Вы находитесь на странице: 1из 24

District: Kohistan

Sr. No.

Contract No.

Update
Unique
Code

Modules
Proposed: 1

752

2+0 Linear

3875991

688

2+0 Linear

305724

3875718

937

Admin Block

Bankhad

305735

3875843

887

12

2+0 Linear

Pattan

Jijal

308049

3879587

683

13

2+0 Linear

GHS Jijal

Pattan

Jijal

310576

3879442

850

21

5+1

GPS Jijal

Pattan

Jijal

310576

3879442

850

21

5+1

GPS KM Palalo

Pattan

Bankhad

305327

3875472

1128

24

2+0 Linear

GPS Sanga Kandow

Pattan

Bankhad

308097

3874366

1250

32

2+0 Linear

Pattan

Segayun

316256

3886694

1030

20

2+0 Linear
2+1 L shaped +
Toilet

Name of Institute

Tehsil

Union Council

Easting

Northing

Elevation

GGPS Chakai Bankhad

Pattan

Bankhad

309155

3874628

GGPS Moreen Bankhad

Pattan

Bankhad

307380

GHS Bankad

Pattan

Bankhad

Pattan

PERRA/KOHISTAN/ GPS Bankad


03/2006
GPS Bazar Ranolia

GPS Galgan
PERRA/Kohistan/02/
2007
GPS Sangai

Pkg
No.

8A

6A

Pattan

Segayun

315719

3890602

1227

GGPS Baila Gaidan

Pattan

Dubair Khas

309808

3891057

1413

GGPS Kuss Dubair

Pattan

Dubair Payeen

310951

3885708

1054

Pattan

Dubair Khass

303342

3882734

1667

Pattan

Dubair Payeen

308352

3882906

863

GPS Faqir Abad

Pattan

Dubair Payeen

309082

3883200

GPS Mori Shalkai


GMS Yazai

Pattan
Pattan

Dubair Payeen
Chawa Dara

307989
315450

Pattan

Chawa Dara

Pattan

Chawa Dara

GPS Semo

Pattan

Chawa Dara

GMS Badakot

Palas

Haran

320530

3881001

1612

GPS Bataira Pain


PERRA/Kohistan/06/
GPS Batal Harran
2007
GMS ParaGari Harran
GPS Nasro

Palas
Palas

Bataira
Haran

306855
321066

3869167
3881550

631
1999

Palas
Palas

Haran
Sharakot

319746
318896

3882090
3880236

GPS Baila Sali Khail


GPS Ashial Seo
PERRA/Kohistan/07/ GPS Kai Rustam Abad
2007
GPS Kai Sher Seo
GPS Ramal

Palas
Dassu
Dassu

Bar sharyal
Sigloo
Seo

324828
330435
328215

Dassu
Dassu

Sigloo
Seo

Pattan

Pattan

PERRA/Kohistan/03/ GPS Darra shabe khel


GPS Dubair
2007

GPS Banil Qillah


PERRA/Kohistan/04/
2007
GPS Morodil

PERRA/Kohistan/13/
GHS Pattan
2007

31

2+0 Linear

Modules
Proposed: 2

Modules
Proposed: 3

5+1 Class room

Lab. & Lib

Principal Office

Toilets

14

3+1 U shape with


Toilets
2+0 R-L

18

2+0 L shaped

Toilets

939

19

2+0 Linear

Principal Office

3889648
3895546

1796
2251

25
10

2+0 Linear
3+0

315680

3891224

1308

11

2+0L shaped

Toilet

316262

3893723

1747

26

2+0 L shaped

Toilet

5A

Modules
Proposed: 4

Toilets

2+1
71

3+0 Linear

Principal Office

75
66

5+1
2+0R-L

Principal Office

1416
2034

65
78

2+0L
2+0L

3873921
3909200
3908679

2049
1832
1966

79
72
67

3+1
3+0U
2+0R-L

328305
334550

3908557
3907740

1955
1349

68
74

3+1
3+0R-L

317858

3886576

1248

12+0 (Block-1)

6C

Toilet

Toilet

12+0 (Block-2)

ADMIN BLOCK

Lab+Liabrary

Sr. No.

Contract No.

