Rate Analysis for Hume Pipes

Lowering, laying and jointing true to line and level RCC Hume pipes (NP-2
class) with specials including collars and perfect linking of joints with jack to
correct position including cost of pipes & collars, jointing materials i.e. C:M 1:3
proportion and tar dipped hemp, including filling the excavated trench with
approved quality saturated sand on sides, bottom and top surface of pipe with
all leads and lifts, including giving hydraulic test to the required pressure equal
to 2.10 times the working pressure (Contractor will make his own
arrangements for procuring water for testing).
Sl. No.

Item

Unit

Providing & laying NP2 Class 300mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes

Rmt
Each
Rmt

900.00
65.00
80.00

Rmt
Rmt

97.50
26.67
1169.17
120.63
15.20
96.50
1401.49
210.22
1611.71
537.24
540.00

d) Labour charges for laying & jointing pipes


including cost of jointing material.
e) Labour charges for sand filling
Sub Total
f) VAT @ 12.5% on (a) & (b)
g) Service Tax @ 12.24% on (d) & (e)
h) Transportation @ 10% on (a) & (b)
Sub Total
i) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 540.00 / Rmt
2

Providing & laying NP2 Class 450mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes
d) Labour charges for laying & jointing pipes
including cost of jointing material.
e) Labour charges for sand filling
Sub Total
f) VAT @ 12.5% on (a) & (b)
g) Service Tax @ 12.24% on (d) & (e)
h) Transportation @ 10% on (a) & (b)
Sub Total
i) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 960.00 / Rmt

Providing & laying NP2 Class 600mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes
d) Labour charges for laying & jointing pipes
including cost of jointing material.
e) Labour charges for sand filling
Sub Total

Page 1

Rs.
Rs.
Rs.

Rate

Rmt
Each
Rmt

1620.00
120.00
129.00

Rmt
Rmt

177.00
43.00
2089.00
217.50
26.93
174.00
2507.43
376.11
2883.54
961.18
960.00

Rs.
Rs.
Rs.

Rmt
Each
Rmt

3000.00
180.00
185.00

Rmt
Rmt

229.50
61.67
3656.17

Rate Analysis for Hume Pipes


Lowering, laying and jointing true to line and level RCC Hume pipes (NP-2
class) with specials including collars and perfect linking of joints with jack to
correct position including cost of pipes & collars, jointing materials i.e. C:M 1:3
proportion and tar dipped hemp, including filling the excavated trench with
approved quality saturated sand on sides, bottom and top surface of pipe with
all leads and lifts, including giving hydraulic test to the required pressure equal
to 2.10 times the working pressure (Contractor will make his own
arrangements for procuring water for testing).
Sl. No.

Item
f) VAT @ 12.5% on (a) & (b)
g) Service Tax @ 12.24% on (d) & (e)
h) Transportation @ 10% on (a) & (b)
Sub Total
i) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 1,690.00 / Rmt
Providing & laying NP2 Class 900mm Hume
pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes
d) Labour charges for laying & jointing pipes
including cost of jointing material.
e) Labour charges for sand filling
Sub Total
f) VAT @ 12.5% on (a) & (b)
g) Service Tax @ 12.24% on (d) & (e)
h) Transportation @ 10% on (a) & (b)
Sub Total
i) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 2,475.00 / Rmt

Providing & laying NP2 Class 1200mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes
d) Labour charges for laying & jointing pipes
including cost of jointing material.
e) Labour charges for sand filling
Sub Total
f) VAT @ 12.5% on (a) & (b)
g) Service Tax @ 12.24% on (d) & (e)
h) Transportation @ 10% on (a) & (b)
Sub Total
i) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 3,845.00 / Rmt

Page 2

Unit

Rs.
Rs.
Rs.

Rate
397.50
35.64
318.00
4407.31
661.10
5068.40
1689.47
1690.00

Rmt
Each
Rmt

4380.00
180.00
325.00

Rmt
Rmt

375.00
108.33
5368.33
570.00
59.16
456.00
6453.49
968.02
7421.52
2473.84
2475.00

Rs.
Rs.
Rs.

