BUB 2013 DECEMBER 2015

DILG-ARMM SALINTUBIG PROGRAM (B


As of December 31, 2015
LGU

NAME OF PROJECT

PROJECT COST

MAGUINDANAO
1

Ampatuan

Buldon

Buluan

Datu Montawal

Datu Odin Sinsuat

Datu Piang

GSK Pendatun

Mamasapano

Matanog

10

Parang

11

South Upi

12

Sultan Sa Barongis

Construction of Water System Project (LI)


Construction of Water System Project (LII)
Construction of Water System Project (LII)
Construction of Water System Project (LI)
Construction of Water System Project (LII) Phase-I
Construction of Water System Project
L-I
Construction of Water System Project (LI)
Construction of Water System Project (LI)
Construction of Water System Project L-II
Phase I
Completion of Parang PWS (Primary
Sedimentation Tank)
Construction of Water System Project
(
L-II Phase I)
Construction of Water System Project L-II
Phase I
SUB-TOTAL COST

800,000.00
2,210,000.00
1,900,000.00
1,700,000.00
1,315,000.00
1,000,000.00
1,600,000.00
2,000,000.00
1,000,000.00
5,900,000.00
10,900,000.00
1,500,000.00

31,825,000.00

Page 1

BUB 2013 DECEMBER 2015

LANAO DEL SUR


13

Bubong

14

Bumbaran

15

Kapai

16

Lumba-Bayabao

17

Marogong

18

Pagayawan

Construction of Water System Project (LII-Phase I)


Construction of Water System Project (LII)
Construction of Water System Project L-II

LGU

Construction of Water System Project ( LII)


Construction of Water System Project ( LII Phase I)
Construction of Water System Project L-II

1,000,000.00
1,000,000.00
1,000,000.00
4,000,000.00
3,000,000.00
2,000,000.00

SUB-TOTAL COST

12,000,000.00

NAME OF PROJECT

PROJECT COST

BASILAN
19 Tipo-Tipo
20 Tuburan

Construction of Tipo-Tipo Water System


Phase II
Construction of Water System Project
L-I
SUB-TOTAL COST

6,200,000.00
700,000.00

6,900,000.00

SULU
21

Indanan

Construction of Water System Project LII


Page 2

4,200,000.00

BUB 2013 DECEMBER 2015

22

Kalinggalan Kaluang

23

Maimbung

24

Parang

25

Talipao

Construction of Water System Project L-II


Construction of Water System Project
(L-III Phase I)
Construction of Water System Project L-II
Phase I
Construction of Water System Project L-II
Phase I
SUB-TOTAL COST

6,800,000.00
2,700,000.00
7,500,000.00
1,000,000.00

22,200,000.00

TAWI-TAWI
26

Bongao

27

Languyan

28

Sapa-Sapa

29

Simunul

30

Sitangkai

Supply and Distribution of Plastic Water


Tank
Construction of Water System Project (L-I
)
Construction of Two Units WS Project (LII)
Supply and Distribution of Plastic Water
Tank
Supply and Distribution of Plastic Water
Tank
SUB-TOTAL COST
TOTAL COST

Prepared by:

ROHAINA T. SAPAL
Engineer I

Page 3

2,000,000.00
4,385,000.00
12,000,000.00
1,350,000.00
4,700,000.00

24,435,000.00
97,360,000.00

BUB 2013 DECEMBER 2015

M SALINTUBIG PROGRAM (BUB 2013)


As of December 31, 2015
FUND RELEASED
(%)

Amount

PHYSICAL
ACCOMPLISHMENT

REMARKS

100%

744,000.00

100%

Completed

90%

1,847,560.00

98%

Last tranche ready for release upon submission


of the liquidation report

50%

836,000.00

98%

2nd tranche ready for release upon submission


of the liquidation papers

100%

1,581,000.00

100%

Completed

90%

1,091,450.00

80%

Last tranche ready for release upon submission


of the liquidation report

90%

830,000.00

100%

Last tranche ready for release upon submission


of the liquidation report

90%

1,328,000.00

100%

Last tranche ready for release upon submission


of liquidation report

100%

1,860,000.00

100%

50%

440,000.00

34%

Problem in water source and equipment

90%

4,932,400.00

100%

Last tranche ready for release upon submission


of liquidation report

90%

9,047,000.00

100%

Last tranche ready for release upon submission


of the liquidation report

100%

1,395,000.00

100%

Completed

87%

25,932,410.00

93%

Page 4

BUB 2013 DECEMBER 2015

100%

930,000.00

100%

Completed

90%

830,000.00

100%

Second tranche (40%) ready for release upon


submission of the liquidation report

100%

930,000.00

100%

Completed

50%

1,760,000.00

90%

Second tranche (40%) ready for release upon


submission of the liquidation report

100%

2,790,000.00

100%

Completed

90%

1,660,000.00

97%

Project on progress

88%

8,900,000.00

FUND RELEASED
(%)

