With the explained provisions, the internal roads in SC Colonies are prepared
these provisions are adopted as per the actual requirement based on the road condition to
extent of absolute necessity.
Provisions:For CC Roads:1)
2)
3)
4)
5)
6)
Providing
Providing
Providing
Providing
Providing
Providing
For CC Drains:1)
2)
3)
4)
5)
6)
7)
1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
The estimate is prepared with 2015-2016 commom SSR for all Enginee
Department and datas as per MoRT&H standard data book duly adopting over head charge
6% and contractors profit at 10% as per G.O.Ms No 141, T(R&B) Dept, dated 27.07.20
Provision for VAT is shown separately as PART "B" in the estimate as per G.O.Ms No 141, T(R
Dept., Dt 27.07.2006 The work will be carriedout as per relevant clauses of IRC & MO
specifications.
Asst Executive Engineer (R&B),
R&B Section, Malikipuram
5) 12 mm thick
GENERAL ABSTRACT
Name of the 1.Providing CC roads in SC Colony of Kanthetivaripodu in V.V.
Work ::
Meraka in E.G.Dt. 2. Providing CC road to Choppallavari
Group SC Colony in Malikipuram Village in E.G.Dt. 3.
Providing CC Road to SC Colony at Kandikatlavari Group in
Lakkavaram Village, Malikipuram Mandal, E.G.Dt.
Sl.
No.
Item Description
Part - A
Cost of CC road work
Amount
65,14,441
Sub-Total (A)
,25,41,141
---------------90,55,582
Part-B
VAT @ 5%
4,52,779
Seigniorage Charges
1,61,586
1,50,000
46,100
,34,864
,9,056
2,500
40,000
40,000
7,534
---------------Sub-Total (B)
9,44,419
---------------------GRAND TOTAL (A)+(B) Excess percentage
1,00,00,000
Name of work :
1.Providing CC roads in SC Colony of Kanthetivaripodu in V.V. Meraka in E.G.Dt. 2.
Providing CC road to Choppallavari Group SC Colony in Malikipuram Village in E.G.Dt. 3
Providing CC Road to SC Colony at Kandikatlavari Group in Lakkavaram Village,
Malikipuram Mandal, E.G.Dt.
(CC Road Work)
S.
No.
1
DESCRIPTION
NO
Contents
Rate
Per
67.50
48.38
131.25
112.50
359.63
360.00 2245.00 cum
cum
67.50
48.38
131.25
112.50
359.63
360.00 4415.00 cum
cum
S.
No.
3
DESCRIPTION
NO
Contents
Rate
Per
101.25
72.56
196.88
168.75
539.44
540.00 6825.00 cum
cum
7.70
5.78
15.40
28.88
57.75
0.06
MT
###
MT
S.
No.
DESCRIPTION
NO
3.75
4
0.15
3.75
3
0.15
Choppallavari Group SC Colony in Malikipuram Village
3.75
8
0.15
Kandikatlavari Group, Lakkavaram Village
3.75
3
0.15
or
Contents
Rate
Per
2.25
1.69
4.50
1.69
10.13
11.00 991.00 sqm
sqm
90.00
32.25
87.50
150.00
359.75
360.00 1160.00 cum
cum
808200
1589400
Amount
3685500
2840
Amount
10901
417600
7E+006
Description of item
No
Quantit
y
Rate
/Per
Amount
0.900
129
Choppallavari Group SC Colony in Malikipuram Village
( 1 x 1 )
0.900
350
Total length of drain 479.00
110.30
0.950
299.25
or say
409.55
410.00
Cum
93.00
1 /Cum
38,130
0.950
0.100
11.61
0.100
31.50
or say
43.11
43.11 1153.00
Cum 1 /Cum
0.100
11.61
0.100
31.50
43.11
49,706
Sl.
No.
Description of item
No
6
or say
Rate
/Per
7
8
43.11 4415.00
Cum 1 /Cum
Amount
9
1,90,331
Quantit
y
0.200
23.22
0.200
63.00
or say
86.22
86.22 5405.00
Cum 1 /Cum
4,66,019
) 129.00
0.600
38.70
0.600
105.00
or say
6
143.70
143.70 5946.00
Cum 1 /Cum
0.200
23.22
8,54,440
Sl.
No.
Description of item
No
Quantit
y
Rate
/Per
Amount
( 1 x 700 )
0.50
0.900
0.200
Cover Blocks
or say
7
5,46,882
63.00
86.22
87.00 6286.00
Cum 1 /Cum
87.00
75.000
Kgs
/1 cum
or say
6525.00
Kgs
6.50 44734.00
Mt
1 /Mt
2,90,771
) 129.00
2.320
--
299.28
) 350.00
2.320
--
812.00
or say
1,111.28
### 943.00
Sqm 10/ Sqm
TOTAL
1,04,862
###
LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work: 1.Providing CC roads in SC Colony of Kanthetivaripodu in V.V. Meraka in E.G.Dt. 2.
Providing CC road to Choppallavari Group SC Colony in Malikipuram Village in E.G.Dt. 3.
Providing CC Road to SC Colony at Kandikatlavari Group in Lakkavaram Village,
Malikipuram Mandal, E.G.Dt. -:oOo:-
Kanthetivaripodu in VV Meraka
Reach proposed in the present estimate:
Centre KM of the Working Reach =
=
A) For HBG metal:
HBG metal from Katheru quarry
a) Cart track length =
b) Metalled road length:
From km 906 / 400
to
944 / 805
From km
61 / 425
to
31 / 735
From km 120 / 350
to
115 / 550
From km
0 / 000
to
2 / 600
From km
0 / 000
to
5 / 650
From km
0 / 000
to
0 / 735
From km
0 / 000
to
0 / 758
0.155
Working K.M.
K.M.
c) Total lead
B) For gravel:
Gravel from Kadium Quarry
a) Cart track length =
b) Metalled road length:
Quarry at Kadium Quarry
From km
55 / 600
to
60
From km 918 / 200
to
944
From km
61 / 425
to
31
From km 120 / 350
to
115
From km
0 / 000
to
2
From km
0 / 000
to
5
From km
0 / 000
to
0
From km
0 / 000
to
0
0.155
Working K.M.
K.M.
c) Total lead
km
to
309
0.309 kms
0.155 kms
2.200 kms
0.155 K.M.
of
of
of
of
of
of
of
NH 16
NH 16 to RP road
NH 216
S M road
CBM Road
CBM road to NREGS Building
NREGS Building to Kanthetivaripodu
=
=
=
=
=
=
=
=
=
Or say:
/
/
/
/
/
/
/
/
200
805
735
550
600
650
735
758
of
of
of
of
of
of
of
of
C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to Panchayat Road
Panchayat Road
From km
49 / 072
to
61 / 425 of Rajavaram - Podalada Road
From km 120 / 350
to
115 / 550 of NH 216
From km
0 / 000
to
2 / 600 of S M road
From km
0 / 000
to
5 / 650 of CBM Road
From km
0 / 000
to
0 / 735 of CBM road to NREGS Building
From km
0 / 000
to
0 / 758 of NREGS Building to Kanthetivaripodu
0.155
Working K.M.
K.M.
c) Total lead
38.405
29.690
4.800
2.600
5.650
0.735
0.758
0.155
84.993
kms
kms
kms
kms
kms
kms
kms
kms
kms
kms
0.000 kms
=
=
=
=
=
=
=
=
=
=
Or say:
4.600
26.605
29.690
4.800
2.600
5.650
0.735
0.758
0.155
75.593
kms
kms
kms
kms
kms
kms
kms
kms
kms
kms
kms
=
=
=
=
=
=
=
=
=
=
Or say:
0.110
0.200
12.353
4.800
2.600
5.650
0.735
0.758
0.155
27.361
kms
kms
kms
kms
kms
kms
kms
kms
kms
kms
kms
LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work: 1.Providing CC roads in SC Colony of Kanthetivaripodu in V.V. Meraka in E.G.Dt. 2.
Providing CC road to Choppallavari Group SC Colony in Malikipuram Village in E.G.Dt.
3. Providing CC Road to SC Colony at Kandikatlavari Group in Lakkavaram Village,
Malikipuram Mandal, E.G.Dt.
-:oOo:-
B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length =
b) Metalled road length:
Quarry at Kadium Quarry
From km
55 / 600
to
60
From km 918 / 200
to
944
From km
61 / 425
to
31
From km 123 / 935
to
115
From km
81 / 600
to
86
0.175
Working K.M.
K.M.
c) Total lead
/
/
/
/
805
735
760
980
km
/ 000 to
0.350 kms
0.175 kms
2.200 kms
0.175 K.M.
of
of
of
of
NH 16
NH 16 to RP road
NH 216
KANF Road
=
=
=
=
=
=
Or say:
/
/
/
/
/
200
805
735
760
980
of
of
of
of
of
C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to Panchayat Road
Panchayat Road
From km
49 / 072
to
61 / 425 of Rajavaram - Podalada Road
From km 123 / 935
to
115 / 760 of NH 216
From km
81 / 600
to
86 / 980 of KANF Road
0.175
Working K.M.
K.M.
