Вы находитесь на странице: 1из 19

http://www.pass4sures.co/C9060-599.

html

Preparing for the Certified Cost Professional exam is


challenging, at the same time a rewarding experience! We
will help with the challenge, you enjoy
the reward! Prepare for the CCP Exam with our world
class learning resources prepared by
renowned experts from the industry.

http://www.pass4sures.co/C9060-599.html

Passing the exam reflects an advanced knowledge of


many different aspects of the culinary field. That
said, your chances of success will increase if you
have a working knowledge of the major ethnic
cuisines, a thorough foundation in techniques, and a
familiarity with sanitation requirements and basic
nutrition.

http://www.pass4sures.co/C9060-599.html

This table provides helpful information and facts about each


pass4sures certification test. You can link directly to test
information page or to the associated certifications page(s).
Planning your goals can be simple and easy.

http://www.pass4sures.co/C9060-599.html

Many of the exam questions are drawn from the sources in the reading
list. A certification review
session is offered during the Annual Conference, typically held in April.
Review sessions can also be
scheduled at other times and in other locales by contacting the CCP
Committee Chair. If you need
additional assistance with your study program, you can arrange
mentoring support through our CCP
Study Hall Program. Again, contact the Committee Chair for more
information.

http://www.pass4sures.co/C9060-599.html

Passing this assessment test does not result in achieving a


credential. It is designed to provide diagnostic feedback on
the Examination Score Report, correlating back to the test
objectives, showing how you scored on each section of the
test.
Number of questions: 65
Time allowed in minutes: 90
Passing score: 69%
Language: English

http://www.pass4sures.co/C9060-599.html

C9060-599 Questions Based on Real Exams


Scenarios
Experts Verified Questions and Answers
Easy to use Testing Engine & print PDF format
Download Free C9060-599 Demo (Try before Buy)
According to recommended syllabus and
Objectives
100% Pass Guaranteed
90 days free updates (testing engine)

http://www.pass4sures.co/C9060-599.html

Pass4sure C9060-599 IBM study guide imparts confidence to its


clients to shake off their exam fears of C9060-599 and get an
assured success, employing only minimum efforts. By using Pass 4
sures Exam C9060-599 products you are assured to pass IT
certification exam with 100% money back guarantee.

http://www.pass4sures.co/C9060-599.html

Question No : 1

What should a customer do to verify any failure of


scheduled jobs or tasks on the standalone GUI for IBM
Tivoli Storage Productivity Center?
A. run a repocopy
B. contact IBM Support
C. run a daily report and check for failures
D. examine the logs for failed jobs or tasks
Answer: D

http://www.pass4sures.co/C9060-599.html

Question No : 2

An IBM Tivoli Storage Productivity Center V5.1 (TSPC)


administrator uses batch jobs for
reporting. Logs are created when the batch jobs run.
Where can these logs be found on a
Windows TSPC server?
A. C:\Program Files\TPC\data\log\report_name.log
B. C:\Program Files\TPC\report\log\report_name.log
C. C:\Program Files\IBM\TPC\data\log\report_name.log
D. C:\Program
Files\IBM\TPC\report\log\report_name.log
Answer: C

http://www.pass4sures.co/C9060-599.html

Question No : 3
A Cognos report was previously customized and saved. What action would
an administrator take to run this report in IBM Tivoli Storage Productivity
Center V5.1 (TSPC)?
A. open the TSPC V5.1 Web-based GUI and select Reporting > Cognos
reporting
B. open the TSPC V5.1 Web-based GUI and select Reporting > View
predefined reports
C. open the TSPC V5.1 Web-based GUI and expand IBM Tivoli Storage
Productivity
Center > Reporting > My Reports
D. open the TSCP V5.1 Web-based GUI and expand IBM Tivoli Storage
Productivity
Center > Reporting > Cognos Reporting
Answer: B

http://www.pass4sures.co/C9060-599.html

Question No : 4
A storage administrator from a customer site attempted to install IBM Tivoli Storage
Productivity Center V5.1 (TSPC) on a new UNIX server. During installation, the
installation
failed with this error message: No valid local database found. The administrator
confirmed
that the correct version of IBM DB2 has been installed successfully and the instance
db2inst1 is running. What important step did the administrator miss before running
the
TSPC installation program?
A. The administrator should have rebooted the server.
B. The administrator should have sourced the DB2 profile.
C. The administrator should have created the SAMPLE database.
D. The administrator should have stopped the DB2admin session.
Answer: D

http://www.pass4sures.co/C9060-599.html

Question No : 5

In provisioning a new storage subsystem, an


administrator might accidentally violate a
zoning-related policy. If the zoning-related configuration
changes persist in the database,
which IBM Tivoli Storage Productivity Center V5.1 feature
can detect this policy violation?
A. Storage Optimizer
B. SAN Policy Manager
C. Analytics Validation tool
D. Configuration Analysis tool
Answer: D

http://www.pass4sures.co/C9060-599.html

Question No : 6

Which panel can specify how far back to keep a history of


the data collected by IBM Tivoli
Storage Productivity Center V5.1?
A. Alert Disposition panel
B. Resource History Retention panel
C. Removed Resource Retention panel
D. Configuration History Settings panel
Answer: B

http://www.pass4sures.co/C9060-599.html

Question No : 7

Retention periods must be set to establish how long data


that is collected by IBM Tivoli
Storage Productivity Center V5.1 will be kept. To set the
retention periods, at which GUI
Navigation Tree location can this information be
configured?
A. Administrative Services > System > Retention
B. Administrative Services > Data > History Retention
C. Administrative Services > Resource History Retention
D. Administrative Services > Configuration > Resource
History Retention
Answer: D

http://www.pass4sures.co/C9060-599.html

Question No : 8

What is the correct path to create a batch report?


A. Administrative Services > Reporting > My Reports >
Reports > Batch Reports
B. IBM Tivoli Storage Productivity Center > Reporting >
My Reports > Batch Reports
C. Administrative Services > Job Management > My
Reports > Reports > Batch Reports
D. IBM Tivoli Storage Productivity Center > Job
Management > My Reports > Batch
Reports
Answer: B

http://www.pass4sures.co/C9060-599.html

Question No : 9

What action would an IBM Tivoli Storage Productivity


Center V5.1 administrator take to
create a new report using Cognos?
A. open the V5.1 Web-based GUI and select Reporting >
Create a Basic Report
B. open the V5.1 Web-based GUI and select Reporting >
Create a Cognos Report
C. open the V5.1 Web-based GUI and expand IBM Tivoli
Storage Productivity Center >
Reporting > Create a Report
D. open the V5.1 Web-based GUI and expand IBM Tivoli
Storage Productivity Center >
Answer: A

http://www.pass4sures.co/C9060-599.html

Question No : 10

What is the primary purpose of the Repocopy tool in IBM


Tivoli Storage Productivity Center
V5.1 (TSPC)?
A. to export all the tables in the TSPC database
B. to detect the system configuration and collect the
applicable information
C. to copy all the logs files to a compressed file that can
be sent to the IBM Support Center
D. to collect information from all installed TSPC
components (i.e Device Manager, GUI,
TIP, and TCR)
Answer: A

http://www.pass4sures.co/C9060-599.html