Amount

98%

PHYSICAL
ACCOMPLISHMENT

REMARKS

90%

5,146,000.00

70%

Last Tranche (10%) ready for release upon


submission of the liquidation report

90%

585,200.00

65%

Last Tranche (10%) ready for release upon


submission of the liquidation report

90%

5,731,200.00

68%

90%

3,486,000.00

54%

Page 5

Last Tranche (10%) ready for release upon


submission of the liquidation report

BUB 2013 DECEMBER 2015

50%

2,992,000.00

72%

Second tranche (40%) ready for release upon


submission of the liquidation report

50%

1,188,000.00

98%

Second tranche (40%) ready for release upon


submission of the liquidation report

90%

6,270,000.00

96%

Last tranche ready for release upon submission


of the liquidation report

90%

830,000.00

100%

Last tranche ready for release upon submission


of the liquidation report

74%

14,766,000.00

84%

90%

1,672,000.00

85%

Second tranche (40%) ready for release upon


submission of the liquidation report

50%

1,929,000.00

88%

Second tranche (40%) ready for release upon


submission of the liquidation report

90%

9,960,000.00

90%

Last tranche ready for release upon submission


of the liquidation report

90%

1,120,500.00

100%

Last tranche ready for release upon submission


of the liquidation report

100%

4,371,000.00

100%

Completed

84%
85%

19,052,500.00
74,382,110.00

93%
87%

Noted by:

EVELYN S. BUSCATO
Head, SPMU

Page 6

BUB 2013 DECEMBER 2015

Page 7

BUB 2013 DECEMBER 2015

Page 8

BUB 2013 DECEMBER 2015

Page 9

BUB 2013 DECEMBER 2015

Page 10

BUB 2013 DECEMBER 2015

Page 11

BUB 2013 DECEMBER 2015

Page 12

BUB 2013 DECEMBER 2015

Page 13

BUB 2013 DECEMBER 2015

Page 14

BUB 2013 DECEMBER 2015

Page 15

BUB 2013 DECEMBER 2015

Page 16

BUB 2013 DECEMBER 2015

Page 17

BUB 2013 DECEMBER 2015

Page 18

BUB 2013 DECEMBER 2015

Page 19

BUB 2013 DECEMBER 2015

Page 20

BUB 2013 DECEMBER 2015

Page 21

BUB 2013 DECEMBER 2015

Page 22

BUB 2013 DECEMBER 2015

Page 23

BUB 2013 DECEMBER 2015

Page 24

BUB 2013 DECEMBER 2015

Page 25

BUB 2013 DECEMBER 2015

Page 26

BUB 2013 DECEMBER 2015

Page 27

BUB 2013 DECEMBER 2015

Page 28

BUB 2013 DECEMBER 2015

Page 29

BUB 2013 DECEMBER 2015

Page 30

BUB 2014 DECEMBER 2015

DILG-ARMM SALINTUBIG PROGRAM (BU


AS OF DECEMBER 31, 2015
LGU

NAME OF PROJECT

PROJECT COST

MAGUINDANAO
1

BARIRA

Construction of Water System Project L-II

5,000,000.00

BULDON

Expansion of Tap Stand/Communal Faucet


(Water Supply, Level II) at Brgy. Poblacion
Calaan and Mataya

2,500,000.00

DATU ANGGAL MIDTIMBANG

Construction of Water System Project Level II

4,000,000.00

DATU HOFFER AMPATUAN

Construction of Water System Project Level II

5,000,000.00

DATU ODIN SINSUAT

Construction of Water System Project Level II

6,500,000.00

DATU SALIBO

Construction of Water System Project Level II

1,870,000.00

DATU UNSAY

Provision of Potable Water Supply: a.


Construction of Datu unsay Water System Level
I & b. Repair/ Rehabilitation of Level II W.S.

6,697,500.00

MAMASAPANO

Construction of Water System Project Level II

2,000,000.00

MATANOG

Construction of Water System Project Level II

2,000,000.00

10

PAGALUNGAN

Construction of Water System Project Level II

3,800,000.00

11

PARANG

Provision of Potable Water Supply: Completion of


Level III Potable Water Supply Project

Page 31

15,000,000.00

BUB 2014 DECEMBER 2015

12

RAJAH BUAYAN

13

SHARIFF AGUAK

14

S. SAYDONA MUSTAPHA

15

SOUTH UPI

16

SULTAN KUDARAT

Construction of Water System Project L-II

14,000,000.00

17

SULTAN MASTURA

Construction of Water System Project L-II

7,500,000.00

18

SULTAN SA BARONGIS

LGU

Construction of Water System Project Level II

6,350,000.00

Rehabilitation and Repair of Shariff Aguak Level


3 Water System

6,400,000.00

Construction of Water System Project Level I

2,000,000.00

Provision of Level II Water System

1,444,000.00

Construction of Water System Project Level IPhase II

NAME OF PROJECT

930,000.00

PROJECT COST

19

TALITAY

Construction of Water System Project L-II

6,000,000.00

20

UPI

Construction of Water System Project L-II

2,000,000.00

SUB-TOTAL COST

100,991,500.00

LANAO DEL SUR


21 BALABAGAN

Construction of Water System Project L-II

1,500,000.00

22 BAYANG

Construction of Water System Project L-II

500,000.00

Page 32

BUB 2014 DECEMBER 2015

23

BUTIG

Construction of Water System Project L-II

2,500,000.00

Construction of Water System Project (L-II Phase


II)

9,000,000.00

25 KAPATAGAN

Construction of Water System Project L-II

1,000,000.00

26 LUMBATAN

Construction of Water System Project L-II

2,500,000.00

Construction of Water System Project (L-II Phase


I)

3,000,000.00

28 MALABANG

Construction of Water System Project (L-II)

4,000,000.00

29 MAROGONG

Construction of Water System Project (L-II Phase


II)