Total lead
350
38.405
29.690
8.175
5.380
0.175
84.025
kms
kms
kms
kms
kms
kms
kms
0.000 kms
=
=
=
=
=
=
=
Or say:
4.600
26.605
29.690
8.175
5.380
0.175
74.625
kms
kms
kms
kms
kms
kms
kms
kms
=
=
=
=
=
=
=
Or say:
0.110
0.200
12.353
8.175
5.380
0.175
26.393
kms
kms
kms
kms
kms
kms
kms
kms
LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work: 1.Providing CC roads in SC Colony of Kanthetivaripodu in V.V. Meraka in E.G.Dt. 2.
Providing CC road to Choppallavari Group SC Colony in Malikipuram Village in E.G.Dt. 3.
Providing CC Road to SC Colony at Kandikatlavari Group in Lakkavaram Village,
Malikipuram Mandal, E.G.Dt. -:oOo:-
km
to
300
0.300 kms
0.150 kms
2.200 kms
0.150 K.M.
of
of
of
of
of
NH 16
NH 16 to RP road
NH 216
S M road
CBM Road
=
=
=
=
=
=
=
Or say:
/
/
/
/
/
/
200
805
735
550
600
517
of
of
of
of
of
of
C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to Panchayat Road
Panchayat Road
From km
49 / 072
to
61 / 425 of Rajavaram - Podalada Road
From km 120 / 350
to
115 / 550 of NH 216
From km
0 / 000
to
2 / 600 of S M road
From km
0 / 000
to
4 / 517 of CBM Road
0.150
Working K.M.
K.M.
c) Total lead
38.405
29.690
4.800
2.600
4.517
0.150
82.362
kms
kms
kms
kms
kms
kms
kms
kms
0.000 kms
=
=
=
=
=
=
=
=
Or say:
4.600
26.605
29.690
4.800
2.600
4.517
0.150
72.962
kms
kms
kms
kms
kms
kms
kms
kms
kms
=
=
=
=
=
=
=
=
Or say:
0.110
0.200
12.353
4.800
2.600
4.517
0.150
24.730
kms
kms
kms
kms
kms
kms
kms
kms
kms
Sl.
No.
Road Name
Road
Length
in kms
HBG
Lead
in kms
Gravel
Weighted
Average
Lead
in kms
Sand
Weighted
Average
Lead
in kms
Weighted
Average
Kanthetivaripodu in VV Meraka
0.309
84.993
26.263
75.593
23.358
27.361
8.454
0.350
84.025
29.409
74.625
26.119
26.393
9.238
0.300
82.362
24.709
72.962
21.889
24.730
7.419
83.817
84.000
or say
74.417
74.000
26.185
26.000
Sl.
No
Description of Metal
Source of
Supply
Lead
Conveyanc
in
e
Kms
Initial
cost
Machine
Blasting crushin
charges
g
charges
Seigniorag
e charges
NAME OF WORK ::- 1.Providing CC roads in SC Colony of Kanthetivaripodu in V.V. Meraka in E.G.Dt. 2. Providing CC
road to Choppallavari Group SC Colony in Malikipuram Village in E.G.Dt. 3. Providing CC Road to
SC Colony at Kandikatlavari Group in Lakkavaram Village, Malikipuram Mandal, E.G.Dt.
Deduct
13.615% CP &
Toal Cost
OH charges
per Cum
from
conveyance
Katheru
84
948.90
419.00
70.00
--
--
-113.71
1324.19
-- do --
84
948.90
456.00
70.00
--
--
-113.71
1361.19
-- do --
84
948.90
588.00
70.00
--
--
-113.71
1493.19
-- do --
84
948.90
456.00
70.00
114.00
--
-113.71
1475.19
-- do --
84
948.90
588.00
70.00
147.00
--
-113.71
1640.19
-- do --
84
948.90
944.00
70.00
236.00
--
-113.71
2085.19
-- do --
84
948.90
984.00
70.00
246.00
--
-113.71
2135.19
-- do --
84
948.90
780.00
70.00
195.00
--
-113.71
1880.19
-- do --
84
948.90
656.00
70.00
164.00
--
-113.71
1725.19
-- do --
84
948.90
504.00
70.00
126.00
--
-113.71
1535.19
-- do --
84
948.90
308.00
70.00
77.00
--
-113.71
1290.19
-- do --
84
948.90
350.00
--
--
--
-113.71
1185.19
Kadiyam
74
845.90
103.00
--
--
--
-101.37
847.53
Katheru
84
948.90
620.00
70.00
155.00
--
-113.71
1680.19
-- do --
84
948.90
994.00
70.00
248.50
--
-113.71
2147.69
-- do --
84
948.90
1036.00
70.00
259.00
--
-113.71
2200.19
-- do --
84
948.90
822.00
70.00
205.50
--
-113.71
1932.69
-- do --
84
948.90
692.00
70.00
173.00
--
-113.71
1770.19
-- do --
84
948.90
532.00
70.00
133.00
--
-113.71
1570.19
8
9
12 Gravel
B) FOR C.D. WORKS
Description of Metal
Source of
Supply
Initial
cost
Machine
Blasting crushin
charges
g
charges
Seigniorag
e charges
Sl.
No
Lead
Conveyanc
in
e
Kms
Deduct
13.615% CP &
Toal Cost
OH charges
per Cum
from
conveyance
Gannavaram
26
343.10
610.00
--
--
--
-41.12
911.98
Gannavaram
26
343.10
450.00
--
--
--
-41.12
751.98
Gannavaram
26
343.10
677.00
--
--
--
-41.12
978.98
22 HYSD Steel
34000.00
36000.00
24 Mild Steel
38000.00
25 Cement
5920.00
DATA
Name of Work ::- 1.Providing CC roads in SC Colony of Kanthetivaripodu in V.V.
Meraka in E.G.Dt. 2. Providing CC road to Choppallavari Group SC
Colony in Malikipuram Village in E.G.Dt. 3. Providing CC Road to
SC Colony at Kandikatlavari Group in Lakkavaram Village,
Malikipuram Mandal, E.G.Dt.
Quantity
Description of Item
Rate
per
Amount
1 Construction of Granular sub-base by providing HBG material confirming to Grading - III of
MoRT&H Table 400-2 including cost, seigniorage charges and conveyance of all materials to
work site and spreading in uniform layers with motor grader or by approved means, on
prepared surface mixing by mix in place method with Rotavator / approved means at OMC
and compacting with vibratory roller to achieve the desired density etc., complete for finished
item of work as per MoRT&H Specification
401 (4 th revision) and as directed by the
Engineer-in-charge. ( Payment will be made based on levels for finished item of work ).
Unit = cum
Taking output = 300 cum
Page 95 of MoRT&H SDB
(A) Labour
0.40 day
Mate
375.00
2.00 day
Mazdoor skilled
388.50
8.00 day
Mazdoor unskilled
320.00
Total
(B) Machinery
6.00 hr
Motor grader 3.35M Blade @50 cum/Hr
3220.00
12.00 hr
Tractor with Rotavator
425.00
6.00 hr
Vibratory roller 8T
2609.10
3.00 hr
Water tanker 6 KL
630.00
Total
(C) Material
Coarse graded Granular sub-base
material as per Table 400-2 of MORT&H
day
day
day
hr
hr
hr
hr
150.00
777.00
2560.00
3487.00
19320.00
5100.00
15654.60
1890.00
41964.60
1516.86
Cum
386799.30
255.00 cum
129.00 cum
1185.19
Cum
152889.51
Total
(D) Over head charges @ 4.615% (10%-VAT)
Add for Over head charges @ 4.615% on (A)+(B)+( C)
4.615 %
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 300 cum (E) + (F)
Rate per 1 cum
Rate to be adopted
539688.81
27004.23
###
61214.46
###
2244.53
2245.00
1 Cum
Quantity
Description of Item
Rate
per
Amount
2 Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone
aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost,
seigniorage conveyance of all materials to site and labour charges, centering, machine
mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of
all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700,
2100 (4th Revision) and as directed by the Engineer-in-Charge for base coarse below CC
Pavement.
Unit = cum
Taking output = 15 cum
(A) Labour
0.64 nos
Mate
day
240.00
375.00
1.00 nos
Mason
day
388.50
388.50
15.00 nos
Mazdoor
day
4800.00
320.00
Total
5428.50
(B) Material
13.50 cum
1680.19 cum
22682.57
Cost of 40mm SS-5 HBG M/C metal
6.75
cum
Sand at site
911.98
cum
6155.87
2.43
MT
Cement at site
5920.00
MT
14385.60
Total
43224.04
Machinery
6.00
hr
Concrete mixer 0.4/0.28 cum
456.20
hr
2737.20
6.00
hr
Generator set 35 KVA
816.80
hr
4900.80
2.00
hr
Water tanker 6 KL
630.00
hr
1260.00
Total
8898.00
(D)
4.615
(E)
(F)
2655.96
60206.50
6020.65
66227.15
4415.14
4415.00
1 Cum
3 Vibrated cement concrete M 35 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 10002) including cost, seigniorage conveyance of all materials to site and labour charges,
centering, machine mixing, laying, vibrating, curing etc., including all other incidental and
operational charges of all T&P etc., complete for finished item of work as per MoRT&H
specification 1500, 1700, 2100 & 2702 (4th Revision) and as directed by the Engineer-inCharge for C.C Pavement.
