Академический Документы
Профессиональный Документы
Культура Документы
Aditya Vidyarthi
Electrical Engineering
12EIAEE002
IET, ALWAR
CANDIDATE DECLARATION
I, Aditya Vidyarthi hereby declare that the work, which is being presented in the report
entitled Manufacturing of turbo generators in the partial fulfillment for the award of
degree of Bachelor of Technology in the department of Electrical engineering ,
Institute of Engineering and Technology , Alwar affiliated to Rajasthan Technical
University is a record of my own investigation carried under the able guidance of Mr.
Rajmani Jaiswal at BHEL, Haridwar.
I hav not submitted the matter presented in this report anywhere else for the award of any
other degree.
Aditya Vidyarthi
Roll no 12EIAEE002
ii
CERTIFICATE
This is to certify that Mr. Aditya Vidyarthi, Roll No 12EIAEE002 a student of Bachelor of
Technology, 7the semester of this institute has completed the Industrial Summer Training
at BHEL , Haridwar of 60 days duration in partial fulfillment of Bachelor of Technology
degree program of Institute of Engineering and Technology, Alwar .
iii
ABSTRACT
BHEL is the largest engineering and manufacturing enterprise in India in the energy related
infrastructure sector today which manufactures Turbo Generators (2-pole and 4-pole)
ranging up to 150 MHz .
The manufacturing process of Turbo Generator is mainly divided into stator section and
rotor section where stator frame, stator core, stator windings, end covers are received from
the stator building section and rotor with rotor windings and rotor retaining rings is received
from rotor section and assembled at the assembly section.
Each and every process is carried out in a sequential process. Turbo Generators are
designed with the Closed circuit air cooling with water or air coolers mounted in the pit.
The layout of the manufacturing plant is such that it is well streamlined to enable smooth
material flow from the raw material stages to finished goods.
The raw material that are produced for manufacture are used only after thorough material
testing in the testing lab and with strict quality checks at various stages of productions.
Latest technologies like vacuum press impregnated moralistic high voltage insulation,
polyester fleece tape impregnation for outer corona protection are implemented to produce
high quality insulation for turbines, outstanding performance and long lasting lifetime.
Aditya Vidyarthi
Electrical Engineering
IET, Alwar
iv
LIST OF CONTENTS
I. Acknowledgement
II. Certificate
III. List of Contents
BHEL- An Overview
1.2
1-5
2. Introduction to Turbo-Generators
6-12
2.1
Turbo-Generator
2.2
2.3
2.4
2.5
Generator module
2.6
3. STATOR
3.1
Stator frame
3.2
Stator core
3.3
Lamination preparation
3.4
Assembly of Core
3.5
Stator binding
3.6
3.7
Bushings
3.8
12-21
4. ROTOR
4.1
Parts of Rotor
4.2
Rotor winding
4.3
Insulation
4.4
4.5
4.6
Field connection
4.7
Rotor fan
22-29
5. EXCITATION SYSTEM
5.1
Brushless Excitation
5.2
Pilot Exciter
5.3
Main Exciter
5.4
Rectifier Wheel
5.5
Flow Chart
5.6
30-35
6. COOLING SYSTEM
35-38
6.1
6.2
6.3
Hydrogen cooled
39
40-44
9.
8.1
8.2
8.3
8.4
8.5
Helium test
CONCLUSION
45
10. REFERENCES
46
vi