N: CDR-SROI-IN-01OC
Rev.:
00
Fecha/Date:
13-11-15
INFORME DE SEGUIMIENTO
EXPEDITING REPORT
Cliente :
Client
PEDIDO N:
PO N
P0927048-SROP-OC-0003
DESCRIPCIN :
Description
Referencia
Project
FECHA:
Date
CERRO DRAGON
29/07/15
REVISIN N:
Revision N
Hoja N:
Sheet N
0
FECHA:
Date
PROVEEDOR:
Vendor
LOCALIDAD :
Place
Franco da Rocha / SP / BR
SUBPROVEEDOR:
NA
LOCALIDAD :
Place
NA
DIRECCIN :
Address
Subvendor
FECHA DE VISITA:
Visit dated on
1.
DE
29/07/2015
ITEM
ITEM
21PGA20AN001
PROGRESO
PROGRESS (%)
PLANIFICADO
10/02/2016
ACTUAL
PLANNED
CURRENT
INGENIERA
100%
80%
SUBPEDIDOS
100%
99%
ACOPIOS
100%
100%
FABRICACIN
17%
17%
ENSAYOS / PRUEBAS
0%
0%
ENTREGA
0%
0%
ENGINEERING
SUB-ORDERS
STORE-UP
MANUFACTURING
TESTING
DELIVERY
10/02/2016
ESPERADA
EXPECTED
10/02/2016
TOTAL
TOTAL
1.3 ESTADO DEL TALLER (INDICAR CARGA DE TRABAJO) / WORKSHOP STATUS (WORKLOAD TO BE INDICATED)
It was verified that GEA have a great demand from another client, ODEBRECHT. They have several air coolers in the
manufacturing process, and it is a concern. This concern was reported to Lidia, and she said that there will not be a
delay in the delivery of the SENER project.
1.4 CONCLUSIN DE LA VISITA / CONCLUSION OF VISIT
INFORME DE SEGUIMIENTO
EXPEDITING REPORT
Cliente :
Client
2.
Referencia
Project
Doc. N:
CDR-SROI-IN-01OC
Rev.:
00
Fecha/Date:
13-11-15
CERRO DRAGON
Hoja N:
Sheet N
DE
GEA must revise the drawing mentioned below and submit it for SENER certification.
GEA need to prepare the FIN FAN DRIVER ASSEMBLY drawing as soon as possible. They informed us that they will
issue this on 16-Nov-15.
Description
Document n#
Rev.
SCHEDULE
MONTHLY PROGRESS REPORT
HIDROSTATIC TEST PROCEDURE
PAINTING PROCEDURE
WELDING MAP
WELDING "WPS"
WELDING "PQR"
WELDER QUALIFICATION "WPQ"
JUNCTION BOX - TRAYS AND CABLES
WIRING
JUNCTION BOX - JUNCTION
JUNCTION BOX - CABLE LIST
QUALITY DOSSIER
DATA BOOK
TREATMENT THERMAL PLAN
CDR-S009-PL-0001
CDR-S009-PL-0002
CDR-S009-PR-0002
CDR-S009-PR-0003
CDR-S009-PR-0004
CDR-S009-PR-0005
CDR-S009-PR-0006
CDR-S009-PR-0007
0
B
B
0
B
B
B
B
CDR-S009-PE-0004
CDR-S009-PE-0005
CDR-S009-PE-0006
CDR-S009-VV-0002
CDR-S009-VV-0003
CDR-S009-PR-0008
0
0
0
A
A
B
3.
Description
Document n#
Rev.
CDR-S009-PM-0001
CDR-S009-PM-0008
CDR-S009-MC-0001
CDR-S009-MC-0002
CDR-S009-MC-0003
CDR-S009-HD-0001
CDR-S009-PL-0003
CDR-S009-PR-0001
CDR-S009-HD-0004
CDR-S009-PE-0001
CDR-S009-PE-0002
CDR-S009-PE-0003
CDR-S009-MA-0001
CDR-S009-PM-0010
1
0
0
0
B
0
C
B
B
B
B
B
0
A
Description
Document n#
Rev.
DOCUMENT LIST
CDR-S009-LW-0001
INFORME DE SEGUIMIENTO
EXPEDITING REPORT
Cliente :
Client
Referencia
Project
CDR-S009-PM-0002
CDR-S009-PM-0003
CDR-S009-PM-0004
CDR-S009-PM-0005
CDR-S009-PM-0006
CDR-S009-PM-0007
CDR-S009-LT-0001
CDR-S009-HD-0002
CDR-S009-HD-0003
CDR-S009-PM-0009
Doc. N:
CDR-SROI-IN-01OC
Rev.:
00
Fecha/Date:
13-11-15
CERRO DRAGON
Hoja N:
Sheet N
DE
0
0
1
0
0
0
0
0
0
0
3.2
3.5
4.
