Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
0.00
11.04
23.91
34.95
45.99
57.03
68.07
79.11
90.15
101.19
112.23
123.27
134.31
145.35
156.39
167.43
178.47
189.51
200.55
211.59
222.63
233.67
244.71
255.75
266.79
277.83
288.87
299.91
310.95
321.99
331.19
340.39
349.59
358.79
367.99
377.19
386.39
395.59
404.79
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
0.00
11.04
23.91
34.95
45.99
57.03
68.07
79.11
90.15
101.19
112.23
123.27
134.31
145.35
156.39
167.43
178.47
189.51
200.55
211.59
222.63
233.67
244.71
255.75
266.79
277.83
288.87
299.91
310.95
321.99
331.19
340.39
349.59
358.79
367.99
377.19
386.39
395.59
404.79
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
0.00
17.74
38.44
56.18
73.92
91.66
109.40
127.14
144.88
162.62
180.36
198.10
215.84
233.58
251.32
269.06
286.80
304.54
322.28
340.02
357.76
375.50
393.24
410.98
428.72
446.46
464.20
481.94
499.68
517.42
532.21
547.00
561.79
576.58
591.37
606.16
620.95
635.74
650.53
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
0.00
15.65
36.60
52.83
69.06
85.29
101.52
117.75
133.98
150.21
166.44
182.67
198.90
215.13
231.36
247.59
263.82
280.05
296.28
312.51
328.74
344.97
361.20
377.43
393.66
409.89
426.12
442.35
458.58
474.81
488.34
501.87
515.40
528.93
542.46
555.99
569.52
583.05
596.58
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
0.00
6.66
15.56
22.46
29.36
36.26
43.16
50.06
56.96
63.86
70.76
77.66
84.56
91.46
98.36
105.26
112.16
119.06
125.96
132.86
139.76
146.66
153.56
160.46
167.36
174.26
181.16
188.06
194.96
201.86
207.61
213.36
219.11
224.86
230.61
236.36
242.11
247.86
253.61
311891749.xls
CONVEYANCE
1 of 194
Sl.No
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
413.99
423.19
432.39
441.59
450.79
459.99
469.19
478.39
487.59
496.79
505.99
515.19
524.39
533.59
542.79
551.99
561.19
570.39
579.59
588.79
597.99
607.19
616.39
625.59
634.79
643.99
653.19
662.39
671.59
680.79
689.99
699.19
708.39
717.59
726.79
735.99
745.19
754.39
763.59
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
413.99
423.19
432.39
441.59
450.79
459.99
469.19
478.39
487.59
496.79
505.99
515.19
524.39
533.59
542.79
551.99
561.19
570.39
579.59
588.79
597.99
607.19
616.39
625.59
634.79
643.99
653.19
662.39
671.59
680.79
689.99
699.19
708.39
717.59
726.79
735.99
745.19
754.39
763.59
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
665.32
680.11
694.90
709.69
724.48
739.27
754.06
768.85
783.64
798.43
813.22
828.01
842.80
857.59
872.38
887.17
901.96
916.75
931.54
946.33
961.12
975.91
990.70
1005.49
1020.28
1035.07
1049.86
1064.65
1079.44
1094.23
1109.02
1123.81
1138.60
1153.39
1168.18
1182.97
1197.76
1212.55
1227.34
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
610.11
623.64
637.17
650.70
664.23
677.76
691.29
704.82
718.35
731.88
745.41
758.94
772.47
786.00
799.53
813.06
826.59
840.12
853.65
867.18
880.71
894.24
907.77
921.30
934.83
948.36
961.89
975.42
988.95
1002.48
1016.01
1029.54
1043.07
1056.60
1070.13
1083.66
1097.19
1110.72
1124.25
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
259.36
265.11
270.86
276.61
282.36
288.11
293.86
299.61
305.36
311.11
316.86
322.61
328.36
334.11
339.86
345.61
351.36
357.11
362.86
368.61
374.36
380.11
385.86
391.61
397.36
403.11
408.86
414.61
420.36
426.11
431.86
437.61
443.36
449.11
454.86
460.61
466.36
472.11
477.86
311891749.xls
CONVEYANCE
2 of 194
Sl.No
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
772.79
781.99
791.19
800.39
809.59
818.79
827.99
837.19
846.39
855.59
864.79
873.99
883.19
892.39
901.59
910.79
919.99
929.19
938.39
947.59
956.79
965.99
975.19
984.39
993.59
1002.79
1011.99
1021.19
1030.39
1039.59
1048.79
1057.99
1067.19
1076.39
1085.59
1094.79
1103.99
1113.19
1122.39
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
772.79
781.99
791.19
800.39
809.59
818.79
827.99
837.19
846.39
855.59
864.79
873.99
883.19
892.39
901.59
910.79
919.99
929.19
938.39
947.59
956.79
965.99
975.19
984.39
993.59
1002.79
1011.99
1021.19
1030.39
1039.59
1048.79
1057.99
1067.19
1076.39
1085.59
1094.79
1103.99
1113.19
1122.39
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
1242.13
1256.92
1271.71
1286.50
1301.29
1316.08
1330.87
1345.66
1360.45
1375.24
1390.03
1404.82
1419.61
1434.40
1449.19
1463.98
1478.77
1493.56
1508.35
1523.14
1537.93
1552.72
1567.51
1582.30
1597.09
1611.88
1626.67
1641.46
1656.25
1671.04
1685.83
1700.62
1715.41
1730.20
1744.99
1759.78
1774.57
1789.36
1804.15
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
1137.78
1151.31
1164.84
1178.37
1191.90
1205.43
1218.96
1232.49
1246.02
1259.55
1273.08
1286.61
1300.14
1313.67
1327.20
1340.73
1354.26
1367.79
1381.32
1394.85
1408.38
1421.91
1435.44
1448.97
1462.50
1476.03
1489.56
1503.09
1516.62
1530.15
1543.68
1557.21
1570.74
1584.27
1597.80
1611.33
1624.86
1638.39
1651.92
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
483.61
489.36
495.11
500.86
506.61
512.36
518.11
523.86
529.61
535.36
541.11
546.86
552.61
558.36
564.11
569.86
575.61
581.36
587.11
592.86
598.61
604.36
610.11
615.86
621.61
627.36
633.11
638.86
644.61
650.36
656.11
661.86
667.61
673.36
679.11
684.86
690.61
696.36
702.11
311891749.xls
CONVEYANCE
3 of 194
Sl.No
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
1131.59
1140.79
1149.99
1159.19
1168.39
1177.59
1186.79
1195.99
1205.19
1214.39
1223.59
1232.79
1241.99
1251.19
1260.39
1269.59
1278.79
1287.99
1297.19
1306.39
1315.59
1324.79
1333.99
1343.19
1352.39
1361.59
1370.79
1379.99
1389.19
1398.39
1407.59
1416.79
1425.99
1435.19
1444.39
1453.59
1462.79
1471.99
1481.19
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
1131.59
1140.79
1149.99
1159.19
1168.39
1177.59
1186.79
1195.99
1205.19
1214.39
1223.59
1232.79
1241.99
1251.19
1260.39
1269.59
1278.79
1287.99
1297.19
1306.39
1315.59
1324.79
1333.99
1343.19
1352.39
1361.59
1370.79
1379.99
1389.19
1398.39
1407.59
1416.79
1425.99
1435.19
1444.39
1453.59
1462.79
1471.99
1481.19
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
1818.94
1833.73
1848.52
1863.31
1878.10
1892.89
1907.68
1922.47
1937.26
1952.05
1966.84
1981.63
1996.42
2011.21
2026.00
2040.79
2055.58
2070.37
2085.16
2099.95
2114.74
2129.53
2144.32
2159.11
2173.90
2188.69
2203.48
2218.27
2233.06
2247.85
2262.64
2277.43
2292.22
2307.01
2321.80
2336.59
2351.38
2366.17
2380.96
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
1665.45
1678.98
1692.51
1706.04
1719.57
1733.10
1746.63
1760.16
1773.69
1787.22
1800.75
1814.28
1827.81
1841.34
1854.87
1868.40
1881.93
1895.46
1908.99
1922.52
1936.05
1949.58
1963.11
1976.64
1990.17
2003.70
2017.23
2030.76
2044.29
2057.82
2071.35
2084.88
2098.41
2111.94
2125.47
2139.00
2152.53
2166.06
2179.59
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
707.86
713.61
719.36
725.11
730.86
736.61
742.36
748.11
753.86
759.61
765.36
771.11
776.86
782.61
788.36
794.11
799.86
805.61
811.36
817.11
822.86
828.61
834.36
840.11
845.86
851.61
857.36
863.11
868.86
874.61
880.36
886.11
891.86
897.61
903.36
909.11
914.86
920.61
926.36
311891749.xls
CONVEYANCE
4 of 194
Sl.No
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
1490.39
1499.59
1508.79
1517.99
1527.19
1536.39
1545.59
1554.79
1563.99
1573.19
1582.39
1591.59
1600.79
1609.99
1619.19
1628.39
1637.59
1646.79
1655.99
1665.19
1674.39
1683.59
1692.79
1701.99
1711.19
1720.39
1729.59
1738.79
1747.99
1757.19
1766.39
1775.59
1784.79
1793.99
1803.19
1812.39
1821.59
1830.79
1839.99
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
1490.39
1499.59
1508.79
1517.99
1527.19
1536.39
1545.59
1554.79
1563.99
1573.19
1582.39
1591.59
1600.79
1609.99
1619.19
1628.39
1637.59
1646.79
1655.99
1665.19
1674.39
1683.59
1692.79
1701.99
1711.19
1720.39
1729.59
1738.79
1747.99
1757.19
1766.39
1775.59
1784.79
1793.99
1803.19
1812.39
1821.59
1830.79
1839.99
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
2395.75
2410.54
2425.33
2440.12
2454.91
2469.70
2484.49
2499.28
2514.07
2528.86
2543.65
2558.44
2573.23
2588.02
2602.81
2617.60
2632.39
2647.18
2661.97
2676.76
2691.55
2706.34
2721.13
2735.92
2750.71
2765.50
2780.29
2795.08
2809.87
2824.66
2839.45
2854.24
2869.03
2883.82
2898.61
2913.40
2928.19
2942.98
2957.77
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
2193.12
2206.65
2220.18
2233.71
2247.24
2260.77
2274.30
2287.83
2301.36
2314.89
2328.42
2341.95
2355.48
2369.01
2382.54
2396.07
2409.60
2423.13
2436.66
2450.19
2463.72
2477.25
2490.78
2504.31
2517.84
2531.37
2544.90
2558.43
2571.96
2585.49
2599.02
2612.55
2626.08
2639.61
2653.14
2666.67
2680.20
2693.73
2707.26
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
932.11
937.86
943.61
949.36
955.11
960.86
966.61
972.36
978.11
983.86
989.61
995.36
1001.11
1006.86
1012.61
1018.36
1024.11
1029.86
1035.61
1041.36
1047.11
1052.86
1058.61
1064.36
1070.11
1075.86
1081.61
1087.36
1093.11
1098.86
1104.61
1110.36
1116.11
1121.86
1127.61
1133.36
1139.11
1144.86
1150.61
311891749.xls
CONVEYANCE
5 of 194
Sl.No
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
1849.19
1858.39
1867.59
1876.79
1885.99
1895.19
1904.39
1913.59
1922.79
1931.99
1941.19
1950.39
1959.59
1968.79
1977.99
1987.19
1996.39
2005.59
2014.79
2023.99
2033.19
2042.39
2051.59
2060.79
2069.99
2079.19
2088.39
2097.59
2106.79
2115.99
2125.19
2134.39
2143.59
2152.79
2161.99
2171.19
2180.39
2189.59
2198.79
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
1849.19
1858.39
1867.59
1876.79
1885.99
1895.19
1904.39
1913.59
1922.79
1931.99
1941.19
1950.39
1959.59
1968.79
1977.99
1987.19
1996.39
2005.59
2014.79
2023.99
2033.19
2042.39
2051.59
2060.79
2069.99
2079.19
2088.39
2097.59
2106.79
2115.99
2125.19
2134.39
2143.59
2152.79
2161.99
2171.19
2180.39
2189.59
2198.79
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
2972.56
2987.35
3002.14
3016.93
3031.72
3046.51
3061.30
3076.09
3090.88
3105.67
3120.46
3135.25
3150.04
3164.83
3179.62
3194.41
3209.20
3223.99
3238.78
3253.57
3268.36
3283.15
3297.94
3312.73
3327.52
3342.31
3357.10
3371.89
3386.68
3401.47
3416.26
3431.05
3445.84
3460.63
3475.42
3490.21
3505.00
3519.79
3534.58
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
2720.79
2734.32
2747.85
2761.38
2774.91
2788.44
2801.97
2815.50
2829.03
2842.56
2856.09
2869.62
2883.15
2896.68
2910.21
2923.74
2937.27
2950.80
2964.33
2977.86
2991.39
3004.92
3018.45
3031.98
3045.51
3059.04
3072.57
3086.10
3099.63
3113.16
3126.69
3140.22
3153.75
3167.28
3180.81
3194.34
3207.87
3221.40
3234.93
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
1156.36
1162.11
1167.86
1173.61
1179.36
1185.11
1190.86
1196.61
1202.36
1208.11
1213.86
1219.61
1225.36
1231.11
1236.86
1242.61
1248.36
1254.11
1259.86
1265.61
1271.36
1277.11
1282.86
1288.61
1294.36
1300.11
1305.86
1311.61
1317.36
1323.11
1328.86
1334.61
1340.36
1346.11
1351.86
1357.61
1363.36
1369.11
1374.86
311891749.xls
CONVEYANCE
6 of 194
Sl.No
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
2207.99
2217.19
2226.39
2235.59
2244.79
2253.99
2263.19
2272.39
2281.59
2290.79
2299.99
2309.19
2318.39
2327.59
2336.79
2345.99
2355.19
2364.39
2373.59
2382.79
2391.99
2401.19
2410.39
2419.59
2428.79
2437.99
2447.19
2456.39
2465.59
2474.79
2483.99
2493.19
2502.39
2511.59
2520.79
2529.99
2539.19
2548.39
2557.59
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
2207.99
2217.19
2226.39
2235.59
2244.79
2253.99
2263.19
2272.39
2281.59
2290.79
2299.99
2309.19
2318.39
2327.59
2336.79
2345.99
2355.19
2364.39
2373.59
2382.79
2391.99
2401.19
2410.39
2419.59
2428.79
2437.99
2447.19
2456.39
2465.59
2474.79
2483.99
2493.19
2502.39
2511.59
2520.79
2529.99
2539.19
2548.39
2557.59
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
3549.37
3564.16
3578.95
3593.74
3608.53
3623.32
3638.11
3652.90
3667.69
3682.48
3697.27
3712.06
3726.85
3741.64
3756.43
3771.22
3786.01
3800.80
3815.59
3830.38
3845.17
3859.96
3874.75
3889.54
3904.33
3919.12
3933.91
3948.70
3963.49
3978.28
3993.07
4007.86
4022.65
4037.44
4052.23
4067.02
4081.81
4096.60
4111.39
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
3248.46
3261.99
3275.52
3289.05
3302.58
3316.11
3329.64
3343.17
3356.70
3370.23
3383.76
3397.29
3410.82
3424.35
3437.88
3451.41
3464.94
3478.47
3492.00
3505.53
3519.06
3532.59
3546.12
3559.65
3573.18
3586.71
3600.24
3613.77
3627.30
3640.83
3654.36
3667.89
3681.42
3694.95
3708.48
3722.01
3735.54
3749.07
3762.60
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
1380.61
1386.36
1392.11
1397.86
1403.61
1409.36
1415.11
1420.86
1426.61
1432.36
1438.11
1443.86
1449.61
1455.36
1461.11
1466.86
1472.61
1478.36
1484.11
1489.86
1495.61
1501.36
1507.11
1512.86
1518.61
1524.36
1530.11
1535.86
1541.61
1547.36
1553.11
1558.86
1564.61
1570.36
1576.11
1581.86
1587.61
1593.36
1599.11
311891749.xls
CONVEYANCE
7 of 194
Sl.No
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
2566.79
2575.99
2585.19
2594.39
2603.59
2612.79
2621.99
2631.19
2640.39
2649.59
2658.79
2667.99
2677.19
2686.39
2695.59
2704.79
2713.99
2723.19
2732.39
2741.59
2750.79
2759.99
2769.19
2778.39
2787.59
2796.79
2805.99
2815.19
2824.39
2833.59
2842.79
2851.99
2861.19
2870.39
2879.59
2888.79
2897.99
2907.19
2916.39
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
2566.79
2575.99
2585.19
2594.39
2603.59
2612.79
2621.99
2631.19
2640.39
2649.59
2658.79
2667.99
2677.19
2686.39
2695.59
2704.79
2713.99
2723.19
2732.39
2741.59
2750.79
2759.99
2769.19
2778.39
2787.59
2796.79
2805.99
2815.19
2824.39
2833.59
2842.79
2851.99
2861.19
2870.39
2879.59
2888.79
2897.99
2907.19
2916.39
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
4126.18
4140.97
4155.76
4170.55
4185.34
4200.13
4214.92
4229.71
4244.50
4259.29
4274.08
4288.87
4303.66
4318.45
4333.24
4348.03
4362.82
4377.61
4392.40
4407.19
4421.98
4436.77
4451.56
4466.35
4481.14
4495.93
4510.72
4525.51
4540.30
4555.09
4569.88
4584.67
4599.46
4614.25
4629.04
4643.83
4658.62
4673.41
4688.20
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
3776.13
3789.66
3803.19
3816.72
3830.25
3843.78
3857.31
3870.84
3884.37
3897.90
3911.43
3924.96
3938.49
3952.02
3965.55
3979.08
3992.61
4006.14
4019.67
4033.20
4046.73
4060.26
4073.79
4087.32
4100.85
4114.38
4127.91
4141.44
4154.97
4168.50
4182.03
4195.56
4209.09
4222.62
4236.15
4249.68
4263.21
4276.74
4290.27
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
1604.86
1610.61
1616.36
1622.11
1627.86
1633.61
1639.36
1645.11
1650.86
1656.61
1662.36
1668.11
1673.86
1679.61
1685.36
1691.11
1696.86
1702.61
1708.36
1714.11
1719.86
1725.61
1731.36
1737.11
1742.86
1748.61
1754.36
1760.11
1765.86
1771.61
1777.36
1783.11
1788.86
1794.61
1800.36
1806.11
1811.86
1817.61
1823.36
311891749.xls
CONVEYANCE
8 of 194
Sl.No
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
2925.59
2934.79
2943.99
2953.19
2962.39
2971.59
2980.79
2989.99
2999.19
3008.39
3017.59
3026.79
3035.99
3045.19
3054.39
3063.59
3072.79
3081.99
3091.19
3100.39
3109.59
3118.79
3127.99
3137.19
3146.39
3155.59
3164.79
3173.99
3183.19
3192.39
3201.59
3210.79
3219.99
3229.19
3238.39
3247.59
3256.79
3265.99
3275.19
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
2925.59
2934.79
2943.99
2953.19
2962.39
2971.59
2980.79
2989.99
2999.19
3008.39
3017.59
3026.79
3035.99
3045.19
3054.39
3063.59
3072.79
3081.99
3091.19
3100.39
3109.59
3118.79
3127.99
3137.19
3146.39
3155.59
3164.79
3173.99
3183.19
3192.39
3201.59
3210.79
3219.99
3229.19
3238.39
3247.59
3256.79
3265.99
3275.19
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
4702.99
4717.78
4732.57
4747.36
4762.15
4776.94
4791.73
4806.52
4821.31
4836.10
4850.89
4865.68
4880.47
4895.26
4910.05
4924.84
4939.63
4954.42
4969.21
4984.00
4998.79
5013.58
5028.37
5043.16
5057.95
5072.74
5087.53
5102.32
5117.11
5131.90
5146.69
5161.48
5176.27
5191.06
5205.85
5220.64
5235.43
5250.22
5265.01
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
4303.80
4317.33
4330.86
4344.39
4357.92
4371.45
4384.98
4398.51
4412.04
4425.57
4439.10
4452.63
4466.16
4479.69
4493.22
4506.75
4520.28
4533.81
4547.34
4560.87
4574.40
4587.93
4601.46
4614.99
4628.52
4642.05
4655.58
4669.11
4682.64
4696.17
4709.70
4723.23
4736.76
4750.29
4763.82
4777.35
4790.88
4804.41
4817.94
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
1829.11
1834.86
1840.61
1846.36
1852.11
1857.86
1863.61
1869.36
1875.11
1880.86
1886.61
1892.36
1898.11
1903.86
1909.61
1915.36
1921.11
1926.86
1932.61
1938.36
1944.11
1949.86
1955.61
1961.36
1967.11
1972.86
1978.61
1984.36
1990.11
1995.86
2001.61
2007.36
2013.11
2018.86
2024.61
2030.36
2036.11
2041.86
2047.61
311891749.xls
CONVEYANCE
9 of 194
Sl.No
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
3284.39
3293.59
3302.79
3311.99
3321.19
3330.39
3339.59
3348.79
3357.99
3367.19
3376.39
3385.59
3394.79
3403.99
3413.19
3422.39
3431.59
3440.79
3449.99
3459.19
3468.39
3477.59
3486.79
3495.99
3505.19
3514.39
3523.59
3532.79
3541.99
3551.19
3560.39
3569.59
3578.79
3587.99
3597.19
3606.39
3615.59
3624.79
3633.99
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
3284.39
3293.59
3302.79
3311.99
3321.19
3330.39
3339.59
3348.79
3357.99
3367.19
3376.39
3385.59
3394.79
3403.99
3413.19
3422.39
3431.59
3440.79
3449.99
3459.19
3468.39
3477.59
3486.79
3495.99
3505.19
3514.39
3523.59
3532.79
3541.99
3551.19
3560.39
3569.59
3578.79
3587.99
3597.19
3606.39
3615.59
3624.79
3633.99
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
5279.80
5294.59
5309.38
5324.17
5338.96
5353.75
5368.54
5383.33
5398.12
5412.91
5427.70
5442.49
5457.28
5472.07
5486.86
5501.65
5516.44
5531.23
5546.02
5560.81
5575.60
5590.39
5605.18
5619.97
5634.76
5649.55
5664.34
5679.13
5693.92
5708.71
5723.50
5738.29
5753.08
5767.87
5782.66
5797.45
5812.24
5827.03
5841.82
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
4831.47
4845.00
4858.53
4872.06
4885.59
4899.12
4912.65
4926.18
4939.71
4953.24
4966.77
4980.30
4993.83
5007.36
5020.89
5034.42
5047.95
5061.48
5075.01
5088.54
5102.07
5115.60
5129.13
5142.66
5156.19
5169.72
5183.25
5196.78
5210.31
5223.84
5237.37
5250.90
5264.43
5277.96
5291.49
5305.02
5318.55
5332.08
5345.61
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
2053.36
2059.11
2064.86
2070.61
2076.36
2082.11
2087.86
2093.61
2099.36
2105.11
2110.86
2116.61
2122.36
2128.11
2133.86
2139.61
2145.36
2151.11
2156.86
2162.61
2168.36
2174.11
2179.86
2185.61
2191.36
2197.11
2202.86
2208.61
2214.36
2220.11
2225.86
2231.61
2237.36
2243.11
2248.86
2254.61
2260.36
2266.11
2271.86
311891749.xls
CONVEYANCE
10 of 194
Sl.No
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
3643.19
3652.39
3661.59
3670.79
3679.99
3689.19
3698.39
3707.59
3716.79
3725.99
3735.19
3744.39
3753.59
3762.79
3771.99
3781.19
3790.39
3799.59
3808.79
3817.99
3827.19
3836.39
3845.59
3854.79
3863.99
3873.19
3882.39
3891.59
3900.79
3909.99
3919.19
3928.39
3937.59
3946.79
3955.99
3965.19
3974.39
3983.59
3992.79
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
3643.19
3652.39
3661.59
3670.79
3679.99
3689.19
3698.39
3707.59
3716.79
3725.99
3735.19
3744.39
3753.59
3762.79
3771.99
3781.19
3790.39
3799.59
3808.79
3817.99
3827.19
3836.39
3845.59
3854.79
3863.99
3873.19
3882.39
3891.59
3900.79
3909.99
3919.19
3928.39
3937.59
3946.79
3955.99
3965.19
3974.39
3983.59
3992.79
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
5856.61
5871.40
5886.19
5900.98
5915.77
5930.56
5945.35
5960.14
5974.93
5989.72
6004.51
6019.30
6034.09
6048.88
6063.67
6078.46
6093.25
6108.04
6122.83
6137.62
6152.41
6167.20
6181.99
6196.78
6211.57
6226.36
6241.15
6255.94
6270.73
6285.52
6300.31
6315.10
6329.89
6344.68
6359.47
6374.26
6389.05
6403.84
6418.63
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
5359.14
5372.67
5386.20
5399.73
5413.26
5426.79
5440.32
5453.85
5467.38
5480.91
5494.44
5507.97
5521.50
5535.03
5548.56
5562.09
5575.62
5589.15
5602.68
5616.21
5629.74
5643.27
5656.80
5670.33
5683.86
5697.39
5710.92
5724.45
5737.98
5751.51
5765.04
5778.57
5792.10
5805.63
5819.16
5832.69
5846.22
5859.75
5873.28
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
2277.61
2283.36
2289.11
2294.86
2300.61
2306.36
2312.11
2317.86
2323.61
2329.36
2335.11
2340.86
2346.61
2352.36
2358.11
2363.86
2369.61
2375.36
2381.11
2386.86
2392.61
2398.36
2404.11
2409.86
2415.61
2421.36
2427.11
2432.86
2438.61
2444.36
2450.11
2455.86
2461.61
2467.36
2473.11
2478.86
2484.61
2490.36
2496.11
311891749.xls
CONVEYANCE
11 of 194
Sl.No
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
4001.99
4011.19
4020.39
4029.59
4038.79
4047.99
4057.19
4066.39
4075.59
4084.79
4093.99
4103.19
4112.39
4121.59
4130.79
4139.99
4149.19
4158.39
4167.59
4176.79
4185.99
4195.19
4204.39
4213.59
4222.79
4231.99
4241.19
4250.39
4259.59
4268.79
4277.99
4287.19
4296.39
4305.59
4314.79
4323.99
4333.19
4342.39
4351.59
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
4001.99
4011.19
4020.39
4029.59
4038.79
4047.99
4057.19
4066.39
4075.59
4084.79
4093.99
4103.19
4112.39
4121.59
4130.79
4139.99
4149.19
4158.39
4167.59
4176.79
4185.99
4195.19
4204.39
4213.59
4222.79
4231.99
4241.19
4250.39
4259.59
4268.79
4277.99
4287.19
4296.39
4305.59
4314.79
4323.99
4333.19
4342.39
4351.59
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
6433.42
6448.21
6463.00
6477.79
6492.58
6507.37
6522.16
6536.95
6551.74
6566.53
6581.32
6596.11
6610.90
6625.69
6640.48
6655.27
6670.06
6684.85
6699.64
6714.43
6729.22
6744.01
6758.80
6773.59
6788.38
6803.17
6817.96
6832.75
6847.54
6862.33
6877.12
6891.91
6906.70
6921.49
6936.28
6951.07
6965.86
6980.65
6995.44
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
5886.81
5900.34
5913.87
5927.40
5940.93
5954.46
5967.99
5981.52
5995.05
6008.58
6022.11
6035.64
6049.17
6062.70
6076.23
6089.76
6103.29
6116.82
6130.35
6143.88
6157.41
6170.94
6184.47
6198.00
6211.53
6225.06
6238.59
6252.12
6265.65
6279.18
6292.71
6306.24
6319.77
6333.30
6346.83
6360.36
6373.89
6387.42
6400.95
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
2501.86
2507.61
2513.36
2519.11
2524.86
2530.61
2536.36
2542.11
2547.86
2553.61
2559.36
2565.11
2570.86
2576.61
2582.36
2588.11
2593.86
2599.61
2605.36
2611.11
2616.86
2622.61
2628.36
2634.11
2639.86
2645.61
2651.36
2657.11
2662.86
2668.61
2674.36
2680.11
2685.86
2691.61
2697.36
2703.11
2708.86
2714.61
2720.36
311891749.xls
CONVEYANCE
12 of 194
Sl.No
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
4360.79
4369.99
4379.19
4388.39
4397.59
4406.79
4415.99
4425.19
4434.39
4443.59
4452.79
4461.99
4471.19
4480.39
4489.59
4498.79
4507.99
4517.19
4526.39
4535.59
4544.79
4553.99
4563.19
4572.39
4581.59
4590.79
4599.99
4609.19
4618.39
4627.59
4636.79
4645.99
4655.19
4664.39
4673.59
4682.79
4691.99
4701.19
4710.39
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
4360.79
4369.99
4379.19
4388.39
4397.59
4406.79
4415.99
4425.19
4434.39
4443.59
4452.79
4461.99
4471.19
4480.39
4489.59
4498.79
4507.99
4517.19
4526.39
4535.59
4544.79
4553.99
4563.19
4572.39
4581.59
4590.79
4599.99
4609.19
4618.39
4627.59
4636.79
4645.99
4655.19
4664.39
4673.59
4682.79
4691.99
4701.19
4710.39
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
7010.23
7025.02
7039.81
7054.60
7069.39
7084.18
7098.97
7113.76
7128.55
7143.34
7158.13
7172.92
7187.71
7202.50
7217.29
7232.08
7246.87
7261.66
7276.45
7291.24
7306.03
7320.82
7335.61
7350.40
7365.19
7379.98
7394.77
7409.56
7424.35
7439.14
7453.93
7468.72
7483.51
7498.30
7513.09
7527.88
7542.67
7557.46
7572.25
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
6414.48
6428.01
6441.54
6455.07
6468.60
6482.13
6495.66
6509.19
6522.72
6536.25
6549.78
6563.31
6576.84
6590.37
6603.90
6617.43
6630.96
6644.49
6658.02
6671.55
6685.08
6698.61
6712.14
6725.67
6739.20
6752.73
6766.26
6779.79
6793.32
6806.85
6820.38
6833.91
6847.44
6860.97
6874.50
6888.03
6901.56
6915.09
6928.62
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
2726.11
2731.86
2737.61
2743.36
2749.11
2754.86
2760.61
2766.36
2772.11
2777.86
2783.61
2789.36
2795.11
2800.86
2806.61
2812.36
2818.11
2823.86
2829.61
2835.36
2841.11
2846.86
2852.61
2858.36
2864.11
2869.86
2875.61
2881.36
2887.11
2892.86
2898.61
2904.36
2910.11
2915.86
2921.61
2927.36
2933.11
2938.86
2944.61
311891749.xls
CONVEYANCE
13 of 194
Sl.No
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
4719.59
4728.79
4737.99
4747.19
4756.39
4765.59
4774.79
4783.99
4793.19
4802.39
4811.59
4820.79
4829.99
4839.19
4848.39
4857.59
4866.79
4875.99
4885.19
4894.39
4903.59
4912.79
4921.99
4931.19
4940.39
4949.59
4958.79
4967.99
4977.19
4986.39
4995.59
5004.79
5013.99
5023.19
5032.39
5041.59
5050.79
5059.99
5069.19
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
4719.59
4728.79
4737.99
4747.19
4756.39
4765.59
4774.79
4783.99
4793.19
4802.39
4811.59
4820.79
4829.99
4839.19
4848.39
4857.59
4866.79
4875.99
4885.19
4894.39
4903.59
4912.79
4921.99
4931.19
4940.39
4949.59
4958.79
4967.99
4977.19
4986.39
4995.59
5004.79
5013.99
5023.19
5032.39
5041.59
5050.79
5059.99
5069.19
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
7587.04
7601.83
7616.62
7631.41
7646.20
7660.99
7675.78
7690.57
7705.36
7720.15
7734.94
7749.73
7764.52
7779.31
7794.10
7808.89
7823.68
7838.47
7853.26
7868.05
7882.84
7897.63
7912.42
7927.21
7942.00
7956.79
7971.58
7986.37
8001.16
8015.95
8030.74
8045.53
8060.32
8075.11
8089.90
8104.69
8119.48
8134.27
8149.06
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
6942.15
6955.68
6969.21
6982.74
6996.27
7009.80
7023.33
7036.86
7050.39
7063.92
7077.45
7090.98
7104.51
7118.04
7131.57
7145.10
7158.63
7172.16
7185.69
7199.22
7212.75
7226.28
7239.81
7253.34
7266.87
7280.40
7293.93
7307.46
7320.99
7334.52
7348.05
7361.58
7375.11
7388.64
7402.17
7415.70
7429.23
7442.76
7456.29
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
2950.36
2956.11
2961.86
2967.61
2973.36
2979.11
2984.86
2990.61
2996.36
3002.11
3007.86
3013.61
3019.36
3025.11
3030.86
3036.61
3042.36
3048.11
3053.86
3059.61
3065.36
3071.11
3076.86
3082.61
3088.36
3094.11
3099.86
3105.61
3111.36
3117.11
3122.86
3128.61
3134.36
3140.11
3145.86
3151.61
3157.36
3163.11
3168.86
311891749.xls
CONVEYANCE
14 of 194
Sl.No
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
5078.39
5087.59
5096.79
5105.99
5115.19
5124.39
5133.59
5142.79
5151.99
5161.19
5170.39
5179.59
5188.79
5197.99
5207.19
5216.39
5225.59
5234.79
5243.99
5253.19
5262.39
5271.59
5280.79
5289.99
5299.19
5308.39
5317.59
5326.79
5335.99
5345.19
5354.39
5363.59
5372.79
5381.99
5391.19
5400.39
5409.59
5418.79
5427.99
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
5078.39
5087.59
5096.79
5105.99
5115.19
5124.39
5133.59
5142.79
5151.99
5161.19
5170.39
5179.59
5188.79
5197.99
5207.19
5216.39
5225.59
5234.79
5243.99
5253.19
5262.39
5271.59
5280.79
5289.99
5299.19
5308.39
5317.59
5326.79
5335.99
5345.19
5354.39
5363.59
5372.79
5381.99
5391.19
5400.39
5409.59
5418.79
5427.99
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
8163.85
8178.64
8193.43
8208.22
8223.01
8237.80
8252.59
8267.38
8282.17
8296.96
8311.75
8326.54
8341.33
8356.12
8370.91
8385.70
8400.49
8415.28
8430.07
8444.86
8459.65
8474.44
8489.23
8504.02
8518.81
8533.60
8548.39
8563.18
8577.97
8592.76
8607.55
8622.34
8637.13
8651.92
8666.71
8681.50
8696.29
8711.08
8725.87
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
7469.82
7483.35
7496.88
7510.41
7523.94
7537.47
7551.00
7564.53
7578.06
7591.59
7605.12
7618.65
7632.18
7645.71
7659.24
7672.77
7686.30
7699.83
7713.36
7726.89
7740.42
7753.95
7767.48
7781.01
7794.54
7808.07
7821.60
7835.13
7848.66
7862.19
7875.72
7889.25
7902.78
7916.31
7929.84
7943.37
7956.90
7970.43
7983.96
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
3174.61
3180.36
3186.11
3191.86
3197.61
3203.36
3209.11
3214.86
3220.61
3226.36
3232.11
3237.86
3243.61
3249.36
3255.11
3260.86
3266.61
3272.36
3278.11
3283.86
3289.61
3295.36
3301.11
3306.86
3312.61
3318.36
3324.11
3329.86
3335.61
3341.36
3347.11
3352.86
3358.61
3364.36
3370.11
3375.86
3381.61
3387.36
3393.11
311891749.xls
CONVEYANCE
15 of 194
Sl.No
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
5437.19
5446.39
5455.59
5464.79
5473.99
5483.19
5492.39
5501.59
5510.79
5519.99
5529.19
5538.39
5547.59
5556.79
5565.99
5575.19
5584.39
5593.59
5602.79
5611.99
5621.19
5630.39
5639.59
5648.79
5657.99
5667.19
5676.39
5685.59
5694.79
5703.99
5713.19
5722.39
5731.59
5740.79
5749.99
5759.19
5768.39
5777.59
5786.79
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
5437.19
5446.39
5455.59
5464.79
5473.99
5483.19
5492.39
5501.59
5510.79
5519.99
5529.19
5538.39
5547.59
5556.79
5565.99
5575.19
5584.39
5593.59
5602.79
5611.99
5621.19
5630.39
5639.59
5648.79
5657.99
5667.19
5676.39
5685.59
5694.79
5703.99
5713.19
5722.39
5731.59
5740.79
5749.99
5759.19
5768.39
5777.59
5786.79
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
8740.66
8755.45
8770.24
8785.03
8799.82
8814.61
8829.40
8844.19
8858.98
8873.77
8888.56
8903.35
8918.14
8932.93
8947.72
8962.51
8977.30
8992.09
9006.88
9021.67
9036.46
9051.25
9066.04
9080.83
9095.62
9110.41
9125.20
9139.99
9154.78
9169.57
9184.36
9199.15
9213.94
9228.73
9243.52
9258.31
9273.10
9287.89
9302.68
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
7997.49
8011.02
8024.55
8038.08
8051.61
8065.14
8078.67
8092.20
8105.73
8119.26
8132.79
8146.32
8159.85
8173.38
8186.91
8200.44
8213.97
8227.50
8241.03
8254.56
8268.09
8281.62
8295.15
8308.68
8322.21
8335.74
8349.27
8362.80
8376.33
8389.86
8403.39
8416.92
8430.45
8443.98
8457.51
8471.04
8484.57
8498.10
8511.63
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
3398.86
3404.61
3410.36
3416.11
3421.86
3427.61
3433.36
3439.11
3444.86
3450.61
3456.36
3462.11
3467.86
3473.61
3479.36
3485.11
3490.86
3496.61
3502.36
3508.11
3513.86
3519.61
3525.36
3531.11
3536.86
3542.61
3548.36
3554.11
3559.86
3565.61
3571.36
3577.11
3582.86
3588.61
3594.36
3600.11
3605.86
3611.61
3617.36
311891749.xls
CONVEYANCE
16 of 194
Sl.No
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
5795.99
5805.19
5814.39
5823.59
5832.79
5841.99
5851.19
5860.39
5869.59
5878.79
5887.99
5897.19
5906.39
5915.59
5924.79
5933.99
5943.19
5952.39
5961.59
5970.79
5979.99
5989.19
5998.39
6007.59
6016.79
6025.99
6035.19
6044.39
6053.59
6062.79
6071.99
6081.19
6090.39
6099.59
6108.79
6117.99
6127.19
6136.39
6145.59
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
5795.99
5805.19
5814.39
5823.59
5832.79
5841.99
5851.19
5860.39
5869.59
5878.79
5887.99
5897.19
5906.39
5915.59
5924.79
5933.99
5943.19
5952.39
5961.59
5970.79
5979.99
5989.19
5998.39
6007.59
6016.79
6025.99
6035.19
6044.39
6053.59
6062.79
6071.99
6081.19
6090.39
6099.59
6108.79
6117.99
6127.19
6136.39
6145.59
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
9317.47
9332.26
9347.05
9361.84
9376.63
9391.42
9406.21
9421.00
9435.79
9450.58
9465.37
9480.16
9494.95
9509.74
9524.53
9539.32
9554.11
9568.90
9583.69
9598.48
9613.27
9628.06
9642.85
9657.64
9672.43
9687.22
9702.01
9716.80
9731.59
9746.38
9761.17
9775.96
9790.75
9805.54
9820.33
9835.12
9849.91
9864.70
9879.49
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
8525.16
8538.69
8552.22
8565.75
8579.28
8592.81
8606.34
8619.87
8633.40
8646.93
8660.46
8673.99
8687.52
8701.05
8714.58
8728.11
8741.64
8755.17
8768.70
8782.23
8795.76
8809.29
8822.82
8836.35
8849.88
8863.41
8876.94
8890.47
8904.00
8917.53
8931.06
8944.59
8958.12
8971.65
8985.18
8998.71
9012.24
9025.77
9039.30
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
3623.11
3628.86
3634.61
3640.36
3646.11
3651.86
3657.61
3663.36
3669.11
3674.86
3680.61
3686.36
3692.11
3697.86
3703.61
3709.36
3715.11
3720.86
3726.61
3732.36
3738.11
3743.86
3749.61
3755.36
3761.11
3766.86
3772.61
3778.36
3784.11
3789.86
3795.61
3801.36
3807.11
3812.86
3818.61
3824.36
3830.11
3835.86
3841.61
311891749.xls
CONVEYANCE
17 of 194
Sl.No
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
6154.79
6163.99
6173.19
6182.39
6191.59
6200.79
6209.99
6219.19
6228.39
6237.59
6246.79
6255.99
6265.19
6274.39
6283.59
6292.79
6301.99
6311.19
6320.39
6329.59
6338.79
6347.99
6357.19
6366.39
6375.59
6384.79
6393.99
6403.19
6412.39
6421.59
6430.79
6439.99
6449.19
6458.39
6467.59
6476.79
6485.99
6495.19
6504.39
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
6154.79
6163.99
6173.19
6182.39
6191.59
6200.79
6209.99
6219.19
6228.39
6237.59
6246.79
6255.99
6265.19
6274.39
6283.59
6292.79
6301.99
6311.19
6320.39
6329.59
6338.79
6347.99
6357.19
6366.39
6375.59
6384.79
6393.99
6403.19
6412.39
6421.59
6430.79
6439.99
6449.19
6458.39
6467.59
6476.79
6485.99
6495.19
6504.39
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
9894.28
9909.07
9923.86
9938.65
9953.44
9968.23
9983.02
9997.81
10012.60
10027.39
10042.18
10056.97
10071.76
10086.55
10101.34
10116.13
10130.92
10145.71
10160.50
10175.29
10190.08
10204.87
10219.66
10234.45
10249.24
10264.03
10278.82
10293.61
10308.40
10323.19
10337.98
10352.77
10367.56
10382.35
10397.14
10411.93
10426.72
10441.51
10456.30
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
9052.83
9066.36
9079.89
9093.42
9106.95
9120.48
9134.01
9147.54
9161.07
9174.60
9188.13
9201.66
9215.19
9228.72
9242.25
9255.78
9269.31
9282.84
9296.37
9309.90
9323.43
9336.96
9350.49
9364.02
9377.55
9391.08
9404.61
9418.14
9431.67
9445.20
9458.73
9472.26
9485.79
9499.32
9512.85
9526.38
9539.91
9553.44
9566.97
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
3847.36
3853.11
3858.86
3864.61
3870.36
3876.11
3881.86
3887.61
3893.36
3899.11
3904.86
3910.61
3916.36
3922.11
3927.86
3933.61
3939.36
3945.11
3950.86
3956.61
3962.36
3968.11
3973.86
3979.61
3985.36
3991.11
3996.86
4002.61
4008.36
4014.11
4019.86
4025.61
4031.36
4037.11
4042.86
4048.61
4054.36
4060.11
4065.86
311891749.xls
CONVEYANCE
18 of 194
Sl.No
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
6513.59
6522.79
6531.99
6541.19
6550.39
6559.59
6568.79
6577.99
6587.19
6596.39
6605.59
6614.79
6623.99
6633.19
6642.39
6651.59
6660.79
6669.99
6679.19
6688.39
6697.59
6706.79
6715.99
6725.19
6734.39
6743.59
6752.79
6761.99
6771.19
6780.39
6789.59
6798.79
6807.99
6817.19
6826.39
6835.59
6844.79
6853.99
6863.19
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
6513.59
6522.79
6531.99
6541.19
6550.39
6559.59
6568.79
