Вы находитесь на странице: 1из 112

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

NDICE
INTRODUCCIN ...................................................................................................................2
UBICACIN DEL REA DE RIEGO ...........................................................................................3
DATOS DE LA ESTACIN ...................................................................................................3
CLCULO DE LOS CAUDALES MENSUALES GARANTIZADOS AL 75% ...................................... 10
DATOS DE LA ESTACIN ................................................................................................. 10
COMPLETANDO LOS DATOS............................................................................................ 11
ANLISIS DE CONSISTENCIA ............................................................................................ 13
ANLISIS DE TENDENCIA ................................................................................................ 16
CAUDALES DE DEMANDA DE RIEGO ................................................................................... 24
CLCULO DEL VOLUMEN TIL ............................................................................................ 37
CLCULO DE LOS CAUDALES DE AVENIDA ........................................................................... 38
UBICACIN DE LA REPRESA ................................................................................................ 49
DETERMINACIN DEL VOLUMEN DE LA PRESA (Vp) ............................................................ 62
DETERMINACIN DEL COCIENTE Ve / Vp ............................................................................ 67
TRNSITO DE AVENIDAS PARA EL CAUDAL CORRESPONDIENTE A UN PERIODO DE RETORNO
DE 100 AOS ..................................................................................................................... 68
CLCULO DE NIVELES CARACTERSTICOS DEL EMBALSE ....................................................... 73
PLANTEAMIENTO DEL SISTEMA DE RIEGO .......................................................................... 94
DISEO DEL DESARENADOR ............................................................................................... 96
DISEO DE LOS CANALES PRINCIPALES Y SECUNDARIOS ................................................... 101
CLCULO DE LA LONGITUD DE TRANSICIN .................................................................. 109
CONCLUSIONES ............................................................................................................... 110
BIBLIOGRAFA.................................................................................................................. 112

TRABAJO ESCALONADO ENTREGA FINAL

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

INTRODUCCIN
La vida tal como la conocemos no sera posible sin el agua dado que la totalidad de los seres
vivientes estn constituidos predominantemente de AGUA.
El contenido de agua en los vegetales vara de un 60% a un 95% de su peso, en los insectos es
de un 50%, en los peces puede llegar a un 70% y en el hombre es aproximadamente de un 68%,
razn por la cual se puede concluir que el AGUA es el elemento vital para todos los seres
vivientes.
En el proceso de su desarrollo tanto los animales como las plantas pierden agua
constantemente, los primeros pueden recuperarla bebiendo directamente el agua o comiendo
plantas que tengan humedad. Las plantas en cambio absorben el agua del suelo mediante finas
radculas y por medio de un complicado sistema de conductos transportan el agua hasta los
puntos ms distantes de sus ramas y hojas.
Mediante el agua contenida en el suelo la planta obtiene los elementos minerales y nutrientes
que requiere, y por el fenmeno de la evapotranspiracin el agua retenida en las hojas y los
tallos pasa a la atmsfera, razn por la cual esta prdida tiene su lmite, si es abundante la planta
se marchita y muere.
En todo tiempo el hombre ha utilizado el agua para sus alimentos como para saciar la sed, luego
la ha utilizado para alimentar y dar de beber a sus animales y posteriormente en el riego de las
tierras con objeto de desarrollar las plantas y lograr sus frutos. Su aprovechamiento organizado
se remonta a la aparicin de las primeras plantas y animales domesticados por el hombre.
Sin agua no puede realizarse ningn proceso vital, razn por la cual una gran parte de las plantas
y animales vive en el mar. Para desarrollar sus procesos vitales todos los organismos vivientes
necesitan agua por lo que una gran deshidratacin puede ocasionarles hasta la muerte.
El presente trabajo escalonado que se realiza consiste en plantear una irrigacin a una zona la
cual carece de ella, para ellos se nos asign una zona de trabajo en la cual debamos buscar una
estacin con datos por un mnimo de 20 aos consecutivos. Se eligi la estacin La Capilla,
ubicada en el ro Mala (Caete Lima) a una altura de 424 m y se procedi con los clculos
presentados a continuacin. Luego se proceder con el diseo de las diferentes estructuras
hidrulicas del proyecto como son: la presa, canales y desarenador.

