1

x
X

4
18

1.31
4.66

0.45
0.45

0.450
0.450

1.06
16.99

Below Flooring

1
1

X
x

14
2

4.22
4.88

4.88
4.88

0.080
0.080

23.06
3.81

in Ver

1
1

x
x

1
2

42.10
17.96

2.10
2.10

0.080
0.080

7.07
6.03

in connecting passage

1
1

x
x

1
1

4.57
16.23

2.10
4.88

0.080
0.080

0.77
6.34
###

cum

###

cum

Under P/B long wall internal

or say

Plain Cement Concrete (1:4:8) proportion (cement: fine aggregate:


Coarse aggregate) using 40mm size Hard Broken Granite (IS383, 1970)
machine crushed metal from approved quarry including cost and conveyance
of all materials like cement, sand, coarse aggregate, water etc. to site,
mixing concrete in concrete mixer including seigniorage charges, sales &
other taxes on all materials, all operational, incidental, and labour charges
such as laying and ramming concrete in layers in position not exceeding
15cm, finishing top surface, curing concrete, etc., complete for finished item
of work. (APSS No. 402).
for Footing F1 to F40
for Footing T1 To T10

1
1

X
X

40
10

2.50
2.50

2.50
2.50

0.15
0.15

37.50
9.38

for Ver Footing


Under P/B long wall external

1
1

X
X

14
18

1.90
4.66

1.90
0.45

0.15
0.100

7.58
3.77

2
1

X
x

3
3

20.47
42.10

0.45
0.45

0.100
0.100

5.53
5.68

1
1
1

x
x
x

2
2
5

4.35
16.91
4.66

0.45
0.45
0.45

0.100
0.100
0.100

0.39
1.52
1.05

1
1

x
x

2
4

8.25
1.00

0.45
0.45

0.100
0.100

0.74
0.18

1
1

x
X

4
18

1.31
4.66

0.45
0.45

0.100
0.100

0.24
3.77

Below Flooring

1
1

X
x

14
2

4.22
4.88

4.88
4.88

0.080
0.080

4.73
0.78

in Ver

1
1

x
x

1
2

42.10
17.96

2.10
2.10

0.080
0.080

3.37
2.87

in connecting passage

1
1

x
x

1
1

4.57
16.23

2.10
4.88

0.080
0.080

0.37
1.30

For Connecting passage


For Toilet Block
Cross walls

Under P/B long wall internal

90.75
311891749.xlsGF-Est

109

cum

247.70

258599

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

or say
91.00
Filling with useful available excavated earth (excluding rock) in trenches,
sides of foundations and basement with initial lead in layers not exceeding
15 cm thick, consolidating each deposited layer by watering and ramming
including cost and conveyance of water to work site and all operational,
incidental, labour charges, hire charges of T & P etc., complete for finished
item of work. APSS No.309 & 31
Qty of E.W.E. up to 2M depth

cum

Rate

Amount

3932.55

357862

cum

20.05

19749

cum

246.25

72398

-90.75

(-) Qty of Footings

###

(-) Qty of Pedastals

-8.71

Refilling Required

747.91

Excavated Earth Available


Useful Excavated Earth
Available
Total Refilling

296.08

cum

236.86

cum

80%

984.77
or say

985.00

Filling with Gravel in trenches, sides of foundations and basement with


initial lead in layers not exceeding 15cm thick, consolidating each deposited
layer by watering and ramming including all operational, incidental, labour
charges, seignorage charges, hire charges of T & P etc., complete for
finished item of work. APSS No.309 & 310
Below Flooring

14

in Ver

1
1

x
x

1
1
1

x
x
x

in connecting passage

Unit

###

(-)Qty of PCC (1:4:8)

Qty.

4.22

4.88

0.500 144.16

2
1

4.88
42.10

4.88
2.10

0.500
0.500

23.81
44.21

2
1
1

17.96
4.57
16.23

2.10
2.10
4.88

0.500
0.500
0.500

37.72
4.80
39.60

294.29
or say 294.00
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456
using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as weigh
batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work
(APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including centering, shuttering,
laying concrete, vibrating, curing etc. complete for Footings, Pedastal,
Plinth beam
FOOTINGS
for Footing F1 to F40
for Footing T1 To T10
for Ver Footing

1
1
1

X
X
X

40
10
14

2.80
2.80
1.90

2.80
2.80
1.90

0.45 141.12
0.45 35.28
0.40 20.22
###

PEDASTALS
P1
P2

1
1

X
X

50
14

0.40
0.40

0.60
0.45

0.60
0.60

7.20
1.51
8.71

311891749.xlsGF-Est

110

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Qty.

42.10
20.47

0.23
0.23

0.450
0.450

13.07
12.71

4.66
4.65

0.23
0.23

0.450
0.450

8.68
0.96

Unit

Rate

Amount

PLINTH BEAMS

Connecting passage sides

1
2

X
X

3
3

1
1

X
X

18
2

1
1

x
x

2
5

16.69
4.88

0.23
0.23

0.450
0.450

3.45
2.53

1
1
1

x
x
x

2
4
4

8.47
1.22
1.53

0.23
0.23
0.23

0.300
0.300
0.300

1.17
0.34
0.42

18

4.88

0.23

0.300

6.06
49.40

Total Quantity of Footings, Pedastals & Plinth Beam

###
255.00

cum

7671.25

1956169

cum

9063.40

253775

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456


using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as weigh
batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work
(APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including centering, shuttering,
laying concrete, vibrating, curing etc. complete for Columns
GROUND FLOOR
Columns
c1 to C 40
T1 to T10
c2Ver C 1 to C14

1
1
1

X
X
X

40
10
14

0.23
0.23
0.23

0.40
0.40
0.300

5.00
5.00
5.00

18.40
4.60
4.83
27.83
28.00

311891749.xlsGF-Est

111

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Qty.

Unit

Rate

Amount

Reinforced Cement Concrete M25 Grade corresponding to IS 456 using


20mm size graded machine crushed hard granite metal (coarse aggregate)
from approved quarry including cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including
all operational, incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete but excluding cost of
steel and its fabrication charges for finished item of work (APSS No. 402)
with minimum cement content @ 380Kgs/Cum from standard suppliers
approved by the department including
centering, shuttering, laying
concrete, curing etc. complete for Lintels
Ground Floor
D1
W1
for cupboards

1
1

X
X

16
48

1.65
1.35

0.23
0.23

0.15
0.15

0.91
2.24

16

1.35

0.23

0.15

2.24
5.39 Cu.M.

or say

5.40 Cu.M.

8865.35

47873

9204.95

340583

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456


using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as weigh
batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work
(APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including centering, shuttering,
laying concrete, vibrating, curing etc. complete for Beams
Ground Floor
External Long beams

14
2

X
X

2
2

4.26
4.88

0.23
0.23

0.300
0.300

8.23
1.35

1
1

x
x

1
20

4.26
5.34

0.23
0.23

0.300
0.450

0.29
11.05

conecting passage
Toilet Block

1
2
2

x
x
x

2
2
2

4.57
3.65
4.12

0.23
0.23
0.23

0.450
0.300
0.300

0.95
1.01
1.14

main beams

1
1

x
x

5
2

5.34
8.47

0.23
0.23

0.450
0.300

2.76
1.17

1
1

x
x

4
4

1.22
1.52

0.23
0.23

0.300
0.300

0.34
0.42

Verandah Tie beam

1
1

x
x

2
1

20.47
27.31

0.23
0.23

0.400
0.400

3.77
2.51

at staircase mid landing

1
1

x
x

1
1

4.72
4.26

0.23
0.23

0.400
0.400

0.43
0.39

connecting beams in ver

1.88

0.23

0.300

Main beams

or say

311891749.xlsGF-Est

112

1.04
36.85 Cu.M.
37.00 Cu.M.

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Qty.

Unit

Rate

Amount

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456


using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as weigh
batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work
(APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including centering, shuttering,
laying concrete, vibrating, curing etc. complete

a) for Slab of 125mm thick


Ground Floor Slab with all
round 0.30 proj
over central rooms

42.70

8.00

341.60

Ded Stair case

-1

4.26

5.11

-21.77

over side rooms

17.96

8.00

287.36

over connecting passage

4.57

3.26

14.90

over toilet block

17.29

5.94

102.70
or say

724.79 Sqm
725.00 Sqm

1077.35

781079

1476.05

37639

752.75

51187

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456


using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
10 including all operational, incidental and labour charges such as weigh
batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work
(APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including centering, shuttering, laying
concrete, vibrating, curing etc. complete for Slab of 150mm thick
Staircase I flight
Landing

1
1

X
X

1
1

3.85
4.26

2.10
2.10

Staircase II flight

3.85

2.10

8.09
8.95
8.09
25.13 Sqm
or say

25.50 Sqm

Reinforced Cement Concrete M25 Grade corresponding to IS 456 using


20mm size graded machine crushed hard granite metal (coarse aggregate)
from approved quarry including cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including
all operational, incidental and labour charges such as weigh batching,
11 machine mixing, laying concrete, curing etc.,complete but excluding cost of
steel and its fabrication charges for finished item of work (APSS No. 402)
with minimum cement content @ 380Kgs/Cum from standard suppliers
approved by the department including
centering, shuttering, laying
concrete, curing etc. complete for Sunshades / Chajjas for 75mm thick at
Fixed end and 50mm thick at Free end and for a width of 0.60 Mts. etc
complete for finished item of work.
Ground Floor
Window W1
ver sunshade at ends

1
1

X
x

32
2

1
1

x
x

2
1

1.35
3.11

0.6
0.6

25.92
3.73

17.96
27.99

0.6
0.6

21.55
16.79

orsay

311891749.xlsGF-Est

113

67.99 Sqm
68.00 Sqm

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Qty.

Unit

Rate

Amount

Plain Cement Concrete M25 Grade of Concrete corresponding to IS 456 using


20mm size graded machine crushed hard granite metal (coarse aggregate)
from approved quarry including cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including
12 all operational, incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete but excluding cost of
steel and its fabrication charges for finished item of work (APSS No. 402)
with minimum cement content @ 380Kgs/Cum from standard suppliers
approved by the department including
centering, shuttering, laying
concrete, curing etc. complete for Steps
Ground Floor
for stair case

22

2.10

0.30

0.075
orsay

1.04
1.04 Cum
2.00 Cum

7855.90

15712

5690.20

383178

4754.45

1051209

Brick Masonry in superstructure with CM(1:6)/ (1:8) prop: using second


class bricks from approved source having minimum crushing strength of 40
Kg/Sqcm. including cost and conveyance of all materials like cement, sand,
13 bricks, water etc., to site, including seigniorage charges, sales & other taxes
on all materials, all operational, incidental and labour charges such as mixing
cement mortar, constructing masonry, scaffolding charges, lift charges,
curing, etc., complete for finished item of work.
For Basement

toilet block c passage


toilet block

1
14
2
1
1
2
2
1
2
1
1

Ground Floor
For Basement

20
2
2
6
2
2
2
5
6
4
4

20

4.54
4.26
4.88
1.88
4.57
3.65
4.12
4.54
1.22
1.22
1.53

4.54

0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.23
0.23
0.23

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60

19.07
25.05
4.10
2.37
1.92
3.07
3.46
4.77
2.02
0.67
0.84
67.34

0.23

3.20

66.83

14
2

x
x

2
2

4.26
4.88

0.23
0.23

3.35
3.20

91.91
14.37

above ver beam

1
1

x
x

2
1

1.88
1.88

0.23
0.23

1.12
3.35

0.97
1.45

Ver Entra blature wall

2
1

x
x

4
3

4.26
4.26

0.23
0.23

1.12
1.12

8.78
3.29

1
1

x
x

2
1

6.69
4.26

0.23
0.23

1.12
3.35

3.45
3.28

1
2

x
x

2
2

4.57
3.65

0.23
0.23

1.20
3.35

2.52
11.25

2
1
1

x
x
x

2
2
2

4.12
4.54
8.93

0.23
0.23
0.23

3.35
3.20
2.45

12.70
6.68
10.06

1
1

x
x

7
7

1.53
1.22

0.23
0.23

2.45
2.45

6.04
4.81
-9.43

toilet block c passage


toilet block

X
x
x
x
x
x
x
x
x
x
x

DEDUCTIONS
D1

16

1.22

0.23

2.10

W1
ventilators

1
1

X
X

48
32

0.90
0.90

0.23
0.23

1.35 -13.41
0.30
-1.99

in toilet block

3.00

0.23

0.45
or say

311891749.xlsGF-Est

114

cum

-2.48
221.08 Cu.M.
221.10 Cu.M.

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Qty.

Unit

Rate

Amount

Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion (cement:
fine aggregate: Coarse aggregate) using 20mm size Hard Broken Granite
(IS383, 1970) Machine Crushed graded metal from from approved quarry
including cost and conveyance of all materials like cement, sand, coarse
14
aggregate, water etc. to site, including seigniorage charges, sales & other
taxes on all materials, all operational, incidental and labour charges such as
mixing, laying, curing concrete, etc., complete for finished item of work for
Bed Blocks and Hold Fasts (APSS No. 402)
Ground Floor
D1
W1

16
48

X
X

6
4

0.23
0.23

0.23
0.23

0.15
0.15
or say

0.76
1.52
2.280 Cu.M.
3.00 Cu.M.

5356.40

16069

45215.55

1989484

Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as
per IS 1786-1979) of different diameters for RCC works, including labour
charges for straightening, cutting, bending to required sizes and shapes,
placing in position with cover blocks of approved materials and size and
tying and lapsplicing with binding wire of 18 SWG, forming grills for
15 reinforcement work as per approved designs and drawings, including cost
and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding wire,
cover blocks and all incidental, operational, laour charges such as cutting,
bending placing in position, tying including sales and other taxes on all
materials etc., complete for finished item of work in all floors. (APSS No.126)
Ground Floor ::
for foottings
for coloumns
for roof beams
for roof slab of 125mm thick
for Waist slab of 150mm
thick
for lintals
for sunshades of
600x65mmthick

1
1

X
X

1
1

255.00
28.00

100
100

25500
2800

1
1

X
X

1
1

37.00
725.00

120
100

4440
9063

1
1

x
X

1
1

25.50
5.40

0.150

100
80

383
432

68.00

0.075

80

408
43025

0.125

or say

311891749.xlsGF-Est

115

43.03
44.00

Mts
Mts

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Qty.

Unit

Rate

Amount

Plastering 20mm thick in two coats with base coat of 16mm thick in CM
(1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including
cost and conveyance of all materials like cement, screened sand, water etc.,
to site, seigniorage charges, sales & other taxes on all materials, all
16 operational, incidental and labour charges such as mixing mortar,scaffolding
charges, lift charges, finishing,including cutting of Grooves wherever
necessary as directed by Engineer - in - charge, curing, etc., for Uneven
Surfaces of Brick Wall complete for finished item of work. (APSS 901,903 &
904)
Ground Floor- External
a

For basement
Back Side Wall
R/L Side Wall

1
1

X
X

1
2

42.10
25.81

0.60
0.60

25.26
30.97

1
1

x
x

2
2

7.52
17.96

0.60
0.60

9.02
21.55

for toilet block

1
1

x
x

1
2

27.99
16.81

0.60
0.60

16.79
20.17

connecting passage

1
1

x
x

2
2

5.46
4.57

0.60
0.60

6.55
5.48

1
1

x
x

1
1

4.72
4.72

1.2
0.9

0.30
0.15

1.42
0.64

1
1

x
x

1
1

4.72
4.72

0.6
0.3

0.15
0.15

0.42
0.21
138.50

for steps

or say
b

139.00 Sqm

3150.80

43796

3150.80

325792

Superstructure
For Walls

1
1

X
X

1
2

42.10
25.81

3.65 153.67
3.65 188.41

1
1

x
x

2
2

7.52
17.96

3.65 54.90
3.65 131.11

1
1

x
x

1
2

27.99
16.81

3.65 102.16
3.65 122.71

1
1

x
x

2
2

5.46
4.57

staircase sides

2
2
2

x
x
x

1
1
1

17.96
18.81
4.88

3.65 131.11
3.65 137.31
3.65 35.62

deduction for ver opening


deduction for ver opening

1
1

x
x

2
1

17.96
27.99

2.13 -76.51
2.13 -59.62

deduction for doors

1
1

x
x

2
16

1.88
1.22

2.13
-8.01
2.13 -41.58

deduction for windows


deduction for ventilators

1
1

x
x

48
8

0.90
3.00

1.37 -59.18
0.45 -10.80

deduction for ventilators


add for passage

1
1

x
x

32
2

0.90
4.57

0.30
0.23

add for passage top


toilet block allround
toilet block allround

1
1
1

x
x
x

2
2
2

4.57
16.69
5.34

3.65
3.65

39.86
33.36

-8.64
2.10

0.23
2.10
3.65 121.84
3.65 38.98
3.09
### Sqm

311891749.xlsGF-Est

116

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Qty.

Unit

Rate

Amount

Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6)
and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost
and conveyance of all materials like cement, sand, water etc., to site,
seigniorage charges, sales & other taxes on all materials,all operational,
17
incidental and labour charges such as mixing mortar, scaffolding charges, lift
charges, including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, finishing, curing, etc., for Even Surfaces of brick wall
complete for finished item of work. (APSS 901,903 & 904)
Ground Floor -Internal
Rooms

14

18.28

3.65 934.11

1
1

X
X

2
2

19.52
5.11

3.65 142.50
3.65 37.30

inside ver

1
1

x
x

2
1

17.96
27.99

deduction for ver opening


deduction for ver opening
add for toilet connecting
passage

1
1

x
x

2
1

17.96
27.99

2
2

x
x

1
1

4.57
4.57

toilet

1
1
1

x
x
x

1
1
1

42.22
11.83
12.43

inside WC

1
1

x
x

6
6

4.88
5.50

2.45
2.45

71.74
80.85

top of walls

1
1

x
x

1
1

11.83
12.43

0.23
0.23

2.72
2.86

deduction for toilets doors

0.75

3.65 131.11
3.65 102.16
2.13 -76.51
2.13 -59.62
1.00
0.23

3.65 154.10
2.45 28.98
2.45 30.45

2.13 -19.17
### Sqm
or say

311891749.xlsGF-Est

117

9.14
2.10

### Sqm

3464.40

545643

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Qty.

Unit

Rate

Amount

Ceiling Plastering with CM (1:3) Prop: 12mm thick in single coat spong
finish including cost and conveyance of all materials like cement, sand,
water etc., to site, including seigniorage charges, sales & other taxes on all
18
materials, all operational, incidental charges and labour charges such as
mixing mortar, finishing, curing, etc., complete for finished item of work.
(APSS 901,906)
Ground Floor
rooms

1
1

X
X

14
2

Stair case
Verandah

1
1

X
x

connecting passage

1
1

toilets

slab projection

toilets slab projection

4.26
4.88

4.88
4.88

291.04
47.63

1
2

4.26
17.96

4.88
1.88

20.79
67.53

x
x

1
1

27.99
4.57

1.88
1.88

52.62
8.59

1
2

x
x

1
1

4.88
5.11

16.23
1.88

79.20
19.21

1
1

X
x

32
2

1.35
3.11

0.60
0.60

25.92
3.73

1
1
1

x
x
x

2
1
1

17.96
27.99
42.70

0.60
0.60
0.30

21.55
16.79
12.81

1
1

x
x

2
2

25.81
17.96

0.30
0.30

15.49
10.78

1
1

x
x

1
2

27.99
7.40

0.30
0.30

8.40
4.44

1
1

x
x

2
2

3.97
17.29

0.30
0.30

2.38
10.37

5.34

0.30

3.20
722.49 Sq.M.
or say

723.00 Sq.M.

1424.60

102999

528.00 Sq.M. 10646.05

562111

Flooring and Treads with Polished Bethamcherla coloured stone minimum


25 mm thick (0.254M x0.254M) set over base coat of CM (1:8) over already
laid CC bed / RCC Roof Slab, including neat cement slurry of honey like
19 consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full
depth including cost of all materials like cement, sand, and water and
flooring stones etc., complete, including seigniorage charges, labour charges
for dressing of flooring stones etc., complete for finished item of work, .
Ground Floor
Class rooms

14

4.26

4.88

291.04

Staircase

1
1

X
X

2
1

4.88
4.26

4.88
4.88

47.63
20.79

Verandah

1
1

x
x

2
1

17.96
27.99

1.88
1.88

67.53
52.62

connecting passage

1
2

x
x

1
1

4.57
5.11

1.88
1.88

8.59
19.21

21

2.10

0.30

13.23

4.26

a ) Ground Floor- Treads


Stair Case
a ) Mid Landing
Ground floor

1.52
or say

311891749.xlsGF-Est

118

6.48
527.12 Sq.M.

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Qty.

Unit

Rate

Amount

Providing Skirting to internal walls and Risers of Steps to 15 cm height


with Polished shabad / Tandur stone minimum 15 to 18 mm thick of size
(0.254M x0.254M) length equal to flooring stones, set over base coat of CM
(1:3) 12 mm thick with cement slurry of honey like consistency spread at the
20
rate of 3.30 kgs per sqm and jointed with white cement paste mixed with
pigment of matching shade to full depth, including cost of all materials like
tiles, cement, sand and water etc., complete including seigniorage charges,
etc., complete for finished item of work,
Ground Floor
rooms
corner rooms

1
1

X
X

14
2

18.28
19.52

0.15
0.15

38.39
5.86

staircase sides

1
1
1

X
X
x

2
1
2

5.11
4.26
17.96

0.15
0.15
0.15

1.53
0.64
5.39

1
1

x
X

1
2

42.10
5.11

0.15
0.15

6.32
1.53

deduction for doors


connecting passage

1
1

X
x

16
2

1.22
4.57

0.15
0.15

-2.93
1.37

a ) Ground Floor- Risers


Stair Case

22

2.10

0.15

6.93

ver

or say

65.03 Sqmt
66.00 Sqmt 11082.15

73142

Flooring with ceramic tiles 7.3mm thick of 1st quality all


shades of makes Jhonson & Jhonson, Kajaria, Nitco and
Marbonite, set over base coat of cement mortar (1:8), 12
mm thick over CC bed already laid or RCC roof slab,
including neat cement slurry of honey like consistency
spread @ 3.3.kgs per sqm & jointed neatly with white
cement paste to full depth mixed with pigment of matching
shade, including cost of all materials like cement, sand
water and tiles etc., complete, including seigniorage
charges, etc., complete for finished item of work.
GF

16.23

4.88

79.20

deduction for WC

0.40

0.50

-1.20
78.00 sqmts

8024.80

62595

### sqmts 10309.75

164090

Dadooing to walls with Decorated white back ground glazed


tiles 200mm x 152mm 1st. quality of any bramd as
approved by Engineer - in - charge and set over a base coat
of CM (1:5), 12mm thick and neat cement paste at the rate
of 3.3 Kg/Sqmt. and jointed with white cement paste mixed
with pigment of matching shade including cost and
conveyance of all materials like cement, sand, water, tiles,
etc. to site, seigniorage charges, sales and other taxes on all
materials, C921 such as mixing of cement mortar, laying in
position, curing, lift charges etc., complete for finished item
of work
1
x
1
42.22

1.53

64.60

WC
For Bath

1.37
1.65

40.11
54.45

1
1

x
x

6
6

4.88
5.50

Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using 2nd class bricks
having a crushing strength of not less than 35.00kg/cm2 and using two mild
steel bars of 6m dia in every third layer of brick masory, with free joints of
the main block work including cost and seignorage charges and conveyance
21
of all materials and water from approved sources to work site and all
operational, incidental, labour charges such as scaffolding mixing mortor
constructing masonary lift charges, curing etc. complete but excluding the
cost of steel and its fabrication charges
Stair case railing

7.29

1.050

7.65
or say

311891749.xlsGF-Est

119

7.65 Sqm
8.00 Sqm

6679.15

5343

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Qty.

