Вы находитесь на странице: 1из 136

Clai

m
S.No

Dam Site
Equipment
Description

Invoice Rate

2.00

1,182.40
Landed
cost

3.00

1183.6
Scheduled
Life
In years
4

0.02
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Dozer
ROC

2 Boom Drill Jumbo


600 KVA Diesel Generator
Excavator
Hyva
Loader

Welding Machine
Batching Plant
JCB 3DX

Concrete Pump
Transit Mixer
Grout Pump
Wet Shotcrete Machine
Dewatering 10 HP
Dewatering 20 HP

8,000,000.00

###

18,665,000.00

###

28,000,000.00

###

10

3,089,049.60

###

15

4,612,746.00

###

12

1,605,116.58

###

10

7,843,137.00

###

10

19,588.40

19,588.40

10

3,262,674.00

###

18

1,745,000.69

###

10

1,836,000.00

###

938,829.00

938,829.00

10

2,920,243.53

###

10

29,054,171.48

###

10

84,637.00

84,637.00

12

220,850.00

220,850.00

12

17
18
19

Dewatering 35 HP
Ventilation Fan
Atlas Copco XAH 210

20
21
22
23
24
25
25
26

Hydra
Water Tanker
Compressor XA175
Compressor XAH210

Jack Hammer
Tata 909
Tipper
Spider Excavator

234,375.00

234,375.00

12

922,549.00

922,549.00

12

968,827.68

968,827.68

10

863,516.00

863,516.00

10

550,000.00

550,000.00

10

759,321.00

759,321.00

10

968,827.68

968,827.68

10

60,500.00

60,500.00

10

1,592,634.00

###

10

1,592,634.00

###

10

15,000,000.00

###

10

Ventilation Duct calculation

Chainage of Claim

Adit 2

445.00

Adit 3

236.00

Adit 4

400.00

Adit 5

196.00

Length of Adit
#N/A

Length of
HRT
1,183.00

Total Length
#N/A

Cadre
Unskilled
Semi Skilled
Skilled
Highly Skilled

Rate
145
165
190
219

Unit rate
paid
508.20
578.30
665.92
766.82

Engineer

30,000.00

Manager

60,000.00

Sr. manager

80,000.00

8,324

Explosive
ED
NED
Rockbolt

52.94
13.51
74.02
143.01

58.23
14.86
81.42
157.32

Cement
Sand
Aggregate
Accelerator

345.00
1,129.00
2,470.00
34.98
26.15
30.50
30.50

379.50
1,241.90
2,717.00
38.48
28.77
33.55
33.55

Micro Silica
AEA
WRA

2,139
6,025

Superplasticizer
Reinforcement
Structural Steel
Polyfibre
Diesel
Boulder

30.50
35,350.00
45,105.00
261.98
42.19

33.55
38,885.00
49,615.50
288.18
46.41

Time
Period

Ownership Cost
Repair
Provision

In hours

Annual
Operation
hrs

Life in Hrs

Life in
years

918,000.00

979,200.00

9000

200%

1200

8000

80%

2200

###

###

15000

120%

1200

###

###

30000

120%

2000

185,342.98

185,342.98

15000

150%

2000

345,955.95

553,529.52

12000

175%

2000

144,460.49

240,767.49

15000

200%

2000

705,882.33

941,176.44

12000

80%

2000

1,762.96

2,938.26

30000

75%

2000

163,133.70

195,760.44

15000

200%

2000

157,050.06

209,400.08

8000

100%

2000

330,480.00

413,100.00

10000

120%

2000

84,494.61

168,989.22

10000

100%

2000

262,821.92

525,643.84

15000

100%

2000

20000

70%

2000

6,347.78

7,617.33

20000

70%

2000

16,563.75

19,876.50

###

###

20000

70%

2000

17,578.13

21,093.75

24000

80%

2000

69,191.18

69,191.18

12000

100%

2000

87,194.49

145,324.15

12000

150%

2000

77,716.44

129,527.40

16000

120%

2000

49,500.00

61,875.00

12000

100%

2000

68,338.89

113,898.15

12000

100%

2000

87,194.49

145,324.15

8000

80%

2000

5,445.00

13,612.50

12000

175%

2000

146,203.80

243,673.00

12000

175%

2000

146,203.80

243,673.00

12000

100%

2000

RD
From

To

1,182.40

1183.6

###
8

###
9

Cadre
Monthly
rate
12,064

Cadre

Rate/mand
ay
508.20

Unskilled work

Helper, Beldar

508.20
Helper

13,728

Watchman,
Cable Man
15,808 Driver,Mechani
c, Electrician,
Supervisor
18,203
Operator ,
Foreman,
48,750

508.20
Beldar

578.30
Watchman

Supervisor

578.30
Cableman

665.92
Driver

140,833

665.92
Mechanic
Electrician
Supervisor
Driller
Operator
Foreman
Engineer
Manager

195,000

Sr. Manager
Semi Skilled
Skilled
Highly Skilled
Blaster

kg
No
No
RM

bag
cum
cum
kg
kg
kg
kg

Dia

12
16
25
32

Reinforcement deduct
NEC rates
salvage
value@10%
44.25
44.25
44.25
44.25

39.83
39.83
39.83
39.83

665.92
766.82
766.82
766.82
766.82
2,138.80
6,024.92
8,324.44
578.30
665.92
766.82
766.82

