ITEM
1/18
NO.
ITEM
8
2/18
10
11
12
OVERALL TOTAL
Less 20%
FINAL TOTAL
3/18
4/18
5/18
DESCRIPTION
B/F
Supply all necessary materials and labour and construct mass limestone
rubble wall inclusive to sides of drain. The spalls to be 150mm to 225mm
sizes. Include for packing interstices with 1:3:6-19mm concrete and
jointing and flush pointing faces with cement mortar 1:3.
TURFING (ITEM 2-21-1/SR 31)
Supply blended soil as specified in Section "C" and spread to a
thickness not less than 75mm. Including for fertilizing with 'rock
phosphate' or 'NPK 15.15.15' as specified.
CONSTRUCTION OF NEW ROAD AND ROAD WIDENING
SUPPLY CRUSHER RUN (ITEM 4-2-7/ SR 42)
Supply crusher run stone from an approved quarry and spread over
formation, fill interstices with a proportion of smaller gauge stones
packed to a consolidated thickness or not less than 300 mm and roll in
two layers each of 100mm with a roller of not less than 8 tonne weight
true to line, camber and level.
OVERALL TOTAL
Less 20%
FINAL TOTAL
7/18
8/18
QTY
UNIT
RATES
(RM)
AMOUNT
(RM)
60.00
m3
33.00
1,980.00
130.00
m3
8.60
1,118.00
40.00
m3
18.00
15.00
m3
236.00
3,540.00
6.00
m3
236.00
1,416.00
720.00
9/18
55.00
13.20
726.00
8.00
103.50
828.00
50.00
69.00
3,450.00
13,778.00
QTY
UNIT
RATES
(RM)
AMOUNT
(RM)
13,778.00
10/18
220.00
m3
161.00
35,420.00
300.00
m2
12.00
3,600.00
250.00
m2
27.00
6,750.00
250.00
m2
2.00
500.00
250.00
m2
24.00
6,000.00
66,048.00
13,209.60
52,838.40
11/18
12/18
NO.
ITEM
13/18
TOTAL
Less 20%
FINAL TOTAL
14/18
DESCRIPTION
15/18
TOTAL
Less 20%
FINAL TOTAL
16/18
QTY
UNIT
RATES
(RM)
AMOUNT
(RM)
300.00
m2
220.00
66,000.00
300.00
m2
6.00
1,800.00
100.00
m3
20.70
2,070.00
215.00
200.00
43,000.00
17/18
112,870.00
22,574.00
90,296.00
18/18