7,000,000.00

30 SAGUIARAN

Construction of Water System Project L-II

2,500,000.00

31 SULTAN DUMALONDONG

Construction of Water System Project L-II

5,000,000.00

32 TAGOLOAN

Construction of Water System Project L-II

4,500,000.00

24 KAPAI

27 LUMBAYANAGUE

SUB-TOTAL COST

43,000,000.00

BASILAN
33

AL BARKA

Construction of Water System Project L-II

34

HJI MOHAMMAD AJUL

Construction of Water System Project L-II

Page 33

4,275,000.00
8,000,000.00

BUB 2014 DECEMBER 2015

35

LAMITAN CITY

LGU

Construction of Water System Project L-II

NAME OF PROJECT

6,000,000.00

PROJECT COST

36

SUMISIP

Construction of Water System Project L-II

1,650,000.00

37

TABUAN LASA

Construction of Water System Project L-I

1,133,750.00

38

TIPO-TIPO

Construction of Water System Project L-II

2,000,000.00

39

TUBURAN

Construction of Water System Project L-II

3,000,000.00

40

UNGKAYA PUKAN

Construction of Water System Project L-II

4,225,000.00

SUB-TOTAL COST

30,283,750.00

SULU
41

MAIMBUNG

42

PANAMAO

43

PARANG

44

SIASI

Construction of Water System Project (L-III Phase


II)

6,000,000.00

Construction of Water System Project L-II

2,300,000.00

Construction of Water System Project (L-II-Phase


II)
Construction of Water System Project L-II

Page 34

10,000,000.00
1,000,000.00

BUB 2014 DECEMBER 2015

45

TALIPAO

46

TAPUL

Potable Water Supply Project: using RAM Pump


Technology

2,585,000.00

Construction of Water System Project L-II

5,000,000.00

SUB-TOTAL COST
TAWI-TAWI

26,885,000.00

LANGUYAN

Capacity Building for CSOs,POS and Basic


Sectors on Organizational & Financial Mngt.
Regestration/Accreditation to Different Agencies
and LGU Special Bodies

500,000.00

48

MAPUN

Supply and Distribution of Water System Project


& Pos Strengthening/Capability Bldg./ Re: Water
Management

4,000,000.00

49

PANGLIMA SUGALA

47

LGU

Potable Water Supply- Level I

NAME OF PROJECT

Construction of Water System Project L-III

700,000.00

PROJECT COST

50

SIMUNUL

51

SITANGKAI

Potable Water Supply Project:


Construction/Installation of Plastic Water Tank
with Base

5,000,000.00

52

SOUTH UBIAN

Capability Building of LGU and CSOs on Local


Government

500,000.00

Page 35

15,000,000.00

BUB 2014 DECEMBER 2015

SUB-TOTAL COST
GRAND TOTAL COST
Prepared by:

ROHAINA T. SAPAL
Engineer I

Page 36

25,700,000.00
226,860,250.00

BUB 2014 DECEMBER 2015

G PROGRAM (BUB 2014 )

MBER 31, 2015

FUND RELEASED

PHYSICAL
ACCOMPLISHMENT

REMARKS

3,925,000.00

98%

Project on progress

90%

1,962,500.00

45%

Project on progress

100%

3,520,000.00

100%

Completed

100%

4,400,000.00

100%

Completed

90%

5,102,500.00

87%

Project on progress

90%

1,467,950.00

75%

The project was affected by conflict

90%

5,256,350.00

90%

There is no progress due to LGU's


political problem

100%

1,760,000.00

100%

Completed

90%

1,570,000.00

98%

Project on progress

100%

3,344,000.00

100%

Completed

72%

Project on progress

(%)

Amount

90%

90%

11,775,000.00

Page 37

BUB 2014 DECEMBER 2015

90%

4,984,750.00

100%

10% lapsed

90%

5,024,000.00

80%

No progress due to unavailabilty of


funds

90%

1,570,000.00

100%

10% lapsed

50%

599,260.00

54%

Project on progress

90%

10,990,000.00

100%

10% lapsed

90%

5,887,500.00

85%

Project on progress

100%

Project on progress

PHYSICAL
ACCOMPLISHMENT

REMARKS

100%

874,200.00

FUND RELEASED
(%)

Amount

90%

4,710,000.00

100%

10% lapsed

90%

1,570,000.00

98%

Project on progress

91%

80,293,010.00

89%

100%

1,320,000.00

100%

Completed

100%

Project on progress

100%

475,000.00

Page 38

BUB 2014 DECEMBER 2015

100%

2,200,000.00

100%

Completed

100%

7,920,000.00

100%

Completed

90%

785,000.00

100%

10% lapsed

90%

1,962,500.00

100%

10% lapsed

90%

2,355,000.00

98%

Project on progress

90%

3,140,000.00

95%

Project on progress

100%

6,160,000.00

100%

Completed

60%

Project on progress

90%

1,962,500.00

90%

3,925,000.00

60%

Project on progress

90%

3,532,500.00

100%

10% lapsed

94%

35,737,500.00

93%

50%

1,774,125.00

83%

Project on progress

50%

3,320,000.00

60%

Project on progress

Page 39

BUB 2014 DECEMBER 2015

90%

4,710,000.00

FUND RELEASED

75%

Project on progress

PHYSICAL
ACCOMPLISHMENT

REMARKS

(%)

Amount

90%

1,295,250.00

85%

Project on progress

50%

468,950.00

25%

Project on progress

60%

Project on progress

50%

830,000.00

90%

2,355,000.00

70%

Project on progress

90%

3,316,625.00

65%

Project on progress

70%

18,069,950.00

65%

50%

2,490,000.00

44%

Project on progress

50%

954,500.00

17%

Project on progress: delayed due to


unavailabilty of the contractor

90%

7,850,000.00

95%

Project on progress

50%

415,000.00

59%

Project on progress

Page 40

BUB 2014 DECEMBER 2015

90%

2,029,225.00

100%

10% lapsed

90%

3,925,000.00

99%

Project on progress

70%

17,663,725.00

69%

50%

237,500.00

100%

Capacity Development Conducted

90%

3,140,000.00

48%

Project on progress

87%

87% Plastic Water tank procured


and is ready for distribution

PHYSICAL
ACCOMPLISHMENT

REMARKS

80%

Project on progress

90%

591,500.00

FUND RELEASED
(%)