Rmt
Each
Rmt
Rmt
Rmt

6720.00
180.00
750.00

487.50
250.00
8387.50
862.50
90.27
690.00
10030.27
1504.54
Rs. 11534.81
Rs. 3844.94
Rs. 3845.00

Rate Analysis for Hume Pipes


Lowering, laying and jointing true to line and level RCC Hume pipes (NP-2
class) with specials including collars and perfect linking of joints with jack to
correct position including cost of pipes & collars, jointing materials i.e. C:M 1:3
proportion and tar dipped hemp, including filling the excavated trench with
approved quality saturated sand on sides, bottom and top surface of pipe with
all leads and lifts, including giving hydraulic test to the required pressure equal
to 2.10 times the working pressure (Contractor will make his own
arrangements for procuring water for testing).
Sl. No.

Item

Unit

Rate

Lowering, laying and jointing true to line and level RCC Hume pipes (NP-3
class) with specials including collars and perfect linking of joints with jack to
correct position including cost of pipes & collars, jointing materials i.e. C:M 1:3
proportion and tar dipped hemp, including filling the excavated trench with
approved quality saturated sand on sides, bottom and top surface of pipe with
all leads and lifts, including giving hydraulic test to the required pressure equal
to 2.10 times the working pressure (Contractor will make his own
arrangements for procuring water for testing).
Sl. No.

Item

Unit

Rate

Providing & laying NP3 Class 300mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes

Rmt
Each
Rmt

1320.00
65.00
80.00

Rmt
Rmt

180.00
26.67
1671.67
173.13
25.30
138.50
2008.59
301.29
2309.88
769.96
770.00

d) Labour charges for laying & jointing pipes


including cost of jointing material.
e) Labour charges for sand filling
Sub Total
f) VAT @ 12.5% on (a) & (b)
g) Service Tax @ 12.24% on (d) & (e)
h) Transportation @ 10% on (a) & (b)
Sub Total
i) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 770.00 / Rmt
2

Providing & laying NP3 Class 450mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes
d) Labour charges for laying & jointing pipes
including cost of jointing material.
e) Labour charges for sand filling
Sub Total
f) VAT @ 12.5% on (a) & (b)
g) Service Tax @ 12.24% on (d) & (e)
h) Transportation @ 10% on (a) & (b)
Sub Total
i) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 1,600.00 / Rmt

Page 3

Rs.
Rs.
Rs.

Rmt
Each
Rmt

2940.00
120.00
129.00

Rmt
Rmt

225.00
43.00
3457.00
382.50
32.80
306.00
4178.30
626.75
4805.05
1601.68
1600.00

Rs.
Rs.
Rs.

Rate Analysis for Hume Pipes


Lowering, laying and jointing true to line and level RCC Hume pipes (NP-2
class) with specials including collars and perfect linking of joints with jack to
correct position including cost of pipes & collars, jointing materials i.e. C:M 1:3
proportion and tar dipped hemp, including filling the excavated trench with
approved quality saturated sand on sides, bottom and top surface of pipe with
all leads and lifts, including giving hydraulic test to the required pressure equal
to 2.10 times the working pressure (Contractor will make his own
arrangements for procuring water for testing).
Sl. No.

Item

Unit

Rate

Providing & laying NP3 Class 600mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes

Rmt
Each
Rmt

3720.00
180.00
185.00

Rmt
Rmt

292.50
61.67
4439.17
487.50
43.35
390.00
5360.02
804.00
6164.02
2054.67
2055.00

d) Labour charges for laying & jointing pipes


including cost of jointing material.
e) Labour charges for sand filling
Sub Total
f) VAT @ 12.5% on (a) & (b)
g) Service Tax @ 12.24% on (d) & (e)
h) Transportation @ 10% on (a) & (b)
Sub Total
i) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 2,055.00 / Rmt
4

Providing & laying NP3 Class 900mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes
d) Labour charges for laying & jointing pipes
including cost of jointing material.
e) Labour charges for sand filling
Sub Total
f) VAT @ 12.5% on (a) & (b)
g) Service Tax @ 12.24% on (d) & (e)
h) Transportation @ 10% on (a) & (b)
Sub Total
i) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 3,560.00 / Rmt

Rs.
Rs.
Rs.