6577.99
6587.19
6596.39
6605.59
6614.79
6623.99
6633.19
6642.39
6651.59
6660.79
6669.99
6679.19
6688.39
6697.59
6706.79
6715.99
6725.19
6734.39
6743.59
6752.79
6761.99
6771.19
6780.39
6789.59
6798.79
6807.99
6817.19
6826.39
6835.59
6844.79
6853.99
6863.19
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
10471.09
10485.88
10500.67
10515.46
10530.25
10545.04
10559.83
10574.62
10589.41
10604.20
10618.99
10633.78
10648.57
10663.36
10678.15
10692.94
10707.73
10722.52
10737.31
10752.10
10766.89
10781.68
10796.47
10811.26
10826.05
10840.84
10855.63
10870.42
10885.21
10900.00
10914.79
10929.58
10944.37
10959.16
10973.95
10988.74
11003.53
11018.32
11033.11
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
9580.50
9594.03
9607.56
9621.09
9634.62
9648.15
9661.68
9675.21
9688.74
9702.27
9715.80
9729.33
9742.86
9756.39
9769.92
9783.45
9796.98
9810.51
9824.04
9837.57
9851.10
9864.63
9878.16
9891.69
9905.22
9918.75
9932.28
9945.81
9959.34
9972.87
9986.40
9999.93
10013.46
10026.99
10040.52
10054.05
10067.58
10081.11
10094.64
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
4071.61
4077.36
4083.11
4088.86
4094.61
4100.36
4106.11
4111.86
4117.61
4123.36
4129.11
4134.86
4140.61
4146.36
4152.11
4157.86
4163.61
4169.36
4175.11
4180.86
4186.61
4192.36
4198.11
4203.86
4209.61
4215.36
4221.11
4226.86
4232.61
4238.36
4244.11
4249.86
4255.61
4261.36
4267.11
4272.86
4278.61
4284.36
4290.11
311891749.xls
CONVEYANCE
19 of 194
Sl.No
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
6872.39
6881.59
6890.79
6899.99
6909.19
6918.39
6927.59
6936.79
6945.99
6955.19
6964.39
6973.59
6982.79
6991.99
7001.19
7010.39
7019.59
7028.79
7037.99
7047.19
7056.39
7065.59
7074.79
7083.99
7093.19
7102.39
7111.59
7120.79
7129.99
7139.19
7148.39
7157.59
7166.79
7175.99
7185.19
7194.39
7203.59
7212.79
7221.99
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
6872.39
6881.59
6890.79
6899.99
6909.19
6918.39
6927.59
6936.79
6945.99
6955.19
6964.39
6973.59
6982.79
6991.99
7001.19
7010.39
7019.59
7028.79
7037.99
7047.19
7056.39
7065.59
7074.79
7083.99
7093.19
7102.39
7111.59
7120.79
7129.99
7139.19
7148.39
7157.59
7166.79
7175.99
7185.19
7194.39
7203.59
7212.79
7221.99
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
11047.90
11062.69
11077.48
11092.27
11107.06
11121.85
11136.64
11151.43
11166.22
11181.01
11195.80
11210.59
11225.38
11240.17
11254.96
11269.75
11284.54
11299.33
11314.12
11328.91
11343.70
11358.49
11373.28
11388.07
11402.86
11417.65
11432.44
11447.23
11462.02
11476.81
11491.60
11506.39
11521.18
11535.97
11550.76
11565.55
11580.34
11595.13
11609.92
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
10108.17
10121.70
10135.23
10148.76
10162.29
10175.82
10189.35
10202.88
10216.41
10229.94
10243.47
10257.00
10270.53
10284.06
10297.59
10311.12
10324.65
10338.18
10351.71
10365.24
10378.77
10392.30
10405.83
10419.36
10432.89
10446.42
10459.95
10473.48
10487.01
10500.54
10514.07
10527.60
10541.13
10554.66
10568.19
10581.72
10595.25
10608.78
10622.31
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
4295.86
4301.61
4307.36
4313.11
4318.86
4324.61
4330.36
4336.11
4341.86
4347.61
4353.36
4359.11
4364.86
4370.61
4376.36
4382.11
4387.86
4393.61
4399.36
4405.11
4410.86
4416.61
4422.36
4428.11
4433.86
4439.61
4445.36
4451.11
4456.86
4462.61
4468.36
4474.11
4479.86
4485.61
4491.36
4497.11
4502.86
4508.61
4514.36
311891749.xls
CONVEYANCE
20 of 194
Sl.No
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
7231.19
7240.39
7249.59
7258.79
7267.99
7277.19
7286.39
7295.59
7304.79
7313.99
7323.19
7332.39
7341.59
7350.79
7359.99
7369.19
7378.39
7387.59
7396.79
7405.99
7415.19
7424.39
7433.59
7442.79
7451.99
7461.19
7470.39
7479.59
7488.79
7497.99
7507.19
7516.39
7525.59
7534.79
7543.99
7553.19
7562.39
7571.59
7580.79
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
7231.19
7240.39
7249.59
7258.79
7267.99
7277.19
7286.39
7295.59
7304.79
7313.99
7323.19
7332.39
7341.59
7350.79
7359.99
7369.19
7378.39
7387.59
7396.79
7405.99
7415.19
7424.39
7433.59
7442.79
7451.99
7461.19
7470.39
7479.59
7488.79
7497.99
7507.19
7516.39
7525.59
7534.79
7543.99
7553.19
7562.39
7571.59
7580.79
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
11624.71
11639.50
11654.29
11669.08
11683.87
11698.66
11713.45
11728.24
11743.03
11757.82
11772.61
11787.40
11802.19
11816.98
11831.77
11846.56
11861.35
11876.14
11890.93
11905.72
11920.51
11935.30
11950.09
11964.88
11979.67
11994.46
12009.25
12024.04
12038.83
12053.62
12068.41
12083.20
12097.99
12112.78
12127.57
12142.36
12157.15
12171.94
12186.73
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
10635.84
10649.37
10662.90
10676.43
10689.96
10703.49
10717.02
10730.55
10744.08
10757.61
10771.14
10784.67
10798.20
10811.73
10825.26
10838.79
10852.32
10865.85
10879.38
10892.91
10906.44
10919.97
10933.50
10947.03
10960.56
10974.09
10987.62
11001.15
11014.68
11028.21
11041.74
11055.27
11068.80
11082.33
11095.86
11109.39
11122.92
11136.45
11149.98
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
4520.11
4525.86
4531.61
4537.36
4543.11
4548.86
4554.61
4560.36
4566.11
4571.86
4577.61
4583.36
4589.11
4594.86
4600.61
4606.36
4612.11
4617.86
4623.61
4629.36
4635.11
4640.86
4646.61
4652.36
4658.11
4663.86
4669.61
4675.36
4681.11
4686.86
4692.61
4698.36
4704.11
4709.86
4715.61
4721.36
4727.11
4732.86
4738.61
311891749.xls
CONVEYANCE
21 of 194
Sl.No
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
7589.99
7599.19
7608.39
7617.59
7626.79
7635.99
7645.19
7654.39
7663.59
7672.79
7681.99
7691.19
7700.39
7709.59
7718.79
7727.99
7737.19
7746.39
7755.59
7764.79
7773.99
7783.19
7792.39
7801.59
7810.79
7819.99
7829.19
7838.39
7847.59
7856.79
7865.99
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
7589.99
7599.19
7608.39
7617.59
7626.79
7635.99
7645.19
7654.39
7663.59
7672.79
7681.99
7691.19
7700.39
7709.59
7718.79
7727.99
7737.19
7746.39
7755.59
7764.79
7773.99
7783.19
7792.39
7801.59
7810.79
7819.99
7829.19
7838.39
7847.59
7856.79
7865.99
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
12201.52
12216.31
12231.10
12245.89
12260.68
12275.47
12290.26
12305.05
12319.84
12334.63
12349.42
12364.21
12379.00
12393.79
12408.58
12423.37
12438.16
12452.95
12467.74
12482.53
12497.32
12512.11
12526.90
12541.69
12556.48
12571.27
12586.06
12600.85
12615.64
12630.43
12645.22
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
11163.51
11177.04
11190.57
11204.10
11217.63
11231.16
11244.69
11258.22
11271.75
11285.28
11298.81
11312.34
11325.87
11339.40
11352.93
11366.46
11379.99
11393.52
11407.05
11420.58
11434.11
11447.64
11461.17
11474.70
11488.23
11501.76
11515.29
11528.82
11542.35
11555.88
11569.41
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
4744.36
4750.11
4755.86
4761.61
4767.36
4773.11
4778.86
4784.61
4790.36
4796.11
4801.86
4807.61
4813.36
4819.11
4824.86
4830.61
4836.36
4842.11
4847.86
4853.61
4859.36
4865.11
4870.86
4876.61
4882.36
4888.11
4893.86
4899.61
4905.36
4911.11
4916.86
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
311891749.xls
CONVEYANCE
22 of 194
Sl.No
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
311891749.xls
CONVEYANCE
23 of 194
Sl.No
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
311891749.xls
CONVEYANCE
24 of 194
Sl.No
937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
311891749.xls
CONVEYANCE
25 of 194
Sl.No
976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
311891749.xls
CONVEYANCE
26 of 194
Sl.No
1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
311891749.xls
CONVEYANCE
27 of 194
Sl.No
1054
1055
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066
1067
1068
1069
1070
1071
1072
1073
1074
1075
1076
1077
1078
1079
1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
1090
1091
1092
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
1054
1055
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066
1067
1068
1069
1070
1071
1072
1073
1074
1075
1076
1077
1078
1079
1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
1090
1091
1092
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
1054
1055
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066
1067
1068
1069
1070
1071
1072
1073
1074
1075
1076
1077
1078
1079
1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
1090
1091
1092
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
1054
1055
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066
1067
1068
1069
1070
1071
1072
1073
1074
1075
1076
1077
1078
1079
1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
1090
1091
1092
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
1054
1055
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066
1067
1068
1069
1070
1071
1072
1073
1074
1075
1076
1077
1078
1079
1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
1090
1091
1092
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
1054
1055
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066
1067
1068
1069
1070
1071
1072
1073
1074
1075
1076
1077
1078
1079
1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
1090
1091
1092
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
311891749.xls
CONVEYANCE
28 of 194
Sl.No
1093
1094
1095
1096
1097
1098
1099
1100
1101
1102
1103
1104
1105
1106
1107
1108
1109
1110
1111
1112
1113
1114
1115
1116
1117
1118
1119
1120
1121
1122
1123
1124
1125
1126
1127
1128
1129
1130
1131
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
1093
1094
1095
1096
1097
1098
1099
1100
1101
1102
1103
1104
1105
1106
1107
1108
1109
1110
1111
1112
1113
1114
1115
1116
1117
1118
1119
1120
1121
1122
1123
1124
1125
1126
1127
1128
1129
1130
1131
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
1093
1094
1095
1096
1097
1098
1099
1100
1101
1102
1103
1104
1105
1106
1107
1108
1109
1110
1111
1112
1113
1114
1115
1116
1117
1118
1119
1120
1121
1122
1123
1124
1125
1126
1127
1128
1129
1130
1131
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
1093
1094
1095
1096
1097
1098
1099
1100
1101
1102
1103
1104
1105
1106
1107
1108
1109
1110
1111
1112
1113
1114
1115
1116
1117
1118
1119
1120
1121
1122
1123
1124
1125
1126
1127
1128
1129
1130
1131
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
1093
1094
1095
1096
1097
1098
1099
1100
1101
1102
1103
1104
1105
1106
1107
1108
1109
1110
1111
1112
1113
1114
1115
1116
1117
1118
1119
1120
1121
1122
1123
1124
1125
1126
1127
1128
1129
1130
1131
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
1093
1094
1095
1096
1097
1098
1099
1100
1101
1102
1103
1104
1105
1106
1107
1108
1109
1110
1111
1112
1113
1114
1115
1116
1117
1118
1119
1120
1121
1122
1123
1124
1125
1126
1127
1128
1129
1130
1131
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
311891749.xls
CONVEYANCE
29 of 194
Sl.No
1132
1133
1134
1135
1136
1137
1138
1139
1140
1141
1142
1143
1144
1145
1146
1147
1148
1149
1150
1151
1152
1153
1154
1155
1156
1157
1158
1159
1160
1161
1162
1163
1164
1165
1166
1167
1168
1169
1170
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
1132
1133
1134
1135
1136
1137
1138
1139
1140
1141
1142
1143
1144
1145
1146
1147
1148
1149
1150
1151
1152
1153
1154
1155
1156
1157
1158
1159
1160
1161
1162
1163
1164
1165
1166
1167
1168
1169
1170
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
1132
1133
1134
1135
1136
1137
1138
1139
1140
1141
1142
1143
1144
1145
1146
1147
1148
1149
1150
1151
1152
1153
1154
1155
1156
1157
1158
1159
1160
1161
1162
1163
1164
1165
1166
1167
1168
1169
1170
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
1132
1133
1134
1135
1136
1137
1138
1139
1140
1141
1142
1143
1144
1145
1146
1147
1148
1149
1150
1151
1152
1153
1154
1155
1156
1157
1158
1159
1160
1161
1162
1163
1164
1165
1166
1167
1168
1169
1170
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
1132
1133
1134
1135
1136
1137
1138
1139
1140
1141
1142
1143
1144
1145
1146
1147
1148
1149
1150
1151
1152
1153
1154
1155
1156
1157
1158
1159
1160
1161
1162
1163
1164
1165
1166
1167
1168
1169
1170
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
1132
1133
1134
1135
1136
1137
1138
1139
1140
1141
1142
1143
1144
1145
1146
1147
1148
1149
1150
1151
1152
1153
1154
1155
1156
1157
1158
1159
1160
1161
1162
1163
1164
1165
1166
1167
1168
1169
1170
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
311891749.xls
CONVEYANCE
30 of 194
Sl.No
1171
1172
1173
1174
1175
1176
1177
1178
1179
1180
1181
1182
1183
1184
1185
1186
1187
1188
1189
1190
1191
1192
1193
1194
1195
1196
1197
1198
1199
1200
1201
1202
1203
1204
1205
1206
1207
1208
1209
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
1171
1172
1173
1174
1175
1176
1177
1178
1179
1180
1181
1182
1183
1184
1185
1186
1187
1188
1189
1190
1191
1192
1193
1194
1195
1196
1197
1198
1199
1200
1201
1202
1203
1204
1205
1206
1207
1208
1209
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
1171
1172
1173
1174
1175
1176
1177
1178
1179
1180
1181
1182
1183
1184
1185
1186
1187
1188
1189
1190
1191
1192
1193
1194
1195
1196
1197
1198
1199
1200
1201
1202
1203
1204
1205
1206
1207
1208
1209
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
1171
1172
1173
1174
1175
1176
1177
1178
1179
1180
1181
1182
1183
1184
1185
1186
1187
1188
1189
1190
1191
1192
1193
1194
1195
1196
1197
1198
1199
1200
1201
1202
1203
1204
1205
1206
1207
1208
1209
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
1171
1172
1173
1174
1175
1176
1177
1178
1179
1180
1181
1182
1183
1184
1185
1186
1187
1188
1189
1190
1191
1192
1193
1194
1195
1196
1197
1198
1199
1200
1201
1202
1203
1204
1205
1206
1207
1208
1209
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
1171
1172
1173
1174
1175
1176
1177
1178
1179
1180
1181
1182
1183
1184
1185
1186
1187
1188
1189
1190
1191
1192
1193
1194
1195
1196
1197
1198
1199
1200
1201
1202
1203
1204
1205
1206
1207
1208
1209
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
311891749.xls
CONVEYANCE
31 of 194
Sl.No
1210
1211
1212
1213
1214
1215
1216
1217
1218
1219
1220
1221
1222
1223
1224
1225
1226
1227
1228
1229
1230
1231
1232
1233
1234
1235
1236
1237
1238
1239
1240
1241
1242
1243
1244
1245
1246
1247
1248
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
1210
1211
1212
1213
1214
1215
1216
1217
1218
1219
1220
1221
1222
1223
1224
1225
1226
1227
1228
1229
1230
1231
1232
1233
1234
1235
1236
1237
1238
1239
1240
1241
1242
1243
1244
1245
1246
1247
1248
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
1210
1211
1212
1213
1214
1215
1216
1217
1218
1219
1220
1221
1222
1223
1224
1225
1226
1227
1228
1229
1230
1231
1232
1233
1234
1235
1236
1237
1238
1239
1240
1241
1242
1243
1244
1245
1246
1247
1248
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
1210
1211
1212
1213
1214
1215
1216
1217
1218
1219
1220
1221
1222
1223
1224
1225
1226
1227
1228
1229
1230
1231
1232
1233
1234
1235
1236
1237
1238
1239
1240
1241
1242
1243
1244
1245
1246
1247
1248
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
1210
1211
1212
1213
1214
1215
1216
1217
1218
1219
1220
1221
1222
1223
1224
1225
1226
1227
1228
1229
1230
1231
1232
1233
1234
1235
1236
1237
1238
1239
1240
1241
1242
1243
1244
1245
1246
1247
1248
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
1210
1211
1212
1213
1214
1215
1216
1217
1218
1219
1220
1221
1222
1223
1224
1225
1226
1227
1228
1229
1230
1231
1232
1233
1234
1235
1236
1237
1238
1239
1240
1241
1242
1243
1244
1245
1246
1247
1248
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
311891749.xls
CONVEYANCE
32 of 194
Sl.No
1249
1250
1251
1252
1253
1254
1255
1256
1257
1258
1259
1260
1261
1262
1263
1264
1265
1266
1267
1268
1269
1270
1271
1272
1273
1274
1275
1276
1277
1278
1279
1280
1281
1282
1283
1284
1285
1286
1287
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
1249
1250
1251
1252
1253
1254
1255
1256
1257
1258
1259
1260
1261
1262
1263
1264
1265
1266
1267
1268
1269
1270
1271
1272
1273
1274
1275
1276
1277
1278
1279
1280
1281
1282
1283
1284
1285
1286
1287
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
1249
1250
1251
1252
1253
1254
1255
1256
1257
1258
1259
1260
1261
1262
1263
1264
1265
1266
1267
1268
1269
1270
1271
1272
1273
1274
1275
1276
1277
1278
1279
1280
1281
1282
1283
1284
1285
1286
1287
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
1249
1250
1251
1252
1253
1254
1255
1256
1257
1258
1259
1260
1261
1262
1263
1264
1265
1266
1267
1268
1269
1270
1271
1272
1273
1274
1275
1276
1277
1278
1279
1280
1281
1282
1283
1284
1285
1286
1287
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
1249
1250
1251
1252
1253
1254
1255
1256
1257
1258
1259
1260
1261
1262
1263
1264
1265
1266
1267
1268
1269
1270
1271
1272
1273
1274
1275
1276
1277
1278
1279
1280
1281
1282
1283
1284
1285
1286
1287
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
1249
1250
1251
1252
1253
1254
1255
1256
1257
1258
1259
1260
1261
1262
1263
1264
1265
1266
1267
1268
1269
1270
1271
1272
1273
1274
1275
1276
1277
1278
1279
1280
1281
1282
1283
1284
1285
1286
1287
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
311891749.xls
CONVEYANCE
33 of 194
Sl.No
1288
1289
1290
1291
1292
1293
1294
1295
1296
1297
1298
1299
1300
1301
1302
1303
1304
1305
1306
1307
1308
1309
1310
1311
1312
1313
1314
1315
1316
1317
1318
1319
1320
1321
1322
1323
1324
1325
1326
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
1288
1289
1290
1291
1292
1293
1294
1295
1296
1297
1298
1299
1300
1301
1302
1303
1304
1305
1306
1307
1308
1309
1310
1311
1312
1313
1314
1315
1316
1317
1318
1319
1320
1321
1322
1323
1324
1325
1326
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
1288
1289
1290
1291
1292
1293
1294
1295
1296
1297
1298
1299
1300
1301
1302
1303
1304
1305
1306
1307
1308
1309
1310
1311
1312
1313
1314
1315
1316
1317
1318
1319
1320
1321
1322
1323
1324
1325
1326
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
1288
1289
1290
1291
1292
1293
1294
1295
1296
1297
1298
1299
1300
1301
1302
1303
1304
1305
1306
1307
1308
1309
1310
1311
1312
1313
1314
1315
1316
1317
1318
1319
1320
1321
1322
1323
1324
1325
1326
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
1288
1289
1290
1291
1292
1293
1294
1295
1296
1297
1298
1299
1300
1301
1302
1303
1304
1305
1306
1307
1308
1309
1310
1311
1312
1313
1314
1315
1316
1317
1318
1319
1320
1321
1322
1323
1324
1325
1326
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
1288
1289
1290
1291
1292
1293
1294
1295
1296
1297
1298
1299
1300
1301
1302
1303
1304
1305
1306
1307
1308
1309
1310
1311
1312
1313
1314
1315
1316
1317
1318
1319
1320
1321
1322
1323
1324
1325
1326
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
311891749.xls
CONVEYANCE
34 of 194
Sl.No
1327
1328
1329
1330
1331
1332
1333
1334
1335
1336
1337
1338
1339
1340
1341
1342
1343
1344
1345
1346
1347
1348
1349
1350
1351
1352
1353
1354
1355
1356
1357
1358
1359
1360
1361
1362
1363
1364
1365
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
1327
1328
1329
1330
1331
1332
1333
1334
1335
1336
1337
1338
1339
1340
1341
1342
1343
1344
1345
1346
1347
1348
1349
1350
1351
1352
1353
1354
1355
1356
1357
1358
1359
1360
1361
1362
1363
1364
1365
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
1327
1328
1329
1330
1331
1332
1333
1334
1335
1336
1337
1338
1339
1340
1341
1342
1343
1344
1345
1346
1347
1348
1349
1350
1351
1352
1353
1354
1355
1356
1357
1358
1359
1360
1361
1362
1363
1364
1365
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
1327
1328
1329
1330
1331
1332
1333
1334
1335
1336
1337
1338
1339
1340
1341
1342
1343
1344
1345
1346
1347
1348
1349
1350
1351
1352
1353
1354
1355
1356
1357
1358
1359
1360
1361
1362
1363
1364
1365
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
1327
1328
1329
1330
1331
1332
1333
1334
1335
1336
1337
1338
1339
1340
1341
1342
1343
1344
1345
1346
1347
1348
1349
1350
1351
1352
1353
1354
1355
1356
1357
1358
1359
1360
1361
1362
1363
1364
1365
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
1327
1328
1329
1330
1331
1332
1333
1334
1335
1336
1337
1338
1339
1340
1341
1342
1343
1344
1345
1346
1347
1348
1349
1350
1351
1352
1353
1354
1355
1356
1357
1358
1359
1360
1361
1362
1363
1364
1365
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
311891749.xls
CONVEYANCE
35 of 194
Sl.No
1366
1367
1368
1369
1370
1371
1372
1373
1374
1375
1376
1377
1378
1379
1380
1381
1382
1383
1384
1385
1386
1387
1388
1389
1390
1391
1392
1393
1394
1395
1396
1397
1398
1399
1400
1401
1402
1403
1404
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
1366
1367
1368
1369
1370
1371
1372
1373
1374
1375
1376
1377
1378
1379
1380
1381
1382
1383
1384
1385
1386
1387
1388
1389
1390
1391
1392
1393
1394
1395
1396
1397
1398
1399
1400
1401
1402
1403
1404
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
1366
1367
1368
1369
1370
1371
1372
1373
1374
1375
1376
1377
1378
1379
1380
1381
1382
1383
1384
1385
1386
1387
1388
1389
1390
1391
1392
1393
1394
1395
1396
1397
1398
1399
1400
1401
1402
1403
1404
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
1366
1367
1368
1369
1370
1371
1372
1373
1374
1375
1376
1377
1378
1379
1380
1381
1382
1383
1384
1385
1386
1387
1388
1389
1390
1391
1392
1393
1394
1395
1396
1397
1398
1399
1400
1401
1402
1403
1404
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
1366
1367
1368
1369
1370
1371
1372
1373
1374
1375
1376
1377
1378
1379
1380
1381
1382
1383
1384
1385
1386
1387
1388
1389
1390
1391
1392
1393
1394
1395
1396
1397
1398
1399
1400
1401
1402
1403
1404
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
1366
1367
1368
1369
1370
1371
1372
1373
1374
1375
1376
1377
1378
1379
1380
1381
1382
1383
1384
1385
1386
1387
1388
1389
1390
1391
1392
1393
1394
1395
1396
1397
1398
1399
1400
1401
1402
1403
1404
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
311891749.xls
CONVEYANCE
36 of 194
Sl.No
1405
1406
1407
1408
1409
1410
1411
1412
1413
1414
1415
1416
1417
1418
1419
1420
1421
1422
1423
1424
1425
1426
1427
1428
1429
1430
1431
1432
1433
1434
1435
1436
1437
1438
1439
1440
1441
1442
1443
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
1405
1406
1407
1408
1409
1410
1411
1412
1413
1414
1415
1416
1417
1418
1419
1420
1421
1422
1423
1424
1425
1426
1427
1428
1429
1430
1431
1432
1433
1434
1435
1436
1437
1438
1439
1440
1441
1442
1443
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
1405
1406
1407
1408
1409
1410
1411
1412
1413
1414
1415
1416
1417
1418
1419
1420
1421
1422
1423
1424
1425
1426
1427
1428
1429
1430
1431
1432
1433
1434
1435
1436
1437
1438
1439
1440
1441
1442
1443
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
1405
1406
1407
1408
1409
1410
1411
1412
1413
1414
1415
1416
1417
1418
1419
1420
1421
1422
1423
1424
1425
1426
1427
1428
1429
1430
1431
1432
1433
1434
1435
1436
1437
1438
1439
1440
1441
1442
1443
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
1405
1406
1407
1408
1409
1410
1411
1412
1413
1414
1415
1416
1417
1418
1419
1420
1421
1422
1423
1424
1425
1426
1427
1428
1429
1430
1431
1432
1433
1434
1435
1436
1437
1438
1439
1440
1441
1442
1443
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
1405
1406
1407
1408
1409
1410
1411
1412
1413
1414
1415
1416
1417
1418
1419
1420
1421
1422
1423
1424
1425
1426
1427
1428
1429
1430
1431
1432
1433
1434
1435
1436
1437
1438
1439
1440
1441
1442
1443
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
311891749.xls
CONVEYANCE
37 of 194
Sl.No
1444
1445
1446
1447
1448
1449
1450
1451
1452
1453
1454
1455
1456
1457
1458
1459
1460
1461
1462
1463
1464
1465
1466
1467
1468
1469
1470
1471
1472
1473
1474
1475
1476
1477
1478
1479
1480
1481
1482
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
1444
1445
1446
1447
1448
1449
1450
1451
1452
1453
1454
1455
1456
1457
1458
1459
1460
1461
1462
1463
1464
1465
1466
1467
1468
1469
1470
1471
1472
1473
1474
1475
1476
1477
1478
1479
1480
1481
1482
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
1444
1445
1446
1447
1448
1449
1450
1451
1452
1453
1454
1455
1456
1457
1458
1459
1460
1461
1462
1463
1464
1465
1466
1467
1468
1469
1470
1471
1472
1473
1474
1475
1476
1477
1478
1479
1480
1481
1482
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
1444
1445
1446
1447
1448
1449
1450
1451
1452
1453
1454
1455
1456
1457
1458
1459
1460
1461
1462
1463
1464
1465
1466
1467
1468
1469
1470
1471
1472
1473
1474
1475
1476
1477
1478
1479
1480
1481
1482
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
1444
1445
1446
1447
1448
1449
1450
1451
1452
1453
1454
1455
1456
1457
1458
1459
1460
1461
1462
1463
1464
1465
1466
1467
1468
1469
1470
1471
1472
1473
1474
1475
1476
1477
1478
1479
1480
1481
1482
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
1444
1445
1446
1447
1448
1449
1450
1451
1452
1453
1454
1455
1456
1457
1458
1459
1460
1461
1462
1463
1464
1465
1466
1467
1468
1469
1470
1471
1472
1473
1474
1475
1476
1477
1478
1479
1480
1481
1482
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
311891749.xls
CONVEYANCE
38 of 194
Sl.No
1483
1484
1485
1486
1487
1488
1489
1490
1491
1492
1493
1494
1495
1496
1497
1498
1499
1500
Rubble/Size
Earth/Sand/Gra
Stone/ Cut
vel/ Murrum
Bricks per 1000
Stone/ Coarse
/Lime/Surki per
Nos.
aggregates per
Cum
cum
PCC
Slabs/Shabad
Slabs/CC &
Laterite
Blocks/Wood
per cum
Cement/Steel/R
CC poles/A.C &
G.I Sheets
/Packed
materials per
MT
Km
Charges
Km
Charges
Km
Charges
Km
Charges
Km
Charges
1483
1484
1485
1486
1487
1488
1489
1490
1491
1492
1493
1494
1495
1496
1497
1498
1499
1500
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
1483
1484
1485
1486
1487
1488
1489
1490
1491
1492
1493
1494
1495
1496
1497
1498
1499
1500
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
-27.59
1483
1484
1485
1486
1487
1488
1489
1490
1491
1492
1493
1494
1495
1496
1497
1498
1499
1500
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
-44.36
1483
1484
1485
1486
1487
1488
1489
1490
1491
1492
1493
1494
1495
1496
1497
1498
1499
1500
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
-39.14
1483
1484
1485
1486
1487
1488
1489
1490
1491
1492
1493
1494
1495
1496
1497
1498
1499
1500
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
-16.63
311891749.xls
CONVEYANCE
39 of 194
GOVERNMENT OF TELANGANA
TRIBAL WELFARE ENGINEERING DEPARTMENT
DETAILED CUM ABSTRACT ESTIMATE
NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL
TO AHS (G) AT KAMEPALLY (V&M) IN KHAMMAM(Dist.)
Name of the District
Khammam
Bhadrachalam
Sudimalla
Kamepally
Estimate Cost
19.00
Grant
Lakhs
GENERAL ABSTRACT
NAME OF THE WORK : CONSTRUCTION OF COMPOUND
WALL TO AHS (G) AT KAMEPALLY (V&M) IN
KHAMMAM(Dist.)
Sl.
No.
Description of item
Amount
1234326.00
2) Kitchen Shed
100000.00
3) Electrification
84877.00
4) Compound Wall
460154.00
Sub Total :
5) Add VAT @ 5%
###
93968.00
575.00
Total :
Assistant Engineer
TW- Manuguru
Executive Engineer,
T. W. Division, Bhadrachalam.
###
Description of Item
No.s
Measurements
L
Qty.
Rate
Amount
1) Earth work excavation and depositing on bank with initial lead of 10m and
initial lift of 2m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary
Gravelly Soils ( SS 20-B) including shoring, strutting, sheeting, planking and
dewatering including cost of hire charges of T & P, labour charges etc.,
complete for finished item of work for Foundation of Building.(APSS No.
308).
Main Columns
Varandah Colums
1
1
X 12
X 6
1.80
1.65
1.80
1.65
2.00
2.00
77.76
32.67
Steps
1.83
0.90
0.45
0.74
18.75 0.45
0.30
7.59
6.23
0.45
0.30
3.36
122.12 Cum
247.70 /Cum
30249.00
2.04
19.83 Cum 3268.95 /Cum
64823.00
Main Columns
X 12
1.80
1.80
0.10
3.89
Varandah Colums
1.65
1.65
0.10
1.63
Steps
1.83
0.90
0.10
0.16
18.75 0.45
Hall Flooring
MMS Room
1
1
X
X
1
1
Varendah
0.10
2.53
0.45
0.10
1.12
10.94 4.26
3.65 5.00
0.10
0.10
4.66
1.83
6.46
0.10
1.97
10.95 1.86
0.10
6.23
3.05
122.12
-18.34
-3.89
-1.45
-5.68
92.76 Cum
20.05 /Cum
1860.00
Sl.
No.
Description of Item
No.s
Measurements
L
4
B
5
D
6
Qty.
Rate
Amount
Hall Basement
Back side hall
Varandah Inside basement
"
"
Toilet block area
1
1
1
1
1
1
1
1
1
2
3.66
4.27
###
7.78
3.66
9.07
10.98
1.60
1.60
4.27
0.90
0.90
0.85
0.85
0.85
59.75
42.19
30.27
10.58
26.56
246.25 /Cum
41702.00
4.73
18.34 Cum 7671.25 /Cum
140691.00
3.89
3.89 Cum 7671.25 /Cum
29841.00
169.35 Cum
5) Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456
using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc.,
to site and including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges such as
weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work
(APSS No. 402) with minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department including centering,
shuttering, laying concrete, vibrating, curing etc.
A) Footings
Col. Footings FT1 (Main)
Col. Footings FT2 (Verandah)
X 12
1.80
1.80
0.35
1.50
1.50
0.35
13.61
B) Peadastals
1
x 18
0.60
0.60
0.60
C) Columns
Up to Ground Level
Main Columns
X 12
0.23
0.35
1.00
0.97
Verandah Columns
Above Ground Level
0.23
0.35
1.00
0.48
Main Columns
1
1
X 12
X 6
0.23
0.23
0.35
0.35
3.60
3.60
3.48
1.74
Verandah Columns
1
1
X
X
4
2
18.54 0.23
6.45
4.20
0.23
0.23
0.30
3.84
0.30
0.30
1.78
0.58
6.20 Cum 7671.25 /Cum
47562.00
0.35
4.48
C/Walls
1
1
X
X
4
2
6.45
4.20
0.23
0.23
0.35
0.35
2.08
0.68
Mid Landing
2.44
0.23
0.35
0.20
7.44 Cum 9204.95 /Cum
68485.00
110.18
110.18 Sqm 1077.35 /Sqm
118702.00
C/Walls
18.54 0.23
60453.00
15.74 7.00
3.70
1.20
4.44
X
X
1
1
3.70
2.44
1.20
1.50
4.44
3.66
12.54 Sqm 1476.05 /Sqm
18510.00
Sl.
No.
1
Description of Item
Measurements
No.s
L
4
2
H) Sun Shades 0.60 Mts Wide
Fornt Verandah
3
1
Over Windows W1
B
5
10.95 0.60
1.80
0.60
D
6
-
Qty.
Rate
Amount
6.57
9.72
16.29 Sqm
752.75 /Sqm
12262.00
7004.00
I) Lintels
Doors
Windows
1.50
0.23
0.10
0.14
1.80
0.23
0.15
0.56
Toilets Doors
1.00
0.23
0.10
0.09
0.79 Cum 8865.35 /Cum
Doors
0.23
0.23
0.15
0.38
Windows
0.23
0.23
0.15
0.29
0.67 Cum 5356.40 /Cum
3589.00
7) Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as
per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to
required sizes and shapes placing in position with cover blocks of approved
size and binding wire of 20SWG, forming grills for reinforcement work as per
approved designs and drawings including cost and conveyance of bars from
approved sources to site of work, including cost and conveyance of binding
wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all
operational, incidental, and labour charges such as cutting, bending,
placing in position, tying etc., and sales & other taxes,on cost of all
materials complete for finished item of work (APSS No.126) in all floors
Footings FT1
Plinth Beam
18.34
3.89
X 70
X 100
Kgs
Kgs
1283.80
389.00
Columns GF
6.67
X 120
Kgs
800.40
Roof Beams
Lintels
7.44
X 120
Kgs
892.80
0.79
X 70
Kgs
Sunshades
125 mm Thick Slab
180 mm Thick Slab
55.30
16.29 X 8
Kgs
110.18 X 60 Kgs/ 10Sqm
12.54
130.32
661.08
X 60 Kgs/ 10Sqm
75.24
### Kg
Or Say
5.25 M.T.
### /M.T.
237382.00
Sl.
No.
Description of Item
No.s
Measurements
L
4
B
5
D
6
Qty.
Rate
Amount
Long walls
Cross walls
1
1
X
X
2
4
18.54 0.23
6.45 0.23
3.60
3.60
30.70
21.36
10.95 0.23
1.60
4.03
Deductions
Doors
1.20
0.23
-2.10
-2.32
Windows
1.50
0.23
-1.35
-4.19
-0.67
-0.79
48.12 Cum 4754.45 /Cum
228784.00
9) Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using 2nd class bricks
having a crushing strength of not less than 35.00kg/cm2 and using two mild
steel bars of 6m dia in every third layer of brick masory, with free joints of
the main block work including cost and seignorage charges and conveyance
of all materials and water from approved sources to work site and all
operational, incidental, labour charges such as scaffolding mixing mortor
constructing masonary lift charges, curing etc. complete but excluding the
cost of steel and its fabrication charges.
Long walls
Cross walls
3.65
2.40
17.52
1.20
2.40
5.76
Hand Railing
3.70
0.90
6.66
29.94 Sqm 6679.15 /10 Sqm
19997.00
10) Ceiling Plastering with CM(1:5) Prop: 12mm thick in single coat including
cost and conveyance of all materials like cement, sand, water etc., to site,
including seigniorage charges, sales & other taxes on all materials, all
operational, incidental charges and labour charges such as mixing mortar,
finishing, curing, etc., complete for finished item of work. (APSS 901,906)
Hall
MMS Room
Verandah
10.95 4.25
46.54
6.65
24.27
10.95 1.80
3.65
19.71
90.52 Sqm 1424.60 /10 Sqm
12895.00
11) Plastering with CM(1:5) Prop: 12mm thick in single coat including cost and
conveyance of all materials like cement, sand, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all operational,
incidental charges and labour charges such as mixing mortar, finishing,
curing, etc., complete for finished item of work. (APSS 901,906)
Hall
MMS Room
1
1
X
X
2
2
Verandah C/W
1
4
Doors
Windows
Toilets Doors
WC
(10.94+4.25)
(3.65+5.00)
3.00
3.00
91.14
51.90
4.25
3.00
25.50
2.40
3.00
7.20
13.00
3.00
39.00
X
X
2
2
1.80
(1.20+1.20)
3.00
3.00
10.80
57.60
1.20
-2.10
-10.08
1.50
-1.35
-18.23
0.75
-2.10
Deductins
-6.30
248.53 Sqm 1222.50 /10 Sqm
30383.00
Sl.
No.
Description of Item
No.s
Measurements
L
4
B
5
D
6
Qty.
Rate
Amount
12) Plastering 20mm thick in two coats with base coat of 8mm thick in CM (1:6)
and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost
and conveyance of all materials like cement, sand, water etc., to site,
seigniorage charges, sales & other taxes on all materials,all operational,
incidental and labour charges such as mixing mortar, scaffolding charges,
lift charges, including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, finishing, curing, etc., complete for finished item of
work to uneven surface of walls inside of the building (APSS 901,903 & 904)
L/walls
18.55
3.35
62.14
L/walls
C/Walls
1
1
X
X
1
2
18.55
6.95
1.35
3.35
25.04
46.57
133.75 Sqm 3150.80 /10 Sqm
42142.00
13) Flooring and Treads with Polished Bethamcherla coloured stone minimum 25
mm thick (0.254M x0.254M) set over base coat of CM (1:8) over already laid
CC bed / RCC Roof Slab, including neat cement slurry of honey like
consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full
depth including cost of all materials like cement, sand, and water and
flooring stones etc., complete, including seigniorage charges, labour
charges for dressing of flooring stones etc., complete for finished item of
work, .
