knowledge
Issue
No: 1
Issue Date:
14.08.2015
Revision:
00
Revision Date:
SWPL/C&I / SMP/I-170
Page 0 of 5
File no:
Revision
Date
Remarks / Reason
for Revision
SWPL/C&I / I /SMP177
0
1
14.08.2015
Pankaj ku.
Pradhan
Reviewed/Chec
ked By :
Dept. Head
G.C.Ghosh
Reviewed/Cleare
d By :
Site Head
R.L.Sanyal
E&I Head
Plant In charge
Validated by :
Functional
Head (HO)*
Signature
Designation
Manager
Reviewed
&/
Approved
by :
Reviewed &
Approved
by:
Plant Head
Maintenanc
e Head
Name
0 | Page
Signature
Pralhad
Datir
Pralhad
Datir
Rohit kumar
Upadhyaya
Reviewed
&
Approved
By :
Functional
Head (HO)
Approved By
: Apex Body
Power from
knowledge
Issue
No: 1
Issue Date:
14.08.2015
Revision Date:
File no:
SWPL/C&I / SMP/I-170
Page 1 of 5
1 | Page
Power from
knowledge
Issue
No: 1
Issue Date:
14.08.2015
Revision Date:
SWPL/C&I / SMP/I-170
File no:
Page 2 of 5
INDEX
1.
Objective
2.
Technical Specification
3.
Responsibility
4.
5.
6.
7.
Safety Aspects
8.
9.
10. Protocols/Records
11. Permit Closure & Trial / Clearance for regular Operation
12. Frequency
13. Conclusion
1.
OBJECTIVE
2 | Page
Power from
knowledge
Issue
No: 1
Issue Date:
14.08.2015
Revision:
00
Revision Date:
File no:
SWPL/C&I / SMP/I-170
Page 3 of 5
The purpose of this document is to detail out the standard procedure to ensure
smooth, safe checking of ETS Interlock and Protection to increase the reliability &
ensure the healthiness of system.
2. TECHNICAL SPCIFICATION
OEM Guidelines : Annexure-I
3. RESPONSIBILITY
Area In charge C&I Department
1. To apply for permit as per the schedule.
2. Ensure necessary isolations before starting the work.
3. To ensure the completion of the activities as per the SMP and to check all the
parameters as per the check list.
4. Ensure housekeeping after completing the work.
5. Returning the permit.
Shift Manager Operation
1. To ensure availability of the equipment for maintenance as per planned time interval.
2. To ensure issuance of Work Permit complying with the safety requirements as
required.
3. To ensure Isolations done as per SOP.
4. Cancellation of the Work Permit after completion of the work.
5. Normalization of the system and trial run.
Power from
knowledge
Issue
No: 1
Issue Date:
14.08.2015
Revision:
00
Revision Date:
File no:
SWPL/C&I / SMP/I-170
Page 4 of 5
6. STANDARD PROCEDURE
Take the PTW and ensure the required isolations have been done.
4 | Page
Power from
knowledge
Issue
No: 1
Issue Date:
14.08.2015
Revision:
00
Revision Date:
SWPL/C&I / SMP/I-170
File no:
Page 5 of 5
Close the Inlet isolating valve for two oil pressure switches & open the Drain
valve .Observe the Changeover of the switch contacts (NO contact to NC contact).
3.3 Ensure the STATUS of Turbine trip in SOE (Sequence of Events) and ALARM
History. Note down the FIRST OUT cause for TRIP.
3.4 Normalize the isolation and close the drain of switches.
Connect the portable vaccume calibrator instrument, and set the vaccume up to
the -100KPa.
4.2
Close the Inlet isolating valve for two vaccume switches & open the Drain
valve .Observe the Changeover of the switch contacts (NO contact to NC contact).
4.3 Ensure the STATUS of Turbine trip in SOE (Sequence of Events) and ALARM
History. Note down the FIRST OUT cause for TRIP.
4.4 Normalize the isolation and close the drain of switches.
5.2
5.3
5.4
degree C (ohms) .A
little increase above 120 degree C(146.07 ohms) shall TRIP the turbine. Check
the STATUS of ID fan in SOE (Sequence of Events) and ALARM History
5 | Page
Power from
knowledge
Issue
No: 1
Issue Date:
14.08.2015
Revision:
00
Revision Date:
SWPL/C&I / SMP/I-170
File no:
Page 6 of 5
Make a provision for all the condition for the Turbine trip should be
healthy.
6.2
Connect the epro system software to the hardwire epro MODEL MMS 6210
reduce the setting near to zero. Check for the high vibration.
6.3
6.4
Normalise the setting of axial displacement upper danger alarm 1.20mm and
lower danger alarm -1.65mm.
DEH Failure:
7.1
Make a provision for all the condition for the Turbine trip should be healthy.