Name of Institute

Tehsil

Union Council

Pkg
No.
Easting

Northing

Elevation

Unique
Code

Modules
Proposed: 1

Modules
Proposed: 2

Modules
Proposed: 3

Modules
Proposed: 4

PERRA/Kohistan/08/
GGMS Guli Bagh
2007

Palas

Haran

319684

3882211

1399

57

3+0 U Shaped

Office

Lab

Toilets

PERRA/KOHISTAN/
GHS Bataira
13/2008

Palas

Bataira

306800

3869156

622

90

80'x40' Hall

Lab & Lib Block

6+0 class
rooms(Block -1)

Admin Block

10

PERRA/KOHISTAN/
GPS Nijab Abad
15/2008

Palas

Bar Sharyal

320109

3880917

1670

13A

157

2+0 L shape

Principal Office

Toilets

11

PERRA/KOHISTAN/
GHS Sharakot
17/2009

Palas

Sharakot

321716

3879483

2024

12A

58

6+0 class room


school

Lab & Lib

Admin Block

12

PERRA/KOHISAN/2
GPS Jahangir Abad
6/2009

Palas

Kolai

314598

3880217

1155

12-D

139

2+0 L shape
Reduced

13

PERRA/KOHISAN/2
GPS Muhammad Abad
7/2009

Palas

Haran

319405

3882511

1296

12-E

134

4+0 D/S

Tehsil

Union Council

Modules
Proposed: 1

Modules
Proposed: 2

Modules
Proposed: 3

Sr. No.

14

Contract No.

PERRA/
KOHITSAN/24/2009

Name of Institute

GPS Karo Bair

Chawadara

Pkg
No.
Easting

Northing

Elevation

Unique
Code

318779

3897334

1875

148

Pattan

2+1 Reduced

12-B

GPS Lohidar

316188

3892665

1513

149

Chawadara

3+1 D/S

15

PERRA/KOHISTAN/
GPS Gujjar Banda
22/2009

Pattan

Dubair Khas

315337

3894332

1258

11-C

138

2+1 Reduced

16

PERRA/KOHISTAN/
GPS Sazeen
23/2009

Dassu

Sazeen

364251

3932192

1390

11-D

53

2+0 L Shape

Toilet

17

PERRA/KOHISTAN/
GPS Shabbir Abad
25/2009

Pattan

Chawadara

316243

3893514

1622

12-C

159

2+0 Reduced L
shape

Toilet

18

PERRA/KOHISTAN/
GMS Karang
16/2009

Dassu

Karang

315105

3927745

1485

11-A

44

6+2 D/S

19

PERRA/KOHISTAN/
GPS Kandrot
21/2009

Dassu

kuz Jalkot

339681

3902852

1200

11-B

85

20

PERRA/KOHISTAN/
GGPS Gakuz
20/2009

Dassu

Harban

385202

3926295

1684

2-B

39

2+0 Reduced L
shape
2+0 Reduced L
shape

Toilet

Modules
Proposed: 4

Updated Status for the Month of January 2016


Education Sector
Modules
Proposed: 5

Modules
Proposed: 6

Modules
Proposed: 7

80' x 40' HALL

GUARD HUT

TOILET

Modules
Proposed: 5

Modules
Proposed: 6

Modules
Proposed: 7

Modules
Proposed: 6

Modules
Proposed: 7

6+0 class
rooms(Block -2)

Modules
Proposed: 5

Month of January 2016


Name Of
Contractor

Covered Area
Module 1
(Sq.ft)

M/S Arif Khan


& Bros

Covered Area
Module 3
(Sq.ft)

Covered Area
Module 4
(Sq.ft)

Covered Area
Module 5
(Sq.ft)

Covered Area
Module 6
(Sq.ft)

Covered Area
Module 7
(Sq.ft)