Rmt
Each
Rmt

6600.00
180.00
325.00

Rmt
Rmt

472.50
108.33
7685.83
847.50
71.09
678.00
9282.43
1392.36
Rs. 10674.79
Rs. 3558.26
Rs. 3560.00

Providing & laying NP3 Class 1200mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes

Rmt
Each
Rmt

10800.00
180.00
750.00

d) Labour charges for laying & jointing pipes


including cost of jointing material.
e) Labour charges for sand filling

Rmt
Rmt

645.00
250.00

Page 4

Rate Analysis for Hume Pipes


Lowering, laying and jointing true to line and level RCC Hume pipes (NP-2
class) with specials including collars and perfect linking of joints with jack to
correct position including cost of pipes & collars, jointing materials i.e. C:M 1:3
proportion and tar dipped hemp, including filling the excavated trench with
approved quality saturated sand on sides, bottom and top surface of pipe with
all leads and lifts, including giving hydraulic test to the required pressure equal
to 2.10 times the working pressure (Contractor will make his own
arrangements for procuring water for testing).
Sl. No.

Item

Unit
Sub Total

f) VAT @ 12.5% on (a) & (b)


g) Service Tax @ 12.24% on (d) & (e)
h) Transportation @ 10% on (a) & (b)
Sub Total
i) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 5,830.00 / Rmt

Note : Labour cost for laying & jointing


adopted from KUWSDB 1999-2000 as basis.

Page 5

Rate
12625.00
1372.50
109.55
1098.00
15205.05
2280.76
Rs. 17485.81
Rs. 5828.60
Rs. 5830.00

Rate Analysis for Hume Pipes


Lowering, laying and jointing true to line and level RCC Hume pipes (NP-2
class) with specials including collars and perfect linking of joints with jack to
correct position including cost of pipes & collars, jointing materials i.e. C:M 1:3
proportion and tar dipped hemp, including filling the excavated trench with
approved quality saturated sand on sides, bottom and top surface of pipe with
all leads and lifts, including giving hydraulic test to the required pressure equal
to 2.10 times the working pressure (Contractor will make his own arrangements
for procuring water for testing).
Sl. No.

Item

Unit

Providing & laying NP2 Class 300mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes

Rmt
Each
Rmt

900.00
65.00
80.00

Rmt
Rmt

97.50
53.33
1195.83
96.50
1292.33
51.69
1344.03
201.60
1545.63
515.21
515.00

d) Labour charges for laying & jointing pipes


including cost of jointing material.
e) Labour charges for sand filling
Sub Total
g) Transportation @ 10% on (a) & (b)
Sub Total
f) WCT @ 4% on sub total
Sub Total
h) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 515.00 / Rmt
2

Providing & laying NP2 Class 450mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes
d) Labour charges for laying & jointing pipes
including cost of jointing material.
e) Labour charges for sand filling
Sub Total
g) Transportation @ 10% on (a) & (b)
Sub Total
f) WCT @ 4% on sub total
Sub Total
h) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 920.00 / Rmt

Providing & laying NP2 Class 600mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes

Rs.
Rs.
Rs.

Rate

Rmt
Each
Rmt

1620.00
120.00
129.00

Rmt
Rmt

177.00
86.00
2132.00
174.00
2306.00
92.24
2398.24
359.74
2757.98
919.33
920.00

Rs.
Rs.
Rs.

Rmt
Each
Rmt

3000.00
180.00
185.00

d) Labour charges for laying & jointing pipes


including cost of jointing material.
e) Labour charges for sand filling
Sub Total
g) Transportation @ 10% on (a) & (b)
Sub Total
f) WCT @ 4% on sub total
Sub Total
h) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 1,610.00 / Rmt
4

Providing & laying NP2 Class 900mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes
d) Labour charges for laying & jointing pipes
including cost of jointing material.
e) Labour charges for sand filling
Sub Total
g) Transportation @ 10% on (a) & (b)
Sub Total
f) WCT @ 4% on sub total
Sub Total
h) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 2,365.00 / Rmt

Providing & laying NP2 Class 1200mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes
d) Labour charges for laying & jointing pipes
including cost of jointing material.
e) Labour charges for sand filling
Sub Total
g) Transportation @ 10% on (a) & (b)
Sub Total
f) WCT @ 4% on sub total
Sub Total
h) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 3,720.00 / Rmt

Rmt
Rmt

Rs.
Rs.
Rs.