Unit = cum
Page 345,346 of MoRT&H SDB
Taking output = 15 cum
(A)
0.86
1.50
20.00
(B)
8.10
5.40
6.75
6.33
Labour
nos
Mate
nos
Mason
nos
Mazdoor
Total
Material
cum
Cost of 20mm SS-5 HBG M/C metal
cum
Cost of 10mm SS-5 HBG M/C metal
cum
Sand at site
MT
Cement at site
375.00
388.50
320.00
day
day
day
322.50
582.75
6400.00
7305.25
2200.19
1770.19
911.98
5920.00
cum
cum
cum
MT
17821.54
9559.03
6155.87
37473.6
Quantity
Description of Item
Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
6.00 hr
Generator set 35 KVA
(D) Form work
3.50 %
Form work @ 3.50% on (A)+(B)+( C)
(E)
4.615
(F)
(G)
Rate
per
456.20
816.80
hr
hr
85953.29
Cum
Amount
71010.04
2737.20
4900.80
7638.00
3008.37
4105.58
93067.24
9306.72
###
6824.93
6825.00
1 Cum
4 Providing Uncoated Mild Steel bars ( Fe-250 ) of diferent diameters, wrought and put up bars
of all diameters including cost and conveyance of steel to site and all labour charges for
fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing
them in position etc., complete including cost and conveyance of binding wire and all
handling charges and operational charges etc., and including over lapping welding if required
etc., complete for all R.C.C items for finished item of work as per standard drawings, as per
the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (4 th
revision) and as per I.S.1786 of 1985 .
Unit = MT
Page 460 of MoRT&H SDB
Taking output = 1 MT
(A)
0.28
1.50
5.50
Labour
nos
Mate
nos
Black smith
nos
Mazdoor
Total
(B) Material
1.05 MT
Mild steel bars including overlaps
6.00 Kg
Binding wire
Total
(C)
4.615
(D)
(E)
375.00
375.00
320.00
day
day
day
105.00
562.50
1760.00
2427.50
38000.00
36000.00
MT
MT
39900.00
216.00
40116.00
1963.38
44506.88
4450.69
48957.57
48958.00
1 MT
5 Providing 25.4 mm mastic pads for Longitudinal joints, Transversal expansion joints and
Construction joints of approved quality including cost, conveyance and placing in position,
etc., complete as directed by the Engineer-in-charge.
1.00 sqm
991.00
1 SQM
991.00
991.00
1 SQM
Quantity
Description of Item
Rate
per
Amount
6 Sawing of Concrete Pavement using a self propelled walk behind, petro/electric powered saw
of suitable capacity to give a finished groove of 4mm width and 1/4 to 1/3 depth in the cured
concrete in the longitudinal and transverse directions along predetermined lines. The rate is
inclusive of the cost of consumables such as diamond blade. Masons engaged for the
marking is also deemed to be included in the rate and pouring of Polysulphide Sealent to the
full depth of groove. The rate is inclusive of the cleaning of the groove after the sawing to
remove cementatious particles adn cement washings to give a clean dry surface and surface
preparation of the sides of the groove to accommodate the sealent material etc., to give a
neat finished look including cost of sealent, hire and operational charges of Generator of
Adequate capacity and other T&P and labour charges for all operations etc. complete.
60.00
1 RM
7 Forming shoulders with borrowed useful selected earth having MDD of not less than 1.75
gms/CC from outside road boundary by mechnical means with a lead of 17 kms. and lifts
including pre-watering of soil at borrow area, removal of top soil, excavation of soils at
borrowed area, conveyance of soil, depositing the soils on the embankment, spreading soils,
breaking clods, sectioning, grading and consolidation with vibratory road roller @ OMC to
meet requirement of table 300-2 of MORT&H including all hire and operational charges of T&P
and complete for finished item of work as per MORT&H specification 305 (4th revision)
Unit : Cum
Taking out put = 100 Cum
(A) Labour
0.04 day
1.00 day
74
Lead for selected earth
Page 68, 69 of MoRT&H SDB
Mate
Mazdoor unskilled
Km.
375.00
320.00
day
day
15.00
320.00
335.00
13.00
cum
1300.00
7.22
t.km
85484.80
(B) Machinery
100.00 cum
11840.00 t.km
(160 x L)
hr
hr
4.00 hr
1.00 hr
8548.48
2540.90
3220.00
630.00
2609.10
hr
hr
hr
hr
0.00
cum
0.00
0.00
2520.00
2609.10
100462.38
0.00
4651.80
###
10544.92
###
1159.94
1160.00
1 Cum
8 Supply and fixing cap to reinforcement with PVC Pipe of 25.40mm dia as per technical
specifications and as directed by the Engineer-in-charge.
Quantity
1.00 RM
Description of Item
PVC Pipe 25.40mm dia (item no. 55 ELEC 1.2.4 of SSR 2015-16)
Rate to be adopted
Rate
per
Amount
31.80
31.80
1 RM
32.00
1 RM
DRAIN DATA
Quantity
Description of Item
Rate
per
Amount
1 Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone
aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost,
seigniorage conveyance of all materials to site and labour charges, centering, machine
mixing, laying, Vibrating, curing etc., including all other incidental and operational charges
of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700,
2100 (4th Revision) and as directed by the Engineer-in-Charge for base coarse below CC
Pavement.
Unit = cum
Taking output = 15 cum
(A) Labour
0.64 nos
Mate
day
240.00
375.00
1.00 nos
Mason
day
388.50
388.50
15.00 nos
Mazdoor
day
4800.00
320.00
Total
5428.50
(B) Material
13.50 cum
1680.19
cum 22682.57
Cost of 40mm SS-5 HBG M/C metal
6.75
cum
Sand at site
911.98
cum
6155.87
2.43
MT
Cement at site
5920.00
MT
14385.60
Total
43224.04
Machinery
6.00
hr
Concrete mixer 0.4/0.28 cum
456.20
hr
2737.20
6.00
hr
Generator set 35 KVA
816.80
hr
4900.80
2.00
hr
Water tanker 6 KL
630.00
hr
1260.00
Total
8898.00
(D)
4.615
(E)
(F)
2655.96
###
6020.65
###
4415.14
4415.00
1 Cum
2 Earthwork excavation in soils upto SDR by mechanical means for foundations of structures
as per drawing and technical specification including setting out, construction of shoring
and bracing, removal of stumps and other deleterious matter, dressing sides of bottom,
back filling the excavation earth to the extent required etc., complete including
seignioarge charges for finished item of work as per MoRT&H specification 304(4 th Revision)
and as directed by the Engineer-in-Charge
Unit : Cum
Taking out put = 240 Cum
(A) Labour
0.32 day
Mate
375.00
day
8.00 day
Mazdoor unskilled
320.00
day
2791.00
cum
16746.00
0.00
cum
0.00
(B) Machinery
6.00 Hr
Hydraulic excavator 1.0 cum bucket
capacity
(C) Seigniorage charges
240.00 Cum
Seigniorage charges
120.00
2560.00
2680.00
Quantity
Description of Item
Rate
per
Amount
896.51
###
2032.25
###
93.14
93.00
1 Cum
3 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG
crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine
aggregate conforming to table 1000-2) including cost,seignorage and conveyance of all
materials to site and all labour charges for machine mixing,laying in position, Compacting ,
Vibrating and curing including all other incidental and all other operational charges of T&P
required etc., complete as per MoRT&H Specification 1500,1700, 2100 (4 th Revision) for
base course below CC drains
Unit = cum
Page 335,500 of MoRT&H SDB
Taking output = 15 cum
(A)
0.86
1.50
20.00
(B)
8.10
4.05
1.35
6.75
4.13
6.00
6.00
Labour
nos
Mate
nos
Mason
nos
Mazdoor
Total
Material
cum
Cost of 40mm SS-5 HBG
cum
Cost of 20mm SS-5 HBG
cum
Cost of 10mm SS-5 HBG
cum
Sand at site
MT
Cement at site
Total
Machinery
hr
Concrete mixer 0.4/0.28
hr
Generator set 35 KVA
M/C metal
M/C metal
M/C metal