MMS Room
1
1
X
X
1
1
Verandah
Steps
Landing
X 22
1.20
0.30
2.40
1.50
Hall
Staicase room
10.95 4.25
46.54
4.25
6.45
10.20
23.54
13.00 1.80
23.40
7.92
2.40
3.65
3.60
115.20 Sqm
14) Providing Skirting to internal walls and Risers of Steps to 15 cm height with
Polished Bethamcherla coloured stone minimum 25 mm thick (0.254M
x0.254M) length equal to flooring stones, set over base coat of CM (1:3) 12
mm thick with cement slurry of honey like consistency spread at the rate of
3.30 kgs per sqm and jointed with white cement paste mixed with pigment
of matching shade to full depth, including cost of all materials like tiles,
cement, sand and water etc., complete including seigniorage charges, etc.,
complete for finished item of work,
Hall
Staicase room
1
1
X
X
1
1
10.95
2.40
0.10
0.10
1.10
0.24
MMS Room
Verandah
Steps
3.65
0.10
0.37
13.00
0.10
X 22
1.30
1.20
0.15
Landing
3.96
2.4
0.1
0.24
7.21 Sqm
7990.00
4622.00
15) Flooring with Ceramic Tiles of 7.3mm thick 1st. quality of any shade as
approved by Engineer - in - charge set over a base coat of CM (1:8), 12mm
thick laid over flooring bed / V.R.C.C. slab, with neat grey cement slurry of
honey like consistency spread at the rate of 3.3 Kgs of cement per Sq.m
and jointed with neat white cement paste mixed with pigment of matching
shade including cost and conveyance of all materials like cement, sand,
water, ceramic tiles etc. to site, seigniorage charges, sales and other taxes
on all materials, all operational, incidental and labour charges such as
mixing of cement mortar, laying, curing, lift charges etc., complete for
finished item of work.(APSS No.701 & 707) in All Floors
In Toilets
1.20
1.20
5.76
Sl.
No.
Description of Item
No.s
Measurements
L
4
B
5
D
6
Qty.
Rate
Amount
16) Painting to New External Walls with two coats of Plastic Emulsion paint of
Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved
brand and shade as approved by the Engineer - in - Charge over base coat
of cement primer water base grade -II exterior making three coats in all to
give an even shade after thoroughly brushing the surface to remove all
loose powdered materials, including cost and conveyance of all materials,
including cost and conveyance of all materials, cost of brushes, water to
site, etc., sales & other taxes, all operational, incidental and labour charges
such as scaffolding charges, lift charges, curing etc., complete for finished
item of work in all floors for external Walls.(APSS No. 911)
L/walls
18.55
3.35
62.14
L/walls
C/Walls
1
1
X
X
1
2
18.55
6.95
1.35
3.35
25.04
46.57
133.75 Sqm 1314.90 /10 Sqm
17587.00
16) Painting to new internal walls with two (2) coats of ready mixed oil bound
washable distemper acrylic base of approved brand and shade over a base
coat of cement primer water base interior Grade-I of approved brand,
makind three (3) coats in all to give an even shade after thourughly
brushing the surface to remove all dirt and remains of loose powdered
materials, including cost and conveyance of all materials to work site and
all operational, incidental, labour charges etc., complete for finished item of
work in all floors for internal walls (SS 911)
Hall
(10.94+4.25)
3.00
91.14
MMS Room
Stair case room
(3.65+5.00)
3.00
51.90
4.25
3.00
25.50
1
1
X
X
1
1
2.40
13.00
3.00
3.00
7.20
39.00
1.80
3.00
10.80
3.00
57.60
Doors
1.20
-2.10
-10.08
Windows
1.50
-1.35
-18.23
Toilets Doors
0.75
-2.10
(1.20+1.20)
Deductins
-6.30
248.53 Sqm 1077.90 /10 Sqm
26789.00
18) Painting to new Iron work with two coats of ready mixed syinthetic eanmel
paint first quality all shades over a base coat of wood primer making three
coats in all to give an even shade after throughly brushing the surface to
remove all remains of loose powdered materials, including C/C of all
materials, site and other taxes all operational incidental and labour charges
etc., complete for finished item of work. ( APSS NO. 1201,1207 & 1212)
Door D1
2.25
1.20
2.10
22.68
D2
W1
2.25
0.75
2.10
14.18
2.75
1.50
1.35
50.12
86.98 Sqm
8477.00
19) Supply and fixing of Mild Steel Door of size 1.22m x 2.13 m (double leaf
shutter) with door frame of Mild Steel Square hollow section of size 80mm x
80mm x 4mm (TATA make or equivalent), Hold Fast - 6 Nos. of MS equal
angle of ISA 2525 of size 25mm x 25mm x 4mm,Labour charges including
welding charges etc., complete for finished item of work.etc., complete for
finished item of work.
4.00
4.00 No.s 7699.00 Each
30796.00
Sl.
No.
Description of Item
No.s
Measurements
L
4
B
5
D
6
Qty.
Rate
Amount
20) Supply and fixing of M.S. WINDOW of size 1.50 M x 1.37 M with outer
angular frame of rolled steel equal angle ISA 4040 of size 40mm x40mm x
6mm and inner shutter angular frame of rolled steel equal angle ISA 2525
of size 25mm x25mm x4mm and rolled steel Tee Bars of size 40mmx
40mmx 6mm, sales and other taxes ,cost and conveyance of all materials to
site, all labour cahrges etc.,complete for finished item of work.
4.00
4.00 No.s 7949.00 Each
31796.00
4.00
4.00 No.s 4061.00 Each
16244.00
21) Supply and fixing of Mild Steel Door of size 0.75m x 2.10 m (double leaf
shutter) with door frame of Mild Steel Square hollow section of size 80mm x
80mm x 4mm (TATA make or equivalent), Hold Fast - 6 Nos. of MS equal
angle of ISA 2525 of size 25mm x 25mm x 4mm,Labour charges including
welding charges etc., complete for finished item of work.etc., complete for
finished item of work.
Toilets Doors
Total:
Asst.Engineer
Executive Engineer
TW Section- Palvancha
TWSD - Palvancha
###
Description of Item
Measurements
No.s
2
3
4
5
6
1
1) Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456
using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as weigh
batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work
(APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including centering, shuttering,
laying concrete, vibrating, curing etc. complete.
Qty.
Rate
Amount
A) Columns
Main Columns
X 12
0.23
0.35
3.00
2.90
Verandah Columns
0.23
0.35
3.00
1.45
4.35 Cum
B) Roof Beams
L/Walls
C/Walls
C/Walls
Mid Landing
### /Cum
47172.00
7.44 Cum
9608.60 /Cum
71488.00
142.42
142.42 Sqm
1124.85 /Sqm
160201.00
1529.05 /Sqm
19174.00
797.95 /Sqm
12999.00
### /Cum
8311.00
5471.95 /Cum
3174.00
1
1
X
X
3
4
18.54
6.45
0.23
0.23
0.35
0.35
4.48
2.08
1
1
X
x
2
1
4.20
2.44
0.23
0.23
0.35
0.35
0.68
0.20
18.74
7.60
3.70
1.20
4.44
1
1
X
X
1
1
3.70
2.44
1.20
1.50
4.44
3.66
12.54 Sqm
1
1
X
X
1
9
10.95
1.80
0.60
0.60
6.57
9.72
16.29 Sqm
F) Lintels
Doors
Windows
Toilets Doors
1
1
X
X
4
9
1.50
1.80
0.23
0.23
0.10
0.15
0.14
0.56
1.00
0.23
0.10
0.09
0.79 Cum
2) Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion (cement:
fine aggregate: Coarse aggregate) using 20mm size Hard Broken Granite
(IS383, 1970) Machine Crushed graded metal from from approved quarry
including cost and conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, including seigniorage charges, sales & other
taxes on all materials, all operational, incidental and labour charges such as
mixing, laying, curing concrete, etc., complete for finished item of work for
Bed Blocks and Hold Fasts (APSS No. 402)
Doors
0.23
0.23
0.15
0.29
Windows
0.23
0.23
0.15
0.29
0.58 Cum
Sl.
No.
Description of Item
No.s
Measurements
L
Qty.
Rate
Amount
3) Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as
per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required
sizes and shapes placing in position with cover blocks of approved size and
binding wire of 20SWG, forming grills for reinforcement work as per
approved designs and drawings including cost and conveyance of bars from
approved sources to site of work, including cost and conveyance of binding
wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all
operational, incidental, and labour charges such as cutting, bending, placing
in position, tying etc., and sales & other taxes,on cost of all materials
complete for finished item of work (APSS No.126) in all floors
Columns GF
Roof Beams
Lintels
Sunshades
125 mm Thick Slab
180 mm Thick Slab
4.35
X 120
Kgs
522.00
7.44
0.79
X 120
X 70
Kgs
Kgs
892.80
55.30
16.29 X 8
Kgs
### X 60 Kgs/ 10Sqm
130.32
854.52
75.24
### Kg
Or Say
3.00 M.T.
### /M.T.
135647.00
5690.20 /Cum
216398.00
Long walls
Cross walls
Verandah above Bressumere
Deductions
Doors
Windows
Deduct Bed Bocks Qty
1
1
X
X
2
4
18.54
6.45
0.23
0.23
3.00
3.00
25.59
17.80
10.95
0.23
1.00
2.52
1
1
X
X
4
9
1.20
1.50
0.23
0.23
-2.10
-1.35
-2.32
-4.19
-0.58
-0.79
38.03 Cum
5) Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using 2nd class bricks
having a crushing strength of not less than 35.00kg/cm2 and using two mild
steel bars of 6m dia in every third layer of brick masory, with free joints of
the main block work including cost and seignorage charges and conveyance
of all materials and water from approved sources to work site and all
operational, incidental, labour charges such as scaffolding mixing mortor
constructing masonary lift charges, curing etc. complete but excluding the
cost of steel and its fabrication charges.
Long walls
Cross walls
1
1
X
X
2
2
3.65
1.20
2.40
2.40
Hand Railing
3.70
0.90
17.52
5.76
6.66
29.94 Sqm
21761.00
15989.00
6) Ceiling Plastering with CM(1:5) Prop: 12mm thick in single coat including
cost and conveyance of all materials like cement, sand, water etc., to site,
including seigniorage charges, sales & other taxes on all materials, all
operational, incidental charges and labour charges such as mixing mortar,
finishing, curing, etc., complete for finished item of work. (APSS 901,906)
Hall
MMS Room
Verandah
1
1
X
X
1
1
10.95
3.65
4.25
6.65
10.95
1.80
46.54
24.27
19.71
90.52 Sqm
Sl.
No.
Description of Item
No.s
Measurements
L
Qty.
Rate
Amount
7) Plastering with CM(1:5) Prop: 12mm thick in single coat including cost and
conveyance of all materials like cement, sand, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all operational,
incidental charges and labour charges such as mixing mortar, finishing,
curing, etc., complete for finished item of work. (APSS 901,906)
Hall
1
1
X
X
2
2
1
1
X
X
2
1
1
1
X
X
WC
Deductins
Doors
Windows
MMS Room
Stair case room
Toilets Doors
(10.94+4.25)
(3.65+5.00)
3.00
3.00
91.14
51.90
4.25
2.40
3.00
3.00
25.50
7.20
1
2
13.00
1.80
3.00
3.00
39.00
10.80
(1.20+1.20)
3.00
57.60
1.20
-2.10
-10.08
1
1
X
X
9
4
1.50
0.75
-1.35
-2.10
-18.23
-6.30
248.53 Sqm
37127.00
51512.00
125208.00
8169.00
8) Plastering 20mm thick in two coats with base coat of 8mm thick in CM (1:6)
and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost
and conveyance of all materials like cement, sand, water etc., to site,
seigniorage charges, sales & other taxes on all materials,all operational,
incidental and labour charges such as mixing mortar, scaffolding charges, lift
charges, including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, finishing, curing, etc., complete for finished item of
work to uneven surface of walls inside of the building (APSS 901,903 & 904)
L/walls
18.55
3.35
62.14
L/walls
C/Walls
1
1
X
X
1
2
18.55
6.95
1.35
3.35
25.04
46.57
133.75 Sqm
Hall
Staicase room
MMS Room
Verandah
Steps
Landing
1
1
X
X
1
1
10.95
2.40
4.25
4.25
46.54
10.20
1
1
X
X
1
1
3.65
13.00
6.45
1.80
23.54
23.40
1
1
X 22
X 1
1.20
2.40
0.30
1.50
7.92
3.60
115.20 Sqm
10) Providing Skirting to internal walls and Risers of Steps to 15 cm height with
Polished Bethamcherla coloured stone minimum 25 mm thick (0.254M
x0.254M) length equal to flooring stones, set over base coat of CM (1:3) 12
mm thick with cement slurry of honey like consistency spread at the rate of
3.30 kgs per sqm and jointed with white cement paste mixed with pigment
of matching shade to full depth, including cost of all materials like tiles,
cement, sand and water etc., complete including seigniorage charges, etc.,
complete for finished item of work,
Hall
10.95
0.10
1.10
Staicase room
MMS Room
1
1
X
X
1
1
2.40
3.65
0.10
0.10
0.24
0.37
Verandah
Steps
1
1
1
X 1 13.00
X 22 1.20
X 1
2.4
0.10
0.15
0.1
1.30
3.96
0.24
Landing
7.21 Sqm
Sl.
No.
Description of Item
No.s
Measurements
L
Qty.
Rate
Amount
11) Flooring with Ceramic Tiles of 7.3mm thick 1st. quality of any shade as
approved by Engineer - in - charge set over a base coat of CM (1:8), 12mm
thick laid over flooring bed / V.R.C.C. slab, with neat grey cement slurry of
honey like consistency spread at the rate of 3.3 Kgs of cement per Sq.m and
jointed with neat white cement paste mixed with pigment of matching shade
including cost and conveyance of all materials like cement, sand, water,
ceramic tiles etc. to site, seigniorage charges, sales and other taxes on all
materials, all operational, incidental and labour charges such as mixing of
cement mortar, laying, curing, lift charges etc., complete for finished item of
work.(APSS No.701 & 707) in All Floors
In Toilets
1.20
1.20
2.88
2.88 Sqm
2699.00
17587.00
27129.00
7786.00
12) Painting to New External Walls with two coats of Plastic Emulsion paint of
Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved
brand and shade as approved by the Engineer - in - Charge over base coat of
cement primer water base grade -II exterior making three coats in all to give
an even shade after thoroughly brushing the surface to remove all loose
powdered materials, including cost and conveyance of all materials,
including cost and conveyance of all materials, cost of brushes, water to
site, etc., sales & other taxes, all operational, incidental and labour charges
such as scaffolding charges, lift charges, curing etc., complete for finished
item of work in all floors for external Walls.(APSS No. 911)
L/walls
L/walls
C/Walls
1
1
X
X
1
1
18.55
18.55
3.35
1.35
6.95
3.35
62.14
25.04
46.57
133.75 Sqm
13) Painting to new internal walls with two (2) coats of ready mixed oil bound
washable distemper acrylic base of approved brand and shade over a base
coat of cement primer water base interior Grade-I of approved brand,
makind three (3) coats in all to give an even shade after thourughly brushing
the surface to remove all dirt and remains of loose powdered materials,
including cost and conveyance of all materials to work site and all
operational, incidental, labour charges etc., complete for finished item of
work in all floors for internal walls (SS 911)
Hall
MMS Room
Stair case room
Verandah Entablature wall
Verandah C/W
WC
Deductins
Doors
Windows
Toilets Doors
1
1
X
X
2
2
1
1
X
X
2
1
1
1
X
X
(10.94+4.25)
(3.65+5.00)
3.00
3.00
91.14
51.90
4.25
2.40
3.00
3.00
25.50
7.20
1
2
13.00
1.80
3.00
3.00
39.00
10.80
(1.20+1.20)
3.00
57.60
1
1
X
X
4
9
1.20
1.50
-2.10
-1.35
-10.08
-18.23
0.75
-2.10
-3.15
251.68 Sqm
14) Painting to new Iron work with two coats of ready mixed syinthetic eanmel
paint first quality all shades over a base coat of wood primer making three
coats in all to give an even shade after throughly brushing the surface to
remove all remains of loose powdered materials, including C/C of all
materials, site and other taxes all operational incidental and labour charges
etc., complete for finished item of work. ( APSS NO. 1201,1207 & 1212)
Door D1
D2
W1
2.25
1.20
2.10
22.68
1
1
X
X
2
9
2.25
2.75
0.75
1.50
2.10
1.35
7.09
50.12
79.89 Sqm
Sl.
No.
Description of Item
No.s
Measurements
L
Qty.
Rate
Amount
15) Supply and fixing of Mild Steel Door of size 1.22m x 2.13 m (double leaf
shutter) with door frame of Mild Steel Square hollow section of size 80mm x
80mm x 4mm (TATA make or equivalent), Hold Fast - 6 Nos. of MS equal
angle of ISA 2525 of size 25mm x 25mm x 4mm,Labour charges including
welding charges etc., complete for finished item of work.etc., complete for
finished item of work.
Hall & MMS Room
4.00
4.00 No.s
7699.00 Each
30796.00
4.00
4.00 No.s
7949.00 Each
31796.00
16) Supply and fixing of M.S. WINDOW of size 1.50 M x 1.37 M with outer
angular frame of rolled steel equal angle ISA 4040 of size 40mm x40mm x
6mm and inner shutter angular frame of rolled steel equal angle ISA 2525
of size 25mm x25mm x4mm and rolled steel Tee Bars of size 40mmx
40mmx 6mm, sales and other taxes ,cost and conveyance of all materials to
site, all labour cahrges etc.,complete for finished item of work.
Sl.
No.
Description of Item
No.s
Measurements
L
Qty.
Rate
Amount
17) Supply and fixing of Mild Steel Door of size 0.75m x 2.10 m (double leaf
shutter) with door frame of Mild Steel Square hollow section of size 80mm x
80mm x 4mm (TATA make or equivalent), Hold Fast - 6 Nos. of MS equal
angle of ISA 2525 of size 25mm x 25mm x 4mm,Labour charges including
welding charges etc., complete for finished item of work.etc., complete for
finished item of work.
Toilets Doors
4.00
4.00 No.s
4061.00 Each
16244.00
142.42
142.42 Sqm
4114.55 /Sqm
58599.00
18) Providing impervious coat to exposed RCC roof slab surface with CM(1:3),
20mm thick with 1kg of water proof compound per bag of cement laid over
roof when it is green including cost of all materials, seigniorage charges,
excluding conveyance charges of materials and including all operational,
incidental and labour charges for mixing mortar, laying, rendering smooth
and thread lining, curing, rounding off junctions of wall and slab etc,,
complete for finished item of work
18.74
7.60
Total: 1126966.00
Asst.Engineer
Executive Engineer
TW Section- Palvancha
TWSD - Palvancha
Sl.N
o
Description of item
Nos.
3
GROUND FLOOR
Measurements
L
B
D
4
5
6
QTY
Unit
Per
Unit
Rate
9
Amount
10
1) Earth work excavation and depositing on bank with initial lead of 10m and
initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary
Gravelly Soils ( SS 20-B) including all operational incidental labour charges
such as shoring, strutting, sheeting, planking and dewatering including cost
of hire charges of T & P, labour charges etc., complete for finished item of
work including seignerage charges excluding dewatering charges etc.,
complete for Foundation of Building.(APSS No. 308).
F1
F2
F3
F4
F5
F6
F7
25 to 30
11 to 13
1, 15
5,6
2,4,16,18
3,17
19,20
1
1
1
1
1
1
1
x
x
x
x
x
x
x
9
3
2
2
4
2
2
1.55
1.85
1.85
2.25
2.25
2.40
2.50
1.55
1.85
1.85
2.25
2.25
2.40
2.50
2.40
2.40
2.40
2.40
2.40
2.40
2.40
C1-2
C2-3
C2-4
C4-5
C5-6
C1-11
C11-15
C15-25
C25-34
1
1
1
1
1
1
1
1
1
x
x
x
x
x
x
x
x
x
1
1
1
1
1
1
1
1
5
1.11
0.84
0.84
0.92
0.42
1.32
1.32
1.04
1.610
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.25
0.25
0.20
0.20
0.20
0.20
0.15
0.25
0.15
Entrance steps
1 x
1 x
1
1
3.00
1.75
0.75
0.75
0.30
0.30
51.89
24.64
16.43
24.30
48.60
27.65
30.00
223.51
0.17
0.13
0.10
0.11
0.05
0.16
0.12
0.16
0.72
1.72
0.68
0.39
1.07
226.30
Cum
Cum
Cum
Cum
247.70
1 Cum
56055.00
1 Cum
3596.00
Entrance side
stage side
Entrance side
1 x
1 x
1 x
1
1
1
3.00
1.75
8.35
0.75
0.75
0.45
Dormitory GF
0.15
0.15
0.15
0.34
0.20
0.56
1.10 Cum 3268.95
Sl.N
o
Description of item
Nos.
3
GROUND FLOOR
Measurements
L
B
D
4
5
6
QTY
Unit
Per
Unit
Rate
9
Amount
10
F1
F2
F3
F4
F5
F6
F7
1
1
1
1
1
1
1
x
x
x
x
x
x
x
6
3
2
2
4
2
2
1.55
1.85
1.85
2.25
2.25
2.40
2.50
1.55
1.85
1.85
2.25
2.25
2.40
2.50
0.15
0.15
0.15
0.15
0.15
0.15
0.15
Hall
Stircase
Verandah
1 x
1 x
1 x
2
1
1
6.10
6.33
15.60
6.10
2.44
1.83
0.10
0.10
0.10
Dormitory GF
2.16
1.54
1.03
1.52
3.04
1.73
1.88
12.90 Cum
7.44
1.54
2.85
11.83 Cum
24.73 Cum
3932.55
1 Cum
97252.00
Sl.N
o
Description of item
Nos.
3
GROUND FLOOR
Measurements
L
B
D
4
5
6
QTY
Unit
Per
Unit
Rate
9
Amount
10
4) Filling with Gravel in trenches, sides of foundations and basement with initial
lead in layers not exceeding 15cm thick, consolidating each deposited layer
by watering and ramming including cost and conveyence of water to the
work site and all operational, incidental, labour charges, seignorage
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310)
F1
F2
F3
F4
F5
F6
F7
1
1
2
1
1
1
1
x
x
x
x
x
x
x
6
3
2
2
4
2
2
1.55
1.85
1.85
2.25
2.25
2.40
2.50
1.55
1.85
1.85
2.25
2.25
2.40
2.50
0.35
0.40
0.35
0.40
0.40
0.35
0.35
1
1
1
1
1
-1
x
x
x
x
x
x
1
1
1
1
1
4
6.10
6.10
8.16
6.10
6.10
0.23
6.10
6.10
2.44
1.83
1.83
0.22
1.30
1.20
1.05
1.25
1.20
1.00
5.05
4.11
4.79
4.05
8.10
4.03
4.38
34.51 Cum
223.51
-34.51
-12.90
-27.51
-2.58
-1.87
144.14 Cum
48.37
44.65
20.91
13.95
13.40
-0.20
141.08 Cum
319.73 Cum 246.25
1 Cum
78734.00
1 Cum
32406.00
2 x
15.56
0.45
0.15
2.10
1 x
13.32
0.45
0.15
0.90
Left side
1 x
2.05
0.45
0.15
0.14
Right side
6 x
7.94
0.45
0.15
3.22
Deduct Columns
-1 x 20
0.45
0.23
0.15
-0.31
6.05 Cum 5356.40
Dormitory GF
Sl.N
o
Description of item
Nos.
3
GROUND FLOOR
Measurements
L
B
D
4
5
6
QTY
Unit
Per
Unit
Rate
9
Amount
10
6 x
6 x
3 x
3 x
2 x
2 x
2 x
2 x
4 x
4 x
2 x
2 x
2 x
2 x
B) For Pedestals: F1
F2
F3
F4
F5
F6
F7
C) For Columns : Columns upto Ground Level
C11,C14
C12,C13
C26,C27,C28,C29,C30,C25
C1,C15
C2,C6
C7,C9
C19,C20
C3
6
3
2
2
4
2
1
x
x
x
x
x
x
x
1
1
1
1
1
1
2
1.25
1.25
0.275
0.125/3(1.25*1.25+.55*.4
8+1.25*1.25*.55*.48
1.55
1.55
0.300
0.125/3(1.55*1.55+.63*.4
8+1.55*1.55*.63*.48
1.55
1.55
0.300
0.125/3(1.55*1.55+0.70*0
.48+1.55*1.55*0.70*0.48
1.95
1.95
0.300
0.125/3(1.95*1.95+0.63*0
.48+1.95*1.95*0.63*0.48
1.95
1.95
0.300
0.125/3(1.95*1.95+0.70*0
.48+1.95*1.95*0.70*0.48
2.10
2.10
0.325
0.125/3(2.1*2.1+0.70*0.4
8+2.10*2.10*0.70*0.48
2.20
2.20
0.325
0.125/3(2.2*2.2+0.70*0.4
8+2.20*2.20*0.70*0.48
0.45
0.53
0.60
0.53
0.60
0.60
0.60
0.38
0.38
0.38
0.38
0.38
0.38
0.38
0.60
0.60
0.60
0.60
0.60
0.60
0.60
2.58
1.03
2.16
0.30
1.44
0.61
2.28
0.60
4.56
2.46
2.87
2.39
3.15
1.08
27.51 Cum
7671.25
1 Cum
###
0.62
0.36
0.27
0.24
0.55
0.27
0.27
2.58 Cum
9148.90
1 Cum
23604.00
1
1
1
1
1
1
1
1
x
x
x
x
x
x
x
x
1
2
6
2
2
2
2
1
0.38
0.38
0.30
0.45
0.45
0.45
0.45
0.45
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.60
0.55
0.70
0.60
0.60
0.63
0.67
0.61
0.05
0.10
0.29
0.12
0.12
0.13
0.14
0.06
1.01 Cum
1
1
1
1
x
x
x
x
2
1
1
6
0.45
0.45
0.38
0.30
0.23
0.23
0.23
0.23
1.20
2.15
2.15
2.15
0.25
0.22
0.19
0.89
Dormitory GF
Sl.N
o
Description of item
2
C1
C2,C3,C4,C16,C17
C19,C20
C12,C13,C14
Nos.
3
1 x 1
1 x 5
1 x 2
1 x 3
2
3
2
1
x
x
x
x
1
1
1
1
GROUND FLOOR
Measurements
L
B
D
4
5
6
0.45
0.23
2.94
0.45
0.23
2.79
0.45
0.23
2.94
0.38
0.23
2.94
8.61
8.92
15.86
13.10
0.23
0.23
0.23
0.23
0.30
0.30
0.30
0.30
1 x
1 x
1 x
1
1
1
15.86
2.58
2.90
0.23
0.23
0.23
0.30
0.30
0.30
Side Beam
Middle Beam
Beam at stair case
Beam at stair case
Back and middle
B1 at stair case
1
1
1
1
2
1
3
5
2
2
4
1
8.92
6.78
3.47
3.31
2.94
2.44
0.23
0.23
0.23
0.23
0.23
0.23
0.30
0.45
0.30
0.30
0.30
0.30
x
x
x
x
x
x
1 x
1 x
1
1
3.65
2.90
1.22
1.53
---
2nd Flight
1 x
3.80
1.22
--
Dormitory GF
QTY
Unit
Per
Unit
Rate
9
Amount
10
0.30
1.44
0.61
0.77
4.67 Cum
5.68 Cum
9063.40
1 Cum
51480.00
1.19
1.85
2.19
0.90
6.13 Cum
9564.25
1 Cum
58629.00
1.09
0.18
0.20
1.47 Cum
1.85
3.51
0.48
0.46
1.62
0.17
8.09 Cum
9.56 Cum
9204.95
1 Cum
87999.00
4.45
4.44
8.89 Sqm
4.64
4.64 Sqm
13.53 Sqm
1476.05
1 Sqm
19971.00
Sl.N
o
1
Description of item
Nos.
3
2
G) For Slab 115mm thick : Stiar case Verandah
H) For Lintels : At Door
At Window
1 x
1 x
1
1
1 x 2
1 x 10
GROUND FLOOR
Measurements
L
B
D
4
5
6
12.89
3.93
1.65
2.13
8.62
2.44
0.23
0.23
---
0.15
0.15
1 x
1 x
1
1
15.86
2.28
0.60
0.60
---
Back side
1 x
1.83
0.60
--
QTY
Unit
Per
Unit
Rate
9
Amount
10
111.11
9.59
120.70 Sqm
847.20
1 Sqm
###
0.11
0.73
0.85 Cum
8865.35
1 Cum
7524.00
9.52
1.37
10.89 Sqm
4.39
4.39 Sqm
15.28 Sqm
752.75
1 Sqm
11502.00
75.76
23.15
8.32
10.98
118.21 Sqm
1424.60
1 Sqm
###
1 MT
###
7) Ceiling Plastering 12mm thick in two coats with base coat of 8mm thick in
CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish
including cost and conveyance of all materials like cement, sand, water etc.,
to site, seigniorage charges, sales & other taxes on all materials,all
operational, incidental and labour charges such as mixing mortar,
scaffolding charges, lift charges, including cutting of Grooves wherever
necessary as directed by Engineer - in - charge, finishing, curing, etc.,
complete for finished item of work. (APSS 901,903 & 904) for Ground floor
Rooms
Verandah
Staircase room
T'Beams
1
1
1
2
x
x
x
x
1
1
1
2
12.42
12.65
3.41
6.10
6.10
1.83
2.44
--
0.45
8) Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as
per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required
sizes and shapes placing in position with cover blocks of approved size and
binding wire of 20SWG, forming grills for reinforcement work as per
approved designs and drawings including cost and conveyance of bars from
approved sources to site of work, including cost and conveyance of binding
wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all
operational, incidental, and labour charges such as cutting, bending, placing
in position, tying etc., and sales & other taxes,on cost of all materials
complete for finished item of work (APSS No.126) in all floors.
10.00
10.00 MT
9) Brick Masonry in superstructure with CM (1:8) prop with Flyash Cement solid
blocks of size 290 x 225 x 140 mm, for manufacturing of flyash solid blocks
using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust
with a compresive strength not lessthan 50 kg/sqm including cost and
conveyance of all materials, labour charges, seiniorage charges, scaffolding
and curing etc., for Superstructure Walls
At Basement level
Back side
Left side
Right side
Front side
Staircase front and back
Above Verandah beam to Roof
Level
Front
Existing Building side
Left side and Right side
1
1
1
1
1
1
1
x
x
x
x
x
x
x
8
2
1
2
1
7
2
2.94
2.86
1.83
2.86
1.83
2.94
2.44
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.70
0.70
0.70
0.70
0.70
0.70
0.70
1
1
1
1
x
x
x
x
7
1
1
2
2.94
2.44
1.12
1.83
0.23
0.23
0.23
0.23
0.75
0.75
0.75
0.75
Dormitory GF
4.94
1.20
0.38
1.20
0.38
4.32
1.02
13.44 Cum
3.55
0.42
0.19
0.63
60915.30
Sl.N
o
Description of item
Nos.
3
GROUND FLOOR
Measurements
L
B
D
4
5
6
QTY
Unit
8
4.79 Cum
4
1
1
1
-1
-1
-1
x
x
x
x
x
x
x
2
1
2
1
2
6
1
2.94
5.50
5.50
2.44
1.05
1.53
2.44
0.23
0.23
0.23
0.23
0.23
0.23
0.23
2.18
2.94
2.94
2.94
2.13
1.37
0.49
11.79
3.72
7.44
1.65
-1.03
-2.89
-0.27
20.41 Cum
2
-1
-1
-1
x
x
x
x
4
4
6
4
2.94
1.65
2.13
1.05
0.23
0.23
0.23
0.23
0.76
0.15
0.15
0.45
4.11
-0.23
-0.44
-0.43
3.01 Cum
1 x
1 x
1 x
4
1
1
2.94
2.44
1.80
0.23
0.23
0.23
0.90
0.90
0.90
2.43
0.51
0.37
3.31 Cum
2
1
1
1
1
x
x
x
x
x
8
3
4
1
1
0.45
0.45
0.48
12.40
9.10
0.23
0.23
0.23
0.45
0.45
0.75
0.75
0.75
0.10
0.10
1
1
1
1
1
x
x
x
x
x
1
1
1
1
2
2.90
2.90
1.75
1.75
3.50
0.60
0.30
0.60
0.30
0.23
0.30
0.15
0.30
0.15
0.28
1.24
0.23
0.33
0.56
0.41
2.77 Cum
0.52
0.13
0.32
0.08
0.44
1.49 Cum
49.22 Cum
Per
Unit
Rate
9
Amount
10
Dwarf wall
For Shelves
Dormitory GF
4754.45
1 Cum
###
Sl.N
o
Description of item
Nos.
3
GROUND FLOOR
Measurements
L
B
D
4
5
6
QTY
Unit
Per
Unit
Rate
9
Amount
10
For Shelves
Left side
1 x
1 x
2
1
3.65
0.10
0.90
0.90
6.57
0.09
6.66 Sqm
6679.15
1 Sqm
44483.00
22.32
18.20
40.52 Sqm
663.00
1 Sqm
26865.00
2.00
1.00
3.00 Each
2539.50
1 Each
7619.00
0.36
0.09
0.87
1.74
1.05
0.53
0.36
0.09
1.05
6.14 Sqm
1222.50 10 Sqm
751.00
2 x
2 x
2
2
12.40
9.10
0.45
0.50
12) Making Green Chalk Board of size 3.00 x 1.20 Mts including border with
plastering in CM(1:2) 12mm thick as base coat and 3mm top coat with
cement green oxide powder (1:1) and making border in CM (1:2) of 50 x
20mm thick allround the chalk board over existing plastered surface and
painting the chalk board surface with chalk board paint as per direction of
Enginer-in-Charge including cost, conveyance of all materials, sales and
other taxes on cost of all materials and all operational, incidental and labour
charges etc. complete for finished item of work (APSS No: 1603).
Room No.1
Carridor
1 x
1 x
2
1
2.44
2.44
1.22
1.22
13) Plastering with CM(1:5) Prop: 20mm thick in single coat including cost and
conveyance of all materials like cement, sand, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all operational,
incidental charges and labour charges such as mixing mortar, finishing,
curing, etc., complete for finished item of work. (APSS 901,906) for Ground
floor.
Staircase entrance 1st step
Stage side
1
1
1
1
1
1
1
1
1
x
x
x
x
x
x
x
x
x
2
2
2
2
2
2
2
2
2
0.60
0.30
2.90
2.90
1.75
1.75
0.60
0.30
3.50
0.30
0.15
0.15
0.30
0.30
0.15
0.30
0.15
0.15
14) Plastering 20mm thick in two coats with base coat of 16mm thick in CM
(1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including
cost and conveyance of all materials like cement, sand, water etc., to site,
seigniorage charges, sales & other taxes on all materials, all operational,
incidental and labour charges such as mixing mortar,scaffolding charges,
lift charges, finishing,including cutting of Grooves wherever necessary as
directed by Engineer - in - charge, curing, etc., complete for Uneven
Surfaces of Brick Wall for finished item of work. (APSS 901,903 & 904).
Dormitory GF
Sl.N
o
Description of item
2
Carridor wall
at staircase wall
Backside
GROUND FLOOR
Measurements
Nos.
L
B
D
3
4
5
6
1 x 1
12.66
3.10
1 x 2
6.65
3.35
1 x 1
12.66
3.35
1 x 1
2.81
3.35
1 x 1
6.51
3.35
1 x 2
2.00
1.00
1 x 1
15.17
1.00
1 x 9
1.20
1.23
2 x 2
3.65
0.90
2 x 2
3.65
0.10
2 x 2
0.10
0.90
2 x 10
0.23
3.35
1 x 1
15.47
0.67
1 x 2
6.51
0.90
QTY
Unit
Per
Unit
Rate
9
Amount
10
39.25
44.56
42.41
9.41
21.81
4.00
15.17
13.28
13.14
1.46
0.36
15.41
10.36
11.72
242.34 Sqm
3150.80 10 Sqm
76356.00
153.76
75.02
9.90
7.90
1.62
-2.24
-25.15
-2.77
8.56
11.34
4.05
5.76
31.82
4.21
2.35
286.13 Sqm
3464.40 10 Sqm
99127.00
6745.00
13490.00
15) Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6)
and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost
and conveyance of all materials like cement, sand, water etc., to site,
seigniorage charges, sales & other taxes on all materials,all operational,
incidental and labour charges such as mixing mortar, scaffolding charges,
lift charges, including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of
Wall for finished item of work. (APSS 901,903 & 904).
2
2
1
1
1
-1
-1
-1
6
4
4
4
1
1
1
x 2
x 2
x 1
x 1
x 1
x 1
x 12
x 8
x 2
x 9
x 3
x 4
x 1
x 2
x 1
12.40
6.05
11.00
8.78
1.80
1.05
1.53
0.91
0.23
0.45
0.45
0.48
27.67
1.83
2.35
3.10
3.10
0.90
0.90
0.90
2.13
1.37
0.38
3.10
0.70
0.75
0.75
1.15
1.15
1.00
16) Supply and fixing of MILD Steel Door of size 1.06m x2.13 m (Double leaf
shutter) with door frame of Mild Steel square hollow section of
80mmx80mmx4mm (TATA make or equivalent). Hold fast - 6 Nos of MS
equal angle of ISA 2525 of size 25mm x25mmx4mm, Door frame embedded
in the flooring to a depth of 50mm connecting the bottom of two vertical of
door frame with MS Flat 25mm wise - 4mm (TATA make or equivalent) with
styles and planks of MS sheet 1.25 mm thick, Towe Bolts - 2 Nos of MS
12mm round bars including hardware fixtures 1) MSPC Butt Ginges IS: 205
150mm long - 3 Nos. 2) MSPC Aldrops IS : 2681 300mm long - 2 Nos, 3)
MSPC Door handles IS: 208 125mm long - 2 Nos including cost and
conveyance of all materials to site, Fabrication charges of MS Door frame
and shutter including welding of hard ware fixtures to Door frame and
shutters, labour charges for fixing of door in position, Red oxide paint of
Grade - I wuality to MS Door Rame and shutters, Sales and other taxes,
operational and incidental charges. Labour charges including welding
charges etc comple for finished item of work.
(1.06 x 2.13 M)
1 x
2.00
2.00 No
Dormitory GF
1 No
Sl.N
o
Description of item
Nos.
3
GROUND FLOOR
Measurements
L
B
D
4
5
6
Per
Unit
Rate
Amount
QTY
Unit
6.00
6.00 No
6155
1 No
36930.00
4.00
4.00 No
1000
1 No
4000.00
10
17) Supply and fixing of Mild Steel Window of size 1.53m x 1.37 m (six leaf
shutter) with window frame of Mild Steel Square hollow section of size
40mm x40mm x 3.20mm (TATA make or equivalent), Hold Fast - 4 Nos. of
MS equal angle of ISA 2525 of size 25mm x 25mm x 4mm, Window
Shutter :- Shutter frame of Mild Steel square hollow section of size 25mm x
25mm x 2.60mm (TATA make or equivalent), with styles and planks of MS
sheet 1.25mm thick, including hardware fixtures 1) MS PC Butt Hinges IS :
205 100mm long - 8 Nos, 2) MSPC window handles IS : 208 125mm long - 4
Nos MSPC Tower Bolts IS : 204 100mm long - 8 Nos, Safety bars of 12mm
square rods @ 100mm centre to centre welded horizontally to full width of
windows including cost and conveyance of all materials to site, Fabrication
charges of MS Window frame and shutter including welding of hardware
fixtures to window frame and shutters, labour charges for fixing of window
in position, Red oxide paint of Grade-I quality to MS Window Frame and
shutters, Sales and other taxes, operational and incidental charges, labour
charges including welding charges Subject to variation in the weight of
window the rate will be adjusted based on the final approval of plan of
window and its total weight by the Engineer incharge etc., complete for
finished item of work.
(1.53 x 1.37 M)
1 x
18) Supply and fixing of M.S.Grill Ventilators of size 0.90x0.38 m with outer
angular frame of rolled steel equal angle of ISA 2525 of size 25mm x 25mm
x 4mm welded with safety bars of 10mm square rods at 100mm centre to
centre horizontally and verticlally including red oxide primer of grade-I
quality, sales and other taxes, cost and conveyance of all materials to site,
all labour charges, and fixing in position etc., complete for finished item of
work.