229.50
123.33
3717.83
318.00
4035.83
161.43
4197.27
629.59
4826.86
1608.95
1610.00

Rmt
Each
Rmt

4380.00
180.00
325.00

Rmt
Rmt

375.00
216.67
5476.67
456.00
5932.67
237.31
6169.97
925.50
7095.47
2365.16
2365.00

Rs.
Rs.
Rs.

Rmt
Each
Rmt

6720.00
180.00
750.00

Rmt
Rmt

487.50
500.00
8637.50
690.00
9327.50
373.10
9700.60
1455.09
11155.69
3718.56
3720.00

Rs.
Rs.
Rs.

Lowering, laying and jointing true to line and level RCC Hume pipes (NP-3
class) with specials including collars and perfect linking of joints with jack to
correct position including cost of pipes & collars, jointing materials i.e. C:M 1:3
proportion and tar dipped hemp, including filling the excavated trench with
approved quality saturated sand on sides, bottom and top surface of pipe with
all leads and lifts, including giving hydraulic test to the required pressure equal
to 2.10 times the working pressure (Contractor will make his own arrangements
for procuring water for testing).
Sl. No.

Item

Unit

Rate

Providing & laying NP3 Class 300mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes

Rmt
Each
Rmt

1320.00
65.00
80.00

Rmt
Rmt

180.00
53.33
1698.33
138.50
1836.83
73.47
1910.31
286.55
2196.85
732.28
735.00

d) Labour charges for laying & jointing pipes


including cost of jointing material.
e) Labour charges for sand filling
Sub Total
g) Transportation @ 10% on (a) & (b)
Sub Total
f) WCT @ 4% on sub total
Sub Total
h) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 735.00 / Rmt
2

Providing & laying NP3 Class 450mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes
d) Labour charges for laying & jointing pipes
including cost of jointing material.
e) Labour charges for sand filling
Sub Total
g) Transportation @ 10% on (a) & (b)
Sub Total
f) WCT @ 4% on sub total
Sub Total
h) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 1,520.00 / Rmt

Rs.
Rs.
Rs.

Rmt
Each
Rmt

2940.00
120.00
129.00

Rmt
Rmt

225.00
86.00
3500.00
306.00
3806.00
152.24
3958.24
593.74
4551.98
1517.33
1520.00

Rs.
Rs.
Rs.

Providing & laying NP3 Class 600mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes

Rmt
Each
Rmt

3720.00
180.00
185.00

d) Labour charges for laying & jointing pipes


including cost of jointing material.

Rmt

292.50

e) Labour charges for sand filling


Sub Total
g) Transportation @ 10% on (a) & (b)
Sub Total
f) WCT @ 4% on sub total
Sub Total
h) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 1,950.00 / Rmt
4

Providing & laying NP3 Class 900mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes
d) Labour charges for laying & jointing pipes
including cost of jointing material.
e) Labour charges for sand filling
Sub Total
g) Transportation @ 10% on (a) & (b)
Sub Total
f) WCT @ 4% on sub total
Sub Total
h) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 3,380.00 / Rmt

Providing & laying NP3 Class 1200mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes
d) Labour charges for laying & jointing pipes
including cost of jointing material.
e) Labour charges for sand filling
Sub Total
g) Transportation @ 10% on (a) & (b)
Sub Total
f) WCT @ 4% on sub total
Sub Total
h) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 5,570.00 / Rmt

Note : 1) Labour cost for laying & jointing


adopted from KUWSDB 1999-2000 as basis.
2) Collar joints considered one in every 3 M.

Rmt

Rs.
Rs.
Rs.