Amount

90%

11,775,000.00

90%

3,925,000.00

100%

Project on progress

470,000.00

100%

Capacity Development Conducted

100%

Page 41

BUB 2014 DECEMBER 2015

85%

20,139,000.00

86%

82%

171,903,185.00

80%

Noted by:

EVELYN S. BUSCATO
Head, SPMU

Page 42

REGULAR 2014 DECEMBER 2015

DILG-ARMM SALINTUBIG REGULAR


AS OF DECEMBER 31, 2015
LGU

NAME OF PROJECT

PROJECT COST

MAGUINDANAO
1

Datu Montawal

Potable Water System Project L-II

8,820,000.00

Datu Odin Sinsuat

Potable Water System Project L-II

8,820,000.00

Potable Water System Project L-II

8,820,000.00

Construction of Potable Water System


L-II

8,820,000.00

Potable Water System Project L-II

8,820,000.00

III (Sand Filter)

8,820,000.00

Potable Water System Project L-II (Two


Unit)

8,820,000.00

Potable Water System Project L-II

8,820,000.00

Guindulungan

Kabuntalan

Northern Kabuntalan

Parang

Sultan Kudarat

Talayan

TOTAL COST

70,560,000.00

LANAO DEL SUR


9

Bacolod-Kalawi

Potable Water Supply L-III

Page 43

8,820,000.00

REGULAR 2014 DECEMBER 2015

10

Butig

Potable Water System Project L-II

8,820,000.00

11

Bubong

Potable Water System Project L-II

8,820,000.00

12

Calanogas

Potable Water System Project L-II

8,820,000.00

13

Ditsaan-Ramain

14

Ganassi

15
16

Proposed Water System Project


Expansion)

(L-II

8,820,000.00

Potable Water System Project L-II

8,820,000.00

Madamba

Construction of Water System Project


L-II

8,820,000.00

Madalum

Construction of L-II Water System

8,820,000.00

LGU

NAME OF PROJECT

PROJECT COST

17

Malabang

Potable Water System Project L-II

8,820,000.00

18

Marogong

Potable Water System Project L-II

8,820,000.00

19

Masiu

Potable Water System Project L-II

8,820,000.00

20

Poona Bayabao

Potable Water System Project L-II

8,820,000.00

21

Saguiaran

Construction/Expansion of Water
System L-II

8,820,000.00

22

Wao

Potable Water System Project L-II

8,820,000.00

Page 44

REGULAR 2014 DECEMBER 2015

TOTAL COST

123,480,000.00

BASILAN
23

Ungkaya Pukan

Potable Water System Project L-II

8,820,000.00

24

Sumisip

Potable Water System Project L-II

8,820,000.00

25

Lantawan

II

8,820,000.00

TOTAL COST

26,460,000.00

SULU
26

MAIMBUNG

Potable Water System Project L-II

8,820,000.00

27

TALIPAO

Potable Water System Project L-II

8,820,000.00

TOTAL COST
GRAND TOTAL FOR ALL PROVINCES
Prepared by:

ROHAINA T. SAPAL
Engineer I

Page 45

17,640,000.00
238,140,000.00

REGULAR 2014 DECEMBER 2015

M SALINTUBIG REGULAR
DECEMBER 31, 2015
FUND RELEASED
(%)

Amount

PHYSICAL
ACCOMPLISHMENT

REMARKS

100%

7,761,600.00

100%

Completed

90%

6,923,700.00

98%

Project on progress

100%

7,761,600.00

100%

Completed

90%

7,452,900.00

98%

Project on progress

100%

8,290,800.00

100%

Completed

90%

7,452,900.00

98%

Project on progress

90%

6,923,700.00

100%

10% lapsed

90%

6,923,700.00

100%

10% lapsed

94%

59,490,900.00

99%

100%

8,290,800.00

100%

Completed

Page 46

REGULAR 2014 DECEMBER 2015

100%

8,290,800.00

100%

Completed

100%

7,761,600.00

100%

Completed

90%

6,923,700.00

100%

10% lapsed

100%

8,290,800.00

100%

Completed

100%

8,290,800.00

100%

Completed

100%

8,290,800.00

100%

Completed

100%

8,290,800.00

100%

Completed

PHYSICAL
ACCOMPLISHMENT

REMARKS

FUND RELEASED
(%)

Amount

90%

6,923,700.00

98%

Project on progress

100%

8,290,800.00

100%

Completed

100%

8,290,800.00

100%

Completed

90%

7,452,900.00

40%

Project on progress

100%

8,290,800.00

100%

Completed

90%

6,923,700.00

90%

Project on progress

Page 47

REGULAR 2014 DECEMBER 2015

97%

110,602,800.00

95%

50%

3,660,300.00

95%

Project on progress

90%

6,923,700.00

50%

Project on progress

80%

Project on progress

90%

6,923,700.00

77%

17,507,700.00

75%

50%

3,660,300.00

81%

Project on progress

90%

6,923,700.00

97%

Project on progress

70%

10,584,000.00

89%

84%

198,185,400.00

90%

Noted by:

EVELYN S. BUSCATO
Head, SPMU

Page 48

TISP DECEMBER 2015

TRANSITION INVESTMENT SUPPORT PLAN

MUNICIPALITY

LANAO DEL SUR


Balindong

LEVEL

PROVISION OF POTABLE WATER SUPPLY PROJECT FOR ARMM


Status of Implementation as of December 2015
PROJECT COST
FUND RELEASED FROM PGO

ll

4.86

(%)
90%

Bayang

ll

4.86

50%

Buadiposo-Buntong

ll

9.50

90%

Butig

ll

4.86

67%

Ditsaan-Ramain

ll

4.86

80%

Ganassi

ll

4.86

50%

Calanogas

ll

4.86

50%

Kapatagan

ll

9.50

50%

Lumbaca-Unayan

ll

9.50

90%

Lumbatan

ll

9.50

50%

10

Page 49

TISP DECEMBER 2015


11

Lumbayanague

ll

9.50

50%

12

Madalum

ll

4.86

50%

13

Madamba

ll

9.50

50%

14

Malabang

ll

9.50

81%

LEVEL

PROJECT COST

MUNICIPALITY
LANAO DEL SUR

FUND RELEASED FROM PGO


(%)

15

Masiu

ll

4.86

77%

16

Poona-Bayabao

ll

9.50

50%

17

Saguiaran

ll

9.50

50%

18

Tamparan

ll

4.86

50%

19

Taraka

ll

4.86

15%

20

Tubaran

ll

4.86

50%

21

Wao

ll

4.86

76%

SUB-TOTAL

143.82

MAGUINDANAO

Page 50

TISP DECEMBER 2015


22

Ampatuan

ll

7.00

100%

23

Barira

ll

7.00

100%

24

Buldon

ll

7.00

80%

25

Buluan

II

7.00

50%

26

Datu Abdullah Sangki

2.00

80%

27

Datu Blah Sinsuat

ll

7.00

50%

28

Datu Odin Sinsuat

ll

7.00

80%

29

Datu Paglas

ll

7.00

50%

LEVEL

PROJECT COST

MUNICIPALITY

MAGUINDANAO

FUND RELEASED FROM PGO

(%)

30

Datu Piang

ll

5.00

80%

31

Datu Salibo

ll

1.60

80%

32

Datu Saudi Ampatuan

ll

7.00

80%

33

Shariff Saydona Mustap

1.50

80%

34

Gen. SK Pendatun

II

5.00

80%

Page 51

TISP DECEMBER 2015


35

Guindulungan

ll

3.00

100%

36

Kabuntalan

ll

7.00

50%

37

Mamasapano

1.50

80%

38

Mangudadatu

ll

7.00

50%

39

Matanog

ll

7.00

80%

40

Northern Kabuntalan

ll

7.00

80%

41

Pagagawan (Datu Montawa

ll

6.60

100%

42

Paglat

lll

7.00

80%

43

Pandag

ll

7.00

50%

44

Parang

ll

7.00

100%

45

Rajah Buayan

ll

4.00

80%

46

Shariff Aguak

0.80

80%

LEVEL

PROJECT COST

MUNICIPALITY

MAGUINDANAO
47

South Upi

FUND RELEASED FROM PGO

(%)
ll

7.00

Page 52

80%

TISP DECEMBER 2015


48

Sultan Kudarat

ll

2.00

50%

49

Sultan sa Barongis

7.00

80%

50

Sultan Mastura

ll

2.00

100%

51

Talayan

ll

3.00

80%

52

Talitay

1.50

50%

53

Upi

III

7.00

50%

SUB-TOTAL

165.50

TAWI-TAWI
54

Bongao

9.45

50%

55

Languyan

ll

9.45

100%

56

Mapun

ll

9.45

50%

57

Panglima Sugala

ll

9.45

100%

58

Sapa-Sapa

ll

9.45

100%

59

Simunul

ll

9.45

50%

60

South Ubian

ll

9.45

100%

61

Tandubas

ll

9.45

100%

Page 53

TISP DECEMBER 2015


62

Turtle Island

0.62

SUB-TOTAL
MUNICIPALITY

100%

76.22
LEVEL

PROJECT COST

FUND RELEASED FROM PGO

SULU OCTOBER
63

Lugus

ll

9.45

100%

64

Luuk

ll

9.45

100%

65

Maimbung

ll

9.45

100%

66

Omar

ll

9.45

67

Pandami

ll

9.45

100%

68

Panglima Estino

ll

9.45

100%

69

Pata

ll

9.45

100%

70

Talipao

ll

9.45

100%

SUB-TOTAL

75.60

BASILAN
71

Tuburan

ll

9.45

70%

72

Lantawan

ll

9.45

50%

SUB-TOTAL

18.9
Page 54

TISP DECEMBER 2015

GRAND TOTAL

480.04

Prepared by:

ROHAINA T. SAPAL
Engineer I

Page 55

TISP DECEMBER 2015

ENT SUPPORT PLAN

SUPPLY PROJECT FOR ARMM


as of December 2015
RELEASED FROM PGO

PHYSICAL
ACCOMPLISHMENT
CIVIL WORKS

REMARKS

Amount
4.374

(%)
100%

2.430

100%

Awaiting remaining funds


from the Prov. Gov't.

8.550

100%

Residents are interested in


expansion of WS to Level III

3.238

100%

Expansion of water system in


other barangays

3.888

100%

Completed. Subject for Turn


Over

2.430

100%

Awaiting remaining funds


from the Prov. Gov't.