(0.90 x 0.38 M)
1 x 4
19) Flooring with high polished granite stones 16 to 18mm thick other tan block
and regular colour set over base coat of cement mortar (1:8) 12mm thick
(joints of stone must be flushed) over CC bed already laid or RCC roof slab,
including near cement slurry of honey like consistency spread @ 3.30 Kgs
per sqm. Jointed with neat cement to full depth mixed with pigment of
matching shade, including cost of all materials like flooring stone, cement,
sand and water etc., complete, including seigniorage charges and labour
charges for cutting, dressing and laying etc., complete for finished item of
work.(APSS 701) for Ground floor.
shelves top
staircase landing
Landing 2nd
Landing 2nd
2
2
1
1
1
1
x
x
x
x
x
x
1
1
1
1
1
1
12.40
9.10
0.56
2.40
0.85
1.73
0.48
0.48
1.08
1.23
1.10
2.40
11.90
8.73
0.60
2.95
0.93
4.15
29.26 Sqm
45081.75 10 Sqm
###
75.64
19.69
-0.85
45.14
139.62 Sqm
8024.80 10 Sqm
###
20) Flooring with ceramic tiles 7.3mm thick, set over base coat of cement
mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab,
including neat cement slurry of honey like consistency spread @ 3.3.kgs per
sqm & jointed neatly with white cement paste to full depth mixed with
pigment of matching shade, including cost of all materials like cement, sand
water and tiles etc., complete, including seigniorage charges, etc., complete
for finished item of work.
Room1
Entrance staircase
Deduct staircase step
Carridor
1
1
-1
1
x
x
x
x
1
1
1
2
12.40
8.38
1.22
12.68
6.10
2.35
0.70
1.78
Dormitory GF
Sl.N
o
Description of item
Nos.
3
GROUND FLOOR
Measurements
L
B
D
4
5
6
QTY
Unit
Per
Unit
Rate
9
Amount
10
1 x
1 x
-1 x
2
2
2
12.40
5.68
1.05
Dormitory GF
0.10
0.10
0.10
2.48
1.13
-0.21
3.40 Sqm
7138.40 10 Sqm
2427.00
Sl.N
o
Description of item
Nos.
3
GROUND FLOOR
Measurements
L
B
D
4
5
6
QTY
Unit
Per
Unit
Rate
9
Amount
10
22) Painting to new internal walls with two (2) coats of ready mixed oil bound
washable distemper acrylic base of approved brand and shade over a base
coat of appropriate cement primer of approved brand, makind three (3)
coats in all to give an even shade after thourughly brushing the surface to
remove all dirt and remains of loose powdered materials, including cost and
conveyance of all materials to work site and all operational, incidental,
labour charges etc., complete for finished item of work in all floors for
internal walls (SS 911)
Ceiling Room 1
T'Beams
Verandah
T'Beams
Staircase room
Waist slab
2nd flight
Landing
Room long walls
Cross walls
Stair case side walls
Verandah walls
Side toilet block
Staircase bottom wall
Hand Railing
Verandah walls
Deduction:
Door
Windows
Ventilators
Shelves bottom
Grill
Brick fins
Shelves room 1
Fins
1
2
2
2
1
1
1
1
2
2
2
1
1
1
1
1
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
1
2
1
2
1
1
1
1
2
2
1
2
1
1
2
2
-1
-1
-1
2
2
4
4
4
x 4
x 12
x 8
x 1
x 1
x 9
x 3
x 4
12.42
6.10
12.65
1.83
3.41
3.65
3.70
2.90
12.42
6.10
6.30
12.66
2.35
2.35
3.65
3.65
1.05
1.53
0.90
12.40
9.10
0.45
0.45
0.48
6.10
0.45
1.83
0.23
2.44
1.22
1.22
1.30
3.00
3.00
2.00
2.10
1.20
1.20
0.75
0.90
2.13
1.37
0.38
0.45
0.45
0.60
0.60
0.60
75.76
10.98
46.29
1.68
8.32
4.45
4.51
3.77
149.04
73.20
25.20
53.17
2.82
2.82
5.47
6.57
-8.94
-25.15
-2.73
11.16
8.19
9.72
3.24
4.60
474.14 Sqm
1077.90 10 Sqm
51108.00
10.06
34.58
1.36
46.00 Sqm
974.55 10 Sqm
4483.00
23) Painting to New Iron work with two coats of ready mixed synthetic enamel
paint first quality all shades over red oxide primer Grade-I making three (3)
coats in all to given and even shade after thourughly brushing the surface to
remove all dirt and remains of loose powered materials, including cost and
conveyance of all materials to site, sales & other taxes, incidental,
operational and all labour charges etc., complete for finished item of work.
(APSS No. 1201, 1207 & 1212).in All Floors
Doors
Windows
Ventilators
2 x ###
6 x ###
1 x 4
1.05
1.53
0.90
2.13
1.37
0.38
24) Painting to New External Walls with two coats of Plastic Emulsion paint of
Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved
brand and shade as approved by the Engineer - in - Charge over base coat
of cement primer grade -I making three coats in all to give an even shade
after thoroughly brushing the surface to remove all loose powdered
materials, including cost and conveyance of all materials, including cost and
conveyance of all materials, cost of brushes, water to site, etc., sales &
other taxes, all operational, incidental and labour charges such as
scaffolding charges, lift charges, curing etc., complete for finished item of
work in all floors for external Walls.(APSS No. 911).
Long walls
Cross walls
Cross walls
Dwarf Long walls
Front
1
1
2
2
1
x
x
x
x
x
1
1
1
1
2
12.87
2.44
6.65
2.00
15.87
Dormitory GF
3.35
3.35
3.35
1.00
1.00
43.11
8.17
44.55
4.00
31.74
Sl.N
o
1
Description of item
2
Sunshades
Front side sunshade
Cross walls
Patti
Front patti
Cross walls
Top
Pillars
Circular columns
Front sunshade patti alround
Column projection sides
Nos.
3
1 x 4
1 x 1
1 x 1
2 x 8
1 x 1
1 x 1
1 x 1
1 x 9
1 x 9
2 x 9
1 x 1
GROUND FLOOR
Measurements
L
B
D
4
5
6
1.83
0.60
15.87
0.60
2.28
0.60
0.60
0.08
15.87
0.08
2.28
0.08
0.60
0.08
1.20
1.22
0.30
1.13
0.08
1.13
2.06
1.13
QTY
Unit
4.39
9.52
1.36
0.76
1.26
0.18
0.04
13.17
3.05
1.62
2.32
169.24 Sqm
Per
Unit
Rate
9
1314.90 10 Sqm
Amount
10
22253.00
###
Dormitory GF
Sl.N
o
Description of item
QTY
Unit
Per
Unit
Rate
9
Amount
10
Parapet wall
32.30
0.25
0.60
20.00
0.25
0.60
4.85
3.00
7.85 Cum
361.00 1 Cum
2834.00
A) For Columns : 7
0.23
0.23
3.30
1.22
1.22 Cum
###
1 Cum
13230.00
1 Cum
22388.00
20.00
0.23
0.35
1.61
4.50
0.23
0.35
0.72
2.33 Cum 9608.60
3.60
1.20
--
Landing
3.00
1.80
--
10.80
19.44 Sqm
2nd Flight
3.80
1.22
--
4.64
4.64 Sqm
24.08 Sqm 1529.05
1 Sqm
36820.00
243.87
243.87 Sqm 1124.85
1 Sqm
###
8.64
32.30
7.55
--
1.20
0.35
0.15
0.25
17 x
1.20
0.35
0.15
1.07
1.32 Cum
###
1 Cum
13918.00
10.08
10.08 Sqm
797.95
1 Sqm
8043.00
1.20
0.60
Dormitory FF
--
Sl.N
o
Description of item
QTY
Unit
Per
Unit
Rate
9
Amount
10
3) Ceiling Plastering 12mm thick in two coats with base coat of 8mm thick in CM
(1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including
cost and conveyance of all materials like cement, sand, water etc., to site,
seigniorage charges, sales & other taxes on all materials,all operational,
incidental and labour charges such as mixing mortar, scaffolding charges, lift
charges, including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, finishing, curing, etc., complete for finished item of
work. (APSS 901,903 & 904) for.
2
End room
Sunshades
10.00
4.50
2 x
14 x
1
2
5.80
1.20
4.50
0.60
--
90.00
52.20
20.16
Columns
0.96
2.10
Bressure bottom
20.00
0.23
4.60
Verandah Sunshade
20.00
0.60
24.00
Waist Slab
3.60
1.20
3.00
1.80
14.11
8.64
10.80
224.51 Sqm 388.595
1 Sqm
87243.00
4) Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as
per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required
sizes and shapes placing in position with cover blocks of approved size and
binding wire of 20SWG, forming grills for reinforcement work as per approved
designs and drawings including cost and conveyance of bars from approved
sources to site of work, including cost and conveyance of binding wire, cover
blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational,
incidental, and labour charges such as cutting, bending, placing in position,
tying etc., and sales & other taxes,on cost of all materials complete for
finished item of work (APSS No.126) in all floors.
4.00
4.00 MT
###
1 MT
###
1 Cum
###
5) Brick Masonry in superstructure with CM (1:8) prop: using second class bricks
from approved source having minimum crushing strength of 40 Kg/Sqcm.
including cost and conveyance of all materials like cement, sand, bricks,
water etc., to site, including seigniorage charges, sales & other taxes on all
materials, all operational, incidental and labour charges such as mixing
cement mortar, constructing masonry, scaffolding charges, lift charges,
curing, etc., complete for finished item of work.
L/W
32.30
0.35
3.30
74.61
C/W
4.50
0.35
3.30
31.19
Verandha L/W
20.00
0.35
1.30
9.10
Dwar wall
20.00
0.23
1.10
5.06
Deduct Columns
0.23
0.23
-1.30
-0.48
1.20
0.35
-2.10
-3.53
17 x
0.90
0.35
-1.35
0.23
0.35
-0.20
-7.23
-0.39
17 x
Door
Windows
0.23
0.35
-0.20
-1.09
Ventilators
0.90
0.35
-0.30
-0.66
Staircase
2.40
0.35
-3.30
-2.77
Lintels
1.50
0.35
-0.15
-0.32
17 x
1.20
0.35
-0.15
Dormitory FF
-1.07
102.42 Cum 5690.20
Sl.N
o
Description of item
QTY
Unit
Per
Unit
Rate
9
Amount
10
6) Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6)
and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and
conveyance of all materials like cement, sand, water etc., to site, seigniorage
charges, sales & other taxes on all materials, all operational, incidental and
labour charges such as mixing mortar,scaffolding charges, lift charges,
finishing,including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick
Wall for finished item of work. (APSS 901,903 & 904).
Outside L/W
32.30
3.30
106.59
Verandah Bressure
20.00
1.30
26.00
6.50
3.30
42.90
175.49 Sqm 3851.40 10 Sqm
67588.00
7) Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6)
and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and
conveyance of all materials like cement, sand, water etc., to site, seigniorage
charges, sales & other taxes on all materials,all operational, incidental and
labour charges such as mixing mortar, scaffolding charges, lift charges,
including cutting of Grooves wherever necessary as directed by Engineer - in charge, finishing, curing, etc., complete for Even Surfaces of Wall for
finished item of work. (APSS 901,903 & 904).
(10.00+4.50)
3.30
95.70
End Room
(4.20+5.8)
3.30
132.00
4.50
3.30
59.40
20.00
3.30
66.00
Deduct Door
1.20
-2.10
-10.08
17 x
7 x
1
1
0.90
0.90
-1.20
-0.30
-18.36
Windows
Ventilators
-1.89
322.77 Sqm 3737.20 10 Sqm
###
8) Manufacturing, Supply, delivery and fixing of plain MS sheet door of size 1.20
x 2.13 with frame made of L Angular section of 40 X 40 X 6mm and inner
frame of double leave shutters with MS "L"angle of 35 X 35 X 4mm welded
with 2 nos of 25 X 25 X 3 angle and 3 No.s of 30x4mm each leaf and welded
with powder coated fixtures including red oxide paint including cost and
conveyance of all materials and labour charges etc., complete for finished
item of work. (Ground Floor & First floor) weight not less than 75 Kgs
(1.20x 2.13 M)
4.00
4.00 No
6745.00
1 No
26980.00
17.00
17.00 No
6155.00
1 No
###
7.00
7.00 No
626.00
1 No
4382.00
9) Supply and fixing of 18 guage M.S plain sheet Window with three leaves
shutter of size 0.90mx1.37m with outer angular frame of rolled steel equal
angle ISA 4040 of size 40x40x6mm and inner shutter angular frame of rolled
steel equal angle ISA 3535 of size 35x4mm on MS Flat of size 30x4mm 2 Nos
welded horizontally to each of leaf and also welded with fixtures such as M.S
powder coated tower bolts IS204 250mm long 2 Nos, M.S powder coated Bolt
hinges IS 205 125mm long 3 Nos, M.S powder coated handles IS 208 125mm
long 2 Nos, M.S powder coated Aldrop IS 268 250mm long 1 No including Red
oxide primer of grade-I quality, sales and other taxes, cost and conveyance of
all materiasl to site all labour charges etc., complete for finished item of work.
(0.90 x 1.35 M)
17 x
10) Supply and fixing of M.S.Grill Ventilators of size 0.90x0.38 m with outer
angular frame of rolled steel equal angle of ISA 2525 of size 25mm x 25mm x
4mm welded with safety bars of 10mm square rods at 100mm centre to
centre horizontally and verticlally including red oxide primer of grade-I
quality, sales and other taxes, cost and conveyance of all materials to site, all
labour charges, and fixing in position etc., complete for finished item of work.
(0.90 x 0.38 M)
Dormitory FF
Sl.N
o
Description of item
QTY
Unit
Per
Unit
Rate
9
Amount
10
11) Flooring with ceramic tiles 7.3mm thick, set over base coat of cement mortar
(1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat
cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed
neatly with white cement paste to full depth mixed with pigment of matching
shade, including cost of all materials like cement, sand water and tiles etc.,
complete, including seigniorage charges, etc., complete for finished item of
work.
End room
Verandah
14.00
4.50
126.00
5.80
4.50
52.20
8.50
4.50
76.50
20.00
2.10
42.00
14.00
2.10
58.80
355.50 Sqm 9372.35 10 Sqm
###
End room
Verandah
(5.80+4.50)
0.10
4.12
(8.50+4.50)
0.10
5.20
20.00
Dormitory FF
0.10
4.00
13.32 Sqm 7202.90 10 Sqm
9594.00
Sl.N
o
Description of item
QTY
Unit
Per
Unit
Rate
9
Amount
10
13) Painting to new internal walls with two (2) coats of ready mixed oil bound
washable distemper acrylic base of approved brand and shade over a base
coat of appropriate cement primer of approved brand, makind three (3) coats
in all to give an even shade after thourughly brushing the surface to remove
all dirt and remains of loose powdered materials, including cost and
conveyance of all materials to work site and all operational, incidental, labour
charges etc., complete for finished item of work in all floors for internal walls
(SS 911)
65752.00
14) Painting to New Iron work with two coats of ready mixed synthetic enamel
paint first quality all shades over red oxide primer Grade-I making three (3)
coats in all to given and even shade after thourughly brushing the surface to
remove all dirt and remains of loose powered materials, including cost and
conveyance of all materials to site, sales & other taxes, incidental, operational
and all labour charges etc., complete for finished item of work. (APSS No.
1201, 1207 & 1212).in All Floors
Doors
Windows
x ###
1.20
2.10
22.68
17 x ###
0.90
1.35
56.80
79.48 Sqm
974.55 10 Sqm
7746.00
23075.00
15) Painting to New External Walls with two coats of Plastic Emulsion paint of
Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved
brand and shade as approved by the Engineer - in - Charge over base coat of
cement primer grade -I making three coats in all to give an even shade after
thoroughly brushing the surface to remove all loose powdered materials,
including cost and conveyance of all materials, including cost and conveyance
of all materials, cost of brushes, water to site, etc., sales & other taxes, all
operational, incidental and labour charges such as scaffolding charges, lift
charges, curing etc., complete for finished item of work in all floors for
external Walls.(APSS No. 911).
###
Assistant Engineer,
Executive Engineer
TW Section Paloncha
TWSD Paloncha
TW Divn, Bhadrachalam.
Dormitory FF
NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY (V&M)
IN KHAMMAM(Dist.)
Sl.N
o
Description of item
Terrace Floor
Measurements
Nos.
3
L
4
B
5
D
6
QTY
Unit
Per
Unit
Rate
9
Amount
10
1) Brick Masonry in superstructure with CM (1:8) prop: using second class bricks
from approved source having minimum crushing strength of 40 Kg/Sqcm.
including cost and conveyance of all materials like cement, sand, bricks, water
etc., to site, including seigniorage charges, sales & other taxes on all materials,
all operational, incidental and labour charges such as mixing cement mortar,
constructing masonry, scaffolding charges, lift charges, curing, etc., complete for
finished item of work.
L/W
22.30
0.23
0.90
9.23
C/W
5.90
0.23
0.90
2.44
7.77
11.55
Staircase L/W
3.70
0.35
(3.30+2.70
)/2
C/W
5.50
0.35
(3.30+2.70
)/2
Deduct Door
1.20
0.23
-2.10
-0.58
30.41 Cum 5982.45
1 Cum
###
2.67
114.09 Sqm 3737.20 10 Sqm
42638.00
2) Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and
top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and
conveyance of all materials like cement, sand, water etc., to site, seigniorage
charges, sales & other taxes on all materials,all operational, incidental and
labour charges such as mixing mortar, scaffolding charges, lift charges, including
cutting of Grooves wherever necessary as directed by Engineer - in - charge,
finishing, curing, etc., complete for Even Surfaces of Wall for finished item of
work. (APSS 901,903 & 904).
Outside L/W
22.30
0.90
80.28
Top
C/W
2
2
x
x
1
2
22.30
5.80
0.23
0.90
10.26
20.88
Top
5.80
0.23
3) Supply and fixing of 18 guage M.S plain sheet Window with three leaves shutter
of size 0.90mx1.37m with outer angular frame of rolled steel equal angle ISA
4040 of size 40x40x6mm and inner shutter angular frame of rolled steel equal
angle ISA 3535 of size 35x4mm on MS Flat of size 30x4mm 2 Nos welded
horizontally to each of leaf and also welded with fixtures such as M.S powder
coated tower bolts IS204 250mm long 2 Nos, M.S powder coated Bolt hinges IS
205 125mm long 3 Nos, M.S powder coated handles IS 208 125mm long 2 Nos,
M.S powder coated Aldrop IS 268 250mm long 1 No including Red oxide primer of
grade-I quality, sales and other taxes, cost and conveyance of all materiasl to
site all labour charges etc., complete for finished item of work.
(1.20x 2.13 M)
1 x
1
1.00
1.00 No
6745.00
1 No
6745.00
###
Assistant Engineer,
TW Section Paloncha
Dormitory TF
Executive Engineer
TW Divn, Bhadrachalam.
DESCRIPTION OF ITEM
No's
D/H
Qty.
Unit
8
Rate
Amount
10
C1
0.30
0.300
3.05
0.27
C1a
0.30
0.300
3.05
0.27
C1b
0.30
0.300
3.05
0.27
C2
0.30
0.375
3.05
1.03
C3
0.30
0.400
3.05
0.73
2.57 Cum
11829.65
30402.00
11407.80
6274.00
1.50
0.23
0.15
0.10
windows
10
1.30
0.23
0.15
0.45
0.55 Sqm
Roof beam B1
5.95
0.23
0.45
1.23
B2
9.68
0.23
0.30
0.67
B3
7.90
0.23
0.45
1.64
B3
3.50
0.23
0.30
0.24
B4
5.95
0.23
0.45
1.23
B5
3.66
0.23
0.30
0.25
B7
4.57
0.23
0.45
0.47
B7
3.12
0.23
0.30
0.22
B8
4.57
0.23
0.45
0.47
B8
3.12
0.23
0.30
0.22
B9
7.85
0.23
0.45
0.81
B10
7.85
0.23
0.45
0.81
8.26 Cum
10443.25
86261.00
Roof slab
Slab
9.00
8.39
75.51
75.51 Sqm
1224.85
92488.00
Roof slab
S3
9.00
6.25
56.25
56.25 Sqm
1423.05
80047.00
841.75
6061.00
743.25
18552.00
Sunshade of window
1.50
0.60
7.20
7.20 Sqm
5.20
0.60
24.96
24.96 Sqm
5.45
0.23
2.00
5.01
In between columns
7.90
0.23
2.00
7.27
Doors
1.05
0.23
-2.00
-0.97
Windows
0.90
0.23
-1.20
-1.99
Columns
0.23
0.23
-2.00
-0.85
In between columns
5.45
0.23
1.10
2.76
In between columns
7.90
0.23
1.10
7.99
Ventilatars
0.60
0.23
-0.45
-0.25
Dwarf Wall
9.65
0.23
1.00
2.22
Parapet wall
14.50
0.23
1.00
6.67
9.00
0.23
1.00
2.07
21.19 Cum
5982.45
126768.00
7.20 Sqm
7857.60
5657.00
5.00 M.T
45215.55
226078.00
0.60
0.75
7.20
12 Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500
grade as per IS 1786-1979) of different diameters for RCC works,
including labour charges for straightening, cutting, bending to
required sizes and shapes, placing in position with cover blocks of
approved materials and size and tying and lapsplicing with binding
wire of 18 SWG, forming grills for reinforcement work as per
approved designs and drawings, including cost and conveyance of
steel bars, including all wastages such as overlaps, couplings, chairs,
spacer bars including cost and conveyance of binding wire, cover
blocks and all incidental, operational, laour charges such as cutting,
bending placing in position, tying including sales and other taxes on
all materials etc., complete for finished item of work in all floors.
(APSS No.126).
Or in MT
13 Plastering 12mm thick in two coats with base coat of 8mm thick in
CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish
including cost and conveyance of all materials like cement, sand,
water etc., to site, seigniorage charges, sales & other taxes on all
materials,all operational, incidental and labour charges such as
mixing mortar, scaffolding charges, lift charges, including cutting of
Grooves wherever necessary as directed by Engineer - in - charge,
finishing, curing, etc., for Even Surfaces of brick wall complete for
finished item of work. (APSS 901,903 & 904).
Domitory Halls
13.42
3.50
93.94
9.65
3.50
33.78
Dwarf Wall
9.65
1.00
9.65
Top
9.65
0.23
2.22
9.65
0.50
4.83
Parapet wall
14.50
1.00
29.00
9.00
1.00
18.00
Deduction door
1.05
2.00
-4.20
Window
10
0.90
1.20
-10.80
Ventilater
0.60
0.45
-1.08
175.34 Sqm
4009.85
70309.00
4124.10
124373.00
1915.00
36638.00
14 Plastering 20mm thick in two coats with base coat of 16mm thick in
CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish
including cost and conveyance of all materials like cement, screened
sand, water etc., to site, seigniorage charges, sales & other taxes on
all materials, all operational, incidental and labour charges such as
mixing mortar,scaffolding charges, lift charges, finishing,including
cutting of Grooves wherever necessary as directed by Engineer - in charge, curing, etc., for Uneven Surfaces of Brick Wall complete
for finished item of work. (APSS 901,903 & 904).
Dormitory halls
9.00
4.60
82.80
6.00
4.60
55.20
9.00
4.60
82.80
9.65
3.50
33.78
Parapet wall
14.50
1.00
29.00
9.00
1.00
18.00
301.58 Sqm
5.50
7.90
86.90
Corridor
9.65
2.20
21.23
Beam side
5.50
Sunshades
1.50
0.60
7.20
Shelevs
5.20
0.60
49.92
Slab Projection
9.00
0.30
5.40
8.35
0.30
5.01
9.60
0.30
5.76
Veranda Beams
0.45
9.90
191.32 Sqm
5.50
7.90
base
9.65
1.60
86.90
15.44
102.34 Sqm
11091.45
113510.00
11579.35
13218.00
1077.90
39522.00
1314.90
39654.00
13.40
0.15
base
11.25
0.15
8.04
3.38
11.42 Sqm
18 Painting to new internal walls with two (2) coats of ready mixed oil
bound washable distemper acrylic base of approved brand and
shade over a base coat of cement primer water base interior Grade-I
of approved brand, makind three (3) coats in all to give an even
shade after thourughly brushing the surface to remove all dirt and
remains of loose powdered materials, including cost and conveyance
of all materials to work site and all operational, incidental, labour
charges etc., complete for finished item of work in all floors for
internal walls (SS 911).
Celing 12mm Qty.
191.32
175.34
366.66 Sqm
301.58
301.58 Sqm
1.05
2.00
4.20
4.20 Sqm
3571.00
14998.00
4253.00
45932.00
4340.75
57584.00
TOTAL
1234326.00
21 Supply and fixing of Window of Size 0.90 x 1.22 M Six Leaf shutter
with window frame of Medium Teak wood of Section 100 mm x 65
mm and shutter frame of Medium Teak wood of section 100mm x
32 mm thick and window planks of medium fiber board exterior both
sides laminated 12mm thick and safety bars of 10 mm square bars
at 100mm center to center distance horizantally and Hardware
fixtures ie., MSPC Butt Hinges 100mm Long 12nos, MSPC Handles
125 mm Long 6 Nos MSPC Tower Bolt 150mm long 6 Nos, MS Hold
Fast 4 Nos Including Labour charges for making Window frame and
shutter, fixing of Fixtures etc., and cost and conveyance of all
materials to site, taxes extra complete for finished item of work.
Second Floor
Windows
10
0.90
1.20
10.80
10.80 Sqm
9.00
8.39
75.51
9.00
6.35
57.15
132.66 Sqm
Asst. Engineer
TW : Manuguru
Dy.Executive Engineer
TWSD : Palvancha
Executive Engineer
TW Divn. : Bhadrachalam
DESCRIPTION OF
ITEM
No.s
D/H
Qty.
Unit
Rate
Amount
10
39.60
8.10
47.70
Cum
247.70
11815.00
Cum
3268.95
13010.00
Cum
7671.25
45721.00
1) Earth work excavation for foundations and depositing on bank for all
lifts and with an initial lead of 10m including all operational, incidental,
seigniorage charges, labour charges such as shoring ,sheeting,
planking, strutting, dewatering etc. complete for finished item of work
as per SS - 20 B (APSS 308). for Foundation.
For Column footings
For Combind footings
1
1
x
x
33
3
1.00
1.50
1.00
1.50
1.20
1.20
1
1
x
x
33
3
1.00
1.50
1.00
1.50
0.10
0.10
3.30
0.68
3.98
a) Footings
b) Columns
c) Plinth Beam
1
1
x
x
33
3
1.00
1.50
1.00
1.50
0.15
0.15
4.95
1.01
5.96
3.49
33
0.23
0.23
2.00
0.23
0.23
2.00
0.63
4.12
Cum
9063.40
37341.00
100.00
0.23
0.30
6.90
6.90
Cum
9564.25
65993.00
Cum
4754.45
180526.00
1
1
x
x
1
36
100.00
0.23
0.23
0.23
1.80
-1.80
41.40
-3.43
37.97
311891749.xlsComp Wall
82
Sl.
No.
DESCRIPTION OF
ITEM
No.s
D/H
Qty.
Unit
Rate
Amount
Sqm
1222.50
57091.00
447.00
Sqm
279.30
12485.00
0.80
0.80
M.T.
45215.55
36172.00
100.00
2.10
420.00
100.00
0.35
35.00
100.00
0.06
12.00
467.00
6) White washing two coats with paint grade white lime for wash or
equivalent quality to give an even shade after thoroughly brushing the
surface to remove all dirt and remains of loose powdered materials
including cost of all materials, labour charges and incidental such as
scaffolding, lift charges etc., complete for finished item of work in all
floors for walls
For Compound wall Both
"
"
Top
Bottom sides offset
100.00
2.00
400.00
1
1
x
x
1
2
100.00
100.00
0.35
0.06
35.00
12.00
7) Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500
grade as per IS 1786-1979) of different diameters for RCC works,
including labour charges for straightening, cutting, bending to required
sizes and shapes, placing in position with cover blocks of approved
materials and size and tying and lapsplicing with binding wire of 18
SWG, forming grills for reinforcement work as per approved designs
and drawings, including cost and conveyance of steel bars, including all
wastages such as overlaps, couplings, chairs, spacer bars including
cost and conveyance of binding wire, cover blocks and all incidental,
operational, laour charges such as cutting, bending placing in position,
tying including sales and other taxes on all materials etc., complete for
finished item of work in all floors. (APSS No.126)
8)
Supply and fixing of Iron gate including all cost and conveyance of all materials etc
Total :-
Asst. Engineer,
TW Manuguru
311891749.xlsComp Wall
Executive Engineer,
TW Divn., Bhadrachalam
83
460154.00
NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY (V&M) IN
KHAMMAM(Dist.)
DETAIL CUM ABSTRACT ESTIMATE - SECOND FLOOR
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Qty.
Unit
Rate
Amount
10
cum
11829.65
40
0.23
0.40
3.35
12.33
T1 to T10
c2Ver C 1 to C14
1
1
X
X
10
14
0.23
0.23
0.40
0.300
3.35
3.35
3.08
3.24
18.65
19.00
311891749.xlsSF-Est F
84
224763
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Unit
Rate
Amount
1
1
16
X
X
X
16
48
3
1.65
1.35
1.35
0.23
0.23
0.23
0.15
0.15
0.15
or say
Qty.
0.91
2.24
2.24
5.39 Cu.M.
5.40 Cu.M. 11407.80
61602
Main beams
conecting passage
Toilet Block
main beams
14
2
1
1
1
2
2
1
1
1
1
1
1
1
1
1
X
X
x
x
x
x
x
x
x
x
x
x
x
x
x
x
2
2
1
20
2
2
2
5
2
4
4
2
1
1
1
8
4.26
4.88
4.26
5.34
4.57
3.65
4.12
5.34
8.47
1.22
1.52
20.47
27.31
4.72
4.26
1.88
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.300
0.300
0.300
0.450
0.450
0.300
0.300
0.450
0.300
0.300
0.300
0.400
0.400
0.400
0.400
0.300
or say
311891749.xlsSF-Est F
85
8.23
1.35
0.29
11.05
0.95
1.01
1.14
2.76
1.17
0.34
0.42
3.77
2.51
0.43
0.39
1.04
36.85 Cu.M.
37.00 Cu.M. 10443.25
386400
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Qty.
311891749.xlsSF-Est F
86
Unit
Rate
Amount
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Qty.
Unit
Rate
Amount
42.70
8.00
341.60
17.96
8.00
287.36
4.57
3.26
14.90
17.29
5.94
102.70
or say
1224.85
914963
841.75
57239
1
1
1
1
X
x
x
x
32
2
2
1
1.35
3.11
17.96
27.99
0.6
0.6
0.6
0.6
orsay
746.56 Sqm
747.00 Sqm
25.92
3.73
21.55
16.79
67.99 Sqm
68.00 Sqm
311891749.xlsSF-Est F
1
14
2
1
1
2
1
1
1
1
2
2
1
1
1
1
X
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
20
2
2
2
1
4
3
2
1
2
2
2
2
2
7
7
4.54
4.26
4.88
1.88
1.88
4.26
4.26
6.69
4.26
4.57
3.65
4.12
4.54
8.93
1.53
1.22
87
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
3.20
3.35
3.20
1.12
3.35
1.12
1.12
1.12
3.35
1.20
3.35
3.35
3.20
2.45
2.45
2.45
66.83
91.91
14.37
0.97
1.45
8.78
3.29
3.45
3.28
2.52
11.25
12.70
6.68
10.06
6.04
4.81
Sl.
No.
DESCRIPTION OF ITEM
DEDUCTIONS
D1
W1
ventilators
in toilet block
311891749.xlsSF-Est F
NO'S
1
1
1
1
X
X
X
x
16
48
32
8
1.22
0.90
0.90
3.00
0.23
0.23
0.23
0.23
88
D/H
Qty.
Unit
2.10
-9.43
1.35 -13.41
0.30
-1.99
0.45
-2.48
221.08 Cu.M.
or say 221.10 Cu.M.
Rate
5982.45
Amount
1322720
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Unit
Rate
Amount
Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion (cement:
fine aggregate: Coarse aggregate) using 20mm size Hard Broken Granite
(IS383, 1970) Machine Crushed graded metal from from approved quarry
including cost and conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, including seigniorage charges, sales & other
taxes on all materials, all operational, incidental and labour charges such as
mixing, laying, curing concrete, etc., complete for finished item of work for
Bed Blocks and Hold Fasts (APSS No. 402)
SECOND FLOOR
D1
W1
16
48
X
X
6
4
0.23
0.23
0.23
0.23
0.15
0.15
or say
Qty.
0.76
1.52
2.280 Cu.M.
3.00 Cu.M.
5965.50
17897
45215.55
768664
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as
per IS 1786-1979) of different diameters for RCC works, including labour
charges for straightening, cutting, bending to required sizes and shapes,
placing in position with cover blocks of approved materials and size and
tying and lapsplicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost
and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding wire,
cover blocks and all incidental, operational, laour charges such as cutting,
bending placing in position, tying including sales and other taxes on all
materials etc., complete for finished item of work in all floors. (APSS No.126)
SECOND FLOOR
for coloumns
for roof beams
for roof slab of 125mm thick
for lintals
for sunshades of
600x65mmthick
1
1
1
1
1
X
X
X
X
X
1
1
1
1
1
19.00
37.00
747.00
5.40
68.00
0.125
0.075
100
120
100
80
80
or say
311891749.xlsSF-Est F
89
1900
4440
9338
432
408
16518
16.52
17.00
Mts
Mts
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Qty.
Unit
Rate
Amount
Plastering 20mm thick in two coats with base coat of 16mm thick in CM
(1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including
cost and conveyance of all materials like cement, screened sand, water etc.,
to site, seigniorage charges, sales & other taxes on all materials, all
operational, incidental and labour charges such as mixing mortar,scaffolding
charges, lift charges, finishing,including cutting of Grooves wherever
necessary as directed by Engineer - in - charge, curing, etc., for Uneven
Surfaces of Brick Wall complete for finished item of work. (APSS 901,903 &
904)
SECOND FLOOR- External
Superstructure
For Walls
staircase sides
deduction for ver opening
deduction for ver opening
deduction for doors
deduction for windows
deduction for ventilators
deduction for ventilators
add for passage
add for passage top
toilet block allround
toilet block allround
1
1
1
1
1
1
1
1
2
2
2
1
1
1
1
1
1
1
1
1
1
1
X
X
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
1
2
2
2
1
2
2
2
1
1
1
2
1
2
16
48
8
32
2
2
2
2
42.10
25.81
7.52
17.96
27.99
16.81
5.46
4.57
17.96
18.81
4.88
17.96
27.99
1.88
1.22
0.90
3.00
0.90
4.57
4.57
16.69
5.34
3.65
3.65
3.65
3.65
3.65
3.65
3.65
3.65
3.65
3.65
3.65
2.13
2.13
2.13
2.13
1.37
0.45
0.30
0.23
0.23
3.65
3.65
153.67
188.41
54.90
131.11
102.16
122.71
39.86
33.36
131.11
137.31
35.62
-76.51
-59.62
-8.01
-41.58
-59.18
-10.80
-8.64
2.10
2.10
121.84
38.98
3.09
### Sqm
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6)
and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost
and conveyance of all materials like cement, sand, water etc., to site,
seigniorage charges, sales & other taxes on all materials,all operational,
10
incidental and labour charges such as mixing mortar, scaffolding charges, lift
charges, including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, finishing, curing, etc., for Even Surfaces of brick wall
complete for finished item of work. (APSS 901,903 & 904)
SECOND FLOOR -Internal
Rooms
inside ver
deduction for ver opening
deduction for ver opening
add for toilet connecting
passage
311891749.xlsSF-Est F
1
1
1
1
1
1
1
2
2
X
X
X
x
x
x
x
x
x
14
2
2
2
1
2
1
1
1
18.28
19.52
5.11
17.96
27.99
17.96
27.99
4.57
4.57
90
3.65
3.65
3.65
3.65
3.65
2.13
2.13
1.00
0.23
934.11
142.50
37.30
131.11
102.16
-76.51
-59.62
9.14
2.10
4124.10
426431
Sl.
No.
DESCRIPTION OF ITEM
toilet
inside WC
top of walls
deduction for toilets doors
311891749.xlsSF-Est F
NO'S
1
1
1
1
1
1
1
2
x
x
x
x
x
x
x
x
L
1
1
1
6
6
1
1
6
42.22
11.83
12.43
4.88
5.50
11.83
12.43
0.75
91
D/H
Qty.
Unit
3.65 154.10
2.45 28.98
2.45 30.45
2.45 71.74
2.45 80.85
0.23
2.72
0.23
2.86
2.13 -19.17
### Sqm
or say
### Sqm
Rate
4009.85
Amount
631551
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Qty.
Unit
Ceiling Plastering with CM (1:3) Prop: 12mm thick in single coat spong
finish including cost and conveyance of all materials like cement, sand,
water etc., to site, including seigniorage charges, sales & other taxes on all
11
materials, all operational, incidental charges and labour charges such as
mixing mortar, finishing, curing, etc., complete for finished item of work.
(APSS 901,906)
SECOND FLOOR
rooms
1
X 14
4.26
4.88
291.04
1
X 2
4.88
4.88
47.63
Stair case
1
X 1
4.26
4.88
20.79
Verandah
1
x
2
17.96
1.88
67.53
1
x
1
27.99
1.88
52.62
connecting passage
1
x
1
4.57
1.88
8.59
toilets
1
x
1
4.88 16.23
79.20
2
x
1
5.11
1.88
19.21
1
X 32
1.35
0.60
25.92
1
x
2
3.11
0.60
3.73
1
x
2
17.96
0.60
21.55
1
x
1
27.99
0.60
16.79
slab projection
1
x
1
42.70
0.30
12.81
1
x
2
25.81
0.30
15.49
1
x
2
17.96
0.30
10.78
1
x
1
27.99
0.30
8.40
1
x
2
7.40
0.30
4.44
toilets slab projection
1
x
2
3.97
0.30
2.38
1
x
2
17.29
0.30
10.37
1
x
2
5.34
0.30
3.20
722.49 Sq.M.
or say 723.00 Sq.M.
Providing impervious coat to exposed RCC roof slab surface with CM(1:3),
20mm thick with 1kg of water proof compound per bag of cement laid over
roof when it is green including cost of all materials, seigniorage charges,
12 excluding conveyance charges of materials and including all operational,
incidental and labour charges for mixing mortar, laying, rendering smooth
and thread lining, curing, rounding off junctions of wall and slab etc,,
complete for finished item of work
over central rooms
1
X 1
42.70
8.00
341.60
over side rooms
1
x
2
17.96
8.00
287.36
over connecting passage
1
x
1
4.57
3.26
14.90
over toilet block
1
x
1
17.29
5.94
102.70
746.56 Sqm
or say 747.00 Sqm
311891749.xlsSF-Est F
1
1
X
X
14
2
4.26
4.88
92
4.88
4.88
291.04
47.63
Rate
1915.00
Amount
138455
Sl.
No.
DESCRIPTION OF ITEM
Staircase
Verandah
connecting passage
SECOND FLOOR- Treads
Stair Case
Mid Landing
SECOND FLOOR
NO'S
1
1
1
1
2
X
x
x
x
x
1
2
1
1
1
D/H
4.26
17.96
27.99
4.57
5.11
4.88
1.88
1.88
1.88
1.88
20.79
67.53
52.62
8.59
19.21
21
2.10
0.30
13.23
4.26
1.52
or say
311891749.xlsSF-Est F
Qty.
93
Unit
Rate
6.48
527.12 Sq.M.
528.00 Sq.M. 11091.45
Amount
585629
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Qty.
Unit
Rate
Amount
1
1
1
1
1
1
1
1
1
X
X
X
X
x
x
X
X
x
14
2
2
1
2
1
2
16
2
18.28
19.52
5.11
4.26
17.96
42.10
5.11
1.22
4.57
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
22
2.10
0.15
or say
38.39
5.86
1.53
0.64
5.39
6.32
1.53
-2.93
1.37
6.93
65.03 Sqmt
66.00 Sqmt
11579.35
76424
79.20
-1.20
78.00 sqmts
9628.00
75101
64.60
40.11
54.45
### sqmts 10309.75
164090
1
1
x
x
1
6
16.23
0.40
4.88
0.50
311891749.xlsSF-Est F
94
1.53
1.37
1.65
Sl.
No.
DESCRIPTION OF ITEM
NO'S
L
B
D/H
Qty.
Painting to external walls with Water Proof Cement Paint two (2) coats all
colours and shade as approved by Engineer in charge over a base coat of a
cement primer water base exterior Grade-II of approved brand, makind
three (3) coats in all to give an even shade after thourughly brushing the
15
surface to remove all dirt and remains of loose powdered materials, including
cost and conveyance of all materials to work site and all operational,
incidental, labour charges etc., complete for finished item of work in all
floors
for item
external
walls (SS 911)
qty vide
no.18
722.49
qty vide item no.17
or say
311891749.xlsSF-Est F
95
Unit
###
###
### Sqm
Rate
279.30
Amount
43990
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Qty.
Unit
Rate
Amount
Painting to New External Walls with two coats of Polymer Plastic Emulsion
paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of
approved brand and shade as approved by the Engineer - in - Charge over
base coat of cement primer water base grade -II exterior making three coats
in all to give an even shade after thoroughly brushing the surface to remove
16
all loose powdered materials, including cost and conveyance of all materials,
including cost and conveyance of all materials, cost of brushes, water to site,
etc., sales & other taxes, all operational, incidental and labour charges such
as scaffolding charges, lift charges, curing etc., complete for finished item of
work in all floors for external Walls.(APSS No. 911)
SECOND FLOOR- External
qty vide item no.16 b
or say
###
###
###
1314.90
135961
7699.00
320106
#REF!
#REF!
