Вы находитесь на странице: 1из 37

PIERINA MINE

MODELAMIENTO DEL DISEMINADO EN PIERINA

CARLOS PINEDA T.

PIERINA

MINA PIERINA

TAJO
TAJO

ADMINISTRACION
ADMINISTRACION
FIN
FIN DE
DE FAJA
FAJA
DESMONTE
DESMONTE

PILA
PILA DE
DE LIXIVIACION
LIXIVIACION

PLANTA
PLANTA

8955500

8955000

PROGRAMA EXPLORACION
ID
RC
DDH
TOTAL

# HOLES MTS. PERF


409
76,570
95
18,397
504
94,967

VAR.
81%
19%

8954500

Gold Grade-Thickness
800 gm-meters
400 gm-meters

MALLA PROMEDIO (mts).


PROFUNDIDAD PROMEDIO (mt

50
200

100 gm-meters

8954000

217000

PIERINA

216500

216000

Pierina drill hole locations and accumulated grade-thickness

PIERINA

DISTRIBUCION ESPACIAL
TALADROS EXPLORACION

PIERINA

Modelamiento
Geolgico (Zonas)
Zonas Definidos por:

Alteraciones (4 tipos)
Litologia

Ley Oro-Envolventes (+ 0.20 g/tn)

Fallas Dominantes (7 fallas bloque)

PIERINA

Geologic Modeling Process

Alteraciones & Au son interpolados en secciones NS y EW de cada 50 mts

Los datos de las secciones son ajustados a medio banco.

Se Identifica y Asigna codigo a las zonas usando las variables: alteracin, Ley
Oro (envolventes) , Fallas etc.

Anualmente se actualiza el modelo (new holes, pit mapping, & BH)

PIERINA

Software Usados
1. MineSight DH Database, Geologic Modeling, Grade
Estimation, 3-D Graphics
2. GSLIB Descriptive Statistics (assays, composites, blocks)
3. Sage2001 Spatial statistics (variograms-correlograms)
4. Psion Pit mapping data collection
5. AutoCAD Graphics, pit mapping data
6. Whittle 4X Pit optimization
7. QPit Mine design

PIERINA

Au Envelope - 3820 Elevation

PIERINA

Legend
Colluvium
Argillic
Quartz Alunite
Vuggy Silica
0.2 g/mt Au

500 m

Fault Block Domains


Tinyash Fault

6
4

PIERINA

Erika Fault
Pierina Fault

Antauran Fault

Au Distribution

PIERINA

Quartz-alunite Material

Vuggy-silica Material

20

10

Frequency (Percent)

15

10

5058
0.431
0.585
1.777
0.000
0.080
0.200
0.480
17.710

Frequency (Percent)

N
m
2

/m
min
q
0.25
q
0.50
q
0.75
max

Class width = 0.050


The last class contains
all values 3.950

0
0.000

1.000

2.000

0
0.000

5.000

10.000

Gold (g/mt)

15.000

20.000

Gold (g/mt)

Vuggy-silica Material

Quartz-alunite Material
100

10

10

Gold (g/mt)

Gold (g/mt)

100

1.0

1.0

0.10

0.10
0.01

0.01

0.1

1 2

5 10

20 30 40 50 60 70 80

90 95

98 99

Cumulative Probability (percent)

99.9

1042
3.130
12.325
1.122
0.000
1.130
2.120
3.830
35.350

Class width = 0.250


The last class contains
all values 19.750

4.000

3.000

N
m
2

/m
min
q
0.25
q
0.50
q
0.75
max

0.1

1 2

5 10

20 30 40 50 60 70 80

90 95

98 99

99.99

Cumulative Probability (percent)

99.9

99.99

Gold Correlograms

PIERINA

MEAN =
LOG MEAN=

5.43728
2.75717

STD. DEV=
LOG STDV=

6.70680
1.98527

NO. =
C.V.=

MEAN =
LOG MEAN=

302
1.23

2.16557
2.07121

STD. DEV=
LOG STDV=

3.32456
1.82866

NO. =
C.V.=

1.75000

1.75000

NUGGET= 0.11000
SILL =
0.27783
RANGE =
82.0

NUGGET= 0.32000
SILL =
1.00000
RANGE =
212.2

SILL =
0.61217
RANGE =
230.1

GAMMA (H)

GAMMA (H)

1.31250

1.31250

0.87500

0.87500

HORZ WIN=
VERT WIN=

30.00
30.00
ANGLE
HORZ VERT
168 -9
258 0
168 -90

0.43750

HORZ WIN=
VERT WIN=

30.00
30.00
ANGLE
HORZ VERT
160 -3
250 0
160 -90

0.43750

0.00000

0.00000
120.0

240.0

360.0

480.0

D I STAN C E
Au Correlograms - Fault Domain 1 - Major Axis (S78E;-9)

Fault Domain 1

600.0

120.0

240.0

360.0

480.0

D I STAN C E
Au Correlograms - Fault Domain 2 - Major Axis (S70E;-3)

Fault Domain 2

600.0

1362
1.54

PIERINA

Search Ellipsoids

Block Model Au Grades

PIERINA

Block Au (g/mt)
0.0 0.5
0.5 1.0
1.0 2.05
2.0 5.0
5.0 10.0
> 10.0

100m

PIERINA

PIERINA

El cuerpo mineralizado es controlado litologica y estructuralmente. La


alta ley esta alojada en la silica residual y en estructuras.