Unit

Rate

Amount

White washing two coats with paint grade white lime for wash or
equivalent quality to give an even shade after thoroughly brushing the
22 surface to remove all dirt and remains of loose powdered materials including
cost of all materials, labour charges and incidental such as scaffolding, lift
charges etc., complete for finished item of work in all floors for walls
qty vide item no.18

722.49

qty vide item no.17

###
###
or say

### Sqm

279.30

43990

1314.90

154238

7699.00

320106

#REF!

#REF!

Painting to New External Walls with two coats of Polymer Plastic Emulsion
paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of
approved brand and shade as approved by the Engineer - in - Charge over
base coat of cement primer water base grade -II exterior making three coats
in all to give an even shade after thoroughly brushing the surface to remove
23
all loose powdered materials, including cost and conveyance of all materials,
including cost and conveyance of all materials, cost of brushes, water to site,
etc., sales & other taxes, all operational, incidental and labour charges such
as scaffolding charges, lift charges, curing etc., complete for finished item of
work in all floors for external Walls.(APSS No. 911)
Ground Floor- External
qty vide item no.16 b

###

qty vide item no.16 b

138.50
###
or say

###

DOORS AND WINDOWS


Manufacturing, Supply, delivery and fixing of plain MS sheet door of size 1.20
x 2.13 with frame made of L Angular section of 40 X 40 X 6mm and inner
frame of double leave shutters with MS "L"angle of 35 X 35 X 4mm welded
25 with 2 nos of 25 X 25 X 3 angle and 3 No.s of 30x4mm each leaf and welded
with powder coated fixtures including red oxide paint including cost and
conveyance of all materials and labour charges etc., complete for finished
item of work. (Ground Floor & First floor) weight not less than 75 Kgs
Ground Floor
(D1)

16

1.22

2.13

41.58
or say

Sqm
41.58 Sqm

WINDOWS
Supply and fixing of Window of Size 0.90 x 1.20 M Four Leaf shutter with
window frame of Medium Teak wood of Section 100 mm x 75 mm and
shutter frame of Medium Teak wood of section 100mm x 32 mm thick and
window planks of medium fiber board exterior both sides laminated 12mm
thick and safety bars of 10 mm square bars at 100mm center to center
26
distance horizantally and Hardware fixtures ie., MSPC Butt Hinges 100mm
Long 12nos, MSPC Handles 125 mm Long 6 Nos MSPC Tower Bolt 150mm
long 6 Nos, MS Hold Fast 4 Nos Including Labour charges for making Window
frame and shutter, fixing of Fixtures etc., and cost and conveyance of all
materials to site, taxes extra complete for finished item of work.
Ground Floor
Windows

48

0.91

1.37

59.84
or say

311891749.xlsGF-Est

120

59.84 Sqm

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Qty.

Unit

Rate

Amount

Supply and fixing of MS Ventilators of size 1.22 M x 1.22 M with out angular
frame of rolled steel equal angle of ISA 2525 opf size 25 mm x 25mm x 4mm
(2 Nos. horizontally and 2 Nos. vertically) weleded with safety bars of 10 mm
square rods at 100 mm centre to centre horizontally and vertically as per
approved drawing of Enginer-in-Charge including red oxide primer of grade-I
quality, sales and other taxes cost and conveyuance of all materials to site
all labour charges etc complete for finished item of work.
1

3.05

0.45

10.98 Sqm

27 Supply and fixing of PVC doors with all costs,all incidental labour charges etc complete
for toilets main door
1
x
1
1.22
2.13
2.60
for toilet doors
1
x 12
0.75
2.13 19.17
21.77 Sqm
or say
22.00 Sqm

1591.30

17472

3500

77000

974.55

25241

Painting to New Iron work with two coats of ready mixed synthetic enamel
paint first quality all shades over red oxide primer Grade-I making three (3)
coats in all to given and even shade after thourughly brushing the surface to
28 remove all dirt and remains of loose powered materials, including cost and
conveyance of all materials to site, sales & other taxes, incidental,
operational and all labour charges etc., complete for finished item of work.
(APSS No. 1201, 1207 & 1212).in All Floors
DOORS
WINDOWS

16
48

X ###
X 2.75

1.22
0.91

2.13
1.37

93.55
164.56
258.11
259.00

Sqm
Sqm
Sqm
Sqm

#REF!

Asst. Engineer,
TW Bhadrachalam

311891749.xlsGF-Est

#REF!

Dy. Executive Engineer,


TW SD: Bhadrachalam

121

Executive Engineer,
TW Divn., Bhadrachalam

NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS


(G) AT KAMEPALLY (V&M) IN KHAMMAM(Dist.)

GENERAL ABSTRACT
Sl. No.

Description of Item

Amount

1 a)

Additional Rooms ( 16 Nos.) in Ground Floor & Toilet


Block

#REF!

b)

Ground Floor electrification

18049

c)

Constructionof Septic Tank (200 users) & sanitary


arrangements

#REF!

2 a)

Additional Rooms ( 16 Nos.) in First Floor & Toilet


Block

#REF!

b)

First Floor electrification

84877

c)

Sanitary arrangements

89785
Sub-Total ::

#REF!

Add VAT 5%

#REF!

Q,C charges @ 0.50%

#REF!

L.S. Provision for Price Escalation and Flctuation of


rates and Rounding off
TOTAL ::

Assistant Engineer
TWS: Bhadrachalam

311891749.xls GA

122

1855302
#REF!

Dy. Executive Engineer,


TW SD: Bhadrachalam

Supply and fixing of Door size 1.05 x 1.98 M Double Leaf with Door Frame of Medium Teak wood
Section 100 mm x 75 mm and shutter of Plain Particle Board: Exterior Grade - 35mm thick, Hardware
fixtures ie., MSPC Butt Hinges 150mm Long 6 nos, MSPC Handles 150 mm Long 2 Nos MSPC Tower
Bolt 300mm long 1 Nos,MSPC Aldrop 300 mm long 1 no, MS Hold Fast 6 Nos including Including
Labour charges for making of door, fixing of fixtures etc., and cost and conveyance of all materials to
site, taxes extra for finished item of work.
Door Size : 1.05 x 1.98
Door Frame Horizontal
Vertical

1.05

1.98

2.08 Sqm.

1
1

1.05
1.98

0.10
0.10

0.075
0.075
Say

Door shutter : Plain Particle Board: Exterior Grade - 35mm thick


Horizontal x Vertical
2
0.53
1.98
Say

0.008
0.015
0.0230
0.0230

2.079 Sqm
2.08 Sqm
2.08

AB S T RAC T
Sl.
No.
1

Description
Door frame (Medium Teak wood)

Plain Particle Board: Exterior


Grade - 35mm thick(BMT-K-14)
3 Hard ware fixtures
a Hold fast
b MSPC Butt Hinges 150mm
c MSPC Handles 150mm
d MSPC Tower Bold 300mm long
e MSPC Aldrop 300mm
Labour charges for making of door
4(a)
frame
2

Labour charges for fixing Plain


Particle Board: Exterior Grade of
any thickness to the existing door
4(b)
frame including fixing the fixtures
to the door shutter excluding cost
of shutter
5
6
7

Agency Allowance on fixing


charges (4(a) +(b))
LS for screws
Over heads & Contractors profit @
14%

Qty.

Rate/Per

Amount

0.02 Cum

76280.00 Cum

1754.44

2.08 Sqm

1034.00 sqm

2150.72

6
6
4
2
2

Nos.
Nos.
Nos.
No.
Nos.

49.00
43.00
49.00
90.00
176.00

Each
Each
Each
Each
Each

294.00
258.00
196.00
180.00
352.00
200.00

2.08 Sq.m

230.00 Sqm

478.40

25%

678.40

169.60
LS

14%

20.00
6053.16
847.44

Rate per Each

cum
cum
cum
Cum

6900.60
7748.04

Supply and fixing of Window of Size 0.90 x 1.20 M Four Leaf shutter with window frame of Medium
Teak wood of Section 100 mm x 75 mm and shutter frame of Medium Teak wood of section 100mm x
32 mm thick and window planks of medium fiber board exterior both sides laminated 12mm thick and
safety bars of 10 mm square bars at 100mm center to center distance horizantally and Hardware
fixtures ie., MSPC Butt Hinges 100mm Long 12nos, MSPC Handles 125 mm Long 6 Nos MSPC Tower
Bolt 150mm long 6 Nos, MS Hold Fast 4 Nos Including Labour charges for making Window frame and
shutter, fixing of Fixtures etc., and cost and conveyance of all materials to site, taxes extra complete for
finished item of work.
Window Size :
0.90
Window Frame - Medium Teak wood
Horizontal
2.00
Vertical
2.00

1.20

1.08 Sqm.

0.90
1.20

0.10
0.10

0.075
0.075

0.014
0.018
0.0315
0.0315

cum
cum
cum
Cum

0.032
0.032

0.0029
0.0038
0.007
0.027
0.027

cum
cum
cum

Say
b

Window shutter : Medium Teak wood


for one shutter
Horizontal
2.00
Vertical
2.00

0.45
0.60

0.10
0.10

For Four shutters

4.00

0.007

Medium fiber board exterior both sides laminated 12mm thick


for Planks
for one shutter
Horizontal x vertical
0.19

Say

0.46

4.00

0.09

0.0874 Sqm
0.09 Sqm
0.36 Sqm

10.00

0.90

9.00 Rmt

Say
For Four shutters
Safety bars 12mm square rods

Horizontal

cum

Eq. weight Total Weight

0.89

0.89 Kg/Rmt
8.01 Kgs

AB S T RAC T
Sl.
No.

Description

1
2
3
4
5
a
b
c
d
e
6(a)

Qty.

Window frame (Medium Teak


wood)
Window shutter frame , Medium
Teak wood
Plain Particle Board: Exterior
Grade - 12mm thick(BMT-K-10
Safety bars 12mm square rods
Hard weare fixtures
MS Hold fast
MSPC Butt Hinges 100mm
MSPC Handles 125mm
MSPC Tower Bolt 150mm long
Delux window stay alluminium
Labour charges for making of
window frame

Labour charges for fixing Plain


Particle Board: Exterior Grade of
any thickness to the existing
6(b)
window frame including fixing the
fixtures to the window shutter
excluding cost of shutter
7
8
9

Agency Allowance on fixing


charges (4(a) +(b))
LS for screws

Rate/Per

0.0315 cum

76280.00 Cum

2402.82

0.027 cum

76280.00 Cum

2050.41

0.36 Sqm

363.00 sqm

130.68

8.01 Kgs

40.00 Kgs

320.40

4
8
4
4
4

Nos.
Nos.
Nos.
No.
Nos.

49.00
22.00
33.00
37.00
140.00

Each
Each
Each
Each
Each

196.00
176.00
132.00
148.00
560.00
199.00

1.87 Sq.m

230.00 Sqm

25%

430.10

629.10
LS

Over heads & Contractors profit @


14%

251.64
20.00
7017.05
982.39

Rate per Each

Assistant Engineer
TW: Manuguru

Amount

Deputy Executive Engineer


TWSD: Palvancha

Superintending Engineer

7999.44
8000.00

Executive Engineer
TWD: Bhadrachalam

Tribal Welfare, Warangal

GENERAL ABSTRACT
NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT
KAMEPALLY (V&M) IN KHAMMAM(Dist.)

S No.

Description of Item

Estimate

CONSTRUCTION OF COMPOUND WALL

ELECTRIFICATION

0.00

SUB ESTIMATE FOR WATER SUPPLY TO


TOILETS

0.00

1282077.00

60000.00

SUB ESTIMATE FOR MS GATE


Sub-Total ::

1342077.00
67104.00

Add VAT 5%

Q.C Charges @ 0.5%

Drilling of Bore Well with 2.00HP Submersible


Motor LS

LS for Unforeseen Iteams Such as Provision


for MS Gate

6710.00

TOTAL ::

1415891.00

Procg. No.G1/4086/2015, Dt:26-09-2015 of Commissioner of TW, TS, Hyd


Estimate Cost Rs. In
Lakhs

Name of Work
2 - Kitchen Cum Dining

484109.00

Grant

DETAILED CUM ABSTRACT ESTIMATE


NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY (V&M) IN
KHAMMAM(Dist.)
S
No.

Description of Item

Measurements

Nos.
3

Qty.

Rate

Unit

Amount

10

Earth work excavation for foundations and depositing on bank


for all lifts and with an initial lead of 10m including all
operational, incidental, seigniorage charges, labour charges
such as shoring ,sheeting, planking, strutting, dewatering etc.
complete for finished item of work as per SS - 20 B (APSS 308).
for Building Foundation
Qty VP No: 1 of MB No: 6671/C/TW
East Side
North Side
West Side Retaining Wall
South Side

1
1
1
1

x 18
x 22
x 1
x 8

0.90
0.90
32.60
0.90

0.90
0.90
0.75
0.90

0.90
0.90
0.75
0.90

13.12
16.04
18.34
5.83

Qty VP No: 6 of MB No: 6671/C/TW


East Side Plinth Beam

x 14

1.90

0.35

0.10

0.93

East Side Plinth Beam

1.30

0.35

0.10

0.09

East Side Plinth Beam

0.85

0.35

0.10

0.03

East Side Plinth Beam

2.00

0.35

0.10

0.07

North Side Plinth Beam


in between columns
North Side Plinth Beam
in between columns
North Side Plinth Beam
in between columns
North Side Plinth Beam
in between columns
North Side Plinth Beam
in between columns
North Side Plinth Beam
in between columns
North Side Plinth Beam
in between columns

x 12

1.90

0.35

0.10

0.80

1.20

0.35

0.10

0.04

0.90

0.35

0.10

0.03

1.70

0.35

0.10

0.12

3.00

0.35

0.10

0.11

1.70

0.35

0.10

0.06

0.30

0.35

0.10

0.01

0.35

0.10

0.11

Qty VP No: 7 of MB No: 6671/C/TW


North Side Plinth Beam 1
in between columns

1.60

South Side Plinth Beam 1


in between columns
South Side Plinth Beam 1
in between columns
South Side Plinth Beam 1
in between columns

1.90

0.35

0.10

0.40

1.30

0.35

0.10

0.05

0.35

0.10

0.03

0.90

0.90

0.90

1.46

0.90

0.90

0.90

9.48

0.35

0.10

0.13

0.90

Qty VP No: 18 of MB No: 6671/C/TW


East Side

South Side

x 13

Qty VP No: 23 of MB No: 6671/C/TW


East Side Plinth Beam in 1
between Column

1.90

South Side Plinth Beam 1


in between Column

x 10

0.35

0.10

0.67

1.90

1.10

0.35

0.10

0.04

1.10

0.35

0.10

0.04

1.10

0.35

0.10

0.04
68.07

Plain Cement Concrete (1:5:10) proportion (cement: fine


aggregate: Coarse aggregate) using 40mm size Hard Broken
Granite (IS383, 1970) machine crushed metal from approved
quarry including cost and conveyance of all materials like
cement, sand, coarse aggregate, water etc. to site, mixing
concrete in concrete mixer including seigniorage charges, sales
& other taxes on all materials, all operational, incidental, and
labour charges such as laying and ramming concrete in layers
in position not exceeding 15cm, finishing top surface, curing
concrete, etc., complete for finished item of work (APSS No.
402) for Levelling Course and Flooring Bed

Qty VP No: 2 of MB No: 6671/C/TW


East Side
North Side

1
1

x 18
x 22

West Side Retaining Wall


West Side Retaining Wall
West Side Retaining Wall
South Side

1
1
1
1

x
x
x
x

1
1
1
8

0.90
0.90

0.90
0.90

0.15
0.15

2.19
2.67

15.00
15.00
2.60
0.90

0.75
0.75
0.75
0.90

0.15
0.15
0.15
0.15

1.69
1.69
0.29
0.97

Qty VP No: 9 of MB No: 6671/C/TW


East Side
Column

in

between 1

x 14

2.80

0.35

0.075

1.03

East Side
Column
East Side
Column
North Side
Column
North Side
Column
North Side
Column
North Side
Column
North Side
Column
North Side
Column

in

between 1

2.20

0.35

0.075

0.12

in

between 1

1.75

0.35

0.075

0.05

in between 1

2.90

0.35

0.075

0.08

in between 1

x 12

2.80

0.35

0.075

0.88

in between 1

2.10

0.35

0.075

0.06

in between 1

1.80

0.35

0.075

0.05

in between 1

2.60

0.35

0.075

0.14

in between 1

3.90

0.35

0.075

0.10

North Side
columns
North Side
columns

in between 1

2.60

0.35

0.075

0.07

in between 1

1.20

0.35

0.075

0.03

North Side
columns

in between 1

2.50

0.35

0.075

0.13

South Side in between 1


columns

2.80

0.35

0.075

0.44

266.00

Cum

18107.00

South Side in between 1


columns

2.20

0.35

0.075

0.06

South Side in between 1


columns

1.80

0.35

0.075

0.05

0.90

0.90

0.15

0.24

0.90

0.90

0.15

1.58

0.35

0.075

0.15

0.35

0.075

0.74

Qty VP No: 19 of MB No: 6671/C/TW


East Side

South Side

x 13

Qty VP No: 24 of MB No: 6671/C/TW


East Side Plinth Beam in 1
between Column

South Side Plinth Beam 1


in between Column

x 10

2.80

2.80

2.00

0.35

0.075

0.05

2.00

0.35

0.075

0.05

2.80

0.35

0.075

0.07
15.67

Plain Cement Concrete M15 grade nominal mix (1:2.5:5)


proportion (cement: fine aggregate: Coarse aggregate) using
20mm size Hard Broken Granite (IS383, 1970) Machine
Crushed graded metal from from approved quarry including
cost and conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, including seigniorage charges,
sales & other taxes on all materials, all operational, incidental
and labour charges such as mixing, laying, curing concrete,
etc., complete for finished item of work for Bed Blocks and Hold
Fasts (APSS No. 402)

Qty VP No: 31 of MB No: 6671/C/TW


East Side

23.20

0.30

0.050

0.35

East Side

6.45

0.30

0.050

0.10

East Side

24.30

0.30

0.050

0.36

East Side

5.85

0.30

0.050

0.09

North Side

18.20

0.30

0.050

0.27

North Side

23.25

0.30

0.050

0.35

North Side

5.50

0.30

0.050

0.08

North Side

4.00

0.30

0.050

0.06

North Side

4.30

0.30

0.050

0.06

Qty VP No: 32 of MB No: 6671/C/TW


North Side

5.65

0.30

0.050

0.08

West Side

32.60

0.30

0.050

0.49

South Side

4.65

0.30

0.050

0.07

South Side

18.20

0.30

0.050

0.27

South Side

32.50

0.30

0.050

0.49

4176.35

Cum

65443.00

South Side

5.40

0.30

0.050

0.08

Deduct Gate Port

-1

1.20

0.30

0.050

-0.02
3.18

5356.40

Cum

17033.00

6262.52

Cum

72708.00

9117.00

Cum

110407.00

PCC (1:3:6) using 60% of 40mm HBG metal and 40% 0f 20mm
HBG machine crushed metal including cost and conveyance of
all materials, centering charges, labour charges and curing fo
Side Walls
Qty VP No: 10 of MB No: 6671/C/TW
West Side Retaining Wall

15.00

0.60

0.600

5.40

West Side Retaining Wall

15.00

0.60

0.600

5.40

West Side Retaining Wall

2.60

0.60

0.600

0.94

Deduct Column Port

-1

0.23

0.23

0.600

-0.13
11.61

Vibrated
Reinforced
Cement
Concrete
M25
Grade
corresponding to IS 456 using 20mm size graded machine
crushed hard granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on
all materials including all operational, incidental and labour
charges such as weigh batching, machine mixing, laying
concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work (APSS No. 402)
with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including centering,
shuttering, laying concrete, vibrating, curing etc. complete

for FOOTINGS
Qty VP No: 4 of MB No: 6671/C/TW

For East Side

x 18

0.90

0.90

0.225

3.28

For North Side


For West Side
For South Side

1
1
1

x 22
x 4
x 8

0.90
0.75
0.90

0.90
0.75
0.90

0.225
0.225
0.225

4.01
0.51
1.46

0.90

0.90

0.225

0.36

Qty VP No: 21 of MB No: 6671/C/TW


For East Side

For South Side

x 11

0.90

0.90

0.225

2.00

0.90

0.90

0.300

0.49

For
South
Pillar

Side Gate 1

12.11

for PLINTH BEAM


Qty VP No: 14 of MB No: 6671/C/TW
For
Side
For
Side
For
Side
For
Side

Plinth
Plinth

Beam
Beam

East 1
East 1

x
x

1
1

23.20
6.45

0.23
0.23

0.30
0.30

1.60
0.45

Plinth Beam East 1


Plinth Beam North 1

x
x

1
1

24.30
18.20

0.23
0.23

0.30
0.30

1.68
1.26

For Plinth Beam North 1


Side

23.25

0.23

0.30

1.60

For Plinth Beam North 1


Side

5.50

0.23

0.30

0.38

For Plinth Beam North 1


Side

4.00

0.23

0.30

0.28

For Plinth Beam North 1


Side

4.30

0.23

0.30

0.30

For Plinth Beam North 1


Side

5.65

0.23

0.30

0.39

For West Side

32.60

0.23

0.30

2.25

Qty VP No: 15 of MB No: 6671/C/TW


For South Side

4.65

0.23

0.30

0.32

For West Side

18.20

0.23

0.30

1.26

Qty VP No: 26 of MB No: 6671/C/TW


For Plinth Beam East 1
Side
For Plinth Beam South 1
Side
For Plinth Beam South 1
Side
C

5.85

0.23

0.30

0.40

32.50

0.23

0.30

2.24

5.40

0.23

0.30

0.37
14.78

for Column
Qty VP No: 4 of MB No: 6671/C/TW
Column up to GL South 1
Side

Column
EastSide

up

to

GL 1

Column
EastSide

up

to

GL 1

0.23

0.23

0.40

0.17

x 12

0.23

0.23

0.40

0.25

0.23

0.23

0.30

0.10

Column up to GL North 1
Side

x 16

0.23

0.23

0.40

0.34

Column up to GL North 1
Side

0.23

0.23

0.30

0.10

Column up to GL
Side

0.23

0.23

0.35

0.07

West 1

Qty VP No: 15 of MB No: 6671/C/TW


Column East Side

0.23

0.23

1.80

0.76

Column East Side

0.23

0.23

1.80

0.19

Column East Side

0.23

0.23

1.80

0.76

Column North Side

x 15

0.23

0.23

1.80

1.43

Column North Side

0.23

0.23

1.80

0.19

Column North Side

0.23

0.23

1.80

0.19

Column North Side

0.23

0.23

1.80

0.29

Column West Side

x 13

0.23

0.23

1.80

1.24

Column South Side

0.23

0.23

1.80

0.19

Column South Side

0.23

0.23

1.80

0.57

11212.35

Cum

165719.00

Qty VP No: 21 of MB No: 6671/C/TW


For East Side

0.23

0.23

0.400

0.04

For South Side

0.23

0.23

0.300

0.03

Side Gate 1

0.35

0.35

0.400

0.10

0.23

0.23

0.400

0.19

0.23

0.23

1.950

0.21

For
South
Pillar

For South Side

Qty VP No: 26 of MB No: 6671/C/TW


For Column East Side

For Column East Rear Side

x 18

0.23

0.23

0.150

0.14

For Column Narth Side


Raising
For Column Narth Side
Raising
For Column West Side
Raising

x 16

0.23

0.23

0.150

0.13

0.23

0.23

0.300

0.10

x 13

0.23

0.23

0.150

0.10

0.23

0.23

0.150

0.06

Qty VP No: 27 of MB No: 6671/C/TW


For Column South Side

For Column South Side

x 11

0.23

0.23

1.950

1.13

For Column South Side


Gate Pillar

0.35

0.35

1.950

0.48

9.55

10618.45

Cum

101406.00

20.05

Cum

787.00

246.25

Cum

0.00

Filling with useful available excavated earth (excluding rock) in


trenches, sides of foundations and basement with initial lead in
layers not exceeding 15 cm thick, consolidating each deposited
layer by watering and ramming including cost and conveyance
of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item
of work. APSS No.309 & 310

Qty VP No: 5 of MB No: 6671/C/TW


5

Earth work excavation


Deductions:
PCC 1:5:10 Qty
Footings Qty
Columns Qty Vide

68.07
-15.67
-12.11
-1.03
39.26

Filling with Gravel in trenches, sides of foundations and


basement with initial lead in layers not exceeding 15cm thick,
consolidating each deposited layer by watering and ramming
including all operational, incidental, labour charges, seignorage
charges, hire charges of T & P etc., complete for finished item
of work. APSS No.309 & 310

Toilet
6

x 16

1.20

1.20

0.50

0.00
0.00

Brick Masonry in superstructure with CM (1:8) prop: using


second class bricks of size 23 x 11 x 7 Cms from approved
source having minimum crushing strength of 40 Kg/Sqcm.
including cost and conveyance of all materials like cement,
sand, bricks, water etc., to site, including seigniorage charges,
sales & other taxes on all materials, all operational, incidental
and labour charges such as mixing cement mortar,
constructing masonry, scaffolding charges, lift charges, curing,
etc., complete for finished item of work.