16
1.22
2.13
41.58
or say
Sqm
41.58 Sqm
WINDOWS
Supply and fixing of Window of Size 0.90 x 1.20 M Four Leaf shutter with
window frame of Medium Teak wood of Section 100 mm x 75 mm and
shutter frame of Medium Teak wood of section 100mm x 32 mm thick and
window planks of medium fiber board exterior both sides laminated 12mm
thick and safety bars of 10 mm square bars at 100mm center to center
18
distance horizantally and Hardware fixtures ie., MSPC Butt Hinges 100mm
Long 12nos, MSPC Handles 125 mm Long 6 Nos MSPC Tower Bolt 150mm
long 6 Nos, MS Hold Fast 4 Nos Including Labour charges for making Window
frame and shutter, fixing of Fixtures etc., and cost and conveyance of all
materials to site, taxes extra complete for finished item of work.
SECOND FLOOR
Windows
48
0.91
1.37
or say
311891749.xlsSF-Est F
96
59.84
59.84 Sqm
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Qty.
Unit
Rate
Amount
Supply and fixing of MS Ventilators of size 1.22 M x 1.22 M with out angular
frame of rolled steel equal angle of ISA 2525 opf size 25 mm x 25mm x 4mm
(2 Nos. horizontally and 2 Nos. vertically) weleded with safety bars of 10 mm
square rods at 100 mm centre to centre horizontally and vertically as per
approved drawing of Enginer-in-Charge including red oxide primer of grade-I
quality, sales and other taxes cost and conveyuance of all materials to site
all labour charges etc complete for finished item of work.
1
3.05
0.45
10.98 Sqm
19 Supply and fixing of PVC doors with all costs,all incidental labour charges etc complete
for toilets main door
1
x
1
1.22
2.13
2.60
for toilet doors
1
x 12
0.75
2.13 19.17
21.77 Sqm
or say
22.00 Sqm
1591.30
17472
3500
77000
974.55
25241
Painting to New Iron work with two coats of ready mixed synthetic enamel
paint first quality all shades over red oxide primer Grade-I making three (3)
coats in all to given and even shade after thourughly brushing the surface to
20 remove all dirt and remains of loose powered materials, including cost and
conveyance of all materials to site, sales & other taxes, incidental,
operational and all labour charges etc., complete for finished item of work.
(APSS No. 1201, 1207 & 1212).in All Floors
DOORS
WINDOWS
16
48
X ###
X 2.75
1.22
0.91
2.13
1.37
#REF!
311891749.xlsSF-Est F
93.55
164.56
258.11
259.00
Sqm
Sqm
Sqm
Sqm
#REF!
97
DESCRIPTION OF ITEM
NO'S
D/H
Qty.
Unit
Rate
Amount
10
1
1
1
X
X
X
40
10
14
0.23
0.23
0.23
0.40
0.40
0.300
3.35
3.35
3.35
206040
1
1
16
X
X
X
16
48
3
1.65
1.35
1.35
0.23
0.23
0.23
0.15
0.15
0.15
or say
12.33
3.08
3.24
18.65
19.00 cum 10844.20
0.91
2.24
2.24
5.39Cu.M.
5.40Cu.M. 10520.05
Main beams
conecting passage
Toilet Block
311891749.xlsFF-Est F
14
2
1
1
1
2
X
X
x
x
x
x
2
2
1
20
2
2
4.26
4.88
4.26
5.34
4.57
3.65
98
0.23
0.23
0.23
0.23
0.23
0.23
0.300
0.300
0.300
0.450
0.450
0.300
8.23
1.35
0.29
11.05
0.95
1.01
56808
Sl.
No.
DESCRIPTION OF ITEM
NO'S
2
311891749.xlsFF-Est F
D/H
4.12
0.23
0.300
99
Qty.
1.14
Unit
Rate
Amount
Sl.
No.
DESCRIPTION OF ITEM
main beams
NO'S
1
1
1
1
1
1
1
1
1
x
x
x
x
x
x
x
x
x
L
5
2
4
4
2
1
1
1
8
5.34
8.47
1.22
1.52
20.47
27.31
4.72
4.26
1.88
D/H
Qty.
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.450
0.300
0.300
0.300
0.400
0.400
0.400
0.400
0.300
2.76
1.17
0.34
0.42
3.77
2.51
0.43
0.39
1.04
36.85Cu.M.
37.00Cu.M. 9608.60
or say
a)
Unit
Rate
Amount
355518
42.70
8.00
341.60
-1
4.26
5.11
-21.77
17.96
8.00
287.36
4.57
3.26
14.90
17.29
5.94
102.70
724.79
or say 725.00
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456
using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges such as
weigh batching, machine mixing, laying concrete, curing etc.,complete
but excluding cost of steel and its fabrication charges for finished item of
work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department including centering,
shuttering, laying concrete, vibrating, curing etc. complete for Slab of
150mm thick
Staircase I flight
1
X 1
3.85
2.10
8.09
Landing
1
X 1
4.26
2.10
8.95
Staircase II flight
1
X 1
3.85
2.10
8.09
25.13
or say
25.50
311891749.xlsFF-Est F
100
Sqm
Sqm
1124.85
815516
Sqm
Sqm
1529.05
38991
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
1
1
1
1
X
x
x
x
32
2
2
1
1.35
3.11
17.96
27.99
0.6
0.6
0.6
0.6
orsay
Rate
Amount
25.92
3.73
21.55
16.79
67.99 Sqm
68.00 Sqm
797.95
54261
8063.15
16126
Unit
Qty.
1.04
1.04 Cum
orsay
2.00 Cum
Brick Masonry in superstructure with CM(1:6)/ (1:8) prop: using second
class bricks from approved source having minimum crushing strength of
40 Kg/Sqcm. including cost and conveyance of all materials like cement,
sand, bricks, water etc., to site, including seigniorage charges, sales &
other taxes on all materials, all operational, incidental and labour
charges such as mixing cement mortar, constructing masonry,
scaffolding charges, lift charges, curing, etc., complete for finished item
of work.
First Floor
For superstructure
1
X 20
4.54
0.23
3.20 66.83
14
x 2
4.26
0.23
3.35 91.91
2
x 2
4.88
0.23
3.20 14.37
above ver beam
1
x 2
1.88
0.23
1.12
0.97
1
x 1
1.88
0.23
3.35
1.45
Ver Entra blature wall
2
x 4
4.26
0.23
1.12
8.78
1
x 3
4.26
0.23
1.12
3.29
1
x 2
6.69
0.23
1.12
3.45
1
x 1
4.26
0.23
3.35
3.28
toilet block c passage
1
x 2
4.57
0.23
1.20
2.52
toilet block
2
x 2
3.65
0.23
3.35 11.25
2
x 2
4.12
0.23
3.35 12.70
1
x 2
4.54
0.23
3.20
6.68
1
x 2
8.93
0.23
2.45 10.06
1
x 7
1.53
0.23
2.45
6.04
311891749.xlsFF-Est F
22
2.10
101
0.30
0.075
Sl.
No.
DESCRIPTION OF ITEM
NO'S
1
311891749.xlsFF-Est F
L
7
1.22
102
B
0.23
D/H
2.45
Qty.
4.81
Unit
Rate
Amount
Sl.
No.
DESCRIPTION OF ITEM
DEDUCTIONS
D1
W1
ventilators
in toilet block
NO'S
Superstructure
For Walls
311891749.xlsFF-Est F
1
1
1
1
1
1
1
X
X
X
x
X
X
x
x
x
x
x
16
48
32
8
1.22
0.90
0.90
3.00
0.23
0.23
0.23
0.23
D/H
Qty.
Unit
Rate
2.10
-9.43
1.35 -13.41
0.30
-1.99
0.45
-2.48
221.08Cu.M.
or say 221.10Cu.M. 5690.20
Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion
(cement: fine aggregate: Coarse aggregate) using 20mm size Hard
Broken Granite (IS383, 1970) Machine Crushed graded metal from from
approved quarry including cost and conveyance of all materials like
9 cement, sand, coarse aggregate, water etc. to site, including seigniorage
charges, sales & other taxes on all materials, all operational, incidental
and labour charges such as mixing, laying, curing concrete,
etc.,
complete for finished item of work for Bed Blocks and Hold Fasts
(APSS No. 402)
First Floor
D1
16 X 6
0.23
0.23
0.15
0.76
W1
48 X 4
0.23
0.23
0.15
1.52
2.280Cu.M.
or say
3.00Cu.M. 5471.95
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500
grade as per IS 1786-1979) of different diameters for RCC works,
including labour charges for straightening, cutting, bending to required
sizes and shapes, placing in position with cover blocks of approved
materials and size and tying and lapsplicing with binding wire of 18 SWG,
forming grills for reinforcement work as per approved designs and
10
drawings, including cost and conveyance of steel bars, including all
wastages such as overlaps, couplings, chairs, spacer bars including cost
and conveyance of binding wire, cover blocks and all incidental,
operational, laour charges such as cutting, bending placing in position,
tying including sales and other taxes on all materials etc., complete for
finished item of work in all floors. (APSS No.126)
First Floor
for coloumns
1
X 1
19.00
100
1900
for roof beams
1
X 1
37.00
120
4440
for roof slab of 125mm
1
X 1 725.00 0.125
100
9063
thick
for Waist slab of 150mm
1
x
1
25.50 0.150
100
383
thick
for lintals
1
X 1
5.40
80
432
for sunshades of
1
X 1
68.00 0.075
80
408
600x65mmthick
16625
16.63 Mts
or say
17.00 Mts 45215.55
Plastering 20mm thick in two coats with base coat of 16mm thick in
CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish
including cost and conveyance of all materials like cement, screened
sand, water etc., to site, seigniorage charges, sales & other taxes on all
11 materials, all operational, incidental and labour charges such as mixing
mortar,scaffolding charges, lift charges, finishing,including cutting of
Grooves wherever necessary as directed by Engineer - in - charge,
curing, etc., for Uneven Surfaces of Brick Wall complete for finished
item of work. (APSS 901,903 & 904)
FIRST FLOOR- External
a
1
1
1
1
1
2
2
2
1
2
2
42.10
25.81
7.52
17.96
27.99
16.81
5.46
103
3.65
3.65
3.65
3.65
3.65
3.65
3.65
153.67
188.41
54.90
131.11
102.16
122.71
39.86
Amount
1258103
16416
768664
Sl.
No.
DESCRIPTION OF ITEM
staircase sides
deduction for ver
opening
deduction for ver
opening
deduction for doors
deduction for windows
deduction for ventilators
deduction for ventilators
add for passage
add for passage top
toilet block allround
toilet block allround
NO'S
1
2
2
2
1
1
1
1
1
1
1
1
1
1
1
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
L
2
1
1
1
2
1
2
16
48
8
32
2
2
2
2
D/H
4.57
17.96
18.81
4.88
17.96
27.99
1.88
1.22
0.90
3.00
0.90
4.57
4.57
16.69
5.34
3.65
3.65
3.65
3.65
2.13
2.13
2.13
2.13
1.37
0.45
0.30
0.23
0.23
3.65
3.65
Qty.
Unit
33.36
131.11
137.31
35.62
-76.51
-59.62
-8.01
-41.58
-59.18
-10.80
-8.64
2.10
2.10
121.84
38.98
3.09
### Sqm
Rate
Amount
3851.40
398234
3737.20
588609
Plastering 12mm thick in two coats with base coat of 8mm thick in CM
(1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish
including cost and conveyance of all materials like cement, sand, water
etc., to site, seigniorage charges, sales & other taxes on all materials,all
12 operational, incidental and labour charges such as mixing mortar,
scaffolding charges, lift charges, including cutting of Grooves wherever
necessary as directed by Engineer - in - charge, finishing, curing, etc.,
for Even Surfaces of brick wall complete for finished item of work. (APSS
901,903 & 904)
FIRST FLOOR -Internal
Rooms
inside ver
deduction for ver
opening
deduction for ver
opening
add for toilet connecting
passage
toilet
inside WC
top of walls
deduction for toilets
doors
1
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
2
X
X
X
x
x
x
x
x
x
x
x
x
x
x
x
x
x
14
2
2
2
1
2
1
1
1
1
1
1
6
6
1
1
6
18.28
19.52
5.11
17.96
27.99
17.96
27.99
4.57
4.57
42.22
11.83
12.43
4.88
5.50
11.83
12.43
0.75
3.65
3.65
3.65
3.65
3.65
2.13
2.13
1.00
0.23
3.65
2.45
2.45
2.45
2.45
0.23
0.23
2.13
or say
311891749.xlsFF-Est F
104
934.11
142.50
37.30
131.11
102.16
-76.51
-59.62
9.14
2.10
154.10
28.98
30.45
71.74
80.85
2.72
2.86
-19.17
### Sqm
### Sqm
Sl.
No.
13
14
a)
a)
DESCRIPTION OF ITEM
NO'S
D/H
Qty.
Unit
Rate
Ceiling Plastering with CM (1:3) Prop: 12mm thick in single coat spong
finish including cost and conveyance of all materials like cement, sand,
water etc., to site, including seigniorage charges, sales & other taxes on
all materials, all operational, incidental charges and labour charges such
as mixing mortar, finishing, curing, etc., complete for finished item of
work. (APSS 901,906)
FIRST FLOOR
rooms
1
X 14
4.26
4.88
291.04
1
X 2
4.88
4.88
47.63
Stair case
1
X 1
4.26
4.88
20.79
Verandah
1
x
2
17.96
1.88
67.53
1
x
1
27.99
1.88
52.62
connecting passage
1
x
1
4.57
1.88
8.59
toilets
1
x
1
4.88 16.23
79.20
2
x
1
5.11
1.88
19.21
1
X 32
1.35
0.60
25.92
1
x
2
3.11
0.60
3.73
1
x
2
17.96
0.60
21.55
1
x
1
27.99
0.60
16.79
slab projection
1
x
1
42.70
0.30
12.81
1
x
2
25.81
0.30
15.49
1
x
2
17.96
0.30
10.78
1
x
1
27.99
0.30
8.40
1
x
2
7.40
0.30
4.44
toilets slab projection
1
x
2
3.97
0.30
2.38
1
x
2
17.29
0.30
10.37
1
x
2
5.34
0.30
3.20
722.49Sq.M.
or say 723.00Sq.M. 1766.35
Flooring and Treads with Polished Bethamcherla coloured stone
minimum 25 mm thick (0.254M x0.254M) set over base coat of CM (1:8)
over already laid CC bed / RCC Roof Slab, including neat cement slurry of
honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat
cement to full depth including cost of all materials like cement, sand, and
water and flooring stones etc., complete, including seigniorage charges,
labour charges for dressing of flooring stones etc., complete for finished
item of work, .
FIRST FLOOR
Class rooms
1
X 14
4.26
4.88
291.04
1
X 2
4.88
4.88
47.63
Staircase
1
X 1
4.26
4.88
20.79
Verandah
1
x
2
17.96
1.88
67.53
1
x
1
27.99
1.88
52.62
connecting passage
1
x
1
4.57
1.88
8.59
2
x
1
5.11
1.88
19.21
FIRST FLOOR- Treads
Stair Case
1
X 21
2.10
0.30
13.23
Mid Landing
FIRST FLOOR
1
X 1
4.26
1.52
6.48
527.12Sq.M.
or say 528.00Sq.M. 10868.75
311891749.xlsFF-Est F
105
Amount
127707
573870
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Qty.
Unit
Rate
Amount
1
1
1
1
1
1
1
1
1
X
X
X
X
x
x
X
X
x
14
2
2
1
2
1
2
16
2
18.28
19.52
5.11
4.26
17.96
42.10
5.11
1.22
4.57
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
38.39
5.86
1.53
0.64
5.39
6.32
1.53
-2.93
1.37
6.93
65.03 Sqmt
66.00 Sqmt 11330.75
74783
79.20
-1.20
78.00sqmts 9372.35
73107
64.60
40.11
54.45
###sqmts10309.75
164090
7.65
7.65 Sqm
or say
8.00 Sqm
Painting to external walls with Water Proof Cement Paint two (2) coats all
colours and shade as approved by Engineer in charge over a base coat
of a cement primer water base exterior Grade-II of approved brand,
makind three (3) coats in all to give an even shade after thourughly
17
brushing the surface to remove all dirt and remains of loose powdered
materials, including cost and conveyance of all materials to work site and
all operational, incidental, labour charges etc., complete for finished item
of work in all floors for external walls (SS 911)
qty vide item no.18
722.49
qty vide item no.17
###
###
or say
### Sqm
311891749.xlsFF-Est F
7.29
106
1.050
7268.30
5815
279.30
43990
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Qty.
Unit
Rate
Amount
Painting to New External Walls with two coats of Polymer Plastic Emulsion
paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality
of approved brand and shade as approved by the Engineer - in - Charge
over base coat of cement primer water base grade -II exterior making
three coats in all to give an even shade after thoroughly brushing the
18 surface to remove all loose powdered materials, including cost and
conveyance of all materials, including cost and conveyance of all
materials, cost of brushes, water to site, etc., sales & other taxes, all
operational, incidental and labour charges such as scaffolding charges,
lift charges, curing etc., complete for finished item of work in all floors for
external Walls.(APSS No. 911)
FIRST FLOOR- External
qty vide item no.16 b
or say
###
###
###
1314.90
135961
Sqm
41.58 Sqm
7699.00
320106
WINDOWS
Supply and fixing of Window of Size 0.90 x 1.20 M Four Leaf shutter
with window frame of Medium Teak wood of Section 100 mm x 75 mm
and shutter frame of Medium Teak wood of section 100mm x 32 mm
thick and window planks of medium fiber board exterior both sides
laminated 12mm thick and safety bars of 10 mm square bars at 100mm
20 center to center distance horizantally and Hardware fixtures ie., MSPC
Butt Hinges 100mm Long 12nos, MSPC Handles 125 mm Long 6 Nos
MSPC Tower Bolt 150mm long 6 Nos, MS Hold Fast 4 Nos Including
Labour charges for making Window frame and shutter, fixing of Fixtures
etc., and cost and conveyance of all materials to site, taxes extra
complete for finished item of work.
FIRST FLOOR
Windows
1
X 48
0.91
1.37
59.84
or say
59.84 Sqm
#REF!
#REF!
1591.30
17472
21 Supply and fixing of PVC doors with all costs,all incidental labour charges etc complete
for toilets main door
1
x
1
1.22
2.13
2.60
for toilet doors
1
x 12
0.75
2.13 19.17
21.77 Sqm
or say
22.00 Sqm
3500
77000
16
1.22
2.13
41.58
or say
311891749.xlsFF-Est F
107
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Qty.
Unit
Rate
Sqm
Sqm
Sqm
Sqm
974.55
Amount
Painting to New Iron work with two coats of ready mixed synthetic
enamel paint first quality all shades over red oxide primer Grade-I
making three (3) coats in all to given and even shade after thourughly
22 brushing the surface to remove all dirt and remains of loose powered
materials, including cost and conveyance of all materials to site, sales &
other taxes, incidental, operational and all labour charges etc., complete
for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors
DOORS
WINDOWS
16
48
X ###
X 2.75
1.22
0.91
2.13
1.37
93.55
164.56
258.11
259.00
#REF!
Asst. Engineer,
TW Bhadrachalam
311891749.xlsFF-Est F
25241
#REF!
108
Executive Engineer
TWD: Bhadrachalam
NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY (V&M) IN
KHAMMAM(Dist.)
DETAIL CUM ABSTRACT ESTIMATE - GROUND FLOOR
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Qty.
Unit
Rate
Amount
10
Earth work excavation for foundations and depositing on bank for all lifts and
with an initial lead of 10m including all operational, incidental, seigniorage
charges, labour charges such as shoring ,sheeting, planking, strutting,
dewatering etc. complete for finished item of work as per SS - 20 B (APSS
308). for Foundation
for Footing F1 to F40
40
2.80
2.80
2.00 627.20
1
1
X
X
10
14
2.80
2.20
2.80
2.20
2.00 156.80
2.00 135.52
1
2
X
X
18
3
4.66
20.47
0.45
0.45
0.450
0.450
16.99
24.87
1
1
1
x
x
x
2
2
5
4.35
16.91
4.66
0.45
0.45
0.45
0.450
0.450
0.450
1.76
6.85
4.72
1
1
x
x
2
4
8.25
1.00
0.45
0.45
0.450
0.450
3.34
0.81
1
1
x
X
4
18
1.31
4.66
0.45
0.45
0.450
0.450
1.06
16.99
Below Flooring
1
1
X
x
14
2
4.22
4.88
4.88
4.88
0.080
0.080
23.06
3.81
in Ver
1
1
x
x
1
2
42.10
17.96
2.10
2.10
0.080
0.080
7.07
6.03
in connecting passage
1
1
x
x
1
1
4.57
16.23
2.10
4.88
0.080
0.080
0.77
6.34
###
cum
###
cum
or say
1
1
X
X
40
10
2.50
2.50
2.50
2.50
0.15
0.15
37.50
9.38
1
1
X
X
14
18
1.90
4.66
1.90
0.45
0.15
0.100
7.58
3.77
2
1
X
x
3
3
20.47
42.10
0.45
0.45
0.100
0.100
5.53
5.68
1
1
1
x
x
x
2
2
5
4.35
16.91
4.66
0.45
0.45
0.45
0.100
0.100
0.100
0.39
1.52
1.05
1
1
x
x
2
4
8.25
1.00
0.45
0.45
0.100
0.100
0.74
0.18
1
1
x
X
4
18
1.31
4.66
0.45
0.45
0.100
0.100
0.24
3.77
Below Flooring
1
1
X
x
14
2
4.22
4.88
4.88
4.88
0.080
0.080
4.73
0.78
in Ver
1
1
x
x
1
2
42.10
17.96
2.10
2.10
0.080
0.080
3.37
2.87
in connecting passage
1
1
x
x
1
1
4.57
16.23
2.10
4.88
0.080
0.080
0.37
1.30
90.75
311891749.xlsGF-Est
109
cum
247.70
258599
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
or say
91.00
Filling with useful available excavated earth (excluding rock) in trenches,
sides of foundations and basement with initial lead in layers not exceeding
15 cm thick, consolidating each deposited layer by watering and ramming
including cost and conveyance of water to work site and all operational,
incidental, labour charges, hire charges of T & P etc., complete for finished
item of work. APSS No.309 & 31
Qty of E.W.E. up to 2M depth
cum
Rate
Amount
3932.55
357862
cum
20.05
19749
cum
246.25
72398
-90.75
###
-8.71
Refilling Required
747.91
296.08
cum
236.86
cum
80%
984.77
or say
985.00
14
in Ver
1
1
x
x
1
1
1
x
x
x
in connecting passage
Unit
###
Qty.
4.22
4.88
0.500 144.16
2
1
4.88
42.10
4.88
2.10
0.500
0.500
23.81
44.21
2
1
1
17.96
4.57
16.23
2.10
2.10
4.88
0.500
0.500
0.500
37.72
4.80
39.60
294.29
or say 294.00
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456
using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as weigh
batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work
(APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including centering, shuttering,
laying concrete, vibrating, curing etc. complete for Footings, Pedastal,
Plinth beam
FOOTINGS
for Footing F1 to F40
for Footing T1 To T10
for Ver Footing
1
1
1
X
X
X
40
10
14
2.80
2.80
1.90
2.80
2.80
1.90
0.45 141.12
0.45 35.28
0.40 20.22
###
PEDASTALS
P1
P2
1
1
X
X
50
14
0.40
0.40
0.60
0.45
0.60
0.60
7.20
1.51
8.71
311891749.xlsGF-Est
110
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Qty.
42.10
20.47
0.23
0.23
0.450
0.450
13.07
12.71
4.66
4.65
0.23
0.23
0.450
0.450
8.68
0.96
Unit
Rate
Amount
PLINTH BEAMS
1
2
X
X
3
3
1
1
X
X
18
2
1
1
x
x
2
5
16.69
4.88
0.23
0.23
0.450
0.450
3.45
2.53
1
1
1
x
x
x
2
4
4
8.47
1.22
1.53
0.23
0.23
0.23
0.300
0.300
0.300
1.17
0.34
0.42
18
4.88
0.23
0.300
6.06
49.40
###
255.00
cum
7671.25
1956169
cum
9063.40
253775
1
1
1
X
X
X
40
10
14
0.23
0.23
0.23
0.40
0.40
0.300
5.00
5.00
5.00
18.40
4.60
4.83
27.83
28.00
311891749.xlsGF-Est
111
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Qty.
Unit
Rate
Amount
1
1
X
X
16
48
1.65
1.35
0.23
0.23
0.15
0.15
0.91
2.24
16
1.35
0.23
0.15
2.24
5.39 Cu.M.
or say
5.40 Cu.M.
8865.35
47873
9204.95
340583
14
2
X
X
2
2
4.26
4.88
0.23
0.23
0.300
0.300
8.23
1.35
1
1
x
x
1
20
4.26
5.34
0.23
0.23
0.300
0.450
0.29
11.05
conecting passage
Toilet Block
1
2
2
x
x
x
2
2
2
4.57
3.65
4.12
0.23
0.23
0.23
0.450
0.300
0.300
0.95
1.01
1.14
main beams
1
1
x
x
5
2
5.34
8.47
0.23
0.23
0.450
0.300
2.76
1.17
1
1
x
x
4
4
1.22
1.52
0.23
0.23
0.300
0.300
0.34
0.42
1
1
x
x
2
1
20.47
27.31
0.23
0.23
0.400
0.400
3.77
2.51
1
1
x
x
1
1
4.72
4.26
0.23
0.23
0.400
0.400
0.43
0.39
1.88
0.23
0.300
Main beams
or say
311891749.xlsGF-Est
112
1.04
36.85 Cu.M.
37.00 Cu.M.
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Qty.
Unit
Rate
Amount
42.70
8.00
341.60
-1
4.26
5.11
-21.77
17.96
8.00
287.36
4.57
3.26
14.90
17.29
5.94
102.70
or say
724.79 Sqm
725.00 Sqm
1077.35
781079
1476.05
37639
752.75
51187
1
1
X
X
1
1
3.85
4.26
2.10
2.10
Staircase II flight
3.85
2.10
8.09
8.95
8.09
25.13 Sqm
or say
25.50 Sqm
1
1
X
x
32
2
1
1
x
x
2
1
1.35
3.11
0.6
0.6
25.92
3.73
17.96
27.99
0.6
0.6
21.55
16.79
orsay
311891749.xlsGF-Est
113
67.99 Sqm
68.00 Sqm
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Qty.
Unit
Rate
Amount
22
2.10
0.30
0.075
orsay
1.04
1.04 Cum
2.00 Cum
7855.90
15712
5690.20
383178
4754.45
1051209
1
14
2
1
1
2
2
1
2
1
1
Ground Floor
For Basement
20
2
2
6
2
2
2
5
6
4
4
20
4.54
4.26
4.88
1.88
4.57
3.65
4.12
4.54
1.22
1.22
1.53
4.54
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.23
0.23
0.23
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
19.07
25.05
4.10
2.37
1.92
3.07
3.46
4.77
2.02
0.67
0.84
67.34
0.23
3.20
66.83
14
2
x
x
2
2
4.26
4.88
0.23
0.23
3.35
3.20
91.91
14.37
1
1
x
x
2
1
1.88
1.88
0.23
0.23
1.12
3.35
0.97
1.45
2
1
x
x
4
3
4.26
4.26
0.23
0.23
1.12
1.12
8.78
3.29
1
1
x
x
2
1
6.69
4.26
0.23
0.23
1.12
3.35
3.45
3.28
1
2
x
x
2
2
4.57
3.65
0.23
0.23
1.20
3.35
2.52
11.25
2
1
1
x
x
x
2
2
2
4.12
4.54
8.93
0.23
0.23
0.23
3.35
3.20
2.45
12.70
6.68
10.06
1
1
x
x
7
7
1.53
1.22
0.23
0.23
2.45
2.45
6.04
4.81
-9.43
X
x
x
x
x
x
x
x
x
x
x
DEDUCTIONS
D1
16
1.22
0.23
2.10
W1
ventilators
1
1
X
X
48
32
0.90
0.90
0.23
0.23
1.35 -13.41
0.30
-1.99
in toilet block
3.00
0.23
0.45
or say
311891749.xlsGF-Est
114
cum
-2.48
221.08 Cu.M.
221.10 Cu.M.
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Qty.
Unit
Rate
Amount
Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion (cement:
fine aggregate: Coarse aggregate) using 20mm size Hard Broken Granite
(IS383, 1970) Machine Crushed graded metal from from approved quarry
including cost and conveyance of all materials like cement, sand, coarse
14
aggregate, water etc. to site, including seigniorage charges, sales & other
taxes on all materials, all operational, incidental and labour charges such as
mixing, laying, curing concrete, etc., complete for finished item of work for
Bed Blocks and Hold Fasts (APSS No. 402)
Ground Floor
D1
W1
16
48
X
X
6
4
0.23
0.23
0.23
0.23
0.15
0.15
or say
0.76
1.52
2.280 Cu.M.
3.00 Cu.M.
5356.40
16069
45215.55
1989484
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as
per IS 1786-1979) of different diameters for RCC works, including labour
charges for straightening, cutting, bending to required sizes and shapes,
placing in position with cover blocks of approved materials and size and
tying and lapsplicing with binding wire of 18 SWG, forming grills for
15 reinforcement work as per approved designs and drawings, including cost
and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding wire,
cover blocks and all incidental, operational, laour charges such as cutting,
bending placing in position, tying including sales and other taxes on all
materials etc., complete for finished item of work in all floors. (APSS No.126)
Ground Floor ::
for foottings
for coloumns
for roof beams
for roof slab of 125mm thick
for Waist slab of 150mm
thick
for lintals
for sunshades of
600x65mmthick
1
1
X
X
1
1
255.00
28.00
100
100
25500
2800
1
1
X
X
1
1
37.00
725.00
120
100
4440
9063
1
1
x
X
1
1
25.50
5.40
0.150
100
80
383
432
68.00
0.075
80
408
43025
0.125
or say
311891749.xlsGF-Est
115
43.03
44.00
Mts
Mts
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Qty.
Unit
Rate
Amount
Plastering 20mm thick in two coats with base coat of 16mm thick in CM
(1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including
cost and conveyance of all materials like cement, screened sand, water etc.,
to site, seigniorage charges, sales & other taxes on all materials, all
16 operational, incidental and labour charges such as mixing mortar,scaffolding
charges, lift charges, finishing,including cutting of Grooves wherever
necessary as directed by Engineer - in - charge, curing, etc., for Uneven
Surfaces of Brick Wall complete for finished item of work. (APSS 901,903 &
904)
Ground Floor- External
a
For basement
Back Side Wall
R/L Side Wall
1
1
X
X
1
2
42.10
25.81
0.60
0.60
25.26
30.97
1
1
x
x
2
2
7.52
17.96
0.60
0.60
9.02
21.55
1
1
x
x
1
2
27.99
16.81
0.60
0.60
16.79
20.17
connecting passage
1
1
x
x
2
2
5.46
4.57
0.60
0.60
6.55
5.48
1
1
x
x
1
1
4.72
4.72
1.2
0.9
0.30
0.15
1.42
0.64
1
1
x
x
1
1
4.72
4.72
0.6
0.3
0.15
0.15
0.42
0.21
138.50
for steps
or say
b
139.00 Sqm
3150.80
43796
3150.80
325792
Superstructure
For Walls
1
1
X
X
1
2
42.10
25.81
3.65 153.67
3.65 188.41
1
1
x
x
2
2
7.52
17.96
3.65 54.90
3.65 131.11
1
1
x
x
1
2
27.99
16.81
3.65 102.16
3.65 122.71
1
1
x
x
2
2
5.46
4.57
staircase sides
2
2
2
x
x
x
1
1
1
17.96
18.81
4.88
3.65 131.11
3.65 137.31
3.65 35.62
1
1
x
x
2
1
17.96
27.99
2.13 -76.51
2.13 -59.62
1
1
x
x
2
16
1.88
1.22
2.13
-8.01
2.13 -41.58
1
1
x
x
48
8
0.90
3.00
1.37 -59.18
0.45 -10.80
1
1
x
x
32
2
0.90
4.57
0.30
0.23
1
1
1
x
x
x
2
2
2
4.57
16.69
5.34
3.65
3.65
39.86
33.36
-8.64
2.10
0.23
2.10
3.65 121.84
3.65 38.98
3.09
### Sqm
311891749.xlsGF-Est
116
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Qty.
Unit
Rate
Amount
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6)
and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost
and conveyance of all materials like cement, sand, water etc., to site,
seigniorage charges, sales & other taxes on all materials,all operational,
17
incidental and labour charges such as mixing mortar, scaffolding charges, lift
charges, including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, finishing, curing, etc., for Even Surfaces of brick wall
complete for finished item of work. (APSS 901,903 & 904)
Ground Floor -Internal
Rooms
14
18.28
3.65 934.11
1
1
X
X
2
2
19.52
5.11
3.65 142.50
3.65 37.30
inside ver
1
1
x
x
2
1
17.96
27.99
1
1
x
x
2
1
17.96
27.99
2
2
x
x
1
1
4.57
4.57
toilet
1
1
1
x
x
x
1
1
1
42.22
11.83
12.43
inside WC
1
1
x
x
6
6
4.88
5.50
2.45
2.45
71.74
80.85
top of walls
1
1
x
x
1
1
11.83
12.43
0.23
0.23
2.72
2.86
0.75
3.65 131.11
3.65 102.16
2.13 -76.51
2.13 -59.62
1.00
0.23
3.65 154.10
2.45 28.98
2.45 30.45
2.13 -19.17
### Sqm
or say
311891749.xlsGF-Est
117
9.14
2.10
### Sqm
3464.40
545643
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Qty.
Unit
Rate
Amount
Ceiling Plastering with CM (1:3) Prop: 12mm thick in single coat spong
finish including cost and conveyance of all materials like cement, sand,
water etc., to site, including seigniorage charges, sales & other taxes on all
18
materials, all operational, incidental charges and labour charges such as
mixing mortar, finishing, curing, etc., complete for finished item of work.
(APSS 901,906)
Ground Floor
rooms
1
1
X
X
14
2
Stair case
Verandah
1
1
X
x
connecting passage
1
1
toilets
slab projection
4.26
4.88
4.88
4.88
291.04
47.63
1
2
4.26
17.96
4.88
1.88
20.79
67.53
x
x
1
1
27.99
4.57
1.88
1.88
52.62
8.59
1
2
x
x
1
1
4.88
5.11
16.23
1.88
79.20
19.21
1
1
X
x
32
2
1.35
3.11
0.60
0.60
25.92
3.73
1
1
1
x
x
x
2
1
1
17.96
27.99
42.70
0.60
0.60
0.30
21.55
16.79
12.81
1
1
x
x
2
2
25.81
17.96
0.30
0.30
15.49
10.78
1
1
x
x
1
2
27.99
7.40
0.30
0.30
8.40
4.44
1
1
x
x
2
2
3.97
17.29
0.30
0.30
2.38
10.37
5.34
0.30
3.20
722.49 Sq.M.
or say
723.00 Sq.M.
1424.60
102999
562111
14
4.26
4.88
291.04
Staircase
1
1
X
X
2
1
4.88
4.26
4.88
4.88
47.63
20.79
Verandah
1
1
x
x
2
1
17.96
27.99
1.88
1.88
67.53
52.62
connecting passage
1
2
x
x
1
1
4.57
5.11
1.88
1.88
8.59
19.21
21
2.10
0.30
13.23
4.26
1.52
or say
311891749.xlsGF-Est
118
6.48
527.12 Sq.M.
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Qty.
Unit
Rate
Amount
1
1
X
X
14
2
18.28
19.52
0.15
0.15
38.39
5.86
staircase sides
1
1
1
X
X
x
2
1
2
5.11
4.26
17.96
0.15
0.15
0.15
1.53
0.64
5.39
1
1
x
X
1
2
42.10
5.11
0.15
0.15
6.32
1.53
1
1
X
x
16
2
1.22
4.57
0.15
0.15
-2.93
1.37
22
2.10
0.15
6.93
ver
or say
65.03 Sqmt
66.00 Sqmt 11082.15
73142
16.23
4.88
79.20
deduction for WC
0.40
0.50
-1.20
78.00 sqmts
8024.80
62595
164090
1.53
64.60
WC
For Bath
1.37
1.65
40.11
54.45
1
1
x
x
6
6
4.88
5.50
Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using 2nd class bricks
having a crushing strength of not less than 35.00kg/cm2 and using two mild
steel bars of 6m dia in every third layer of brick masory, with free joints of
the main block work including cost and seignorage charges and conveyance
21
of all materials and water from approved sources to work site and all
operational, incidental, labour charges such as scaffolding mixing mortor
constructing masonary lift charges, curing etc. complete but excluding the
cost of steel and its fabrication charges
Stair case railing
7.29
1.050
7.65
or say
311891749.xlsGF-Est
119
7.65 Sqm
8.00 Sqm
6679.15
5343
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Qty.
Unit
Rate
Amount
White washing two coats with paint grade white lime for wash or
equivalent quality to give an even shade after thoroughly brushing the
22 surface to remove all dirt and remains of loose powdered materials including
cost of all materials, labour charges and incidental such as scaffolding, lift
charges etc., complete for finished item of work in all floors for walls
qty vide item no.18
722.49
###
###
or say
### Sqm
279.30
43990
1314.90
154238
7699.00
320106
#REF!
#REF!
Painting to New External Walls with two coats of Polymer Plastic Emulsion
paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of
approved brand and shade as approved by the Engineer - in - Charge over
base coat of cement primer water base grade -II exterior making three coats
in all to give an even shade after thoroughly brushing the surface to remove
23
all loose powdered materials, including cost and conveyance of all materials,
including cost and conveyance of all materials, cost of brushes, water to site,
etc., sales & other taxes, all operational, incidental and labour charges such
as scaffolding charges, lift charges, curing etc., complete for finished item of
work in all floors for external Walls.(APSS No. 911)
Ground Floor- External
qty vide item no.16 b
###
138.50
###
or say
###
16
1.22
2.13
41.58
or say
Sqm
41.58 Sqm
WINDOWS
Supply and fixing of Window of Size 0.90 x 1.20 M Four Leaf shutter with
window frame of Medium Teak wood of Section 100 mm x 75 mm and
shutter frame of Medium Teak wood of section 100mm x 32 mm thick and
window planks of medium fiber board exterior both sides laminated 12mm
thick and safety bars of 10 mm square bars at 100mm center to center
26
distance horizantally and Hardware fixtures ie., MSPC Butt Hinges 100mm
Long 12nos, MSPC Handles 125 mm Long 6 Nos MSPC Tower Bolt 150mm
long 6 Nos, MS Hold Fast 4 Nos Including Labour charges for making Window
frame and shutter, fixing of Fixtures etc., and cost and conveyance of all
materials to site, taxes extra complete for finished item of work.
Ground Floor
Windows
48
0.91
1.37
59.84
or say
311891749.xlsGF-Est
120
59.84 Sqm
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Qty.
Unit
Rate
Amount
Supply and fixing of MS Ventilators of size 1.22 M x 1.22 M with out angular
frame of rolled steel equal angle of ISA 2525 opf size 25 mm x 25mm x 4mm
(2 Nos. horizontally and 2 Nos. vertically) weleded with safety bars of 10 mm
square rods at 100 mm centre to centre horizontally and vertically as per
approved drawing of Enginer-in-Charge including red oxide primer of grade-I
quality, sales and other taxes cost and conveyuance of all materials to site
all labour charges etc complete for finished item of work.
1
3.05
0.45
10.98 Sqm
27 Supply and fixing of PVC doors with all costs,all incidental labour charges etc complete
for toilets main door
1
x
1
1.22
2.13
2.60
for toilet doors
1
x 12
0.75
2.13 19.17
21.77 Sqm
or say
22.00 Sqm
1591.30
17472
3500
77000
974.55
25241
Painting to New Iron work with two coats of ready mixed synthetic enamel
paint first quality all shades over red oxide primer Grade-I making three (3)
coats in all to given and even shade after thourughly brushing the surface to
28 remove all dirt and remains of loose powered materials, including cost and
conveyance of all materials to site, sales & other taxes, incidental,
operational and all labour charges etc., complete for finished item of work.
(APSS No. 1201, 1207 & 1212).in All Floors
DOORS
WINDOWS
16
48
X ###
X 2.75
1.22
0.91
2.13
1.37
93.55
164.56
258.11
259.00
Sqm
Sqm
Sqm
Sqm
#REF!
Asst. Engineer,
TW Bhadrachalam
311891749.xlsGF-Est
#REF!
121
Executive Engineer,
TW Divn., Bhadrachalam
GENERAL ABSTRACT
Sl. No.
Description of Item
Amount
1 a)
#REF!
b)
18049
c)
#REF!
2 a)
#REF!
b)
84877
c)
Sanitary arrangements
89785
Sub-Total ::
#REF!
Add VAT 5%
#REF!
#REF!
Assistant Engineer
TWS: Bhadrachalam
311891749.xls GA
122
1855302
#REF!