TRABAJO ESCALONADO ENTREGA FINAL

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

UBICACIN DEL REA DE RIEGO

DATOS DE LA ESTACIN
ESTACIN
DEPARTAMENTO
PROVINCIA
DISTRITO
LATITUD
LONGITUD
ALTITUD

LA CAPILLA
LIMA
CAETE
CALANGO
7629'46.6"
1231'18.9"
424

Ubicacin en el software Google Earth

TRABAJO ESCALONADO ENTREGA FINAL

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Para realizar esta operacin se utiliz el programa ArcGis y as poder realizar un mapa de
pendiente partiendo desde las curvas de nivel de las cartas nacionales 25j, 25k, 26j y 26k.

Software utilizado

Descarga gratuita de los archivos de las cartas nacionales

TRABAJO ESCALONADO ENTREGA FINAL

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Se procede a hacer el procesamiento de informacin:

Curvas de nivel de las cartas nacionales


H: Ubicacin de la estacin La Capilla

Seguimos una serie de pasos en el software ArcGis y logramos obtener el mapa de pendiente.

Mapa de pendientes

TRABAJO ESCALONADO ENTREGA FINAL

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Se recomienda seleccionar como reas de cultivo los terrenos con 10% de pendiente como
mximo. Entonces en decisin conjunta del grupo se opt por la siguiente propuesta de rea de
riego:

Propuesta del grupo para el rea de riego

TRABAJO ESCALONADO ENTREGA FINAL

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Ampliacin de la imagen
rea de cultivo = 210 Ha
Otro punto importante para la eleccin de nuestra rea de cultivo es que debemos corroborar
nuestra seleccin con el Mapa de capacidad de uso del suelo del Per.

Mapa de capacidad de uso del suelo del Per

TRABAJO ESCALONADO ENTREGA FINAL

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Observamos en nuestra zona elegida:

Ubicacin de nuestra zona de riego en el mapa de capacidad de uso de suelos del Per.

Se observa que nuestra zona se encuentra en la clasificacin X. Ahora observamos en la


leyenda del mapa:

TRABAJO ESCALONADO ENTREGA FINAL

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

X: Tierras de Proteccin
Representan las tierras de caractersticas inapropiadas para el desarrollo agropecuario y
explotacin forestal dentro de mrgenes econmicos. Pueden prestar gran valor econmico
para otros usos como el desarrollo de la actividad minera, suministro de energa, vida silvestre
y reas de inters paisajstico y turstico, entre otros.
De ambos mapas se concluye que no es recomendable realizar una irrigacin en ese lugar pero
por fines acadmicos obviaremos la recomendacin del mapa de capacidad de uso de suelos. Lo
ideal es que ambos mapas nos den la aprobacin para continuar con el proyecto.

Ubicacin de zona de riego:


Coordenada Este:

328445.89 m

Coordenada Norte:

8609604.16 m

Sistema de coordenadas: WGS-1984-Zona-18S


rea:

114.97 Ha

Cota aproximada:

400 m

TRABAJO ESCALONADO ENTREGA FINAL

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

CLCULO DE LOS CAUDALES MENSUALES GARANTIZADOS AL 75%


Para el clculo de los caudales mensuales garantizados, se us informacin de la pgina del
ANA, en la cual ubicamos nuestra estacin LA CAPILLA.

DATOS DE LA ESTACIN
ESTACIN
DEPARTAMENTO
PROVINCIA
DISTRITO
LATITUD
LONGITUD
ALTITUD

LA CAPILLA
LIMA
CAETE
CALANGO
7629'46.6"
1231'18.9"
424

De dicha estacin sacamos los caudales medios mensuales:

TRABAJO ESCALONADO ENTREGA FINAL

10

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Teniendo un total de 24 aos del 1939 al 1963.


Nuestra informacin contaba son datos incompletos los cuales se tuvieron que
completar, as tambin se tuvo que verificar saltos o tendencias.

