Harmonised

Common Structural Rules


Project Status
Industry Presentation
June 2013

Gary Horn, Chair of IACS Hull Panel


Philippe Baumans and ge Be,
IACS Project Management Team
Hasan Ocakli, PM of Consequence Assessment team

IACS Harmonised CSR


Industry Presentations

Welcome, and thank you for


attending

Safety First

Agenda
Topic

Presenter

Welcome & Introduction

G. Horn

Status
1. Schedule
2. Industry feedback and rule changes
Changes to the CSR-H since 1-Jul-2012
1. General Principles
2. Loads
3. Hull Girder & Local Prescriptive Reqts
4. Direct Strength Analysis
5. Buckling Criteria
6. Fatigue Strength
7. Discussions (Q/A)
Consequence Assessment
1. General, scope and method
2. Oil Tankers, prescriptive and FEM
3. Discussions (Q/A)
4. Bulk Carriers, prescriptive and FEM
5. Discussions (Q/A)
General Discussion (Q/A)
June 2013

G. Horn

P. Baumans
. Be

H. Ocakli

All
Welcome

Goal based standards & Harmonised CSR


CSR-OT
CSR-BC

(RCN1 of the 2010 CSRs)

1July

1Apr.

Harmonised CSR

2
30 Jun.

2010

2011

2012
CSR-H
1st Draft Rules

External review period


Technical Committee review
IACS adoption
Entry into force
June 2013

2013

2014

2015

2016

CSR-H
2nd Draft Rules

Deadline of submission to IMO for GBS


verification
( 31 December 2013)

GBS to start
application to
oil tanker and
bulker
(1 July 2016)
Welcome

CSR-H Schedule
C66 Approved
Schedule
First draft (External)

1 Jul 2012

1st Industry Review

1 Jul 31 Dec 2012


(6 months)

Feedback/Re-work

1 Jan 31 Mar 2013


(3 months)

Second draft

1 Apr 2013

2nd Industry Review

1 Apr 31 Aug 2013


(5 months)

Feedback/Re-work

1 Sep 31 Oct 2013


(2 months)

Third (TC) draft


TC Review

1 Nov 2013
1 Nov 15 Dec 2013
(1.5 months)

IACS Adoption

December 2013

Final clean-up

15 Dec 1 Feb 2014

Release Rules

1 Feb 2014
5

2nd Draft of CSR-H Released


Released 1 April 2013

(Website: www.iacs.org.uk)

CSR-H Rule Text.

Technical Background.

Consequence Assessment (based on 31-Dec-2012 internal version).

IACS Press Release.

IACS web site modified to suit.

A working draft showing track changes from 1st external release of


1-Jul-2012 is available upon request.

In Progress items from 1st draft of 1-Jul-2012 addressed as necessary


and labels removed.

2nd Draft of CSR-H Released


2nd Industry Review Period

1 April 2013 ~ 31 August 2013

Industry invited to review and comment during the review period,


and further advised:

This period constitutes the last opportunity for "substantive"


review of the draft harmonized CSR.

There will be a final Technical Committee review of the draft


harmonized Common Structural Rules during the period of
1 Nov 2013 thru 15 Dec 2013, however, this final review is
planned as a non-substantive confirmation of the Rules.

the reason being the schedule for the submission of the CSR-H to
IMO for verification of compliance with the IMO Goal Based
Standards.

Technical Documentation Package to IMO


IACS Common Package, 1st Part

ABS

Other IACS
documents
(UR, PR, UI, etc.)
References

BV

CSR-H
documents

IACS Common Package, 2nd Part


June 2013

CCS

RS

A letter +
Individual Tech.
Doc. Package
to IMO

Note: IACS is working closely with the IMO Secretariat to


coordinate scope and schedule of the GBS
submission package.
Welcome

Detailed Technical Presentations


2nd round of Industry Presentations:
18 June 2013 Athens
20 June 2013 London
24 June 2013 Shanghai
26 June 2013 Busan
28 June 2013 Tokyo

TC Review
Current 2nd Industry Review Period

Now ~ 31 August 2013.

Final TC and Industry Review Period

1 ~ 15 December 2013.

Final review as a non-substantive confirmation of the Rules.