Supply and fixing of Door size 1.05 x 1.98 M Double Leaf with Door Frame of Medium Teak wood
Section 100 mm x 75 mm and shutter of Plain Particle Board: Exterior Grade - 35mm thick, Hardware
fixtures ie., MSPC Butt Hinges 150mm Long 6 nos, MSPC Handles 150 mm Long 2 Nos MSPC Tower
Bolt 300mm long 1 Nos,MSPC Aldrop 300 mm long 1 no, MS Hold Fast 6 Nos including Including
Labour charges for making of door, fixing of fixtures etc., and cost and conveyance of all materials to
site, taxes extra for finished item of work.
Door Size : 1.05 x 1.98
Door Frame Horizontal
Vertical
1.05
1.98
2.08 Sqm.
1
1
1.05
1.98
0.10
0.10
0.075
0.075
Say
0.008
0.015
0.0230
0.0230
2.079 Sqm
2.08 Sqm
2.08
AB S T RAC T
Sl.
No.
1
Description
Door frame (Medium Teak wood)
Qty.
Rate/Per
Amount
0.02 Cum
76280.00 Cum
1754.44
2.08 Sqm
1034.00 sqm
2150.72
6
6
4
2
2
Nos.
Nos.
Nos.
No.
Nos.
49.00
43.00
49.00
90.00
176.00
Each
Each
Each
Each
Each
294.00
258.00
196.00
180.00
352.00
200.00
2.08 Sq.m
230.00 Sqm
478.40
25%
678.40
169.60
LS
14%
20.00
6053.16
847.44
cum
cum
cum
Cum
6900.60
7748.04
Supply and fixing of Window of Size 0.90 x 1.20 M Four Leaf shutter with window frame of Medium
Teak wood of Section 100 mm x 75 mm and shutter frame of Medium Teak wood of section 100mm x
32 mm thick and window planks of medium fiber board exterior both sides laminated 12mm thick and
safety bars of 10 mm square bars at 100mm center to center distance horizantally and Hardware
fixtures ie., MSPC Butt Hinges 100mm Long 12nos, MSPC Handles 125 mm Long 6 Nos MSPC Tower
Bolt 150mm long 6 Nos, MS Hold Fast 4 Nos Including Labour charges for making Window frame and
shutter, fixing of Fixtures etc., and cost and conveyance of all materials to site, taxes extra complete for
finished item of work.
Window Size :
0.90
Window Frame - Medium Teak wood
Horizontal
2.00
Vertical
2.00
1.20
1.08 Sqm.
0.90
1.20
0.10
0.10
0.075
0.075
0.014
0.018
0.0315
0.0315
cum
cum
cum
Cum
0.032
0.032
0.0029
0.0038
0.007
0.027
0.027
cum
cum
cum
Say
b
0.45
0.60
0.10
0.10
4.00
0.007
Say
0.46
4.00
0.09
0.0874 Sqm
0.09 Sqm
0.36 Sqm
10.00
0.90
9.00 Rmt
Say
For Four shutters
Safety bars 12mm square rods
Horizontal
cum
0.89
0.89 Kg/Rmt
8.01 Kgs
AB S T RAC T
Sl.
No.
Description
1
2
3
4
5
a
b
c
d
e
6(a)
Qty.
Rate/Per
0.0315 cum
76280.00 Cum
2402.82
0.027 cum
76280.00 Cum
2050.41
0.36 Sqm
363.00 sqm
130.68
8.01 Kgs
40.00 Kgs
320.40
4
8
4
4
4
Nos.
Nos.
Nos.
No.
Nos.
49.00
22.00
33.00
37.00
140.00
Each
Each
Each
Each
Each
196.00
176.00
132.00
148.00
560.00
199.00
1.87 Sq.m
230.00 Sqm
25%
430.10
629.10
LS
251.64
20.00
7017.05
982.39
Assistant Engineer
TW: Manuguru
Amount
Superintending Engineer
7999.44
8000.00
Executive Engineer
TWD: Bhadrachalam
GENERAL ABSTRACT
NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT
KAMEPALLY (V&M) IN KHAMMAM(Dist.)
S No.
Description of Item
Estimate
ELECTRIFICATION
0.00
0.00
1282077.00
60000.00
1342077.00
67104.00
Add VAT 5%
6710.00
TOTAL ::
1415891.00
Name of Work
2 - Kitchen Cum Dining
484109.00
Grant
Description of Item
Measurements
Nos.
3
Qty.
Rate
Unit
Amount
10
1
1
1
1
x 18
x 22
x 1
x 8
0.90
0.90
32.60
0.90
0.90
0.90
0.75
0.90
0.90
0.90
0.75
0.90
13.12
16.04
18.34
5.83
x 14
1.90
0.35
0.10
0.93
1.30
0.35
0.10
0.09
0.85
0.35
0.10
0.03
2.00
0.35
0.10
0.07
x 12
1.90
0.35
0.10
0.80
1.20
0.35
0.10
0.04
0.90
0.35
0.10
0.03
1.70
0.35
0.10
0.12
3.00
0.35
0.10
0.11
1.70
0.35
0.10
0.06
0.30
0.35
0.10
0.01
0.35
0.10
0.11
1.60
1.90
0.35
0.10
0.40
1.30
0.35
0.10
0.05
0.35
0.10
0.03
0.90
0.90
0.90
1.46
0.90
0.90
0.90
9.48
0.35
0.10
0.13
0.90
South Side
x 13
1.90
x 10
0.35
0.10
0.67
1.90
1.10
0.35
0.10
0.04
1.10
0.35
0.10
0.04
1.10
0.35
0.10
0.04
68.07
1
1
x 18
x 22
1
1
1
1
x
x
x
x
1
1
1
8
0.90
0.90
0.90
0.90
0.15
0.15
2.19
2.67
15.00
15.00
2.60
0.90
0.75
0.75
0.75
0.90
0.15
0.15
0.15
0.15
1.69
1.69
0.29
0.97
in
between 1
x 14
2.80
0.35
0.075
1.03
East Side
Column
East Side
Column
North Side
Column
North Side
Column
North Side
Column
North Side
Column
North Side
Column
North Side
Column
in
between 1
2.20
0.35
0.075
0.12
in
between 1
1.75
0.35
0.075
0.05
in between 1
2.90
0.35
0.075
0.08
in between 1
x 12
2.80
0.35
0.075
0.88
in between 1
2.10
0.35
0.075
0.06
in between 1
1.80
0.35
0.075
0.05
in between 1
2.60
0.35
0.075
0.14
in between 1
3.90
0.35
0.075
0.10
North Side
columns
North Side
columns
in between 1
2.60
0.35
0.075
0.07
in between 1
1.20
0.35
0.075
0.03
North Side
columns
in between 1
2.50
0.35
0.075
0.13
2.80
0.35
0.075
0.44
266.00
Cum
18107.00
2.20
0.35
0.075
0.06
1.80
0.35
0.075
0.05
0.90
0.90
0.15
0.24
0.90
0.90
0.15
1.58
0.35
0.075
0.15
0.35
0.075
0.74
South Side
x 13
x 10
2.80
2.80
2.00
0.35
0.075
0.05
2.00
0.35
0.075
0.05
2.80
0.35
0.075
0.07
15.67
23.20
0.30
0.050
0.35
East Side
6.45
0.30
0.050
0.10
East Side
24.30
0.30
0.050
0.36
East Side
5.85
0.30
0.050
0.09
North Side
18.20
0.30
0.050
0.27
North Side
23.25
0.30
0.050
0.35
North Side
5.50
0.30
0.050
0.08
North Side
4.00
0.30
0.050
0.06
North Side
4.30
0.30
0.050
0.06
5.65
0.30
0.050
0.08
West Side
32.60
0.30
0.050
0.49
South Side
4.65
0.30
0.050
0.07
South Side
18.20
0.30
0.050
0.27
South Side
32.50
0.30
0.050
0.49
4176.35
Cum
65443.00
South Side
5.40
0.30
0.050
0.08
-1
1.20
0.30
0.050
-0.02
3.18
5356.40
Cum
17033.00
6262.52
Cum
72708.00
9117.00
Cum
110407.00
PCC (1:3:6) using 60% of 40mm HBG metal and 40% 0f 20mm
HBG machine crushed metal including cost and conveyance of
all materials, centering charges, labour charges and curing fo
Side Walls
Qty VP No: 10 of MB No: 6671/C/TW
West Side Retaining Wall
15.00
0.60
0.600
5.40
15.00
0.60
0.600
5.40
2.60
0.60
0.600
0.94
-1
0.23
0.23
0.600
-0.13
11.61
Vibrated
Reinforced
Cement
Concrete
M25
Grade
corresponding to IS 456 using 20mm size graded machine
crushed hard granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on
all materials including all operational, incidental and labour
charges such as weigh batching, machine mixing, laying
concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work (APSS No. 402)
with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including centering,
shuttering, laying concrete, vibrating, curing etc. complete
for FOOTINGS
Qty VP No: 4 of MB No: 6671/C/TW
x 18
0.90
0.90
0.225
3.28
1
1
1
x 22
x 4
x 8
0.90
0.75
0.90
0.90
0.75
0.90
0.225
0.225
0.225
4.01
0.51
1.46
0.90
0.90
0.225
0.36
x 11
0.90
0.90
0.225
2.00
0.90
0.90
0.300
0.49
For
South
Pillar
Side Gate 1
12.11
Plinth
Plinth
Beam
Beam
East 1
East 1
x
x
1
1
23.20
6.45
0.23
0.23
0.30
0.30
1.60
0.45
x
x
1
1
24.30
18.20
0.23
0.23
0.30
0.30
1.68
1.26
23.25
0.23
0.30
1.60
5.50
0.23
0.30
0.38
4.00
0.23
0.30
0.28
4.30
0.23
0.30
0.30
5.65
0.23
0.30
0.39
32.60
0.23
0.30
2.25
4.65
0.23
0.30
0.32
18.20
0.23
0.30
1.26
5.85
0.23
0.30
0.40
32.50
0.23
0.30
2.24
5.40
0.23
0.30
0.37
14.78
for Column
Qty VP No: 4 of MB No: 6671/C/TW
Column up to GL South 1
Side
Column
EastSide
up
to
GL 1
Column
EastSide
up
to
GL 1
0.23
0.23
0.40
0.17
x 12
0.23
0.23
0.40
0.25
0.23
0.23
0.30
0.10
Column up to GL North 1
Side
x 16
0.23
0.23
0.40
0.34
Column up to GL North 1
Side
0.23
0.23
0.30
0.10
Column up to GL
Side
0.23
0.23
0.35
0.07
West 1
0.23
0.23
1.80
0.76
0.23
0.23
1.80
0.19
0.23
0.23
1.80
0.76
x 15
0.23
0.23
1.80
1.43
0.23
0.23
1.80
0.19
0.23
0.23
1.80
0.19
0.23
0.23
1.80
0.29
x 13
0.23
0.23
1.80
1.24
0.23
0.23
1.80
0.19
0.23
0.23
1.80
0.57
11212.35
Cum
165719.00
0.23
0.23
0.400
0.04
0.23
0.23
0.300
0.03
Side Gate 1
0.35
0.35
0.400
0.10
0.23
0.23
0.400
0.19
0.23
0.23
1.950
0.21
For
South
Pillar
x 18
0.23
0.23
0.150
0.14
x 16
0.23
0.23
0.150
0.13
0.23
0.23
0.300
0.10
x 13
0.23
0.23
0.150
0.10
0.23
0.23
0.150
0.06
x 11
0.23
0.23
1.950
1.13
0.35
0.35
1.950
0.48
9.55
10618.45
Cum
101406.00
20.05
Cum
787.00
246.25
Cum
0.00
68.07
-15.67
-12.11
-1.03
39.26
Toilet
6
x 16
1.20
1.20
0.50
0.00
0.00
in
between 1
x 14
2.80
0.15
1.80
10.58
Est Side
Column
in
between 1
2.20
0.15
1.80
1.19
Est Side
Column
in
between 1
1.75
0.15
1.80
0.47
Est Side
Column
in
between 1
2.90
0.15
1.80
0.78
x 12
2.80
0.15
1.80
9.07
2.10
0.15
1.80
0.57
1.80
0.15
1.80
0.49
2.60
0.15
1.80
1.40
3.90
0.15
1.80
1.05
in between 1
2.60
0.15
1.80
0.70
in between 1
1.20
0.15
1.80
0.32
in between 1
2.50
0.15
1.80
1.35
in between 1
0.15
1.80
0.27
in between 1
1 (1.20+0
.90)/2
x 12
2.80
0.15
1.80
9.07
in between 1
2.80
0.15
1.80
4.54
in between 1
2.20
0.15
1.80
0.59
in between 1
1.80
0.15
1.80
0.49
2.80
0.15
1.95
1.64
in
between 1
x 14
2.80
0.15
0.15
0.88
Est Side in
Column Raising
Est Side in
Column Raising
Est Side in
Column Raising
Narth Side in
Column Raising
between 1
2.20
0.15
0.15
0.10
between 1
1.75
0.15
0.15
0.04
between 1
2.90
0.15
0.15
0.07
between 1
2.80
0.15
0.25
0.84
2.80
0.15
0.30
0.50
2.10
0.15
0.30
0.09
1.80
0.15
0.30
0.08
0.25
0.15
0.20
0.15
0.15
0.09
0.15
0.15
0.06
0.15
0.15
0.03
0.15
0.15
0.11
0.15
0.15
0.02
0.15
0.15
0.76
0.15
1.00
0.72
0.15
0.25
0.63
0.15
0.25
0.08
0.15
0.15
0.04
0.15
1.90
8.78
0.15
1.95
0.59
2.00
0.15
1.95
0.59
1.20
0.15
1.95
-0.35
59.52
5901.95
Cum
351284.00
57935.55
MT
153297.00
0.906
1.110
0.370
0.260
2.646
Ellies pattern flooring with CC(1:4:8)pro 80mm th with 40mm HG M/C metal
and CC(i:2:4)pro 40mm th with 20mm HG M/C metal and neatcement finishing
i/c c/c of all materials and labour charges etc
5.64
0.90
0.00
0.00
5550.69
10
Sqm
0.00
297.20
10
Sqm
12091.00
White washing SIngle coats with paint grade white lime for wash or
equivalent quality to give an even shade after thoroughly brushing the surface
to remove all dirt and remains of loose powdered materials including cost of all
materials, labour charges and incidental such as scaffolding, lift charges etc.,
complete for finished item of work in all floors for walls
East Side
23.20
1.95
45.24
East Side
6.45
1.95
12.58
East Side
30.15
1.95
58.79
Narth Side
18.20
1.95
35.49
Narth Side
16.50
2.10
34.65
Narth Side
6.75
1.95
13.16
Narth Side
4.00
1.95
7.80
Narth Side
4.30
1.95
8.39
Narth Side
5.65
1.95
11.02
32.60
1.95
63.57
South Side
4.65
1.95
9.07
South Side
18.20
1.95
35.49
South Side
32.50
1.95
63.38
South Side
5.40
1.95
10.53
-1
1.20
1.95
-2.34
Deduct Gate
406.82
23.20
1.95
45.24
East Side
6.45
1.95
12.58
East Side
30.15
1.95
58.79
Narth Side
18.20
1.95
35.49
Narth Side
16.50
2.10
34.65
Narth Side
6.75
1.95
13.16
Narth Side
4.00
1.95
7.80
Narth Side
4.30
1.95
8.39
Narth Side
5.65
1.95
11.02
32.60
1.95
63.57
South Side
4.65
1.95
9.07
South Side
18.20
1.95
35.49
South Side
32.50
1.95
63.38
South Side
5.40
1.95
10.53
-1
1.20
1.95
-2.34
Deduct Gate
406.82
1432.00
10
Sqm
58257.00
3150.80
10
Sqm
109657.00
Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6)
and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and
conveyance of all materials like cement, screened sand, water etc., to site,
seigniorage charges, sales & other taxes on all materials, all operational,
incidental and labour charges such as mixing mortar,scaffolding charges, lift
charges, finishing,including cutting of Grooves wherever necessary as directed
by Engineer - in - charge, curing, etc., for Uneven Surfaces of Brick Wall
complete for finished item of work. (APSS 901,903 & 904)
23.20
1.95
45.24
East Side
6.45
1.95
12.58
North Side
18.20
1.95
35.49
North Side
16.50
2.10
34.65
North Side
6.75
1.95
13.16
North Side
4.00
1.95
7.80
North Side
4.30
1.95
8.39
North Side
5.65
1.95
11.02
West Side
32.60
1.95
63.57
4.65
1.95
9.07
South Side
18.20
1.95
35.49
South Side
32.50
1.95
63.38
South Side
5.40
1.95
10.53
-1
1.20
1.95
-2.34
348.03
East Side
23.20
1.95
45.24
East Side
6.45
1.95
12.58
North Side
18.20
1.95
35.49
North Side
16.50
2.10
34.65
North Side
6.75
1.95
13.16
North Side
4.00
1.95
7.80
North Side
4.30
1.95
8.39
North Side
5.65
1.95
11.02
West Side
32.60
1.95
63.57
South Side
4.65
1.95
9.07
South Side
18.20
1.95
35.49
South Side
32.50
1.95
63.38
South Side
5.40
1.95
10.53
-1
1.20
1.95
-2.34
348.03
1318.30
10
Sqm
45881.00
Assistant Engineer,
TWS-Bhadrachalam.
Sl.
No
.
DESCRIPTION OF
ITEM
No's
D/H
1
1
Quantity UNIT
1
1
1
X
X
X
0.90
0.90
0.90
2.19
1
1
3.00
15.00
0.30
0.30
0.60
0.30
0.54
1.35
4.08 Cum
10
247.70
1011.00
3268.95
4021
20.05
200
246.25
359
7671.25
3728
Amount
Earth work excavation for foundations and depositing on bank for all lifts and with an
initial lead of 10m including all operational, incidental, seigniorage charges, labour
charges such as shoring ,sheeting, planking, strutting, dewatering etc. complete for
finished item of work as per SS - 20 B (APSS 308). for Building Foundation
For Footings
Rate
1
1
X
X
3
1
0.90
3.00
0.90
0.30
0.10
0.10
15.00
0.30
0.10
0.24
0.09
0.90
1.23 Cum
Filling with useful available excavated earth (excluding rock) in trenches, sides of
foundations and basement with initial lead in layers not exceeding 15 cm thick,
consolidating each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour charges, hire
charges of T & P etc., complete for finished item of work. APSS No.309 & 31
E/W/E - PCC+Fottings+Column
9.98 Cum
Filling with Gravel in trenches, sides of foundations and basement with initial lead in
layers not exceeding 15cm thick, consolidating each deposited layer by watering and
ramming including all operational, incidental, labour charges, seignorage charges, hire
charges of T & P etc., complete for finished item of work. APSS No.309 & 310
Basement filing
3 0.9
0.9
0.6
1.46
1.46 Cum
0.90
0.90
Page 139
0.200
0.49
0.49 Cum
Sl.
No
.
DESCRIPTION OF
ITEM
No's
D/H
1
6
Drain
0.23
0.23
2.50
0.40
0.40 Cum
1
1
1
x
x
X
2
2
2
3.00
0.23
0.70
2.54
15.00
0.23
0.10
0.70
0.30
10
9063.40
3596.00
4754.45
12789.00
45215.55
1130
3464.40
5485
0.97
0.82
0.90
2.69 Cum
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS
1786-1979) of different diameters for RCC works, including labour charges for
straightening, cutting, bending to required sizes and shapes, placing in position with
cover blocks of approved materials and size and tying and lapsplicing with binding
wire of 18 SWG, forming grills for reinforcement work as per approved designs and
drawings, including cost and conveyance of steel bars, including all wastages such as
overlaps, couplings, chairs, spacer bars including cost and conveyance of binding
wire, cover blocks and all incidental, operational, laour charges such as cutting,
bending placing in position, tying including sales and other taxes on all materials etc.,
complete for finished item of work in all floors. (APSS No.126)
0.025 Mts
0.025 Mts
9
Amount
Brick Masonry in superstructure with CM (1:8) prop: using second class bricks of size
23 x 11 x 7 Cm from approved source having minimum crushing strength of 40
Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks,
water etc., to site, including seigniorage charges, sales & other taxes on all materials,
all operational, incidental and labour charges such as mixing cement mortar,
constructing masonry, scaffolding charges, lift charges, curing, etc., complete for
finished item of work.
For Long Wall
For Cross Wall
Rate
Quantity UNIT
Plastering to even surfaces of wall with CM(1:4) Prop: 12mm thick in single coat
including cost and conveyance of all materials like cement, sand, water etc., to site,
including seigniorage charges, sales & other taxes on all materials, all operational,
incidental charges and labour charges such as mixing mortar, finishing, curing, etc.,
complete for finished item of work. (APSS 901,906)
For Long Wall
For Cross Wall
1
1
x
x
2
2
3.00
2.54
0.40
0.40
Drain
For Columns Alround
1
1
X
X
1
3
15.00
2.50
0.30
0.92
Page 140
2.40
2.03
4.50
6.90
15.83 10 Sqm
Sl.
No
.
10
DESCRIPTION OF
ITEM
No's
D/H
Quantity UNIT
Amount
10
Supply and Delivary of MS 40mm dia Medium weight pipes including all material to
site, all labour charges and fixing in position for etc, complete for finished iteam of
work
MS Pipe 40mm dia
10.67
53.35
350.00 Kg
11
Rate
65.00
22750.00
65.00
5525.00
515.47
25135
Supply and Delivary of MS 50mm dia Medium weight pipes including all material to
site, all labour charges and fixing in position for etc, complete for finished iteam of
work
MS Pipe 50mm dia
4.57
13.71
85.00 Kg
12 Roofing with Galvanized Trapezoidal profile roofing sheet with 0.50 mm thick fixed
with G.IJbolts & nuts 8mm dia with bitumen & G.I limpet washers filled with white
lead & including acoatof approved steel primer and two coats of approved paint on
over lapping of sheets complete (uptoapitchof600) and seigniorage charges,etc.,
complete, excluding the cost of purlins, rafters, trusses & cost of conveyance of all
materials.
1
10.67
4.57
48.76
48.76 Sqm
13 Ellispattern flooring with CC(1:5:10) using 40mm HBG metal of 80mm thick and top
with CC(1:2:4) using 20 mm HBG metal of 40mm thick and top finish with CM(1:3) of
0.07 cum/10 sqm and cement slurry 3.30 kg/10 sqm including cost and conveyance of
all materials of all materials etc., complete.
1
3.00
3.00
9.00
9.00
10
Sqm
5055.52
4550.00
14 Jungle Clearance Cleaning of open place including all Charges etc, complete
9721.00
Total :
Asst Engineer
TW Bhadrachalam
Dy Exe Engineer
TW SD, Bhadrachalam
Page 141
100000.00
Exe Engineer
TW Div-Bhadrachalam.
NAME OF THE WORK : PROVIDING SANITARY & WATER SUPPLY AND DRAINAGE FACILITIES TO TOILET
BLOCK AT STREE SHAKTHI BUILDING AT BHADRACHALAM (V&M)
S
No.
Description of Item
Measurements
Nos.
3
Qty.
Rate
Unit
Amount
10
Supplying & fixing SWR Nahani traps 1st quality including cost and
conveyance of all materials to site, all labour charges, sales and
other taxes on all materials etc., complete for finished item of
work. (APSS No 1326) for All Floors.
For Urinal
3.00
3.00
10
Rmt
3843.00
4186.10
Each
16744.00
258.00
Each
1548.00
6.85
Litre
6850.00
212.00
Rmt
21200.00
35.50
Each
355.00
6.00
6.00
Providing
RCC Storage Tank with cover and suitable locking
arrangement & making necessary holes for inlet & outlets and
over flow pipes but without fittings & base support for tanks
1
1000.00
###
###
SSupplying and fixing 1" dia CPVC Elbow including cost and
conveyance of all materials to site, all labour charges, sales and
other taxes on all materials etc., complete for finished item of
work
1 x 10
-
10.00
10.00
Supplying & Fixing 12.7mm N.P bib tap Indian make 300 grams
Seiko / Nice/ Senior or equivalent including cost and conveyance of
all materials to site, all labour charges, sales and other taxes on all
materials etc., complete for finished item of work for All Floors.
For Toilts
384.33
4.00
4.00
336.00
Each
10.00
10.00
112.00
Supplying and fixing 1" dia CPVC "T" Bend including cost and
conveyance of all materials to site, all labour charges, sales and
other taxes on all materials etc., complete for finished item of
work
10
10.00
10.00
430.00
29.50
Each
443.00
38.50
Each
462.00
288.00
Each
1440.00
180.00
Each
720.00
5.00
5.00
12 Supplying and fixing 1" dia CPVC Tank Nipple including cost and
conveyance of all materials to site, all labour charges, sales and
other taxes on all materials etc., complete for finished item of
work
1 x
4
-
Each
12.00
12.00
11 Supplying and fixing 1" dia CPVC Ball Valve including cost and
conveyance of all materials to site, all labour charges, sales and
other taxes on all materials etc., complete for finished item of
work
1 x
5
-
15.00
15.00
43.00
4.00
4.00
LEAD CHART
NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY (V&M) IN KHAMMAM(Dist.)
AS PER SCHEDULE OF RATES FOR BUILDINGS / IRRIGATION FOR THE YEAR 2015 - 2016
25%
Agency
Initial Cost Loading Unloading
Allowance
Conveyance excluding
Charges
Charges
on Loading
Charges
Seigionarage (Manual (Mechanical & Unloading
Charges
means)
means)
manual
means
6
7
8
9
10
Sl.
No.
Description
Index code
Source of
Material
Lead in
Km
27
Pg. No. 22
Gommuru
7.00
68.07
560.00
27
Pg. No. 22
Gommuru
7.00
68.07
28
Pg. No. 22
Gommuru
7.00
Gravel
M008
Pg. No. 32
Local
R.R. Stone(Granite,
Dolamite &Trap
variety)
M148
Pg. No. 42
Allowance
Total
Unit per
Remarks
11
12
13
0.00
628.07
Cum.
560.00
0.00
628.07
Cum.
68.07
760.00
0.00
828.07
Cum.
10.00
101.19
103.00
0.00
204.19
Cum.
Local
10.00
101.19
252.00
0.00
353.19
Cum.
M 050
Pg. No. 34
Thoggudem
28.00
299.91
735.00
0.00
1034.91
Cum.
M 051
Pg. No. 34
Thoggudem
28.00
299.91
935.00
0.00
1234.91
Cum.
M 052
Pg. No. 34
Thoggudem
28.00
299.91
1097.00
0.00
1396.91
Cum.
M 053
Pg. No. 34
Thoggudem
28.00
299.91
1365.00
0.00
1664.91
Cum.
M 054
Pg. No. 34
Thoggudem
28.00
299.91
1313.00
0.00
1612.91
Cum.
10
M 055
Pg. No. 35
Thoggudem
28.00
299.91
845.00
0.00
1144.91
Cum.
11
TBSC-A.I-01
Gondigudem
30.00
517.42
5000.00
46.10
46.10
23.05
5632.67
1000
Nos
Loading &
Unloading Manual
means
12
Polished Bethamcherla
coloured stone
minimum 25 mm thick
(0.254M x0.254M)
TBSC-B.I-08
Betham
Cherla
550.00
1877.60
3860.00
33.40
16.75
12.54
5800.29
10 Sqm.
Loading &
Unloading Manual
means
13
TBSC-B.III-01
Khammam
125.00
290.43
31830.00
33.40
16.75
12.54
32183.12
10 Sqm.
14
Polished Shahabad
(Tandur Blue) stones of
15 to 18mm thick
(0.457M x0.304M)
TBSC-B.I-03
Tandur
500.00
1127.60
1650.00
33.40
16.75
12.54
2840.29
10Sqm.
15
Shahabad/Tandur/Rou
gh stone slabs
minimum 40mm thick
TBSC-B.I-02
Tandur
500.00
2733.56
1240.00
33.40
16.75
12.54
4036.25
10Sqm.
16
TBSC-B.I-06
Kadapa
750.00
1532.46
1380.00
33.40
16.75
12.54
2975.15
10Sqm.
17
Ordinary Portland
Cement 43 Grade
At Site
0.00
6100.00
0.00
55.40
13.85
6169.25
M.T
18
At Site
0.00
42000.00
0.00
66.30
16.58
42082.88
M.T
-do-
19
At Site
0.00
34000.00
0.00
66.30
16.58
34082.88
M.T
-do-
20
At Site
0.00
40000.00
0.00
66.30
16.58
40082.88
M.T
-do-
Loading &
Unloading Manual
means
Unloading Manual
means
21
M.S. Plates
At Site
0.00
41000.00
0.00
66.30
16.58
41082.88
M.T
-do-
Note :- Rates of CEMENT and STEEL for the Month of August 2015 Vide GO.No. G.O.RT.No. 453 Dated: 18.09.2015
CERTIFICATES:1
Certified that the above leads are true and correct to the best of my knowledge
Certified that the quarry requries blasting for RR, CRS, 6mm, 10mm, 12mm, 20mm & 40mm Metal
Certified that the 40mm, 20mm, 12mm, 10mm, 6mm Metal requires Machine Crushing
Certified that the work spot falls within the limits of Agency area. Hence 25 % on labour is proposed and the same may be allowed.
Certified that mandal average leads are adopted for this work.
GRADED METAL OF 20mm for Concrete Work
6mm
10mm
12mm
20mm
Asst. Engineer,
TW Bhadrachalam
10%
15%
15%
60%
1034.91
1234.91
1396.91
1664.91
6mm
10mm
12mm
20%
20%
60%
1034.91
1234.91
1396.91
206.98
246.98
838.15
1292.11
415.00
370.00
310.00
310.00
480.00
370.00
Executive Engineer,
TW Divn., Bhadrachalam
Superintending Engineer
Tribal Welfare, Warangal
NAME OF THE WORK : CONSTRUCTION OF COMPOUND WALL TO AHS (G) AT KAMEPALLY (V&M)
IN KHAMMAM(Dist.)
DATAS AS PER A.P.REVISED STANDARD DATA FOR BUILDINGS - PART-III
VIDE G.O.MS.NO.49, I&CAD (PW: Reforms) Department dt.02-03-2009
WITH SCHEDULE OF RATES FOR BUILDING / IRRIGATION WORKS FOR THE YEAR 2015 - 2016
13.615%
BLDCSTN
- 1-3
Page - 14
Amount
Kg
Cum
720.00
1.05
6169.25
628.07
MT
Cum
4441.86
659.47
Day
25%
0.20
62.00
310.00
Day
62.00
15.50
5178.83
Kg
Cum
480.00
1.05
6169.25
628.07
MT
Cum
2961.24
659.47
Day
25%
0.20
62.00
310.00
Day
62.00
15.50
3698.21
Kg
Cum
360.00
1.05
6169.25
628.07
MT
Cum
2220.93
659.47
Day
25%
0.20
62.00
310.00
Day
62.00
15.50
2957.90
Kg
Cum
288.00
1.05
6169.25
628.07
MT
Cum
1776.74
659.47
Day
25%
0.20
62.00
310.00
Day
62.00
15.50
2513.72
Kg
Cum
240.00
1.05
6169.25
628.07
MT
Cum
1480.62
659.47
Day
25%
0.20
62.00
310.00
Day
62.00
15.50
2217.59
Cement Mortar(1:5)
Unit : Cum
A. Materials
Cement
Sand (Including 5% Wastage)
B.Labour
Man mazdoor for mixing mortar
Add Agency Allowance
Grand Total
BLDCSTN
- 1-7
Page - 15
Per
Cement Mortar(1:4)
Unit : Cum
A. Materials
Cement
Sand (Including 5% Wastage)
B.Labour
Man mazdoor for mixing mortar
Add Agency Allowance
Grand Total
BLDCSTN
- 1-6
Page - 15
Rate
Cement Mortar(1:3)
Unit : Cum
A. Materials
Cement
Sand (Including 5% Wastage)
B.Labour
Man mazdoor for mixing mortar
Add Agency Allowance
Grand Total
BLDCSTN
- 1-5
Page - 15
Qty
Cement Mortar(1:2)
Unit : Cum
A. Materials
Cement
Sand (Including 5% Wastage)
B.Labour
Man mazdoor for mixing mortar
Add Agency Allowance
Grand Total
BLDCSTN
- 1-4
Page - 14
Unit
Cement Mortar(1:6)
Unit : Cum
A. Materials
Cement
Sand (Including 5% Wastage)
B.Labour
Man mazdoor for mixing mortar
Add Agency Allowance
Grand Total
148
BLDCSTN
- 1-8
Page - 15
Cement Mortar(1:8)
Unit : Cum
A. Materials
Cement
Sand (Including 5% Wastage)
B.Labour
Man mazdoor for mixing mortar
Add Agency Allowance
Grand Total
BLDCSTN
- 2-1
Page - 16
Kg
Cum
180.00
1.05
6169.25
628.07
MT
Cum
1110.47
659.47
Day
25%
0.20
62.00
310.00
Day
62.00
15.50
1847.44
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m
including all operational, incidental, seigniorage charges, labour charges such as shoring ,sheeting,
planking, strutting, dewatering etc. complete for finished item of work as per SS - 20 B (APSS 308). for
Building Foundation
Orinary soil - Manual means upto 3mts. Depts
Unit : Cum
Taking output = 10 Cum
a.Labour
Mate
Day
0
Mazdoor(Unskilled)
Day
3.64
Add 75% for building foundation
Add Agency Allowance
25%
1128.40
Sub-Total ::
b) Add 13.615 % Overhead& Contractors profit on (a+b)
c) Seigniorage charges
cum
10
Cost for 10 Cum = a+b
Rate per Cum = a+b/10
Rate per Cum
BLDCSTN
- 2-1
Page - 16
Day
Day
13.615%
22.00
2256.80
cum
0.00
1128.40
846.30
282.10
2256.80
0.00
220.00
2476.80
247.68
247.70
Earth work excavation for Septic tank and depositing on bank for all lifts and with an initial lead of 10m
including all operational, incidental, seniorage charges, labour charges such as shoring ,sheeting,
planking, strutting, dewatering and back filling etc. for finished item of work as per SS - 20 B (APSS
308).
Orinary soil - Manual means upto 3mts. Depts
Unit : Cum
Taking output = 10 Cum
a.Labour
Mate
Day
0
Mazdoor(Unskilled)
Day
3.64
Add Agency Allowance
25%
1128.40
Sub-Total ::
b) Add 13.615 % Overhead& Contractors profit on (a+b)
c) Seigniorage charges
cum
10
Cost for 10 Cum = a+b
Rate per Cum = a+b/10
Rate per Cum
BLDCSTN
- 2-8
Page - 18
0.00
310.00
0.00
310.00
Day
Day
13.615%
22.00
1410.50
cum
0.00
1128.40
282.10
1410.50
192.04
220.00
1822.54
182.25
182.30
Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by
watering and ramming including cost and conveyance of water to work site and all operational,
incidental, labour charges, hire charges of T & P etc., complete for finished item of work. APSS No.309
& 310
Unit :Cum
Taking output = 6 cum
a.Labour
Mate
Mazdoor(Unskilled)
Add Agency Allowance
Day
Day
25%
0.00
0.31
96.10
149
0.00
310.00
Day
Day
13.615%
120.13
0.00
96.10
24.03
120.13
0.00
120.13
20.02
20.05
BLDCSTN
- 2-8
Page - 18
Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not
exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all
operational, incidental, labour charges, seignorage charges, hire charges of T & P etc., complete for
finished item of work. APSS No.309 & 310
Unit :6 Cum
a.Labour
Mate
Mazdoor(Unskilled)
Add Agency Allowance
Day
Day
25%
0.00
0.31
96.10
0.00
310.00
Day
Day
0.00
96.10
24.03
b. Material
Gravel
cum
6.00
204.19
cum
13.615%
22.00
1345.27
cum
1225.14
1345.27
0.00
132.00
246.21
246.21
246.25
BLDCSTN
- 2-8
Page - 18
Filling with Sand in trenches, sides of foundations and basement with initial lead in layers not
exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all
operational, incidental, labour charges, seignorage charges, hire charges of T & P etc., complete for
finished item of work. APSS No.309 & 310
Unit :6 Cum
a.Labour
Mate
Mazdoor(Unskilled)
Add Agency Allowance
Day
Day
25%
0.00
0.31
96.10
0.00
310.00
Day
Day
0.00
96.10
24.03
b. Material
Sand
cum
6.00
628.07
cum
13.615%
40.00
3888.55
cum
3768.42
3888.55
529.43
240.00
776.33
776.33
776.35
BLDCSTN
- 3-7
Page - 21
Say
Say
Plain Cement Concrete (1:5:10) proportion (cement: fine aggregate: Coarse aggregate) using 40mm
size Hard Broken Granite (IS383, 1970) machine crushed metal from approved quarry including cost
and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, mixing
concrete in concrete mixer including seigniorage charges, sales & other taxes on all materials, all
operational, incidental, and labour charges such as laying and ramming concrete in layers in position
not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work.
(APSS No. 402).
Unit : Cum
a.Material
Cement
Coarse aggregate 40mm
Fine Aggregate (Sand)
b. Machinery
Concrete Mixer (0.2/0.8 cum
capacity) 600/400 (Diesel)
Kg
Cum
Cum
129.60
0.90
0.45
6169.25
1144.91
628.07
MT
Cum
Cum
799.53
1030.42
282.63
2112.59
hour
1.00
459.30
hour
459.30
459.30
c.Labour
Mason 1st Class
Mazdoor(Unskilled)
Add Agency Allowance
Add Agency Allowance on Crew
charges of concrete mixer
Day
Day
25%
0.10
1.39
472.40
25%
174.20
415.00
310.00
Day
Day
43.55
634.05
3205.94
Sub-Total ::
d.
Add
13.615%
Overhead&
Contractors profit (a+b+c)
0.13615
150
41.50
430.90
118.10
3205.94
0.00
BLDCSTN
- 3-7
Page - 21
cum
0.90
50.00
cum
45.00
(ii) Sand
Cost for 1 cum (a+b+c+d+e)
Rate Per Cum
Rate Per Cum
cum
0.45
40.00
cum
18.00
3268.94
3268.94
3268.95
Say
Plain Cement Concrete (1:4:8) proportion (cement: fine aggregate: Coarse aggregate) using 40mm
size Hard Broken Granite (IS383, 1970) machine crushed metal from approved quarry including cost
and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, mixing
concrete in concrete mixer including seigniorage charges, sales & other taxes on all materials, all
operational, incidental, and labour charges such as laying and ramming concrete in layers in position
not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work
(APSS No. 402) for Levelling Course and Flooring Bed.
Unit : Cum
a.Material
Cement
Coarse aggregate 40mm
Fine Aggregate (Sand)
b. Machinery
Concrete Mixer (0.2/0.8 cum
capacity) 600/400 (Diesel)
Kg
Cum
Cum
162.00
0.90
0.45
6169.25
1144.91
628.07
MT
Cum
Cum
999.42
1030.42
282.63
2312.47
hour
1.00
459.30
hour
459.30
459.30
c.Labour
Mason 1st Class
Mazdoor (Unskilled)
Add Agency Allowance
Add Agency Allowance on Crew
charges of concrete mixer
Day
Day
25%
0.10
1.39
472.40
25%
174.20
415.00
310.00
Day
Day
43.55
634.05
3405.82
Sub-Total ::
d.
Add
13.615%
Overhead&
Contractors profit (a+b+c)
BLDCSTN
- 3-1
Page - 19
41.50
430.90
118.10
0.13615
3405.82
463.70
cum
0.90
50.00
cum
45.00
(ii) Sand
Cost for 1 cum (a+b+c+d+e)
Rate Per Cum
Rate Per Cum
cum
0.45
40.00
cum
18.00
3932.52
3932.52
3932.55
Say
Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion (cement: fine aggregate: Coarse
aggregate) using 20mm size Hard Broken Granite (IS383, 1970) Machine Crushed graded metal from
from approved quarry including cost and conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all
operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for
finished item of work for Bed Blocks and Hold Fasts (APSS No. 402)
Unit : Cum
a.Material
Cement
20mm HBG Graded Metal
Fine Aggregate (Sand)
Kg
Cum
Cum
275.00
0.90
0.45
6169.25
1497.22
628.07
MT
Cum
Cum
1696.54
1347.50
282.63
3326.67
b.Labour
Mason 1st Class
Mazdoor(Unskilled)
Add Agency Allowance
Day
Day
25%
0.10
2.36
773.10
415.00
310.00
Day
Day
41.50
731.60
193.28
966.38
4293.05
151
a
b
c
d
e
FF
SF
TF
4293.05
4293.05
4293.05
4293.05
61.00
61.00
61.00
61.00
244.00
244.00
244.00
244.00
61.00
61.00
61.00
61.00
0.00
101.71
203.42
305.13
0.00
0.00
332.67
665.33
4659.05
4760.76
5195.14
5629.52
634.33
648.18
707.32
766.46
cum
45.00
45.00
45.00
45.00
cum
18.00
5356.38
5356.40
18.00
5471.94
5471.95
18.00
5965.46
5965.50
18.00
6458.98
6459.00
25%
BLDCSTN
- 3-1
Page - 19
GF
Plain Cement Concrete M25 Grade of Concrete corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including all operational, incidental
and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department
including centering, shuttering, laying concrete, curing etc. complete for Steps.