COMPLETANDO LOS DATOS


Mtodo de la Media + Desviacin Estndar

Cuadro de datos- incompletos


Se quiere completar el dato faltante del mes de diciembre (1943), se debe aplicar la siguiente
relacin:

TRABAJO ESCALONADO ENTREGA FINAL

11

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

XD= XPD + SD D
Donde:
XD: Dato mensual que se quiere completar
XPD: Promedio de los valores del mes a completar
SD: Desviacin estndar de los valores del mes a completar
D: Variable pseudo aleatoria del mes a completar

D=

N=

E=

Xp
S

+
2

NOVIEMBRE DICIEMBRE
6,05
12,47
7,86
12,97

ENERO
34,52
18,23

Adems:

Nov=

Ener=
Dic=

2,816,05
7,86

= -0.4122

31,0534,52
18,23

=-0.19034

0.41220.19034

TRABAJO ESCALONADO ENTREGA FINAL

=-0.30127

12

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

XDic= 12,47 + 12,97 x -0.30127 =8.563

ANLISIS DE CONSISTENCIA
Las inconsistencias en la medicin de informacin hidrometeorolgica pueden ocurrir debido al
cambio de estacin de medicin o al cambio de las condiciones de medicin.
Graficamos los caudales versus el tiempo (mes) para poder observar algunas inconsistencias.

TRABAJO ESCALONADO ENTREGA FINAL

13

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

SEPARAMOS EN EL MES 84 SE OBSERVA UNA POSIBLE INCONSISTENCIA:

N
Xp
S

1ERA SERIE
84
15,57
19,93

2DA SERIE
204
17,87
26,25

CONSISTENCIA EN LA MEDIA
Usamos la siguiente formula.

Sp=10,65

Sd =1,381
TRABAJO ESCALONADO ENTREGA FINAL

14

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Con este valor calculamos el estadstico:


tc: t de Student calculado, aplicando:

Tc= 1,666
Nivel de significacin: ( = 5%)

Grados de libertad: 286 por tabla tT=1,96

1,666<1,96

Consistencia en la Desviacin Estndar

FC =1,67

Grados de libertad:
# Datos del numerador menos 1 = 203
# Datos del denominador menos 1=83

FT =1.73
Vemos que: FC < FT La informacin es consistente en la desviacin estndar para
el nivel de significacin del 5%.
TRABAJO ESCALONADO ENTREGA FINAL

15

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

ANLISIS DE TENDENCIA
TENDENCIA EN LA MEDIA
La media y la desviacin estndar de estos valores son:

XP = 17,20 m3/s

S = 24,56 m3/s

Tmt = -0,0199t + 20,08


r = 0,068

tc= 1,153
El valor terico (tT) lo obtenemos de la tabla de distribucin t de Student, con:

Nivel de significacin: 5%
Grados de libertad: 288 2 = 286

tT= 1,96
Como: tC > tT: La tendencia en la media No

es significativa para = 5%

TENDENCIA EN LA DESVIACIN ESTNDAR


Calculamos la dispersin para cada serie anual:

St

22,79
18,81
16,83
17,91
24,13
23,53
18,62
57,11
17,41
15,27

2
3
4
5
6
7
8
9
10

TRABAJO ESCALONADO ENTREGA FINAL

16

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

11
12
13
14
15
16
17
18
19
20
21
22
23
24

16,02
20,62
25,18
27,11
41,90
31,23
19,02
25,75
18,23
7,71
23,11
8,62
17,59
23,30

GRAFICO DE LA DISPERCON VS CADA AO


Se puede observar que la ecuacin de la lnea St es:
St = -0,1709t + 24,544
r = 0,119

tc= 0.562

TRABAJO ESCALONADO ENTREGA FINAL

17

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

El valor terico (tT) lo obtenemos de la tabla de distribucin t de Student, con:


Nivel de significacin: 5%
Grados de libertad: 24 2 = 22

Obtenemos: tT = 2,0739

Como: tC < tT: La tendencia en la desviacin estndar No

es significativa para =

5%

Una vez ya completados nuestros datos y analizados podemos pasar al clculo de los caudales
mensuales garantizados al 75% de persistencia.

