Академический Документы
Профессиональный Документы
Культура Документы
PROGRAM
Q.No
1
2
A
ASSIGNMENT
Fall 2015
MBADS (SEM 4/SEM 6)
MBAFLEX/ MBA (SEM 4)
PGDOMN (SEM 2)
OM 0017 ADVANCED PRODUCTION PLANNING AND
CONTROL
4
B2010
60
Criteria
Marks
What is the importance of production planning and control?
What factors affect inventory planning and control?
What is the difference between batch and mass production?
List the importance of production
2
planning and control
b. Discuss the three factors that affect 3
inventory planning and control
c. List the differences between batch
5
and mass production
What is a master schedule? Explain.
Define master schedule
1
a.
b.
c.
a.
Discuss
master
the
process
of
master
Total Marks
10
10
scheduling
List
the
characteristics
of
schedule
3
A
What are the different types of planning and scheduling tools? Explain.
1
List the three types of planning and scheduling
10
tools
Discuss the three types of planning and
scheduling tools
4
1
4 (2 marks for each
pillar)
10
He also
Had a discussion with the new planner, Mr. Max, for the current appraisal system. On
the basis of his observations and discussions, Mr. Jackson made certain conclusions.
He stated that Mr. Max was not following the appropriate production process, because
the number of orders accepted for production was more than the resources available at
the production unit. He also stated that the problem was not completely Mr. Maxs fault,
because the organisation did not train him on the existing production process and
neither did they make him aware of the competitors and the market.
Question
What is main issue in the case study? Evaluate why this issue was caused and provide
a solution to resolve it.
Describe the main issue in the case study.
2
10
To evaluate why the issue was caused
Assess if the recruitment of the new
the
problem,
would
Advanced scheduling
Cost centre
Advanced scheduling
10
*A-Answer
Note Answer all questions. Kindly note that answers for 10 marks questions should be approximately of
400 words. Each question is followed by evaluation scheme.
***********