kg
MT
MT
kg
l

Ownership Cost

Repair
Cost

Operation
Cost
Regular

Average

Hourly
Ownership
Cost

Foreman
Operator Mechani
c
18,203.15

948,600.00

###

###

790.50

1,813.33

0.25

1.00

0.25

###

1,557.68

1,903.83

0.25

2.00

0.25

###

1,890.00

2,240.00

0.125

1.00

0.25

185,342.98

92.67

123.56

0.125

1.00

0.50

449,742.74

224.87

461.27

0.25

1.00

0.25

192,613.99

96.31

234.08

0.25

823,529.39

411.76

1,045.75

0.13

2,350.61

1.18

1.31

179,447.07

89.72

81.57

0.50

2.00

0.50

183,225.07

91.61

232.67

0.13

1.00

0.50

371,790.00

185.90

229.50

0.13

1.00

0.17

126,741.92

63.37

112.66

0.25

1.00

0.50

394,232.88

197.12

292.02

0.25

1.00

0.17

1,525.34

1,936.94

0.13

1.00

0.50

6,982.55

3.49

2.96

1.00

0.17

18,220.13

9.11

7.73

1.00

0.17

###

1.00

0.25
0.250
0.25

19,335.94

9.67

8.20

1.00

0.17

69,191.18

34.60

30.75

0.75

0.75

116,259.32

58.13

80.74

0.13

1.00

0.25

103,621.92

51.81

107.94

0.50

1.00

0.25

55,687.50

27.84

41.25

91,118.52

45.56

63.28

0.13

1.00

0.25

116,259.32

58.13

80.74

0.13

1.00

0.25

9,528.75

4.76

6.05

1.00

0.13

194,938.40

97.47

236.90

0.25

0.25

194,938.40

97.47

236.90

0.25

0.25

918.00

1,275.00

0.25

###
10

11

12

0.25

13

1.00
14

0.25
15

Regular

Total

Welder

Driver

Regular

Casual
Helper

Electricia Supervis
n
or
###

1.00

###

0.17

###

Watchma
n
###

###

###

###

1.00

0.25

###

2.00

0.50

###

4.00

0.25

###

1.00

0.17

###

1.00

0.25

8,502.79

1.00

0.25

###

1.00

0.17

###

1.00

###
###

1.00

0.17

###

1.00

0.17

###

1.00

0.25

###

1.00

0.17

###

1.00

0.25

0.17

###

1.00

0.17

###

1.00

0.17

###

1.00

###

1.50

0.17

0.50

###

1.00

0.25

0.25

###

2.00

0.25

###

1.00

0.50

###

1.00

0.25

0.50

###

1.00

0.25

###

0.50

0.13

8,502.79

1.00

0.25

8,502.79

1.00

0.25

###

1.00

0.25

2.00

0.20

16

17

18

19

20

21

22

Casual

Total
Beldar

Casual

Indirect Cost

Total Indirect
Cost

Regular

Casual

80.00%

55.00%

###

21,364.75

8,522.80

29,887.55

###

35,927.26

###

52,972.86

Cablema
n
###

###

6.00

###

###

###

21,364.75

8,522.80

29,887.55

###

6,802.23

8,522.80

15,325.03

###

19,544.43

7,896.12

27,440.55

###

17,919.95

6,635.20

24,555.15

###

42,729.49

###

82,540.69

###

22,706.03

7,896.12

30,602.15

###

18,494.78

7,918.77

26,413.55

###

24,526.35

8,522.80

33,049.15

###

20,315.09

7,896.12

28,211.21

###

22,706.03

8,522.80

31,228.83

###

18,786.41

6,635.20

25,421.61

###

18,786.41

6,635.20

25,421.61

23

24

###

18,786.41

6,635.20

25,421.61

###

20,406.69

###

31,643.06

###

25,867.63

8,522.80

34,390.43

###

28,166.98

###

43,324.98

###

28,454.40

6,635.20

35,089.60

###

25,867.63

8,522.80

34,390.43

###

25,867.63

8,522.80

34,390.43

7,748.00

18,672.60

4,261.40

22,934.00

###

6,802.23

8,522.80

15,325.03

###

6,802.23

8,522.80

15,325.03

###

21,364.75

8,522.80

29,887.55

25

26

27

28

Labour Cost per


month

Labour charges per


year

Labour Cost per


hour

72,089.48

865,073.74

720.89

128,873.94

1,546,487.30

702.95

76,118.54

913,422.47

761.19

42,780.30

513,363.59

256.68

72,089.48

865,073.74

432.54

39,323.82

471,885.79

235.94

66,227.66

794,731.96

397.37

59,019.08

708,229.02

354.11

208,336.56

2,500,038.68

1,250.02

73,341.26

880,095.16

440.05

63,929.78

767,157.40

383.58

79,203.08

950,436.94

475.22

67,961.66

815,539.87

407.77

75,107.37

901,288.45

450.64

60,968.63

731,623.59

365.81

60,968.63

731,623.59

365.81

60,968.63

731,623.59

365.81

77,581.18

930,974.10

465.49

82,220.97

986,651.65

493.33

106,093.69

1,273,124.33

636.56

82,721.60

992,659.20

496.33

82,220.97

986,651.65

493.33

82,220.97

986,651.65

493.33

54,022.74

648,272.91

324.14

39,323.82

471,885.79

235.94

39,323.82

471,885.79

235.94

72,089.48

865,073.74

432.54

29

30

31

For diesel Powered equipment


FHP of equipment

C1

C2

90

0.57

Rate of
Diesel
46.41

46.41
46.41

Cost of
Diesel

654.71
-

147.40

0.8

46.41

1,203.96

643.43

46.41

6,569.42

135.00

0.5 1.2

46.41

827.01

200.00

0.3 1.4

46.41

857.64

223.00

0.58 1.3

46.41

1,716.73

76
70
61.66

0.58 1.3
1

0.3 1.4

46.41

46.41

46.41

585.07

46.41

714.70

46.41

264.41

46.41

46.41

46.41

46.41

46.41

46.41

60

46.41

612.60

49

0.8

46.41

400.23

46.41

771.87

180

0.3 1.4

50

46.41

510.50

60

46.41

612.60

46.41

180.00

0.3 1.4

46.41

771.87

180.00

0.3 1.4

46.41

771.87

78.00

0.3 1.4

46.41

334.48

32

33

34

35

46.41

36

For diesel Powered equipment


%age of lubricant
consumption

30.00%
25.00%

Cost of oil
lubricants

Cost of
sundries
10%

196.41
-

Total POL
Cost

181.33
-

1,032.46
-

27.50%

331.09

224.00

1,759.05

27.50%

1,806.59

12.36

8,388.37

30.00%

248.10

46.13

1,121.24

30.00%

257.29

23.41

1,138.34

30.00%

515.02

104.58

2,336.32

25.00%

25.00%

30.00%

175.52

23.27

783.86

27.50%

196.54

22.95

934.19

30.00%

79.32

11.27

355.00

25.00%

25.00%

25.00%

25.00%

25.00%

25.00%

27.50%

168.46

8.07

789.14

27.50%

110.06

10.79

521.09

30.00%

231.56

4.13

1,007.56

27.50%

140.39

6.33

657.21

27.50%

168.46

8.07

789.14

25.00%

30.00%

231.56

23.69

1,027.13

30.00%

231.56

23.69

1,027.13

30.00%

100.34

127.50

562.32

37

25.00%

38

39

40

For Electrical Dirven Equipme


Engine Capacity in kw

135
0

C1 C
2

0.8 1
0

Rate of
electricity

Cost of
Electricity

38.46

0.00

38.46

0.00

38.46

3,115.30

38.46
38.46

0.00

38.46

0.00

38.46

0.00

12

38.46

461.53

46

38.46

1,769.18

38.46

0.00

38.46

0.00

38.46

0.00

38.46

1,692.26

0.8 1

38.46

4,153.73

44
135

7.46

38.46

286.91

14.92

38.46

573.83

26.11

38.46

1,004.20

75

38.46

2,884.53

38.46

0.00

38.46

0.00

38.46

0.00

38.46

0.00

38.46

0.00

38.46

0.00

38.46

0.00

38.46

0.00

38.46

0.00

41

42 43

44

45

ectrical Dirven Equipment


%age of lubricant
consumption

Cost of
lubricants

Cost of
sundries
0.10

Total POL
Cost

25.00%

0.00

0.00

0.00

25.00%

0.00

0.00

0.00

27.50%

856.71

224.00

4,196.00

25.00%

0.00

0.00

0.00

25.00%

0.00

0.00

0.00

25.00%

0.00

0.00

0.00

27.50%

126.92

0.13

588.58

27.50%

486.52

8.16

2,263.86

25.00%

0.00

0.00

0.00

25.00%

0.00

0.00

0.00

25.00%

0.00

0.00

0.00

27.50%

465.37

29.20

2,186.83

27.50%

1142.28

193.69

5,489.70

27.50%

78.90

0.30

366.11

27.50%

157.80

0.77

732.41

27.50%

276.16

0.82

1,281.18

27.50%

793.25

3.08

3,680.86

25.00%

0.00

0.00

0.00

25.00%

0.00

0.00

0.00

25.00%

0.00

0.00

0.00

25.00%

0.00

0.00

0.00

25.00%

0.00

0.00

0.00

25.00%

0.00

0.00

0.00

25.00%

0.00

0.00

0.00

25.00%

0.00

0.00

0.00

25.00%

0.00

0.00

0.00

46

47

48

49

For Pneumatic Dirven


Engine Capacity in kw

C1 C
2

Rate of
electricity

Air Charges

38.46
38.46
135
0

0.8 1
0

38.46
38.46
38.46
38.46
38.46

12

38.46

46

38.46
38.46
38.46
38.46

44
135

38.46

0.8 1

38.46

7.46

38.46

14.92

38.46

163.51

26.11

38.46

75

38.46
38.46
38.46
38.46
38.46
38.46
38.46

163.51

38.46
38.46
38.46
50

51 52

53

54

For Pneumatic Dirven Equipment


Cost of
Electricity

%age of lubricant
consumption

Cost of
lubricants

Cost of
sundries
0.10

0.00

25.00%

0.00

0.00

654.05

25.00%

163.51

0.20

3,115.30

27.50%

856.71

0.40

0.00

25.00%

0.00

0.00

0.00

25.00%

0.00

0.00

0.00

25.00%

0.00

0.00

461.53

27.50%

126.92

0.10

1,769.18

27.50%

486.52

0.00

0.00

25.00%

0.00

0.00

0.00

25.00%

0.00

0.00

0.00

25.00%

0.00

0.00

1,692.26

27.50%

465.37

0.10

4,153.73

27.50%

1142.28

0.10

286.91

27.50%

78.90

0.10

573.83

27.50%

157.80

0.10

1,004.20

27.50%

276.16

0.10

2,884.53

27.50%

793.25

0.15

0.00

25.00%

0.00

0.00

0.00

25.00%

0.00

0.00

0.00

25.00%

0.00

0.00

0.00

25.00%

0.00

0.00

0.00

25.00%

0.00

0.00

654.05

25.00%

163.51

0.05

0.00

25.00%

0.00

0.00

0.00

25.00%

0.00

0.00

0.00

25.00%

0.00

0.00

55

56

57

58

Total POL
Cost

Hourly use
Rate of
rate
Deliverables
(if any)

Total POL
Cost

0.00

1,032.46

4,357

5,446

817.76

817.76

4,982

6,228

3,972.40

9,927.46

14,819

18,523

8,388.37

8,861

11,077

0.00

1,121.24

2,240

2,800

0.00

1,138.34

1,705

2,131

0.00

2,336.32

4,191

5,239

588.54

1,177.12

1,534

1,917

2,255.71

4,519.57

5,941

7,426

0.00

783.86

1,548

1,935

0.00

934.19

1,733

2,166

0.00

355.00

1,006

1,258

2,157.73

4,344.56

5,241

6,552

5,296.10

10,785.80

14,699

18,373

365.92

732.03

1,104

1,380

731.73

1,464.14

1,847

2,308

38.46

1,280.46

2,561.64

2,945

3,682

3,677.93

7,358.79

7,890

9,862

0.00

789.14

1,421

1,777

0.00

521.09

1,317

1,647

0.00

1,007.56

1,573

1,966

0.00

657.21

1,259

1,574

0.00

789.14

1,421

1,777

817.61

817.61

1,153

1,441

0.00

1,027.13

1,597

1,997

0.00

1,027.13

1,597

1,997

0.00

562.32

3,188

3,985

59

60

61

Rate of Electricity

Rate analysis of Dozer


Cost of Equipment (Rs.)
Scheduled Life in years
Scheduled Life in hours

8160000
8
9000

Life time repair provision (% of Cost of Equipment)


Estimated annual operational hours =

200
1200

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours

918000.00
979200.00

Average hourly dereciation (Rs.)

948600.00

B Hourly Repair Charges


Average over lifetime (Rs.)

790.50

1813.33

C Labour Charges
Regular

Nos.

Wages(Rs
Amount (Rs.)
.)/month
18203.15
0.00

Operator

Foreman

0.25

18203.15

4550.79

Mechanic

0.25

15808.00

3952.00

Electrician

15808.00

0.00

Supervisor

15808.00

0.00

Driver

15808.00

15808.00

Sub Total

24310.79

Casual
1

12064.00

12064.00

Watchman

Helper

0.25

13728.00

3432.00

Cable Man

13728.00

0.00

Beldar

12064.00

0.00

Sub Total

15496.00

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

27971.43
67778.22

Total Crew Charges/month


Total Crew Charges/year

813338.59

Hourly Crew Charges

677.78

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 30%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Energy Charges for drilling
C1
Rate of Electricity (Rs./KWH)
C2
Cost of Electricity (Rs.)
Cost of oil and lubricant @ 30%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Electricity)

0.57
1.25

0
0

Hourly POL and Energy Charges (Rs.)


Hourly Use Rate of the Equipment
[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

90
14.11
14.11
46.41
654.73
196.42
181.33
1032.48
0.00
0.00
0.00
0.00
0.00
0.00
1032.48

say,

4314.10
4314

5393

Rate analysis of ROC


Cost of Equipment (Rs.)
Scheduled Life in years

###

Scheduled Life in hours


Life time repair provision (% of Cost of Equipment)

8000
80

Estimated annual operational hours =

2200

A Ownership cost
Yearly dereciation wrt life in years

2141808.75

Yearly dereciation wrt life in hours


Average hourly dereciation (Rs.)

4711979.25
3426894.00

1557.68

B Hourly Repair Charges


Average over lifetime (Rs.)