Qty VP No: 16 of MB No: 6671/C/TW


Est Side
Column

in

between 1

x 14

2.80

0.15

1.80

10.58

Est Side
Column

in

between 1

2.20

0.15

1.80

1.19

Est Side
Column

in

between 1

1.75

0.15

1.80

0.47

Est Side
Column

in

between 1

2.90

0.15

1.80

0.78

North Side in between 1


Column

x 12

2.80

0.15

1.80

9.07

North Side in between 1


Column

2.10

0.15

1.80

0.57

North Side in between 1


Column

1.80

0.15

1.80

0.49

North Side in between 1


Column

2.60

0.15

1.80

1.40

North Side in between 1


Column

3.90

0.15

1.80

1.05

Qty VP No: 17 of MB No: 6671/C/TW


North Side
Column
North Side
Column
North Side
Column
West Side
Column
West Side
Column
South Side
Column
South Side
Column
South Side
Column

in between 1

2.60

0.15

1.80

0.70

in between 1

1.20

0.15

1.80

0.32

in between 1

2.50

0.15

1.80

1.35

in between 1

0.15

1.80

0.27

in between 1

1 (1.20+0
.90)/2
x 12
2.80

0.15

1.80

9.07

in between 1

2.80

0.15

1.80

4.54

in between 1

2.20

0.15

1.80

0.59

in between 1

1.80

0.15

1.80

0.49

2.80

0.15

1.95

1.64

Qty VP No: 28 of MB No: 6671/C/TW


Est Side
Column

in

between 1

Est Side in between 1


Column Raising

x 14

2.80

0.15

0.15

0.88

Est Side in
Column Raising
Est Side in
Column Raising
Est Side in
Column Raising
Narth Side in
Column Raising

between 1

2.20

0.15

0.15

0.10

between 1

1.75

0.15

0.15

0.04

between 1

2.90

0.15

0.15

0.07

between 1

2.80

0.15

0.25

0.84

Narth Side in between 1


Column Raising
Narth Side in between 1
Column Raising
Narth Side in between 1
Column Raising

2.80

0.15

0.30

0.50

2.10

0.15

0.30

0.09

1.80

0.15

0.30

0.08

Narth Side in between 1 x 2


2.60
Column Raising
Narth Side in between 1 x 1
3.90
Column Raising
Narth Side in between 1 x 1
2.60
Column Raising
Narth Side in between 1 x 1
1.20
Column Raising
Narth Side in between 1 x 2
2.50
Column Raising
West Side in between 1 x 1
0.90
Column Raising
West Side in between 1 x 12
2.80
Column Raising
West Side in between 1 x 1
4.80
Column Raising
South Side in between 1 x 6
2.80
Column Raising
South Side in between 1 x 1
2.20
Column Raising
South Side in between 1 x 1
1.80
Column Raising
South Side in between 1 x 11
2.80
Column Raising
South Side in between 1 x 1
2.00
Column Raising
Qty VP No: 30 of MB No: 6671/C/TW

0.25

0.15

0.20

0.15

0.15

0.09

0.15

0.15

0.06

0.15

0.15

0.03

0.15

0.15

0.11

0.15

0.15

0.02

0.15

0.15

0.76

0.15

1.00

0.72

0.15

0.25

0.63

0.15

0.25

0.08

0.15

0.15

0.04

0.15

1.90

8.78

0.15

1.95

0.59

South Side in between 1


Column Raising
Deduct Gate Portation
-1

Qty VP No: 29 of MB No: 6671/C/TW

2.00

0.15

1.95

0.59

1.20

0.15

1.95

-0.35
59.52

5901.95

Cum

351284.00

57935.55

MT

153297.00

Providing High Yield Strength Deformed (HYSD) steel bars (Fe


415 grade as per IS 1786-1979) of different diameters for RCC
works, including labour charges for straightening, cutting,
bending to required sizes and shapes, placing in position with
cover blocks of approved materials and size and tying and
lapsplicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings,
including cost and conveyance of steel bars, including all
wastages such as overlaps, couplings, chairs, spacer bars
including cost and conveyance of binding wire, cover blocks
and all incidental, operational, laour charges such as cutting,
bending placing in position, tying including sales and other
taxes on all materials etc., complete for finished item of work in
all floors. (APSS No.126)

Qty VP No: 3 of MB No: 6671/C/TW

0.906

Qty VP No: 13 of MB No: 6671/C/TW

1.110

Qty VP No: 20 of MB No: 6671/C/TW

0.370

Qty VP No: 25 of MB No: 6671/C/TW

0.260
2.646

Ellies pattern flooring with CC(1:4:8)pro 80mm th with 40mm HG M/C metal
and CC(i:2:4)pro 40mm th with 20mm HG M/C metal and neatcement finishing
i/c c/c of all materials and labour charges etc

5.64

0.90

0.00

0.00

5550.69

10

Sqm

0.00

297.20

10

Sqm

12091.00

White washing SIngle coats with paint grade white lime for wash or
equivalent quality to give an even shade after thoroughly brushing the surface
to remove all dirt and remains of loose powdered materials including cost of all
materials, labour charges and incidental such as scaffolding, lift charges etc.,
complete for finished item of work in all floors for walls

East Side

23.20

1.95

45.24

East Side

6.45

1.95

12.58

East Side

30.15

1.95

58.79

Narth Side

18.20

1.95

35.49

Narth Side

16.50

2.10

34.65

Narth Side

6.75

1.95

13.16

Narth Side

4.00

1.95

7.80

Narth Side

4.30

1.95

8.39

Narth Side

5.65

1.95

11.02

Qty VP No: 34 of MB No: 6671/C/TW


West Side

32.60

1.95

63.57

South Side

4.65

1.95

9.07

South Side

18.20

1.95

35.49

South Side

32.50

1.95

63.38

South Side

5.40

1.95

10.53

-1

1.20

1.95

-2.34

Deduct Gate

406.82

Plastering to even surfaces of wall with CM(1:5) Prop: 12mm


thick in single coat including cost and conveyance of all
materials like cement, sand, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all
operational, incidental charges and labour charges such as
mixing mortar, finishing, curing, etc., complete for finished
item of work. (APSS 901,906)
Qty VP No: 33 of MB No: 6671/C/TW
East Side

23.20

1.95

45.24

East Side

6.45

1.95

12.58

East Side

30.15

1.95

58.79

Narth Side

18.20

1.95

35.49

Narth Side

16.50

2.10

34.65

Narth Side

6.75

1.95

13.16

Narth Side

4.00

1.95

7.80

Narth Side

4.30

1.95

8.39

Narth Side

5.65

1.95

11.02

Qty VP No: 34 of MB No: 6671/C/TW


West Side

32.60

1.95

63.57

South Side

4.65

1.95

9.07

South Side

18.20

1.95

35.49

South Side

32.50

1.95

63.38

South Side

5.40

1.95

10.53

-1

1.20

1.95

-2.34

Deduct Gate

406.82

1432.00

10

Sqm

58257.00

3150.80

10

Sqm

109657.00

Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6)
and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and
conveyance of all materials like cement, screened sand, water etc., to site,
seigniorage charges, sales & other taxes on all materials, all operational,
incidental and labour charges such as mixing mortar,scaffolding charges, lift
charges, finishing,including cutting of Grooves wherever necessary as directed
by Engineer - in - charge, curing, etc., for Uneven Surfaces of Brick Wall
complete for finished item of work. (APSS 901,903 & 904)

Qty VP No: 35 of MB No: 6671/C/TW


East Side

23.20

1.95

45.24

East Side

6.45

1.95

12.58

North Side

18.20

1.95

35.49

North Side

16.50

2.10

34.65

North Side

6.75

1.95

13.16

North Side

4.00

1.95

7.80

North Side

4.30

1.95

8.39

North Side

5.65

1.95

11.02

West Side

32.60

1.95

63.57

Qty VP No: 36 of MB No: 6671/C/TW


South Side

4.65

1.95

9.07

South Side

18.20

1.95

35.49

South Side

32.50

1.95

63.38

South Side

5.40

1.95

10.53

Deduct Column Port

-1

1.20

1.95

-2.34
348.03

Painting to New External Walls with two coats of Polymer Plastic


Emulsion paint of Asian / Berger / Nerolac / Saicoat / Endocem
or equalent quality of approved brand and shade as approved
by the Engineer - in - Charge over base coat of cement primer
water base grade -II exterior making three coats in all to give
an even shade after thoroughly brushing the surface to remove
all loose powdered materials, including cost and conveyance of
all materials, including cost and conveyance of all materials,
cost of brushes, water to site, etc., sales & other taxes, all
operational, incidental and labour charges such as scaffolding
charges, lift charges, curing etc., complete for finished item of
work in all floors for external Walls.(APSS No. 911

East Side

23.20

1.95

45.24

East Side

6.45

1.95

12.58

North Side

18.20

1.95

35.49

North Side

16.50

2.10

34.65

North Side

6.75

1.95

13.16

North Side

4.00

1.95

7.80

North Side

4.30

1.95

8.39

North Side

5.65

1.95

11.02

West Side

32.60

1.95

63.57

Qty VP No: 36 of MB No: 6671/C/TW

South Side

4.65

1.95

9.07

South Side

18.20

1.95

35.49

South Side

32.50

1.95

63.38

South Side

5.40

1.95

10.53

Deduct Column Port

-1

1.20

1.95

-2.34
348.03

1318.30

10

Sqm

45881.00

LS For U/F Iteams


SUB TOTAL :: 1282077.00

Assistant Engineer,
TWS-Bhadrachalam.

Dy. Executive Engineer,


TWSD-Bhadrachalam.

NAME OF THE WORK: CONSTRUCTION OF KITCHEN SHED AND UTENCIL CLEANING


PLATFORM AT SAMMAKKA SARALAMMA FUNCTIONAL HALL AT BHADRACHALAM (V&M)

Sl.
No
.

DESCRIPTION OF
ITEM

No's

D/H

1
1

Quantity UNIT

For Wash Area


Drain

1
1
1

X
X
X

0.90

0.90

0.90

2.19

1
1

3.00
15.00

0.30
0.30

0.60
0.30

0.54
1.35
4.08 Cum

10

247.70

1011.00

3268.95

4021

20.05

200

246.25

359

7671.25

3728

Plain Cement Concrete (1:5:10) proportion (cement: fine aggregate: Coarse


aggregate) using 40mm size Hard Broken Granite (IS383, 1970) machine crushed
metal from approved quarry including cost and conveyance of all materials like
cement, sand, coarse aggregate, water etc. to site, mixing concrete in concrete mixer
including seigniorage charges, sales & other taxes on all materials, all operational,
incidental, and labour charges such as laying and ramming concrete in layers in
position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for
finished item of work. (APSS No. 402).
For Footings
For Wash Area
Drain

Amount

Earth work excavation for foundations and depositing on bank for all lifts and with an
initial lead of 10m including all operational, incidental, seigniorage charges, labour
charges such as shoring ,sheeting, planking, strutting, dewatering etc. complete for
finished item of work as per SS - 20 B (APSS 308). for Building Foundation
For Footings

Rate

1
1

X
X

3
1

0.90
3.00

0.90
0.30

0.10
0.10

15.00

0.30

0.10

0.24
0.09
0.90
1.23 Cum

Filling with useful available excavated earth (excluding rock) in trenches, sides of
foundations and basement with initial lead in layers not exceeding 15 cm thick,
consolidating each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour charges, hire
charges of T & P etc., complete for finished item of work. APSS No.309 & 31
E/W/E - PCC+Fottings+Column
9.98 Cum

Filling with Gravel in trenches, sides of foundations and basement with initial lead in
layers not exceeding 15cm thick, consolidating each deposited layer by watering and
ramming including all operational, incidental, labour charges, seignorage charges, hire
charges of T & P etc., complete for finished item of work. APSS No.309 & 310
Basement filing

3 0.9

0.9

0.6

1.46
1.46 Cum

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using


20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials including all operational, incidental and
labour charges such as weigh batching, machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item
of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including
centering, shuttering, laying
concrete, vibrating, curing etc. complete for Footings
FOOTINGS
for Footing F1

0.90

0.90

Page 139

0.200

0.49
0.49 Cum

Sl.
No
.

DESCRIPTION OF
ITEM

No's

D/H

1
6

Drain

0.23

0.23

2.50

0.40
0.40 Cum

1
1
1

x
x
X

2
2
2

3.00

0.23

0.70

2.54
15.00

0.23
0.10

0.70
0.30

10

9063.40

3596.00

4754.45

12789.00

45215.55

1130

3464.40

5485

0.97
0.82
0.90
2.69 Cum

Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS
1786-1979) of different diameters for RCC works, including labour charges for
straightening, cutting, bending to required sizes and shapes, placing in position with
cover blocks of approved materials and size and tying and lapsplicing with binding
wire of 18 SWG, forming grills for reinforcement work as per approved designs and
drawings, including cost and conveyance of steel bars, including all wastages such as
overlaps, couplings, chairs, spacer bars including cost and conveyance of binding
wire, cover blocks and all incidental, operational, laour charges such as cutting,
bending placing in position, tying including sales and other taxes on all materials etc.,
complete for finished item of work in all floors. (APSS No.126)

0.025 Mts
0.025 Mts
9

Amount

Brick Masonry in superstructure with CM (1:8) prop: using second class bricks of size
23 x 11 x 7 Cm from approved source having minimum crushing strength of 40
Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks,
water etc., to site, including seigniorage charges, sales & other taxes on all materials,
all operational, incidental and labour charges such as mixing cement mortar,
constructing masonry, scaffolding charges, lift charges, curing, etc., complete for
finished item of work.
For Long Wall
For Cross Wall

Rate

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using


20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials including all operational, incidental and
labour charges such as weigh batching, machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item
of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including
centering, shuttering, laying
concrete, vibrating, curing etc. complete for Columns
1

Quantity UNIT

Plastering to even surfaces of wall with CM(1:4) Prop: 12mm thick in single coat
including cost and conveyance of all materials like cement, sand, water etc., to site,
including seigniorage charges, sales & other taxes on all materials, all operational,
incidental charges and labour charges such as mixing mortar, finishing, curing, etc.,
complete for finished item of work. (APSS 901,906)
For Long Wall
For Cross Wall

1
1

x
x

2
2

3.00
2.54

0.40
0.40

Drain
For Columns Alround

1
1

X
X

1
3

15.00
2.50

0.30
0.92

Page 140

2.40
2.03
4.50
6.90
15.83 10 Sqm

Sl.
No
.

10

DESCRIPTION OF
ITEM

No's

D/H

Quantity UNIT

Amount

10

Supply and Delivary of MS 40mm dia Medium weight pipes including all material to
site, all labour charges and fixing in position for etc, complete for finished iteam of
work
MS Pipe 40mm dia

10.67

53.35
350.00 Kg

11

Rate

65.00

22750.00

65.00

5525.00

515.47

25135

Supply and Delivary of MS 50mm dia Medium weight pipes including all material to
site, all labour charges and fixing in position for etc, complete for finished iteam of
work
MS Pipe 50mm dia

4.57

13.71
85.00 Kg

12 Roofing with Galvanized Trapezoidal profile roofing sheet with 0.50 mm thick fixed
with G.IJbolts & nuts 8mm dia with bitumen & G.I limpet washers filled with white
lead & including acoatof approved steel primer and two coats of approved paint on
over lapping of sheets complete (uptoapitchof600) and seigniorage charges,etc.,
complete, excluding the cost of purlins, rafters, trusses & cost of conveyance of all
materials.
1

10.67

4.57

48.76
48.76 Sqm

13 Ellispattern flooring with CC(1:5:10) using 40mm HBG metal of 80mm thick and top
with CC(1:2:4) using 20 mm HBG metal of 40mm thick and top finish with CM(1:3) of
0.07 cum/10 sqm and cement slurry 3.30 kg/10 sqm including cost and conveyance of
all materials of all materials etc., complete.
1

3.00

3.00

9.00
9.00

10
Sqm

5055.52

4550.00

14 Jungle Clearance Cleaning of open place including all Charges etc, complete

9721.00
Total :

Asst Engineer
TW Bhadrachalam

Dy Exe Engineer
TW SD, Bhadrachalam

Page 141

100000.00

Exe Engineer
TW Div-Bhadrachalam.

NAME OF THE WORK : PROVIDING SANITARY & WATER SUPPLY AND DRAINAGE FACILITIES TO TOILET
BLOCK AT STREE SHAKTHI BUILDING AT BHADRACHALAM (V&M)
S
No.

Description of Item

Measurements

Nos.
3

Qty.

Rate

Unit

Amount

10

Supplying & fixing SWR Nahani traps 1st quality including cost and
conveyance of all materials to site, all labour charges, sales and
other taxes on all materials etc., complete for finished item of
work. (APSS No 1326) for All Floors.
For Urinal

3.00
3.00

10

Rmt

3843.00

4186.10

Each

16744.00

258.00

Each

1548.00

6.85

Litre

6850.00

212.00

Rmt

21200.00

35.50

Each

355.00

6.00
6.00

Providing
RCC Storage Tank with cover and suitable locking
arrangement & making necessary holes for inlet & outlets and
over flow pipes but without fittings & base support for tanks
1

1000.00

###
###

Supplying and fixing


1" dia CPVC pipe including cost and
conveyance of all materials to site, all labour charges, sales and
other taxes on all materials etc., complete for finished item of
work
1 x
1
100.00
100.00
100.00

SSupplying and fixing 1" dia CPVC Elbow including cost and
conveyance of all materials to site, all labour charges, sales and
other taxes on all materials etc., complete for finished item of
work
1 x 10
-

10.00
10.00

Supplying & Fixing 12.7mm N.P bib tap Indian make 300 grams
Seiko / Nice/ Senior or equivalent including cost and conveyance of
all materials to site, all labour charges, sales and other taxes on all
materials etc., complete for finished item of work for All Floors.
For Toilts

384.33

4.00
4.00

336.00

Constructing 457.2mm x 457.2mm ( 1'-6" x 1'-6") brick in CM


(1:6) prop. Masonry inspection chamber upto 914.4mm (3'-0") and
fitted with light weight 457.2mm x 457.2mm ( 1'-6" x 1'-6") C.I.
frame and cover of 20Kg. including cost and conveyance of all
materials to site, all labour charges, sales and other taxes on all
materials etc., complete for finished item of work.
1

Each

10.00
10.00

Supplying and fixing of 160 mm dia 3.00Mts Double Socket


PVC/SWR PIPE 4.00 Kg/cm2 including cost and conveyance of all
materials and labour charges , etc, complete for finished item of
work for all floors.
1

112.00

Supplying and fixing 1" dia CPVC "T" Bend including cost and
conveyance of all materials to site, all labour charges, sales and
other taxes on all materials etc., complete for finished item of
work

10

10.00
10.00

Supplying and fixing


1" dia CPVC MTA including cost and
conveyance of all materials to site, all labour charges, sales and
other taxes on all materials etc., complete for finished item of
work
1 x 15
-

430.00

29.50

Each

443.00

38.50

Each

462.00

288.00

Each

1440.00

180.00

Each

720.00

5.00
5.00

12 Supplying and fixing 1" dia CPVC Tank Nipple including cost and
conveyance of all materials to site, all labour charges, sales and
other taxes on all materials etc., complete for finished item of
work
1 x
4
-

Each

12.00
12.00

11 Supplying and fixing 1" dia CPVC Ball Valve including cost and
conveyance of all materials to site, all labour charges, sales and
other taxes on all materials etc., complete for finished item of
work
1 x
5
-

15.00
15.00

10 Supplying and fixing


1" dia CPVC FTA including cost and
conveyance of all materials to site, all labour charges, sales and
other taxes on all materials etc., complete for finished item of
work
1 x 12
-

43.00

4.00
4.00

SUB TOTAL :: 54371.00

LEAD CHART
NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY (V&M) IN KHAMMAM(Dist.)
AS PER SCHEDULE OF RATES FOR BUILDINGS / IRRIGATION FOR THE YEAR 2015 - 2016
25%
Agency
Initial Cost Loading Unloading
Allowance
Conveyance excluding
Charges
Charges
on Loading
Charges
Seigionarage (Manual (Mechanical & Unloading
Charges
means)
means)
manual
means
6
7
8
9
10

Sl.
No.

Description

Index code

Source of
Material

Lead in
Km

Coarse Sand for Mortar

27
Pg. No. 22

Gommuru

7.00

68.07

560.00

Coarse Sand for filling

27
Pg. No. 22

Gommuru

7.00

68.07

Fine sand (screened)

28
Pg. No. 22

Gommuru

7.00

Gravel

M008
Pg. No. 32

Local

R.R. Stone(Granite,
Dolamite &Trap
variety)

M148
Pg. No. 42

6mm M/c HBG Metal


Nominal size

Allowance

Total

Unit per

Remarks

11

12

13

0.00

628.07

Cum.

560.00

0.00

628.07

Cum.

68.07

760.00

0.00

828.07

Cum.

10.00

101.19

103.00

0.00

204.19

Cum.

Local

10.00

101.19

252.00

0.00

353.19

Cum.

M 050
Pg. No. 34

Thoggudem

28.00

299.91

735.00

0.00

1034.91

Cum.

10mm M/c HBG Metal


Nominal size

M 051
Pg. No. 34

Thoggudem

28.00

299.91

935.00

0.00

1234.91

Cum.

13.2/12.5mm M/c HBG


Metal Nominal size

M 052
Pg. No. 34

Thoggudem

28.00

299.91

1097.00

0.00

1396.91

Cum.

Intial rate including


loading charges

20mm M/c HBG Metal


Nominal size

M 053
Pg. No. 34

Thoggudem

28.00

299.91

1365.00

0.00

1664.91

Cum.

25mm M/c HBG Metal


Nominal size

M 054
Pg. No. 34

Thoggudem

28.00

299.91

1313.00

0.00

1612.91

Cum.

10

40mm M/c HBG Metal


Nominal size

M 055
Pg. No. 35

Thoggudem

28.00

299.91

845.00

0.00

1144.91

Cum.

11

2nd Class Bricks of


size 23x11x7cm

TBSC-A.I-01

Gondigudem

30.00

517.42

5000.00

46.10

46.10

23.05

5632.67

1000
Nos

Loading &
Unloading Manual
means

12

Polished Bethamcherla
coloured stone
minimum 25 mm thick
(0.254M x0.254M)

TBSC-B.I-08

Betham
Cherla

550.00

1877.60

3860.00

33.40

16.75

12.54

5800.29

10 Sqm.

Loading &
Unloading Manual
means

13

High Polished Granite


Slabs 16 to 18mm thick
upto 8'-0" (2.43 Mts)

TBSC-B.III-01

Khammam

125.00

290.43

31830.00

33.40

16.75

12.54

32183.12

10 Sqm.

14

Polished Shahabad
(Tandur Blue) stones of
15 to 18mm thick
(0.457M x0.304M)

TBSC-B.I-03

Tandur

500.00

1127.60

1650.00

33.40

16.75

12.54

2840.29

10Sqm.