7.2
Stop/Fail the DC 230 V power supply this will give the DEH failure.
7.3
Make a provision for all the condition for the Turbine trip should be
healthy.
1.2
1.3
Simulate the MFT signal from DCS .check for the turbine trip.
Ensure the STATUS of Turbine in SOE (Sequence of Events) and ALARM
History. Note down the FIRST OUT cause for TRIP.
6 | Page
Power from
knowledge
Issue
No: 1
Issue Date:
14.08.2015
Revision:
00
Revision Date:
SWPL/C&I / SMP/I-170
Page 7 of 5
File no:
Make a provision for all the condition for the Turbine trip should be healthy.
9.2
Simulate the Generator CB signal from Electrical. Check for the turbine trip.
9.3
Make a provision for all the condition for the Turbine trip should be healthy.
10.2
10.3
11.2
11.3
11.4 Gradually increase the resistance of the decade box according to temperature
of 110 degree C. Alarm will come at the temperature of
degree C (ohms) .A
little increase above 110 degree C(142.29 ohms) shall TRIP the turbine. Check
the STATUS of ID fan in SOE (Sequence of Events) and ALARM History.
7 | Page
Power from
knowledge
Issue
No: 1
Issue Date:
14.08.2015
Revision:
00
Revision Date:
SWPL/C&I / SMP/I-170
Page 8 of 5
File no:
11.6
11.7
11.8 Gradually increase the resistance of the decade box according to temperature
of 110 degree C. Alarm will come at the temperature of
degree C (ohms) .A
little increase above 110 degree C(142.29 ohms) shall TRIP the turbine. Check
the STATUS of ID fan in SOE (Sequence of Events) and ALARM History.
13 HP-LP Differential Expansion Shut OFF:
13.1 Make a provision for all the condition for the Turbine trip should be healthy.
13.2 Connect the epro system software to the hardwire epro MODEL MMS 6120
reduce the setting near to zero. HP-Differential Expansion.
13.3 Ensure the STATUS of Turbine in SOE (Sequence of Events) and ALARM
History. Note down the FIRST OUT cause for TRIP.
13.4 Normalise the setting of HP-Differential Expansion upper danger alarm
6.20mm and lower danger alarm -3.20mm.
13.5
Connect the epro system software to the hardwire epro MODEL MMS 6120
reduce the setting near to zero. LP-Differential Expansion.
13.6
Power from
knowledge
Issue
No: 1
Issue Date:
14.08.2015
Revision:
00
Revision Date:
SWPL/C&I / SMP/I-170
Page 9 of 5
File no:
13.8 Make a provision for all the condition for the Turbine trip should be healthy.
13.9 Connect the epro system software to the hardwire epro MODEL MMS 6120
reduce the speed setting near to zero.
13.10 Ensure the STATUS of Turbine in SOE (Sequence of Events) and ALARM
History. Note down the FIRST OUT cause for TRIP.
13.11 Normalise the setting of OPC to 3300rpm
7. SAFETY ASPECTS
a) Hazard Involved :
Electrocution
Accidently/Suddenly starting of energised equipment.
Fire Hazard
Cut / Crush Injury or Personal injury while performing activity.
b) Precaution to be taken :
Unauthorized person not allowed checking for checking ETS conditions.
c) SAFTEY PPEs :
Helmet with chin strip, Ear Plugs, Safety Goggles, Hand Gloves, Nose masks, safety
harness etc.
ANNEXURE - I
WPCL
SR.
NO.
PROTECTION
9 | Page
CHECK
OPER.
SIGN
Date
C&I SIGN
ACK BY
SHIFT I/C
REMARK
Power from
knowledge
Issue
No: 1
Issue Date:
14.08.2015
DEH Failure
10
11
12
13
14
OPC Shutoff
Revision Date:
File no:
SWPL/C&I / SMP/I-170
Page 10 of 5
8. QUALITY CHECKS/VALIDATION
1.
Ensure set points or trigger point of Vibration, Pressure switches, Tx & RTD.
2.
Ensure related alarms & SOE events get logged at DCS end.
2.
DONTs:
1.
2.
10 | P a g e
Power from
knowledge
Issue
No: 1
Issue Date:
14.08.2015
Revision Date:
SWPL/C&I / SMP/I-170
File no:
Page 11 of 5
of shift Incharge.
PROTOCOLS/RECORDS
10.
Signoff the ID Fan Interlock documents by Operation , Electrical , Mechanical and C&I
department and maintain the document for future reference.
11.
12.
1.
2.
3.
FREQUENCY
Yearly : After Each Unit Annual Overhaul.
13.
CONCLUSION
Purpose of this Document is to Ensure the healthiness of each instruments which is
assigned for ETS logic and initiation of trip signal for as per OEM guideline for safety of
individuals & Auxiliary by tripping in critical conditions.
ANNEXURE-II
11 | P a g e