Final adoption by IACS Council during mid-December 2013.

Ready for the submission of the CSR to IMO for verification of


compliance with the IMO Goal Based Standards.

10

Time schedule
Schedule
Knowledge Centre
IACS Organisation

Harmonised CSR - Time Schedule

June 2013

12

IACS Knowledge Centre


IACS knowledge centre address: http://www.iacs-csrkc.org.uk
Accessible by anyone
Comments and questions received from

120

Industry
Answers provided by IACS groups
(HPTs, PMTs, Hull panel, etc )
Questions Received

100

Total 300 Q

80
60
40

Jun 2013

May 2013

Apr 2013

Mar 2013

Feb 2013

Jan 2013

Dec 2012

Nov 2012

Oct 2012

Sep 2012

Aug 2012

Jul 2012

20

Industry contact through: csr@iacs.org.uk


June 2013

13

IACS CSR Organisation


IACS Council

SG/CSR
(ABS, BV, LR, NK, Rina)

GPG

EG/GBS

CSR
Secretariat

PT/GBS

Hull Panel
(13 members)

Project Management Team


CSR Harmonization
(BV, DNV)

CSR
Maintenance

11 Project Teams
CSR-H
June 2013

14

Harmonisation of CSR-OT & CSR-BC


2006
April
2006
CSR EIF

2007

2008

Harmonization
Detail Plan

2009

2010

2011

2012

2013

PMT Project Management Team


(BV, DNV)
1 - Wave Load (BV)
2 Buckling (CCS)

Submission to
IMO
for GBS
(Dec 2013)

3 - Finite Element Analysis (KR)


4 - Corrosion additions (ABS)
5 Welding (RS)

CSR-H Deliverables

7 - Ship in operation (Rina)

1. Common part

8 Fatigue (DNV)

2. Part for specific ship


types (oil tanker and
bulk carrier)
June 2013

9 - Prescriptive Requirements (BV/DNV)


10 Consequence Assessment (LR)

Total staff: 71
15

Technical issues solved in ER April 2013

LC for FE Number of LC for FE assessment


Governing Load Cases identified per ship type for
Midship region
Outside Midship
Work in progress for foremost and
aftmost cargo hold

Fatigue
Improvement for prescriptive and FE fatigue assessment

Buckling
Improvement of Ch 8, Sec 5, Tab 2 case 2 (Simple support with y)
Improvement of plate buckling - side shell in single side bulk carriers
June 2013

16

Goal Based Standards


Residual strength after collision or grounding
Introduced in Pt 1, Ch 5, Sec 3

Structural redundancy
Technical background is under development
Conclusion: Ship structure, i.e. stiffened panels with scantlings in
accordance with CSR have inherent redundancy and do not need
reinforcement for this purpose

Fatigue Vibration due to whipping / springing


Implicitly covered for a very large part of ships as it is included in
the experience from operation
Technical background Report is under development
June 2013

17

Goal based standards


CSR-H
Text

Survey
Panel

PT/GBSGAPS

Yes

Yes

(Yes)

Yes

10 Design transparency

(Yes)

Yes

11 Construction quality procedures

(Yes)

Yes

12 Survey during construction

(Yes)

Yes

Yes

Yes

Yes

No.

Functional Req.

1 Design Life

8 Watertight & Weathertight integrity
9 Human element consideration

13 Survey and maintenance


14 Structural accessibility
15 Recycling

Reference to IACS
Guidelines
June 2013

18

Main Rule Updates between July 2012 and


April 2013

Table of content ER April 2013 - 1/2


Part 1: General Hull Requirements
Grab 20, 30, 35t

Envelop
method
removal
SSS BC
modification

Removal of
IMO PSPC
Reduction of
fatigue loads

Reduction of
FE LC
June 2013

Main Modifications :
20

Table of content ER April 2013 - 2/2


Part 1: General Hull Requirements

Improvement

June 2013

Part 2: Ship Type Requirements

Protection
against
wire rope

21

Main Rule updates Pt 1 Ch 1 to 3

Ch 1: Rule General
Principles

Sec 1, [3.2.2]: Grab notation 35, 30, 20t


Sec 2: Many minor editorial corrections

Ch 2: General
Arrangement Design

Sec 4, [1]: Closed spaces must be accessible for easy inspection


Sec 4: Corrosion protection: removal of IMO PSPC for ballast tanks
Sec 6: Structural detail principles
[5.2] Connection of stiffener to PSM :