1903.83

C Labour Charges

Regular

Nos.
Operator

Wages(Rs.
Amount (Rs.)
)/month
18203.15

18203.15

Foreman 0.125

18203.15

2275.39

Mechanic 0.125

15808.00

1976.00

Electrician

15808.00

0.00

Supervisor

15808.00

0.00

Driver

15808.00

0.00

Sub Total

22454.54

Casual
1

12064.00

12064.00

Watchman

Helper

0.25

13728.00

3432.00

Cable Man

13728.00

0.00

Beldar

12064.00

0.00

Sub Total

15496.00

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

26486.43

Total Crew Charges/month

64436.97

Total Crew Charges/year


Hourly Crew Charges

773243.65
351.47

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 30%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)

0.5
0.8

Energy Charges for drilling


C1
Rate of Electricity (Rs./KWH)
C2
Cost of Electricity (Rs.)
Cost of oil and lubricant @ 30%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Electricity)

Cost of air for 100 cfm


Cost of air for 201 cfm
Lubricants- 27.5% of cost of air
Sundries and Misc. supplied @ 10 % above
Hourly POL cost (Pneumatic)

Hourly POL and Energy Charges (Rs.)


Hourly Use Rate of the Equipment
[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

145
12.76
12.76
46.41
592.19
177.66
190.38
960.23
0.00
0.00
0.00
0.00
0.00
0.00

217.25
436.67
120.08
190.38
747.13

1707.37

say,

5520.35
5520

6900

Rate analysis of 2 Boom Drill Jumbo


Cost of Equipment (Rs.)
Scheduled Life in years

28000000
10

Scheduled Life in hours

15000

Life time repair provision (% of Cost of Equipment)

120

Estimated annual operational hours =

1200

A Ownership cost
Yearly dereciation wrt life in years

2520000.00

Yearly dereciation wrt life in hours

2016000.00

Average hourly dereciation (Rs.)

2268000.00

1890.00

B Hourly Repair Charges


Average over lifetime (Rs.)

2240.00

C Labour Charges
Regular

Nos.
Operator

Wages(Rs
Amount (Rs.)
.)/month
18203.15
36406.29

Foreman 0.125 18203.15

2275.39

Mechanic

0.25

15808.00

3952.00

Electrician

15808.00

0.00

Supervisor

15808.00

0.00

Driver

15808.00

0.00

Sub Total

42633.69

Casual
4

12064.00

48256.00

Watchman

Helper

0.25

13728.00

3432.00

Cable Man

13728.00

0.00

Beldar

12064.00

0.00

Sub Total

51688.00

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

62535.35
156857.03

Total Crew Charges/month


Total Crew Charges/year
Hourly Crew Charges

1882284.40
1568.57

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)

C1

Effective fuel consumption per hour


C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 25%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine capacity in kw
Electric Energy completion per hour

C1
C2

0.8
1

0.8
1

Rate of Electricity
Cost of Electricity
Cost of oil and lubricant @ 25%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Electricity)

Hourly POL and Energy Charges (Rs.)


Hourly Use Rate of the Equipment
[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

147.4
25.94
25.94
46.41
1203.99
301.00
224.00
1728.98
270
216.00
216.00
38.46
8307.36
2076.84
224.00
10608.20

12337.18
18035.75

22545

Rate analysis of 600 KVA Diesel Generator


Cost of Equipment (Rs.)
Scheduled Life in years
Scheduled Life in hours
Life time repair provision (% of Cost of Equipment)

3,089,050

15
30000
120

Estimated annual operational hours =

2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours

185342.98
185342.98

Average hourly dereciation (Rs.)

185342.98

92.67

B Hourly Repair Charges


Average over lifetime (Rs.)

123.56

C Labour Charges
Regular

Nos.
Operator

Wages(Rs
Amount (Rs.)
.)/month
18203.15
18203.15

Foreman 0.125 18203.15

2275.39

Mechanic

0.5

15808.00

7904.00

Electrician

15808.00

0.00

Supervisor

15808.00

0.00

Driver

15808.00

0.00

Sub Total

28382.54

Casual
1

12064.00

12064.00

Watchman

Helper

0.17

13728.00

2333.76

Cable Man

13728.00

0.00

Beldar

12064.00

0.00

Sub Total

14397.76

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

30624.80
73405.10

Total Crew Charges/month


Total Crew Charges/year
Hourly Crew Charges

880861.18
440.43

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 25%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine capacity in kw
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Electricity
Cost of Electri ity
Cost of oil and lubricant @ 27.50%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Electricity)

1
1

0
0

Hourly POL and Energy Charges (Rs.)


Hourly Use Rate of the Equipment
[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

643.43
141.55
141.55
46.41
6569.55
1642.39
12.36
8224.29
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00

8224.29
8880.96

11101

Rate analysis of 320 KVA Diesel Generator


Cost of Equipment (Rs.)
Scheduled Life in years
Scheduled Life in hours
Life time repair provision (% of Cost of Equipment)

1,350,000

15
30000
120

Estimated annual operational hours =

2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours

81000.00
81000.00

Average hourly dereciation (Rs.)

81000.00

40.50

B Hourly Repair Charges


Average over lifetime (Rs.)

54.00

C Labour Charges
Regular

Nos.
Operator

Wages(Rs
Amount (Rs.)
.)/month
18203.15
18203.15

Foreman 0.125 18203.15

2275.39

Mechanic

0.5

15808.00

7904.00

Electrician

15808.00

0.00

Supervisor

15808.00

0.00

Driver

15808.00

0.00

Sub Total

28382.54

Casual
1

12064.00

12064.00

Watchman

Helper

0.17

13728.00

2333.76

Cable Man

13728.00

0.00

Beldar

12064.00

0.00

Sub Total

14397.76

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

30624.80
73405.10

Total Crew Charges/month


Total Crew Charges/year
Hourly Crew Charges

880861.18
440.43

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 25%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine capacity in kw
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Electricity
Cost of Electri ity
Cost of oil and lubricant @ 27.50%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Electricity)

1
1

0
0

Hourly POL and Energy Charges (Rs.)


Hourly Use Rate of the Equipment
[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

343.16
75.50
75.50
46.41
3503.73
875.93
5.40
4385.07
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00

4385.07

say,

4920.00
4920

6150.0

Rate analysis of Excavator


Cost of Equipment (Rs.)
Scheduled Life in years
Scheduled Life in hours
Life time repair provision (% of Cost of Equipment)

4,612,746

12
15000
150

Estimated annual operational hours =

2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours

345955.95
553529.52

Average hourly dereciation (Rs.)

449742.74

224.87

B Hourly Repair Charges


Average over lifetime (Rs.)

461.27

C Labour Charges
Regular

Nos.

Wages(Rs
Amount (Rs.)
.)/month
18203.15
18203.15

Operator

Foreman

0.25

18203.15

4550.79

Mechanic

0.25

15808.00

3952.00

Electrician

15808.00

0.00

Supervisor

15808.00

0.00

Driver

15808.00

0.00

Sub Total

26705.93

Casual
1

12064.00

12064.00

Watchman

Helper

0.25

13728.00

3432.00

Cable Man

13728.00

0.00

Beldar

12064.00

0.00

Sub Total

15496.00

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

29887.55
72089.48

Total Crew Charges/month


Total Crew Charges/year
Hourly Crew Charges

865073.74
432.54

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 30%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine capacity in kw
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Electricity
Cost of Electri ity
Cost of oil and lubricant @ 27.50%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Electricity)

0.5
1.2

0
0

Hourly POL and Energy Charges (Rs.)


Hourly Use Rate of the Equipment
[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

135
17.82
17.82
46.41
827.03
248.11
46.13
1121.26
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1121.26

say,

2239.94
2240

2800

Rate analysis of Hyva


Cost of Equipment (Rs.)
Scheduled Life in years
Scheduled Life in hours
Life time repair provision (% of Cost of Equipment)

1,605,117

12
15000
175

Estimated annual operational hours =

2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours

120383.74
192613.99

Average hourly dereciation (Rs.)

156498.87

78.25

B Hourly Repair Charges


Average over lifetime (Rs.)

187.26

C Labour Charges
Regular

Nos.

Wages(Rs
Amount (Rs.)
.)/month

Operator

18203.15

0.00

Foreman

0.25

18203.15

4550.79

Mechanic

0.25

15808.00

3952.00

Electrician

15808.00

0.00

Supervisor

15808.00

0.00

Driver

15808.00

15808.00

Sub Total

24310.79

Casual
1

12064.00

12064.00

Watchman

Helper

0.25

13728.00

3432.00

Cable Man

13728.00

0.00

Beldar

12064.00

0.00

Sub Total

15496.00

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

27971.43
67778.22

Total Crew Charges/month


Total Crew Charges/year
Hourly Crew Charges

813338.59
406.67

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 25%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine capacity in kw
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Electricity
Cost of Electri ity
Cost of oil and lubricant @ 27.50%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Electricity)

0.3
1.4

0
0

Hourly POL and Energy Charges (Rs.)


Hourly Use Rate of the Equipment
[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

200
18.48
18.48
46.41
857.66
214.41
18.73
1090.80
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1090.80

say,

1762.98
1763

2204

Rate analysis of Loader


Cost of Equipment (Rs.)
Scheduled Life in years
Scheduled Life in hours
Life time repair provision (% of Cost of Equipment)

7,843,137

10
15000
200

Estimated annual operational hours =

2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours

705882.33
941176.44

Average hourly dereciation (Rs.)

823529.39

411.76

B Hourly Repair Charges


Average over lifetime (Rs.)