M/S Arif Khan


& Bros

M/S Arif Khan


& Bros

Total
Contract
Amount

Date of Award Of
Work

Commenceme
nt Date

Feb 2007

Feb 2008

1,408

---do---

-----do------

-----do------

Feb 2008

---do---

-----do------

3630

4666

1,408

---do---

1,408

-----do------

Feb 2008

Date of Site
Possession

*Feb 2007
*Feb 2007
*Feb 2007
*Feb 2007

-----do------

-----do------

Feb 2008

---do---

-----do------

-----do------

Feb 2008

*'Feb 2007

---do---

-----do------

7/12/2007

6/12/2008

7/12/2007

---do---

-----do------

7/12/2007

6/12/2008

7/12/2007

1,408

---do---

-----do------

Feb 2007

Feb 2008

Feb 2007

1,408

---do---

-----do------

Feb 2007

Feb 2008

Feb 2007

1,408

------

1,620

---do---

20/09/2008

21/09/2007

296

93

21/09/2007

2/7/2007

2/7/2007

---do---

2/7/2007

---do---

---do---

---do---

---do---

2/7/2007

---do---

---do---

---do---

2/7/2007

---do---

---do---

---do---

2/7/2007

---do--7/7/2007
7/7/2007
7/7/2007
7/7/2007
7/7/2007

---do--7/7/2007
7/7/2007
7/7/2007
7/7/2007
7/7/2007

---do--6/7/2008
6/7/2008
6/7/2008
6/7/2008
6/7/2008

2/7/2007
7/7/2007
7/7/2007
7/7/2007
7/7/2007
7/7/2007

---do---

7//2007

NIL

Not applicable

NIL

21/09/2007

21/09/2007

20/09/08

21/09/2007

93

---do---

1408

296

1408
2094

93
93

1160

93

---do---

1160

93

---do---

5/6/2007

28.556

---do-----do--------

2094

296

93

---do---

3630
930

296

93

---do-----do---

1,160

93

9898

1/7/2008

---do---

1408

93

21/09/2007

---do---

---do---

2242
930

7.097

---do--93

2242
1650
930

28/8/07

47.624

---do---

1160

1,160
1160

13/1/07

18/6/07

17.834

21/09/2007
21/09/2007

21/09/2007
21/09/2007

20/09/08
20/09/08

21/09/2007
21/09/2007

---do-----do---

21/09/2007
21/09/2007

21/09/2007
21/09/2007

20/09/08
20/09/08

21/09/2007
21/09/2007

93
93

---do-----do-----do---

21/09/2007
21/09/2007
21/09/2007

21/09/2007
21/09/07
21/09/007

20/09/08
20/09/2008
20/09/2008

21/09/2007
21/09/07
21/09/007

93

---do-----do---

21/09/2007
21/09/2007

21/09/007
21/09/1007

20/09/2008
20/09/2008

21/09/007
21/09/1007

15/12/2007
15/12/2007

14/12/2008
14/12/2008

15/12/2007
15/12/2007

15/12/2007
15/12/2007

14/12/2008
14/12/2008

15/12/2007
15/12/2007

---do-----do---

15/12/2007
15/12/2007

14/12/2008
14/12/2008

15/12/2007
15/12/2007

---do---

15/12/2007

14/12/2008

15/12/2007

28/8/07

28/8/07

40.774

21.814

---do-----do--M/S Arif Khan


& Bros

Completion
Date

Not Held with this


office

1708

M/S Haroon &


Sons

DATE OF
ISSUANCE
OF LOAS

-------

1,408

M/S Arif Khan


& Bros

Contract
Amount of
Individual
Facility

1,408

2260
M/S Wazir
Muhammad
Wazir & Co

Covered Area
Module 2
(Sq.ft)

9898

2260

4666

3648

80

93

---do-----do---

15/11/07

52.740

1/12/2007

Name Of
Contractor

M/S Arif Khan


& Bros

Covered Area
Module 1
(Sq.ft)

Covered Area
Module 2
(Sq.ft)

Covered Area
Module 3
(Sq.ft)

Covered Area
Module 4
(Sq.ft)

Covered Area
Module 5
(Sq.ft)

Covered Area
Module 6
(Sq.ft)

Covered Area
Module 7
(Sq.ft)

1650

296

600

93

--------do-----do--3648

M/S Akbar
Khan Govt
Contractor
M/S Subadar
Govt
Contractor
M/S Subadar
Govt
Contractor
Name Of
Contractor

