Академический Документы
Профессиональный Документы
Культура Документы
Project Code:
Project Name:
Original Estimated Price (LKR):
Number of Bills:
Tender Date:
Project Awarded Date:
Expected Project Starting Date:
Expected Project Completion Date:
Contact for deliveries:
Address 1:
Address 2:
Address 3:
City:
Province:
Country:
Telephone No:
Fax No:
Email:
Tax Category:
Customer Branch:
HF-13-##
Housing Project For Training ##
2,000,001.00
1
Store Keeper
Housing Project For Training ##
Katubedda
Moratuwa
WP
Sri Lanka
+94112650567
+94112650622
VAT only
RDA
Special Note
## should be your attendance number such as 03, the following are not accepted \ / space . , " ' &
## should be your attendance number such as 03
Ten weeks before the current date - example current date 6th January then 5th November previous
One week after start date
Two weeks after Tender date
12 weeks after start date
Item
Bill No
Description
BILL NO 1
PRELIMINARIES
1
1
1
1
A-1
Performance bond
A-2
A-3
A-4
B-1
B-2
B-3
1
B-4
1
1
B-5
BILL NO 2
RUBBLE FOUNDATION and DPC
2
C-1
C-2
DPC with 20mm thick 1:3 Cement sand mortar and two
coats of DPC tar
CONCRETE WORK
D-1
Screed Concree for rubble foundation and pad fottings 50mm thick
D-2
2
2
FORMWORK
2
2
2
2
D-3
D-4
REINFORCEMENT
D-5
D-6
D-7
D-8
2
BLOCKWALLS
2
2
E-1
E-2
ROOF WORK
2
F-1
F-2
2
BILL NO 3
3' 6" x 8' 0" door with RCC frames, sash to be of 1" thck
panel of class 2 timber, door lock and iron mongery. This
item will be supplied to the home owner in a finished
form.
G-2
3' 0" x 8' 0" door with RCC frames, sash to be of 1" thck
panel of class 2 timber, door lock and iron mongery. This
item will be supplied to the home owner in a finished
form.
G-3
4' 0" x 5' 6" window with RCC frames, sash to be of 1"
thck panel of class 2 timber, fasteners and barrel bolt .
This item will be supplied to the home owner in a
finished form.
G-4
3' 0" x 3' 6" window with RCC frames, sash to be of 1"
thck panel of class 2 timber, fasteners and barrel bolt .
This item will be supplied to the home owner in a
finished form.
G-5
H-1
H-2
3
PAINTING
J-1
J-2
3
3
3
3
J-3
Painting of doors
J-4
Polishing of windows
BILL NO 4
ELECTRICAL WORK
4
4
4
K-1
K-2
K-3
K-4
Panel board with two pole main switch, 3 pole trip and
5Nos miniature breakers
K-5
4
4
WATER SUPPLY
4
4
4
4
4
4
4
L-1
L-2
L-3
Installation of Commode
L-4
Installation of washbasin
L-5
L-6
L-7
TOTAL
Total.
Distributiton of work
Quantity
Unit
1.00 Nr
1.00 Nr
4.00 Months
4.00 Months
1,200.00 m2
18.40 m3
2.40 m3
20.80 m3
12.40 m3
12.74 m3
33.20 m2
33.60 m2
0.09 m3
2.40 m2
9.00 m2
58.00 kg
4.50 kg
41.15 m
Rate
Amount
46.45 m2
104.98 m2
24.10 m2
74.32 m2
1.00 Nr
1.00 Nr
3.00 Nr
1.00 Nr
3.00 Nr
1.00 Nr
53.51 m2
111.48 m2
1.00 Nr
1.00 Nr
1.00 Item
1.00 Item
1.00 Nr
1.00 Nr
1.00 Nr
1.00 Nr
1.00 Nr
1.00 Nr
1.00 Nr
1.00 Nr
1.00 Nr
1.00 Nr
25.00 m
34.00 m
This is to perform as Rate Analysis giving resources - assume two unskilled labour for for two shifts
This is spot pricing put conversion factor to be value around 1500
This is not availale in BSR. The issue is the thickness. We can use BSR-C01 with a conversion
factor of 0.05; i.e. 50/1000=0.05
Match with BSR-C08 - check unit
BSR-G03
BSR-G02
BSR-Q01
BSR-Q10
BSR-K01
BSR-K03
BSR-M03
BSR-M12
Find
BSR-V111
BSR-V094
BSR-V095
Find
Find
BSR-T040
BSR-S56
BSR-S44
BSR-S14
Find
Find
Find
or two shifts
A-1
A-2
PRELIMINARIES
Performance bond
Mobilisation Advance
Gurantee
A-3
Provide Security to
Site
A-4
Provide electricity
and water site