1045.75

C Labour Charges
Regular

Nos.
Operator

Wages(R
s.)/mont Amount (Rs.)
h
18203.15
18203.15

Foreman 0.125 18203.15

2275.39

Mechanic

0.25

15808.00

3952.00

Electrician

15808.00

0.00

Supervisor

15808.00

0.00

Driver

15808.00

0.00

Sub Total

24430.54

12064.00

12064.00

Casual
Helper

Watchman 0.167 13728.00

2288.00

Cable Man

13728.00

Beldar

12064.00

0.00

Sub Total

14352.00

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

0.00

27438.03
66220.57

Total Crew Charges/month


Total Crew Charges/year
Hourly Crew Charges

794646.85
397.32

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 30%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine capacity in kw
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Electricity
Cost of Electri ity
Cost of oil and lubricant @ 27.50%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Electricity)

0.58
1.3

0
0

Hourly POL and Energy Charges (Rs.)


Hourly Use Rate of the Equipment
[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

223
36.99
36.99
46.41
1716.76
515.03
104.58
2336.37
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00

2336.37

say,

4191.21
4191

5239

Rate analysis of Welding Machine


Cost of Equipment (Rs.)
Scheduled Life in years

19,588

10

Scheduled Life in hours


Life time repair provision (% of Cost of Equipment)

12000
80

Estimated annual operational hours =

2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours

1762.96
2938.26

Average hourly dereciation (Rs.)

2350.61

1.18

B Hourly Repair Charges


Average over lifetime (Rs.)

1.31

C Labour Charges

Wages(Rs
Amount (Rs.)
.)/month
18203.15
0.00

Foreman

18203.15

0.00

Mechanic

0.25

15808.00

3952.00

15808.00

15808.00

Regular

Nos.
Operator

Welder
Electrician

0.167 15808.00

2639.94

Supervisor

15808.00

Driver

15808.00

0.00
0.00

Sub Total

22399.94

Casual
Helper

12064.00

12064.00

Watchman

13728.00

0.00

Cable Man

13728.00

0.00

Beldar

12064.00

0.00

Sub Total

12064.00

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

24555.15
59019.08

Total Crew Charges/month


Total Crew Charges/year

708229.02

Hourly Crew Charges

354.11

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 30%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine capacity in kw
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Electricity
Cost of Electri ity
Cost of oil and lubricant @ 30%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Electricity)

0
0

0
0.00
0.00
46.41
0.00
0.00
0.00
0.00
12

1
1

Hourly POL and Energy Charges (Rs.)


Hourly Use Rate of the Equipment
[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

0.00
38.46
461.52
138.46
0.13
600.11

600.11

say,

956.70
957

1196

Rate analysis of batching plant


Cost of Equipment (Rs.)
Scheduled Life in years

3,262,674

18

Scheduled Life in hours


Life time repair provision (% of Cost of Equipment)

30000
75

Estimated annual operational hours =

2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours

163133.70
195760.44

Average hourly dereciation (Rs.)

179447.07

89.72

B Hourly Repair Charges


Average over lifetime (Rs.)

81.57

C Labour Charges
Regular

Nos.

Wages(Rs
Amount (Rs.)
.)/month
18203.15 109218.88

Operator

Foreman

1.5

18203.15

27304.72

Mechanic

1.5

15808.00

23712.00

Electrician

1.5

15808.00

23712.00

Supervisor

15808.00

0.00

Driver

15808.00

0.00

Sub Total

183947.60

Casual
Helper

12064.00

48256.00

Watchman

13728.00

41184.00

Cable Man

13728.00

0.00

18

12064.00

217152.00

Sub Total

306592.00

Beldar

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

315783.68
806323.27

Total Crew Charges/month


Total Crew Charges/year

9675879.25

Hourly Crew Charges

4837.94

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 27.50%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine Capacity in Kw
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Electricity
Cost of Electricity
Cost of oil and lubricant @ 25%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Electricity)

0
0

0
0.00
0.00
46.41
0.00
0.00
0.00
0.00
46

1
1

Total POL cost

0.00
38.46
1769.16
442.29
8.16
2219.61

2219.61

Hourly Use Rate of the Equipment


[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

say,

7228.84
7229

9036

Rate analysis of JCB 3DX


Cost of Equipment (Rs.)
Scheduled Life in years

1,745,001

10

Scheduled Life in hours


Life time repair provision (% of Cost of Equipment)
Estimated annual operational hours =

15000
200
2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours
Average hourly dereciation (Rs.)

157050.06
209400.08
183225.07

91.61

B Hourly Repair Charges


Average over lifetime (Rs.)

232.67

C Labour Charges
Regular

Nos.
Operator

Wages(Rs
Amount (Rs.)
.)/month
18203.15
18203.15

Foreman 0.125 18203.15

2275.39

Mechanic

0.5

15808.00

7904.00

Electrician

15808.00

0.00

Supervisor

15808.00

0.00

Driver

15808.00

0.00

Sub Total

28382.54

12064.00

12064.00

Casual
Helper

Watchman 0.167 13728.00

2292.58

Cable Man

13728.00

Beldar

12064.00

0.00

Sub Total

14356.58

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

0.00

30602.15
73341.26

Total Crew Charges/month


Total Crew Charges/year
Hourly Crew Charges

880095.16
440.05

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 30%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine Capacity in Kw
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Electricity
Cost of Electricity
Cost of oil and lubricant @ 27.50%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Electricity)

0.58
1.3

0
1

Total POL cost

76
12.61
12.61
46.41
585.09
175.53
23.27
783.88
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00

783.88

Hourly Use Rate of the Equipment


[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

say,

1548.20
1548

1935

Rate analysis of Concrete Pump


Cost of Equipment (Rs.)
Scheduled Life in years

1,836,000

Scheduled Life in hours


Life time repair provision (% of Cost of Equipment)
Estimated annual operational hours =

8000
100
2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours
Average hourly dereciation (Rs.)

330480.00
413100.00
371790.00

185.90

B Hourly Repair Charges


Average over lifetime (Rs.)

229.50

C Labour Charges
Regular

Nos.
Operator

Wages(Rs
Amount (Rs.)
.)/month
18203.15
18203.15

Foreman 0.125 18203.15

2275.39

Mechanic 0.167 15808.00

2639.94

Electrician

15808.00

0.00

Supervisor

15808.00

0.00

Driver

15808.00

0.00

Sub Total

23118.48

12064.00

12064.00

Casual
Helper

Watchman 0.167 13728.00

2292.58

Cable Man

13728.00

Beldar

12064.00

0.00

Sub Total

14356.58

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

0.00

26390.90
63865.95

Total Crew Charges/month


Total Crew Charges/year
Hourly Crew Charges

766391.38
383.20

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 27.50%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine Capacity in Kw
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Electricity
Cost of Electricity
Cost of oil and lubricant @ 27.50%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Electricity)

1
1

0
1

Total POL cost

70
15.40
15.40
46.41
714.71
196.55
22.95
934.21
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00

934.21

Hourly Use Rate of the Equipment


[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

say,

1732.80
1733

2166

Rate analysis of transit mixer


Cost of Equipment (Rs.)
Scheduled Life in years

938,829

10

Scheduled Life in hours


Life time repair provision (% of Cost of Equipment)
Estimated annual operational hours =

10000
120
2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours
Average hourly dereciation (Rs.)

84494.61
168989.22
126741.92

63.37

B Hourly Repair Charges


Average over lifetime (Rs.)

112.66

C Labour Charges
Regular

Nos.
Operator

0.5

Wages(Rs
Amount (Rs.)
.)/month
18203.15
9101.57

Foreman 0.125 18203.15

2275.39

Mechanic

0.25

15808.00

3952.00

Electrician

15808.00

0.00

Supervisor

15808.00

0.00

Driver

15808.00

0.00

Sub Total

15328.97

12064.00

6032.00

Watchman 0.1667 13728.00

2288.00

Casual
Helper

0.5

Cable Man

13728.00

Beldar

12064.00

0.00

Sub Total

8320.00

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

0.00

16839.17
40488.14

Total Crew Charges/month


Total Crew Charges/year
Hourly Crew Charges

485857.67
242.93

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 30%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine Capacity in Kw
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Electricity
Cost of Electricity
Cost of oil and lubricant @ 27.50%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Electricity)

0.3
1.4

0
1

Total POL cost

61.66
5.70
5.70
46.41
264.42
79.32
11.27
355.01
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00

355.01

Hourly Use Rate of the Equipment


[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

say,

773.97
774

968

Rate analysis of Grout Pump


Cost of Equipment (Rs.)
Scheduled Life in years

2,920,244

10

Scheduled Life in hours


Life time repair provision (% of Cost of Equipment)
Estimated annual operational hours =

10000
100
2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours
Average hourly dereciation (Rs.)

262821.92
525643.84
394232.88

197.12

B Hourly Repair Charges


Average over lifetime (Rs.)

292.02

C Labour Charges
Regular

Nos.
Operator

Wages(Rs
Amount (Rs.)
.)/month
18203.15
18203.15

Foreman 0.125 18203.15

2275.39

Mechanic 0.167 15808.00

2634.67

Electrician

15808.00

0.00

Supervisor

15808.00

0.00

Driver

15808.00

0.00

Sub Total

23113.21

12064.00

12064.00

Casual
Helper

Watchman 0.167 13728.00

2292.58

Cable Man

13728.00

Beldar

12064.00

0.00

Sub Total

14356.58

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

0.00

26386.68
63856.46

Total Crew Charges/month


Total Crew Charges/year
Hourly Crew Charges

766277.56
383.14

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 30%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine Capacity in Kw
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Electricity
Cost of Electricity
Cost of oil and lubricant @ 30%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Electricity)

0
0

0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
44

1
1

Total POL cost

0.00
38.46
1692.24
507.67
29.20
2229.11

2229.11

Hourly Use Rate of the Equipment


[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

say,

3101.39
3101

3877

Rate analysis of Wet Shotcrete machine


Cost of Equipment (Rs.)
Scheduled Life in years
Scheduled Life in hours

###

5
6000

Life time repair provision (% of Cost of Equipment)


Estimated annual operational hours =

100
2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours

5229750.87
8716251.44

Average hourly dereciation (Rs.)

6973001.15

B Hourly Repair Charges


Average over lifetime (Rs.)