SUBPROVEEDOR
SUBVENDOR
PEDIDO
P.O.
NMERO
FECHA
NUMBER
DATE
FECHA ENTREGA
DELIVERY DATE
CONTRACTUAL
ACTUAL
CONTRACTUAL
CURRENT
Plates
Paulifer
846039541
30/09/15
27/10/15
27/10/15
Piping
BTL
845063312
20/08/15
24/09/15
24/09/15
Piping
Mercotubos
845064020
21/10/15
10/11/15
09/11/15
OBSERVACIONES
REMARKS
Material delivery
Material delivery
Material delivery
INFORME DE SEGUIMIENTO
EXPEDITING REPORT
Cliente :
Client
Referencia
Project
Doc. N:
CDR-SROI-IN-01OC
Rev.:
00
Fecha/Date:
13-11-15
CERRO DRAGON
Hoja N:
Sheet N
DE
Material delivery
Fitting
Ruspristeel
845063930
13/10/15
10/11/15
10/11/15
Fitting
HCI
845063836
05/10/15
13/11/15
13/11/15
Motor
WEG
845063441
02/09/15
23/12/15
23/12/15
Ventilador
Cofimco
845063440
02/09/15
10/12/15
10/12/15
WAM
845064133
29/10/15
09/12/15
09/12/15
Structural
Material
WAN
Junction Box
PSS Solutions
845063763
05/10/15
18/12/15
18/12/15
Drive components
Superlyne
845063894
09/10/15
09/12/15
09/12/15
Plug fitting
STAMPINOX
845063526
09/09/15
17/11/15
17/11/15
Bushing
RO-PECAS
846039586
07/10/15
09/12/15
09/12/15
Paint
AkzoNobel
845064206
05/11/15
25/11/15
25/11/15
5.
Expected arrive
Isnt release for WEG
manufacturing yet
Customs clearence
15/12/15
FABRICACIN / MANUFACTURING
5.1
5.2
FECHA PREVISTA Y LUGAR DE PRUEBAS / PLANNED DATE AND LOCATION FOR TESTS
The tests will occur in GEA facilities. They are able to perform the tests there.
For the hydrostatic test GEA are expecting to start the test on 29-Dec-2015.
For the drive test, they are expecting to start the test on 11-Jan-2016.
As they are at the start of the manufacturing process, it isnt possible to evaluate if the GEA schedule may be
delayed.
6. INSPECCIN
/ INSPECTION
6.1.
6.2.
7. ENTREGAS / DELIVERIES
GEA maintain the delivery of the 3 bays and 6 bundles of Fin Fan Cooler TAG 21PGA20AN001 for 10-Feb-2016.
8. OBSERVACIONES
/ REMARKS
As mentioned above there is a concern that there is another project that has an earlier delivery date than the
SENER project. This concern was mentioned to GEA and they inform us that everything is on schedule, and their
only concern is if delays occur with their sub vendors. GEA informs us that they are monitoring the sub vendors and
they will inform us if a delay occurs with the delivery.
During the visit, it was possible to evaluate the GEAs facilities as shown in the photos below. They are able to
supply and have the equipment to manufacture the Fin Fan Cooler. It is believed that they have the organization to
comply with the schedule. The dates set out on the manufacturing plan are too tight and dont allow for delays
during the process.
INFORME DE SEGUIMIENTO
EXPEDITING REPORT
Cliente :
Client
Referencia
Project
Doc. N:
CDR-SROI-IN-01OC
Rev.:
00
Fecha/Date:
13-11-15
CERRO DRAGON
Hoja N:
Sheet N
DE
GEA did not foresee an inspection during this visit, therefore it was not possible to perform an inspection on raw
material available at the GEA factory. It was suggested to GEA to issue an inspection notification for checking the
raw material available.
9.
ADJUNTOS
/ ATTACHMENTS
Documents List
Sub-orders
Manufacturing Planning
INFORME DE SEGUIMIENTO
EXPEDITING REPORT
Cliente :
Client
Referencia
Project
Doc. N:
CDR-SROI-IN-01OC
Rev.:
00
Fecha/Date:
13-11-15
CERRO DRAGON
Hoja N:
Sheet N
DE
INFORME DE SEGUIMIENTO
EXPEDITING REPORT
Cliente :
Client
Referencia
Project
INSPECTOR:
Inspector
FECHA:
Date
Doc. N:
CDR-SROI-IN-01OC
Rev.:
00
Fecha/Date:
13-11-15
CERRO DRAGON
Hoja N:
Sheet N
Marcelo Pires
13/11/2015
FIRMA:
Signature
DE