M/S Sher
Muhammad
Govt
Contractor

930

4412

930

4666

M/S Akbar
Khan Govt
Contractor

4412

296

4666

Total
Contract
Amount

Date of Award Of
Work

28/8/2007

8.224

21/9/2007

2260

4412

20/11/2008

60.907

26/1/2009

---do-----do---

3648

Commenceme
nt Date

Completion
Date

Date of Site
Possession

21/09/2007

20/09/2008

21/09/2007

21/09/2007
21/09/2007

20/09/2008
20/09/2008

21/09/2007
21/09/2007

26/03/2009
26/03/2009
26/03/2009

25/03/2010
25/03/2010
25/03/2010

26/03/2009
26/03/2009
26/03/2009

26/03/2009
26/03/2009

25/03/2010
25/03/2010

26/03/2009
26/03/2009

---do---

18/04/2009

8.879

6/5/2009

6/5/2009

5/5/2010

6/052009

---------do---

8/10/2009

34.560

9/10/2009

10/11/2009

9/11/2010

10/11/2009

6.451

13/01/2010

6.451

15/02/2010

19/03/2010

18/03/2011

5/3/2010

7.289

13/01/2010

7.289

15/02/2010

19/03/2010

18/03/2011

5/3/2010

Contract
Amount of
Individual
Facility

DATE OF
ISSUANCE
OF LOAS

Total
Contract
Amount

Date of Award Of
Work

Commenceme
nt Date

Completion
Date

Date of Site
Possession

13/01/2010

17.540

22/02/2010

30/03/2010

29/03/2011

16/03/2010

13/01/2010

6.663

22/02/2010

5/4/2010

4/4/2011

22/03/2010

7.836

13/01/2010

7.836

17/02/2010

5/4/2010

4/4/2011

22/03/2010

6.037

13/01/2010

6.037

22/02/2010

05/04/2010

04/04/2011

22/03/2010

15.392

13/01/2010

15.392

22/02/2010

7/4/2010

6/4/2011

24/03/2010

93

2260

---do---

93

1535

93

Covered Area
Module 1
(Sq.ft)

Covered Area
Module 2
(Sq.ft)

754

93

2888
M/S Kohistan
Construction
Company
M/S Kaseer
Construction
company
M/S Sher
Muhammad
Govt
M/S Sher
Contractor
Muhammad
Govt
Contractor
M/S Umer
Rehman & Co

DATE OF
ISSUANCE
OF LOAS

-------do-----do---

M/S Haji
Muhammad
Anwar & Sons

M/S S.S Ali


Khan Govt
Contractor

Contract
Amount of
Individual
Facility

Covered Area
Module 3
(Sq.ft)

Covered Area
Module 4
(Sq.ft)

Covered Area
Module 5
(Sq.ft)

Covered Area
Module 6
(Sq.ft)

Covered Area
Module 7
(Sq.ft)

------------

------------

754

93

1160

93

930

93

5,892

6.663

930

93

6.469

930

93

6.138

22/02/2010

22/02/2010

6.469

6.138

26/04/2010

6/5/2010

Site is officially not


Depends on handing
handed over to
over of site
Contractor

23/06/2010

22/06/2011

Not held yet


9/6/2010

*Date Of Submission of Soil


Investigation Report

*Date of Issuance of
Construction Drawings

24/05/2007
11/8/2007
18/07/2007
14/05/2007

24/05/2007
11/8/2007
20/06/2007
20/06/2007
24/05/2007
24/05/2007

Not held with this office

14/04/2008

Not held with this office

14/04/2008

Not held with this office

1/10/2007

---do---

1/10/2007

---do---

24/11/2007

---do---

1/11/2007

---do---

1/10/2007

---do--Not held
---do-----do-----do-----do---

1/11/2007

15/12/2007

NIL

Not issued

12/2/2008

3/3/2008

12/4/2008
Not held

23/04/2008
3/3/2008

12/2/2008
Not held

3/3/2008
14/04/2008

Not held
11/4/2008
7/4/2008

14/04/2008
23/04/2008
14/04/2008

7/4/2008
7/4/2008

14/04/2008
14/04/2008
16/05/2008
16/05/2008

7/4/2008

16/05/2008
16/05/2008
16/05/2008
16/05/2008
16/05/2008

*Date Of Submission of Soil


Investigation Report

*Date of Issuance of
Construction Drawings

3/3/2008
12/2/2008

23/02/2009

3/3/2008
3/3/2008
23/02/2009
23/02/2009
23/02/2009
23/02/2009
23/02/2009

Not required

6/5/2009

7/1/2010

13/01/2010

Soil investigation not required

Tendered Drawings are declared as


construction drawings

Soil investigation carried out.


*Date Of Submission of Soil
Investigation Report

Soil investigation carried out and


tendered Drawings are declared as
Construction Drawings.

*Date of Issuance of
Construction Drawings

Not carried out yet.

Tendered Drawings are declared as


construction drawings

Soil investigation carried out.

Soil investigation carried out and


tendered Drawings are declared as
Construction Drawings.

Soil investigation not required

Tendered Drawings are declared as


construction drawings

Soil investigation not required

Tendered Drawings are declared as


construction drawings

Soil investigation not required

Tendered Drawings are declared as


construction drawings

24/05/2010

Construction Drawing issued.