3486.50

4842.36

C Labour Charges
Regular

Nos.
Operator

Wages(Rs
Amount (Rs.)
.)/month
18203.15
18203.15

Foreman 0.125 18203.15

2275.39

Mechanic

0.5

15808.00

7904.00

Electrician

15808.00

0.00

Supervisor

15808.00

0.00

Driver

15808.00

0.00

Sub Total

28382.54

Casual
1

12064.00

12064.00

Watchman

Helper

0.25

13728.00

3432.00

Cable Man

13728.00

0.00

Beldar

12064.00

0.00

Sub Total

15496.00

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

31228.83
75107.37

Total Crew Charges/month


Total Crew Charges/year

901288.45

Hourly Crew Charges

450.64

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 30%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)

Engine Capacity in Kw
Hourly fuel consumption (in litres)
Effective fuel consumption per hour
Rate of Electricity
Cost of Electricity
Cost of oil and lubricant @ 25%
Sundries and Misc. supplied
Hourly POL cost (Electricity)

0
0

0
0.00
0.00
0.00
0.00
0.00
0.00
0.00

135
C1
C2

0.4
1

Cost of air for 100 cfm


Cost of air for 1150 cfm
Lubricants- 25% of cost of air
Sundries and Misc. supplied @ 10 % (B) above
Hourly POL cost (Pneumatic)

Total POL cost

0.00
38.46
2076.84
519.21
484.24
3080.29

217.25
2498.35
624.59
484.24
3607.17

6687.46

Hourly Use Rate of the Equipment


[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

say,

15466.96
15467

19334

Rate analysis of Ventilation Fan


Cost of Equipment (Rs.)
Scheduled Life in years

922,549

12

Scheduled Life in hours


Life time repair provision (% of Cost of Equipment)
Estimated annual operational hours =

10000
80
2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours
Average hourly dereciation (Rs.)

69191.18
166058.82
117625.00

58.81

B Hourly Repair Charges


Average over lifetime (Rs.)

73.80

C Labour Charges
Regular

Nos.
Operator

0.25

Wages(Rs
Amount (Rs.)
.)/month
18203.15
4550.79

Foreman

18203.15

0.00

Mechanic

0.25

15808.00

3952.00

Electrician

15808.00

0.00

Supervisor

15808.00

0.00

Driver

15808.00

0.00

Sub Total

8502.79

Casual
0.5

12064.00

6032.00

Watchman

Helper

13728.00

0.00

Cable Man

13728.00

0.00

Beldar

12064.00

0.00

Sub Total

6032.00

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

10119.83
24654.62

Total Crew Charges/month


Total Crew Charges/year
Hourly Crew Charges

295855.39
147.93

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 30%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Rated HP
Hourly fuel consumption (in litres)
Effective fuel consumption per hour
Rate of Electricity
Cost of Electricity
Cost of oil and lubricant @ 30%
Sundries and Misc. supplied
Hourly POL cost (Electricity)

0
0

0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
75

C1
C2

1
1

Total POL cost

0.00
38.46
2884.50
865.35
3.08
3752.93

3752.93

Hourly Use Rate of the Equipment


[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

say,

4033.47
4033

5042

#N/A

Rate analysis of Compressor XA 280


Cost of Equipment (Rs.)
Scheduled Life in years

893,937

10

Scheduled Life in hours


Life time repair provision (% of Cost of Equipment)

12000
100

Estimated annual operational hours =

2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours

80454.33
134090.55

Average hourly dereciation (Rs.)

107272.44

53.64

B Hourly Repair Charges


Average over lifetime (Rs.)

74.49

C Labour Charges
Regular

Nos.
Operator

Wages(Rs
Amount (Rs.)
.)/month
18203.15 18203.146

Foreman 0.125 18203.15 2275.39325


0.25

15808.00

3952

Electrician

Mechanic

15808.00

Supervisor

15808.00

Driver

15808.00

Sub Total 24430.5393


Casual
1

12064.00

12064

Watchman

Helper

0.25

13728.00

3432

Cable Man

13728.00

Beldar

12064.00

Sub Total

15496

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour
Total Crew Charges/month

28067.2314
67993.77065

Total Crew Charges/year

815925.2478

Hourly Crew Charges

407.962624

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 27.5%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine Capacity in Kw
Hourly fuel consumption (in litres)
Effective fuel consumption per hour
Rate of Electricity
Cost of Electricity
Cost of oil and lubricant @ 27.50%
Sundries and Misc. supplied
Hourly POL cost (Diesel)

C1
C2

1
1

0
0

Total POL cost

60
13.20
13.20
46.41
612.61
168.47
7.45
788.53
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00

788.53

Hourly Use Rate of the Equipment


[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

say,

1324.62
1325

1656

Rate analysis of XAH 210


Cost of Equipment (Rs.)
Scheduled Life in years

968,828

10

Scheduled Life in hours


Life time repair provision (% of Cost of Equipment)
Estimated annual operational hours =

12000
100
2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours
Average hourly dereciation (Rs.)

87194.49
145324.15
116259.32

58.13

B Hourly Repair Charges


Average over lifetime (Rs.)

80.74

C Labour Charges
Regular

Nos.
Operator

Wages(Rs
Amount (Rs.)
.)/month
18203.15
18203.15

Foreman 0.125 18203.15

2275.39

Mechanic

0.25

15808.00

3952.00

Electrician

15808.00

0.00

Supervisor

15808.00

0.00

Driver

15808.00

0.00

Sub Total

24430.54

Casual
1

12064.00

12064.00

Watchman

Helper

0.25

13728.00

3432.00

Cable Man

13728.00

0.00

Beldar

12064.00

0.00

Sub Total

15496.00

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

28067.23
67993.77

Total Crew Charges/month


Total Crew Charges/year
Hourly Crew Charges

815925.25
407.96

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 30%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine Capacity in Kw
Hourly fuel consumption (in litres)
Effective fuel consumption per hour
Rate of Electricity
Cost of Electricity
Cost of oil and lubricant @ 27.50%
Sundries and Misc. supplied
Hourly POL cost (Electricity)

C1
C2

1
1

0
0

Total POL cost

60
13.20
13.20
46.41
612.61
183.78
8.07
804.47
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00

804.47

Hourly Use Rate of the Equipment


[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

say,

1351.30
1351

1689

Rate analysis of Hydra


Cost of Equipment (Rs.)
Scheduled Life in years

863,516

10

Scheduled Life in hours


Life time repair provision (% of Cost of Equipment)
Estimated annual operational hours =

12000
150
2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours
Average hourly dereciation (Rs.)

77716.44
129527.40
103621.92

51.81

B Hourly Repair Charges


Average over lifetime (Rs.)

107.94

C Labour Charges
Regular

Nos.

Wages(Rs
Amount (Rs.)
.)/month
18203.15
18203.15

Operator

Foreman

0.25

18203.15

4550.79

Mechanic

0.25

15808.00

3952.00

Electrician

0.25

15808.00

3952.00

Supervisor

15808.00

0.00

Driver

15808.00

0.00

Sub Total

30657.93

Casual
2

12064.00

24128.00

Watchman

Helper

0.25

13728.00

3432.00

Cable Man

13728.00

0.00

Beldar

12064.00

0.00

Sub Total

27560.00

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

39684.35
97902.28

Total Crew Charges/month


Total Crew Charges/year
Hourly Crew Charges

1174827.34
587.41

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 30%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine Capacity in Kw
Hourly fuel consumption (in litres)
Effective fuel consumption per hour
Rate of Electricity
Cost of Electricity
Cost of oil and lubricant @ 27.50%
Sundries and Misc. supplied
Hourly POL cost (Electricity)

C1
C2

0.8
1

0
0

Total POL cost

49
8.62
8.62
46.41
400.24
120.07
10.79
531.11
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00

531.11

Hourly Use Rate of the Equipment


[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

say,

1278.27
1278

1598

Rate analysis of Water Tanker


Cost of Equipment (Rs.)
Scheduled Life in years

550,000

10

Scheduled Life in hours


Life time repair provision (% of Cost of Equipment)
Estimated annual operational hours =

16000
120
2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours
Average hourly dereciation (Rs.)

49500.00
61875.00
55687.50

27.84

B Hourly Repair Charges


Average over lifetime (Rs.)

41.25

C Labour Charges

Wages(Rs
Amount (Rs.)
.)/month
18203.15
0

Foreman

18203.15

Mechanic

0.25

15808.00

3952

Electrician

15808.00

Supervisor

15808.00

Driver

15808.00

31616

Sub Total

35568

Regular

Nos.
Operator

Casual
Helper

12064.00

12064

Watchman

13728.00

Cable Man

13728.00

Beldar

12064.00

Sub Total

12064

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

35089.6
82721.6

Total Crew Charges/month


Total Crew Charges/year
Hourly Crew Charges

992659.2
496.3296

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 30%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine Capacity in Kw
Hourly fuel consumption (in litres)
Effective fuel consumption per hour
Rate of Electricity
Cost of Electricity
Cost of oil and lubricant @ 27.50%
Sundries and Misc. supplied
Hourly POL cost (Electricity)

C1
C2

0.3
1.4

0
0

Total POL cost

180
16.63
16.63
46.41
771.89
231.57
4.13
1007.58
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1007.58

Hourly Use Rate of the Equipment


[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

say,

1573.01
1573

1966

Rate analysis of Compressor XA175


Cost of Equipment (Rs.)
Scheduled Life in years

759,321

10

Scheduled Life in hours


Life time repair provision (% of Cost of Equipment)
Estimated annual operational hours =

12000
100
2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours
Average hourly dereciation (Rs.)

68338.89
113898.15
91118.52

45.56

B Hourly Repair Charges


Average over lifetime (Rs.)