123.33
4500.83
390.00
4890.83
195.63
5086.47
762.97
5849.44
1949.81
1950.00

Rmt
Each
Rmt

6600.00
180.00
325.00

Rmt
Rmt

472.50
216.67
7794.17
678.00
8472.17
338.89
8811.05
1321.66
10132.71
3377.57
3380.00

Rs.
Rs.
Rs.

Rmt
Each
Rmt

10800.00
180.00
750.00

Rmt
Rmt

645.00
500.00
12875.00
1098.00
13973.00
558.92
14531.92
2179.79
16711.71
5570.57
5570.00

Rs.
Rs.
Rs.

Rate Analysis for Hume Pipes


Lowering, laying and jointing true to line and level RCC Hume pipes (NP-2
class) with specials including collars and perfect linking of joints with jack to
correct position including cost of pipes & collars, jointing materials i.e. C:M 1:3
proportion and tar dipped hemp, including filling the excavated trench with
approved quality saturated sand on sides, bottom and top surface of pipe with
all leads and lifts, including giving hydraulic test for water tightness (Contractor
will make his own arrangements for procuring water for testing).
Sl. No.

Item

Unit

Providing & laying NP2 Class 300mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes

Rmt
Each
Rmt

900.00
65.00
80.00

Rmt
Rmt

97.50
53.33
1195.83
120.63
18.46
96.50
1431.42
214.71
1646.13
548.71
550.00

d) Labour charges for laying & jointing pipes


including cost of jointing material.
e) Labour charges for sand filling
Sub Total
f) VAT @ 12.5% on (a) & (b)
g) Service Tax @ 12.24% on (d) & (e)
h) Transportation @ 10% on (a) & (b)
Sub Total
i) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 550.00 / Rmt
2

Providing & laying NP2 Class 450mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes
d) Labour charges for laying & jointing pipes
including cost of jointing material.
e) Labour charges for sand filling
Sub Total
f) VAT @ 12.5% on (a) & (b)
g) Service Tax @ 12.24% on (d) & (e)
h) Transportation @ 10% on (a) & (b)
Sub Total
i) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 980.00 / Rmt

Rs.
Rs.
Rs.

Rate

Rmt
Each
Rmt

1620.00
120.00
129.00

Rmt
Rmt

177.00
86.00
2132.00
217.50
32.19
174.00
2555.69
383.35
2939.04
979.68
980.00

Rs.
Rs.
Rs.

Providing & laying NP2 Class 600mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes

Rmt
Each
Rmt

3000.00
180.00
185.00

d) Labour charges for laying & jointing pipes


including cost of jointing material.

Rmt

229.50

e) Labour charges for sand filling


Sub Total
f) VAT @ 12.5% on (a) & (b)
g) Service Tax @ 12.24% on (d) & (e)
h) Transportation @ 10% on (a) & (b)
Sub Total
i) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 1,720.00 / Rmt
4

Providing & laying NP2 Class 900mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes
d) Labour charges for laying & jointing pipes
including cost of jointing material.
e) Labour charges for sand filling
Sub Total
f) VAT @ 12.5% on (a) & (b)
g) Service Tax @ 12.24% on (d) & (e)
h) Transportation @ 10% on (a) & (b)
Sub Total
i) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 2,520.00 / Rmt

Providing & laying NP2 Class 1200mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes
d) Labour charges for laying & jointing pipes
including cost of jointing material.
e) Labour charges for sand filling
Sub Total
f) VAT @ 12.5% on (a) & (b)
g) Service Tax @ 12.24% on (d) & (e)
h) Transportation @ 10% on (a) & (b)
Sub Total
i) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 3,955.00 / Rmt

Rmt

Rs.
Rs.
Rs.

123.33
3717.83
397.50
43.19
318.00
4476.52
671.48
5148.00
1716.00
1720.00

Rmt
Each
Rmt

4380.00
180.00
325.00

Rmt
Rmt

375.00
216.67
5476.67
570.00
72.42
456.00
6575.09
986.26
7561.35
2520.45
2520.00

Rs.
Rs.
Rs.

