Академический Документы
Профессиональный Документы
Культура Документы
Refrigeration System
(Page 1 of 5)
HRD Division
Air-conditioning and
Refrigeration System
HRD Division
(Page 2 of 5)
Air-conditioning and
Refrigeration System
HRD Division
(Page 3 of 5)
4) Ventilation
i.
ii.
5) Chillers
i. Reciprocating chillers
ii. Centrifugal chillers
iii. Screw chillers
iv. Cooling Tower: Counter flow/Cross flow/ Chemical treatment of condensed water
6) Chilled water piping.
i. Pipe materials, type and applicable standards
ii. Components & Accessories
iii. Erection Methods.
iv. Installation checks
v. Testing methods
vi. Materials and relevant standards
vii. Good Practices
viii. Bad practices & affects
ix. After installation checks
7) Ducting System
x. Ducting system, components and accessories
xi. Duct Insulation
xii. Applications
Air-conditioning and
Refrigeration System
HRD Division
xiii. Good practices
xiv. Bad practices & affects
xv. Final checks
8) Selection of HVAC components
a. Cooling load Estimation (Manual)
i. Building survey & Architectural drawing study
ii. Zone & Space concept, Strategy
iii. Type of load & load components
iv. Factors & tables
v. Procedure & practices
Selection of
vi. Compressors
vii. Condensers
viii. Evaporators
ix. Air Handling Units (AHUs)
x. Fan coil units (FCUs)
xi. Expansion devices
xii. Piping system design
b. Ducting system
i. Demonstration of various methods
ii. Advantage and applications
iii. Critical factors and effects
(Page 4 of 5)
Air-conditioning and
Refrigeration System
HRD Division
(Page 5 of 5)
ii.
iii.
iv.
v.
vi.
vii.
Controls used Refrigerant Circuit, Chilled water and Conditioned air circuits