Ch 3: Structural
Design Principles

June 2013

Detail calculation when spacings are different


[7.5] Bilge strake: Removed as duplicated in Ch 6 Sec 4
Sec 7:Structural idealisation
[1.3.2] Effective breadth PSM: new formula but similar results
[1.4.2] Bulb section equivalency to Inverted Angle in net
[1.4.6] Z plastic: error correction with sin(w)

22

Main Rule updates Pt 1 Ch 4 - 1/2


Loads

Sec 2: Dynamic load cases

Table 5: CWH increased by 10% except for OST/OSA cases in


strength assessment

Sec 3: Ship motions & accelerations


Coeficient ffa = 0.9 for fatigue, introduced in fp factor (Mwv)

Sec 4: Hull girder loads

Cv and Ch removed and replaced by a 0.9 coefficient for


Ch 4: Loads

fatigue analysis (Mwv, Mwh and Mwt)

fnlh = 0.9 for strength & fnlh = 1 for fatigue :

Mwh reduced for OST/OSA in strength assessment

Sec 5:External loads


Tab 14 : Editorial correction ( fxl =0.7 )
ffa = 0.9 for fatigue introduced in fp factor (Pressure)
[2.2.3] Green see loads: PD-min = 0 for FE analysis
[3.2.1] Bottom slamming pressure case 2: (ztop-z) instead of ztop
in formula and fSL coefficient

June 2013

23

Main Rule updates Pt 1 Ch 4 - 2/2


Loads

Sec 6 Internal loads

fdc: new coefficient for dry cargo in fatigue fdc = 0.5 used in Pbd in

[2.4.3]
MH and MHD defined for 50% consumables
Steel coils: correction of loads on hopper side by cosh :

[4.2.2] & [4.3.2]: correction of Fsc-hs and Fsc-hs-s

Sec 8 Loading conditions

Identification of loading condition with Max SFLC


Cleaning of the large number of footnotes in tables (already

Ch 4: Loads

mentioned in the rule text)


Midship tables: clerical error
Outside midship: introduction of governing LC in tables
Foremost and aftmost CH: reduction of LC but work still in
progress
Introduction of missing check existing in the CSR-BC, URS25 and
CSR-H text in line with the hold mass curves.
Additional tables for fatigue analysis outside midship.

App 1: Hold mass curves


Re-analysis and presentation by ship type for seagoing and
harbour in same table.

June 2013

24

Main Rule updates Pt 1 Ch 5 & 6


Prescriptive Requirements

Sec 1 HG Yielding

Ch 5:
Hull Girder Strength

Sec 2 HG Ultimate strength

Ch 6:
Hull Local Scantling

Use of a and b instead of l and s


[2.2] Correction for bilge plate

Sec 6 Primary supporting members and pillars

June 2013

Rearrangement of Tab 1 and add a row for other plates

Sec 4 Plating

Tab 1, DL-1 draught = TBAL instead of TSC

Sec 3 Minimum thickness

Scope: clarification of scope in [1.1.1] including SS above FB deck, exposed deck


of superstructure and internal decks except inside superstructure and deckhouse.

Sec 2 Load application

Incremental method only - Single Step Ultimate Capacity method removed.

Sec 1 General

Clarification of the Msw for the different design load scenarios

App 2 HG Ultimate capacity

[3.4.6] Equivalent thickness of corrugated bhd provided for oil Tanker

PSM to be calculated in flooded conditions

25

Main Rule updates Pt 1 Ch 7


Direct Strength Analysis
Sec 2 Cargo hold structural strength analysis

Envelop method removed. Only individual method to be used.