cum
375.00
388.50
320.00
day
day
day
322.50
582.75
6400.00
7305.25
1680.19
2200.19
1770.19
911.98
5920.00
cum
cum
cum
cum
MT
13609.54
8910.77
2389.76
6155.87
24449.60
55515.54
456.20
816.80
hr
hr
70458.79
Cum
2737.20
4900.80
7638.00
0.00
3251.67
###
7371.05
###
5405.43
5405.00
1 Cum
4 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG
crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine
aggregate conforming to table 1000-2) including cost,seignorage and conveyance of all
materials to site and all labour charges for machine mixing, laying in position,Compacting,
Vibrating and curing including all other incidental and all other operational charges of T&P
required etc., complete as per MoRT&H Specification 1500,1700, 2200 (4 th Revision) for
Drain body Walls
Quantity
Description of Item
Rate
per
Amount
375.00
388.50
320.00
day
day
day
322.50
582.75
6400.00
7305.25
1680.19
2200.19
1770.19
911.98
5920.00
cum
cum
cum
cum
MT
13609.54
8910.77
2389.76
6155.87
24449.60
55515.54
456.20
816.80
hr
hr
70458.79
Cum
Unit = cum
Page 335,455 of MoRT&H SDB
Taking output = 15 cum
(A)
0.86
1.50
20.00
(B)
8.10
4.05
1.35
6.75
4.13
6.00
6.00
Labour
nos
Mate
nos
Mason
nos
Mazdoor
Total
Material
cum
Cost of 40mm SS-5 HBG
cum
Cost of 20mm SS-5 HBG
cum
Cost of 10mm SS-5 HBG
cum
Sand at site
MT
Cement at site
Total
Machinery
hr
Concrete mixer 0.4/0.28
hr
Generator set 35 KVA
M/C metal
M/C metal
M/C metal
cum
2737.20
4900.80
7638.00
7045.88
3576.84
###
8108.15
###
5945.98
5946.00
1 Cum
5 Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, seigniorage conveyance of all materials to site
and labour charges, centering, machine mixing, laying, vibrating, curing etc., including
other incidental hire and operational charges of all T&P as per approved drawings and as
directed during execution but excluding cost of steel and its fabrication charges for
finished item as per MoRT&H specification 1500,1600,1700 & 2200 (4 th revision ) and as
directed by the Engineer-in-Charge for Cover slabs over Side drains
Unit = cum
Page 472,457 of MoRT&H SDB
Taking output = 15 cum
(A)
0.86
1.50
20.00
(B)
8.10
5.40
6.75
5.12
Labour
nos
Mate
nos
Mason
nos
Mazdoor
Total
Material
cum
Cost of 20mm SS-5 HBG M/C metal
cum
Cost of 10mm SS-5 HBG M/C metal
cum
Sand at site
MT
Cement at site
Total
Machinery
375.00
388.50
320.00
day
day
day
322.50
582.75
6400.00
7305.25
2200.19
1770.19
911.98
5920.00
cum
17821.54
9559.03
6155.87
30310.40
63846.84
cum
MT
Quantity
Description of Item
6.00 hr
6.00 hr
Rate
per
Amount
456.20
816.80
hr
hr
2737.20
4900.80
7638.00
78790.09
Cum
3151.60
3781.61
###
8572.33
###
6286.38
6286.00
1 Cum
6 Providing HYSD bars ( Fe-415 ) of diferent diameters, wrought and put up bars of all
diameters including cost and conveyance of steel to site and all labour charges for
fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing
them in position etc., complete including cost and conveyance of binding wire and all
handling charges and operational charges etc., and including over lapping welding if
required etc., complete for all R.C.C items for finished item of work as per standard
drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification
1600 &2200 (4th revision) and as per I.S.1786 of 1985 for Sub structure of R.C.C items.
Unit = MT
Page 459,460 of MoRT&H SDB
Taking output = 1 MT
(A) Labour
0.34 nos
Mate
day
127.50
375.00
2.00 nos
Black smith
day
750.00
375.00
6.50 nos
Mazdoor
day
2080.00
320.00
Total
2957.50
(B) Material
1.05 MT
HYSD bars including overlaps
34000.00
MT
35700.00
6.00 Kg
Binding wire
36000.00
MT
216.00
Total
35916.00
(C)
4.615
(D)
(E)
1794.01
###
4066.75
44734.26
###
1 MT
7 Sand filling in foundation including cost, seignoirage and conveyence of all materials to
site and watering, tamping etc., complete for finshed item of work as per MoRT&H
specification 304 (4th Revision) and as directed by the Engineer - in - Charge.
Unit = cum
Taking output = 1 cum
(A) Labour
0.01 day
Mate
0.30 day
Mazdoor
(B) Material
1.20 Cum
Sand for filling
375.00
320.00
day
day
751.98
cum
3.75
96.00
99.75
902.38
Quantity
(C)
4.615
(D)
(E)
Description of Item
Rate
per
Amount
46.25
1048.38
104.84
1153.22
1153.00
Or say
1 cum
8 Plastering in CM (1:5) 12 mm thick including cost and conveyance of all materials,
seigniorage charges, labour charges, curing etc complete for finished item of work as
directed by the Engineer -in-Charge
Unit = 10 sqm
Taking output = 10 sqm
(A) Labour
0.04
0.50
0.50
day
day
day
Mate
Mason
Mazdoor
375.00
388.50
320.00
(B) Material
0.144 Cum
Cement Mortar (1:5)
3124.69
(C) Over head charges @ 4.615% (10%-VAT)
Add for Over head charges @ 5% on (A)+ 819.21
4.615 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 10 sqm (D)+(E)
Or say
day
day
day
15.00
194.25
160.00
369.25
Cum
449.96
37.81
857.02
85.70
942.72
943.00
1 Sqm
0.303
1.05
MT
cum
0.04
0.90
day
day
Sub-Analysis
Cement Mortar (1:5)
(a) Material
Cement
5920.00
Sand for Mortar
978.98
(b) Labour
Mate
Mazdoor
Rate per cum
375.00
320.00
MT
cum
1793.76
1027.93
2821.69
15.00
288.00
303.00
3124.69
Name of Work :
Sl.
No.
Unit
Theoritical
requirement of
Seignorage charges
Material per Unit as
per Cum.
per Data (in Cum.)
Gravel
Gravel
Metal Sand
Metal Sand
/
/
Earth
Earth
Seignor-age
charges per
Unit
Quantity
Amount of
Seigniorage
Sand filling
1 Cum.
0.00
1.000
--
75.00
50.00
--
50.00
43.11
2,155.50
0.90
0.450
--
75.00
50.00
--
90.00
43.11
3,879.90
1 Cum.
0.90
0.450
--
75.00
50.00
--
90.00
86.22
7,759.80
1 Cum.
0.90
0.450
--
75.00
50.00
--
90.00
143.70
12,933.00
1 Cum.
0.90
0.450
--
75.00
50.00
--
90.00
87.00
7,830.00
12 mm plastering
1 Cum.
--
0.012
--
50.00
--
0.60
GSB
1 Cum.
1.28
--
--
75.00
50.00
--
96.00
360.00
34,560.00
1 Cum.
0.90
0.450
--
75.00
50.00
--
90.00
360.00
32,400.00
VRCC M35
1 Cum.
0.90
0.450
--
75.00
50.00
--
90.00
540.00
48,600.00
construction of
earthenshoulders
1 Cum.
--
--
1.00
--
--
30.00
30.00
10
1112.00
360.00
667.20
10,800.00
161,586.00
Seignor-age
charges per
Unit
Sl.
No.
Theoritical
requirement of
Seignorage charges
Material per Unit as
per Cum.
Unit
per Data (in Cum.)
Gravel
Gravel
Metal Sand
/
Metal Sand
/
Earth
Earth
(R&B) Sub Division : Razole
(R&B) Division : Amalapuram
Quantity
Amount of
Seigniorage
CERTIFICATE
Name of Work: 1.Providing CC roads in SC Colony of Kanthetivaripodu in
V.V. Meraka in E.G.Dt. 2. Providing CC road to Choppallavari
Group SC Colony in Malikipuram Village in E.G.Dt. 3.
Providing CC Road to SC Colony at Kandikatlavari Group in
Lakkavaram Village, Malikipuram Mandal, E.G.Dt.
1)
2)
Certified that the leads provided in the R.M.R of the estimate are shortest and there is
sufficient yield of good quality material from the quarries proposed in the estimate.
3)
Certified that all the distances in the quarry map are correct.
4)
5)
Certified that the routes shown in the quarry map are the
transportation of the materials.
6)
7)
Certified that the description of all materials mentioned are correct to the best of my
knowledge.
8)
Certified that the selected earth is proposed from Kadiyam quarry nearest from the
workspot .
9)
Certified that no land acquisition is required for the proposed work and the lands
available are free from encumbrance encroachments and utilization.