PIERINA

DATA PARA OPTIMIZACION DE TAJO.

VALUE = (METAL x RECOVERY x PRICE ORE x COSTP) ROCK x COSTM


METAL = Onzas Au puestas al pad
RECOVERY = Proporcion de metal recuperado en el procesos.
PRICE = Precio del Au.
ORE = Toneladas de Au procesados.
COSTP = Extra costo de minado y procesamiento.
ROCK = Total de material (mineral y desmonte) en un bloque
COSTM = Costo de minado.

PIERINA

COSTO INCREMENTAL DE TRANSPORTE

MCAF = {Mining Cost $/bcm/density}


PCAF = Process Cost $/t
Hauling Incremental Cost
Bench
4190
4180
4170
4160
4150
4140
4130
4120
4110
4100
4090
4080
4070
4060
4050
4040
4030
4020
4010
4000
3990
3980
3970
3960
3950
3940
3930
3920
3910
3900
3700

Costo Directo
from Cost

Based on PH-5J2 and 0104A Model


Toneladas Remanentes
Direct Incremental Cost
Ore
Waste
Ore
Waste
60
201
182
172
252
195
192
195
93
285
245
504
831
814
1,451
2,083
2,019
2,183
2,547
2,636
2,770
2,785
2,205
1,821
1,776
1,664
1,298
1,725
1,753
0

8
119
293
625
792
1,056
1,232
1,597
2,050
3,098
4,536
5,397
6,136
6,982
7,572
7,660
7,407
6,890
6,664
5,792
5,458
4,897
4,939
5,127
5,242
4,571
4,461
4,335
3,690
3,182
0

1.297
1.289
1.281
1.273
1.266
1.258
1.250
1.242
1.234
1.227
1.219
1.211
1.203
1.195
1.188
1.180
1.172
1.164
1.156
1.149
1.141
1.133
1.125
1.117
1.110
1.102
1.094
1.104
1.113
1.123
1.317

Average

0.673
0.665
0.658
0.650
0.642
0.634
0.626
0.619
0.611
0.603
0.613
0.622
0.632
0.642
0.652
0.661
0.671
0.681
0.690
0.700
0.710
0.719
0.729
0.739
0.749
0.758
0.768
0.778
0.787
0.797
0.991

0.673
0.875
0.912
0.790
0.753
0.755
0.712
0.685
0.665
0.621
0.649
0.648
0.675
0.701
0.704
0.744
0.781
0.790
0.805
0.837
0.850
0.869
0.872
0.853
0.842
0.854
0.856
0.853
0.891
0.913
1.154

Toneladas Remanentes
Costo directo Incremental
Ore
Waste
Ore
Waste
69,891
148,244
1.171
0.719
1.170
0.718

Average
0.864

IZ Mine CAF Proc CAF


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
50

1.116
1.103
1.091
1.078
1.065
1.052
1.039
1.026
1.013
1.000
1.016
1.032
1.048
1.064
1.080
1.097
1.113
1.129
1.145
1.161
1.177
1.193
1.209
1.225
1.241
1.257
1.273
1.290
1.306
1.322
1.643

Comparisson
Ore
Total

81,809

Waste
Total
106,589
188,398

LOM
%variation
188,401
0.00%

1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.993
0.987
0.980
0.973
0.966
0.960
0.953
0.946
0.940
0.933
0.926
0.920
0.913
0.906
0.899
0.893
0.886
0.886
0.886
0.886
0.886

Ore-Wst
0.624
0.624
0.624
0.624
0.624
0.624
0.624
0.624
0.624
0.624
0.606
0.589
0.571
0.554
0.536
0.519
0.501
0.484
0.466
0.449
0.431
0.414
0.396
0.379
0.361
0.344
0.326
0.326
0.326
0.326
0.326

CPw
2.610
2.610
2.610
2.610
2.610
2.610
2.610
2.610
2.610
2.610
2.593
2.575
2.558
2.540
2.523
2.505
2.488
2.470
2.453
2.435
2.418
2.400
2.383
2.365
2.348
2.330
2.313
2.313
2.313
2.313
2.313

PIERINA

EJEMPLO
La interaccion se inicia en el siguiente caso: Solamente 03
bloques contienen Au y tienen valores como muestran, todos los
otros bloques son desmonte y tiene valores de -1

23.9

17.9

6.9

23.9

3.9

20.9

La interaccin se inicia a lo largo de los proximo banco.