15

Shahabad/Tandur/Rou
gh stone slabs
minimum 40mm thick

TBSC-B.I-02

Tandur

500.00

2733.56

1240.00

33.40

16.75

12.54

4036.25

10Sqm.

16

Polished Kadapa Slab


of 15mm thick

TBSC-B.I-06

Kadapa

750.00

1532.46

1380.00

33.40

16.75

12.54

2975.15

10Sqm.

17

Ordinary Portland
Cement 43 Grade

At Site

0.00

6100.00

0.00

55.40

13.85

6169.25

M.T

18

Mild Steel Bars (Fe


250) for 6mm

At Site

0.00

42000.00

0.00

66.30

16.58

42082.88

M.T

-do-

19

High Yield Strength


Deformed Bars (Fe
415) for 8mm to
40mm dia

At Site

0.00

34000.00

0.00

66.30

16.58

34082.88

M.T

-do-

20

Mild Steel, Structural


steel, I,e, Angles,
Channels & I-Sections

At Site

0.00

40000.00

0.00

66.30

16.58

40082.88

M.T

-do-

Loading &
Unloading Manual
means

Unloading Manual
means

21

M.S. Plates

At Site

0.00

41000.00

0.00

66.30

16.58

41082.88

M.T

-do-

Note :- Rates of CEMENT and STEEL for the Month of August 2015 Vide GO.No. G.O.RT.No. 453 Dated: 18.09.2015
CERTIFICATES:1

Certified that the above leads are true and correct to the best of my knowledge

Certified that the quarry requries blasting for RR, CRS, 6mm, 10mm, 12mm, 20mm & 40mm Metal

Certified that the 40mm, 20mm, 12mm, 10mm, 6mm Metal requires Machine Crushing

Certified that the work spot falls within the limits of Agency area. Hence 25 % on labour is proposed and the same may be allowed.

Certified that mandal average leads are adopted for this work.
GRADED METAL OF 20mm for Concrete Work
6mm
10mm
12mm
20mm

Mason 1st Class


Mason 2nd Class
Man Mazdoor
Woman Mazdoor
Painter Class - 1
Painter Class - 2

Asst. Engineer,
TW Bhadrachalam

10%
15%
15%
60%

1034.91
1234.91
1396.91
1664.91

GRADED METAL for Granolithic Work


103.49
185.24
209.54
998.95
1497.22
415.00
370.00
310.00
310.00
480.00
370.00

Dy. Executive Engineer,


TW SD, Bhadrachalam

6mm
10mm
12mm

20%
20%
60%

1034.91
1234.91
1396.91

206.98
246.98
838.15
1292.11

415.00
370.00
310.00
310.00
480.00
370.00

Executive Engineer,
TW Divn., Bhadrachalam

Superintending Engineer
Tribal Welfare, Warangal

NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY (V&M)
IN KHAMMAM(Dist.)
DATAS AS PER A.P.REVISED STANDARD DATA FOR BUILDINGS - PART-III
VIDE G.O.MS.NO.49, I&CAD (PW: Reforms) Department dt.02-03-2009
WITH SCHEDULE OF RATES FOR BUILDING / IRRIGATION WORKS FOR THE YEAR 2015 - 2016
13.615%
BLDCSTN
- 1-3
Page - 14

Amount

Kg
Cum

720.00
1.05

6169.25
628.07

MT
Cum

4441.86
659.47

Day
25%

0.20
62.00

310.00

Day

62.00
15.50
5178.83

Kg
Cum

480.00
1.05

6169.25
628.07

MT
Cum

2961.24
659.47

Day
25%

0.20
62.00

310.00

Day

62.00
15.50
3698.21

Kg
Cum

360.00
1.05

6169.25
628.07

MT
Cum

2220.93
659.47

Day
25%

0.20
62.00

310.00

Day

62.00
15.50
2957.90

Kg
Cum

288.00
1.05

6169.25
628.07

MT
Cum

1776.74
659.47

Day
25%

0.20
62.00

310.00

Day

62.00
15.50
2513.72

Kg
Cum

240.00
1.05

6169.25
628.07

MT
Cum

1480.62
659.47

Day
25%

0.20
62.00

310.00

Day

62.00
15.50
2217.59

Cement Mortar(1:5)
Unit : Cum
A. Materials
Cement
Sand (Including 5% Wastage)
B.Labour
Man mazdoor for mixing mortar
Add Agency Allowance
Grand Total

BLDCSTN
- 1-7
Page - 15

Per

Cement Mortar(1:4)
Unit : Cum
A. Materials
Cement
Sand (Including 5% Wastage)
B.Labour
Man mazdoor for mixing mortar
Add Agency Allowance
Grand Total

BLDCSTN
- 1-6
Page - 15

Rate

Cement Mortar(1:3)
Unit : Cum
A. Materials
Cement
Sand (Including 5% Wastage)
B.Labour
Man mazdoor for mixing mortar
Add Agency Allowance
Grand Total

BLDCSTN
- 1-5
Page - 15

Qty

Cement Mortar(1:2)
Unit : Cum
A. Materials
Cement
Sand (Including 5% Wastage)
B.Labour
Man mazdoor for mixing mortar
Add Agency Allowance
Grand Total

BLDCSTN
- 1-4
Page - 14

Unit

Cement Mortar(1:6)
Unit : Cum
A. Materials
Cement
Sand (Including 5% Wastage)
B.Labour
Man mazdoor for mixing mortar
Add Agency Allowance
Grand Total

148

BLDCSTN
- 1-8
Page - 15

Cement Mortar(1:8)
Unit : Cum
A. Materials
Cement
Sand (Including 5% Wastage)
B.Labour
Man mazdoor for mixing mortar
Add Agency Allowance
Grand Total

BLDCSTN
- 2-1
Page - 16

Kg
Cum

180.00
1.05

6169.25
628.07

MT
Cum

1110.47
659.47

Day
25%

0.20
62.00

310.00

Day

62.00
15.50
1847.44

Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m
including all operational, incidental, seigniorage charges, labour charges such as shoring ,sheeting,
planking, strutting, dewatering etc. complete for finished item of work as per SS - 20 B (APSS 308). for
Building Foundation
Orinary soil - Manual means upto 3mts. Depts
Unit : Cum
Taking output = 10 Cum
a.Labour
Mate
Day
0
Mazdoor(Unskilled)
Day
3.64
Add 75% for building foundation
Add Agency Allowance
25%
1128.40
Sub-Total ::
b) Add 13.615 % Overhead& Contractors profit on (a+b)
c) Seigniorage charges
cum
10
Cost for 10 Cum = a+b
Rate per Cum = a+b/10
Rate per Cum

BLDCSTN
- 2-1
Page - 16

Day
Day

13.615%
22.00

2256.80
cum

0.00
1128.40
846.30
282.10
2256.80
0.00
220.00
2476.80
247.68
247.70

Earth work excavation for Septic tank and depositing on bank for all lifts and with an initial lead of 10m
including all operational, incidental, seniorage charges, labour charges such as shoring ,sheeting,
planking, strutting, dewatering and back filling etc. for finished item of work as per SS - 20 B (APSS
308).
Orinary soil - Manual means upto 3mts. Depts
Unit : Cum
Taking output = 10 Cum
a.Labour
Mate
Day
0
Mazdoor(Unskilled)
Day
3.64
Add Agency Allowance
25%
1128.40
Sub-Total ::
b) Add 13.615 % Overhead& Contractors profit on (a+b)
c) Seigniorage charges
cum
10
Cost for 10 Cum = a+b
Rate per Cum = a+b/10
Rate per Cum

BLDCSTN
- 2-8
Page - 18

0.00
310.00

0.00
310.00

Day
Day

13.615%
22.00

1410.50
cum

0.00
1128.40
282.10
1410.50
192.04
220.00
1822.54
182.25
182.30

Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by
watering and ramming including cost and conveyance of water to work site and all operational,
incidental, labour charges, hire charges of T & P etc., complete for finished item of work. APSS No.309
& 310
Unit :Cum
Taking output = 6 cum
a.Labour
Mate
Mazdoor(Unskilled)
Add Agency Allowance

Day
Day
25%

0.00
0.31
96.10

b) Add 13.615 % Overhead& Contracorst profit on a


Cost for 6 Cum = (a+b)
Rate per cum = a+b/6
Rate per cum

149

0.00
310.00

Day
Day

13.615%

120.13

0.00
96.10
24.03
120.13
0.00
120.13
20.02
20.05

BLDCSTN
- 2-8
Page - 18

Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not
exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all
operational, incidental, labour charges, seignorage charges, hire charges of T & P etc., complete for
finished item of work. APSS No.309 & 310
Unit :6 Cum
a.Labour
Mate
Mazdoor(Unskilled)
Add Agency Allowance

Day
Day
25%

0.00
0.31
96.10

0.00
310.00

Day
Day

0.00
96.10
24.03

b. Material
Gravel

cum

6.00

204.19

cum

13.615%
22.00

1345.27
cum

1225.14
1345.27
0.00
132.00
246.21
246.21
246.25

c) Add 13.615% Overhead& Contracorst profit on a+b


d) Seigniorage charges
cum
6
Cost for 1 Cum = (a+b+c+d)
Rate per Cum
Rate per cum

BLDCSTN
- 2-8
Page - 18

Filling with Sand in trenches, sides of foundations and basement with initial lead in layers not
exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all
operational, incidental, labour charges, seignorage charges, hire charges of T & P etc., complete for
finished item of work. APSS No.309 & 310
Unit :6 Cum
a.Labour
Mate
Mazdoor(Unskilled)
Add Agency Allowance

Day
Day
25%

0.00
0.31
96.10

0.00
310.00

Day
Day

0.00
96.10
24.03

b. Material
Sand

cum

6.00

628.07

cum

13.615%
40.00

3888.55
cum

3768.42
3888.55
529.43
240.00
776.33
776.33
776.35

c) Add 13.615% Overhead& Contracorst profit on a+b


d) Seigniorage charges
cum
6
Cost for 1 Cum = (a+b+c+d)
Rate per Cum
Rate per cum

BLDCSTN
- 3-7
Page - 21

Say

Say

Plain Cement Concrete (1:5:10) proportion (cement: fine aggregate: Coarse aggregate) using 40mm
size Hard Broken Granite (IS383, 1970) machine crushed metal from approved quarry including cost
and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, mixing
concrete in concrete mixer including seigniorage charges, sales & other taxes on all materials, all
operational, incidental, and labour charges such as laying and ramming concrete in layers in position
not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work.
(APSS No. 402).
Unit : Cum
a.Material
Cement
Coarse aggregate 40mm
Fine Aggregate (Sand)
b. Machinery
Concrete Mixer (0.2/0.8 cum
capacity) 600/400 (Diesel)

Kg
Cum
Cum

129.60
0.90
0.45

6169.25
1144.91
628.07

MT
Cum
Cum

799.53
1030.42
282.63
2112.59

hour

1.00

459.30

hour

459.30
459.30

c.Labour
Mason 1st Class
Mazdoor(Unskilled)
Add Agency Allowance
Add Agency Allowance on Crew
charges of concrete mixer

Day
Day
25%

0.10
1.39
472.40

25%

174.20

415.00
310.00

Day
Day

43.55
634.05
3205.94

Sub-Total ::
d.
Add
13.615%
Overhead&
Contractors profit (a+b+c)

0.13615

150

41.50
430.90
118.10

3205.94

0.00

BLDCSTN
- 3-7
Page - 21

e. Seigniorage charges (i) Aggregate

cum

0.90

50.00

cum

45.00

(ii) Sand
Cost for 1 cum (a+b+c+d+e)
Rate Per Cum
Rate Per Cum

cum

0.45

40.00

cum

18.00
3268.94
3268.94
3268.95

Say

Plain Cement Concrete (1:4:8) proportion (cement: fine aggregate: Coarse aggregate) using 40mm
size Hard Broken Granite (IS383, 1970) machine crushed metal from approved quarry including cost
and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, mixing
concrete in concrete mixer including seigniorage charges, sales & other taxes on all materials, all
operational, incidental, and labour charges such as laying and ramming concrete in layers in position
not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work
(APSS No. 402) for Levelling Course and Flooring Bed.
Unit : Cum
a.Material
Cement
Coarse aggregate 40mm
Fine Aggregate (Sand)
b. Machinery
Concrete Mixer (0.2/0.8 cum
capacity) 600/400 (Diesel)

Kg
Cum
Cum

162.00
0.90
0.45

6169.25
1144.91
628.07

MT
Cum
Cum

999.42
1030.42
282.63
2312.47

hour

1.00

459.30

hour

459.30
459.30

c.Labour
Mason 1st Class
Mazdoor (Unskilled)
Add Agency Allowance
Add Agency Allowance on Crew
charges of concrete mixer

Day
Day
25%

0.10
1.39
472.40

25%

174.20

415.00
310.00

Day
Day

43.55
634.05
3405.82

Sub-Total ::
d.
Add
13.615%
Overhead&
Contractors profit (a+b+c)

BLDCSTN
- 3-1
Page - 19

41.50
430.90
118.10

0.13615

3405.82

463.70

e. Seigniorage charges (i) Aggregate

cum

0.90

50.00

cum

45.00

(ii) Sand
Cost for 1 cum (a+b+c+d+e)
Rate Per Cum
Rate Per Cum

cum

0.45

40.00

cum

18.00
3932.52
3932.52
3932.55

Say

Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion (cement: fine aggregate: Coarse
aggregate) using 20mm size Hard Broken Granite (IS383, 1970) Machine Crushed graded metal from
from approved quarry including cost and conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all
operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for
finished item of work for Bed Blocks and Hold Fasts (APSS No. 402)
Unit : Cum
a.Material
Cement
20mm HBG Graded Metal
Fine Aggregate (Sand)

Kg
Cum
Cum

275.00
0.90
0.45

6169.25
1497.22
628.07

MT
Cum
Cum

1696.54
1347.50
282.63
3326.67

b.Labour
Mason 1st Class
Mazdoor(Unskilled)
Add Agency Allowance

Day
Day
25%

0.10
2.36
773.10

415.00
310.00

Day
Day

41.50
731.60
193.28
966.38
4293.05

Rate Per Cum

151

a
b
c
d
e

Rate for other Floors


Basic Rate of P.C.C(1:2.5:5) per
Cum.
Hire charges for centering and
scaffolding material
Labour charges for centering and
scaffolding material
Allowance on labour charges for
centering and scaffolding material
Lift charges of Labour - Add 10%
labour charges on G.F Rate, 20% on
GF Rate, 30% on GF Rate only

FF

SF

TF

4293.05

4293.05

4293.05

4293.05

61.00

61.00

61.00

61.00

244.00

244.00

244.00

244.00

61.00

61.00

61.00

61.00

0.00

101.71

203.42

305.13

0.00

0.00

332.67

665.33

4659.05

4760.76

5195.14

5629.52

634.33

648.18

707.32

766.46

cum

45.00

45.00

45.00

45.00

cum

18.00
5356.38
5356.40

18.00
5471.94
5471.95

18.00
5965.46
5965.50

18.00
6458.98
6459.00

25%

Lift Charges of Material i.e.for Lifting


Concrete @ 10% from Second Floor
Sub-Total ::
Add
13.615%
Overhead&
Contractors profit on sub total
Seigniorage charges (i) Aggregate
0.90 x 50 = 45
(ii) Sand 0.45 x 40 = 18
Rate per cum.
Say

BLDCSTN
- 3-1
Page - 19

GF

Plain Cement Concrete M25 Grade of Concrete corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including all operational, incidental
and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department
including centering, shuttering, laying concrete, curing etc. complete for Steps.
Unit : 1 Cum
a.Material
Cement
20mm HBG Graded Metal
Sand

Kg
Cum
Cum

380.00
0.80
0.40

6169.25
1497.22
628.07

MT
Cum
Cum

2344.32
1197.78
251.23
3793.32

b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (Both Men & Women)
Add Agency Allowance

Day
Day
Day
25%

0.133
0.267
4.600
1579.99

415.00
370.00
310.00

Day
Day
Day

55.20
98.79
1426.00
395.00
1974.99

Hr

1.333

548.30

Hr

730.88

c. Hire Charges of Machinery


Weigh Batcher Hire charges
(Machine mixing) charges [Batching
plant 0.5 cum ( 6 Cum/hr)]

a
b
c
d
e
f

Basic Rate per Cum (a+b+c)


Rate for other Floors
Basic Rate per Cum.
Hire charges for centering and
scaffolding material
Labour charges for centering and
scaffolding material
Allowance on labour charges for
centering and scaffolding material
Lift charges of Labour - Add 10%
labour charges on G.F Rate, 20% on
GF Rate, 30% on GF Rate only
Lift Charges of Material i.e.for Lifting
Concrete @ 10%
Sub-Total ::

25%

GF
6499.19

FF
6499.19

SF
6499.19

730.88
6499.19
TF
6499.19

61.00

61.00

61.00

61.00

244.00

244.00

244.00

244.00

61.00

61.00

61.00

61.00

0.00

182.40

364.80

547.20

379.33

758.66

7609.32

8171.05

0.00
6865.19

152

7047.59

g
h
i

BLDCSTN
- 3-13
Page - 23

Add
13.615%
Overhead&
Contractors profit on sub total
Seigniorage charges (i) Aggregate
0.80 x 50 = 40.00
(ii) Sand 0.40 x 40 = 16.00
Rate per cum.
Say

934.70

959.53

1036.01

1112.49

cum

40.00

40.00

40.00

40.00

cum

16.00
7855.88
7855.90

16.00
8063.12
8063.15

16.00
8701.33
8701.35

16.00
9339.54
9339.55

Vibrated Reinforced Cement Concrete (1:5:10) proportion nominal mix (cement: fine aggregate:
Coarse aggregate) using 20mm size Hard Broken Granite (IS383, 1970) Machine Crushed Graded
metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse
10
aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all
operational, incidental, and labour charges such as mixing, laying concrete, finishing top surface,
curing concrete, etc., complete for finished item of work for (APSS No. 402) Dummy Columns
Unit = 1 cum
For DUMMY COLUMNS
a.Material
Cement
20mm HBG metal
Sand
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor(Un skilled)
Add Agency allowance
c. Machinery
Concrete Mixer 10 / 7 cft (0.2 / 0.8
cum) capacity 600/400 (Diesel)
Vibrator hire charges
Basic Rate per Cum

a
b
c
d
e

i
j

MT
Cum
Cum
2429.66
Day
Day
Day

799.53
1347.50
282.63

459.30

Hr

459.30

1.00

185.90

Hr

185.90
4344.85

Description of Item

GF

FF

SF

TF

Basic rate per Cum.

4344.85

4344.85

4344.85

4344.85

229.00

229.00

229.00

229.00

1338.00

1472.00

1606.00

1739.00

334.50

368.00

401.50

434.75

0.00

260.80

521.60

782.40

6246.35

6674.65

7102.95

7529.99

0.00

908.75

967.07

1025.21

45.00

45.00

45.00

45.00

18.00
6309.35
6309.35

18.00
7646.40
7646.40

18.00
8133.02
8133.05

18.00
8618.20
8618.25

Hire charges for centering and


scaffolding material
Labour charges for centering and
scaffolding
Agency Allowance on labour charges
for centring material
Lift charges of labour add 10% on
GF rate for F.F,20% on GF Rate for
SF, 30% on GF Rate for T.F
Sub-Total ::
Add
13.615%
Overhead&
Contractors profit on sub total
Seigniorage charges (i) Aggregate
0.90 x 50 = 45
(ii) Sand 0.45 x 22 = 18
Rate per Cum.
Say

Kg
Cum
Cum

129.60
0.90
0.45

6169.25
1497.22
628.07

Day
Day
Day
25%

0.133
0.267
3.600
0.00

415.00
370.00
310.00
1269.99

Hr

1.00

Hr

25%

153

55.20
98.79
1116.00
0.00

BLDCSTN
- 3-13
Page - 23

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including all operational, incidental
11
and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department
including centering, shuttering, laying concrete, vibrating, curing etc. complete for Footings.

Unit : Cum
For Footings
a.Material
Cement
20mm HBG graded metal
Fine aggregate (Sand)

Kg
Cum
Cum

380.00
0.80
0.40

6169.25
1497.22
628.07

MT
Cum
Cum

2344.32
1197.78
251.23
3793.32

b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor(Un skilled)
Add Agency Allowance

Day
Day
Day
25%

0.133
0.267
4.600
1579.99

415.00
370.00
310.00

Day
Day
Day

55.20
98.79
1426.00
395.00
1974.99

c. Hire Charges of Machinery + Fuel charges + crew charges of Machinery


Weigh Batcher Hire charges
(Machine mixing) charges [Batching
plant 0.5 cum ( 6 Cum/hr)]

Hr

1.333

548.30

Hr

730.88

Needle Vibrator hire charges 40mm


(petrol)

Hr

1.333

185.90

Hr

247.80
978.69
6746.99

Basic Rate per Cum


Description of Item
Basic rate per Cum.
Hire charges for centering and
scaffolding material
Labour charges for centering and
scaffolding material
Allowance on labour charges for
centering and scaffolding material
Sub-Total ::
Add
13.615%
Overhead&
Contractors profit on sub total
Seigniorage charges (i) Aggregate
0.80 x 50 = 40.00
(ii) Sand 0.40 x 40 = 16.00
Rate per Cum.
Say

BLDCSTN
- 3-13
Page - 23

6746.99
277.00
473.00
25%

118.25
7615.24
0.00
40.00
16.00
7671.24
7671.25

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including all operational, incidental
11
and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department
including centering, shuttering, laying concrete, vibrating, curing etc. complete for Pedastal.

Unit : Cum
For Footings
a.Material
Cement
20mm HBG graded metal
Fine aggregate (Sand)

Kg
Cum
Cum

380.00
0.80
0.40

6169.25
1497.22
628.07

MT
Cum
Cum

2344.32
1197.78
251.23
3793.32

b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor(Un skilled)
Add Agency Allowance

Day
Day
Day
25%

0.133
0.267
4.600
1579.99

415.00
370.00
310.00

Day
Day
Day

55.20
98.79
1426.00
395.00
1974.99

154

c. Hire Charges of Machinery + Fuel charges + crew charges of Machinery


Weigh Batcher Hire charges
(Machine mixing) charges [Batching
plant 0.5 cum ( 6 Cum/hr)]

Hr

1.333

548.30

Hr

730.88

Needle Vibrator hire charges 40mm


(petrol)

Hr

1.333

185.90

Hr

247.80
978.69
6746.99

Basic Rate per Cum


Description of Item
Basic rate per Cum.
Hire charges for centering and
scaffolding material
Labour charges for centering and
scaffolding material
Allowance on labour charges for
centering and scaffolding material
Sub-Total ::
Add
13.615%
Overhead&
Contractors profit on sub total
Seigniorage charges (i) Aggregate
0.80 x 50 = 40.00
(ii) Sand 0.40 x 40 = 16.00
Rate per Cum.
Say

BLDCSTN
- 3-13
Page - 23

6746.99
315.00
753.00
25%

188.25
8003.24
1089.64
40.00
16.00
9148.88
9148.90

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including all operational, incidental
11
and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department
including centering, shuttering, laying concrete, vibrating, curing etc. complete for Plinth beam.