10)
11)
Certified that the C.B.R. Value of Proposed internal C.C.Roads in SC Colonies is about
5.00%
Construction of CC road is proposed in the internal roads of the SC/ST Colonies and as
such there is no commercial vehicular traffic on these internal roads. Hence,
construction of CC Pavement is proposed with a nominal crust of 100mm GSB + 100
mm thick VCC (1:4:8) + 150mm thick VCC M35.
loading
unloading
stacking
0.25
0.5
1
2
3
4
5
6
7
Earth/Gravel/
Metal
Sand
51.40
102.80
15.70
15.70
xx
xx
xx
xx
xx
xx
31.00
29.90
43.40
41.90
57.90
57.90
70.30
70.30
82.70
82.70
95.10
95.10
107.50
107.50
8
9
10
119.90
132.30
144.70
119.90
132.30
144.70
11
157.10
157.10
12
169.50
169.50
13
14
15
16
17
18
19
181.90
194.30
206.70
219.10
231.50
243.90
256.30
181.90
194.30
206.70
219.10
231.50
243.90
256.30
20
268.70
268.70
21
281.10
281.10
22
23
24
25
26
27
293.50
305.90
318.30
330.70
343.10
355.50
293.50
305.90
318.30
330.70
343.10
355.50
419.00
456.00
588.00
172.00
177.00
144.00
164.00
156.00
136.00
159.00
206.00
49.50
95.00
588.00
656.00
504.00
308.00
350.00
103.00
620.00
692.00
532.00
610.00
460.00
41000.00
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
367.90
380.30
392.70
403.00
413.30
423.60
433.90
444.20
454.50
464.80
475.10
485.40
495.70
506.00
516.30
526.60
536.90
547.20
557.50
567.80
578.10
588.40
598.70
609.00
619.30
629.60
639.90
650.20
660.50
670.80
681.10
691.40
701.70
712.00
722.30
732.60
742.90
753.20
763.50
773.80
784.10
367.90
380.30
392.70
403.00
413.30
423.60
433.90
444.20
454.50
464.80
475.10
485.40
495.70
506.00
516.30
526.60
536.90
547.20
557.50
567.80
578.10
588.40
598.70
609.00
619.30
629.60
639.90
650.20
660.50
670.80
681.10
691.40
701.70
712.00
722.30
732.60
742.90
753.20
763.50
773.80
784.10
Mild Steel
Cement
Mild Steel 6mm
Blasting charges
Blasting charges
Blasting charges for rough stone
Seigniorage charges
Metal
Gravel/earth
Sand
Labour Rates
Mate
Mazdoor skilled (385 x 30% + 345 x 70%)
Mazdoor unskilled
Machinery Rates
Dozer 80 HP for spreading @ 200 cum per hour
Motor grader 3.35M Blade @50 cum/Hr
Hydralic excavator
Front end loader 1 cum capacity
Tipper 5 cum
Vibratory roller 8T
smooth wheeled roller 8 Ton
Water tanker 6 KL
Tractor
Tractor with Rotavator
Tractor with ripper attachment @ 60 cum per hour
Air compressor 250 cfm
Wet mix plant of 60 tonne hr. capacity
Mechanical broom @ 1250 sqm/hr.
Bitumen pressure distributor @1750 sqm/hr
Emulsion pressure distributor @1750 sqm/hr
Hot mix plant 40 to 60 TPH
Mechanical Paver finisher 100 TPH
Hydraulic self propelled chip spreader @ 1500 sqm/hr.
Finish rolling with 6-8 tonne smooth wheeled tandem roller.
Pneumatic road Roller
GSB Plant 50 Cum
Generator 250 KVA
Generator set 125 KVA
Generator set 35 KVA
Concrete mixer 0.4/0.28 cum
2540.90
3220.00
2791.00
1650.00
909.70
2609.10
1101.00
630.00
415.00
425.00
425.00
538.20
1650.00
375.00
1500.00
860.00
19200.00
2250.00
2695.00
1650.00
1347.00
1257.00
1850.00
1320.00
816.80
456.20
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
794.40
804.70
815.00
825.30
835.60
845.90
856.20
866.50
876.80
887.10
897.40
907.70
918.00
928.30
938.60
948.90
959.20
969.50
979.80
990.10
1000.40
1010.70
1021.00
1031.30
1041.60
1051.90
1062.20
1072.50
1083.00
1093.50
1104.00
1114.50
1125.00
1135.50
1146.00
1156.50
1167.00
1177.50
1188.00
1198.50
1209.00
1219.50
794.40
804.70
815.00
825.30
835.60
845.90
856.20
866.50
876.80
887.10
897.40
907.70
918.00
928.30
938.60
948.90
959.20
969.50
979.80
990.10
1000.40
1010.70
1021.00
1031.30
1041.60
1051.90
1062.20
1072.50
1083.00
1093.50
1104.00
1114.50
1125.00
1135.50
1146.00
1156.50
1167.00
1177.50
1188.00
1198.50
1209.00
1219.50
4.50
4.50
58.00
677.00
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
1230.00
1240.50
1251.00
1261.50
1272.00
1282.50
1293.00
1303.50
1314.00
1324.50
1335.00
1345.50
1356.00
1366.50
1377.00
1387.50
1398.00
1408.50
1419.00
1429.50
1440.00
1450.50
1461.00
1471.50
1482.00
1492.50
1503.00
1513.50
1524.00
1534.50
1545.00
1555.50
1566.00
1576.50
1587.00
1597.50
1608.00
1618.50
1629.00
1639.50
1230.00
1240.50
1251.00
1261.50
1272.00
1282.50
1293.00
1303.50
1314.00
1324.50
1335.00
1345.50
1356.00
1366.50
1377.00
1387.50
1398.00
1408.50
1419.00
1429.50
1440.00
1450.50
1461.00
1471.50
1482.00
1492.50
1503.00
1513.50
1524.00
1534.50
1545.00
1555.50
1566.00
1576.50
1587.00
1597.50
1608.00
1618.50
1629.00
1639.50
Semi-skilled Mazdoor
Skilled 30% + Semi 70%
Un-skilled Mazdoor
Pg. No.288, Sl.No.8
Pg. No.289, Sl.No.52
Pg. No.289, Sl.No.54
Pg. No.290, Sl.No.62
Pg. No.289, Sl.No.50
ABOUT ESTIMATE
1
Name of the wor 1.Providing CC roads in SC Colony of Kanthetivaripodu in V.V. Meraka in E.G.Dt. 2.
Providing CC road to Choppallavari Group SC Colony in Malikipuram Village in
E.G.Dt. 3. Providing CC Road to SC Colony at Kandikatlavari Group in Lakkavaram
Village, Malikipuram Mandal, E.G.Dt.
Section
Sub - Division
Division
Circle
Short
SI
description of
No
Item
Unit
V.C.C. (1:4:8)
1 Cum.
for base course
2 VRCC M35
1 Cum.
construction of
3 earthenshoulde 1 Cum.
rs
Theoritical
requirement of
Seignorage
Material per Unit as charges per Cum. Seignorage
per Data (in Cum.)
Quantity
charges
Grave per Unit
Gravel Meta
Metal Sand
Sand
l/
/ Earth
l
Earth
0.90
0.45
--
75.00 50.00
--
90.00
360.00
0.90
0.45
--
75.00 50.00
--
90.00
540.00
--
--
1.00
30.00
30.00
360.00
--
--
Total Rs.
or say
Meraka in E.G.Dt.
ikipuram Village in
roup in
Amount of
Seigniorage
32,400.00
48,600.00
10,800.00
91,800.00
91,800.00
neer (R&B),
: Amalapuram
COST OF BITUMEN / MT
Name of Work
1.Providing CC roads in SC Colony of Kanthetivaripodu in V.V.
Meraka in E.G.Dt. 2. Providing CC road to Choppallavari Group SC
Colony in Malikipuram Village in E.G.Dt. 3. Providing CC Road to SC
Colony at Kandikatlavari Group in Lakkavaram Village, Malikipuram
Mandal, E.G.Dt.
Ref ::- For Emulsion (Bulk) :- HINCOL Price List With Effect From Dt.1-02-2016
For Bulk Bitumen 80/100, 60/70:- HPCL Price List With Effect From Dt. 1-02-2016
Bulk 80/100 Gr.
Emulsion (Bulk)
21,803.00
22,003.00
3,052.42
----------------24,855.42
3,080.42
----------------25,083.42
VAT @ 5%
1,242.77
----------------26,098.19
1,254.17
----------------26,337.59
762.00
762.00
26,860.19
27,099.59
Lead from
Visakhapatnam
254.00 Kms
Lead charges for Bulk @
1.50
per KM
LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the wor 1.Providing CC roads in SC Colony of Kanthetivaripodu in V.V. Meraka
in E.G.Dt. 2. Providing CC road to Choppallavari Group SC Colony in
Malikipuram Village in E.G.Dt. 3. Providing CC Road to SC Colony at
Kandikatlavari Group in Lakkavaram Village, Malikipuram Mandal,
E.G.Dt.
-:oOo:Reach proposed in the present estimat
km 64 / 0 to 68 / 305
Center Km. of the working stretch
66.153
A) For HBG metal:
HBG metal from Katheru quarry
a) Cart track length =
b) Metalled road length:
From km 907 / 000
to
910 / 700 of NH -16
From km
0 / 000
to
3 / 100 of RK Road (V) Punyakshetram
Total metalled road length
Lead upto km
1 / 495
of Bye-Pass Road
Add for centre of working reach
c) Total lead
B) For gravel:
Gravel quarry at Kesavaram
a) Cart track length =
b) Metalled road length:
From km
0 / 000
to
14 / 600 of RK Road (V)Punyakshetram
Lead upto km 68 / 305
of Kakinada - Rajahmundry ro
Add for centre of working reach
Total metalled road length
c) Total lead
C) For Sand :
Sand from Kulla
a) Cart track length =
b) Metalled road length:
Lead upto km 68 / 305
of
Add for centre of working reach
c) Total lead
Kakinada - Rajahmundry ro
4.305 kms
3.000 kms
=
=
3.700 kms
3.100 kms
6.800
9.800
=
2.153
= 11.953
Or say: 65.000
Rs. 753.20 /
kms
kms
kms
kms
kms
cum
1.700 kms
kms
kms
kms
kms
kms
kms
cum
0.700 kms
14.600
16.300
2.153
18.453
= 18.453
Or say: 56.000
Rs. 660.50 /
0.700
=
2.153
= 2.853
Or say:
9.000
Rs. 132.30 /
kms
kms
kms
kms
cum
GENERAL ABSTRACT
Sub-Work
Sl.