Soil investigation not required

Tendered Drawings are declared as


construction drawings

Soil investigation not required

Tendered Drawings are declared as


construction drawings

Updated status for the Month of January 2016

Education Sector
Sr.
No.

Name of Institute

District: Kohistan
Pkg No.

Covered Area
Physical Progress: Module 1

Physical
Physical
Physical Progress: Module
Physical Progress:
Progress: Module
Progress: Module
3
Module 5
4
6

Physical
Progress:
Module 7

%age Physical
Progress: Module 1

GGPS Chakai

Block Masonasy above lintel Beam completed.

26.35

GGPS Moreen

Roof beam casted

29.42

Partial Excavation carried out according to initial


Module in 2007.
Block masonry of superstructure upto Lintel
Level completed

GHS Bankad
GPS Bankad
1

Physical Progress: Module 2

GPS Bazar Ranolia

8-A

0.18
22.74

Work below Plinth Beam Completed.

12.16

GHS Jijal

Superstructure Masonry work up to Lintel level


completed.

15.39

GPS Jijal

Work below Plinth Beam Completed

11.77

GPS KM Palalo

Lintel Beam casted.

26.32

GPS Sanga Kandow

Internal Backfilling completed.

15.48

1407.8384

Flooring work completed.

78.000

1620.5636

Boundary wall Work in progress

55.00

GPS Galgan
2

6-A
GPS Sangai

1407.8384
GGPS Baila Gaidan

External plaster work in progress

Footing casted

47.00

295.9

GGPS Kuss Dubair


3

GPS Darra shabe khel

295.9
7

1160.8964

trusses work in progress.

56.00

Plinth Beam casted

14.38

Sr.
No.
3

Name of Institute

Pkg No.
7

Covered Area
Physical Progress: Module 1

Physical Progress: Module 2

Physical
Physical
Physical Progress: Module
Physical Progress:
Progress: Module
Progress: Module
3
Module 5
4
6

Physical
Progress:
Module 7

%age Physical
Progress: Module 1

GPS Dubair Khass

1407.8384

Plaseter work in progress

46.00

GPS Faqir Abad

1407.8384
295.9

Handed over to Education Deptt.on 04-12-2015

98.00

GPS Mori Shalkai

1407.8384

No work carried out after soil investigation

0.00

GMS Yazai

2094.3264

Excavtion for Retaining wall carried out in


October 2007.

1.67

GPS Banil Qillah

1160.8964
5-A
1407.8384

GPS Morodil
GPS Semo

1620.5636
295.9

GMS Badakot

Work completed

Work completed

100.00

Work completed

Work completed

100.00

Has been droped from this conctract as it is


already constructed through ADP fund.
Shuttering for Roof beem in progress.

Sub Structure masonry and


Columns casted.

Internal ,external plaster work completed and


fixing of doors,windows in progress

GPS Bataira Pain

3630.5316

GPS Batal Harran

295.9

trusses work in progress.

295.9

Columns Work in progress

0.00
22.67

62.00

Lean concrete completed

60.00

3
GMS ParaGari Harran

30.00

GPS Nasro

1160.8964

1.00

GPS Baila Sali Khail

2242.922

1.00

295.9
GPS Ashial Seo

Finishing work in progress.

Finishing work in progress.

94.00

Sr.
No.
6

Name of Institute

Pkg No.

Covered Area
Physical Progress: Module 1

GGPS Kai Rustam Abad

GGPS Kai Sher Seo

GPS Ramal

Physical
Physical
Physical Progress: Module
Physical Progress:
Progress: Module
Progress: Module
3
Module 5
4
6

Physical
Progress:
Module 7

%age Physical
Progress: Module 1

929.664

CGI Sheets in progress

67.00

2242.922

Handed over to the concern deptt: on 21/09/2011

100.00

295.9

Physical Progress: Module 2

295.9
295.9
599.7624
4948.9544
4948.9544
1129.8
2333.4136
3647.8552
79.9468
92.72968

Finishing work in progress.

Finishing work in progress.

94.00

Plinth Beam Casted

No work carried out yet

No work carried out yet

No work carried
out yet

No work carried
out yet

Plaster work in progress

Plaster work in progress

Slab Completed

G/F Masonary in
progress.

Plinth Beam
Completed

-------

False celling in Progress.

False celling in
Progress.

False celling in
Progress.