Unit : Cum
For Footings
a.Material
Cement
20mm HBG graded metal
Fine aggregate (Sand)

Kg
Cum
Cum

380.00
0.80
0.40

6169.25
1497.22
628.07

MT
Cum
Cum

2344.32
1197.78
251.23
3793.32

b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor(Un skilled)
Add Agency Allowance

Day
Day
Day
25%

0.133
0.267
4.600
1579.99

415.00
370.00
310.00

Day
Day
Day

55.20
98.79
1426.00
395.00
1974.99

c. Hire Charges of Machinery + Fuel charges + crew charges of Machinery


Weigh Batcher Hire charges
(Machine mixing) charges [Batching
plant 0.5 cum ( 6 Cum/hr)]

Hr

1.333

548.30

Hr

730.88

Needle Vibrator hire charges 40mm


(petrol)

Hr

1.333

185.90

Hr

247.80
978.69
6746.99

Basic Rate per Cum


Description of Item
Basic rate per Cum.
Hire charges for centering and
scaffolding material
Labour charges for centering and
scaffolding material
Allowance on labour charges for
centering and scaffolding material
Sub-Total ::

6746.99
1335.00
1141.00
25%

285.25
9508.24

155

Add
13.615%
Overhead&
Contractors profit on sub total
Seigniorage charges (i) Aggregate
0.80 x 50 = 40.00
(ii) Sand 0.40 x 40 = 16.00
Rate per Cum.
Say

BLDCSTN
- 3-13
Page - 23

0.00
40.00
16.00
9564.24
9564.25

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including all operational, incidental
12
and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department
including centering, shuttering, laying concrete, vibrating, curing etc. complete for Columns
Unit = 1 cum
For COLUMNS
a.Material
Cement
20mm HBG graded metal
Fine aggregate (Sand)
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor(Un skilled)
Add Agency Allowance

Kg
Cum
Cum

380.00
0.80
0.40

6169.25
1497.22
628.07

MT
Cum
Cum

Day
Day
Day
25%

0.167
0.167
5.600
1867.10

415.00
370.00
310.00

Day
Day
Day

c. Hire Charges of Machinery + Fuel charges + crew charges of Machinery


Weigh Batcher Hire charges
(Machine mixing) charges [Batching
Hr
1.333
548.30
Hr
plant 0.5 cum ( 6 Cum/hr)]
Needle Vibrator hire charges 40mm
(petrol)

Hr

1.333

185.90

Hr

b
c
d
e
f

g
h
i

Description of Item
Basic rate per Cum.
Hire charges for centering and
scaffolding material
Labour charges for centering and
scaffolding material
Allowance on labour charges for
centering and scaffolding material
Lift charges of Labour - Add 10%
labour charges on G.F Rate, 20% on
GF Rate, 30% on GF Rate only
Lift Charges of Material i.e.for Lifting
Concrete @ 10%
Sub-Total ::
Add
13.615%
Overhead&
Contractors profit on sub total
Seigniorage charges (i) Aggregate
0.80 x 50 = 40.00
(ii) Sand 0.40 x 40 = 16.00
Rate per Cum.
Say

730.88
247.80
978.69
7105.87

Basic Rate per Cum

2344.32
1197.78
251.23
3793.32
69.31
61.79
1736.00
466.77
2333.87

25%

156

GF
7105.87

FF
7105.87

SF
7105.87

TF
7105.87

229.00

229.00

229.00

229.00

1338.00

1472.00

1606.00

1739.00

334.50

368.00

401.50

434.75

0.00

320.51

641.02

961.53

0.00

0.00

379.33

758.66

9007.37

9495.38

10362.72

11228.81

0.00

1292.80

1410.88

1528.80

40.00

40.00

40.00

40.00

16.00
9063.37
9063.40

16.00
10844.18
10844.20

16.00
11829.61
11829.65

16.00
12813.62
12813.65

BLDCSTN
- 3-13
Page - 23

Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine
crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of
all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and
13
labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department
including centering, shuttering, laying concrete, curing etc. complete for Lintels.
Unit = 1 cum
a.Material
Cement
20mm HBG graded metal
Fine aggregate (Sand)

Kg
Cum
Cum

380.00
0.80
0.40

6169.25
1497.22
628.07

MT
Cum
Cum

2344.32
1197.78
251.23
3793.32

b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor(Unskilled)
Add Agency Allowance

Day
Day
Day
25%

0.167
0.167
5.600
1867.10

415.00
370.00
310.00

Day
Day
Day

69.31
61.79
1736.00
466.77
2333.87

Hr

730.88

c. Hire Charges of Machinery + Fuel charges + crew charges of Machinery


Weigh Batcher Hire charges
(Machine mixing) charges [Batching
plant 0.5 cum ( 6 Cum/hr)]

Hr

1.333

548.30

730.88
6858.07

Basic Rate per Cum

a
b
c
d
e
f

g
h
i

Description of Item
Basic rate per Cum.
Hire charges for centering and
scaffolding material
Labour charges for centering and
scaffolding material
Allowance on labour charges for
centering and scaffolding material
Lift charges of Labour - Add 10%
labour charges on G.F Rate, 20% on
GF Rate, 30% on GF Rate only
Lift Charges of Material i.e.for Lifting
Concrete @ 10%
Sub-Total ::
Add
13.615%
Overhead&
Contractors profit on sub total
Seigniorage charges (i) Aggregate
0.80 x 50 = 40.00
(ii) Sand 0.40 x 40 = 16.00
Rate per Cum.
Say

25%

157

GF
6858.07

FF
6858.07

SF
6858.07

TF
6858.07

760.00

760.00

760.00

760.00

953.00

1048.00

1144.00

1239.00

238.25

262.00

286.00

309.75

0.00

282.01

564.02

846.03

0.00

0.00

379.33

758.66

8809.32

9210.08

9991.42

10771.51

0.00

1253.95

1360.33

1466.54

40.00

40.00

40.00

40.00

16.00
8865.32
8865.35

16.00
10520.03
10520.05

16.00
11407.75
11407.80

16.00
12294.05
12294.10

BLDCSTN
- 3-13
Page - 24

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including all operational, incidental
14
and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department
including centering, shuttering, laying concrete, vibrating, curing etc. complete for Beams.
Unit = 1 cum
a.Material
Cement
20mm HBG graded metal
Fine aggregate (Sand)

Kg
Cum
Cum

380.00
0.80
0.40

6169.25
1497.22
628.07

MT
Cum
Cum

2344.32
1197.78
251.23
3793.32

b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor(Unskilled)
Add Agency Allowance

Day
Day
Day
25%

0.067
0.133
3.077
1030.89

415.00
370.00
310.00

Day
Day
Day

27.81
49.21
953.87
257.72
1288.61

c. Hire Charges of Machinery + Fuel charges + crew charges of Machinery


Weigh Batcher Hire charges
(Machine mixing) charges [Batching
plant 0.5 cum ( 6 Cum/hr)]

Hr

0.308

548.30

Hr

168.88

Needle Vibrator hire charges 40mm


(petrol)

Hr

0.308

185.90

Hr

57.26
226.13
5308.06

Basic Rate per Cum

a
b
c
d
e
f

g
h
i

Description of Item
Basic rate per Cum.
Hire charges for centering and
scaffolding material
Labour charges for centering and
scaffolding material
Allowance on labour charges for
centering and scaffolding material
Lift charges of Labour - Add 10%
labour charges on G.F Rate, 20% on
GF Rate, 30% on GF Rate only
Lift Charges of Material i.e.for Lifting
Concrete @ 10%
Sub-Total ::
Add
13.615%
Overhead&
Contractors profit on sub total
Seigniorage charges (i) Aggregate
0.80 x 50 = 40.00
(ii) Sand 0.40 x 40 = 16.00
Rate per Cum.
Say

25%

158

GF
5308.06

FF
5308.06

SF
5308.06

TF
5308.06

1342.00

1342.00

1342.00

1342.00

1122.00

1234.00

1346.00

1459.00

280.50

308.50

336.50

364.75

0.00

215.29

430.58

645.87

0.00

0.00

379.33

758.66

8052.56

8407.85

9142.47

9878.34

1096.36

1144.73

1244.75

1344.94

40.00

40.00

40.00

40.00

16.00
9204.91
9204.95

16.00
9608.57
9608.60

16.00
10443.21
10443.25

16.00
11279.27
11279.30

BLDCSTN
- 3-13
Page - 23

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including all operational, incidental
15 and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department
including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 100mm
thick
Unit = 1 cum
a.Material
Cement
20mm HBG graded metal
Fine aggregate (Sand)

Kg
Cum
Cum

380.00
0.80
0.40

6169.25
1497.22
628.07

MT
Cum
Cum

2344.32
1197.78
251.23
3793.32

b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor(Unskilled)
Add Agency Allowance

Day
Day
Day
25%

0.067
0.133
3.077
1030.89

415.00
370.00
310.00

Day
Day
Day

27.81
49.21
953.87
257.72
1288.61

c. Hire Charges of Machinery + Fuel charges + crew charges of Machinery


Weigh Batcher Hire charges
Hr
0.308
548.30
Hr
(Machine mixing) charges [Batching
plant 0.5 cum ( 6 Cum/hr)]
Needle Vibrator hire charges 40mm
(petrol)

Hr

0.308

185.90

Hr

a
b
c
d
e
f

g
h
i

57.26
226.13
5308.06

Basic Rate per Cum


Description of Item
Basic rate of VRCC M-20 per Cum.
For 100mm thick
Hire charges for centering and
scaffolding material
Labour charges for centering and
scaffolding material
Allowance on labour charges for
centering and scaffolding material
Lift charges of Labour - Add 10%
labour charges on G.F Rate, 20% on
GF Rate, 30% on GF Rate only
Lift Charges of Material i.e.for Lifting
Concrete @ 10%
Sub-Total ::
Add
13.615%
Overhead&
Contractors profit on sub total
Seigniorage charges (i) Aggregate
0.80 x 50 = 40.00
(ii) Sand 0.40 x 40 = 16.00
Rate per Sqm.
Say

168.88

25%

159

GF

FF

SF

TF

530.81

530.81

530.81

530.81

152.00

152.00

152.00

152.00

127.00

140.00

152.00

165.00

31.75

35.00

38.00

41.25

0.00

23.01

46.02

69.03

0.00

0.00

37.93

75.87

841.56

880.81

956.76

1033.95

0.00

119.92

130.26

140.77

4.00

4.00

4.00

4.00

1.60
847.16
847.20

1.60
1006.34
1006.35

1.60
1092.62
1092.65

1.60
1180.32
1180.35

BLDCSTN
- 3-13
Page - 23

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including all operational, incidental
16 and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department
including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 125mm
thick
Unit = 1 cum
a.Material
Cement
20mm HBG graded metal
Fine aggregate (Sand)

Kg
Cum
Cum

380.00
0.80
0.40

6169.25
1497.22
628.07

MT
Cum
Cum

2344.32
1197.78
251.23
3793.32

b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor(Unskilled)
Add Agency Allowance

Day
Day
Day
25%

0.067
0.133
3.077
1030.89

415.00
370.00
310.00

Day
Day
Day

27.81
49.21
953.87
257.72
1030.89

c. Hire Charges of Machinery + Fuel charges + crew charges of Machinery


Weigh Batcher Hire charges
(Machine mixing) charges [Batching
plant 0.5 cum ( 6 Cum/hr)]

Hr

0.308

548.30

Hr

168.88

Needle Vibrator hire charges 40mm


(petrol)

Hr

0.308

185.90

Hr

57.26
226.13
5050.34

Basic Rate per Cum

a
b
c
d
e
f

g
h
i

Description of Item
Basic rate of VRCC M-20 per Cum.
For 125mm thick
Hire charges for centering and
scaffolding material
Labour charges for centering and
scaffolding material
Allowance on labour charges for
centering and scaffolding material
Lift charges of Labour - Add 10%
labour charges on G.F Rate, 20% on
GF Rate, 30% on GF Rate only
Lift Charges of Material i.e.for Lifting
Concrete @ 10%
Sub-Total ::
Add
13.615%
Overhead&
Contractors profit on sub total
Seigniorage charges (i) Aggregate
0.80 x 50 = 40.00
(ii) Sand 0.40 x 40 = 16.00
Rate per Sqm.
Say

25%

160

GF

FF

SF

TF

631.29

631.29

631.29

631.29

152.00

152.00

152.00

152.00

127.00

140.00

152.00

165.00

31.75

35.00

38.00

41.25

0.00

25.59

51.17

76.76

0.00

0.00

47.42

94.83

942.04

983.88

1071.88

1161.13

128.26

133.96

145.94

158.09

5.00

5.00

5.00

5.00

2.00
1077.30
1077.35

2.00
1124.83
1124.85

2.00
1224.82
1224.85

2.00
1326.22
1326.25

BLDCSTN
- 3-13
Page - 23

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including all operational, incidental
17 and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department
including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 150mm
thick
Unit = 1 cum
a.Material
Cement
20mm HBG graded metal
Fine aggregate (Sand)

Kg
Cum
Cum

380.00
0.80
0.40

6169.25
1497.22
628.07

MT
Cum
Cum

2344.32
1197.78
251.23
3793.32

b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor(Unskilled)
Add Agency Allowance

Day
Day
Day
25%

0.067
0.133
3.077
1030.89

415.00
370.00
310.00

Day
Day
Day

27.81
49.21
953.87
257.72
1288.61

c. Hire Charges of Machinery + Fuel charges + crew charges of Machinery


Weigh Batcher Hire charges
(Machine mixing) charges [Batching
plant 0.5 cum ( 6 Cum/hr)]

Hr

0.308

548.30

Hr

168.88

Needle Vibrator hire charges 40mm


(petrol)

Hr

0.308

185.90

Hr

57.26
226.13
5308.06

Basic Rate per Cum

a
b
c
d
e
f

g
h
i

Description of Item
Basic rate of VRCC M-20 per Cum.
For 150mm thick
Hire charges for centering and
scaffolding material
Labour charges for centering and
scaffolding material
Allowance on labour charges for
centering and scaffolding material
Lift charges of Labour - Add 10%
labour charges on G.F Rate, 20% on
GF Rate, 30% on GF Rate only
Lift Charges of Material i.e.for Lifting
Concrete @ 10%
Sub-Total ::
Add
13.615%
Overhead&
Contractors profit on sub total
Seigniorage charges (i) Aggregate
0.80 x 50 = 40.00
(ii) Sand 0.40 x 40 = 16.00
Rate per Sqm.
Say

25%

161

GF

FF

SF

TF

796.21

796.21

796.21

796.21

152.00

152.00

152.00

152.00

127.00

140.00

152.00

165.00

31.75

35.00

38.00

41.25

0.00

27.13

54.26

81.40

0.00

0.00

53.11

106.21

1106.96

1150.34

1245.58

1342.07

150.71

156.62

169.59

182.72

5.60

5.60

5.60

5.60

2.24
1265.51
1265.55

2.24
1314.80
1314.80

2.24
1423.01
1423.05

2.24
1532.63
1532.65

BLDCSTN
- 3-13
Page - 23

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including all operational, incidental
18 and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department
including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 180mm
thick
Unit = 1 cum
a.Material
Cement
20mm HBG graded metal
Fine aggregate (Sand)

Kg
Cum
Cum

380.00
0.80
0.40

6169.25
1497.22
628.07

MT
Cum
Cum

2344.32
1197.78
251.23
3793.32

b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor(Unskilled)
Add Agency Allowance

Day
Day
Day
25%

0.067
0.133
3.077
1030.89

415.00
370.00
310.00

Day
Day
Day

27.81
49.21
953.87
257.72
1288.61

c. Hire Charges of Machinery + Fuel charges + crew charges of Machinery

a
b
c
d
e
f

g
h
i

Weigh Batcher Hire charges


(Machine mixing) charges [Batching
plant 0.5 cum ( 6 Cum/hr)]

Hr

0.308

548.30

Hr

168.88

Needle Vibrator hire charges 40mm


(petrol)

Hr

0.308

185.90

Hr

57.26

Basic Rate per Cum


Description of Item
Basic rate of VRCC M-20 per Cum.
For 150mm thick
Hire charges for centering and
scaffolding material
Labour charges for centering and
scaffolding material
Allowance on labour charges for
centering and scaffolding material
Lift charges of Labour - Add 10%
labour charges on G.F Rate, 20% on
GF Rate, 30% on GF Rate only

25%

Lift Charges of Material i.e.for Lifting


Concrete @ 10%
Sub-Total ::
Add
13.615%
Overhead&
Contractors profit on sub total
Seigniorage charges (i) Aggregate
0.80 x 50 = 40.00
(ii) Sand 0.40 x 40 = 16.00
Rate per Sqm.
Say

162

GF

FF

SF

226.13
5308.06
TF

955.45

955.45

955.45

955.45

164.00

164.00

164.00

164.00

137.00

151.00

164.00

178.00

34.25

37.75

41.00

44.50

0.00

29.16

58.33

87.49

0.00

0.00

56.90

113.80

1290.70

1337.36

1439.68

1543.24

175.73

182.08

196.01

210.11

7.20

7.20

7.20

7.20

2.40
1476.03
1476.05

2.40
1529.05
1529.05

2.40
1645.29
1645.30

2.40
1762.95
1763.00

BLDCSTN
- 3-13
Page - 23

Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine
crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of
all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and
labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
19
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department
including centering, shuttering, laying concrete, curing etc. complete for Sunshades / Chajjas for
75mm thick at Fixed end and 50mm thick at Free end and for a width of 0.60 Mts. etc complete for
finished item of work.
Unit = 1 cum
a.Material
Cement
20mm HBG graded metal
Fine aggregate (Sand)

Kg
Cum
Cum

380.00
0.80
0.40

6169.25
1497.22
628.07

MT
Cum
Cum

2344.32
1197.78
251.23
3793.32

b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor(Unskilled)
Add Agency Allowance

Day
Day
Day
25%

0.067
0.133
3.077
1030.89

415.00
370.00
310.00

Day
Day
Day

27.81
49.21
953.87
257.72
1288.61

Hr

168.88

c. Hire Charges of Machinery + Fuel charges + crew charges of Machinery


Weigh Batcher Hire charges
(Machine mixing) charges [Batching
plant 0.5 cum ( 6 Cum/hr)]

Hr

0.308

548.30

168.88
5250.80

Basic Rate per Cum

a
b
c
d
e

f
g
h

Cost of RCC M-20


0.0375
Basic Rate per 0.60 Sqm
Basic Rate for 1 Sqm
Description of Item
Basic rate per Sqm
Hire charges for centering and
scaffolding material
Labour charges for centering and
scaffolding material
Allowance on labour charges for
25%
centering and scaffolding material
Lift charges of Labour - Add 10%
labour charges on G.F Rate, 20% on
GF Rate, 30% on GF Rate only
Sub-Total ::
Add
13.615%
Overhead&
Contractors profit on sub total
Seigniorage charges (i) Aggregate
0.80 x 50 = 40.00
(ii) Sand 0.40 x 40 = 16.00
Rate per Sqm.
Say

163

Cum

5250.80

Cum

GF
328.18

FF
328.18

SF
328.18

196.91
196.91
328.18
TF
328.18

150.00

150.00

150.00

150.00

146.00

161.00

175.00

190.00

36.50

40.25

43.75

47.50

0.00

21.04

42.09

63.13

660.68

700.47

739.01

778.80

89.95

95.37

100.62

106.03

1.50

1.50

1.50

1.50

0.60
752.73
752.75

0.60
797.94
797.95

0.60
841.73
841.75

0.60
886.94
886.95

BLDCSTN
- 3-13
Page - 23

Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine
crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of
all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and
20
labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department
including centering, shuttering, laying concrete, curing etc. complete for Shelves of 50mm thick
Unit = 1 cum
a.Material
Cement
20mm HBG graded metal
Fine aggregate (Sand)

Kg
Cum
Cum

380.00
0.80
0.40

6169.25
1497.22
628.07

MT
Cum
Cum

2344.32
1197.78
251.23
3793.32

b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (Unskilled)
Add Agency Allowance

Day
Day
Day
25%

0.067
0.133
3.077
1030.89

415.00
370.00
310.00

Day
Day
Day

27.81
49.21
953.87
257.72
1030.89

Hr

168.88

c. Hire Charges of Machinery + Fuel charges + crew charges of Machinery


Weigh Batcher Hire charges
(Machine mixing) charges [Batching
plant 0.5 cum ( 6 Cum/hr)]

Hr

0.308

548.30

168.88
4993.08

Basic Rate per Cum


M

RCC M-20 FOR SHELVES 25mm thick


Basic Rate of RCC M25

a
b
c
d
e

f
g
h

BLDCSTN5-5
Page.31

Description of Item
Basic rate per Sqm
Hire charges for centering and
scaffolding material
Labour charges for centering and
scaffolding material
Allowance on labour charges for
centering and scaffolding material
Lift charges of Labour - Add 10%
labour charges on G.F Rate, 20% on
GF Rate, 30% on GF Rate only
Sub-Total ::
Add
13.615%
Overhead&
Contractors profit on sub total
Seigniorage charges (i) Aggregate
0.90 x 50 = 45
(ii) Sand 0.45 x 40 = 18
Rate per Sqm.
Say

0.05

25%

Cum

4993.08

Cum

GF
249.65

FF
249.65

SF
249.65

249.65
249.65
TF
249.65

150.00

150.00

150.00

150.00

146.00

161.00

175.00

190.00

36.50

40.25

43.75

47.50

0.00

17.18

34.35

51.53

582.15

618.08

652.76

688.69

79.26

84.15

88.87

93.76

1.13

1.13

1.13

1.13

0.45
662.99
663.00

0.45
703.81
703.85

0.45
743.21
743.25

0.45
784.03
784.05

Brick Masonry in superstructure with CM (1:8) prop: using second class bricks from approved
source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all
22 materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other
taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar,
constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work.
Unit : Cum
a.Material
Cement
Bricks traditional size 23 x 11 x 7 cms
2nd class
Fine Aggregate (Sand)
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor(unskilled)
Add Agency Allowance

Kg

36.00

6169.25

MT

222.09

Nos

512.00

5632.67

1000Nos

2883.93

Cum

0.20

628.07

Cum

125.61
3231.63

Day
Day
Day
25%

0.240
0.560
1.890
892.70

415.00
370.00
310.00

Day
Day
Day

99.60
207.20
585.90
223.18
1115.88
4347.51

Rate per Cum

164

a
b
c
d
e

f
g

BLDCSTN5-12
Page.33

Description of Item
Basic rate per Cum.
Hire charges of Access Scaffolding
@ 9.93/Sqm /0.23
Labour
charges
for
Access
Scaffolding material (Labour charge /
0.23)
Allowance on labour charges for
Access Sacffolding
Lift charges for Labour - Add 10%
labour charges on G.F Rate, 20% on
GF, 30% on GF Rate only
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.2 x 40 = 8.00
(ii) Bricks - 512 x 38.5/1000=19.71
Rate per Cum
Say

25%

GF
4347.51

FF
4347.51

SF
4347.51

TF
4347.51

43.17

43.17

43.17

43.17

268.83

381.65

494.52

607.35

67.21

95.41

123.63

151.84

0.00

116.15

232.31

348.46

4726.72

4983.90

5241.14

5498.33

0.00

678.56

713.58

748.60

8.00

8.00

8.00

8.00

19.71
4754.43
4754.45

19.71
5690.17
5690.20

19.71
5982.43
5982.45

19.71
6274.64
6274.65

23 Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using 2nd class bricks having a crushing
strength of not less than 35.00kg/cm2 and using two mild steel bars of 6m dia in every third layer of
brick masory, with free joints of the main block work including cost and seignorage charges and
conveyance of all materials and water from approved sources to work site and all operational,
incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing
etc. complete but excluding the cost of steel and its fabrication charges
Unit : 10 Sqmts.
a.Material
2nd class bricks
CM (1:6)

Nos
Cum

512.00
0.20

5632.67
2217.59

Nos
Cum

2883.93
443.52
3327.45

b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (Un skilled)
Add Agency Allowance