PIERINA
Step 12

23.9

-0.1

6.9

23.9

-0.1

8.9

PIERINA
Optimal Pit

23.9

6.9

23.9

Los bloques marcados constituyen el pit ptimo. La pared W del pit


queda con valor de 0.8. El centro queda con valor 1 y ninguno de estos
bloques on marcados y por tanto no son minados.

PIERINA

Cuando explotar un bloque?

Superficie
1
e

d
i

j
n

j
m
o

100 ton lastre

500 ton mineral

Valor tiempo del dinero


Explotar el mejor mineral primero
Posponer movimiento de lastre

Elev. Banco

PIERINA

ANALISIS ENVOLVENTES
Mediante el mtodo de Parametrizacin se
obtiene una serie de envolventes en las que
cada una es ptima para un cierto escenario
tcnico - econmico.
Se debe seleccionar una como la envolvente final
del proyecto.

PIERINA

Cada Envolvente tiene sus caractersticas propias


de:
Precio de diseo.
Tonelaje de lastre y mineral.
Ley media.
Ley de corte.
Costo promedio.
Costo mximo. (incremental)

Valor de Envolventes
$3,000
$2,500

6
7

$1,500
$1,000

$2,000

Valor

PIERINA

$500
$0
150

200

250

300

350

Precio de Diseo (US$/oz)

400

ANALISIS INCREMENTAL
Beneficio Total
3,000

Inicio Problemas

Beneficio

PIERINA

2,500

1.5

2,000

Bajos Ingresos

1,500

0.5

1,000

Etapa de Euforia

500

-0.5

-1

5
Pit

PIERINA

PIT OPTIMO
Cuerpo Sur Pit Shell Definition

300000

Total Material
Ore
Oz.Au

250000

200000

150000

100000

50000

0
-

50

100

150

200

250

300

350

400

450

PIERINA

PIT OPTIMO
(m)Toneladas

VAN(m)

Mximo VAN

500.0

120.0

Tonelaje vs VAN

450.0
400.0
350.0

100.0
80.0

VAN
Tonelaje

300.0

Posible Fase 2

250.0

60.0

200.0
40.0

150.0
100.0

Posible Fase 1

50.0

20.0
0.0

0.0
1

11

16

21

26

31

36

PIERINA

Modelo Mina
Whitttle

Diseo optimo de pit, donde intervienen varibles geologicos,


Geotecnicos, Costos, etc. buscando optimizar el VPN

Qpit

PIERINA

FASES DE MINADO

Maximizar el VAN

PIERINA

ESTIMACION DE RESERVAS
Reserva es aquel recurso que es tcnica y
econmicamente explotable.
Este proceso consiste en asociar al depsito uno o
mas diseos mineros destinados a la extraccin
del recurso en la mejor forma posible.

PIERINA

...
Algunas de las variables mas tpicas a definir son:
Tipo de productos a producir.
Precios de los productos.
Costos esperados.
Recuperacin Metalrgica
Ambiente geotcnico.
Polticas impositivas.
Etc.

PIERINA

...
Al trmino de este proceso se debe contar con la
informacin necesaria para proceder al
planeamiento de minado y a la evaluacin
econmica del proyecto.
Tonelaje y ley a recuperar.
Mtodo(s) a usar.
Envolvente(s) definiendo cuerpos a explotar.
Capacidad de produccin esperada.

PIERINA

RESERVAS MINABLES
Reserva Minables
Mineral : 59.9 M @ 1.83 Au / 7.17 Ag
ROM : 3.8 M @ 0.44 Au / 3.77 Ag

Contenido de Onzas
Au : 3.6 M
Ag : 14.3 M

Ley de Corte
Mineral : 0.50 g/t Au Eq
ROM : 0.30 g/t Au Eq

PIERINA

DISEO ESTRATEGICO
La Planificacion es una actividad
creativa mientras tanto la optimizacion
es un proceso analtico. No muchas
optimizaciones formularan una
estrategia; esto solamente refinaria
una de las seleccionadas. Planificar
es la actividad primaria, la
optimizacin es complementaria.

PIERINA

NIVELES DE PLANIFICACION

El Plan Minero suele separarse en diferentes


horizontes de planeamiento, de distinto nivel de
detalle - riesgo.
Plan para la Vida de la Mina (LOM)
Plan de Largo Plazo (Periodo de
Negocio)
Plan de Operaciones (2 a 5 aos)
Plan Anual
Planes Mensuales o Semanales

PIERINA

PLANIFICACION EN PIERINA
OPTIMIZACION Y MEJORAS

PIERINA

Haga de una mina marginal una


rentable o de una buena mina una
mejor.

GRACIAS.