63.28

C Labour Charges
Regular

Nos.
Operator

Wages(Rs
Amount (Rs.)
.)/month
18203.15
18203.15

Foreman 0.125 18203.15

2275.39

Mechanic

0.25

15808.00

3952.00

Electrician

15808.00

0.00

Supervisor

15808.00

0.00

Driver

15808.00

0.00

Sub Total

24430.54

Casual
1

12064.00

12064.00

Watchman

Helper

0.25

13728.00

3432.00

Cable Man

13728.00

0.00

Beldar

12064.00

0.00

Sub Total

15496.00

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

28067.23
67993.77

Total Crew Charges/month


Total Crew Charges/year
Hourly Crew Charges

815925.25
407.96

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 30%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine Capacity in Kw
Hourly fuel consumption (in litres)
Effective fuel consumption per hour
Rate of Electricity
Cost of Electricity
Cost of oil and lubricant @ 27.50%
Sundries and Misc. supplied
Hourly POL cost (Electricity)

C1
C2

1
1

0
0

Total POL cost

50
11.00
11.00
46.41
510.51
153.15
6.33
669.99
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00

669.99

Hourly Use Rate of the Equipment


[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

say,

1186.79
1187

1484

Rate analysis of Compressor XAH210


Cost of Equipment (Rs.)
Scheduled Life in years

968,828

10

Scheduled Life in hours


Life time repair provision (% of Cost of Equipment)
Estimated annual operational hours =

12000
100
2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours
Average hourly dereciation (Rs.)

87194.49
145324.15
116259.32

58.13

B Hourly Repair Charges


Average over lifetime (Rs.)

80.74

C Labour Charges
Regular

Nos.
Operator

Wages(Rs
Amount (Rs.)
.)/month
18203.15 18203.146

Foreman 0.125 18203.15 2275.39325


0.25

15808.00

3952

Electrician

Mechanic

15808.00

Supervisor

15808.00

Driver

15808.00

Sub Total 24430.5393


Casual
1

12064.00

12064

Watchman

Helper

0.25

13728.00

3432

Cable Man

13728.00

Beldar

12064.00

Sub Total

15496

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

28067.2314
67993.77065

Total Crew Charges/month


Total Crew Charges/year
Hourly Crew Charges

815925.2478
407.962624

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 30%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine Capacity in Kw
Hourly fuel consumption (in litres)
Effective fuel consumption per hour
Rate of Electricity
Cost of Electricity
Cost of oil and lubricant @ 27.50%
Sundries and Misc. supplied
Hourly POL cost (Electricity)

C1
C2

1
1

0
0

Total POL cost

60
13.20
13.20
46.41
612.61
183.78
8.07
804.47
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00

804.47

Hourly Use Rate of the Equipment


[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

say,

1351.30
1351

1689

Rate analysis of Jack Hammer


Cost of Equipment (Rs.)
Scheduled Life in years
Scheduled Life in hours

60,500

10
8000

Life time repair provision (% of Cost of Equipment)


Estimated annual operational hours =

80
2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours

5445.00
13612.50

Average hourly dereciation (Rs.)

9528.75

4.76

B Hourly Repair Charges


Average over lifetime (Rs.)

6.05

C Labour Charges

Operator

Wages(Rs
Amount (Rs.)
.)/month
18203.15
18203.15

Foreman

18203.15

Regular

Nos.

Mechanic 0.125 15808.00

0.00
1976.00

Electrician

15808.00

0.00

Supervisor

0.33

15808.00

5269.33

15808.00

0.00

Sub Total

25448.48

12064.00

6032.00

Watchman 0.125 13728.00

1716.00

Driver
Casual
Helper

0.5

Cable Man

13728.00

Beldar

12064.00

0.00

Sub Total

7748.00

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

0.00

24620.18
57816.66

Total Crew Charges/month


Total Crew Charges/year

693799.95

Hourly Crew Charges

346.90

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 27.5%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine Capacity in Kw
Hourly fuel consumption (in litres)
Effective fuel consumption per hour
Rate of Electricity
Cost of Electricity
Cost of oil and lubricant @ 27.50%
Sundries and Misc. supplied
Hourly POL cost (Electricity)

C1
C2

0
0

0
0

Cost of air for 100 cfm


Cost of air for 160 cfm
Lubricants- 30% of cost of air
Sundries and Misc. supplied @ 10 % (B) above
Hourly POL cost (Pneumatic)

Total POL cost

0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00

217.25
347.60
104.28
0.61
452.48

452.48

Hourly Use Rate of the Equipment


[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

say,

810.19
810

1013

Rate analysis of Tata 909


Cost of Equipment (Rs.)
Scheduled Life in years

1,624,487

10

Scheduled Life in hours


Life time repair provision (% of Cost of Equipment)
Estimated annual operational hours =

12000
175
2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours
Average hourly dereciation (Rs.)

146203.80
243673.00
194938.40

97.47

B Hourly Repair Charges


Average over lifetime (Rs.)

236.90

C Labour Charges
Regular

Nos.
Operator

Wages(Rs
Amount (Rs.)
.)/month
18203.15
18203.15

Foreman 0.125 18203.15

2275.39

Mechanic 0.1667 15808.00

2634.67

Electrician

15808.00

0.00

Supervisor

15808.00

0.00

Driver

15808.00

0.00

Sub Total

23113.21

12064.00

12064.00

Casual
Helper

Watchman 0.1667 13728.00

2288.00

Cable Man

13728.00

Beldar

12064.00

0.00

Sub Total

14352.00

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

0.00

26384.16
63849.37

Total Crew Charges/month


Total Crew Charges/year
Hourly Crew Charges

766192.45
383.10

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 25%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine Capacity in Kw
Hourly fuel consumption (in litres)
Effective fuel consumption per hour
Rate of Electricity
Cost of Electricity
Cost of oil and lubricant @ 27.50%
Sundries and Misc. supplied
Hourly POL cost (Electricity)

C1
C2

0.3
1.4

0
0

Total POL cost

180
16.63
16.63
46.41
771.89
192.97
23.69
988.55
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00

988.55

Hourly Use Rate of the Equipment


[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

say,

1706.02
1706

2133

Rate analysis of Tipper


Cost of Equipment (Rs.)
Scheduled Life in years

1,624,487

10

Scheduled Life in hours


Life time repair provision (% of Cost of Equipment)
Estimated annual operational hours =

12000
175
2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours
Average hourly dereciation (Rs.)

146203.80
243673.00
194938.40

97.47

B Hourly Repair Charges


Average over lifetime (Rs.)

236.90

C Labour Charges
Regular

Nos.
Operator

Wages(Rs
Amount (Rs.)
.)/month
18203.15
18203.15

Foreman 0.125 18203.15

2275.39

Mechanic 0.1667 15808.00

2634.67

Electrician

15808.00

0.00

Supervisor

15808.00

0.00

Driver

15808.00

0.00

Sub Total

23113.21

12064.00

12064.00

Casual
Helper

Watchman 0.1667 13728.00

2288.00

Cable Man

13728.00

Beldar

12064.00

0.00

Sub Total

14352.00

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

0.00

26384.16
63849.37

Total Crew Charges/month


Total Crew Charges/year
Hourly Crew Charges

766192.45
383.10

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 25%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine Capacity in Kw
Hourly fuel consumption (in litres)
Effective fuel consumption per hour
Rate of Electricity
Cost of Electricity
Cost of oil and lubricant @ 27.50%
Sundries and Misc. supplied
Hourly POL cost (Electricity)

C1
C2

0.3
1.4

0
0

Total POL cost

180
16.63
16.63
46.41
771.89
192.97
23.69
988.55
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00

988.55

Hourly Use Rate of the Equipment


[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

say,

1706.02
1706

2133

Rate analysis of Spider Excavator


Cost of Equipment (Rs.)
Scheduled Life in years

###

Scheduled Life in hours


Life time repair provision (% of Cost of Equipment)
Estimated annual operational hours =

10

12000
100
2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours
Average hourly dereciation (Rs.)

1377000.00
2295000.00
1836000.00

918.00

B Hourly Repair Charges


Average over lifetime (Rs.)

1275.00

C Labour Charges
Regular

Nos.

Wages(Rs
Amount (Rs.)
.)/month
18203.15
18203.15

Operator

Foreman

0.25

18203.15

4550.79

Mechanic

0.25

15808.00

3952.00

Electrician

15808.00

0.00

Supervisor

15808.00

0.00

Driver

15808.00

0.00

Sub Total

26705.93

Casual
1

12064.00

12064.00

Watchman

Helper

0.25

13728.00

3432.00

Cable Man

13728.00

0.00

Beldar

12064.00

0.00

Sub Total

15496.00

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

29887.55
72089.48

Total Crew Charges/month


Total Crew Charges/year
Hourly Crew Charges

865073.74
432.54

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 25%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine Capacity in Kw
Hourly fuel consumption (in litres)
Effective fuel consumption per hour
Rate of Electricity
Cost of Electricity
Cost of oil and lubricant @ 27.50%
Sundries and Misc. supplied
Hourly POL cost (Electricity)

C1
C2

0.5
1

0
0

Total POL cost

78
8.58
8.58
46.41
398.20
99.55
127.50
625.25
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00

625.25

Hourly Use Rate of the Equipment


[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

say,

3250.78
3251

4064

Rate analysis of Explosive Van


Cost of Equipment (Rs.)
Scheduled Life in years

481,781

15

Scheduled Life in hours


Life time repair provision (% of Cost of Equipment)
Estimated annual operational hours =

20000
70
2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours
Average hourly dereciation (Rs.)

28906.86
43360.29
36133.58

18.07

B Hourly Repair Charges


Average over lifetime (Rs.)

16.86

C Labour Charges

Operator

Wages(Rs
Amount (Rs.)
.)/month
18203.15
0

Foreman

18203.15

Regular

Nos.