No.
Main Work: Widening and Strengthening of Kakinada Rajahmundry Road from KM 61/600 to 68/305 in East Godavari
District
Sub-Work (2): Widening and Strengthening of Kakinada Rajahmundry Road from KM 64/000 to 68/305 in East Godavari
District
Item Description
Amount
Part - A
Part - B
#REF!
25,41,141
Total
15,25,184
---------------#REF!
LS Provisions
5
#REF!
L.S.
,91,800
Main Work: Widening and Strengthening of Kakinada Rajahmundry Road from KM 61/600 to 68/305 in East
Godavari District
Sub-Work (2): Widening and Strengthening of Kakinada Rajahmundry Road from KM 64/000 to 68/305 in East
Godavari District
Sub Work
Sl.
No.
1
Description of Item
No
Qty.
Rate
Per
Amount
(in Rupees)
10
3/7.5
4000
0.100
320.00
1
1
2
2
2500
2500
0.100
0.100
30
14
500.00
500.00
420.00
###
0.5
702
1 Sqm
250
250
1221480
Sl.
No.
1
Description of Item
No
Qty.
Rate
8
316.00
250.00
Per
9
Each
Amount
(in Rupees)
10
79000
Sl.
No.
1
Description of Item
No
Qty.
Rate
Per
Amount
(in Rupees)
10
3 Providing and fixing Village name board size 900x450 mm made out of Type IV of
ASTMD 4956-09 High Intensity Prismatic Prismatic Retro reflective sheeting and
confirming to IRC 67:2012 for full background of Green Colour & White Letters and
fixed over 3MM Alluminium Composite Material sheet having minimum 0.30 mm
thick Aluminium skin on both sides with back side painted grey colour and fixed
over back support frame of M.S angle 25x25x3mm all round and fixing with
35x35x4mm and mounted on a MS angle post of size 75x75x6mm with clear height
of not less than 2.1 m from the ground level to the bottom of the board. The
signpost should be painted with one coat of red oxide paint and 2 coats of
synthetic enamel paint Black and White colour with bands of 30cm of height. The
signpost shall be firmly fixed with MS base angle 35x35x4 mm in to the ground by
M-15 Concrete foundation of size 450x450x600mm including cost and conveyance
of all materials ,equipment, machinery and labour with all leads and lift, loading
charges necessary for satisfactory completion of the work as directed by Engineer
-in-Charge.
In km 64/0 to 68/305
2.00
5477.00
Each
10954
10
20.00
20.00
4003.00
Each
80060
5 Providing fixing of Median Marker made of polycarbonate for impact resistance and
good weatherability. Polycarbonate used for molding the Median Marker shall have
a minimum Izod impact strength value of 600 J/m at room temperature. The impact
strength of the polycarbonate should not decrease to less than 70 % of its initial
value on being subjected to UV weathering as per ASTM G 155 for 1000 hours or
exposure to 2 years of natural weathering. The body of the median marker shall be
in the form of an isosceles trapezoidal structure of length 15 cm, height and width
of 10x10 cm. The Median Marker shall have fluorescent yellow retro-reflective
sheeting conforming to type XI specifications as per ASTM D4956. Area of reflective
sheeting should not be less than 70 cm2. Edge of retro-reflective sheeting shall be
concealed using a grill/ mesh/ similar mechanism to prevent vandalism and
sheeting pilferage. The logo of the manufacturer shall be embossed and printed in
contrasting color on both sides of median marker for distinct identification (even
from moving vehicles).
In Km.64/0-68/305)
145
290.00
290.00
461.00
Total
Each
Rs.
133690
1,525,184
Sl.
No.
1
Description of Item
No
2
3
Executive Engineer (R&B),
(R&B) Division : Rajahumndry
Qty.
Rate
Per
Amount
(in Rupees)
10
DETAILED-CUM-ABSTRACT ESTIMATE
me of the work:
Sl.
No
1
Description of item
No
Length
Breadth Depth
5
Quantity
7
Rate /
per
8
Part - A
1 Providing B.T. patchwork using 1.20 Cum of 40mm IRC size HBG metal to get compacted
quantity of 1 Cum precoated with bitumen 80/100 grade using a total quantity of 42 Kgs.
including tack coat, cost and conveyance of all materials and stacking the metal an
Km. 64 / 0 to 68 / 305
40.000
or say
40.000
40.000 Cum
#REF!
/Cum.
2 Earthwork excavation in soils upto SDR by mechanical means excluding trimming bottom and
side slopes in accordance with requirements of lines , grades and cross sections etc.,
excluding seignioarge charges for finished item of work for trench cutting a
Km. 64 / 0 to 66 / 060
( 1 x 2 ) 2060.00
2.975
0.550
or say
6741.350
6741.350
6750.000 Cum
19.30
/Cum.
3 Forming embankment with approved materials deposited at site from roadway cutting
including depositing the soils on the embankment, spreading soil, breaking clods, sectioning ,
grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to m
Assuming 25% of excavated earth is useful for forming embankment .
1687.500
6750.000 x 25%
or say
1690.000 Cum
113.00
/Cum.
Grading - III of MoRT&H Table 400-2 including cost, seigniorage charges and conveyance of all
materials to work site and spreading in uniform layers with motor grader
Km. 64 / 0
to 66 / 060
( 1 x
) 2060.00
2.975
0.300
or say
3677.100
3677.100
3680.000 Cum
2245.00
5 Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix
macadem specification including cost,seignorage of all materials and including premixing the
material with water at OMC in Mechanical mix plant carriage of mixed mat
Km. 64 / 0
to 66 / 060
( 1 x
) 2060.00
2.975
0.250
or say
3064.250
3064.250
3070.000 Cum
#REF!
6 Providing and applying Prime coat with bitumen Emulsion (Medium settting) (Bulk) using
Emulsion pressure distributor at the rate of 0.60 kgs per sqm on the prepared
bituminous/granular surface cleaned with mechanical broom for finished item of work as per
MoRT&H Specification 503 (4th revision) and as directed by the Engineer-in-Charge.
Km. 64 / 0
to 66 / 060
( 1 x
) 2060.00
2.975
12257.000
or say
7 Providing and applying tack coat with bitumen 80/100 (Bulk) using
12257.000
12260.000 Sqm
#REF!
Bitumen pressure
distributor at the rate of 0.20 kgs per sqm on the prepared bituminous/granular surface
cleaned with mechanical broom for
Before laying B.M. & B.C.
Km. 64 / 0 to 66 / 060
(
Km. 66 / 060to 66 / 600
(
Km. 68 / 0 to 68 / 305
(
Add for Bell mouths at Junctions
2
2
1
) 2060.00
) 540.00
) 305.00
14.500
14.000
22.000
----
or say
59740.000
15120.000
6710.000
930.000
82500.000
82500.000 Sqm
#REF!
8 Providing and laying of 50mm thick Bituminous Macadam with hot mix plant producing an
average output of 37.5 tonnes per hour using hard blasted granite crushed aggregates of
Grading - II as per table 500-4 of MoRT&H specificaion 504 (4th Revision) pre
Km. 64 / 0 to 66 / 060
( 1 x 1 ) 2060.00
Km. 66 / 060to 66 / 600
( 1 x 1 ) 540.00
Add for Bell mouths at Junctions and Patch wo 2550.00
14.500
14.000
0.050
0.050
or say
1493.500
378.000
28.500
1900.000
1900.000 Cum
#REF!
9 Providing 30 mm thick compacted Bituminous Concrete by hot mix plant using hard blasted
granite crushed aggregates of Grading - 2 as per table 500-17 of specification 509 of MoRT&H
desi
0.030
0.030
0.030
or say
896.100
226.800
201.300
25.800
1350.000
1350.000 Cum
#REF!
10 Construction of earthen shoulders with selected earth with laboratory MDD not less than 17.5
KN / cum. obtained from approved source by mechanical means with all leads and lifts
including excavation of soils at borrowed area, conveyance of soil, depositin
Km. 64 / 0
to 66 / 060
( 1 x
) 1000.00
1.000
0.100
or say
200.000
200.000
200.000 Cum
1160.00
11 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG
crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, and conveyance of all materials to site and all
labour charges , centering, machine mixing, laying in position, Compacting, Vibrating and
curing including all other incidental and all other operational charges of T&P required etc.,
complete as per MoRT&H Specification 1500,1700, 2200 (4th Revision) for Dividers .
Km. 64 / 0 to 66 / 060 Rectangl( 1 x ### )
Length after gaps
Trapizoid( 1 x ### )
1.25
0.250
0.450
1.25 (0.25+0.45)/20.275
or say
210.937
180.469
391.406
400.000
#REF!