False celling in
Progress.

GGMS Guli Bagh

GHS Pattan

6C

GHS Bataira

False celling in Progress.

10

GPS Nijab Abad

13A

Handed over to the concern deptt: on 21/09/2011

Handed over to the


Handed over to the concern
concern deptt: on
deptt: on 21/09/2011
21/09/2011

11

GHS Sherakot

12A

Block masonary in First Floor Completed

Slab Completed.

False celling in Progress.

G-Floor Super Structure


Columns in progress

14.38

---------

53.00

81.00

100.00

53.00

Sr.
No.

Name of Institute

12

GPS Jahangir Abad

13

GPS Muhammad Abad

Pkg No.

Physical
Physical
Physical Progress: Module
Physical Progress:
Progress: Module
Progress: Module
3
Module 5
4
6

Physical
Progress:
Module 7

%age Physical
Progress: Module 1

Physical Progress: Module 1

Physical Progress: Module 2

12D

Handed over to Education Deptt.on 22-11-2013

Handed over to Education


Deptt.on 22-11-2013

12E

Boundary wall Work in progress

62.00

CGI Sheets Completed.

68.00

Fixing of Doors & Windows in progress.

80.00

GPS Karo Bair


14

Covered Area

98.00

12B
GPS Lohidar

15

GPS Gujjar Banda

11C

Handed over to the concern deptt: on


23/06/2012

Handed over to the concern


deptt: on 23/06/2012

100.00

16

GPS Sazeen

11D

Handed over to the concern deptt: on


21/12/2012

Handed over to the concern


deptt: on 21/12/2012

98.00

17

GPS Shabbir Abad

12C

Flooring work in Completed

Plumbing work in progress.

82.00

18

GMS Karang

11A

Excavation is in progress.

0.74

19

GPS Kandrot

11-B

Plinth Beam casted & Steel cutting and binding


for super structure Columns

20.00

20

GGPS Gakuz

2-B

Finishing work in progress.

Plumbing work in progress.

89.00

Updated status for the Month of January 2016

%age Physical
Progress: Module 2

%age Physical Progress:


Module 3

0.00

0.00

17.00

0.00

%age Physical Progress:


Module 4

%age Physical
Progress: Module 2

%age Physical Progress:


Module 3

0.00

98.00

98.00

100.00
100.00

11.38

2.00

94.00

0.00

%age Physical Progress:


Module 4

%age Physical
Progress: Module 2

%age Physical Progress:


Module 3

%age Physical Progress:


Module 4

0.00

0.00

53.00

40.00

31.27

81.00

81.00

81.00

100.00

100.00

50.00

30.00

94.00

%age Physical
Progress: Module 2

98.00

100.00

98.00

82.00

87.00

%age Physical Progress:


Module 3

%age Physical Progress:


Module 4

ry 2016

%age Physical Progress:


Module 5

Over all progress of individual


facility

Remarks/Issues(If Any)

26.35

Termination case is reinstated by Chief Engineer. But new


agreement yet not signed .

29.42

Termination case is reinstated by Chief Engineer. But new


agreement yet not signed .

0.04
22.74
12.16
15.39
11.77
26.32
15.48
80

Termination case is reinstated by Chief Engineer. But new


agreement yet not signed .
Termination case is reinstated by Chief Engineer. But new
agreement yet not signed .
This Site is vanished due to flood in Dubair Nallah.
Termination case is reinstated by Chief Engineer. But new
agreement yet not signed .
Termination case is reinstated by Chief Engineer. But new
agreement yet not signed .
Termination case is reinstated by Chief Engineer. But new
agreement yet not signed .
Termination case is reinstated by Chief Engineer. But new
agreement yet not signed .
Work Stopped by the contractor with out any valid reasons.
Work in Progress.

55.000

38.00

Work in Progress.

56.00

Work Sttoped.

14.38

This facility is totally damaged in flood.

%age Physical Progress:


Module 5

Over all progress of individual


facility

41.40

98

Remarks/Issues(If Any)

Work Sttoped.

Handed over to Education Deptt.on 04-12-2015

0.00

Road from Dubair Bazar to this site is totally venished in flood and
site is unaccessable.

1.67

Claim for GMS Yazai has been forwarded by "The Engineer" to the
Employer vide his Office letter No 2778/334/JK/11-A/833, Dated
26/09/2009.

100.00

Handed Over

100.00

Handed Over

0.00

Dropped

18.15

Work Sttoped.

