Академический Документы
Профессиональный Документы
Культура Документы
Revised 20141229
M&T Representative
Coating Contractor
Contractor QC Tech
Competent Person
PM Conditions
Low Temperature
PSI
Span #
Lane Direction
Start Time
Bridge #
Lane Direction
Bridge #
Start Time
Span #
Lane Direction
Bridge #
Span #
Start Time
Lane Direction
Span #
Lane Direction
Span #
Lane Direction
Span #
Lane Direction
Start Time
Span #
Lane Direction
Span #
Lane Direction
Start Time
Bridge #
Start Time
Start Time
Bridge #
Start Time
Bridge #
Start Time
Bridge #
Span #
Bridge #
SURFACE PREPARATION
Bridge #
Start Time
Estimated Square Feet Blast Cleaned
Specification(s) Required
Abrasive Name
Nozzle Size
Dust Collector RPM
Span
Finish Time
Abrasive Type
Number of Blasters
Compressor PSI
Dust Collector Magnehelic Gage Reading
Contractor performed perform soil sampling at each bridge location prior to blast cl
Tarpaulins spread over all pavements & surfaces underneath blasting equipmen
Air Monitoring 5ft outside of containment for the first 2 days at each bridge location
Test Method
Frequency
Oil Content
ASTM D-4940
ASTM C-566
30 minutes in water
Daily
Daily
Daily
Test Method
Frequency
Non-Abrasive Residue
Non-Abrasive Residue
Non-Abrasive Residue
Water Soluble Contaminants
ASTM E-11
ASTM E-11
ASTM E-11
ASTM D-4940
30 minutes in water
ASTM D-3355
Oil Content
Lead Content
Test Method
Frequency
Oil Content
ASTM D-4940
30 minutes in water
Per Drum
Per Drum
Test Method
Frequency
Blotter Test
ASTM D-4285
Blotter Test
ASTM D-4285
Beam #
Finish Time
Calibration Date
Calibration Date
Removal of slivers, fins, weld spatter or other itmes that will above the final paint layer
Span
Surface Profile Results
Soluble Contam
Lane
Result
Result
Result
Result
Result
Result
Result
Result
Result
Result
Result
Result
Result
Result
Result
Result
Result
Result
COATING EQUIPMENT
Coating Layer
Paint Pump
Hose Diameter
Aplication Type
Ratio/Size
Spray Hose Length
Tip Size
Agitator Type
COATING MATERIAL
Coating Manufacturer
Coating Product Name
Coating Type
Coating Color
Pot Life
Temperature of Mixed Coating
Batch No.
Thinner Manufacturer
Thinner Product Name
Thinner Quantity
Coating Kit Size
Start
Sweat In Time
Total Gallons Applied
NCDOT HICAMS #
Date Manufactured
AMBIENT CONDITIONS
Ambient Conditions Gauge
Bridge #
Time
Dry Bulb
Wet Bulb
Steel Temperature
Dew Point Temp
Relative Humidity
Calibration Date
COATING APPLICATION
Bridge #
Span #
Total # of Members Coated
Start Time
Bridge #
Span #
Total # of Members Coated
Start Time
Bridge #
Span #
Total # of Members Coated
Start Time
Bridge #
Span #
Total # of Members Coated
Start Time
Bridge #
Span #
Total # of Members Coated
Start Time
Bridge #
Span #
Total # of Members Coated
Start Time
Bridge #
Span #
Total # of Members Coated
Start Time
Bridge #
Span #
Total # of Members Coated
Start Time
Bridge #
Span #
Total # of Members Coated
Start Time
Bridge #
Span #
Total # of Members Coated
Start Time
Bridge #
Span #
Total # of Members Coated
Start Time
Bridge #
Span #
Total # of Members Coated
Start Time
Lane Direction
Paint Layer Applied
Estmated Square Feet Coated
Finish Time
Lane Direction
Paint Layer Applied
Estmated Square Feet Coated
Finish Time
Lane Direction
Paint Layer Applied
Estmated Square Feet Coated
Finish Time
Lane Direction
Paint Layer Applied
Estmated Square Feet Coated
Finish Time
Lane Direction
Paint Layer Applied
Estmated Square Feet Coated
Finish Time
Lane Direction
Paint Layer Applied
Estmated Square Feet Coated
Finish Time
Lane Direction
Paint Layer Applied
Estmated Square Feet Coated
Finish Time
Lane Direction
Paint Layer Applied
Estmated Square Feet Coated
Finish Time
Lane Direction
Paint Layer Applied
Estmated Square Feet Coated
Finish Time
Lane Direction
Paint Layer Applied
Estmated Square Feet Coated
Finish Time
Lane Direction
Paint Layer Applied
Estmated Square Feet Coated
Finish Time
Lane Direction
Paint Layer Applied
Estmated Square Feet Coated
Finish Time
Generated waste barrels are labeled "NCDOT Bridge Paint Removal Waste - Pending Analysis
Once test results are received barrels are re-labled Hazardous Waste - Pending Disposal or Paint Waste - Pen
Waste & wash water are being stored in a enclosed, sealed & secured storage container at each bridge
Sampling is performed by the Compentent person in the presence of the Engineer's Representativ
Span
Type of
Waste
Some marring and apparent depression of the film after 50 double rubs.
Heavy depression in the film but no actual penetration to the substrate after 50 double
rubs.
In the case of ze
rating, number
MATERIAL NEEDED- Mechanical lead holder, Mechanical Sharpener & Abrasive Paper (400 grit)
GOUGE HARDNESS- The hardest pencil that will leave the film uncut for a stroke length of at least 3mm (1/8)"
SCRATCH HARDNESS- The hardest pencil that will not rupture or scratch the film.
Pencil Manufacturer
Ambient Temperature
Substrate Temp.
% Humidity
Hardness Testing Type
Piece Mark/Beam/Girder No
AVG DFT
Surface Roughness
Pencil Hardness
MATERIAL NEEDED- Adhesion Testing Apparatus, Roughened 20mm loading fixtures, Timer, Sandpaper (400 grit o
Mechanical/Magnetic clamps, Adhesive & Cotton Swabs
Adhesion Apparatus
Model #
Calibration Date
Dolly Size
Adhesive Type
Ambient Temp.
Substrate Temp.
% Humidity
Failure %
Piece Mark/Beam/Girder No
PSI
PSI
PSI
Failure Type
MATERIAL NEEDED- Cutting Tool, Cutting guide, Pressure Sensitive tape (25mm), Rubber Eraser & Illuminatio
Paint System
Method of Cure
Tape
Manufacturer
Length of Cure
Ambient Temp.
Substrate Temp
% Humidity
Adhesion Rating
Failure Location
Piece Mark/Beam/Girder No
Test Method
INSPECTION DETAILS
SIGNATURE BLOCK
INSPECTORS SIGNATURE
DATE
SUPERVISORY REVIEW
DATE
Raleigh, NC 27607
ax: 919-733-8742
er at Start
rs Washed
rs Washed
rs Washed
rs Washed
rs Washed
rs Washed
rs Washed
rs Washed
rs Washed
cation
o blast cleaning
equipment
on
tape or cones
h Bridge Structure
Results
Results
Results
Results
nt layer
Contaminats Results
Finish
Expiration Date
erty
ng Analysis
Waste - Pending Disposal.
epresentative
DAYS
Test Results Received
from Lab
PE
case of zero
number of
Pass/Fail
grit)
mm (1/8)"
il Hardness
Pass/Fail
Pass/Fail
& Illumination
ation
Pass/Fail
DATE
DATE