400.000 Cum.
12 Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of
scarified material with all leads and lifts upto 1000 Mtrs as per MoRT&H (4th Revision) Specn.
No.305.4.3
Km. 67 / ###
to 67 / 750
( 1 x 1 ) 100.000
16.000
1600.000
Km. 64 / 0 to 66 / 060
( 1 x 1 ) 2060.000
0.500
1030.000
2630.000
or say
2630.000 Sqm
7.60
13 Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone
aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost,
seigniorage conveyance of all materials to site and labour charges, centering, machine mixing,
laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P
etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (4th
Revision) and as directed by the Engineer-in-Charge for base coarse below CC pavement
Km. 67 / ###
to 67 / 750
( 1 x
) 100.000
100.000
16.000
0.100
or say
160.000
160.000
160.000 Cum
4415.00
14 Vibrated cement concrete M 35 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, seigniorage conveyance of all materials to site and labour charges, centering,
machine mixing, laying, vibrating, curing etc., including all other incidental and operational
charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,
1700, 2100 & 2702 (4th Revision) and as directed by the Engineer-in-Charge for C.C
Pavement.
Km. 67 / ###
to 67 / 750
( 1 x
) 100.000
100.000
16.000
0.250
or say
400.000
400.000
400.000 Cum
6825.00
15 Providing HYSD bars ( Fe-415 ) of diferent diameters, wrought and put up bars of all diameters
including cost and conveyance of steel to site and all labour charges for fabrication of
reinforcement including cutting, bending, binding rods, tying grills, placing them in position
etc., complete including cost and conveyance of binding wire and all handling charges and
operational charges etc., and including over lapping welding if required etc., complete for all
R.C.C items for finished item of work as per standard drawings, as per the directions of the
Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (4th revision) and as per
I.S.1786 of 1985 for CC pavement.
providing 12mm with 500mm spacing
Km. 67 / ###
to 67 / 750
( 1 x 1 ) 200.000
0.500
0.890
89.000
Nos
Length each Kg/Rm
Kgs
89.000
or say
0.100 MT
16
16 Providing Uncoated Mild Steel bars ( Fe-250 ) of diferent diameters, wrought and put up bars
of all diameters including cost and conveyance of steel to site and all labour charges for
fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them
in position etc., complete including cost and conveyance of binding wire and all handling
charges and operational charges etc., and including over lapping welding if required etc.,
complete for all R.C.C items for finished item of work as per standard drawings, as per the
directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (4th
revision) and as per I.S.1786 of 1985 .
Providing 25mm 100/4.5 = 22+1 joints
16/0.5=32*2=64Nos
Km. 67 / ###
to 67 / 750
( 1 x 23 )
0.500
3.850
2833.600
64
Joints
Nos
Length each Kg/Rm
Kgs
44576.00
6
or say
7
2833.600
2.900 MT
17 Providing, laying mastic pad of 25.4mm thick including cost , supply, cutting and all labor
charges,etc., complete
100/45= 2+1 = 3 joints
Km. 67 / ###
to 67 / 750
( 1 x 3 ) 16.00
0.200
9.600
Joints
Mts
9.600
or say
10.000 Sqm
8
48958.00
991.00
18 Supply and fixing cap to reinforcement with PVC Pipe of 25.40mm dia as per technical
specifications and as directed by the Engineer-in-charge.
100/45= 2+1 = 3 joints 16/0.5=32*2=64Nos
Km. 67 / ###
to 67 / 750
( 1 x 3 )
0.150
64
Joints
Nos
Length each
or say
28.800
28.800
29.000 Sqm
32.00
19 Providing Vaccum Dewatered Flooring Services including leveling the concrete to be followed
by placement of the bottom and top mats, operation of the Vaccum Machine to release the
excess free water in the Concrete, removal of the mat after completion of dewatering process,
conduction of the initial floating using power floater followed by finishing using power trowel of
adquate capacity. The rate is not inclusive of pin vibration of the concrete, placement of the
concrete and / or provision of the special toppings, but including hire and operational charges
of Generator of adequate capacity and other T&P and labour charges for all operations etc.
complete
Km. 67 / ###
to 67 / 750
( 1 x 1 ) 100.000
16.000
1600.000
1600.000 Cum.
Sqm
or say
1600.000
36.12
20 Sawing of Concrete Pavement using a self propelled walk behind, petro/electric powered saw of
suitable capacity to give a finished groove of 4mm width and 1/4 to 1/3 depth in the cured
concrete in the longitudinal and transverse directions along predetermined lines. The rate is
inclusive of the cost of consumables such as diamond blade. Masons engaged for the marking
is also deemed to be included in the rate and pouring of Polysulphide Sealent to the full depth
of groove. The rate is inclusive of the cleaning of the groove after the sawing to remove
cementatious particles adn cement washings to give a clean dry surface and surface
preparation of the sides of the groove to accommodate the sealent material etc., to give a neat
finished look including cost of sealent, hire and operational charges of Generator of Adequate
capacity and other T&P and labour charges for all operations etc. complete.
Length = 100mts
( 1 x1
) 100.000
100.000
Km. 67 / ###
to 67 / 750
( 1 x 23 ) 16.000
371.555
Joints
471.555
or say
480.000 RM
60.00
(R&B)
Division : Rajahumndry
21 Supply and fixing PVC pipe 110mm dia Prince/ Sudhakar make or equivalent quality PVC
/SWR
pipes & fittings ( as per ISI standards) 6kg/cm2
100/50 =2X2
Km. 67 / ###
to 67 / 750
( 1 x 4 )
16.000
64.000
64.000
or say
70.000 RM
218.33
22 Painting two coats after filling the surface with synthetic enamel paint in all shades on new
plastered concrete surfaces. Etc., complete for finished item of works as per MORTH Spn. No.
803 (4th Revision)
Km. 64 / 0
to 66 / 060
( 1 x
) 2060.000
1.086
or say
2237.160
2237.160
2240.000 Sqm
#REF!
SUB-TOTAL
2
(R&B) Division : Rajahumndry
6
7
(R&B) Circle : Kakinada
Amount
9
#REF!
1,30,275
1,90,970
82,61,600
#REF!
#REF!
#REF!
#REF!
#REF!
2,32,000
#REF!
,19,988
7,06,400
27,30,000
,4,458
9
1,41,978
,9,910
,,928
,57,792
,28,800
: Rajahumndry
,15,283
#REF!
#REF!
Name of
Work::
SI No
CHAINAGE IN KM
AVG. WIDTH
TYPE OF
YEAR OF
OF CARRIAGE
SURFACE RENEWALS
WAY in Meters
CONDITION
OF ROAD
61.600
67.000
7 to 14 M
BT
2009 - 10
FAIR
67.000
68.000
14 to 22 M
BT
20011 - 12
GOOD
68.000
68.305
22 M
BT
2009 - 10
FAIR
Superintending Engineer
(R&B) Circle Kakinada
DESIGN OF CRUST
Main Work: Widening and Strengthening of Kakinada - Rajahmundry Road from KM 61/600
to 68/305 in East Godavari District
Sub-Work (2): Widening and Strengthening of Kakinada - Rajahmundry Road from KM
64/000 to 68/305 in East Godavari District
The CVPD on Kakinada - Rajahmundry road =
5,150
For Four-lane single carriageway roads the design should be based on 40% of the CVPD
Total designed traffic for each direction = 2,575
Design traffic (N in msa) is finalised from
N=
A
n
r
F
D
N=
N=
365 x {(1+r)n - 1 }
r
xAxDxF
x 6952.50
= 358,74,900 say
or say
35.87 msa
Say
35.00 Msa
21.00 msa
710 mm
Reach
Laterite
+Soling
WBM
BT
KM 61/600 to 68/305
450
75
100
Total
crust
Crust
required as
per design
Addl.
Crust
required
625
710
85
Widening portion
Km 64/000 to
66/060
1. G.S.B (mm)
---
300
2. WMM
3. BM
--50
250
50
4. BC
Total Crust
30
80
30
630
Item
Main Work: Widening and Strengthening of Kakinada - Rajahmundry Road from KM 61/600 to 68/305 in East
Godavari District
Sub-Work (2): Widening and Strengthening of Kakinada - Rajahmundry Road from KM 64/000 to 68/305 in East
Godavari District
Berm
1.50
Mts.
Existing road
14 to 22 Mts.
Berm
1.50 Mts.
CC
Shoulders
2:1 Slope
CC
Shoulders
Existing Road
2:1 Slope
INDEX
EXISTING
PROPOSED
B.C. (30 MM)
Widening portion
3.975 to 2.975 Mts.
Existing road
7.00 to 9.00 Mts.
Widening portion
3.975 to 2.975 Mts.
Berm
1.50 Mts.
14.95 MTs.
B.C. (30MM thick)
Centre Dividers
B.M. (50 MM)
Earthen
Shoulders
2:1 Slope
W.M.M.
(250 MM)
G.S.B.
G.S.B.
(300 MM)
(150
MM)
Existing Road
Earthen
Shoulders
G.S.B.