Unit : 1 Cum
a.Material
Cement
20mm HBG Graded Metal
Sand
Kg
Cum
Cum
380.00
0.80
0.40
6169.25
1497.22
628.07
MT
Cum
Cum
2344.32
1197.78
251.23
3793.32
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (Both Men & Women)
Add Agency Allowance
Day
Day
Day
25%
0.133
0.267
4.600
1579.99
415.00
370.00
310.00
Day
Day
Day
55.20
98.79
1426.00
395.00
1974.99
Hr
1.333
548.30
Hr
730.88
a
b
c
d
e
f
25%
GF
6499.19
FF
6499.19
SF
6499.19
730.88
6499.19
TF
6499.19
61.00
61.00
61.00
61.00
244.00
244.00
244.00
244.00
61.00
61.00
61.00
61.00
0.00
182.40
364.80
547.20
379.33
758.66
7609.32
8171.05
0.00
6865.19
152
7047.59
g
h
i
BLDCSTN
- 3-13
Page - 23
Add
13.615%
Overhead&
Contractors profit on sub total
Seigniorage charges (i) Aggregate
0.80 x 50 = 40.00
(ii) Sand 0.40 x 40 = 16.00
Rate per cum.
Say
934.70
959.53
1036.01
1112.49
cum
40.00
40.00
40.00
40.00
cum
16.00
7855.88
7855.90
16.00
8063.12
8063.15
16.00
8701.33
8701.35
16.00
9339.54
9339.55
Vibrated Reinforced Cement Concrete (1:5:10) proportion nominal mix (cement: fine aggregate:
Coarse aggregate) using 20mm size Hard Broken Granite (IS383, 1970) Machine Crushed Graded
metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse
10
aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all
operational, incidental, and labour charges such as mixing, laying concrete, finishing top surface,
curing concrete, etc., complete for finished item of work for (APSS No. 402) Dummy Columns
Unit = 1 cum
For DUMMY COLUMNS
a.Material
Cement
20mm HBG metal
Sand
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor(Un skilled)
Add Agency allowance
c. Machinery
Concrete Mixer 10 / 7 cft (0.2 / 0.8
cum) capacity 600/400 (Diesel)
Vibrator hire charges
Basic Rate per Cum
a
b
c
d
e
i
j
MT
Cum
Cum
2429.66
Day
Day
Day
799.53
1347.50
282.63
459.30
Hr
459.30
1.00
185.90
Hr
185.90
4344.85
Description of Item
GF
FF
SF
TF
4344.85
4344.85
4344.85
4344.85
229.00
229.00
229.00
229.00
1338.00
1472.00
1606.00
1739.00
334.50
368.00
401.50
434.75
0.00
260.80
521.60
782.40
6246.35
6674.65
7102.95
7529.99
0.00
908.75
967.07
1025.21
45.00
45.00
45.00
45.00
18.00
6309.35
6309.35
18.00
7646.40
7646.40
18.00
8133.02
8133.05
18.00
8618.20
8618.25
Kg
Cum
Cum
129.60
0.90
0.45
6169.25
1497.22
628.07
Day
Day
Day
25%
0.133
0.267
3.600
0.00
415.00
370.00
310.00
1269.99
Hr
1.00
Hr
25%
153
55.20
98.79
1116.00
0.00
BLDCSTN
- 3-13
Page - 23
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including all operational, incidental
11
and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department
including centering, shuttering, laying concrete, vibrating, curing etc. complete for Footings.
Unit : Cum
For Footings
a.Material
Cement
20mm HBG graded metal
Fine aggregate (Sand)
Kg
Cum
Cum
380.00
0.80
0.40
6169.25
1497.22
628.07
MT
Cum
Cum
2344.32
1197.78
251.23
3793.32
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor(Un skilled)
Add Agency Allowance
Day
Day
Day
25%
0.133
0.267
4.600
1579.99
415.00
370.00
310.00
Day
Day
Day
55.20
98.79
1426.00
395.00
1974.99
Hr
1.333
548.30
Hr
730.88
Hr
1.333
185.90
Hr
247.80
978.69
6746.99
BLDCSTN
- 3-13
Page - 23
6746.99
277.00
473.00
25%
118.25
7615.24
0.00
40.00
16.00
7671.24
7671.25
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including all operational, incidental
11
and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department
including centering, shuttering, laying concrete, vibrating, curing etc. complete for Pedastal.
Unit : Cum
For Footings
a.Material
Cement
20mm HBG graded metal
Fine aggregate (Sand)
Kg
Cum
Cum
380.00
0.80
0.40
6169.25
1497.22
628.07
MT
Cum
Cum
2344.32
1197.78
251.23
3793.32
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor(Un skilled)
Add Agency Allowance
Day
Day
Day
25%
0.133
0.267
4.600
1579.99
415.00
370.00
310.00
Day
Day
Day
55.20
98.79
1426.00
395.00
1974.99
154
Hr
1.333
548.30
Hr
730.88
Hr
1.333
185.90
Hr
247.80
978.69
6746.99
BLDCSTN
- 3-13
Page - 23
6746.99
315.00
753.00
25%
188.25
8003.24
1089.64
40.00
16.00
9148.88
9148.90
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including all operational, incidental
11
and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department
including centering, shuttering, laying concrete, vibrating, curing etc. complete for Plinth beam.
Unit : Cum
For Footings
a.Material
Cement
20mm HBG graded metal
Fine aggregate (Sand)
Kg
Cum
Cum
380.00
0.80
0.40
6169.25
1497.22
628.07
MT
Cum
Cum
2344.32
1197.78
251.23
3793.32
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor(Un skilled)
Add Agency Allowance
Day
Day
Day
25%
0.133
0.267
4.600
1579.99
415.00
370.00
310.00
Day
Day
Day
55.20
98.79
1426.00
395.00
1974.99
Hr
1.333
548.30
Hr
730.88
Hr
1.333
185.90
Hr
247.80
978.69
6746.99
6746.99
1335.00
1141.00
25%
285.25
9508.24
155
Add
13.615%
Overhead&
Contractors profit on sub total
Seigniorage charges (i) Aggregate
0.80 x 50 = 40.00
(ii) Sand 0.40 x 40 = 16.00
Rate per Cum.
Say
BLDCSTN
- 3-13
Page - 23
0.00
40.00
16.00
9564.24
9564.25
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including all operational, incidental
12
and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department
including centering, shuttering, laying concrete, vibrating, curing etc. complete for Columns
Unit = 1 cum
For COLUMNS
a.Material
Cement
20mm HBG graded metal
Fine aggregate (Sand)
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor(Un skilled)
Add Agency Allowance
Kg
Cum
Cum
380.00
0.80
0.40
6169.25
1497.22
628.07
MT
Cum
Cum
Day
Day
Day
25%
0.167
0.167
5.600
1867.10
415.00
370.00
310.00
Day
Day
Day
Hr
1.333
185.90
Hr
b
c
d
e
f
g
h
i
Description of Item
Basic rate per Cum.
Hire charges for centering and
scaffolding material
Labour charges for centering and
scaffolding material
Allowance on labour charges for
centering and scaffolding material
Lift charges of Labour - Add 10%
labour charges on G.F Rate, 20% on
GF Rate, 30% on GF Rate only
Lift Charges of Material i.e.for Lifting
Concrete @ 10%
Sub-Total ::
Add
13.615%
Overhead&
Contractors profit on sub total
Seigniorage charges (i) Aggregate
0.80 x 50 = 40.00
(ii) Sand 0.40 x 40 = 16.00
Rate per Cum.
Say
730.88
247.80
978.69
7105.87
2344.32
1197.78
251.23
3793.32
69.31
61.79
1736.00
466.77
2333.87
25%
156
GF
7105.87
FF
7105.87
SF
7105.87
TF
7105.87
229.00
229.00
229.00
229.00
1338.00
1472.00
1606.00
1739.00
334.50
368.00
401.50
434.75
0.00
320.51
641.02
961.53
0.00
0.00
379.33
758.66
9007.37
9495.38
10362.72
11228.81
0.00
1292.80
1410.88
1528.80
40.00
40.00
40.00
40.00
16.00
9063.37
9063.40
16.00
10844.18
10844.20
16.00
11829.61
11829.65
16.00
12813.62
12813.65
BLDCSTN
- 3-13
Page - 23
Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine
crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of
all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and
13
labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department
including centering, shuttering, laying concrete, curing etc. complete for Lintels.
Unit = 1 cum
a.Material
Cement
20mm HBG graded metal
Fine aggregate (Sand)
Kg
Cum
Cum
380.00
0.80
0.40
6169.25
1497.22
628.07
MT
Cum
Cum
2344.32
1197.78
251.23
3793.32
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor(Unskilled)
Add Agency Allowance
Day
Day
Day
25%
0.167
0.167
5.600
1867.10
415.00
370.00
310.00
Day
Day
Day
69.31
61.79
1736.00
466.77
2333.87
Hr
730.88
Hr
1.333
548.30
730.88
6858.07
a
b
c
d
e
f
g
h
i
Description of Item
Basic rate per Cum.
Hire charges for centering and
scaffolding material
Labour charges for centering and
scaffolding material
Allowance on labour charges for
centering and scaffolding material
Lift charges of Labour - Add 10%
labour charges on G.F Rate, 20% on
GF Rate, 30% on GF Rate only
Lift Charges of Material i.e.for Lifting
Concrete @ 10%
Sub-Total ::
Add
13.615%
Overhead&
Contractors profit on sub total
Seigniorage charges (i) Aggregate
0.80 x 50 = 40.00
(ii) Sand 0.40 x 40 = 16.00
Rate per Cum.
Say
25%
157
GF
6858.07
FF
6858.07
SF
6858.07
TF
6858.07
760.00
760.00
760.00
760.00
953.00
1048.00
1144.00
1239.00
238.25
262.00
286.00
309.75
0.00
282.01
564.02
846.03
0.00
0.00
379.33
758.66
8809.32
9210.08
9991.42
10771.51
0.00
1253.95
1360.33
1466.54
40.00
40.00
40.00
40.00
16.00
8865.32
8865.35
16.00
10520.03
10520.05
16.00
11407.75
11407.80
16.00
12294.05
12294.10
BLDCSTN
- 3-13
Page - 24
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including all operational, incidental
14
and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department
including centering, shuttering, laying concrete, vibrating, curing etc. complete for Beams.
Unit = 1 cum
a.Material
Cement
20mm HBG graded metal
Fine aggregate (Sand)
Kg
Cum
Cum
380.00
0.80
0.40
6169.25
1497.22
628.07
MT
Cum
Cum
2344.32
1197.78
251.23
3793.32
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor(Unskilled)
Add Agency Allowance
Day
Day
Day
25%
0.067
0.133
3.077
1030.89
415.00
370.00
310.00
Day
Day
Day
27.81
49.21
953.87
257.72
1288.61
Hr
0.308
548.30
Hr
168.88
Hr
0.308
185.90
Hr
57.26
226.13
5308.06
a
b
c
d
e
f
g
h
i
Description of Item
Basic rate per Cum.
Hire charges for centering and
scaffolding material
Labour charges for centering and
scaffolding material
Allowance on labour charges for
centering and scaffolding material
Lift charges of Labour - Add 10%
labour charges on G.F Rate, 20% on
GF Rate, 30% on GF Rate only
Lift Charges of Material i.e.for Lifting
Concrete @ 10%
Sub-Total ::
Add
13.615%
Overhead&
Contractors profit on sub total
Seigniorage charges (i) Aggregate
0.80 x 50 = 40.00
(ii) Sand 0.40 x 40 = 16.00
Rate per Cum.
Say
25%
158
GF
5308.06
FF
5308.06
SF
5308.06
TF
5308.06
1342.00
1342.00
1342.00
1342.00
1122.00
1234.00
1346.00
1459.00
280.50
308.50
336.50
364.75
0.00
215.29
430.58
645.87
0.00
0.00
379.33
758.66
8052.56
8407.85
9142.47
9878.34
1096.36
1144.73
1244.75
1344.94
40.00
40.00
40.00
40.00
16.00
9204.91
9204.95
16.00
9608.57
9608.60
16.00
10443.21
10443.25
16.00
11279.27
11279.30
BLDCSTN
- 3-13
Page - 23
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including all operational, incidental
15 and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department
including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 100mm
thick
Unit = 1 cum
a.Material
Cement
20mm HBG graded metal
Fine aggregate (Sand)
Kg
Cum
Cum
380.00
0.80
0.40
6169.25
1497.22
628.07
MT
Cum
Cum
2344.32
1197.78
251.23
3793.32
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor(Unskilled)
Add Agency Allowance
Day
Day
Day
25%
0.067
0.133
3.077
1030.89
415.00
370.00
310.00
Day
Day
Day
27.81
49.21
953.87
257.72
1288.61
Hr
0.308
185.90
Hr
a
b
c
d
e
f
g
h
i
57.26
226.13
5308.06
168.88
25%
159
GF
FF
SF
TF
530.81
530.81
530.81
530.81
152.00
152.00
152.00
152.00
127.00
140.00
152.00
165.00
31.75
35.00
38.00
41.25
0.00
23.01
46.02
69.03
0.00
0.00
37.93
75.87
841.56
880.81
956.76
1033.95
0.00
119.92
130.26
140.77
4.00
4.00
4.00
4.00
1.60
847.16
847.20
1.60
1006.34
1006.35
1.60
1092.62
1092.65
1.60
1180.32
1180.35
BLDCSTN
- 3-13
Page - 23
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including all operational, incidental
16 and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department
including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 125mm
thick
Unit = 1 cum
a.Material
Cement
20mm HBG graded metal
Fine aggregate (Sand)
Kg
Cum
Cum
380.00
0.80
0.40
6169.25
1497.22
628.07
MT
Cum
Cum
2344.32
1197.78
251.23
3793.32
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor(Unskilled)
Add Agency Allowance
Day
Day
Day
25%
0.067
0.133
3.077
1030.89
415.00
370.00
310.00
Day
Day
Day
27.81
49.21
953.87
257.72
1030.89
Hr
0.308
548.30
Hr
168.88
Hr
0.308
185.90
Hr
57.26
226.13
5050.34
a
b
c
d
e
f
g
h
i
Description of Item
Basic rate of VRCC M-20 per Cum.
For 125mm thick
Hire charges for centering and
scaffolding material
Labour charges for centering and
scaffolding material
Allowance on labour charges for
centering and scaffolding material
Lift charges of Labour - Add 10%
labour charges on G.F Rate, 20% on
GF Rate, 30% on GF Rate only
Lift Charges of Material i.e.for Lifting
Concrete @ 10%
Sub-Total ::
Add
13.615%
Overhead&
Contractors profit on sub total
Seigniorage charges (i) Aggregate
0.80 x 50 = 40.00
(ii) Sand 0.40 x 40 = 16.00
Rate per Sqm.
Say
25%
160
GF
FF
SF
TF
631.29
631.29
631.29
631.29
152.00
152.00
152.00
152.00
127.00
140.00
152.00
165.00
31.75
35.00
38.00
41.25
0.00
25.59
51.17
76.76
0.00
0.00
47.42
94.83
942.04
983.88
1071.88
1161.13
128.26
133.96
145.94
158.09
5.00
5.00
5.00
5.00
2.00
1077.30
1077.35
2.00
1124.83
1124.85
2.00
1224.82
1224.85
2.00
1326.22
1326.25
BLDCSTN
- 3-13
Page - 23
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including all operational, incidental
17 and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department
including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 150mm
thick
Unit = 1 cum
a.Material
Cement
20mm HBG graded metal
Fine aggregate (Sand)
Kg
Cum
Cum
380.00
0.80
0.40
6169.25
1497.22
628.07
MT
Cum
Cum
2344.32
1197.78
251.23
3793.32
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor(Unskilled)
Add Agency Allowance
Day
Day
Day
25%
0.067
0.133
3.077
1030.89
415.00
370.00
310.00
Day
Day
Day
27.81
49.21
953.87
257.72
1288.61
Hr
0.308
548.30
Hr
168.88
Hr
0.308
185.90
Hr
57.26
226.13
5308.06
a
b
c
d
e
f
g
h
i
Description of Item
Basic rate of VRCC M-20 per Cum.
For 150mm thick
Hire charges for centering and
scaffolding material
Labour charges for centering and
scaffolding material
Allowance on labour charges for
centering and scaffolding material
Lift charges of Labour - Add 10%
labour charges on G.F Rate, 20% on
GF Rate, 30% on GF Rate only
Lift Charges of Material i.e.for Lifting
Concrete @ 10%
Sub-Total ::
Add
13.615%
Overhead&
Contractors profit on sub total
Seigniorage charges (i) Aggregate
0.80 x 50 = 40.00
(ii) Sand 0.40 x 40 = 16.00
Rate per Sqm.
Say
25%
161
GF
FF
SF
TF
796.21
796.21
796.21
796.21
152.00
152.00
152.00
152.00
127.00
140.00
152.00
165.00
31.75
35.00
38.00
41.25
0.00
27.13
54.26
81.40
0.00
0.00
53.11
106.21
1106.96
1150.34
1245.58
1342.07
150.71
156.62
169.59
182.72
5.60
5.60
5.60
5.60
2.24
1265.51
1265.55
2.24
1314.80
1314.80
2.24
1423.01
1423.05
2.24
1532.63
1532.65
BLDCSTN
- 3-13
Page - 23
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including all operational, incidental
18 and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department
including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 180mm
thick
Unit = 1 cum
a.Material
Cement
20mm HBG graded metal
Fine aggregate (Sand)
Kg
Cum
Cum
380.00
0.80
0.40
6169.25
1497.22
628.07
MT
Cum
Cum
2344.32
1197.78
251.23
3793.32
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor(Unskilled)
Add Agency Allowance
Day
Day
Day
25%
0.067
0.133
3.077
1030.89
415.00
370.00
310.00
Day
Day
Day
27.81
49.21
953.87
257.72
1288.61
a
b
c
d
e
f
g
h
i
Hr
0.308
548.30
Hr
168.88
Hr
0.308
185.90
Hr
57.26
25%
162
GF
FF
SF
226.13
5308.06
TF
955.45
955.45
955.45
955.45
164.00
164.00
164.00
164.00
137.00
151.00
164.00
178.00
34.25
37.75
41.00
44.50
0.00
29.16
58.33
87.49
0.00
0.00
56.90
113.80
1290.70
1337.36
1439.68
1543.24
175.73
182.08
196.01
210.11
7.20
7.20
7.20
7.20
2.40
1476.03
1476.05
2.40
1529.05
1529.05
2.40
1645.29
1645.30
2.40
1762.95
1763.00
BLDCSTN
- 3-13
Page - 23
Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine
crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of
all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and
labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
19
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department
including centering, shuttering, laying concrete, curing etc. complete for Sunshades / Chajjas for
75mm thick at Fixed end and 50mm thick at Free end and for a width of 0.60 Mts. etc complete for
finished item of work.
Unit = 1 cum
a.Material
Cement
20mm HBG graded metal
Fine aggregate (Sand)
Kg
Cum
Cum
380.00
0.80
0.40
6169.25
1497.22
628.07
MT
Cum
Cum
2344.32
1197.78
251.23
3793.32
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor(Unskilled)
Add Agency Allowance
Day
Day
Day
25%
0.067
0.133
3.077
1030.89
415.00
370.00
310.00
Day
Day
Day
27.81
49.21
953.87
257.72
1288.61
Hr
168.88
Hr
0.308
548.30
168.88
5250.80
a
b
c
d
e
f
g
h
163
Cum
5250.80
Cum
GF
328.18
FF
328.18
SF
328.18
196.91
196.91
328.18
TF
328.18
150.00
150.00
150.00
150.00
146.00
161.00
175.00
190.00
36.50
40.25
43.75
47.50
0.00
21.04
42.09
63.13
660.68
700.47
739.01
778.80
89.95
95.37
100.62
106.03
1.50
1.50
1.50
1.50
0.60
752.73
752.75
0.60
797.94
797.95
0.60
841.73
841.75
0.60
886.94
886.95
BLDCSTN
- 3-13
Page - 23
Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine
crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of
all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and
20
labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department
including centering, shuttering, laying concrete, curing etc. complete for Shelves of 50mm thick
Unit = 1 cum
a.Material
Cement
20mm HBG graded metal
Fine aggregate (Sand)
Kg
Cum
Cum
380.00
0.80
0.40
6169.25
1497.22
628.07
MT
Cum
Cum
2344.32
1197.78
251.23
3793.32
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (Unskilled)
Add Agency Allowance
Day
Day
Day
25%
0.067
0.133
3.077
1030.89
415.00
370.00
310.00
Day
Day
Day
27.81
49.21
953.87
257.72
1030.89
Hr
168.88
Hr
0.308
548.30
168.88
4993.08
a
b
c
d
e
f
g
h
BLDCSTN5-5
Page.31
Description of Item
Basic rate per Sqm
Hire charges for centering and
scaffolding material
Labour charges for centering and
scaffolding material
Allowance on labour charges for
centering and scaffolding material
Lift charges of Labour - Add 10%
labour charges on G.F Rate, 20% on
GF Rate, 30% on GF Rate only
Sub-Total ::
Add
13.615%
Overhead&
Contractors profit on sub total
Seigniorage charges (i) Aggregate
0.90 x 50 = 45
(ii) Sand 0.45 x 40 = 18
Rate per Sqm.
Say
0.05
25%
Cum
4993.08
Cum
GF
249.65
FF
249.65
SF
249.65
249.65
249.65
TF
249.65
150.00
150.00
150.00
150.00
146.00
161.00
175.00
190.00
36.50
40.25
43.75
47.50
0.00
17.18
34.35
51.53
582.15
618.08
652.76
688.69
79.26
84.15
88.87
93.76
1.13
1.13
1.13
1.13
0.45
662.99
663.00
0.45
703.81
703.85
0.45
743.21
743.25
0.45
784.03
784.05
Brick Masonry in superstructure with CM (1:8) prop: using second class bricks from approved
source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all
22 materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other
taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar,
constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work.
Unit : Cum
a.Material
Cement
Bricks traditional size 23 x 11 x 7 cms
2nd class
Fine Aggregate (Sand)
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor(unskilled)
Add Agency Allowance
Kg
36.00
6169.25
MT
222.09
Nos
512.00
5632.67
1000Nos
2883.93
Cum
0.20
628.07
Cum
125.61
3231.63
Day
Day
Day
25%
0.240
0.560
1.890
892.70
415.00
370.00
310.00
Day
Day
Day
99.60
207.20
585.90
223.18
1115.88
4347.51
164
a
b
c
d
e
f
g
BLDCSTN5-12
Page.33
Description of Item
Basic rate per Cum.
Hire charges of Access Scaffolding
@ 9.93/Sqm /0.23
Labour
charges
for
Access
Scaffolding material (Labour charge /
0.23)
Allowance on labour charges for
Access Sacffolding
Lift charges for Labour - Add 10%
labour charges on G.F Rate, 20% on
GF, 30% on GF Rate only
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.2 x 40 = 8.00
(ii) Bricks - 512 x 38.5/1000=19.71
Rate per Cum
Say
25%
GF
4347.51
FF
4347.51
SF
4347.51
TF
4347.51
43.17
43.17
43.17
43.17
268.83
381.65
494.52
607.35
67.21
95.41
123.63
151.84
0.00
116.15
232.31
348.46
4726.72
4983.90
5241.14
5498.33
0.00
678.56
713.58
748.60
8.00
8.00
8.00
8.00
19.71
4754.43
4754.45
19.71
5690.17
5690.20
19.71
5982.43
5982.45
19.71
6274.64
6274.65
23 Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using 2nd class bricks having a crushing
strength of not less than 35.00kg/cm2 and using two mild steel bars of 6m dia in every third layer of
brick masory, with free joints of the main block work including cost and seignorage charges and
conveyance of all materials and water from approved sources to work site and all operational,
incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing
etc. complete but excluding the cost of steel and its fabrication charges
Unit : 10 Sqmts.
a.Material
2nd class bricks
CM (1:6)
Nos
Cum
512.00
0.20
5632.67
2217.59
Nos
Cum
2883.93
443.52
3327.45
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (Un skilled)
Add Agency Allowance
Day
Day
Day
25%
0.600
0.600
2.750
1323.50
415.00
370.00
310.00
Day
Day
Day
249.00
222.00
852.50
330.88
1654.38
4981.83
GF
4981.83
FF
4981.83
SF
4981.83
TF
4981.83
99.30
99.30
99.30
99.30
618.30
877.80
1137.40
1396.90
154.58
219.45
284.35
349.23
0.00
194.18
388.36
582.54
5854.00
6372.56
6891.24
7409.79
797.02
867.62
938.24
1008.84
8.40
8.40
8.40
8.40
19.71
6679.13
6679.15
19.71
7268.29
7268.30
19.71
7857.59
7857.60
19.71
8446.74
8446.75
a
b
c
d
e
f
g
Description of Item
Basic rate per 10 Sqmts.
Hire charges of Access Scaffolding
@ 5.29/Sqm
Labour
charges
for
Access
Scaffolding
Allowance on labour charges for
Access Scaffolding.
Lift charges of Labour- Add 10%
labour charges on G.F Rate, 20% on
GF Rate, 30% on GF Rate only
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.21 x 40 = 8.40
(ii) Bricks - 512 x 38.5/1000=19.71
Rate per 10 Sqmts.
Say
25%
165
BLDCSTN4-1
Page.28
MT
1.05
34082.88
MT
35787.02
Kg
6.00
61.00
Kg
366.00
36153.02
Day
Day
25%
10.00
10.00
7250.00
415.00
310.00
Day
Day
4150.00
3100.00
1812.50
9062.50
45215.52
Rate per MT
Add
13.615%
Contractors profit
Overhead&
0.00
Rate as per 1 MT
Say
BLDCSTN4-1
Page.28
45215.52
45215.55
Providing Mild steel bars (Fe 250 as per as per IS 17861979) of different diameters for RCC works, including
labour charges for straightening, cutting, bending to
required sizes and shapes, placing in position with cover
blocks of approved materials and size and tying and
lapsplicing with binding wire of 18 SWG, forming grills for NOTE :: Standard data revised vide Chief
reinforcement work as per approved designs and drawings,
Engineer, R&B (Buildings)
25
including cost and conveyance of steel bars, including all Procs.No.CEB/TA8/AEE3/SSR: 2010-11
wastages such as overlaps, couplings, chairs, spacer bars
Dt: 21.01.2011.
including cost and conveyance of binding wire, cover
blocks and all incidental, operational, laour charges such
as cutting, bending placing in position, tying including sales
and other taxes on all materials etc., complete for finished
item of work in all floors. (APSS No.126)
Unit : MT
a.Material
MS bars including 5 per cent for
overlaps and wastage
Binding wire
b.Labour
Blacksmith/ bar bender
Mazdoor (Unskilled)
Add Agency Allowance
Rate per MT
Add
13.615%
Contractors profit
MT
1.05
42082.88
MT
44187.02
Kg
6.00
61.00
Kg
366.00
44553.02
Day
Day
25%
10.00
10.00
7250.00
415.00
310.00
Day
Day
4150.00
3100.00
1812.50
9062.50
53615.52
Overhead&
7299.75
Rate per MT
Say
60915.28
60915.30
166
BLDCSTN8-10
Page.44
Ceiling Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat
of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like
cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all
26
operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges,
including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing,
curing, etc., complete for finished item of work. (APSS 901,903 & 904)
Unit : 10Sqm
a.Materials
Cement
Fine Sand (Screened)
Kg
Cum
51.00
0.15
6169.25
828.070
MT
Cum
314.63
124.21
438.84
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (unskilled)
Add Agency Allowance
Day
Day
Day
25%
0.630
1.470
3.900
2014.35
415.00
370.00
310.00
Day
Day
Day
261.45
543.90
1209.00
503.59
2517.94
2956.78
a
b
Description of Item
Basic rate per 10 Sqm
Hire charges for stage scaffolding
GF
2956.78
23.70
FF
2956.78
23.70
SF
2956.78
23.70
TF
2956.78
23.70
125.50
176.40
227.30
278.20
31.38
44.10
56.83
69.55
0.00
213.99
427.97
641.96
3137.36
3414.97
3692.58
3970.19
427.15
464.95
502.74
540.54
6.00
6.00
6.00
6.00
3570.51
3570.55
3885.92
3885.95
4201.32
4201.35
4516.73
4516.75
d
e
g
h
BLDCSTN8-10
Page.44
25%
Total
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of
4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like
cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all
27 operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges,
including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing,
curing, etc., for Even Surfaces of brick wall complete for finished item of work. (APSS 901,903 &
904)
Unit : 10Sqm
a.Materials
Cement
Fine Sand (Screened)
Kg
Cum
51.00
0.15
6169.25
828.070
MT
Cum
314.63
124.21
438.84
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (unskilled)
Add Agency Allowance
Day
Day
Day
25%
0.630
1.470
3.900
2014.35
415.00
370.00
310.00
Day
Day
Day
261.45
543.90
1209.00
503.59
2517.94
2956.78
167
a
b
c
d
e
g
h
BLDCSTN8-9
Page.43
Description of Item
Basic rate per 10 Sqm
Hire charges for access scaffolding
Labour
charges
for
access
scaffolding
Allowance on labour charges for
centring material
Lift charges - Add 10% labour
charges on G.F Rate, 20% on GF,
30% on GF Rate only
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.15 x 40 = 6.00
Rate per 10 Sqm
Say
25%
Total
GF
2956.78
9.90
FF
2956.78
9.90
SF
2956.78
9.90
TF
2956.78
9.90
61.80
87.80
113.70
139.70
15.45
21.95
28.43
34.93
0.00
207.62
415.23
622.85
3043.93
3284.05
3524.04
3764.15
414.43
447.12
479.80
512.49
6.00
6.00
6.00
6.00
3464.36
3464.40
3737.17
3737.20
4009.83
4009.85
4282.64
4282.65
Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of
4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like
cement, screened sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,
28 all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges,
finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge,
curing, etc., for Uneven Surfaces of Brick Wall complete for finished item of work. (APSS 901,903
& 904)
Unit : 10Sqm
a.Materials
Base coat in CM(1:6) 16mm thick
Cement
Fine Sand (Screened)
Top coat in CM(1:4) 4mm thcik
Cement
Fine Sand (Screened)
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (unskilled)
Add Agency Allowance
a
b
c
d
e
g
h
Kg
Cum
43.00
0.18
6169.25
828.070
MT
Cum
265.28
149.05
Kg
Cum
14.50
0.04
6169.25
828.070
MT
Cum
89.45
33.12
536.91
Day
Day
Day
25%
0.630
1.470
3.900
2014.35
415.00
370.00
310.00
Day
Day
Day
GF
3054.85
9.90
FF
3054.85
9.90
SF
3054.85
9.90
261.45
543.90
1209.00
503.59
2517.94
3054.85
TF
3054.85
9.90
61.80
87.80
113.70
139.70
15.45
21.95
28.43
34.93
0.00
207.62
415.23
622.85
3142.00
3382.11
3622.10
3862.22
0.00
460.47
493.15
525.84
8.80
8.80
8.80
8.80
3150.80
3150.80
3851.39
3851.40
4124.05
4124.10
4396.86
4396.90
25%
168
BLDCSTN8-3
Page.42
Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish including cost and
conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales
29
& other taxes on all materials, all operational, incidental charges and labour charges such as mixing
mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906)
Unit : 10Sqm
a.Materials
CM (1:3)
Cum
0.15
3698.21
Cum
554.73
554.73
b.Labour
Mason 1st Class
Mazdoor (Unskilled)
Add Agency Allowance
Day
Day
25%
0.600
0.960
546.60
415.00
310.00
Day
Day
a
b
GF
1237.98
23.70
FF
1237.98
23.70
SF
1237.98
23.70
249.00
297.60
136.65
683.25
1237.98
TF
1237.98
23.70
125.50
176.40
227.30
278.20
31.38
44.10
56.83
69.55
0.00
67.21
134.42
201.63
1418.56
1549.39
1680.23
1811.06
0.00
210.95
228.76
246.58
6.00
6.00
6.00
6.00
1424.56
1424.60
1766.34
1766.35
1914.99
1915.00
2063.64
2063.65
d
e
g
h
BLDCSTN8-7
Page.43
30
25%
Plastering to even surfaces of wall with CM(1:4) Prop: 12mm thick in single coat including cost
and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges,
sales & other taxes on all materials, all operational, incidental charges and labour charges such as
mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906)
Unit : 10Sqm
a.Materials
CM (1:4)
Cum
0.15
2957.90
Cum
443.69
443.69
b.Labour
Mason 1st Class
Mazdoor (Unskilled)
Add Agency Allowance
Day
Day
25%
0.600
0.960
546.60
415.00
310.00
Day
Day
249.00
297.60
136.65
683.25
1126.94
GF
1126.94
9.90
FF
1126.94
9.90
SF
1126.94
9.90
TF
1126.94
9.90
61.80
87.80
113.70
139.70
15.45
21.95
28.43
34.93
0.00
60.84
121.68
182.52
1214.09
1307.43
1400.64
1493.98
0.00
178.01
190.70
203.41
8.40
8.40
8.40
8.40
1222.49
1222.50
1493.83
1493.85
1599.74
1599.75
1705.79
1705.80
a
b
c
d
e
g
h
25%
169
BLDCSTN10-25
Page.71
Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of
water proof compound per bag of cement laid over roof when it is green including cost of all materials,
31 seigniorage charges, excluding conveyance charges of materials and including all operational,
incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing,
rounding off junctions of wall and slab etc,, complete for finished item of work
Unit : 10Sqm
a.Materials
CM (1:3)
Water proof compound (BMT-H.01)
Cum
Kg
0.21
2.00
3698.21
75.00
Cum
Kg
776.62
150.00
926.62
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (Unskilled)
Add Agency Allowance
Day
Day
Day
25%
0.660
1.540
3.700
1990.70
415.00
370.00
310.00
Day
Day
Day
273.90
569.80
1147.00
497.68
2488.38
3415.00
GF
3415.00
FF
3415.00
SF
3415.00
TF
3415.00
0.00
199.07
398.14
597.21
3415.00
3614.07
3813.14
4012.21
492.06
519.16
546.26
8.40
8.40
8.40
8.40
3423.40
3423.45
4114.53
4114.55
4340.70
4340.75
4566.88
4566.90
c
d
e
f
Description of Item
Basic rate per 10 Sqm
Lift charges - Add 10% on labour for
F.F,20% for SF, 30% for T.F
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.21 x 40 = 8.40
Rate per 10 Sqm
Say
170
BLDCSTN8-11
Page.44
RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabbit wire mesh & nominal reinforcement as
directed by Engineer-in-charge with dubara sponge finishing, including cost & conveyance of all
materials to site, seigniorage charges, sales & other taxes on all materials, operational & incidental,
32
cost and conveyance of cement, screened sand, wire mesh, water to work site, centering, scaffolding
and form work, lift charges etc., complete for finished items of work but excluding cost of steel & its
fabrication charges, for finished item of work. (APSS No.403&903)
Sub analysis
Plastering with CM two (2) coats 12mm thick, base coat in
CM (1:4)8mm thick, and top coat in CM (1:2) 4mm thick
with sponze finishing.
a. Material
Base Coat in CM (1:4) 8mm thick
Cement
Fine sand (screened)
Top Coat in CM (1:2) 4mm thick
Cement
Fine sand (screened)
Unit : 10Sqm
Kg
Cum
39.60
0.11
6169.25
828.07
Kg
Cum
244.30
91.09
Kg
Cum
28.80
0.04
6169.25
828.07
Kg
Cum
177.67
33.12
546.19
day
day
day
25%
0.63
1.47
3.90
2014.35
415.00
370.00
310.00
day
day
day
261.45
543.90
1209.00
503.59
2517.94
3064.13
306.41
Sqm
13.30
17.00
Sqm
226.10
cum
Kg
0.25
50.00
3698.21
6169.25
cum
MT
924.55
308.46
Sqm
21.80
306.41
Sqm
6679.80
b. Labour
Mason 1st class
Mason 2nd class
Mazdoor (Un skilled)
Add Agency Allowance
Rate per 10 Sqm
Rate per Sqm
MAIN DATA
Unit : 10Sqm
a.Materials
8138.91
b.Labour
Mason 1st Class
Miller operator
Mazdoor (Unskilled)
Add Agency Allowance
Day
Day
Day
25%
8.000
1.000
10.000
6790.00
415.00
370.00
310.00
Day
Day
Day
a
b
c
d
e
g
h
25%
171
3320.00
370.00
3100.00
1697.50
8487.50
677.80
GF
17304.21
9.90
61.80
FF
17304.21
9.90
87.80
SF
17304.21
9.90
113.70
677.80
17304.21
TF
17304.21
9.90
139.70
15.45
21.95
28.43
34.93
0.00
1124.31
2248.62
3372.92
17391.36
18548.17
19704.85
20861.66
2367.83
2525.33
2682.82
2840.32
24.00
24.00
24.00
24.00
19783.20
19783.20
21097.50
21097.55
22411.67
22411.70
23725.98
23726.00
BLDCSTN9-1
Page.48&4
9
Flooring and Treads with Polished Bethamcherla coloured stone minimum 25 mm thick (0.254M
x0.254M) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat
cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full
33
depth including cost of all materials like cement, sand, and water and flooring stones etc., complete,
including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished
item of work, .
Unit : 10Sqm
a.Materials
Polished Bethamcherla stone
Cement for CM(1:8) Proportion
Sand for CM(1:8) Proportion
Cement slurry
Cement for jointing
Sqm
Kg
Cum
Kg
Kg
11.00
21.60
0.12
33.00
20.00
5800.29
6169.25
628.07
6169.25
6169.25
10 Sqm
MT
Cum
MT
MT
6380.32
133.26
75.37
203.59
123.39
6915.92
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (Unskilled)
Add Agency Allowance
Day
Day
Day
25%
3.100
1.100
0.860
1960.10
415.00
370.00
310.00
Day
Day
Day
1286.50
407.00
266.60
490.03
2450.13
9366.04
GF
9366.04
FF
9366.04
SF
9366.04
TF
9366.04
0.00
196.01
392.02
588.03
9366.04
9562.05
9758.06
9954.07
1275.19
1301.87
1328.56
1355.25
4.80
4.80
4.80
4.80
10646.03
10646.05
10868.72
10868.75
11091.42
11091.45
11314.12
11314.15
c
d
e
f
Description of Item
Basic rate per 10 Sqm
Lift charges - Add 10% on labour for
F.F,20% for SF, 30% for T.F
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.12 x 40 = 4.80
Rate as per 10 Sqm
Say
172
BLDCSTN9-23
Page.60
Providing Skirting to internal walls and Risers of Steps to 15 cm height with Polished
Bethamcherla coloured stone minimum 25 mm thick (0.254M x0.254M) length equal to flooring
stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency
34
spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of
matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc.,
complete including seigniorage charges, etc., complete for finished item of work,
Unit : 10Sqm
a.Materials
Polished Bethamcherla stone
Cement for CM(1:3) Proportion
Sand for CM(1:3) Proportion
Cement slurry
Sqm
Kg
cum
Kg
11.00
57.60
0.12
33.00
5800.29
6169.25
628.07
6169.25
10Sqm
MT
cum
MT
6380.32
355.35
75.37
203.59
7014.62
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (Unskilled)
Add Agency Allowance
Day
Day
Day
25%
0.960
2.240
3.100
2188.20
415.00
370.00
310.00
Day
Day
Day
398.40
828.80
961.00
547.05
2735.25
9749.87
GF
9749.87
FF
9749.87
SF
9749.87
TF
9749.87
0.00
218.82
437.64
656.46
9749.87
9968.69
10187.51
10406.33
1327.45
1357.24
1387.03
1416.82
4.80
4.80
4.80
4.80
11082.12
11082.15
11330.73
11330.75
11579.34
11579.35
11827.96
11828.00
c
d
e
f
Description of Item
Basic rate per 10 Sqm
Lift charges - Add 10% on labour for
F.F,20% for SF, 30% for T.F
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.12 x 40 = 4.80
Rate as per 10 Sqm
Say
173
BLDCSTN9-1
Page.48&4
9
Flooring and Treads with Polished shabad / Tandur stone minimum 15 to 18 mm thick of size
(0.254M x0.254M) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including
neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to
35
full depth including cost of all materials like cement, sand, and water and flooring stones etc.,
complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete
for finished item of work, .