Day
Day
Day
25%

0.600
0.600
2.750
1323.50

415.00
370.00
310.00

Day
Day
Day

249.00
222.00
852.50
330.88
1654.38
4981.83

GF
4981.83

FF
4981.83

SF
4981.83

TF
4981.83

99.30

99.30

99.30

99.30

618.30

877.80

1137.40

1396.90

154.58

219.45

284.35

349.23

0.00

194.18

388.36

582.54

5854.00

6372.56

6891.24

7409.79

797.02

867.62

938.24

1008.84

8.40

8.40

8.40

8.40

19.71
6679.13
6679.15

19.71
7268.29
7268.30

19.71
7857.59
7857.60

19.71
8446.74
8446.75

Rate per 10 Sqmts.

a
b
c
d
e

f
g

Description of Item
Basic rate per 10 Sqmts.
Hire charges of Access Scaffolding
@ 5.29/Sqm
Labour
charges
for
Access
Scaffolding
Allowance on labour charges for
Access Scaffolding.
Lift charges of Labour- Add 10%
labour charges on G.F Rate, 20% on
GF Rate, 30% on GF Rate only
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.21 x 40 = 8.40
(ii) Bricks - 512 x 38.5/1000=19.71
Rate per 10 Sqmts.
Say

25%

165

BLDCSTN4-1
Page.28

Providing High Yield Strength Deformed (HYSD) steel bars


(Fe 415 grade as per IS 1786-1979) of different diameters
for RCC works, including labour charges for straightening,
cutting, bending to required sizes and shapes, placing in
position with cover blocks of approved materials and size
and tying and lapsplicing with binding wire of 18 SWG,
NOTE :: Standard data revised vide Chief
forming grills for reinforcement work as per approved
Engineer, R&B (Buildings)
24 designs and drawings, including cost and conveyance of
Procs.No.CEB/TA8/AEE3/SSR: 2010-11
steel bars, including all wastages such as overlaps,
Dt: 21.01.2011.
couplings, chairs, spacer bars including cost and
conveyance of binding wire, cover blocks and all incidental,
operational, laour charges such as cutting, bending placing
in position, tying including sales and other taxes on all
materials etc., complete for finished item of work in all
floors. (APSS No.126)
Unit : MT
a.Material
HYSD bars including 5 per cent for
overlaps and wastage
Binding wire
b.Labour
Blacksmith/ bar bender
Mazdoor (Unskilled)
Add Agency Allowance

MT

1.05

34082.88

MT

35787.02

Kg

6.00

61.00

Kg

366.00
36153.02

Day
Day
25%

10.00
10.00
7250.00

415.00
310.00

Day
Day

4150.00
3100.00
1812.50
9062.50
45215.52

Rate per MT
Add
13.615%
Contractors profit

Overhead&

0.00

Rate as per 1 MT
Say

BLDCSTN4-1
Page.28

45215.52
45215.55

Providing Mild steel bars (Fe 250 as per as per IS 17861979) of different diameters for RCC works, including
labour charges for straightening, cutting, bending to
required sizes and shapes, placing in position with cover
blocks of approved materials and size and tying and
lapsplicing with binding wire of 18 SWG, forming grills for NOTE :: Standard data revised vide Chief
reinforcement work as per approved designs and drawings,
Engineer, R&B (Buildings)
25
including cost and conveyance of steel bars, including all Procs.No.CEB/TA8/AEE3/SSR: 2010-11
wastages such as overlaps, couplings, chairs, spacer bars
Dt: 21.01.2011.
including cost and conveyance of binding wire, cover
blocks and all incidental, operational, laour charges such
as cutting, bending placing in position, tying including sales
and other taxes on all materials etc., complete for finished
item of work in all floors. (APSS No.126)
Unit : MT
a.Material
MS bars including 5 per cent for
overlaps and wastage
Binding wire
b.Labour
Blacksmith/ bar bender
Mazdoor (Unskilled)
Add Agency Allowance
Rate per MT
Add
13.615%
Contractors profit

MT

1.05

42082.88

MT

44187.02

Kg

6.00

61.00

Kg

366.00
44553.02

Day
Day
25%

10.00
10.00
7250.00

415.00
310.00

Day
Day

4150.00
3100.00
1812.50
9062.50
53615.52

Overhead&

7299.75

Rate per MT
Say

60915.28
60915.30

166

BLDCSTN8-10
Page.44

Ceiling Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat
of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like
cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all
26
operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges,
including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing,
curing, etc., complete for finished item of work. (APSS 901,903 & 904)
Unit : 10Sqm
a.Materials
Cement
Fine Sand (Screened)

Kg
Cum

51.00
0.15

6169.25
828.070

MT
Cum

314.63
124.21
438.84

b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (unskilled)
Add Agency Allowance

Day
Day
Day
25%

0.630
1.470
3.900
2014.35

415.00
370.00
310.00

Day
Day
Day

261.45
543.90
1209.00
503.59
2517.94
2956.78

Rate per 10 Sqm

a
b

Description of Item
Basic rate per 10 Sqm
Hire charges for stage scaffolding

GF
2956.78
23.70

FF
2956.78
23.70

SF
2956.78
23.70

TF
2956.78
23.70

Labour charges for stage scaffolding

125.50

176.40

227.30

278.20

31.38

44.10

56.83

69.55

0.00

213.99

427.97

641.96

3137.36

3414.97

3692.58

3970.19

427.15

464.95

502.74

540.54

6.00

6.00

6.00

6.00

3570.51
3570.55

3885.92
3885.95

4201.32
4201.35

4516.73
4516.75

d
e

g
h

BLDCSTN8-10
Page.44

Allowance on labour charges for


centring material
Lift charges - Add 10% labour
charges on G.F Rate, 20% on GF,
30% on GF Rate only
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.15 x 40 = 6.00
Rate per 10 Sqm
Say

25%

Total

Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of
4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like
cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all
27 operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges,
including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing,
curing, etc., for Even Surfaces of brick wall complete for finished item of work. (APSS 901,903 &
904)
Unit : 10Sqm
a.Materials
Cement
Fine Sand (Screened)

Kg
Cum

51.00
0.15

6169.25
828.070

MT
Cum

314.63
124.21
438.84

b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (unskilled)
Add Agency Allowance

Day
Day
Day
25%

0.630
1.470
3.900
2014.35

415.00
370.00
310.00

Day
Day
Day

261.45
543.90
1209.00
503.59
2517.94
2956.78

Rate per 10 Sqm

167

a
b
c
d
e

g
h

BLDCSTN8-9
Page.43

Description of Item
Basic rate per 10 Sqm
Hire charges for access scaffolding
Labour
charges
for
access
scaffolding
Allowance on labour charges for
centring material
Lift charges - Add 10% labour
charges on G.F Rate, 20% on GF,
30% on GF Rate only
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.15 x 40 = 6.00
Rate per 10 Sqm
Say

25%

Total

GF
2956.78
9.90

FF
2956.78
9.90

SF
2956.78
9.90

TF
2956.78
9.90

61.80

87.80

113.70

139.70

15.45

21.95

28.43

34.93

0.00

207.62

415.23

622.85

3043.93

3284.05

3524.04

3764.15

414.43

447.12

479.80

512.49

6.00

6.00

6.00

6.00

3464.36
3464.40

3737.17
3737.20

4009.83
4009.85

4282.64
4282.65

Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of
4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like
cement, screened sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,
28 all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges,
finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge,
curing, etc., for Uneven Surfaces of Brick Wall complete for finished item of work. (APSS 901,903
& 904)
Unit : 10Sqm
a.Materials
Base coat in CM(1:6) 16mm thick
Cement
Fine Sand (Screened)
Top coat in CM(1:4) 4mm thcik
Cement
Fine Sand (Screened)
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (unskilled)
Add Agency Allowance

a
b
c
d
e

g
h

Rate per 10 Sqm


Description of Item
Basic rate per 10 Sqm
Hire charges for access scaffolding
Labour
charges
for
access
scaffolding
Allowance on labour charges for
centring material
Lift charges - Add 10% labour
charges on G.F Rate, 20% on GF,
30% on GF Rate only
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.22 x 40 = 8.80
Rate per 10 Sqm
Say

Kg
Cum

43.00
0.18

6169.25
828.070

MT
Cum

265.28
149.05

Kg
Cum

14.50
0.04

6169.25
828.070

MT
Cum

89.45
33.12
536.91

Day
Day
Day
25%

0.630
1.470
3.900
2014.35

415.00
370.00
310.00

Day
Day
Day

GF
3054.85
9.90

FF
3054.85
9.90

SF
3054.85
9.90

261.45
543.90
1209.00
503.59
2517.94
3054.85
TF
3054.85
9.90

61.80

87.80

113.70

139.70

15.45

21.95

28.43

34.93

0.00

207.62

415.23

622.85

3142.00

3382.11

3622.10

3862.22

0.00

460.47

493.15

525.84

8.80

8.80

8.80

8.80

3150.80
3150.80

3851.39
3851.40

4124.05
4124.10

4396.86
4396.90

25%

168

BLDCSTN8-3
Page.42

Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish including cost and
conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales
29
& other taxes on all materials, all operational, incidental charges and labour charges such as mixing
mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906)
Unit : 10Sqm
a.Materials
CM (1:3)

Cum

0.15

3698.21

Cum

554.73
554.73

b.Labour
Mason 1st Class
Mazdoor (Unskilled)
Add Agency Allowance

Day
Day
25%

0.600
0.960
546.60

415.00
310.00

Day
Day

a
b

Rate per 10 Sqm.


Description of Item
Basic rate per 10 Sqm
Hire charges for stage scaffolding

GF
1237.98
23.70

FF
1237.98
23.70

SF
1237.98
23.70

249.00
297.60
136.65
683.25
1237.98
TF
1237.98
23.70

Labour charges for stage scaffolding

125.50

176.40

227.30

278.20

31.38

44.10

56.83

69.55

0.00

67.21

134.42

201.63

1418.56

1549.39

1680.23

1811.06

0.00

210.95

228.76

246.58

6.00

6.00

6.00

6.00

1424.56
1424.60

1766.34
1766.35

1914.99
1915.00

2063.64
2063.65

d
e

g
h

BLDCSTN8-7
Page.43

30

Allowance on labour charges for


centring material
Lift charges - Add 10% labour
charges on G.F Rate, 20% on GF,
30% on GF Rate only
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.15 x 40 = 6.00
Rate per 10 Sqm
Say

25%

Plastering to even surfaces of wall with CM(1:4) Prop: 12mm thick in single coat including cost
and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges,
sales & other taxes on all materials, all operational, incidental charges and labour charges such as
mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906)
Unit : 10Sqm
a.Materials
CM (1:4)

Cum

0.15

2957.90

Cum

443.69
443.69

b.Labour
Mason 1st Class
Mazdoor (Unskilled)
Add Agency Allowance

Day
Day
25%

0.600
0.960
546.60

415.00
310.00

Day
Day

249.00
297.60
136.65
683.25
1126.94

GF
1126.94
9.90

FF
1126.94
9.90

SF
1126.94
9.90

TF
1126.94
9.90

61.80

87.80

113.70

139.70

15.45

21.95

28.43

34.93

0.00

60.84

121.68

182.52

1214.09

1307.43

1400.64

1493.98

0.00

178.01

190.70

203.41

8.40

8.40

8.40

8.40

1222.49
1222.50

1493.83
1493.85

1599.74
1599.75

1705.79
1705.80

Rate per 10 Sqm

a
b
c
d
e

g
h

Rate for other floors


Basic rate per 10 Sqm
Hire charges for access scaffolding
Labour
charges
for
access
scaffolding
Allowance on labour charges for
centring material
Lift charges - Add 10% labour
charges on G.F Rate, 20% on GF,
30% on GF Rate only
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.15 x 40 = 8.40
Rate per 10 Sqm
Say

25%

169

BLDCSTN10-25
Page.71

Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of
water proof compound per bag of cement laid over roof when it is green including cost of all materials,
31 seigniorage charges, excluding conveyance charges of materials and including all operational,
incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing,
rounding off junctions of wall and slab etc,, complete for finished item of work
Unit : 10Sqm
a.Materials
CM (1:3)
Water proof compound (BMT-H.01)

Cum
Kg

0.21
2.00

3698.21
75.00

Cum
Kg

776.62
150.00
926.62

b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (Unskilled)
Add Agency Allowance

Day
Day
Day
25%

0.660
1.540
3.700
1990.70

415.00
370.00
310.00

Day
Day
Day

273.90
569.80
1147.00
497.68
2488.38
3415.00

GF
3415.00

FF
3415.00

SF
3415.00

TF
3415.00

0.00

199.07

398.14

597.21

3415.00

3614.07

3813.14

4012.21

492.06

519.16

546.26

8.40

8.40

8.40

8.40

3423.40
3423.45

4114.53
4114.55

4340.70
4340.75

4566.88
4566.90

Rate per 10 Sqm

c
d

e
f

Description of Item
Basic rate per 10 Sqm
Lift charges - Add 10% on labour for
F.F,20% for SF, 30% for T.F
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.21 x 40 = 8.40
Rate per 10 Sqm
Say

170

BLDCSTN8-11
Page.44

RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabbit wire mesh & nominal reinforcement as
directed by Engineer-in-charge with dubara sponge finishing, including cost & conveyance of all
materials to site, seigniorage charges, sales & other taxes on all materials, operational & incidental,
32
cost and conveyance of cement, screened sand, wire mesh, water to work site, centering, scaffolding
and form work, lift charges etc., complete for finished items of work but excluding cost of steel & its
fabrication charges, for finished item of work. (APSS No.403&903)
Sub analysis
Plastering with CM two (2) coats 12mm thick, base coat in
CM (1:4)8mm thick, and top coat in CM (1:2) 4mm thick
with sponze finishing.
a. Material
Base Coat in CM (1:4) 8mm thick
Cement
Fine sand (screened)
Top Coat in CM (1:2) 4mm thick
Cement
Fine sand (screened)

Unit : 10Sqm

Kg
Cum

39.60
0.11

6169.25
828.07

Kg
Cum

244.30
91.09

Kg
Cum

28.80
0.04

6169.25
828.07

Kg
Cum

177.67
33.12
546.19

day
day
day
25%

0.63
1.47
3.90
2014.35

415.00
370.00
310.00

day
day
day

261.45
543.90
1209.00
503.59
2517.94
3064.13
306.41

Rabbit wire mesh (1.0 M panna for


0.6 M drop) TBSC-E.I-12

Sqm

13.30

17.00

Sqm

226.10

Cement Mortar (1:3) for 25 mm thick


Dry Cement for making Lumps

cum
Kg

0.25
50.00

3698.21
6169.25

cum
MT

924.55
308.46

12 mm Plastering 2 coats in 1:4 &


1:2 cm both sides

Sqm

21.80

306.41

Sqm

6679.80

b. Labour
Mason 1st class
Mason 2nd class
Mazdoor (Un skilled)
Add Agency Allowance
Rate per 10 Sqm
Rate per Sqm
MAIN DATA
Unit : 10Sqm
a.Materials

8138.91
b.Labour
Mason 1st Class
Miller operator
Mazdoor (Unskilled)
Add Agency Allowance

Day
Day
Day
25%

8.000
1.000
10.000
6790.00

415.00
370.00
310.00

Day
Day
Day

c. Hire Charges of Machinery + Fuel charges + crew charges of Machinery


Machine Mixing Mortar with Miller Hrs
2.000
338.90
Hrs
Hire charges 300/200 (diesel)

a
b
c
d
e

g
h

Basic Rate per 10 Sqm


Description of Item
Basic rate per 10 Sqm
Hire charges for scaffolding material
Labour charges for scaffolding
Allowance on labour charges for
centring material
Lift charges - Add 10% labour
charges on G.F Rate, 20% on GF,
30% on GF Rate only
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge (i) Sand - 0.60 x
40 = 24
Rate per 10 Sqm
Say

25%

171

3320.00
370.00
3100.00
1697.50
8487.50
677.80

GF
17304.21
9.90
61.80

FF
17304.21
9.90
87.80

SF
17304.21
9.90
113.70

677.80
17304.21
TF
17304.21
9.90
139.70

15.45

21.95

28.43

34.93

0.00

1124.31

2248.62

3372.92

17391.36

18548.17

19704.85

20861.66

2367.83

2525.33

2682.82

2840.32

24.00

24.00

24.00

24.00

19783.20
19783.20

21097.50
21097.55

22411.67
22411.70

23725.98
23726.00

BLDCSTN9-1
Page.48&4
9

Flooring and Treads with Polished Bethamcherla coloured stone minimum 25 mm thick (0.254M
x0.254M) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat
cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full
33
depth including cost of all materials like cement, sand, and water and flooring stones etc., complete,
including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished
item of work, .
Unit : 10Sqm
a.Materials
Polished Bethamcherla stone
Cement for CM(1:8) Proportion
Sand for CM(1:8) Proportion
Cement slurry
Cement for jointing

Sqm
Kg
Cum
Kg
Kg

11.00
21.60
0.12
33.00
20.00

5800.29
6169.25
628.07
6169.25
6169.25

10 Sqm
MT
Cum
MT
MT

6380.32
133.26
75.37
203.59
123.39
6915.92

b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (Unskilled)
Add Agency Allowance

Day
Day
Day
25%

3.100
1.100
0.860
1960.10

415.00
370.00
310.00

Day
Day
Day

1286.50
407.00
266.60
490.03
2450.13
9366.04

GF
9366.04

FF
9366.04

SF
9366.04

TF
9366.04

0.00

196.01

392.02

588.03

9366.04

9562.05

9758.06

9954.07

1275.19

1301.87

1328.56

1355.25

4.80

4.80

4.80

4.80

10646.03
10646.05

10868.72
10868.75

11091.42
11091.45

11314.12
11314.15

Rate per 10 Sqm

c
d

e
f

Description of Item
Basic rate per 10 Sqm
Lift charges - Add 10% on labour for
F.F,20% for SF, 30% for T.F
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.12 x 40 = 4.80
Rate as per 10 Sqm
Say

172

BLDCSTN9-23
Page.60

Providing Skirting to internal walls and Risers of Steps to 15 cm height with Polished
Bethamcherla coloured stone minimum 25 mm thick (0.254M x0.254M) length equal to flooring
stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency
34
spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of
matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc.,
complete including seigniorage charges, etc., complete for finished item of work,
Unit : 10Sqm
a.Materials
Polished Bethamcherla stone
Cement for CM(1:3) Proportion
Sand for CM(1:3) Proportion
Cement slurry

Sqm
Kg
cum
Kg

11.00
57.60
0.12
33.00

5800.29
6169.25
628.07
6169.25

10Sqm
MT
cum
MT

6380.32
355.35
75.37
203.59
7014.62

b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (Unskilled)
Add Agency Allowance

Day
Day
Day
25%

0.960
2.240
3.100
2188.20

415.00
370.00
310.00

Day
Day
Day

398.40
828.80
961.00
547.05
2735.25
9749.87

GF
9749.87

FF
9749.87

SF
9749.87

TF
9749.87

0.00

218.82

437.64

656.46

9749.87

9968.69

10187.51

10406.33

1327.45

1357.24

1387.03

1416.82

4.80

4.80

4.80

4.80

11082.12
11082.15

11330.73
11330.75

11579.34
11579.35

11827.96
11828.00

Rate per 10 Sqm

c
d

e
f

Description of Item
Basic rate per 10 Sqm
Lift charges - Add 10% on labour for
F.F,20% for SF, 30% for T.F
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.12 x 40 = 4.80
Rate as per 10 Sqm
Say

173

BLDCSTN9-1
Page.48&4
9

Flooring and Treads with Polished shabad / Tandur stone minimum 15 to 18 mm thick of size
(0.254M x0.254M) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including
neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to
35
full depth including cost of all materials like cement, sand, and water and flooring stones etc.,
complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete
for finished item of work, .
Unit : 10Sqm
a.Materials
Polished Shabad / Tandur stone
cement for CM(1:8) Proportion
Sand for CM(1:8) Proportion
Cement slurry
Cement for jointing

Sqm
Kg
Cum
Kg
Kg

11.00
21.60
0.12
33.00
20.00

2840.29
6169.25
628.07
6169.25
6169.25

10 Sqm
MT
Cum
MT
MT

3124.31
133.26
75.37
203.59
123.39
3659.91

b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (Unskilled)
Add Agency Allowance

Day
Day
Day
25%

3.100
1.100
0.860
1960.10

415.00
370.00
310.00

Day
Day
Day

1286.50
407.00
266.60
490.03
2450.13
6110.04

GF
6110.04

FF
6110.04

SF
6110.04

TF
6110.04

0.00

196.01

392.02

588.03

6110.04

6306.05

6502.06

6698.07

831.88

858.57

885.26

911.94

4.80

4.80

4.80

4.80

6946.72
6946.75

7169.42
7169.45

7392.11
7392.15

7614.81
7614.85

Rate per 10 Sqm

c
d

e
f

Description of Item
Basic rate per 10 Sqm
Lift charges - Add 10% on labour for
F.F,20% for SF, 30% for T.F
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.12 x 40 = 4.80
Rate as per 10 Sqm
Say

174

BLDCSTN9-23
Page.60

Providing Skirting to internal walls and Risers of Steps to 15 cm height with Polished shabad /
Tandur stone minimum 15 to 18 mm thick of size (0.254M x0.254M) length equal to flooring
stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency
36
spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of
matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc.,
complete including seigniorage charges, etc., complete for finished item of work,
Unit : 10Sqm
a.Materials
Polished Shabad / Tandur stone
Cement for CM(1:3) Proportion
Sand for CM(1:3) Proportion
Cement slurry

Sqm
Kg
cum
Kg

11.00
57.60
0.12
33.00

2840.29
6169.25
628.07
6169.25

10Sqm
MT
cum
MT

3124.31
355.35
75.37
203.59
3758.62

b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (Unskilled)
Add Agency Allowance

Day
Day
Day
25%

0.960
2.240
3.100
2188.20

415.00
370.00
310.00

Day
Day
Day

398.40
828.80
961.00
547.05
2735.25
6493.87

GF
6493.87

FF
6493.87

SF
6493.87

TF
6493.87

0.00

218.82

437.64

656.46

6493.87

6712.69

6931.51

7150.33

884.14

913.93

943.72

973.52

4.80

4.80

4.80

4.80

7382.81
7382.85

7631.42
7631.45

7880.03
7880.05

8128.64
8128.65

Rate per 10 Sqm

c
d

e
f

Description of Item
Basic rate per 10 Sqm
Lift charges - Add 10% on labour for
F.F,20% for SF, 30% for T.F
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.12 x 40 = 4.80
Rate as per 10 Sqm
Say

175

BLDCSTN9-1
Page.48&4
9

Flooring and Treads with Polished shabad / Tandur stone minimum 15 to 18 mm thick of size
(0.254M x0.254M) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including
neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to
37
full depth including cost of all materials like cement, sand, and water and flooring stones etc.,
complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete
for finished item of work, .
Unit : 10Sqm
a.Materials
Polished Kadapa Slab of 15mm thick

Sqm

11.00

2975.15

10 Sqm

3272.67

cement for CM(1:8) Proportion


Sand for CM(1:8) Proportion
Cement slurry
Cement for jointing

Kg
Cum
Kg
Kg

21.60
0.12
33.00
20.00

6169.25
628.07
6169.25
6169.25

MT
Cum
MT
MT

133.26
75.37
203.59
123.39
3808.26

b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (Unskilled)
Add Agency Allowance

Day
Day
Day
25%

3.100
1.100
0.860
1960.10

415.00
370.00
310.00

Day
Day
Day

1286.50
407.00
266.60
490.03
2450.13
6258.39

GF
6258.39

FF
6258.39

SF
6258.39

TF
6258.39

0.00

196.01

392.02

588.03

6258.39

6454.40

6650.41

6846.42

852.08

878.77

905.45

932.14

4.80

4.80

4.80

4.80

7115.27
7115.30

7337.97
7338.00

7560.66
7560.70

7783.36
7783.40

Rate per 10 Sqm

c
d

e
f

BLDCSTN9-6
Page.51&5
2

Description of Item
Basic rate per 10 Sqm
Lift charges - Add 10% on labour for
F.F,20% for SF, 30% for T.F
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.12 x 40 = 4.80
Rate as per 10 Sqm
Say