2.430

100%

Awaiting remaining funds


from the Prov. Gov't.

4.750

100%

Pipes being re-installed due to the


disturbance of unruly individuals

8.550

100%

Awaiting remaining funds


from the Prov. Gov't.

4.750

100%

Awaiting remaining funds


from the Prov. Gov't.

Residents are interested in


expansion to adj. brgys.

Page 56

TISP DECEMBER 2015


4.750

98%

Awaiting remaining funds for


completion

2.430

95%

Awaiting remaining funds for


completion

4.750

100%

7.708

90%

RELEASED FROM PGO

Awaiting remaining funds


from the Prov. Gov't.
Awaiting remaining funds for
the purchase of solar panel

Amount

PHYSICAL
ACCOMPLISHMENT
CIVIL WORKS
(%)

REMARKS

3.733

100%

4.750

100%

4.750

100%

Awaiting remaining funds


from the Prov. Gov't.

2.430

100%

Awaiting remaining funds


from the Prov. Gov't.

0.729

100%

LGU is interested in expansion


to adj. brgys.

2.430

100%

Awaiting remaining funds


from the Prov. Gov't.

3.676

100%

LGU is interested in expansion


to adj. brgys.

87.527

99.19%

Finding another source of


water due to the less supply
of water
Less water supply during dry
season

Page 57

TISP DECEMBER 2015


7.000

100%

Completed

7.000

100%

Completed

5.600

80%

3.500

100%

Completed

1.600

100%

Completed

3.500

100%

Completed

5.600

100%

Completed

3.500

100%

Completed

RELEASED FROM PGO

PHYSICAL
ACCOMPLISHMENT
CIVIL WORKS

Amount

(%)

4.000

97%

1.280

100%

5.600

97%

1.200

98%

4.000

100%

Awaiting remaining funds for


completion

REMARKS

Tap stands not yet


painted/Pipe trenching ongoing
Completed
Report has been changed
from 100% to 97% physical
accomplishment due to some
5 out of 6 units damged due
parts missing causing the
to war
water system to malfunction.
Completed

Page 58

TISP DECEMBER 2015


3.000

100%

Completed. Subject for Turn


Over

3.500

97%

Awaiting remaining funds for


completion

1.200

100%

Completed. Subject for Turn


Over

3.500

100%

Completed

5.600

95%

5.600

100%

Completed

6.600

100%

Completed

5.600

100%

Completed

3.500

100%

Completed

7.000

100%

Completed

3.200

100%

Chlorinator has been


purchased already

0.640

100%

Completed

RELEASED FROM PGO

PHYSICAL
ACCOMPLISHMENT
CIVIL WORKS

Amount

(%)

5.600

100%

The project was taken by the


Prov. Gov't.

REMARKS

Completed

Page 59

TISP DECEMBER 2015


1.000

100%

Phase I completed. Subject for


Turn Over

5.600

100%

Completed. Subject for Turn


Over

2.000

100%

Completed

2.400

100%

Completed. Subject for Turn


Over

0.750

100%

Completed

3.500

100%

Completed. Subject for Turn


Over

123.170

98.88%

4.725

100%

9.45

100%

4.725

70%

Transporting of materials is
the main concern

9.45

80%

Widening of roads is on-going


for faster delivery of materials

9.45

100%

Completed

4.725

100%

Completed

9.45

100%

Completed

9.45

100%

Completed

Delivered 202 Rain water


collectors, 1 water truck, and
1
Gen. set
Completed

Page 60

TISP DECEMBER 2015


0.62

95%

62.045

93.89%

RELEASED FROM PGO

PHYSICAL
ACCOMPLISHMENT CIVIL
WORKS

9.450

63.50%

9.450

100%

9.450

100%
100%

Purchase of plastic water tank


on-going
REMARKS

The implementation has been delayed


from the previous months due to the
hiring of incapable contractor. Engr.
Wazzer Urao confirmed that the
contractor is now continuing the project
implementation.

Completed. Subject for Turnover


Completed. Inaugurated last
October 29, 2014
Completed. The Water System
is already functional.

9.450

83%

Project on progress

9.450

80%

Project on progress

9.450

90%

Project on progress

9.450

100%

66.150

89.56%

6.662

57.09%

4.725

80%

11.387

68.55%

Completed. Subject for Turnover

Didn't follow the approved


design
Project on progress

Page 61

TISP DECEMBER 2015


350.279

90.01%

Noted by:

EVELYN S. BUSCATO
Head, SPMU

Page 62

TRANSITION INVESTMENT SUPPORT PLAN


INFRASTRUCTURE SUPPORT FOR THE PROVINCE OF BASILAN PROJECT
Status of Implementation as of December 2015
MUNICIPALITY

BASILAN
Albarka

PROJECTS

PROJECT
COST

FUND RELEASED
FROM PGO

In M
2.925
14.625
1.950

(%)
50%
50%
70%

In M
1.4625
7.3125
1.376

4 Water Supply

9.750

70%

6.825

Tuburan

5 Public Market

2.925

70%

2.062

Ungkaya Pukan

6 Public Market
7 Water Supply

2.925
1.950

94%
94%

2.750
1.833

Tabuan Lasa

8 Public Market

1.950

94%

1.833

Tipo-Tipo

9 Public Market

2.925

50%

1.4625

10 Water Supply

2.925

50%

1.4625

Lantawan

11 Public Market

2.925

50%

1.4625

Hadji Mohamad Aj

12 Public Market

2.925

50%

1.4625

Maluso

13 Public Market

2.925

78.16%

2.2862

Lamitan City

14 Infirmary Clinic - Phase I


15 Cultural/Weaving Center

4.875
2.925

4.875
2.925

Sumisip

1 Public Market
2 2-Story Municipal Hall
3 Public Market

Total for Infra Investments


Total for Capacity Development
Grand Total
Prepared by:

61.425
1.575
63.000

41.390
Noted by:

ROHAINA T. SAPAL
Engineer I

EVELYN S. BUSCATO
Head, SPMU

SILAN PROJECT
15
PHYSICAL
ACCOMPLISMENT CIVIL
WORKS
80%
80%
100%
74%
100%

REMARKS

Implemented by DILG
Central Office
Completed. Subject for turnover
Water trans. & dist. lines
On-Going

Completed. Turned over

90%
84.99%

On-going painting

96.55%

Painting works on-going

87.87%

Comfort room not yet


constructed

49%
40.19%
90%
99.47%
100%
100%

Phy. Accomp. not updated


since there is no working
plan being followed

Joint project with BUB


2014
Just started April 9, 2014
On-going construction of
Comfort Room

Painting works on-going


Directly released
to LGU from DILG-XII

S. BUSCATO
d, SPMU

84.79%

PAMANA 2013 JANUARY 2016

PAYAPA AT MASAGANANG PAMAYANAN


PAMANA 2013 FOR ARMM
Status Update as of January 2016 as reported by DPWH-ARMM
MUNICIPALITY
MAGUINDANAO
1
Ampatuan

BARANGAY

PROJECT
TITLE

MODE OF
APPROPRIATION ALLOCATION
IMPLEMENTA
(In million)
(In million)
TION

Kauran

Concreting of
By Admin.
Kauran Sitio
Maguindanao II
Pinagayao Road DEO

10.00

9.90

Buldon

Ampuan

Concreting of
By Admin.
Prov. Road,
Maguindanao I
Traversing Brgy. DEO
Aratuc to Brgy.
Ampuan Road

10.00

9.70

Datu Piang

Poblacion
(Dulawan)

Concreting of
Datu Mentang
Samama St. to
Poblacion
(Dulawan)

10.00

9.90

Kabuntalan

Lower Taviran

Concreting of 10 By Contract
km Concrete
awarded to Hi-Tri
Road
Development
Corp.

50.00

48.50

By Admin.
Maguindanao II
DEO

Page 67 of 82

PAMANA 2013 JANUARY 2016


5

MUNICIPALITY

Concreting of
MOA between
Parang - Barira - DPWH-ARMM
Buldon Roads
and LGU Parang
(Phase 1 - 4kms)

Parang

BARANGAY

Talayan

PROJECT
TITLE

Bubong

24.25

MODE OF
APPROPRIATION ALLOCATION
IMPLEMENTA
(In million)
(In million)
TION

Construction of By Admin.
Potable Water Maguindanao II
System Level II DEO

SUB-TOTAL
LANAO DEL SUR
7
Bayang

25.00

5.00

4.95

110.00
Brgy. Dilausan Concreting of

MOA between
DPWH-ARMM
and Prov. Gov't
of LDS

10.00

9.70

Concreting of
MOA between
Songgod - Pantar DPWH-ARMM
Road (1Km)
and Prov. Gov't
of LDS

10.00

9.70

Bayang Dilausan Road


(0.660 Km)

Pantar

Page 68 of 82

PAMANA 2013 JANUARY 2016


9

10

Bumbaran

Sumugot

Concreting of
Somogot Road
(0.45 Km)

MOA between
DPWH-ARMM
and Prov. Gov't
of LDS

5.00

4.85

Butig

Dilembayan

Concreting of
MOA between
Nanagun - Butig DPWH-ARMM
Road (0.33 Km) and Prov. Gov't
of LDS

5.00

4.85

MUNICIPALITY

BARANGAY

PROJECT
TITLE

MODE OF
APPROPRIATION ALLOCATION
IMPLEMENTA
(In million)
(In million)
TION

11

LumbaBayabao

Baugan

Concreting of
Galawan Baugan Road
(0.5 Km)

MOA between
DPWH-ARMM
and Prov. Gov't
of LDS

5.00

4.85

12

LumbaBayabao

Salolodun
Berwar

Concreting of
Salolodun
Berwar Road
(0.50 Km)

MOA between
DPWH-ARMM
and Prov. Gov't
of LDS

5.00

4.85

Page 69 of 82

PAMANA 2013 JANUARY 2016


13

Lumbaca
Unayan

Calipapa

Concreting of
Tringen Calipapa Road
(1 Km)

MOA between
DPWH-ARMM
and Prov. Gov't
of LDS

15.00

14.55

14

Madamba

Pob. Uyaan

Concreting of
Madamba Prov.
Road (0.33 Km)

MOA between
DPWH-ARMM
and Prov. Gov't
of LDS

5.00

4.85

15

Marawi City

Cadayonan I

Concreting of
MOA between
Cadayonan Road DPWH-ARMM
(0.350 Km)
and Prov. Gov't
of LDS

5.00

4.85

MUNICIPALITY

BARANGAY

PROJECT
TITLE

MODE OF
APPROPRIATION ALLOCATION
IMPLEMENTA
(In million)
(In million)
TION

Page 70 of 82

PAMANA 2013 JANUARY 2016


16

Pagayawan

Padas

Concreting of
Linindingan Padas Road
(0.80 Km)

MOA between
DPWH-ARMM
and Prov. Gov't
of LDS

17

Pualas

Ingud

Concreting of
MOA between
Talambo - Ingud DPWH-ARMM
Road
and Prov. Gov't
of LDS

18

Tamparan

Tatayawan &
Linuk

Concreting of
Highway
Tatayawan Linuk Prov. Road

MOA between
DPWH-ARMM
and Prov. Gov't
of LDS

TOTAL

12.00

11.64

5.00

4.85

15.00

14.55

97.00

BASILAN
19

Al-Barka

Cambug

Cambug - Bato- By Admin.