[2.2.2] Simplification for modelling the structure fwd the

Ch 7: Direct Strength
Analysis

foremost CH
[2.4.4] Corrugation: dummy rod elements to be modelled at
intersection between flange and web
[2.5.3] Boundary condition of aftmost CH: same as for midship
[2.5.4] End constraint beam characteristics: Area modified
[4.2] Green sea loads on hatch cover to be considered
[4.3.3] Qtarg aft and fwd redefined
[4.4.5] HG Shear force adjustment procedure revisited.
Introduction of Method 1 and Method 2 using SFLC
[4.4.9] Procedure to adjust vertical and horizontal bending
moments outside midship
[5.2.3] Tab 12 harmonised with tab for buckling, for the vertical
corrugated bhd with and w/o lower stool

Sec 3 Local structural strength analysis

Fine mesh - Mandatory details


Connections between deck and double bottom

longitudinal stiffeners and adjoining structures of


transverse bhd:
Clarification of the required fine mesh to be analysed

June 2013

26

Main Rule updates Pt 1 Ch 8 - 1/3


Buckling
Sec 2: Slenderness requirements
Geometry of the stiffener in Net thickness
Plate panel: ReH can be based on mild steel provided the bucklng

requirements for prescriptive/ FE buckling comply with mild steel.

Sec 3 Prescriptive requirements


[3.2.1] Vertically stiffened side shell plating of Single Side Shell BC

between hopper and top side tanks: Cases of Table 2 (Sec 5)


corresponding to the shorter edge clamped to be considered together
with a mean y stress and y = 1.

[3.3.1] Side frame of single side shell of BC considered as stiffener


Ch 8: Buckling

for buckling assessment

Sec 4 Buckling requirements for FE


[2.3.3] d) Clerical correction in definition of a
[2.4] Reference stress using stress based reference stress only (App 1)
Displacement based reference stress removed.

[4.1.1] Side shell of single side shell of BC: shorter edge of EPP
considered clamped and x = y = 1

[4.1.2] Side frame of single side shell of BC considered as stiffener


for the buckling assessment

June 2013

27

Main Rule updates Pt 1 Ch 8 - 2/3


Buckling
Sec 5: Buckling capacity
[2.2.5] Ftran = 1.15 for single side shell of BC
[2.2.7] Applied stresses: stresses from beam/grillage analysis to be
corrected for Poisson effects ().

Ch 8: Buckling

June 2013

Tab 2: Plane plate panels


Case 2 (Simple support with y)
New case 7 (long edge clamped with y)
Corrections for case 8 (Short edge clamped with x)
New case 9 (Short edge clamped with y)
Corrections for case 10 (4 edges clamped with x)
New case 12 (4 edges clamped with )
Tab 3 Curved plate panels:
Editorial corrections
C value needs not to be taken less than expanded plane panel
[2.3.4] Stiffener capacity: yw modified for angle and bulb profile.
[2.3.5] Effective breadth modified.
Tab 6 Clerical modification for Cwarp of the 4th Case
28

Main Rule updates Pt 1 Ch 8 - 3/3


FE Buckling
App1 Stress based Reference Stress
Regular panel
Longitudinal stress: a) quadratic distribution for plate buckling
b) weighted average for stiffener buckling

Ch 8: Buckling

Transverse stress: no modification (linear distribution)


Irregular panel
Weighted average approach with x = y = 1

Max => Plate buckling


Average =>
Stiff. buckling

El. 1

El. 2

El. 3

a
June 2013

El. 4

El. 5

x
29

Main Rule updates Pt 1 Ch 9


Fatigue

Ch 9: Fatigue

Re-arrangement of the sections.


Sec 1 General considerations

Sec 2 Structural details to be assessed

[4.1.1] Non linear factor introduced i.w.o. the water surface fNL and effective
breadth modified.
[4.2.6] Clarification for relative displacement in stress range.
Tab 4 stress concentration factors revised.
[5.3] Clarification for the methodology to apply in case of alternative design.

Sec 5: FE Stress analysis

[3.1.2] and [4.2.3] Read out stress


Average from each side of AA line and linear interpolation at xshift.
[4.3.1] Hot spot in the web: HS = shift
Tab 2 Stress magnification factor for Screening is revised.

Sec 6: Design standards for details

June 2013

[3.2.1] Mean stress effect: mCor, i(j), max, ReEq


[3.3.1] Thickness effect: improvement for cruciform joint and clarification
between welded and non welded details for the n value

Sec 4: Simplified stress analysis

Improvement of the figures for hot spots in Tables 4 through 18.