Flooring with Vitrified polished floor tiles of size not less than 598 x 598 mm x 8 mm thickness
regular finish and normal colours of make Jhonson & Jhonson, Kajaria, Nitco, Marbonite, set
over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab,
38 including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with
white cement paste to full depth mixed with pigment of matching shade, including cost of all materials
like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for
finished item of work, .
Unit : 10Sqm
a.Materials
Vitrified tiles (BMTC 15)
cement for CM(1:8) Proportion
Sand for CM(1:8) Proportion
Cement slurry
White cement (TBSC-G.I-03)

Sqm
Kg
Cum
Kg
Kg

10.50
21.60
0.12
33.00
6.00

1048.00
6169.25
628.07
6169.25
35.00

Sqm
MT
Cum
MT
Kg

11004.00
133.26
75.37
203.59
210.00
11626.21

b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor Unskilled
Add Agency Allowance

Day
Day
Day
25%

0.960
2.240
3.300
2250.20

415.00
370.00
310.00

Day
Day
Day

398.40
828.80
1023.00
562.55
2812.75
14438.96

GF
14438.96

FF
14438.96

SF
14438.96

TF
14438.96

0.00

225.02

450.04

675.06

14438.96

14663.98

14889.00

15114.02

1965.86

1996.50

2027.14

2057.77

4.80

4.80

4.80

4.80

16409.62
16409.65

16665.28
16665.30

16920.94
16920.95

17176.59
17176.60

Rate per 10 Sqm

c
d

e
f

Description of Item
Basic rate per 10 Sqm
Lift charges - Add 10% on labour for
A.F,20% for SF, 30% for T.F
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.12 x 40 = 4.80
Rate as per 10 Sqm
Say

176

BLDCSTN9-23
Page.60

Providing Skirting to internal walls to 15 cm height and risers of steps with Vitrified polished
floor tiles of size not less than 598 x 598 mm x 8 mm thickness regular finish and normal
colours of make Jhonson & Jhonson, Kajaria, Nitco, Marbonite, set over base coat of CM (1:5) 12
39 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and
jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of
all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc.,
complete for finished item of work,
Unit : 10Sqm
a.Materials
Vitrified tiles (BMTC 16)
Cement for CM(1:5) Proportion
Sand for CM(1:5) Proportion
Cement slurry
White Cement for Jointing & pointing

Sqm
Kg
cum
Kg
Kg

10.50
34.56
0.12
33.00
2.00

1048.00
6169.25
628.07
6169.25
35.00

10Sqm
MT
cum
MT
Kg

11004.00
213.21
75.37
203.59
70.00
11566.16

b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (Unskilled)
Add Agency Allowance

Day
Day
Day
25%

0.960
2.240
3.300
2250.20

415.00
370.00
310.00

Day
Day
Day

398.40
828.80
1023.00
562.55
2812.75
14378.91

GF
14378.91

FF
14378.91

SF
14378.91

TF
14378.91

0.00

225.02

450.04

675.06

14378.91

14603.93

14828.95

15053.97

1957.69

1988.33

2018.96

2049.60

4.80

4.80

4.80

4.80

16341.40
16341.45

16597.06
16597.10

16852.71
16852.75

17108.37
17108.40

Rate per 10 Sqm

c
d

e
f

BLDCSTN9-6
Page.51&5
2

Description of Item
Basic rate per 10 Sqm
Lift charges - Add 10% on labour for
F.F,20% for SF, 30% for T.F
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.12 x 40 = 4.80
Rate as per 10 Sqm
Say

Flooring with ceramic tiles 7.3mm thick of 1st quality all shades of makes Jhonson & Jhonson,
Kajaria, Nitco and Marbonite, set over base coat of cement mortar (1:8), 12 mm thick over CC bed
already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs
40
per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade,
including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage
charges, etc., complete for finished item of work.
Unit : 10Sqm
a.Materials
Ceramic tiles (TBSC-C.I-01)
cement for CM(1:8) Proportion
Sand for CM(1:8) Proportion
Cement slurry
White cement (TBSC-G.I-03)

Sqm
Kg
Cum
Kg
Kg

10.50
21.60
0.12
33.00
2.00

450.00
6169.25
628.07
6169.25
35.00

Sqm
MT
Cum
MT
Kg

4725.00
133.26
75.37
203.59
70.00
5207.21

b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor Unskilled
Add Agency Allowance

Day
Day
Day
25%

0.960
2.240
3.300
2250.20

415.00
370.00
310.00

Day
Day
Day

398.40
828.80
1023.00
562.55
2812.75
8019.96

GF
8019.96

FF
8019.96

SF
8019.96

TF
8019.96

0.00

225.02

450.04

675.06

8019.96

8244.98

8470.00

8695.02

1122.55

1153.19

1183.83

4.80

4.80

4.80

4.80

8024.76
8024.80

9372.33
9372.35

9627.99
9628.00

9883.65
9883.65

Basic Rate per 10 Sqm

c
d

e
f

Description of Item
Basic rate per 10 Sqm
Lift charges - Add 10% on labour for
A.F,20% for SF, 30% for T.F
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.12 x 40 = 4.80
Rate as per 10 Sqm
Say

177

BLDCSTN9-23
Page.60

Providing Skirting to internal walls to height of 15cm and Risers with ceramic tiles 7.3mm thick
of 1st quality all shades of makes Jhonson & Jhonson, Kajaria, Nitco and Marbonite, set over
base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of
41
3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full
depth, including cost of all materials like tiles, cement, sand and water etc., complete including
seigniorage charges, etc., complete for finished item of work,
Unit : 10Sqm
a.Materials
Ceramic tiles (TBSC-C.I-01)
Cement for CM(1:3) Proportion
Sand for CM(1:3) Proportion
Cement slurry
White cement (TBSC-G.I-03)

Sqm
Kg
cum
Kg
Kg

10.50
57.60
0.12
33.00
6.00

450.00
6169.25
628.07
6169.25
35.00

10Sqm
MT
cum
MT
Kg

4725.00
355.35
75.37
203.59
210.00
5569.30

b.Labour
Mason 1st Class
Mazdoor (Unskilled)
Add Agency Allowance

Day
Day
25%

0.770
0.800
567.55

415.00
310.00

Day
Day

319.55
248.00
141.89
709.44
6278.74

GF
6278.74

FF
6278.74

SF
6278.74

TF
6278.74

0.00

56.76

113.51

170.27

6278.74

6335.50

6392.25

6449.01

854.85

862.58

870.31

878.03

4.80

4.80

4.80

4.80

7138.39
7138.40

7202.88
7202.90

7267.36
7267.40

7331.84
7331.85

Rate per 10 Sqm

c
d

e
f

BLDCSTN9-6
Page.51&5
2

Description of Item
Basic rate per 10 Sqm
Lift charges - Add 10% on labour for
F.F,20% for SF, 30% for T.F
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.12 x 40 = 4.80
Rate as per 10 Sqm
Say

Flooring with High Polished Granite Slabs 16 to 18mm thick upto 8'-0" (2.43 Mts) other than
Black and regular colours, set over base coat of cement mortar (1:8), 20mm thick over CC bed
already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs
42
per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade,
including cost of all materials like cement, sand water and Granite Slabs etc., complete, including
seigniorage charges, dressing of Granite Stone Slabs etc., complete for finished item of work, .
Unit : 10Sqm
a.Materials
Granite Slab
cement for CM(1:8) Proportion
Sand for CM(1:8) Proportion
Cement slurry
White cement (TBSC-G.I-03)

Sqm
Kg
Cum
Kg
Kg

10.50
36.00
0.20
33.00
6.00

32183.12
6169.25
628.07
6169.25
35.00

Sqm
MT
Cum
MT
Kg

33792.27
222.09
125.61
203.59
210.00
34553.56

b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor Unskilled
Add Agency Allowance

Day
Day
Day
25%

3.000
1.000
8.000
4095.00

415.00
370.00
310.00

Day
Day
Day

1245.00
370.00
2480.00
1023.75
5118.75
39672.31

GF
39672.31

FF
39672.31

SF
39672.31

TF
39672.31

0.00

409.50

819.00

1228.50

39672.31

40081.81

40491.31

40900.81

5401.39

5457.14

5512.89

5568.65

8.00

8.00

8.00

8.00

45081.70
45081.75

45546.95
45547.00

46012.21
46012.25

46477.46
46477.50

Basic Rate per 10 Sqm

c
d

e
f

Description of Item
Basic rate per 10 Sqm
Lift charges - Add 10% on labour for
A.F,20% for SF, 30% for T.F
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.20 x 40 = 8.00
Rate as per 10 Sqm
Say

178

Flooring with PHOENIX or Equivalent high strength Cement Concrete interlocking Regular
Pavers of 60 mm thickness of M- 40 Grade of which top 12 mm thick shall be for colour
pigmentation with imported colours and white cement to get required reflective glazing, set over
43 base coat of CM (1:8) 12 mm thick with cement slurry of honey like consistency spread at the rate of
3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full
depth, including cost of all materials like tiles, cement, sand and water etc., complete including
seigniorage charges, etc., complete for finished item of work,
Unit : 10Sqm
a.Materials
Cement Concrete tiles (BMT-D.11)
Cement for CM(1:8) for base coat
Sand for CM(1:8) Proportion
White cement (TBSC-G.I-03)

Sqm
Kg
cum
Kg

10.50
21.60
0.12
6.00

335.00
6169.25
628.07
35.00

10Sqm
MT
cum
Kg

3517.50
133.26
75.37
210.00
3936.12

b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (Unskilled)
Add Agency Allowance

Day
Day
Day
25%

0.960
2.240
3.300
2250.20

415.00
370.00
310.00

Day
Day
Day

398.40
828.80
1023.00
562.55
2812.75
6748.87

Rate per 10 Sqm

c
d

e
f

BLDCSTN-9-2
Pg. No 49

Description of Item
Basic rate per 10 Sqm
Lift charges - Add 10% on labour for
F.F,20% for SF, 30% for T.F
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.12 x 40 = 4.80
Rate as per 10 Sqm
Say

GF
6748.87
0.00
6748.87
918.86
4.80
7672.53
7672.55

Flooring with Kadapa Slabs 40mm thick of size (not less than 0.457M x 0.457M) set over base coat of
cement mortar (1:8) 12mm thick over CC bed already laid or RCC roof slab, including pointing with
44 cement mortar 1:3 duly filling joints nearly, including cost of all materials like flooring stone, cement,
sand and water etc., complete, including seigniorage charges, labour charges for dressing of flooring
stones etc., complete for finished item of work.
Unit = 10 Sqm.
a. Materials :
Kadapa slabs (40mm thick)
Cement for CM (1:8) proportion for
base coat
Cement for CM 1:3 proportion for
pointing
Sand for CM (1:8) proportion
Sand for CM (1:3) proportion
b. Labour
Mason 1st Class
Mason 2nd class
Mazdoor (Unskilled)
Add Agency Allowance

Sqm

10.50

4036.25

10 Sqm

4238.07

Kg

21.60

6169.25

MT

133.26

Kg

9.60

6169.25

MT

59.22

cum
cum

0.12
0.02

628.07
628.07

Cum
Cum

75.37
12.56
4518.48

day
day
day
25%

0.96
2.24
3.30
2250.20

415.00
370.00
310.00

day
day
day

398.40
828.80
1023.00
562.55
2812.75
7331.23

Sub-Total ::
c) Add 13.615% Overhead&
Contractors profit on sub total
d) Seigniorage charge
(i) Sand - 0.15 x 40 = 6.00
Rate per 10 Sqm

998.15
6.00
Say

179

8335.37
8335.40

BLDCSTN9-20
Page.58

Dadooing to walls with Decorated white back ground glazed tiles 200mm x 152mm 1st. quality of
any bramd as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick
and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with
45
pigment of matching shade including cost and conveyance of all materials like cement, sand, water,
tiles, etc. to site, seigniorage charges, sales and other taxes on all materials, C921 such as mixing of
cement mortar, laying in position, curing, lift charges etc., complete for finished item of work.
Unit : 10Sqm
a.Materials
Decorated white back ground glazed
tiles 200mm x 152mm (TBSC-C.III01)
cement for CM(1:5) base coat
Sand for CM(1:5)
Cement slurry
White cement (TBSC-G.I-03)

Sqm

10.50

6600.00

10Sqm

6930.00

Kg
Cum
Kg
Kg

34.56
0.12
33.00
2.00

6169.25
628.07
6169.25
35.00

MT
Cum
MT
Kg

213.21
75.37
203.59
70.00
7492.16

b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (Unskilled)
Add Agency Allowance

Day
Day
Day
25%

0.960
2.240
3.300
2250.20

415.00
370.00
310.00

Day
Day
Day

398.40
828.80
1023.00
562.55
2812.75
10304.91

Rate per 10 Sqm


Description of Item
Basic rate per 10 Sqm

GF
10304.91
10304.91

Sub-Total ::
Add
13.615%
Overhead&
Contractors profit on sub total
d) Seigniorage charge
(i) Sand - 0.12 x 40 = 4.80
Rate as per 10 Sqm
Say

BLDCSTN9-13
Page.55

4.80
10309.71
10309.75

Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite
machine crushed metal laid over CC bed already laid or RCC roof slab, in alternate panels of size not
46 exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and
thread lining including cost of all materials like cement, metal, sand and water etc., complete, including
seigniorage charges, etc., complete for finished item of work,
Unit : 10Sqm
a.Materials
6mm to 12mm H.G metal (Machine
crushed)
cement
Sand
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (Unskilled)
Add Agency Allowance

Cum

0.17

1292.110

Cum

219.66

Kg
Cum

120.00
0.085

6169.25
628.07

MT
Cum

740.31
53.39
1013.35

Day
Day
Day
25%

1.250
0.060
3.000
1470.95

415.00
370.00
310.00

Day
Day
Day

518.75
22.20
930.00
367.74
1838.69
2852.04

Basic Rate per 10 Sqm


Description of Item
Basic rate per 10 Sqm

GF
2852.04
2852.04

Sub-Total ::
Add
13.615%
Overhead&
Contractors profit on sub total
Seigniorage charge
(i) Aggregate - 0.17 x 50 = 8.50
(ii) Sand - 0.085 x 40 = 3.40
Rate as per 10 Sqm
Say

388.31
8.50
3.40
3252.25
3252.30

180

BLDCSTN12-1
Page.80

Painting to new internal walls with two (2) coats of ready mixed oil bound washable distemper
acrylic base of approved brand and shade over a base coat of cement primer water base interior
Grade-I of approved brand, makind three (3) coats in all to give an even shade after thourughly
47
brushing the surface to remove all dirt and remains of loose powdered materials, including cost and
conveyance of all materials to work site and all operational, incidental, labour charges etc., complete
for finished item of work in all floors for internal walls (SS 911)
Unit = 10 Sqm
PRIMARY COAT
Cost of cement primer water base
interior Grade-I (TBSC-G.I-01)
Painter (1st class)
Painter (2nd class)
Cost of washable Oil Bound
Distemper acrylic base (TBSC-G.II03)
1st class painter
2nd class painter
Add Agency Allowance

Litre

0.50

165.00

Litre

82.50

Nos
Nos

0.08
0.19

480.00
370.00

Nos
Nos

38.40
70.30

Kg

1.70

90.00

Litre

153.00

Nos
Nos
25%

0.36
0.84
483.60

480.00
370.00

Nos
Nos

Sub-Total ::
Add 13.615% Overhead& Contractor profit on sub-Total
Rate per 10 Sqm
Say
BLDCSTN11-5
Page.79

48

White washing two coats with paint grade white lime for wash or equivalent quality to give an
even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered
materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges
etc., complete for finished item of work in all floors for walls
Unit : 10Sqm
a.Materials
Paint grade white lime for wash
(TBSC-G.II-01)
b.Labour
Painter (1st class)
Painter (2nd class)
Mazdoor (Unskilled)
Add Agency allowance
c) Sundries including brushes
ladders etc., @ 1% on labour (b)
Sub-Total ::
d) Add 13.615% Overhead&
Contractor profit on (a+b+c)
Rate per 10 Sqm

Kg

2.00

24.00

Kg

48.00

Day
Day
Day
25%

0.060
0.150
0.320

480.00
370.00
310.00
183.50

Day
Day
Day

28.80
55.50
99.20
45.88
1.84
279.21

25%

13.615%

279.21

0.00
Say

BLDCSTN12-4
Page.81

344.20
172.80
310.80
120.90
604.50
948.70
129.17
1077.87
1077.90

279.21
279.30

Painting to external walls with Water Proof Cement Paint two (2) coats all colours and shade as
approved by Engineer in charge over a base coat of a cement primer water base exterior Grade-II of
approved brand, makind three (3) coats in all to give an even shade after thourughly brushing the
49
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of
all materials to work site and all operational, incidental, labour charges etc., complete for finished item
of work in all floors for external walls (SS 911)
Unit : 10Sqm
PRIMARY COAT
Cost of Cement Primer water base
exterior Grade-II (TBSC-G.I-01)
Painter (1st class)
Painter (2nd class)
Sundries including brushes, soaps
putty etc., 0.5% on labour
Cost of Water Proof Cement Paint
(TBSC-G.II-04)

Litre

1.00

165.00

Litre

165.00

Day
Day

0.21
0.49

480.00
370.00

day
day

100.80
181.30
1.06

Kg

3.50

55.00

Kg

192.50
640.66

Labour
Painter (1st class)
Painter (2nd class)
Mazdoor (Un skilled)
Add Agency Allowance

Day
Day
Day
25%

Sundries including brushes, soaps


putty etc., 1% on labour
Sub-Total :

0.15
0.35
1.50
666.50

480.00
370.00
310.00

day
day
day

72.00
129.50
465.00
166.63
833.13

833.13

8.33
1482.12

181

Add
13.615%
Contractors profit

Overhead&

201.79

Rate per 10 Sqm


Say

BLDCSTN-1211 (187)
Page - 84

1683.91
1683.95

Painting to New External Walls with two coats of Polymer


Plastic Emulsion paint of Asian / Berger / Nerolac /
Saicoat / Endocem or equalent quality of approved brand
and shade as approved by the Engineer - in - Charge over
base coat of cement primer water base grade -II exterior
making three coats in all to give an even shade after NOTE :: Standard data revised vide Chief
thoroughly brushing the surface to remove all loose
Engineer, R&B (Buildings)
50
powdered materials, including cost and conveyance of all Procs.No.CEB/TA8/AEE3/SSR: 2010-11
materials, including cost and conveyance of all materials,
Dt: 21.01.2011.
cost of brushes, water to site, etc., sales & other taxes, all
operational, incidental and labour charges such as
scaffolding charges, lift charges, curing etc., complete for
finished item of work in all floors for external Walls.
(APSS No. 911)
Unit = 10 Sqm.
Cement Primer water base Grade II
exterior
Polymer Plastic Emulsion paint
(TBSC-G.IV-01)

Litre

1.00

165.00

Litre

165.00

Litre

0.80

270.00

Litre

216.00
381.00

Labour for Primary and Two Coats


1st class painter
2nd class painter
Mazdoor
Add Agency Allowance

Add
13.615%
Contractors profit
Rater per 10 Sqmt.

day
day
day
25%

0.21
0.49
1.50
747.10

480.00
370.00
310.00

day
day
day

Sub-Total :
Overhead&

0.00
Say

BLDCSTN-1211 (187)
Page - 84

100.80
181.30
465.00
186.78
933.88
1314.88

1314.88
1314.90

Painting to New External Walls with two coats of ready


mixed synthetic enamel paint of Asian / Berger /
Nerolac / Saicoat / Endocem or equalent quality of
approved brand and shade as approved by the Engineer in - Charge over base coat of cement primer water base
grade -II exterior making three coats in all to give an even NOTE :: Standard data revised vide Chief
shade after thoroughly brushing the surface to remove all
Engineer, R&B (Buildings)
51
loose powdered materials, including cost and conveyance Procs.No.CEB/TA8/AEE3/SSR: 2010-11
of all materials, including cost and conveyance of all
Dt: 21.01.2011.
materials, cost of brushes, water to site, etc., sales & other
taxes, all operational, incidental and labour charges such
as scaffolding charges, lift charges, curing etc., complete
for finished item of work in all floors for Corridor Walls.
(APSS No. 911)
Unit = 10 Sqm.
Cement Primer water base Grade II
exterior
Synthetic enamal paint (TBSC-G.V01)

Litre

1.00

165.00

Litre

165.00

Litre

0.80

276.00

Litre

220.80
385.80

Labour for Primary and Two Coats


1st class painter
2nd class painter
Mazdoor
Add Agency Allowance

Add
13.615%
Contractors profit
Rater per 10 Sqmt.

day
day
day
25%

0.21
0.49
1.50
747.10

480.00
370.00
310.00

day
day
day

Sub-Total :
Overhead&

100.80
181.30
465.00
186.78
933.88
1319.68
179.67

Say

182

1499.35
1499.40

BLDCSTN12-7 (174)
Page.82

Painting priming coat on New Iron work with red oxide primer Grade-I after thourughly brushing
the surface to remove all dirt and remains of loose powered materials, including cost and conveyance
52
of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete
for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors
Unit : 10Sqm
a.Materials
Red oxide primer (TBSC-G.I-05)

Litre

0.70

142.00

Litre

99.40
99.40

b.Labour
Painter (1st class)
Painter (2nd class)
Add Agency Allowance

day
day
25%

0.21
0.49
282.10

480.00
370.00

day
day

100.80
181.30
70.53
352.63

Add
13.615%
Overhead&
Contractors profit
Rate per 10 Sqm.

48.01
Say

BLDCSTN12-12
(197)
Page.86

500.04
500.05

Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all
shades over red oxide primer Grade-I making three (3) coats in all to given and even shade after
53 thourughly brushing the surface to remove all dirt and remains of loose powered materials, including
cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour
charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors
Unit = 10 Sqm.
a.Materials
Synthetic enamal paint (TBSC-G.V01)

Ltr

1.10

276.000

Ltr

303.60
303.60

b.Labour
Painter (1st class)
Painter (2nd class)
Add Agency Allowance

Day
Day
25%

0.33
0.77
443.30

480.00
370.00

Day
Day

Sub-Total ::
Add 13.615% Overhead& Contractors profit
Rate as per 10 Sqm
Say

183

158.40
284.90
110.83
554.13
857.73
116.78
974.51
974.55

Making Green Chalk Board of size 3.00 x 1.20 Mts including border with plastering in CM(1:2) 12mm
thick as base coat and 3mm top coat with cement green oxide powder (1:1) and making border in CM
(1:2) of 50 x 20mm thick allround the chalk board over existing plastered surface and painting the chalk
54
board surface with chalk board paint as per direction of Enginer-in-Charge including cost, conveyance
of all materials, sales and other taxes on cost of all materials and all operational, incidental and labour
charges etc. complete for finished item of work (APSS No: 1603)
Unit = Each
Base coate CM (1:2) 12mm thick
Cost of CM (1:2)

Area of Board = 3.00 x 1.20 mts = 3.60 Sqm


cu.m.

0.15

5178.83

cu.m.

1st class mason


2nd class mason
Mazdoor (Un skilled)
Add Agency Allowance

day
day
day
25%

0.33
0.77
1.6
917.85

415.00
370.00
310.00

day
day
day

Rate per Ten Sqmts.


Top Coat in CM (1:1)
Cost of Cement
Cost of Green oxide

Total
Kgs
Kg

3.15
15

6.17
105.00

Kgs
Kg

1st class mason


2nd class mason
Mazdoor (Un skilled)
Add Agency Allowance

day
day
day
25%

0.33
0.77
1.6
917.85

415.00
370.00
310.00

day
day
day

Rate per Ten Sqmts.