Bato (.5 km),
Basilan DEO
Bato-Bato - ApilApil (4 km),
Magkawa - Kalih
(4 km), Bohe
Lebbong Cambug (3 km)

28.00

20

Tuburan

Tablas Usew

Construction of MOA between


Municipal Public DPWH-ARMM
Market
and LGU

10.00

Tuburan

Page 71 of 82

9.70

PAMANA 2013 JANUARY 2016

MUNICIPALITY

BARANGAY

21

Tabuan-Lasa

Lanawan

22

Tabuan-Lasa

Lanawan

23

Tipo-Tipo

Bohe-Tambak

PROJECT
TITLE
Construction of
Municipal Road
(5 km)
Construction of
Water System
Level II

MODE OF
APPROPRIATION ALLOCATION
IMPLEMENTA
(In million)
(In million)
TION
By Admin.
Basilan DEO

40.00

39.60

By Admin.
Basilan DEO

10.00

9.90

Construction of By Admin.
Bridges: Bohe- Basilan DEO
Tambak Danapah ( 950
m), Bohe
Lebbong Cambug (70 m)

25.00

TOTAL

113.00

SULU
24

Panglima
Estino

Punay
Poblacion

Public Market

MOA between
DPWH-ARMM
and LGU
Panglima Estino

Page 72 of 82

6.00

5.820

PAMANA 2013 JANUARY 2016


25

Panglima
Estino

MUNICIPALITY

Punay
Poblacion

BARANGAY

Level I to Level By Admin. Sulu II


III Water System DEO

PROJECT
TITLE

10.00

MODE OF
APPROPRIATION ALLOCATION
IMPLEMENTA
(In million)
(In million)
TION

26

Panglima
Estino

Punay
Poblacion

Concreting of
Barangay Road
(2.5 km)

By Admin. Sulu II
DEO

26.00

27

Patikul

Anuling

Concreting of
Barangay Road
(3 km)

By Admin. Sulu I
DEO

30.00

SUB-TOTAL
TAWI-TAWI
28
Languyan

72.00
Water
Distribution
System:
Construction of
Water System
including pipe
laying and
source
development

By Admin. TawiTawi DEO

Page 73 of 82

15.00

14.85

PAMANA 2013 JANUARY 2016

SUB-TOTAL
GRAND TOTAL
Prepared by:

15.00
407.00
Noted by:

ROHAINA T. SAPAL
Engineer I

EVELYN S. BUSCATO
Head, SPMU

Page 74 of 82

PAMANA 2013 JANUARY 2016

MAYANAN
MM
by DPWH-ARMM
TOTAL RELEASED

PHYSICAL
ACCOMPLISHMENT

REMARKS

In Million
9.405

% Released
100%

100%

Completed

8.393

90.54%

90.54%

Completed

9.373

100%

100%

Completed

37.679

75.35%

88.08%

On-going

Page 75 of 82

PAMANA 2013 JANUARY 2016


22.795

100%

TOTAL RELEASED

100%

Completed

PHYSICAL
ACCOMPLISHMENT

REMARKS
Amount
(In
million)

% Released

4.168

100%

100%

Completed

96%
9.118

100.0%

100%

Completed

9.118

100%

100%

Completed

Page 76 of 82

PAMANA 2013 JANUARY 2016


0.728

15%

50%

On-going

3.792

80%

80%

On-going

TOTAL RELEASED

PHYSICAL
ACCOMPLISHMENT

REMARKS

Amount
(In
million)

% Released

4.367

95%

100%

Completed

2.719

51.98%

51.98%

On-going

Page 77 of 82

PAMANA 2013 JANUARY 2016


11.378

80%

100%

Completed

4.559

100%

100%

Completed

4.559

100%

100%

Completed

TOTAL RELEASED

REMARKS

Amount
(In
million)

PHYSICAL
ACCOMPLISHMENT

% Released

Page 78 of 82

PAMANA 2013 JANUARY 2016


7.723

65%

100%

Completed

4.559

100%

100%

Completed

12.122

86.48%

86.48%

On-going

89%
Not yet
released

9.118

Funds returned
to DBM

100%

100%

Completed

Page 79 of 82

PAMANA 2013 JANUARY 2016

TOTAL RELEASED
Amount

PHYSICAL
ACCOMPLISHMENT

(In
million)

% Released

18.81

50%

50.25%

6.93

70%

Not yet
released

34.86

REMARKS
On-going

Basilan DEO to Not yet started


Submit Final
DD/POW
No longer
Funds returned
feasible for
to DBM
there is an ongoing road
construction
that serves as
an alternative
route. Subject
for realignment.

50%
65%

On-going

Page 80 of 82

PAMANA 2013 JANUARY 2016


Basilan DEO to DPWH-ARMM
Submit Final still preparing for
the Program of
DD/POW
Works

TOTAL RELEASED

REMARKS

Amount
(In
million)

% Released

0.00
14.298

PHYSICAL
ACCOMPLISHMENT

%
100%

Completed

100%

Completed

66%
100.00

100%

Completed

Page 81 of 82

PAMANA 2013 JANUARY 2016

100%

Page 82 of 82