Project Data

Project Code:
Project Name:
Original Estimated Price (LKR):
Number of Bills:
Tender Date:
Project Awarded Date:
Expected Project Starting Date:
Expected Project Completion Date:
Contact for deliveries:
Address 1:
Address 2:
Address 3:
City:
Province:
Country:
Telephone No:
Fax No:
Email:
Tax Category:
Customer Branch:

HF-13-##
Housing Project For Training ##
2,000,001.00
1

Store Keeper
Housing Project For Training ##
Katubedda
Moratuwa
WP
Sri Lanka
+94112650567
+94112650622
VAT only
RDA

Special Note

## should be your attendance number such as 03, the following are not accepted \ / space . , " ' &
## should be your attendance number such as 03

Ten weeks before the current date - example current date 6th January then 5th November previous
One week after start date
Two weeks after Tender date
12 weeks after start date

pace . , " ' & @

ber previous year

COMPUTER AIDED ESTIMATING

Item

Bill No

Description

BILL NO 1
PRELIMINARIES
1
1
1
1

A-1

Performance bond

A-2

Mobilisation Advance Gurantee

A-3

Provide Security to Site

A-4

Provide electricity and water site

EXCAVATION and EARTHWORK


1
1

B-1
B-2
B-3

1
B-4
1
1

B-5

Site Clearing all vegitation and reducing to depth not


exceeding 150mm
Excavation of trenches for Random Rubble masonry not
exceeding 1.0m depth
Excavation of pits for Coloumn fottings not exceeding
1.5m depth
Filling from excavated soil of foundation trenches and
pits
Filling foundations from imported soil

BILL NO 2
RUBBLE FOUNDATION and DPC
2

C-1

Random rubble masonry for foundation up to DPC

C-2

DPC with 20mm thick 1:3 Cement sand mortar and two
coats of DPC tar
CONCRETE WORK

D-1

Screed Concree for rubble foundation and pad fottings 50mm thick

D-2

Reinforced concrete Grade 30 for fottings

2
2

FORMWORK
2
2
2
2

D-3

Formwork for Fottings

D-4

Formwork for Columns

REINFORCEMENT
D-5

Reinforement for columns - 12mm Tor steel

D-6

Reinforement for columns - 6mm Mild steel for stirrups

D-7

Lintels for Doors and windows 100X150mm - inlcluding


concrete, 10mm dia tor steel two numbers and
formwork

D-8
2

100mm thick concrete floor in 1:3:6 (25mm) mix


including a layer of 800 gauge DPM and 12mm thick
expansion material.

BLOCKWALLS
2
2

E-1

100mm thick hollow cement blocks for walls in 1:5 mix

E-2

150mm thick hollow cement blocks for walls in 1:5 mix

ROOF WORK
2

F-1

Roof covering laid on class 2 timber framework.

F-2

ridge covering with asbestos or clay tiles set in cement


sand mortar.

2
BILL NO 3

DOORS and WINDOWS


G-1

3' 6" x 8' 0" door with RCC frames, sash to be of 1" thck
panel of class 2 timber, door lock and iron mongery. This
item will be supplied to the home owner in a finished
form.

G-2

3' 0" x 8' 0" door with RCC frames, sash to be of 1" thck
panel of class 2 timber, door lock and iron mongery. This
item will be supplied to the home owner in a finished
form.

G-3

4' 0" x 5' 6" window with RCC frames, sash to be of 1"
thck panel of class 2 timber, fasteners and barrel bolt .
This item will be supplied to the home owner in a
finished form.

G-4

3' 0" x 3' 6" window with RCC frames, sash to be of 1"
thck panel of class 2 timber, fasteners and barrel bolt .
This item will be supplied to the home owner in a
finished form.