20mm thick Plastering in CM(1:2) for Border
Cost of CM (1:2)
cu.m.
0.21
5178.83
1st class mason
2nd class mason
Mazdoor (Un skilled)
Add Agency Allowance

day
day
day
25%

Rate per Ten Sqmts.


Cost of Chalk Board Paint
Cost of Chalk Board Paint
1st Class Painter
2nd Class Painter
Add Agency Allowance

c
d

e
f

Rate per Ten Sqmts.


Cost of Base Coat in CM (1:2)
Top Coat in CM (1:1) with green
oxide powder
Plastering 20mm thick in CM (1:2) for
border
Cost of Chalk Board Paint
Sub-Total ::
Description of Item
Basic rate per Sqm
Lift charges - Add 10% on labour for
F.F,20% for SF, 30% for T.F
Sub-Total ::
Add 13.615% Overhead& Contract
profit charges on sub total

0.66
1.54
3.70
1990.70

415.00
370.00
310.00

Total
cu.m.
day
day
day

Total

776.83
776.83
136.95
284.90
496.00
229.46
1147.31
1924.14
19.43
1575.00
1594.43
136.95
284.90
496.00
229.46
1147.31
2741.74
1087.56
1087.56
273.90
569.80
1147.00
497.68
2488.38
3575.94

Ltr

1.10

199.00

Ltr

day
day
25%

0.33
0.77
443.30

480.00
370.00

day
day

Sq.m.

4.03

192.41

Sq.m.

218.90
218.90
158.40
284.90
110.83
554.13
773.03
775.43

Sq.m.

3.60

274.17

Sq.m.

987.03

Sq.m.

0.43

357.59

Sq.m.

153.77

Sq.m.

4.03

77.30

Sq.m.

GF
2227.75

FF
2227.75

SF
2227.75

311.53
2227.75
TF
2227.75

0.00

96.46

192.91

289.37

2227.75

2324.21

2420.66

2517.12

303.31

316.44

329.57

342.71

8.40

8.40

8.40

8.40

2539.46
2539.50

2649.05
2649.05

2758.64
2758.65

2868.23
2868.25

Seigniorages Sand 40x0.22=8.40


Rate per Sqm
Say

184

BLDCSTN12-12
(195)
Page.86

Painting to New wood work with two coats of ready mixed synthetic enamel paint first quality all
shades to give an even shade over base coatof wood Primer finishing with putty for wood work after
55 thouroughly brushing the surface to remove all remains including cost and conveyance of all materials
to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished
item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors
Unit = 10 Sqm.
a.Materials
Wood primer (TBSC-G.I-07)
Putty for wood work (TBSC-G.I-08)
Synthetic enamal paint (TBSC-G.V01)

Litre
Kg

0.70
1.00

158.00
158.00

Litre
Kg

110.60
158.00

Ltr

1.10

276.000

Ltr

303.60

day
day
25%

0.21
0.49
282.10

480.00
370.00

day
day

100.80
181.30
70.53

Day
Day
25%

0.36
0.84
483.60

480.00
370.00

Day
Day

172.80
310.80
120.90
1529.33

b.Labour
Forpriming coat
Painter (1st class)
Painter (2nd class)
Add Agency allowance
Synthetic enamel paint two coats
Painter (1st class)
Painter (2nd class)
Add Agency allowance
Sub-Total ::
Add 13.615% Overhead&
Contractors profit
Rate as per 10 Sqm

14%

1529.33

208.22
Say

1737.54
1737.60

56 Supply and Fixing of 50mm thick Cement Jali including cost and conveyance of all materials to site,
sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of
work in All Floors.
Rate as per SSR (BMSW-17)
P.No.79
Add 13.615% Overhead&
Contractors profit
Rate per Sqmt.

Sqmt

402.00

14%

402.00

Sqm

402.00
56.28
458.28

57 Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked
together through their entire length and jointed together at the ends by end-locks, mounted on specially
designed pipe shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide channels,
stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull
operations including cost of hood cover and springs complete, painted with one coat of approved steel
primer, locks, ball bearings, all accessories etc complete for finished item of work as per special spn:
1108
Rate as per SSR (BMT -F-29)
P.No.22
Add 14% Overhead& Contractors
profit
Rate per Sqmt.

Sqmt

2861.00

14%

2861.00

Sqm

2861.00
400.54
3261.54

58 Ellispattern flooring with CC(1:5:10) using 40mm HBG metal of 80mm thick and top with CC(1:2:4)
using 20 mm HBG metal of 40mm thick and top finish with CM(1:3) of 0.07 cum/10 sqm and cement
slurry 3.30 kg/10 sqm including cost and conveyance of all materials of all materials etc., complete.
Unit : Cum
CC (1:5:10)
a.Material
Cement
Coarse aggregate 40mm
Fine Aggregate (Sand)
b. Machinery
Concrete Mixer (0.2/0.8 cum
capacity) 600/400 (Diesel)

Kg
Cum
Cum

129.60
0.90
0.45

6169.25
1144.91
628.07

MT
Cum
Cum

799.53
1030.42
282.63
2112.59

hour

1.00

459.30

hour

459.30
459.30

c.Labour
Mason 1st Class
Mazdoor(Unskilled)
Add Agency Allowance
Add Agency Allowance on Crew
charges of concrete mixer

Day
Day
25%

0.10
1.39
472.40

25%

174.20

185

415.00
310.00

Day
Day

41.50
430.90
118.10
43.55

Sub-Total ::

186

634.05
3205.94

CC (1:2:4)
a.Material
Cement
Coarse aggregate 20mm
Fine Aggregate (Sand)
b. Machinery
Concrete Mixer (0.2/0.8 cum
capacity) 600/400 (Diesel)

Kg
Cum
Cum

330.00
0.80
0.40

6169.25
1664.91
628.07

MT
Cum
Cum

2035.85
1331.93
251.23
3619.01

hour

1.00

459.30

hour

459.30
459.30

c.Labour
Mason 1st Class
Mazdoor(Unskilled)
Add Agency Allowance
Add Agency Allowance on Crew
charges of concrete mixer

Day
Day
25%

0.10
1.39
472.40

25%

174.20

415.00
310.00

Cum
Cum

Add 13.615% Overhead&


Contractors profit
For 10 Sqm

Asst.Engineer
TW Bhadrachalam

41.50
430.90
118.10
43.55

Sub-Total ::
Unit - 10 Sqm
CC (1:5:10)
CC (1:2:4)

Day
Day

634.05
4712.36

0.80
0.40

3205.94
4712.36

2564.75
1884.94
4449.69

13.615%

4449.69

605.83
5055.52

Deputy Exe. Engineer Executive Engineer


TW SD, Bhadrachalam T W, Bhadhrachalam

Superintending Engineer
Tribal Welfare, Warangal

187

DETAILED CUM ABSTRACT ESTIMATE


NAME OF THE WORK: BALANCE WORK OF MANADAL MAHILA SAMAKHYA BUILIDING AT
BHADRACHALAM (V)(M) IK KHAMMAM DIST
SL.
NO

Description of Item.

Lengt
h

No.

Qty.

Unit

Rate

per Amount.

Supply and run of 2 of 36/0.3mm (2.5 Sqmm) PVC


insulated flexible copper cable of make Standard /
Havells /HPL / Toyoma in existing PVC conduit pipe
4
circuits, MV Lamp/Security light points including
laboiur charges (Phase, Neutral and earth) and run
of 1 of 1.0 sqmm copper cable for earthing.

Supply and errecting ceiling fan of Crompton /


Bajaj Kassels 50 / Usha Atom. with 3 blades and
double ball bearings and with condenser AC 250V
50 C/S of 48" 1200mm sweep completely erected
in position with out regulator, canopy down rod up
8 to 301.80 mm in length is provided with
hook/clamps nuts and bolts and 24/02 flexible
copper wire etc., complete and pointed with
lettering by enamil paint the Sl. No. and date of
errection including cost and conveyance of all
materials and labour chargers etc., complete.
Class
rooms
Providing
independent earthing for main switches
integrated circuit cutouts and moters with 40mm dia 'B'
class GI Pipe of TATA/Zenith/GST make of 2.0 m length
duly providing 12mm dia 16 Nos. holes and rewired bolts,
nuts and washers, checknuts, Humepipe ring etc., as per
8
IS specifications with necessary double GI earth wire NO.
8 SWG inclkuding filling with equal preparation of salt
and charcoal in layers including cost and conveyance of
all materials to site, labour charges and sales tax etc.,
complete for finished item of work.
Supply and FIXING of 1x40W weather proof
fluorescent street light fitting comprising canopy
of sheet alluminium housing and UV stabilised
acrylic cover of makes Crompton / Bajaj / HPL /
Surya / Havels with copper / VPIT ballast,
5
capacitor, 40 W tube and starter with 1.00 meter
25mm dia GI pipes with bracket and anti tilting
MS flat etc., including cost and conveyance of all
materials to site, labour charges, and sales tax
etx., complete for finished item of work.

1x

1x

30

30 Rmt

43.86 Rmt.

1316

6
6 Pts.

### Each

9696

1x

1 pts

###

2147

1x

1 sets

###

1593

1x

10

Supply and fixing of 1 X 36/40W Patty type Tube


light luminire powder coated CRCA sheet steel
housing with copper chokes and all standard
10 accessories including giving connection and all
labour chrges etc., complete for finished item of
work. Make : Cromption /Bajaj / Surya /Hpl
/Havells.
10
10 Nos.

329.66 Each

3297
18049

ELECTRIFICATION DATA 2015-16


Sl.
No.

Qty.

Units

Description

SSR Item
No. &
Pg.No.

Rate

Per

Amount

Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in wall with all
required accessories including masonary ork and labour charges etc., complete. DATA 1.4.2 (a)
Pg.160

In Walls

In Slab

For Taking 100 mts


100.00

Rmt

Cost of 25mm dia 2mm thick PVC Pipe

ELE-1.2.4
Pg.126(55)

31.80

1Rmt

3180.00

3180.00

100.00

Nos

Cost of U Links

ELEC-8.1.7
Pg.210

44.00

100 No

44.00

0.00

12.00

Nos

25mm dia 1,2,3 & 4 Way deep junction box

ELEC-1.2.39 Pg
(128)

25.00

1Each

300.00

300.00

12.00

Nos

25mm dia PVC Bend

ELEC-1.2.44
Pg.(128)

6.00

1Each

72.00

72.00

50.00

Kgs

Cost of Cement

LEAD
STATEMENT

5348.75

1Mt

267.44

0.00

Labour
2.00

Nos

Skilled Electrician

Labour
Charges

440.00

1 Day

880.00

880.00

2.00

Nos

Semi Skilled Electrician

Labour
Charges

375.00

1 Day

750.00

750.00

2.00

Nos

Helpers

Labour
Charges

345.00

1 Day

690.00

690.00

2.00

Nos

1st Class Massons

Labour
Charges

345.00

1 Day

690.00

690.00

6873.44

6562.00

14%

0.00

Add Overheads and Contractor profits @


14%

For 10.00 Rmt

918.68

For 1.00 Rmt


2

6873.44

7480.68

68.73

74.81

Supply and Fixing of 25mm dia 1.50mm thick PVC pipe (ISI MARK) concealed in wall with all
required accessories including masonary ork and labour charges etc., complete. DATA 1.4.2 (a)
Pg.160
For Taking 100 mts
100.00

Rmt

Cost of 25mm dia 1.50mm thick PVC Pipe

ELEC-1.2.3
Pg.126

25.40

1Rmt

2540.00

100.00

Nos

Cost of U Links

ELEC-8.1.7
Pg.210

44.00

100 No

44.00

12.00

Nos

25mm dia 1,2,3 & 4 Way deep junction box

ELEC-1.2.39 Pg
(128)

25.00

1Each

300.00

12.00

Nos

25mm dia PVC Bend

ELEC-1.2.44
Pg.(128)

6.00

1Each

72.00

50.00

Kgs

Cost of Cement

0.00

0.00

1Mt

0.00

Labour
2.00

Nos

Skilled Electrician

Labour
Charges

440.00

1 Day

880.00

2.00

Nos

Semi Skilled Electrician

Labour
Charges

375.00

1 Day

750.00

2.00

Nos

Helpers

Labour
Charges

345.00

1 Day

690.00

2.00

Nos

1st Class Massons

Labour
Charges

345.00

1 Day

690.00

14%

0.00

Total:

5966.00

Add Overheads and Contractor profits @


14%

6801.24

835.24

/ 100Rmt

For 1.00 Rmt

68.01

/ 1Rmt

Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper
cable (ISI MARK) in existing pipe with 6A witch, Ceiling rose and 3mm thick hylam sheet covering
to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan
points in Non-Residential Buildings Taking Output = 6 Points

100.00

Rmt

Cost of 14/0.3 mm PVC FR Copper wire

ELEC-1.5.1
Pg.129

1051.00

100 Rmt

1051.00

6.00

Nos

Cost of 6 Amps Switches

ELEC-1.7.1
Pg. 132

18.00

1 No

108.00

6.00

Nos

Cost of 6 A 2 way ceiling rose

ELEC-1.7.15

21.00

1Each

126.00

1.00

Nos

Cost of 3mm thick Hylam sheet

ELEC-1.4.19
Pg.149

44.00

1Each

44.00

Labour

0.60

Nos

Skilled Electrician

Labour
Charges

440.00

1 Day

264.00

1.20

Nos

Semi Skilled Electrician

Labour
Charges

375.00

1 Day

450.00

0.60

Nos

Helpers

Labour
Charges

345.00

1 Day

207.00

14%

0.00

Total:

2250.00

Add Overheads and Contractor profits @


14%

2250.00

For 1.00 Point

375.00

/ 6 Points

/ 1 Point

Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper
cable (ISI MARK) in existing pipe with 6A witch, Ceiling rose and 3mm thick hylam sheet covering
to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan
points in Non-Residential Buildings Taking Output = 6 Points
100.00

Rmt

Cost of 14/0.3 mm PVC FR Copper wire

ELEC-1.5.1
Pg.129

1051.00

100 Rmt

1051.00

6.00

Nos

Cost of 6 Amps Switches

ELEC-1.7.1
Pg. 132

18.00

1 No

108.00

6.00

Nos

Cost of 6 A 2 way ceiling rose

ELEC-1.7.15

21.00

1Each

126.00

1.00

Nos

Cost of 3mm thick Hylam sheet

ELEC-1.4.19
Pg.149

44.00

1Each

44.00

Labour Charges

440.00

1 Day

264.00

Labour
0.60

Nos

Skilled Electrician

1.20

Nos

Semi Skilled Electrician

Labour
Charges

375.00

1 Day

450.00

0.60

Nos

Helpers

Labour
Charges

345.00

1 Day

207.00

Total:

2250.00

14%

0.00

Add Overheads and Contractor profits @


14%

315.00

For 1.00 Point

/ 6 Points

2565.00
427.50

/ 1 Point

Supply and Fixing of 16A 3pin and 6A 3pin plug socket with indicator lamp and 16A fuse unit and
16A switch control (5 in 1) duly recessed in wall with wooden deep box of 6" x8" x2 1/2" size
covered with hylam sheet including earth connections and all labour charges etc., complete.

Materials:
1.00

Nos

Deep Wooden Box 8'x 6"

ELEC-1.4.11
Pg.128 (122)

44.00

1Each

44.00

1.00

Nos

3mm Hylam Sheet

ELEC-1.4.18
Pg. 149

26.40

1 No

26.40

1.00

Nos

16 A 3 Pin 5 in 1 Power plug

ELEC-1.7.11
Pg.153)

146.00

1Each

146.00

Labour
0.10

Nos

Skilled Electrician

Labour
Charges

440.00

1 Day

44.00

0.10

Nos

Semi Skilled Electrician

Labour
Charges

375.00

1 Day

37.50

0.10

Nos

Helpers

Labour
Charges

345.00

1 Day

34.50

14%

0.00

Add Overheads and Contractor profits @


14%
Total:

332.40
46.54
378.94

Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of light point complete
with all connections and all labour charges with 40W bulb (for new installation).

Materials:
1.00

Nos

Cost of Battern holder

ELEC-3.6.90
Pg.189

24.20

1Each

24.20

1.00

Nos

Bulb

ELEC-3.7.1
Pg. 190

12.00

1Each

12.00

/ 1Each

Labour
0.05

Nos

Skilled Electrician

Labour
Charges

440.00

1 Day

22.00

0.05

Nos

Helpers

Labour
Charges

345.00

1 Day

17.25

14%

0.00

75.45
Add Overheads and Contractor profits @
14%
Total:

75.45

Supply and run of 2 of 22/0.3mm (1.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing
pipe for mains inlcuding all labour charges etc., complete.

Materials:
200.00

Rmt

Cost of 22/0.3mm FR PVC Copper Wire

ELEC-1.5.2
Pg.150

1555.00

100 Rmt

3110.00

/ 1Each

Labour
0.67

Nos

Skilled Electrician

Labour
Charges

440.00

1 Day

294.80

2.00

Nos

Semi Skilled Electrician

Labour
Charges

375.00

1 Day

750.00

0.67

Nos

Helpers

Labour
Charges

345.00

1 Day

231.15

14%

0.00

Add Overheads and Contractor profits @


14%

For 100 Rmt

For 1.00 Rmt

4385.95

/ 100 Rmt

4385.95
43.86

/ 1 Rmt

Supply of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball
bearings with all standard accessories.

Materials:
1.00

Nos

1%

Cost of Fan

ELEC-5.1.1
Pg.209

Transportation charges

1600.00

1Each

1600.00

1600.00
16.00
1616.00

14%

0.00

Add Overheads and Contractor profits @


14%
Total:

1616.00

Supply and fixing SPN Distribution board with IP-20 protection suitable for single phase Earth
Leakage Circute Braker (ELCB) / Residual Current Circute Braker (RCCB) / Double Pole (DP)
Isolator as incomer and 10kA SPN MCBs as out going including internal connections and labour
charges for surface / flush mounting etc., complete. 40A DP Isolator / RCCB / ELCB - 1 No for
incomer, 6-32A SP MCBs - 6Nos for outgoing.

Materials:
1.00

Nos

8 Way Distribution board

ELEC-2.12.2
Pg.169

880.00

1Each

880.00

1.00

Nos

Cost of 40 Amps DP Isolator

ELEC-2.10.2
Pg.167

366.20

1Each

366.20

6.00

Nos

10 KA 6-32 Amps SPMCBs

ELEC-2.9.1
Pg.166

200.60

1Each

1203.60

/ 1 Each

Labour
0.50

Nos

Skilled Electrician

Labour
Charges

440.00

1 Day

220.00

1.00

Nos

Semi Skilled Electrician

Labour
Charges

375.00

1 Day

375.00

1.00

Nos

Helpers

Labour
Charges

345.00

1 Day

345.00

Sundries
14%

0.00

49.00
3438.80
481.43
3920.23

Add Overheads and Contractor profits @


14%

10

Supply and Run of 2 of 6 Sq.mm WPTC Aluminium cable along with No.10 SWG G.I bearer wire
through PVC cleats with all accessories including labour charges etc., complete.

Materials:
200.00

Rmt

Cost of 6 sqmm 7/18 WPTC Cable

ELEC-1.6.2
Pg.152

1492.00

100 Rmt

2984.00

6.70

Kgs

Cost of No. 10 SWG GI Bearer wire.

ELEC-8.1.45
Pg.235

61.60

1Kg

412.72

4.00

Nos

Insulation taps

ELEC-8.121
Pg.235

15.00

1Each

60.00

2.00

Nos

Box Link PVC clips

ELEC-8.1.11
Pg.234

50.00

Each box

100.00

/ 1Each

Labour
1.00

Nos

Skilled Electrician

Labour
Charges

440.00

1 Day

440.00

1.00

Nos

Semi Skilled Electrician

Labour
Charges

375.00

1 Day

375.00

1.00

Nos

Helpers

Labour
Charges

345.00

1 Day

345.00

Sundries
14%

0.00

For 100 Rmt


Add Overheads and Contractor profits @
14%
For 1.00 Rmt

1.50
4718.22

/ 100 Rmt

4718.22
47.18

/ 1 Rmt

11

Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe
and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with
mesh enclosed in C.C.Chamber of 400m x 400m x400mm with R.C.C. Slab cover duly providing
staggered holes filling with salt and charcoal from the bottom of the pipe giving earth connection
from electrode through G.I strip of 25 x 6mm x 200mm length with all accessories and labour
charges complete, as per IS specifications 732/1982 (Part II)

Materials:
0.85

Cum

Earth work excavation

As per Civil
Data

247.70

10 Cum

21.05

0.90

Cum

Earth work HDR

As per Civil
Data

247.70

10 Cum

22.29

25%

Extra For Narrow cutting (73.11+77.41) =

2.50

Rmt

Cost of 40mm dia GI Pipes

1.00

No

16.00

43.34

10.84

355.00

1Rmt

887.50

GI Flat with holes

50.00

1Each

50.00

Nos

Building of holes 12mm dia

5.00

1Each

80.00

4.00

Rmt

GI Nuts washers and bolts

22.00

1Set

88.00

1.00

No

18" dai Hume Pipe ring

220.00

1Each

220.00

20.00

Kgs

Cost of Salt

4.00

1Kg

80.00

40.00

Kgs

Cost hard charcoal

8.00

1Kg

320.00

ELEC-8.1.57

ELEC-8.1.13

Labour
0.50

Nos

Semi Skilled

Labour
Charges

375.00

1 Day

187.50

0.50

Nos

Helpers

SSR.No.2
Pg.191

345.00

1 Day

172.50

Sundries
14%

0.00

0.35
2140.03
299.60
2439.63

Add Overheads and Contractor profits @


14%
Total:

12

Supply and Fixing of 1x36 W / 40W tube light luminaire on wall / Ceiling with / TW round blocks
with all accessories including giving connections and all labour charges etc., Complete.

Materials:
1.00

No

Cost of Tube light

ELEC-3.6.18
Pg.185

231.00

1Each

231.00

1.00

Rmt

Cost of 23 / 0060 Twin core flexible copper cable.

ELEC-1.6.8
Pg.152

990.00

100 Rmt

9.90

2.00

Nos

Cost of Screw

ELEC-1.4.39
Pg.149

118.80

100 Nos

2.38

2.00

Nos

Cost of rawal plug

ELEC-8.1.9
Pg.235

25.00

100 Each

0.50

2.00

Nos

Round blocks

ELEC-8.1.35
Pg.236

6.00

1 Each

12.00

/ 1Each

Labour
0.10

Nos

Semi Skilled Electrician

Labour
Charges

375.00

1 Day

37.50

0.10

Nos

Helpers

Labour
Charges

345.00

1 Day

34.50

Sundries

1.88
329.66

14%

0.00

Add Overheads and Contractor profits @


14%
Total:

329.66

/ 1Each

13

Supply of 1x40W weatherproof flourescent streetlight fitting comprising canopy of sheet Aluminium
in stove enamel finish with copper / VPIT ballast, capacitor, tube and starter etc., complete.

Materials:
1.00

No

Cost of Flourescent Street light

1.00

No

Cost of 40 W Tube

ELEC-3.1.1
Pg.175

1459.50

1Each

1459.50

45.00

1Each

45.00

Sundries

15.00

Labour
0.10

Nos

Semi Skilled Electrician

Labour
Charges

375.00

1 Day

37.50

0.10

Nos

Helpers

Labour
Charges

345.00

1 Day

34.50

Sundries

1.88
1593.38

14%

0.00

Assistant Engineer
TW Bhadrachalam

Add Overheads and Contractor profits @


14%
Total:

Deputy Executive Engineer


TW SD, Bhadrachalam

Superintending Engineer
Tribal Welfare, Warangal

1593.38

Executive Engineer
TWD: Bhadrachalam