Unit : 10Sqm
a.Materials
Polished Shabad / Tandur stone
cement for CM(1:8) Proportion
Sand for CM(1:8) Proportion
Cement slurry
Cement for jointing
Sqm
Kg
Cum
Kg
Kg
11.00
21.60
0.12
33.00
20.00
2840.29
6169.25
628.07
6169.25
6169.25
10 Sqm
MT
Cum
MT
MT
3124.31
133.26
75.37
203.59
123.39
3659.91
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (Unskilled)
Add Agency Allowance
Day
Day
Day
25%
3.100
1.100
0.860
1960.10
415.00
370.00
310.00
Day
Day
Day
1286.50
407.00
266.60
490.03
2450.13
6110.04
GF
6110.04
FF
6110.04
SF
6110.04
TF
6110.04
0.00
196.01
392.02
588.03
6110.04
6306.05
6502.06
6698.07
831.88
858.57
885.26
911.94
4.80
4.80
4.80
4.80
6946.72
6946.75
7169.42
7169.45
7392.11
7392.15
7614.81
7614.85
c
d
e
f
Description of Item
Basic rate per 10 Sqm
Lift charges - Add 10% on labour for
F.F,20% for SF, 30% for T.F
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.12 x 40 = 4.80
Rate as per 10 Sqm
Say
174
BLDCSTN9-23
Page.60
Providing Skirting to internal walls and Risers of Steps to 15 cm height with Polished shabad /
Tandur stone minimum 15 to 18 mm thick of size (0.254M x0.254M) length equal to flooring
stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency
36
spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of
matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc.,
complete including seigniorage charges, etc., complete for finished item of work,
Unit : 10Sqm
a.Materials
Polished Shabad / Tandur stone
Cement for CM(1:3) Proportion
Sand for CM(1:3) Proportion
Cement slurry
Sqm
Kg
cum
Kg
11.00
57.60
0.12
33.00
2840.29
6169.25
628.07
6169.25
10Sqm
MT
cum
MT
3124.31
355.35
75.37
203.59
3758.62
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (Unskilled)
Add Agency Allowance
Day
Day
Day
25%
0.960
2.240
3.100
2188.20
415.00
370.00
310.00
Day
Day
Day
398.40
828.80
961.00
547.05
2735.25
6493.87
GF
6493.87
FF
6493.87
SF
6493.87
TF
6493.87
0.00
218.82
437.64
656.46
6493.87
6712.69
6931.51
7150.33
884.14
913.93
943.72
973.52
4.80
4.80
4.80
4.80
7382.81
7382.85
7631.42
7631.45
7880.03
7880.05
8128.64
8128.65
c
d
e
f
Description of Item
Basic rate per 10 Sqm
Lift charges - Add 10% on labour for
F.F,20% for SF, 30% for T.F
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.12 x 40 = 4.80
Rate as per 10 Sqm
Say
175
BLDCSTN9-1
Page.48&4
9
Flooring and Treads with Polished shabad / Tandur stone minimum 15 to 18 mm thick of size
(0.254M x0.254M) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including
neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to
37
full depth including cost of all materials like cement, sand, and water and flooring stones etc.,
complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete
for finished item of work, .
Unit : 10Sqm
a.Materials
Polished Kadapa Slab of 15mm thick
Sqm
11.00
2975.15
10 Sqm
3272.67
Kg
Cum
Kg
Kg
21.60
0.12
33.00
20.00
6169.25
628.07
6169.25
6169.25
MT
Cum
MT
MT
133.26
75.37
203.59
123.39
3808.26
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (Unskilled)
Add Agency Allowance
Day
Day
Day
25%
3.100
1.100
0.860
1960.10
415.00
370.00
310.00
Day
Day
Day
1286.50
407.00
266.60
490.03
2450.13
6258.39
GF
6258.39
FF
6258.39
SF
6258.39
TF
6258.39
0.00
196.01
392.02
588.03
6258.39
6454.40
6650.41
6846.42
852.08
878.77
905.45
932.14
4.80
4.80
4.80
4.80
7115.27
7115.30
7337.97
7338.00
7560.66
7560.70
7783.36
7783.40
c
d
e
f
BLDCSTN9-6
Page.51&5
2
Description of Item
Basic rate per 10 Sqm
Lift charges - Add 10% on labour for
F.F,20% for SF, 30% for T.F
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.12 x 40 = 4.80
Rate as per 10 Sqm
Say
Flooring with Vitrified polished floor tiles of size not less than 598 x 598 mm x 8 mm thickness
regular finish and normal colours of make Jhonson & Jhonson, Kajaria, Nitco, Marbonite, set
over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab,
38 including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with
white cement paste to full depth mixed with pigment of matching shade, including cost of all materials
like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for
finished item of work, .
Unit : 10Sqm
a.Materials
Vitrified tiles (BMTC 15)
cement for CM(1:8) Proportion
Sand for CM(1:8) Proportion
Cement slurry
White cement (TBSC-G.I-03)
Sqm
Kg
Cum
Kg
Kg
10.50
21.60
0.12
33.00
6.00
1048.00
6169.25
628.07
6169.25
35.00
Sqm
MT
Cum
MT
Kg
11004.00
133.26
75.37
203.59
210.00
11626.21
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor Unskilled
Add Agency Allowance
Day
Day
Day
25%
0.960
2.240
3.300
2250.20
415.00
370.00
310.00
Day
Day
Day
398.40
828.80
1023.00
562.55
2812.75
14438.96
GF
14438.96
FF
14438.96
SF
14438.96
TF
14438.96
0.00
225.02
450.04
675.06
14438.96
14663.98
14889.00
15114.02
1965.86
1996.50
2027.14
2057.77
4.80
4.80
4.80
4.80
16409.62
16409.65
16665.28
16665.30
16920.94
16920.95
17176.59
17176.60
c
d
e
f
Description of Item
Basic rate per 10 Sqm
Lift charges - Add 10% on labour for
A.F,20% for SF, 30% for T.F
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.12 x 40 = 4.80
Rate as per 10 Sqm
Say
176
BLDCSTN9-23
Page.60
Providing Skirting to internal walls to 15 cm height and risers of steps with Vitrified polished
floor tiles of size not less than 598 x 598 mm x 8 mm thickness regular finish and normal
colours of make Jhonson & Jhonson, Kajaria, Nitco, Marbonite, set over base coat of CM (1:5) 12
39 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and
jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of
all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc.,
complete for finished item of work,
Unit : 10Sqm
a.Materials
Vitrified tiles (BMTC 16)
Cement for CM(1:5) Proportion
Sand for CM(1:5) Proportion
Cement slurry
White Cement for Jointing & pointing
Sqm
Kg
cum
Kg
Kg
10.50
34.56
0.12
33.00
2.00
1048.00
6169.25
628.07
6169.25
35.00
10Sqm
MT
cum
MT
Kg
11004.00
213.21
75.37
203.59
70.00
11566.16
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (Unskilled)
Add Agency Allowance
Day
Day
Day
25%
0.960
2.240
3.300
2250.20
415.00
370.00
310.00
Day
Day
Day
398.40
828.80
1023.00
562.55
2812.75
14378.91
GF
14378.91
FF
14378.91
SF
14378.91
TF
14378.91
0.00
225.02
450.04
675.06
14378.91
14603.93
14828.95
15053.97
1957.69
1988.33
2018.96
2049.60
4.80
4.80
4.80
4.80
16341.40
16341.45
16597.06
16597.10
16852.71
16852.75
17108.37
17108.40
c
d
e
f
BLDCSTN9-6
Page.51&5
2
Description of Item
Basic rate per 10 Sqm
Lift charges - Add 10% on labour for
F.F,20% for SF, 30% for T.F
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.12 x 40 = 4.80
Rate as per 10 Sqm
Say
Flooring with ceramic tiles 7.3mm thick of 1st quality all shades of makes Jhonson & Jhonson,
Kajaria, Nitco and Marbonite, set over base coat of cement mortar (1:8), 12 mm thick over CC bed
already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs
40
per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade,
including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage
charges, etc., complete for finished item of work.
Unit : 10Sqm
a.Materials
Ceramic tiles (TBSC-C.I-01)
cement for CM(1:8) Proportion
Sand for CM(1:8) Proportion
Cement slurry
White cement (TBSC-G.I-03)
Sqm
Kg
Cum
Kg
Kg
10.50
21.60
0.12
33.00
2.00
450.00
6169.25
628.07
6169.25
35.00
Sqm
MT
Cum
MT
Kg
4725.00
133.26
75.37
203.59
70.00
5207.21
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor Unskilled
Add Agency Allowance
Day
Day
Day
25%
0.960
2.240
3.300
2250.20
415.00
370.00
310.00
Day
Day
Day
398.40
828.80
1023.00
562.55
2812.75
8019.96
GF
8019.96
FF
8019.96
SF
8019.96
TF
8019.96
0.00
225.02
450.04
675.06
8019.96
8244.98
8470.00
8695.02
1122.55
1153.19
1183.83
4.80
4.80
4.80
4.80
8024.76
8024.80
9372.33
9372.35
9627.99
9628.00
9883.65
9883.65
c
d
e
f
Description of Item
Basic rate per 10 Sqm
Lift charges - Add 10% on labour for
A.F,20% for SF, 30% for T.F
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.12 x 40 = 4.80
Rate as per 10 Sqm
Say
177
BLDCSTN9-23
Page.60
Providing Skirting to internal walls to height of 15cm and Risers with ceramic tiles 7.3mm thick
of 1st quality all shades of makes Jhonson & Jhonson, Kajaria, Nitco and Marbonite, set over
base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of
41
3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full
depth, including cost of all materials like tiles, cement, sand and water etc., complete including
seigniorage charges, etc., complete for finished item of work,
Unit : 10Sqm
a.Materials
Ceramic tiles (TBSC-C.I-01)
Cement for CM(1:3) Proportion
Sand for CM(1:3) Proportion
Cement slurry
White cement (TBSC-G.I-03)
Sqm
Kg
cum
Kg
Kg
10.50
57.60
0.12
33.00
6.00
450.00
6169.25
628.07
6169.25
35.00
10Sqm
MT
cum
MT
Kg
4725.00
355.35
75.37
203.59
210.00
5569.30
b.Labour
Mason 1st Class
Mazdoor (Unskilled)
Add Agency Allowance
Day
Day
25%
0.770
0.800
567.55
415.00
310.00
Day
Day
319.55
248.00
141.89
709.44
6278.74
GF
6278.74
FF
6278.74
SF
6278.74
TF
6278.74
0.00
56.76
113.51
170.27
6278.74
6335.50
6392.25
6449.01
854.85
862.58
870.31
878.03
4.80
4.80
4.80
4.80
7138.39
7138.40
7202.88
7202.90
7267.36
7267.40
7331.84
7331.85
c
d
e
f
BLDCSTN9-6
Page.51&5
2
Description of Item
Basic rate per 10 Sqm
Lift charges - Add 10% on labour for
F.F,20% for SF, 30% for T.F
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.12 x 40 = 4.80
Rate as per 10 Sqm
Say
Flooring with High Polished Granite Slabs 16 to 18mm thick upto 8'-0" (2.43 Mts) other than
Black and regular colours, set over base coat of cement mortar (1:8), 20mm thick over CC bed
already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs
42
per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade,
including cost of all materials like cement, sand water and Granite Slabs etc., complete, including
seigniorage charges, dressing of Granite Stone Slabs etc., complete for finished item of work, .
Unit : 10Sqm
a.Materials
Granite Slab
cement for CM(1:8) Proportion
Sand for CM(1:8) Proportion
Cement slurry
White cement (TBSC-G.I-03)
Sqm
Kg
Cum
Kg
Kg
10.50
36.00
0.20
33.00
6.00
32183.12
6169.25
628.07
6169.25
35.00
Sqm
MT
Cum
MT
Kg
33792.27
222.09
125.61
203.59
210.00
34553.56
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor Unskilled
Add Agency Allowance
Day
Day
Day
25%
3.000
1.000
8.000
4095.00
415.00
370.00
310.00
Day
Day
Day
1245.00
370.00
2480.00
1023.75
5118.75
39672.31
GF
39672.31
FF
39672.31
SF
39672.31
TF
39672.31
0.00
409.50
819.00
1228.50
39672.31
40081.81
40491.31
40900.81
5401.39
5457.14
5512.89
5568.65
8.00
8.00
8.00
8.00
45081.70
45081.75
45546.95
45547.00
46012.21
46012.25
46477.46
46477.50
c
d
e
f
Description of Item
Basic rate per 10 Sqm
Lift charges - Add 10% on labour for
A.F,20% for SF, 30% for T.F
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.20 x 40 = 8.00
Rate as per 10 Sqm
Say
178
Flooring with PHOENIX or Equivalent high strength Cement Concrete interlocking Regular
Pavers of 60 mm thickness of M- 40 Grade of which top 12 mm thick shall be for colour
pigmentation with imported colours and white cement to get required reflective glazing, set over
43 base coat of CM (1:8) 12 mm thick with cement slurry of honey like consistency spread at the rate of
3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full
depth, including cost of all materials like tiles, cement, sand and water etc., complete including
seigniorage charges, etc., complete for finished item of work,
Unit : 10Sqm
a.Materials
Cement Concrete tiles (BMT-D.11)
Cement for CM(1:8) for base coat
Sand for CM(1:8) Proportion
White cement (TBSC-G.I-03)
Sqm
Kg
cum
Kg
10.50
21.60
0.12
6.00
335.00
6169.25
628.07
35.00
10Sqm
MT
cum
Kg
3517.50
133.26
75.37
210.00
3936.12
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (Unskilled)
Add Agency Allowance
Day
Day
Day
25%
0.960
2.240
3.300
2250.20
415.00
370.00
310.00
Day
Day
Day
398.40
828.80
1023.00
562.55
2812.75
6748.87
c
d
e
f
BLDCSTN-9-2
Pg. No 49
Description of Item
Basic rate per 10 Sqm
Lift charges - Add 10% on labour for
F.F,20% for SF, 30% for T.F
Sub-Total ::
Add 13.615% Overhead& Contractor
profit on sub total
Seigniorage charge
(i) Sand - 0.12 x 40 = 4.80
Rate as per 10 Sqm
Say
GF
6748.87
0.00
6748.87
918.86
4.80
7672.53
7672.55
Flooring with Kadapa Slabs 40mm thick of size (not less than 0.457M x 0.457M) set over base coat of
cement mortar (1:8) 12mm thick over CC bed already laid or RCC roof slab, including pointing with
44 cement mortar 1:3 duly filling joints nearly, including cost of all materials like flooring stone, cement,
sand and water etc., complete, including seigniorage charges, labour charges for dressing of flooring
stones etc., complete for finished item of work.
Unit = 10 Sqm.
a. Materials :
Kadapa slabs (40mm thick)
Cement for CM (1:8) proportion for
base coat
Cement for CM 1:3 proportion for
pointing
Sand for CM (1:8) proportion
Sand for CM (1:3) proportion
b. Labour
Mason 1st Class
Mason 2nd class
Mazdoor (Unskilled)
Add Agency Allowance
Sqm
10.50
4036.25
10 Sqm
4238.07
Kg
21.60
6169.25
MT
133.26
Kg
9.60
6169.25
MT
59.22
cum
cum
0.12
0.02
628.07
628.07
Cum
Cum
75.37
12.56
4518.48
day
day
day
25%
0.96
2.24
3.30
2250.20
415.00
370.00
310.00
day
day
day
398.40
828.80
1023.00
562.55
2812.75
7331.23
Sub-Total ::
c) Add 13.615% Overhead&
Contractors profit on sub total
d) Seigniorage charge
(i) Sand - 0.15 x 40 = 6.00
Rate per 10 Sqm
998.15
6.00
Say
179
8335.37
8335.40
BLDCSTN9-20
Page.58
Dadooing to walls with Decorated white back ground glazed tiles 200mm x 152mm 1st. quality of
any bramd as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick
and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with
45
pigment of matching shade including cost and conveyance of all materials like cement, sand, water,
tiles, etc. to site, seigniorage charges, sales and other taxes on all materials, C921 such as mixing of
cement mortar, laying in position, curing, lift charges etc., complete for finished item of work.
Unit : 10Sqm
a.Materials
Decorated white back ground glazed
tiles 200mm x 152mm (TBSC-C.III01)
cement for CM(1:5) base coat
Sand for CM(1:5)
Cement slurry
White cement (TBSC-G.I-03)
Sqm
10.50
6600.00
10Sqm
6930.00
Kg
Cum
Kg
Kg
34.56
0.12
33.00
2.00
6169.25
628.07
6169.25
35.00
MT
Cum
MT
Kg
213.21
75.37
203.59
70.00
7492.16
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (Unskilled)
Add Agency Allowance
Day
Day
Day
25%
0.960
2.240
3.300
2250.20
415.00
370.00
310.00
Day
Day
Day
398.40
828.80
1023.00
562.55
2812.75
10304.91
GF
10304.91
10304.91
Sub-Total ::
Add
13.615%
Overhead&
Contractors profit on sub total
d) Seigniorage charge
(i) Sand - 0.12 x 40 = 4.80
Rate as per 10 Sqm
Say
BLDCSTN9-13
Page.55
4.80
10309.71
10309.75
Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite
machine crushed metal laid over CC bed already laid or RCC roof slab, in alternate panels of size not
46 exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and
thread lining including cost of all materials like cement, metal, sand and water etc., complete, including
seigniorage charges, etc., complete for finished item of work,
Unit : 10Sqm
a.Materials
6mm to 12mm H.G metal (Machine
crushed)
cement
Sand
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (Unskilled)
Add Agency Allowance
Cum
0.17
1292.110
Cum
219.66
Kg
Cum
120.00
0.085
6169.25
628.07
MT
Cum
740.31
53.39
1013.35
Day
Day
Day
25%
1.250
0.060
3.000
1470.95
415.00
370.00
310.00
Day
Day
Day
518.75
22.20
930.00
367.74
1838.69
2852.04
GF
2852.04
2852.04
Sub-Total ::
Add
13.615%
Overhead&
Contractors profit on sub total
Seigniorage charge
(i) Aggregate - 0.17 x 50 = 8.50
(ii) Sand - 0.085 x 40 = 3.40
Rate as per 10 Sqm
Say
388.31
8.50
3.40
3252.25
3252.30
180
BLDCSTN12-1
Page.80
Painting to new internal walls with two (2) coats of ready mixed oil bound washable distemper
acrylic base of approved brand and shade over a base coat of cement primer water base interior
Grade-I of approved brand, makind three (3) coats in all to give an even shade after thourughly
47
brushing the surface to remove all dirt and remains of loose powdered materials, including cost and
conveyance of all materials to work site and all operational, incidental, labour charges etc., complete
for finished item of work in all floors for internal walls (SS 911)
Unit = 10 Sqm
PRIMARY COAT
Cost of cement primer water base
interior Grade-I (TBSC-G.I-01)
Painter (1st class)
Painter (2nd class)
Cost of washable Oil Bound
Distemper acrylic base (TBSC-G.II03)
1st class painter
2nd class painter
Add Agency Allowance
Litre
0.50
165.00
Litre
82.50
Nos
Nos
0.08
0.19
480.00
370.00
Nos
Nos
38.40
70.30
Kg
1.70
90.00
Litre
153.00
Nos
Nos
25%
0.36
0.84
483.60
480.00
370.00
Nos
Nos
Sub-Total ::
Add 13.615% Overhead& Contractor profit on sub-Total
Rate per 10 Sqm
Say
BLDCSTN11-5
Page.79
48
White washing two coats with paint grade white lime for wash or equivalent quality to give an
even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered
materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges
etc., complete for finished item of work in all floors for walls
Unit : 10Sqm
a.Materials
Paint grade white lime for wash
(TBSC-G.II-01)
b.Labour
Painter (1st class)
Painter (2nd class)
Mazdoor (Unskilled)
Add Agency allowance
c) Sundries including brushes
ladders etc., @ 1% on labour (b)
Sub-Total ::
d) Add 13.615% Overhead&
Contractor profit on (a+b+c)
Rate per 10 Sqm
Kg
2.00
24.00
Kg
48.00
Day
Day
Day
25%
0.060
0.150
0.320
480.00
370.00
310.00
183.50
Day
Day
Day
28.80
55.50
99.20
45.88
1.84
279.21
25%
13.615%
279.21
0.00
Say
BLDCSTN12-4
Page.81
344.20
172.80
310.80
120.90
604.50
948.70
129.17
1077.87
1077.90
279.21
279.30
Painting to external walls with Water Proof Cement Paint two (2) coats all colours and shade as
approved by Engineer in charge over a base coat of a cement primer water base exterior Grade-II of
approved brand, makind three (3) coats in all to give an even shade after thourughly brushing the
49
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of
all materials to work site and all operational, incidental, labour charges etc., complete for finished item
of work in all floors for external walls (SS 911)
Unit : 10Sqm
PRIMARY COAT
Cost of Cement Primer water base
exterior Grade-II (TBSC-G.I-01)
Painter (1st class)
Painter (2nd class)
Sundries including brushes, soaps
putty etc., 0.5% on labour
Cost of Water Proof Cement Paint
(TBSC-G.II-04)
Litre
1.00
165.00
Litre
165.00
Day
Day
0.21
0.49
480.00
370.00
day
day
100.80
181.30
1.06
Kg
3.50
55.00
Kg
192.50
640.66
Labour
Painter (1st class)
Painter (2nd class)
Mazdoor (Un skilled)
Add Agency Allowance
Day
Day
Day
25%
0.15
0.35
1.50
666.50
480.00
370.00
310.00
day
day
day
72.00
129.50
465.00
166.63
833.13
833.13
8.33
1482.12
181
Add
13.615%
Contractors profit
Overhead&
201.79
BLDCSTN-1211 (187)
Page - 84
1683.91
1683.95
Litre
1.00
165.00
Litre
165.00
Litre
0.80
270.00
Litre
216.00
381.00
Add
13.615%
Contractors profit
Rater per 10 Sqmt.
day
day
day
25%
0.21
0.49
1.50
747.10
480.00
370.00
310.00
day
day
day
Sub-Total :
Overhead&
0.00
Say
BLDCSTN-1211 (187)
Page - 84
100.80
181.30
465.00
186.78
933.88
1314.88
1314.88
1314.90
Litre
1.00
165.00
Litre
165.00
Litre
0.80
276.00
Litre
220.80
385.80
Add
13.615%
Contractors profit
Rater per 10 Sqmt.
day
day
day
25%
0.21
0.49
1.50
747.10
480.00
370.00
310.00
day
day
day
Sub-Total :
Overhead&
100.80
181.30
465.00
186.78
933.88
1319.68
179.67
Say
182
1499.35
1499.40
BLDCSTN12-7 (174)
Page.82
Painting priming coat on New Iron work with red oxide primer Grade-I after thourughly brushing
the surface to remove all dirt and remains of loose powered materials, including cost and conveyance
52
of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete
for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors
Unit : 10Sqm
a.Materials
Red oxide primer (TBSC-G.I-05)
Litre
0.70
142.00
Litre
99.40
99.40
b.Labour
Painter (1st class)
Painter (2nd class)
Add Agency Allowance
day
day
25%
0.21
0.49
282.10
480.00
370.00
day
day
100.80
181.30
70.53
352.63
Add
13.615%
Overhead&
Contractors profit
Rate per 10 Sqm.
48.01
Say
BLDCSTN12-12
(197)
Page.86
500.04
500.05
Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all
shades over red oxide primer Grade-I making three (3) coats in all to given and even shade after
53 thourughly brushing the surface to remove all dirt and remains of loose powered materials, including
cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour
charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors
Unit = 10 Sqm.
a.Materials
Synthetic enamal paint (TBSC-G.V01)
Ltr
1.10
276.000
Ltr
303.60
303.60
b.Labour
Painter (1st class)
Painter (2nd class)
Add Agency Allowance
Day
Day
25%
0.33
0.77
443.30
480.00
370.00
Day
Day
Sub-Total ::
Add 13.615% Overhead& Contractors profit
Rate as per 10 Sqm
Say
183
158.40
284.90
110.83
554.13
857.73
116.78
974.51
974.55
Making Green Chalk Board of size 3.00 x 1.20 Mts including border with plastering in CM(1:2) 12mm
thick as base coat and 3mm top coat with cement green oxide powder (1:1) and making border in CM
(1:2) of 50 x 20mm thick allround the chalk board over existing plastered surface and painting the chalk
54
board surface with chalk board paint as per direction of Enginer-in-Charge including cost, conveyance
of all materials, sales and other taxes on cost of all materials and all operational, incidental and labour
charges etc. complete for finished item of work (APSS No: 1603)
Unit = Each
Base coate CM (1:2) 12mm thick
Cost of CM (1:2)
0.15
5178.83
cu.m.
day
day
day
25%
0.33
0.77
1.6
917.85
415.00
370.00
310.00
day
day
day
Total
Kgs
Kg
3.15
15
6.17
105.00
Kgs
Kg
day
day
day
25%
0.33
0.77
1.6
917.85
415.00
370.00
310.00
day
day
day
day
day
day
25%
c
d
e
f
0.66
1.54
3.70
1990.70
415.00
370.00
310.00
Total
cu.m.
day
day
day
Total
776.83
776.83
136.95
284.90
496.00
229.46
1147.31
1924.14
19.43
1575.00
1594.43
136.95
284.90
496.00
229.46
1147.31
2741.74
1087.56
1087.56
273.90
569.80
1147.00
497.68
2488.38
3575.94
Ltr
1.10
199.00
Ltr
day
day
25%
0.33
0.77
443.30
480.00
370.00
day
day
Sq.m.
4.03
192.41
Sq.m.
218.90
218.90
158.40
284.90
110.83
554.13
773.03
775.43
Sq.m.
3.60
274.17
Sq.m.
987.03
Sq.m.
0.43
357.59
Sq.m.
153.77
Sq.m.
4.03
77.30
Sq.m.
GF
2227.75
FF
2227.75
SF
2227.75
311.53
2227.75
TF
2227.75
0.00
96.46
192.91
289.37
2227.75
2324.21
2420.66
2517.12
303.31
316.44
329.57
342.71
8.40
8.40
8.40
8.40
2539.46
2539.50
2649.05
2649.05
2758.64
2758.65
2868.23
2868.25
184
BLDCSTN12-12
(195)
Page.86
Painting to New wood work with two coats of ready mixed synthetic enamel paint first quality all
shades to give an even shade over base coatof wood Primer finishing with putty for wood work after
55 thouroughly brushing the surface to remove all remains including cost and conveyance of all materials
to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished
item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors
Unit = 10 Sqm.
a.Materials
Wood primer (TBSC-G.I-07)
Putty for wood work (TBSC-G.I-08)
Synthetic enamal paint (TBSC-G.V01)
Litre
Kg
0.70
1.00
158.00
158.00
Litre
Kg
110.60
158.00
Ltr
1.10
276.000
Ltr
303.60
day
day
25%
0.21
0.49
282.10
480.00
370.00
day
day
100.80
181.30
70.53
Day
Day
25%
0.36
0.84
483.60
480.00
370.00
Day
Day
172.80
310.80
120.90
1529.33
b.Labour
Forpriming coat
Painter (1st class)
Painter (2nd class)
Add Agency allowance
Synthetic enamel paint two coats
Painter (1st class)
Painter (2nd class)
Add Agency allowance
Sub-Total ::
Add 13.615% Overhead&
Contractors profit
Rate as per 10 Sqm
14%
1529.33
208.22
Say
1737.54
1737.60
56 Supply and Fixing of 50mm thick Cement Jali including cost and conveyance of all materials to site,
sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of
work in All Floors.
Rate as per SSR (BMSW-17)
P.No.79
Add 13.615% Overhead&
Contractors profit
Rate per Sqmt.
Sqmt
402.00
14%
402.00
Sqm
402.00
56.28
458.28
57 Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked
together through their entire length and jointed together at the ends by end-locks, mounted on specially
designed pipe shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide channels,
stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull
operations including cost of hood cover and springs complete, painted with one coat of approved steel
primer, locks, ball bearings, all accessories etc complete for finished item of work as per special spn:
1108
Rate as per SSR (BMT -F-29)
P.No.22
Add 14% Overhead& Contractors
profit
Rate per Sqmt.
Sqmt
2861.00
14%
2861.00
Sqm
2861.00
400.54
3261.54
58 Ellispattern flooring with CC(1:5:10) using 40mm HBG metal of 80mm thick and top with CC(1:2:4)
using 20 mm HBG metal of 40mm thick and top finish with CM(1:3) of 0.07 cum/10 sqm and cement
slurry 3.30 kg/10 sqm including cost and conveyance of all materials of all materials etc., complete.
Unit : Cum
CC (1:5:10)
a.Material
Cement
Coarse aggregate 40mm
Fine Aggregate (Sand)
b. Machinery
Concrete Mixer (0.2/0.8 cum
capacity) 600/400 (Diesel)
Kg
Cum
Cum
129.60
0.90
0.45
6169.25
1144.91
628.07
MT
Cum
Cum
799.53
1030.42
282.63
2112.59
hour
1.00
459.30
hour
459.30
459.30
c.Labour
Mason 1st Class
Mazdoor(Unskilled)
Add Agency Allowance
Add Agency Allowance on Crew
charges of concrete mixer
Day
Day
25%
0.10
1.39
472.40
25%
174.20
185
415.00
310.00
Day
Day
41.50
430.90
118.10
43.55
Sub-Total ::
186
634.05
3205.94
CC (1:2:4)
a.Material
Cement
Coarse aggregate 20mm
Fine Aggregate (Sand)
b. Machinery
Concrete Mixer (0.2/0.8 cum
capacity) 600/400 (Diesel)
Kg
Cum
Cum
330.00
0.80
0.40
6169.25
1664.91
628.07
MT
Cum
Cum
2035.85
1331.93
251.23
3619.01
hour
1.00
459.30
hour
459.30
459.30
c.Labour
Mason 1st Class
Mazdoor(Unskilled)
Add Agency Allowance
Add Agency Allowance on Crew
charges of concrete mixer
Day
Day
25%
0.10
1.39
472.40
25%
174.20
415.00
310.00
Cum
Cum
Asst.Engineer
TW Bhadrachalam
41.50
430.90
118.10
43.55
Sub-Total ::
Unit - 10 Sqm
CC (1:5:10)
CC (1:2:4)
Day
Day
634.05
4712.36
0.80
0.40
3205.94
4712.36
2564.75
1884.94
4449.69
13.615%
4449.69
605.83
5055.52
Superintending Engineer
Tribal Welfare, Warangal
187
Description of Item.
Lengt
h
No.
Qty.
Unit
Rate
per Amount.
1x
1x
30
30 Rmt
43.86 Rmt.
1316
6
6 Pts.
### Each
9696
1x
1 pts
###
2147
1x
1 sets
###
1593
1x
10
329.66 Each
3297
18049
Qty.
Units
Description
SSR Item
No. &
Pg.No.
Rate
Per
Amount
Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in wall with all
required accessories including masonary ork and labour charges etc., complete. DATA 1.4.2 (a)
Pg.160
In Walls
In Slab
Rmt
ELE-1.2.4
Pg.126(55)
31.80
1Rmt
3180.00
3180.00
100.00
Nos
Cost of U Links
ELEC-8.1.7
Pg.210
44.00
100 No
44.00
0.00
12.00
Nos
ELEC-1.2.39 Pg
(128)
25.00
1Each
300.00
300.00
12.00
Nos
ELEC-1.2.44
Pg.(128)
6.00
1Each
72.00
72.00
50.00
Kgs
Cost of Cement
LEAD
STATEMENT
5348.75
1Mt
267.44
0.00
Labour
2.00
Nos
Skilled Electrician
Labour
Charges
440.00
1 Day
880.00
880.00
2.00
Nos
Labour
Charges
375.00
1 Day
750.00
750.00
2.00
Nos
Helpers
Labour
Charges
345.00
1 Day
690.00
690.00
2.00
Nos
Labour
Charges
345.00
1 Day
690.00
690.00
6873.44
6562.00
14%
0.00
918.68
6873.44
7480.68
68.73
74.81
Supply and Fixing of 25mm dia 1.50mm thick PVC pipe (ISI MARK) concealed in wall with all
required accessories including masonary ork and labour charges etc., complete. DATA 1.4.2 (a)
Pg.160
For Taking 100 mts
100.00
Rmt
ELEC-1.2.3
Pg.126
25.40
1Rmt
2540.00
100.00
Nos
Cost of U Links
ELEC-8.1.7
Pg.210
44.00
100 No
44.00
12.00
Nos
ELEC-1.2.39 Pg
(128)
25.00
1Each
300.00
12.00
Nos
ELEC-1.2.44
Pg.(128)
6.00
1Each
72.00
50.00
Kgs
Cost of Cement
0.00
0.00
1Mt
0.00
Labour
2.00
Nos
Skilled Electrician
Labour
Charges
440.00
1 Day
880.00
2.00
Nos
Labour
Charges
375.00
1 Day
750.00
2.00
Nos
Helpers
Labour
Charges
345.00
1 Day
690.00
2.00
Nos
Labour
Charges
345.00
1 Day
690.00
14%
0.00
Total:
5966.00
6801.24
835.24
/ 100Rmt
68.01
/ 1Rmt
Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper
cable (ISI MARK) in existing pipe with 6A witch, Ceiling rose and 3mm thick hylam sheet covering
to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan
points in Non-Residential Buildings Taking Output = 6 Points
100.00
Rmt
ELEC-1.5.1
Pg.129
1051.00
100 Rmt
1051.00
6.00
Nos
ELEC-1.7.1
Pg. 132
18.00
1 No
108.00
6.00
Nos
ELEC-1.7.15
21.00
1Each
126.00
1.00
Nos
ELEC-1.4.19
Pg.149
44.00
1Each
44.00
Labour
0.60
Nos
Skilled Electrician
Labour
Charges
440.00
1 Day
264.00
1.20
Nos
Labour
Charges
375.00
1 Day
450.00
0.60
Nos
Helpers
Labour
Charges
345.00
1 Day
207.00
14%
0.00
Total:
2250.00
2250.00
375.00
/ 6 Points
/ 1 Point
Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper
cable (ISI MARK) in existing pipe with 6A witch, Ceiling rose and 3mm thick hylam sheet covering
to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan
points in Non-Residential Buildings Taking Output = 6 Points
100.00
Rmt
ELEC-1.5.1
Pg.129
1051.00
100 Rmt
1051.00
6.00
Nos
ELEC-1.7.1
Pg. 132
18.00
1 No
108.00
6.00
Nos
ELEC-1.7.15
21.00
1Each
126.00
1.00
Nos
ELEC-1.4.19
Pg.149
44.00
1Each
44.00
Labour Charges
440.00
1 Day
264.00
Labour
0.60
Nos
Skilled Electrician
1.20
Nos
Labour
Charges
375.00
1 Day
450.00
0.60
Nos
Helpers
Labour
Charges
345.00
1 Day
207.00
Total:
2250.00
14%
0.00
315.00
/ 6 Points
2565.00
427.50
/ 1 Point
Supply and Fixing of 16A 3pin and 6A 3pin plug socket with indicator lamp and 16A fuse unit and
16A switch control (5 in 1) duly recessed in wall with wooden deep box of 6" x8" x2 1/2" size
covered with hylam sheet including earth connections and all labour charges etc., complete.
Materials:
1.00
Nos
ELEC-1.4.11
Pg.128 (122)
44.00
1Each
44.00
1.00
Nos
ELEC-1.4.18
Pg. 149
26.40
1 No
26.40
1.00
Nos
ELEC-1.7.11
Pg.153)
146.00
1Each
146.00
Labour
0.10
Nos
Skilled Electrician
Labour
Charges
440.00
1 Day
44.00
0.10
Nos
Labour
Charges
375.00
1 Day
37.50
0.10
Nos
Helpers
Labour
Charges
345.00
1 Day
34.50
14%
0.00
332.40
46.54
378.94
Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of light point complete
with all connections and all labour charges with 40W bulb (for new installation).
Materials:
1.00
Nos
ELEC-3.6.90
Pg.189
24.20
1Each
24.20
1.00
Nos
Bulb
ELEC-3.7.1
Pg. 190
12.00
1Each
12.00
/ 1Each
Labour
0.05
Nos
Skilled Electrician
Labour
Charges
440.00
1 Day
22.00
0.05
Nos
Helpers
Labour
Charges
345.00
1 Day
17.25
14%
0.00
75.45
Add Overheads and Contractor profits @
14%
Total:
75.45
Supply and run of 2 of 22/0.3mm (1.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing
pipe for mains inlcuding all labour charges etc., complete.
Materials:
200.00
Rmt
ELEC-1.5.2
Pg.150
1555.00
100 Rmt
3110.00
/ 1Each
Labour
0.67
Nos
Skilled Electrician
Labour
Charges
440.00
1 Day
294.80
2.00
Nos
Labour
Charges
375.00
1 Day
750.00
0.67
Nos
Helpers
Labour
Charges
345.00
1 Day
231.15
14%
0.00
4385.95
/ 100 Rmt
4385.95
43.86
/ 1 Rmt
Supply of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball
bearings with all standard accessories.
Materials:
1.00
Nos
1%
Cost of Fan
ELEC-5.1.1
Pg.209
Transportation charges
1600.00
1Each
1600.00
1600.00
16.00
1616.00
14%
0.00
1616.00
Supply and fixing SPN Distribution board with IP-20 protection suitable for single phase Earth
Leakage Circute Braker (ELCB) / Residual Current Circute Braker (RCCB) / Double Pole (DP)
Isolator as incomer and 10kA SPN MCBs as out going including internal connections and labour
charges for surface / flush mounting etc., complete. 40A DP Isolator / RCCB / ELCB - 1 No for
incomer, 6-32A SP MCBs - 6Nos for outgoing.
Materials:
1.00
Nos
ELEC-2.12.2
Pg.169
880.00
1Each
880.00
1.00
Nos
ELEC-2.10.2
Pg.167
366.20
1Each
366.20
6.00
Nos
ELEC-2.9.1
Pg.166
200.60
1Each
1203.60
/ 1 Each
Labour
0.50
Nos
Skilled Electrician
Labour
Charges
440.00
1 Day
220.00
1.00
Nos
Labour
Charges
375.00
1 Day
375.00
1.00
Nos
Helpers
Labour
Charges
345.00
1 Day
345.00
Sundries
14%
0.00
49.00
3438.80
481.43
3920.23
10
Supply and Run of 2 of 6 Sq.mm WPTC Aluminium cable along with No.10 SWG G.I bearer wire
through PVC cleats with all accessories including labour charges etc., complete.
Materials:
200.00
Rmt
ELEC-1.6.2
Pg.152
1492.00
100 Rmt
2984.00
6.70
Kgs
ELEC-8.1.45
Pg.235
61.60
1Kg
412.72
4.00
Nos
Insulation taps
ELEC-8.121
Pg.235
15.00
1Each
60.00
2.00
Nos
ELEC-8.1.11
Pg.234
50.00
Each box
100.00
/ 1Each
Labour
1.00
Nos
Skilled Electrician
Labour
Charges
440.00
1 Day
440.00
1.00
Nos
Labour
Charges
375.00
1 Day
375.00
1.00
Nos
Helpers
Labour
Charges
345.00
1 Day
345.00
Sundries
14%
0.00
1.50
4718.22
/ 100 Rmt
4718.22
47.18
/ 1 Rmt
11
Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe
and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with
mesh enclosed in C.C.Chamber of 400m x 400m x400mm with R.C.C. Slab cover duly providing
staggered holes filling with salt and charcoal from the bottom of the pipe giving earth connection
from electrode through G.I strip of 25 x 6mm x 200mm length with all accessories and labour
charges complete, as per IS specifications 732/1982 (Part II)
Materials:
0.85
Cum
As per Civil
Data
247.70
10 Cum
21.05
0.90
Cum
As per Civil
Data
247.70
10 Cum
22.29
25%
2.50
Rmt
1.00
No
16.00
43.34
10.84
355.00
1Rmt
887.50
50.00
1Each
50.00
Nos
5.00
1Each
80.00
4.00
Rmt
22.00
1Set
88.00
1.00
No
220.00
1Each
220.00
20.00
Kgs
Cost of Salt
4.00
1Kg
80.00
40.00
Kgs
8.00
1Kg
320.00
ELEC-8.1.57
ELEC-8.1.13
Labour
0.50
Nos
Semi Skilled
Labour
Charges
375.00
1 Day
187.50
0.50
Nos
Helpers
SSR.No.2
Pg.191
345.00
1 Day
172.50
Sundries
14%
0.00
0.35
2140.03
299.60
2439.63
12
Supply and Fixing of 1x36 W / 40W tube light luminaire on wall / Ceiling with / TW round blocks
with all accessories including giving connections and all labour charges etc., Complete.
Materials:
1.00
No
ELEC-3.6.18
Pg.185
231.00
1Each
231.00
1.00
Rmt
ELEC-1.6.8
Pg.152
990.00
100 Rmt
9.90
2.00
Nos
Cost of Screw
ELEC-1.4.39
Pg.149
118.80
100 Nos
2.38
2.00
Nos
ELEC-8.1.9
Pg.235
25.00
100 Each
0.50
2.00
Nos
Round blocks
ELEC-8.1.35
Pg.236
6.00
1 Each
12.00
/ 1Each
Labour
0.10
Nos
Labour
Charges
375.00
1 Day
37.50
0.10
Nos
Helpers
Labour
Charges
345.00
1 Day
34.50
Sundries
1.88
329.66
14%
0.00
329.66
/ 1Each
13
Supply of 1x40W weatherproof flourescent streetlight fitting comprising canopy of sheet Aluminium
in stove enamel finish with copper / VPIT ballast, capacitor, tube and starter etc., complete.
Materials:
1.00
No
1.00
No
Cost of 40 W Tube
ELEC-3.1.1
Pg.175
1459.50
1Each
1459.50
45.00
1Each
45.00
Sundries
15.00
Labour
0.10
Nos
Labour
Charges
375.00
1 Day
37.50
0.10
Nos
Helpers
Labour
Charges
345.00
1 Day
34.50
Sundries
1.88
1593.38
14%
0.00
Assistant Engineer
TW Bhadrachalam
Superintending Engineer
Tribal Welfare, Warangal
1593.38
Executive Engineer
TWD: Bhadrachalam
/ 1Each