62.00

Work stopped by the contractor due to pending laibility .

42.60

Work in progress.

30.00

Work Sttoped due to Snow fall.

1.00

Termination Recommended by RE/ER vide letter # 2778/331/404


dated 10/09/2011.

1.00

Termination Recommended by RE/ER vide letter # 2778/331/404


dated 10/09/2011.

94.00

Work in progress.

%age Physical Progress:


Module 5

Over all progress of individual


facility

Remarks/Issues(If Any)

67.00

Work stopped

100.00

Handed over

94.00

Work in progress.

7.19

Seriuos community conflict has stopped the work

25.00

51.00

Work in progress.

81.00

81.00

Work in Progress.

100.00

Handed over to the Deptt.

51.00

Work Stopped due to Snow.

%age Physical Progress:


Module 5

Over all progress of individual


facility

Remarks/Issues(If Any)

98.00

Handed over to Education Deptt.on 22-11-2013

62.00

Work in progress.

68.00

Work Stopped due to Snow.

80.00

Work Stopped without any valid reason.

100.00

Handed over to the concern deptt: on 23/06/2012

98.00

Handed over to the concern deptt: on 21/12/2012

82.00

Work Stopped.

0.74

No activity observed at site after flood 2010.

20.00

Work Stopped

88.00

Work in Progress.

1
Tehsil

Union Council

Pkg No.

Pattan & palas

MIS
5, 6 & 8(AWP-1) 11, 12 & 13 (AWP-2)
19(AWP-3)

Total Contract
Amount

Date of Award Of
Work

Commencement
Date

30/03/2010

record of handing over of site is not held.

DATE OF
ISSUANCE OF
LOAS

Contract Amount of
Individual Facility

Covered Area

Name Of
Contractor

168.395

23/02/2010

NA

NA

M/S AM & Co(LP) & M/S Construction


Management & Engineering
Services(CMES)(JV)

sub structur drawings of 19 Nos of schools


have been approved .But Contractor could Modules Proposed
not manage to start the work at site.

Name of Institute

Contract No.

GGPS Dhab Shaman Gul, GPS Nelo Khel Shamal


Gul, GPS Nosher Chawadara, GPS Datra, GPS Dong
Datra, GGPS Qamar Bandi, GPS Charoona Kandogi,
GGPS Nawazabad, GPS Seri Jijal, GGPS Ranolia, GPS
Charri, GMS Kuz Sherial, GGPS Banjar, GMS Sangai,
GPS Ghatam Baik, GGPS Bar Chorlak, GPS Sensteel
Khayal, GPS NajamKot, GPS Kunsher, GPS Kotia,
GPS Sangai, GGPS Bataira Payan, GPS Bataira Bala

PERRA/KOHISTAN/18/2009 (LSF-KOHISTAN-1)

Sr. No.

Light Guage Cold Formed Galvanized Steel Structures (Progress update upto End of January 2016)

Completion Date

Date of Site
Possession

24/11/2010

not held

nuary 2016)

Sr. No.
Name of Institute
Pkg No.
Modules Proposed
Covered Area
(Sft)
Physical Status

1
GGPS Dhab Shaman Gul, GPS Nelo Khel Shamal Gul, GPS Nosher
Chawadara, GPS Datra, GPS Dong Datra, GGPS Qamar Bandi, GPS
Charoona Kandogi, GGPS Nawazabad, GPS Seri Jijal, GGPS Ranolia, GPS
Charri, GMS Kuz Sherial, GGPS Banjar, GMS Sangai, GPS Ghatam Baik,
GGPS Bar Chorlak, GPS Sensteel Khayal, GPS NajamKot, GPS Kunsher,
GPS Kotia, GPS Sangai, GGPS Bataira Payan, GPS Bataira Bala

5, 6 & 8(AWP-1) 11, 12 & 13 (AWP-2) 19(AWP-3)

sub structur drawings of 19 Nos of schools have been


approved .But Contractor could not manage to start the
work at site.

Approved Designs not received yet.

Work not started yet.

Light Guage Cold Formed Galvanized Steel Structures (Progress update upto End o

Financial
Progress
(Rs) Gross
work Done

Approval for substructure designn for Fourteen No,s of schools


has been received but no activity at site are yet been carried out

Physical
Progress
%age

0.00

0.00

rogress update upto End of January 2016)

Remarks/Issues(If
Any)

Вам также может понравиться