Вы находитесь на странице: 1из 6

MECH ENGR.

ABRAR AHMAD
Civil line joharabad.
Tehsill & Distt. Khushab
(Joharabad) Punjab , Pakistan
(+92)-332-5233249
abrar_ahmad008@hotmail.com

CAREER OBJECTIVE / MOTIVATION

Done Mechanical Engineering and seeking a significant and challenging position in


the field of structure designing, fabrication and erection, including civil which
would help me deliver my best and upgrade my skills in this field. Moreover I would
like to utilize my technical skills for achieving the targets and developing the best
performance in the organization .I would like to implement my innovative ideas,
skills and creativity for accomplishing the projects
Date of birth

Nationality :

Pakistani

PEC#

MECH/28014

Passport No

Experience
Domicile

PJ1166501
:

Marital status

6 December 1989

3 Years
Punjab

Single
EDUCATIONAL
BACKGROUND

Sr.
#
01
02

03

04

Institute

Passing
Year

Total
marks/GP
A

Obtain
marks/GPA

Grade

MPhil in Project
management

Riphah
international
university

will pass
on in 2016

1st semester
completed

3.00

BS.C
Mechanical
Engineering

HITEC
UNIVERSITY

2014

4.0

2.4

FS.C Pre
Engineering

BISC
Sargodha
Board

2009

1100

788

Matriculation

BISC
Sargodha
Board

2006

1050

749

Qualification

Professional skills during job

PRO E(Creo Parametric) 3Dmodel, Assembly, Static Analysis, Drawing and


Animation

Auto Cad 2D & 3D Designing

MS Project

MS Office

CURRENT POSITION

JOB DESCRIPTION
PROJECT

New Islamabad International Airport Pakistan

COMPANY

(AB ENGINEERING COMPNAY) sub contractor of CHINA BEIXIN

DURATION

From Nov-2014 to till up to date

DESIGNATION

Site Engineer (Structure and civil)

(Having abilities in the field of fabrication and erection of steel structure, assembling
and installation of trusses, firefighting pipe line, heating, ventilation, air-conditioning,
AHUs, FCUs including plant rooms piping, cooling tower and boiler room)

RESPONSIBILITIES:

Working as site engineer and Responsible for the fabrication and installation
of steel structure work of ATC control tower at new Islamabad international
airport
Working as site engineer and responsible for the contract management,
material and cost scheduling, and estimating the value of contract and
value of material for the required job.
Working as site engineer in AB ENGINEERING COMPANY at New Islamabad
international airport project and responsible for the installation of
firefighting pipe line at PTB (PASSENGER TERMINAL BUILDING) during this
period.
Responsible for the fabrication and installation of zone control valve
assembly including gate valves, gong bells, emergency shut valve and
temperature sensors.
Responsible for the fabrication and erection of chilled water pipe line from
200mm to 900mm including gate valves, non-return valves, strainer, flexible
connection of plant room and connection with chilled water pumps and

condenser water pumps for the air-conditioning purpose of Passenger


terminal building.
Responsible for the fabrication and assembling of valves assembly of AIR
HANDLING UNITS(AHUs) including the gate valves ,butterfly valve, strainer ,
2 way modulating valve and air relief valve .
Responsible for the installation of fire hydrant and fire hose real in the
Passenger Terminal Building of New Islamabad air port
Responsible for the installation of pressure and temperature gauges of plant
room
Responsible for the installation of fuel tank piping for the refilling of Air
plane
Responsible for the installation of FAN coil unit and mini AHU at gang ways
of Islamabad international airport
Responsible for the installation of upright and downward fire protection
sprinkler
Responsible for the installation of different valves and flanges of chilled
water pipe line
Responsible for the installation of underground chilled water pipe line
Having vast experience in dealing with client and consultant regarding the

work progress and drawing acceptance and modification.


Responsible for the Auto Cad drawing modification and approval
Having vast knowledge of construction of as build drawing
Responsible for the installation of chiller plant room piping.
Responsible for the installation of hose reel pipe and stop station
Responsible for the installation of fire hydrant system

PREVIOUS WORK EXPERIENCE

JOB
DESCRIPTION
PROJECT

New Islamabad International Airport Pakistan

COMPANY

(FWO)

DURATION

From OCT-2013 to OCTOBER -2014

DESIGNATION

Trainee engineer

RESPONSIBILITIES:

Working as Trainee engineer at NEW ISLAMABAD INTERNATIONAL AIRPORT


and responsible for the fabrication and erection of steel structure work of
FWO Scope at PTB (PASSENGER TERMINAL BUILDING) during this period.
Responsible for the fabrication and erection of chilled water pipe line
including gate valves, non-return valves, strainer, flexible connection of
plant room and connection with chilled water pumps and condenser water
pumps for the air-conditioning purpose of Passenger terminal building.

Responsible for the installation of UPVC and DRAIN pipe of passenger


terminal buildings including water supply pipe and plumbing work of
washrooms.
Having vast experience in dealing with client and consultant regarding the
work progress and drawing acceptance and modification.
Responsible for the Auto Cad drawing modification and approval

WORK EXPERIENCE DURING STUDY

During
studies

(6 Weeks) Internship at (Hit) Heavy Industries Taxila, Under the Supervision


of Descom Department
(6 Weeks) Internship at Sitara Textile Ltd in Dying and Printing Department

FINAL YEAR
PROJECT

Descriptio
n
Design and fabrication of energy efficient plastic injection molding Machine with self
locking clamping system this is a new concept in the field of molding. Most of the
plastic industries are using these machines in Pakistan as well as in all over the world.
More over this is a funded project from Pakistan Science Foundation. The funded
amount was 0.140 million.
In this project I have calculated the cycle time of a mold process for single and
multiple shot and I tried my level best to design a machine with new concept that is
called self-locking clamping system. From industrial point of view its very economical
because most of the energy we used for the clamping of mold dies wit external force
and it required again energy but my concept totally depends upon only single
operating motor system.

OTHER PROJECTS
During
2009

Design and prototype model of Pelton wheel

2010

Design and practical model of zero head turbine

2011

Installation of strain gauges in order to find out stress and strain in a


cantilever beam using
Wheatstone bridge

2012Parabolic plate solar cooker

During
Studies

ACHIEVEMENTS /
ACTIVITIES

Event head at renewable energy show 2013 held at HITEC University

2nd position in quiz Competition held at HITEC University

Participated in job and project expo held at UET (KSK) and Presented my final
year project

Participated in Express Educational and Career EXPO held at Pak China


friendship hall in 2013

Participated in Lipton Mat-tech 13 the 5th symposium on Materials Held at GIKI


University

Participated in open house and job fair held at HITE University In 2010

Participated in talent hunt held at HITEC University and Selected For Inter
university drama competition

Active member of literary and dramatic society of HITEC University

/ ACTIVITIES
PROFESSIONAL
During Studies

SKILLS

PRO E(Creo Parametric) 3Dmodel, Assembly, Static Analysis,


Drawing and Animation

ANSYS Structural, Thermal, Buckling, Modal Analysis And


Combined Analysis

Auto Cad 2D & 3D Designing

Mat lab Beginners level

PUBLICATIONS
During
Studies
2013

Presented research paper in Lipton Mat-tech 13 a conference on


Materials held at GIKI University
(Importance of rapid prototyping in product designing)

INTERESTS

Travelling,
International affairs,
History
Meeting friends and playing
REFERENCES

Cricket
Fishing and boating are my passion.

CAN BE PROVIDED ON DEMAND.

Вам также может понравиться