Rmt
Each
Rmt
Rmt
Rmt

6720.00
180.00
750.00

487.50
500.00
8637.50
862.50
120.87
690.00
10310.87
1546.63
Rs. 11857.50
Rs. 3952.50
Rs. 3955.00

Lowering, laying and jointing true to line and level RCC Hume pipes (NP-3
class) with specials including collars and perfect linking of joints with jack to
correct position including cost of pipes & collars, jointing materials i.e. C:M 1:3
proportion and tar dipped hemp, including filling the excavated trench with
approved quality saturated sand on sides, bottom and top surface of pipe with
all leads and lifts, including giving hydraulic test for water tightness (Contractor
will make his own arrangements for procuring water for testing).
Sl. No.

Item

Unit

Rate

Providing & laying NP3 Class 300mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes

Rmt
Each
Rmt

1320.00
65.00
80.00

Rmt
Rmt

180.00
53.33
1698.33
173.13
28.56
138.50
2038.52
305.78
2344.30
781.43
785.00

d) Labour charges for laying & jointing pipes


including cost of jointing material.
e) Labour charges for sand filling
Sub Total
f) VAT @ 12.5% on (a) & (b)
g) Service Tax @ 12.24% on (d) & (e)
h) Transportation @ 10% on (a) & (b)
Sub Total
i) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 785.00 / Rmt
2

Providing & laying NP3 Class 450mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes
d) Labour charges for laying & jointing pipes
including cost of jointing material.
e) Labour charges for sand filling
Sub Total
f) VAT @ 12.5% on (a) & (b)
g) Service Tax @ 12.24% on (d) & (e)
h) Transportation @ 10% on (a) & (b)
Sub Total
i) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 1,620.00 / Rmt

Rs.
Rs.
Rs.

Rmt
Each
Rmt

2940.00
120.00
129.00

Rmt
Rmt

225.00
86.00
3500.00
382.50
38.07
306.00
4226.57
633.98
4860.55
1620.18
1620.00

Rs.
Rs.
Rs.

Providing & laying NP3 Class 600mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes

Rmt
Each
Rmt

3720.00
180.00
185.00

d) Labour charges for laying & jointing pipes


including cost of jointing material.
e) Labour charges for sand filling

Rmt
Rmt

292.50
123.33

Sub Total
f) VAT @ 12.5% on (a) & (b)
g) Service Tax @ 12.24% on (d) & (e)
h) Transportation @ 10% on (a) & (b)
Sub Total
i) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 2,085.00 / Rmt
4

Providing & laying NP3 Class 900mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes
d) Labour charges for laying & jointing pipes
including cost of jointing material.
e) Labour charges for sand filling
Sub Total
f) VAT @ 12.5% on (a) & (b)
g) Service Tax @ 12.24% on (d) & (e)
h) Transportation @ 10% on (a) & (b)
Sub Total
i) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 3,605.00 / Rmt

Providing & laying NP3 Class 1200mm Hume


pipes (for 3 M length).
a) Cost of Pipe
b) Cost of Collar
c) Sand filling around pipes
d) Labour charges for laying & jointing pipes
including cost of jointing material.
e) Labour charges for sand filling
Sub Total
f) VAT @ 12.5% on (a) & (b)
g) Service Tax @ 12.24% on (d) & (e)
h) Transportation @ 10% on (a) & (b)
Sub Total
i) Add 15% for Overheads & Profit
Grand Total for 3.00 M
Cost for 1.00 Rmt
Say
Say Rs. 5,940.00 / Rmt

Note : Labour cost for laying & jointing


adopted from KUWSDB 1999-2000 as basis.

Rs.
Rs.
Rs.

Rmt
Each
Rmt

4500.83
487.50
50.90
390.00
5429.23
814.38
6243.62
2081.21
2085.00

6600.00
180.00
325.00

Rmt
Rmt

472.50
216.67
7794.17
847.50
84.35
678.00
9404.02
1410.60
Rs. 10814.62
Rs. 3604.87
Rs. 3605.00

Rmt
Each
Rmt
Rmt
Rmt

10800.00
180.00
750.00

645.00
500.00
12875.00
1372.50
140.15
1098.00
15485.65
2322.85
Rs. 17808.50
Rs. 5936.17
Rs. 5940.00

Вам также может понравиться