Sec 3: Fatigue evaluation

Material with ReH > 390 MPa or with fatigue performance: S-N Curves to be
considered on a case-by-case basis.

Distance to knuckle < 50mm


30

Main Rule updates Pt 1 Ch11 & Ch12


Sec 1: Superstructures, deckhouses and companionways
Ch 11:
Superstructure,
Deckhouses and Hull
Outfitting

[1.1.1] Scope clarified.


[3.1] Superstructure sides and decks
[3.2.1] Plating instead of deck plating of exposed decks
[3.2.3] Beams and stiffeners instead of deck beams & long
deck stiff.

Sec 1: Construction and fabrication

[3.3.1] bent plates: scope changed. 2 bullets apply only for


Ch 12: Construction
and Welding

corrugated bhd subject to lateral liquid pressure.

Sec 3: Design of weld joints

[2.2.2] clarification of a few items

June 2013

31

Main Rule updates Pt 2 Ch 1 & 2


Sec 2: Structural design principles
[3.3.4] Hatchways: added requirements for protection against
wire rope.

Ch 1: Bulk Carriers

Sec 3: Hull local scantling


[1.1.1] Side frame area: 1.1 coefficient was missing.
[2.3.1], [2.3.2], [2.4.1] and [2.4.2] Steel coils, correction due to unit
modification of F in Ch 4

Sec 5: Hatch covers


Ch 2: Oil Tankers

Tab 3: consistency with Ch. 8


[4.1.7]: Self weight to be considered for hatch cover analysis.

Sec 3: Hull local scantling


[1.5.4] Deck transverse adjacent to transverse bhd: missing with
regard to CSR-OT.

June 2013

32

What Next?
Consequence assessment
Schedule

Consequence assessment ships


Bulk carriers

Oil tankers
ID

Type

Lpp

Tsc

Dwt

180200

OT-1

VLCC 1

319

60

23

30

318000

25

180000

OT-2

VLCC 2

324

60

21

29

330000

18

25

205000

OT-3

Suezmax1

264

48

17

24

158000

43

15

21

114500

OT-4

Suezmax2

264

50

17

23

163000

248

43

15

20

115000

OT-5

Aframax 1

240

42

15

22

97000

Panamax 1

225

32

14

20

82000

OT-6

Aframax 2

240

44

15

21

103000

BC-7

Panamax 2

223

32

15

20

81000

OT-7

Aframax 3

234

42

15

21

105000

BC-8

Handymax 1

183

32

13

18

53000

OT-8

Panamax1

220

32

15

21

76000

BC-9

Handymax 2

185

32

13

18

57000

OT-9

Panamax2

219

32

15

21

74000

BC-10

Handymax 3

185

32

14

18

48000

OT-10

Handymax1

176

32

13

18

51000

ID

Type

Lpp

Tsc

Dwt

BC-1

Capesize 1

285

46

18

25

BC-2

Capesize 2

284

45

18

BC-3

Capesize 3

293

50

BC-4

Baby Cape 1

240

BC-5

Baby Cape 2

BC-6

CA updates at each Rule Release


CA Report based on ER April 2013 version available (1200 pages)
June 2013

34

Harmonised CSR - Time Schedule


2011

2012

2012-07-01

2013

2014

1st External draft

1st Hearing
Industry
2013-04-01

2nd External draft

2nd Hearing
Industry
2013-11-01

Final draft

Technical Committee
Review
External review period

2013-12-18

Technical Committee review

IACS Council
Adoption

IACS adoption
Entry into force (T.B.D.)
June 2013

Final CSRH

Submission

2013-12-31
35

Overall situation:
IMO & Harmonised CSR

Ext. Release CSR-H

Industry Review

Jul
2012
1st Presentation
to Industry,
Sept. 2012

Feedback
Rework

Jan
2013

Industry
Review

TC

Jul
2013

2nd Presentation to Industry,


June 2013:
Athens, London: 18 & 20
Asia: 24, 26 & 28

Text of CSR-H and TB available on


IACS web site:
http://www.iacs.org.uk/
June 2013

Feedback
Rework

Jan
2014

IACS
Council
Adoption

Jul
2014

Submission

36

June 2013

37