Mechanic 0.125 15808.00

0
1976

Electrician

15808.00

Supervisor

15808.00

0
0

Driver

15808.00

15808

Sub Total

17784

12064.00

12064

Casual
Helper

Watchman 0.167 13728.00

2288

Cable Man

13728.00

Beldar

12064.00

Sub Total

14352

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

22120.8
54256.8

Total Crew Charges/month


Total Crew Charges/year
Hourly Crew Charges

651081.6
325.5408

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 25%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine Capacity in Kw
Hourly fuel consumption (in litres)
Effective fuel consumption per hour
Rate of Electricity
Cost of Electricity
Cost of oil and lubricant @ 27.50%
Sundries and Misc. supplied
Hourly POL cost (Electricity)

C1
C2

0.3
1.4

0
0

Total POL cost

63
5.82
5.82
46.41
270.16
67.54
1.69
339.39
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00

339.39

Hourly Use Rate of the Equipment


[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

say,

699.86
700

875

Rate analysis of Trailer


Cost of Equipment (Rs.)
Scheduled Life in years

1,307,856

12

Scheduled Life in hours


Life time repair provision (% of Cost of Equipment)
Estimated annual operational hours =

20000
175
2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours
Average hourly dereciation (Rs.)

98089.20
117707.04
107898.12

53.95

B Hourly Repair Charges


Average over lifetime (Rs.)

114.44

C Labour Charges
Regular

Nos.

Wages(Rs
Amount (Rs.)
.)/month
18203.15
0.00

Operator

Foreman

0.25

18203.15

4550.79

Mechanic

0.25

15808.00

3952.00

Electrician

15808.00

0.00

Supervisor

15808.00

0.00

Driver

15808.00

15808.00

Sub Total

24310.79

Casual
1

12064.00

12064.00

Watchman

Helper

0.25

13728.00

3432.00

Cable Man

13728.00

0.00

Beldar

12064.00

0.00

Sub Total

15496.00

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

27971.43
67778.22

Total Crew Charges/month


Total Crew Charges/year
Hourly Crew Charges

813338.59
406.67

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 30%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine Capacity in Kw
Hourly fuel consumption (in litres)
Effective fuel consumption per hour
Rate of Electricity
Cost of Electricity
Cost of oil and lubricant @ 27.50%
Sundries and Misc. supplied
Hourly POL cost (Electricity)

C1
C2

0.3
1.4

0
0

Total POL cost

160
14.78
14.78
46.41
686.13
205.84
11.44
903.41
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00

903.41

Hourly Use Rate of the Equipment


[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

say,

1478.46
1478

1848

Rate analysis of Dewatering 3 HP


Cost of Equipment (Rs.)
Scheduled Life in years

16,569

12

Scheduled Life in hours


Life time repair provision (% of Cost of Equipment)
Estimated annual operational hours =

20000
70
2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours
Average hourly dereciation (Rs.)

1242.67
1491.20
1366.93

0.68

B Hourly Repair Charges


Average over lifetime (Rs.)

0.58

C Labour Charges

Wages(Rs
Amount (Rs.)
.)/month
18203.15
18203.15

Foreman

18203.15

0.00

Mechanic

0.25

15808.00

3952.00

0.125 15808.00

1976.00

Regular

Nos.
Operator

Electrician
Supervisor

15808.00

Driver

15808.00

0.00
0.00

Sub Total

24131.15

Casual
Helper

12064.00

0.00

Watchman

13728.00

0.00

Cable Man

13728.00

0.00

Beldar

12064.00

0.00

Sub Total

0.00

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

19304.92
43436.06

Total Crew Charges/month


Total Crew Charges/year
Hourly Crew Charges

521232.75
260.62

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 30%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine Capacity in Kw
Hourly fuel consumption (in litres)
Effective fuel consumption per hour
Rate of Electricity
Cost of Electricity
Cost of oil and lubricant @ 25%
Sundries and Misc. supplied @ 10%
Hourly POL cost (Electricity)

0
0

0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.238

C1
C2

1
1

Total POL cost

0.00
38.46
86.07
21.52
0.06
107.65

107.65

Hourly Use Rate of the Equipment


[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

say,

369.53
370

462

Rate analysis of Dewatering 5 HP


Cost of Equipment (Rs.)
Scheduled Life in years

77,704

12

Scheduled Life in hours


Life time repair provision (% of Cost of Equipment)
Estimated annual operational hours =

20000
70
2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours
Average hourly dereciation (Rs.)

5827.77
6993.32
6410.55

3.21

B Hourly Repair Charges


Average over lifetime (Rs.)

2.72

C Labour Charges

Wages(Rs
Amount (Rs.)
.)/month
18203.15
18203.15

Foreman

18203.15

0.00

Mechanic

0.25

15808.00

3952.00

0.125 15808.00

1976.00

Regular

Nos.
Operator

Electrician
Supervisor

15808.00

Driver

15808.00

0.00
0.00

Sub Total

24131.15

Casual
Helper

12064.00

0.00

Watchman

13728.00

0.00

Cable Man

13728.00

0.00

Beldar

12064.00

0.00

Sub Total

0.00

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

19304.92
43436.06

Total Crew Charges/month


Total Crew Charges/year
Hourly Crew Charges

521232.75
260.62

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 30%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine Capacity in Kw
Hourly fuel consumption (in litres)
Effective fuel consumption per hour
Rate of Electricity
Cost of Electricity
Cost of oil and lubricant @ 25%
Sundries and Misc. supplied @ 10%
Hourly POL cost (Electricity)

0
0

0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.73

C1
C2

1
1

Total POL cost

0.00
38.46
143.46
35.86
0.27
179.59

179.59

Hourly Use Rate of the Equipment


[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

say,

446.13
446

558

Rate analysis of Dewatering 10 HP


Cost of Equipment (Rs.)
Scheduled Life in years

84,637

12

Scheduled Life in hours


Life time repair provision (% of Cost of Equipment)
Estimated annual operational hours =

20000
70
2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours
Average hourly dereciation (Rs.)

6347.78
7617.33
6982.55

3.49

B Hourly Repair Charges


Average over lifetime (Rs.)

2.96

C Labour Charges

Wages(Rs
Amount (Rs.)
.)/month
18203.15
18203.15

Foreman

18203.15

0.00

Mechanic

0.25

15808.00

3952.00

0.125 15808.00

1976.00

Regular

Nos.
Operator

Electrician
Supervisor

15808.00

Driver

15808.00

0.00
0.00

Sub Total

24131.15

Casual
Helper

12064.00

0.00

Watchman

13728.00

0.00

Cable Man

13728.00

0.00

Beldar

12064.00

0.00

Sub Total

0.00

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

19304.92
43436.06

Total Crew Charges/month


Total Crew Charges/year
Hourly Crew Charges

521232.75
260.62

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 30%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine Capacity in Kw
Hourly fuel consumption (in litres)
Effective fuel consumption per hour
Rate of Electricity
Cost of Electricity
Cost of oil and lubricant @ 27.50%
Sundries and Misc. supplied
Hourly POL cost (Electricity)

0
0

0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.46

C1
C2

1
1

Total POL cost

0.00
38.46
286.91
86.07
0.30
373.29

373.29

Hourly Use Rate of the Equipment


[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

say,

640.36
640

800

Rate analysis of Dewatering 16 HP


Cost of Equipment (Rs.)
Scheduled Life in years

165,173

12

Scheduled Life in hours


Life time repair provision (% of Cost of Equipment)
Estimated annual operational hours =

20000
70
2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours
Average hourly dereciation (Rs.)

12387.95
14865.54
13626.75

6.81

B Hourly Repair Charges


Average over lifetime (Rs.)

5.78

C Labour Charges

Wages(Rs
Amount (Rs.)
.)/month
18203.15
18203.15

Foreman

18203.15

0.00

Mechanic

0.25

15808.00

3952.00

0.125 15808.00

1976.00

Regular

Nos.
Operator

Electrician
Supervisor

15808.00

Driver

15808.00

0.00
0.00

Sub Total

24131.15

Casual
Helper

12064.00

0.00

Watchman

13728.00

0.00

Cable Man

13728.00

0.00

Beldar

12064.00

0.00

Sub Total

0.00

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

19304.92
43436.06

Total Crew Charges/month


Total Crew Charges/year
Hourly Crew Charges

521232.75
260.62

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 30%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine Capacity in Kw
Hourly fuel consumption (in litres)
Effective fuel consumption per hour
Rate of Electricity
Cost of Electricity
Cost of oil and lubricant @ 25%
Sundries and Misc. supplied
Hourly POL cost (Electricity)

0
0

0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.936

C1
C2

1
1

Total POL cost

0.00
38.46
459.06
114.76
0.58
574.40

574.40

Hourly Use Rate of the Equipment


[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

say,

847.61
848

1060

Rate analysis of Dewatering 20 HP


Cost of Equipment (Rs.)
Scheduled Life in years

220,850

12

Scheduled Life in hours


Life time repair provision (% of Cost of Equipment)
Estimated annual operational hours =

20000
70
2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours
Average hourly dereciation (Rs.)

16563.75
19876.50
18220.13

9.11

B Hourly Repair Charges


Average over lifetime (Rs.)

7.73

C Labour Charges

Wages(Rs
Amount (Rs.)
.)/month
18203.15
18203.15

Foreman

18203.15

0.00

Mechanic

0.25

15808.00

3952.00

0.125 15808.00

1976.00

Regular

Nos.
Operator

Electrician
Supervisor

15808.00

Driver

15808.00

0.00
0.00

Sub Total

24131.15

Casual
Helper

12064.00

12064.00

Watchman

13728.00

0.00

Cable Man

13728.00

0.00

Beldar

12064.00

0.00

Sub Total

12064.00

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

25940.12
62135.26

Total Crew Charges/month


Total Crew Charges/year
Hourly Crew Charges

745623.15
372.81

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 30%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine Capacity in Kw
Hourly fuel consumption (in litres)
Effective fuel consumption per hour
Rate of Electricity
Cost of Electricity
Cost of oil and lubricant @ 25%
Sundries and Misc. supplied
Hourly POL cost (Electricity)

0
0

0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14.92

C1
C2

1
1

Total POL cost

0.00
38.46
573.82
143.46
0.77
718.05

718.05

Hourly Use Rate of the Equipment


[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

say,

1107.70
1108

1385

Rate analysis of Dewatering 25 HP


Cost of Equipment (Rs.)
Scheduled Life in years

108,227

12

Scheduled Life in hours


Life time repair provision (% of Cost of Equipment)
Estimated annual operational hours =

20000
70
2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours
Average hourly dereciation (Rs.)