(300 MM)
2:1 Slope
INDEX
EXISTING
PROPOSED
B.C. (30 MM)
B.M. (50 MM)
W.M.M. (250 MM)
Name of Work ::
Main Work: Widening and Strengthening of Kakinada - Rajahmundry Road
from KM 61/600 to 68/305 in East Godavari District
Sub-Work (2): Widening and Strengthening of Kakinada - Rajahmundry Road
from KM 64/000 to 68/305 in East Godavari District
Sub Work ::
Providing CC Drains in Kakinada - Rajahmundry Road from KM 61/600 to
68/305 in East Godavari District.
1.40M
0.250M
0.90M
0.250M
1.20M
V.C.C. M-15
0.60M
V.C.C. M-15
0.20M
0.60M
0.20M
0.10M
0.10M
0.40M
1.40M
Typical Cross Section of CC Drain
The Government of A.P. vide G.O. Ms. No.2, T,R&B (R.I) Dept., dt.12.01.2015
issued orders for adoption of MoRT&H, Govt. of India specifications and Data for Road and
Bridge works in Roads & Buildings Department, with current SSRs
Kgs. / sqm using mechanical means as per MoRT&H Specification 502 (4th revision)
Providing
and applying tack coat with bitumen Emulsion (Medium setting) (Bulk) using
and as
Emulsion pressure distributor at the rate of 0.20 kgs per sqm on the prepared
bituminous/granular surface cleaned with mechanical broom for finished item of work
as per M
7
8
9
Providing and laying of 50mm thick Bituminous Macadam with hot mix plant
producing an average output of 37.5 tonnes per hour using hard blasted granite
crushed aggregates of Grading - II as per table 500-4 of MoRT&H specificaion 504 (4th
Providing
Revision) 25
premm thick compacted Semi-Dense Bituminous Concrete by hot mix plant
using hard blasted granite crushed aggregates of Grading -2 as per table 500-15 of
specification 508 of MoRT&H (4th Revision), premixed with bituminous binder 60/70
Forming
grade @ shoulders with barrowed useful selected earth having MDD of not less than
1.75 Gms/CC from out side road boundary by mechanical means ..
Earthwork excavation in soils upto SDR by mechanical means for foundations of
structures as per drawing and technical specification including setting out.
10 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size for base course below dwarf wall.
11 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size
HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine
aggregate conforming to table 1000-2).. For Dwarf wall
L.S. Provisions for Price adjustment, VAT @ 5%, Quality Control Charges, Road Safety
12 Interventions, Shifting of utilities such Electrical lines, Water supply pipe lines, etc.,
Avagahana Sadassalu and for stationery , XEROX etc.& Unforeseen items.
RATES:
The estimate is prepared with 2014-2015 common SSR for all Engineering
Department and datas as per MoRT&H standard data book duly adopting over head charges
@ 5% and contractors profit at 10% as per G.O.Ms No 141, T(R&B) Dept, dated 27.07
Asst.Engineer (R&B),
Draksharama.
in
HBG material confirming to Grading III of MoRT&H Table 400-2 including cost, seigniorage charges and conveyance of all
materials to work site and spreading in uniform layers with motor grader or by approved
3 Providing,
Spreading
and compacting
HBG crushed
stone aggregate
to
means, onLaying,
prepared
surface mixing
by mix ingraded
place method
with Rotavator
/ approved
Wet
Mix
including
cost roller
of all materials
premixing
means
at Macadam
OMC andspecification
compacting with
vibratory
to achieveand
the including
desired density
etc.,
the
material
water
at of
OMC
in Mechanical
mix plant
carriage of401
mixed
ti
complete
for with
finished
item
work
as per MoRT&H
Specification
(4thmaterial
revision)by
and
as directed by the Engineer-in-charge.
2
4
5
6
7
8
9
Providing and applying prime coat with bitumen Emulsion on prepared surface of
granular base including clearing of road surface and spraying primer at the rate of 0.60
Kgs. / sqm using mechanical means as per MoRT&H Specification 502 (4th revision)
Providing
and applying tack coat with bitumen Emulsion (Medium setting) (Bulk) using
and as
Emulsion pressure distributor at the rate of 0.20 kgs per sqm on the prepared
bituminous/granular surface cleaned with mechanical broom for finished item of work
Providing
as per M and laying of 50mm thick Bituminous Macadam with hot mix plant
producing an average output of 37.5 tonnes per hour using hard blasted granite
crushed aggregates of Grading - II as per table 500-4 of MoRT&H specificaion 504 (4th
Providing
Revision) 25
premm thick compacted Semi-Dense Bituminous Concrete by hot mix plant
using hard blasted granite crushed aggregates of Grading -2 as per table 500-15 of
specification 508 of MoRT&H (4th Revision), premixed with bituminous binder 60/70
Forming
grade @ shoulders with barrowed useful selected earth having MDD of not less than
1.75 Gms/CC from out side road boundary by mechanical means .
Earthwork excavation in soils upto SDR
10 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size For base course
below Dwarf wall .
11 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size
HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine
aggregate conforming to table 1000-2).. For Dwarf wall
L.S. Provisions for Price adjustment, VAT @ 5%, Quality Control Charges, Road Safety
12 Interventions, Shifting of utilities such Electrical lines, Water supply pipe lines, etc.,
Avagahana Sadassalu and for stationery , XEROX etc.& Unforeseen items.
RATES:
The estimate is prepared with 2008-2009 commom SSR for all Engineering
Department and datas as per MoRT&H standard data book duly adopting over head charges
@ 5% and contractors profit at 10% as per G.O.Ms No 141, T(R&B) Dept, dated 27.07.2006.
Provision for VAT is shown separately as PART "B" in the estimate as per G.O.Ms No 141,
T(R&B) Dept., Dt 27.07.2006 The work will be carriedout as per relevant clauses of IRC &
MORTH specifications.
Asst.Engineer (R&B),
Draksharama.
3 Providing and applying prime coat with bitumen Emulsion on prepared surface of
granular base including clearing of road surface and spraying primer at the rate of 0.60
Kgs. / sqm using mechanical means as per MoRT&H Specification 502 (4th revision)
4 Providing
and applying tack coat with bitumen Emulsion (Medium setting) (Bulk) using
and as
Emulsion pressure distributor at the rate of 0.20 kgs per sqm on the prepared
bituminous/granular surface cleaned with mechanical broom for finished item of work
5 Providing
as per M and laying of 50mm thick Bituminous Macadam with hot mix plant
producing an average output of 37.5 tonnes per hour using hard blasted granite
crushed aggregates of Grading - II as per table 500-4 of MoRT&H specificaion 504 (4th
6 Providing
Revision) 25
premm thick compacted Semi-Dense Bituminous Concrete by hot mix plant
using hard blasted granite crushed aggregates of Grading -2 as per table 500-15 of
specification 508 of MoRT&H (4th Revision), premixed with bituminous binder 60/70
@
7 grade
Earthwork excavation in soils upto SDR by mechanical means as per MoRT&H specification
301(4th Revision) and as directed by the Engineer-in-Charge
8 Forming shoulders with barrowed useful selected earth having MDD of not less than 1.75 Gms/CC
from out side road boundary by mechanical means .
18 Construction of Earthen Shoulders on both sides to a depth of the crust.
19 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size below Dwarf wall
20 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size
HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine
aggregate conforming to table 1000-2) including
21 L.S. Provisions for Price adjustment, VAT @ 5%, Quality Control Charges, Road Safety
Interventions, Shifting of utilities such Electrical lines, Water supply pipe lines, etc.,
Avagahana Sadassalu and for stationery , XEROX etc.& Unforeseen items.
RATES:
The estimate is prepared with 2008-2009 commom SSR for all Engineering
Department and datas as per MoRT&H standard data book duly adopting over head charges
@ 5% and contractors profit at 10% as per G.O.Ms No 141, T(R&B) Dept, dated 27.07.2006.
Provision for VAT is shown separately as PART "B" in the estimate as per G.O.Ms No 141,
T(R&B) Dept., Dt 27.07.2006 The work will be carriedout as per relevant clauses of IRC &
MORTH specifications.
Asst.Engineer (R&B),
Draksharama.
Name of Work :
1.60 Kms
Main Work: Widening and Strengthening of Kakinada - Rajahmundry Road from KM 61/600 to 68/305 in
East Godavari District
Sub-Work (2): Widening and Strengthening of Kakinada - Rajahmundry Road from KM 64/000 to 68/305
in East Godavari District
Refinery
VIZAG
Km 719/4
Gravel Quarry
Km 16/910
1.70 Kms
Katheru Quarry
Km 14/600
Km 907/0
N
H
-1
6
R-K
Roa
d (v
) Pu
nyak
estr
a
3.00 Kms
Km
4
9/6
00
0.70 kM
Working Reach
Km 61/60
0
Km 0/0
Km 64/00
0
Sand Ramp
Km
68/
305
Morampudi
Km 910/7
Km 3/100
Dy.Executive Engineer
(R&B) Sub-Dvn.,Rajahmundry
Superintending Engineer
(R&B) Circle, Kakainada
Executive Engineer
(R&B) Division, Rajahmundry
Superintending Engineer
(R&B) Circle, Kakainada