G-5

Cement grill of 5' 0" x 4' 0" in front verandah

PLASTERING and CEMENT RENDERING


3

H-1

15mm thick 1:3 cement rendering of floor, plinth etc.,

H-2

Cement sand 1:5 15mm thick plaster with retarder


admixture such as FEBMIX finished semi rough to both
internal and external wall faces

3
PAINTING
J-1

Painting of Exteranl walls with one coat of primer and


two coats of weatherhseild paint

J-2

Painting of internal walls with one coat of primer and


two coats of emulsion

3
3

3
3

J-3

Painting of doors

J-4

Polishing of windows

BILL NO 4
ELECTRICAL WORK
4
4
4

K-1

Ligting points including wiring, switch and holder

K-2

5A Sockets including wiring

K-3

15A sockets including wiring

K-4

Panel board with two pole main switch, 3 pole trip and
5Nos miniature breakers

K-5

Electrical Supply to house

4
4

WATER SUPPLY
4
4
4
4
4
4
4

L-1

Installation of Water tank 1000liters

L-2

Installation of a kitchen sink 1500X450mm

L-3

Installation of Commode

L-4

Installation of washbasin

L-5

Installation of bib tap

L-6

Installation of pipe 32mm dia

L-7

Insallation of pipe 20mm dia

TOTAL

Total.

Distributiton of work

Quantity

Unit

1.00 Nr
1.00 Nr
4.00 Months
4.00 Months

1,200.00 m2
18.40 m3
2.40 m3
20.80 m3
12.40 m3

12.74 m3
33.20 m2

33.60 m2
0.09 m3

2.40 m2
9.00 m2

58.00 kg
4.50 kg
41.15 m

Rate

Amount

46.45 m2

104.98 m2
24.10 m2

74.32 m2
1.00 Nr

1.00 Nr

3.00 Nr

1.00 Nr

3.00 Nr

1.00 Nr

53.51 m2
111.48 m2

1.00 Nr
1.00 Nr

1.00 Item
1.00 Item

1.00 Nr
1.00 Nr
1.00 Nr
1.00 Nr
1.00 Nr

1.00 Nr
1.00 Nr
1.00 Nr
1.00 Nr
1.00 Nr
25.00 m
34.00 m

GM1 - PRELIMINARIES, EXCAVATION and EARTHWORK, RUBBLE FOUNDATION and DPC


GM2 - CONCRETE WORK, DOORS and WINDOWS, ELECTRICAL WORK
GM3 - BLOCKWALLS, ROOF WORK, WATER SUPPLY

This is spot pricing put conversion factor to be value around 8000


This is spot pricing put conversion factor to be value around 12000

This is to perform as Rate Analysis giving resources - assume two unskilled labour for for two shifts
This is spot pricing put conversion factor to be value around 1500

Match with BSR-B01 - check unit


Match with BSR-B02 - check unit
Match with BSR-B02 - check unit
Match with BSR-B16 - check unit
Match with BSR-B17 - check unit

Match with BSR-H01 - check unit


Match with BSR-J01 - check unit

This is not availale in BSR. The issue is the thickness. We can use BSR-C01 with a conversion
factor of 0.05; i.e. 50/1000=0.05
Match with BSR-C08 - check unit

Match with BSR-D01 - check unit


Match with BSR-D04 - check unit

Match with BSR- E01 - check unit


Match with BSR- E01 - check unit

Match with BSR- C22 - check unit

Use C01 and later andd DPM to the rate analysis

BSR-G03
BSR-G02

BSR-Q01

BSR-Q10

use BSR-N02 and change rate analysis

use BSR-N02 and change rate analysis

use BSR-N15 and change rate analysis

use BSR-N15 and change rate analysis


BSR-G06 and change if necessary

BSR-K01

BSR-K03

BSR-M03

BSR-M05 and change

BSR-M12
Find

BSR-V111
BSR-V094
BSR-V095

Find
Find

BSR-T040
BSR-S56
BSR-S44
BSR-S14
Find
Find
Find

or two shifts

A-1
A-2

PRELIMINARIES
Performance bond
Mobilisation Advance
Gurantee

A-3

Provide Security to
Site

A-4

Provide electricity
and water site