8117.03
9740.44
8928.74

4.46

B Hourly Repair Charges


Average over lifetime (Rs.)

3.79

C Labour Charges

Wages(Rs
Amount (Rs.)
.)/month
18203.15
18203.15

Foreman

18203.15

0.00

Mechanic

0.25

15808.00

3952.00

0.125 15808.00

1976.00

Regular

Nos.
Operator

Electrician
Supervisor

15808.00

Driver

15808.00

0.00
0.00

Sub Total

24131.15

Casual
Helper

12064.00

12064.00

Watchman

13728.00

0.00

Cable Man

13728.00

0.00

Beldar

12064.00

0.00

Sub Total

12064.00

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

25940.12
62135.26

Total Crew Charges/month


Total Crew Charges/year
Hourly Crew Charges

745623.15
373

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 30%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine Capacity in Kw
Hourly fuel consumption (in litres)
Effective fuel consumption per hour
Rate of Electricity
Cost of Electricity
Cost of oil and lubricant @ 25%
Sundries and Misc. supplied
Hourly POL cost (Electricity)

0
0

0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
18.65

C1
C2

1
1

Total POL cost

0.00
38.46
717.28
179.32
0.38
896.98

896.98

Hourly Use Rate of the Equipment


[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

say,

1278.23
1278

1598

Rate analysis of Dewatering 35 HP


Cost of Equipment (Rs.)
Scheduled Life in years

234,375

12

Scheduled Life in hours


Life time repair provision (% of Cost of Equipment)
Estimated annual operational hours =

20000
70
2000

A Ownership cost
Yearly dereciation wrt life in years
Yearly dereciation wrt life in hours
Average hourly dereciation (Rs.)

17578.13
21093.75
19335.94

9.67

B Hourly Repair Charges


Average over lifetime (Rs.)

8.20

C Labour Charges

Wages(Rs
Amount (Rs.)
.)/month
18203.15
18203.15

Foreman

18203.15

0.00

Mechanic

0.25

15808.00

3952.00

0.125 15808.00

1976.00

Regular

Nos.
Operator

Electrician
Supervisor

15808.00

Driver

15808.00

0.00
0.00

Sub Total

24131.15

Casual
Helper

12064.00

12064.00

Watchman

13728.00

0.00

Cable Man

13728.00

0.00

Beldar

12064.00

0.00

Sub Total

12064.00

Add for hidden cost 80 % on Skilled Labour & 55 % on


semi skilled/unskilled Labour

25940.12
62135.26

Total Crew Charges/month


Total Crew Charges/year
Hourly Crew Charges

745623.15
372.81

D POL and Energy Charges


F.H.P. of Engine
Hourly fuel consumption (in litres)
C1
Effective fuel consumption per hour
C2
Rate of Diesel
Cost of Diesel
Cost of oil and lubricant @ 30%
Sundries and Misc. supplied @ 10 % of (B) above
Hourly POL cost (Diesel)
Engine Capacity in Kw
Hourly fuel consumption (in litres)
Effective fuel consumption per hour
Rate of Electricity
Cost of Electricity
Cost of oil and lubricant @ 25%
Sundries and Misc. supplied
Hourly POL cost (Electricity)

0
0

0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
26.11

C1
C2

1
1

Total POL cost

0.00
38.46
1004.19
251.05
0.82
1256.06

1256.06

Hourly Use Rate of the Equipment


[(a) + (b)+ (c) + (d) ]

Hence hourly use rate

say,

1646.74
1647

2058

Equipment
Description

S.No

Invoice Rate

Landed
cost

2.00

3.00

0.02
1

Dozer

8,000,000.00 ###

ROC

18,665,000.00 ###

2 Boom Drill Jumbo

28,000,000.00 ###

600 KVA Diesel Generato

3,089,049.60 ###

Excavator

4,612,746.00 ###

Hyva

1,605,116.58 ###

Loader

7,843,137.00 ###

Welding Machine

Batching Plant

3,262,674.00 ###

10

JCB 3DX

1,745,000.69 ###

11

Concrete Pump

1,836,000.00 ###

12

Transit Mixer

13

Grout Pump

14

Wet Shotcrete Machine

15

Dewatering 10 HP

84,637.00

84,637.00

16

Dewatering 20 HP

220,850.00

220,850.00

17

Dewatering 35 HP

234,375.00

234,375.00

19,588.40

938,829.00

19,588.40

938,829.00

2,920,243.53 ###
29,054,171.48 ###

18

Ventilation Fan

922,549.00 ###

19

Atlas Copco XAH 210

968,827.68

968,827.68

20

Hydra

863,516.00

863,516.00

21

Water Tanker

550,000.00

550,000.00

22

Compressor XA175

759,321.00

759,321.00

23

Compressor XAH210

968,827.68

968,827.68

24

Jack Hammer

60,500.00

60,500.00

25

Tata 909

1,592,634.00 ###

26

Tipper

1,592,634.00 ###

27

Spider Excavator

28

320KVA Diesel Generato

29

Dewatering 3 HP

16,244.00

16,568.88

30

Dewatering 5 HP

76,180.00

77,703.60

31

Dewatering 16 HP

161,934.00

165,172.68

32

Dewatering 25 HP

106,105.00

108,227.10

33

Explosive Van

34

Trailer

35
36
37
38

Rate of Diesel
Air Charges/100 cfm
XA 280

15,000,000.00 ###
1,350,000.00 ###

481,781.00
###
46.41
217.25
8,93,937.00

Explosive
ED
NED
Rockbolt
Cement
Sand
Aggregate
Accelerator

Micro Silica
AEA
WRA
Superplasticizer
Reinforcement
Structural Steel
Polyfibre
Diesel
Boulder

52.94
13.51
74.02
143.01
345.00
1,129.00
2,470.00
34.98
26.15
30.50
30.50
30.50
35,350.00
45,105.00
261.98
42.19

cfm of XAH 210

450

cfm of XAH 175

360
Air Charges Calculation - XAH 210

Hourly use rate of 450 cfm diesel air compressor

1777

Rate for 100 cfm including losses

434

Considering 50 % usage
Air Charges

217.247567
217.2475674

Air Charges Calculation - XA 280


Hourly use rate of approx. 500 cfm diesel air compressor
Rate for 100 cfm including losses

1656
364

Considering 50 % usage
Air Charges

182.135713
182.1357132

Equipment
Description

S.No

work
Hourly use
order
rate
rate

Dozer

5,393

ROC

6,900

2 Boom Drill Jumbo

22,545

600 KVA Diesel Generato

11,101

320 KVA Diesel Generat

6,150

Excavator

2,800

Hyva

2,204

Loader

5,239

Welding Machine

1,196

10

Batching Plant

9,036

11

JCB 3DX

1,935

12

Concrete Pump

2,166

13

Transit Mixer

968

14

Grout Pump

3,877

15

Wet Shotcrete Machine

16

Dewatering 3 HP

439

17

Dewatering 5 HP

520

18

Dewatering 10 HP

839

19

Dewatering 16 HP

940

20

Dewatering 20 HP

1,226

1226

21

Dewatering 25 HP

1,402

1402

6228

19,334

839

22

Dewatering 35 HP

1,788

23

Ventilation Fan

5,042

24

Atlas Copco XAH 210

1,777

25

Hydra

1,647

26

Water Tanker

1,966

27

Compressor XA175

1,574

28

Compressor XAH210

1,777

29

Jack Hammer

1,441

30

Tata 909

1,997

31

Tipper

1,997

32

Spider Excavator

3,985

33

Explosive Van

34

Trailer

1788

1441

806

806

2,197

2197

Cadre
Unskilled
Semi
Skilled
Skilled

Rate
145
165
190

Highly
Skilled

Sr.
manager

219
###
###
###

Unit Monthly
Cadre
rate
rate
paid
508.20
12,064
Helper,
578.30 13,728 Watchman,
Cable Man
665.92 15,808 Driver,Mech
anic,
Electrician,
766.82 18,203 Supervisor
Operator ,
Foreman,
2,139
6,025
8,324

48,750
###
###

Supervisor

Cadre
Unskilled worker
Helper

Rate/manday
508.20
508.20
508.20

Beldar

578.30
Watchman

578.30
Cableman
Driver
Mechanic
Electrician
Supervisor
Driller
Operator
Foreman
Engineer
Manager

Sr. Manager
Semi Skilled
Skilled
Highly Skilled
Blaster

665.92
665.92
665.92
766.82
766.82
766.82
766.82
2,138.80
6,024.92
8,324.44
578.30
665.92
766.82
766.82

Teesta Urja Limited

Teesta Stage-III HE Project

HOURLY USE RATE CALCULATIONS


3.
NAME OF EQUIPMENT

Compressed Air (100% Diesel)

At each work site of the project where the requirement is concentrated, electric
air comprssor will be used like in HRT, PH etc. However, standby diesel ir compressors are
to be provided at these locations. Further, at the locations where the drilling is spread over l
dam excavation, quarry site etc only diesel comprssor will be provided for flexibilty and redu
For calculating air charges, a compsite rate for 100 cfm air from electric and diesel equally h
worked out.
Hourly use rate of 500 cfm diesel air compressor
Rate for 100 cfm including losses
Considering 50 % usage

Detailed Project Report

###
262.27
131.13

6 :28

Revised Cost Estimate

Teesta Urja Limited

Teesta Stage-III HE Project

ONS

dby diesel ir compressors are


here the drilling is spread over like in
e provided for flexibilty and redundancy.
rom electric and diesel equally has been

Detailed Project Report

6 :29

Revised Cost Estimate

Вам также может понравиться