El caudal garantizado se calcula mes por mes a partir del registro extenso de caudales, este no
debe ser menor a 20 aos.
Se pide determinar los caudales mensuales garantizados al 75% de persistencia.
Ordenndolos en forma descendente y calculando el porcentaje de persistencia (Criterio de
Weibull), tenemos:

TRABAJO ESCALONADO ENTREGA FINAL

18

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

m
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

CAUDAL ORDENADO EN FORMA ADESCENDENTE


ENERO

FEB

MAR

ABRIL

MAYO

JUNIO

JULIO

AGOST

SEPTIE

OCTUB

NOVIE

DICIEM

76,14

110,86

179,14

67,31

16,22

5,29

3,56

2,78

2,56

13,26

28,92

47,27

62,29

108,95

121,48

43,45

12,59

4,59

3,42

2,21

2,29

3,53

26,84

40,15

58,65

83,66

87,21

38,16

10,59

3,86

2,79

2,04

2,09

3,46

16,11

28,59

51,76

79,36

80,19

35,97

10,34

3,83

2,50

2,01

1,78

3,14

11,21

27,62

50,86

74,48

78,07

35,68

10,06

3,38

2,46

1,85

1,71

2,94

9,77

21,36

46,77

63,21

74,11

30,27

9,38

3,30

2,29

1,85

1,70

2,69

6,45

20,32

41,42

53,58

70,56

28,34

8,20

3,15

2,27

1,81

1,52

2,66

6,42

18,19

39,89

51,73

70,30

27,52

7,96

2,84

2,13

1,66

1,51

2,13

4,18

15,34

39,88

50,76

63,05

27,12

7,36

2,81

2,13

1,66

1,47

2,03

3,72

10,93

38,86

49,28

62,13

25,70

7,00

2,74

2,11

1,58

1,47

1,91

2,81

9,13

38,47

48,31

57,42

25,34

6,86

2,73

1,98

1,54

1,46

1,85

2,78

8,43

33,90

45,74

56,94

23,84

5,89

2,63

1,92

1,48

1,38

1,82

2,60

6,78

32,93

41,47

56,43

23,00

5,88

2,61

1,91

1,48

1,38

1,74

2,03

6,08

31,05

39,24

48,74

22,54

5,57

2,61

1,87

1,47

1,35

1,67

2,00

5,90

28,59

37,52

47,80

21,75

5,40

2,58

1,84

1,46

1,31

1,66

1,87

5,10

25,90

37,03

47,64

21,72

5,39

2,36

1,83

1,43

1,26

1,49

1,84

4,63

25,59

32,11

47,44

21,56

5,26

2,32

1,67

1,43

1,26

1,44

1,82

4,38

25,26

32,04

46,05

19,84

5,09

2,27

1,64

1,42

1,25

1,44

1,80

3,91

21,67

31,60

41,28

17,41

4,77

2,09

1,50

1,39

1,23

1,34

1,60

2,82

19,48

28,39

41,08

16,09

4,35

1,97

1,34

1,33

1,22

1,29

1,53

2,19

14,26

28,03

32,80

14,84

4,11

1,82

1,31

1,30

1,14

1,27

1,52

2,15

10,43

27,42

32,32

11,34

3,95

1,60

1,27

1,29

1,11

1,27

1,49

2,11

9,29

21,70

24,89

5,21

2,82

1,53

1,12

1,15

1,07

1,19

1,38

1,64

1,74

13,31

13,36

2,89

2,07

1,39

1,07

0,99

0,95

1,06

1,35

0,92

%P
4,0
8,0
12,0
16,0
20,0
24,0
28,0
32,0
36,0
40,0
44,0
48,0
52,0
56,0
60,0
64,0
68,0
72,0
76,0
80,0
84,0
88,0
92,0
96,0

A continuacin se interpola para obtener los caudales (m3/s) al 75% de persistencia.


MES
ENERO
FEBRERO
MARZO
ABRIL
MAYO
JUNIO
JULIO
AGOSTO
SEPTIEMBRE
OCTUBRE
NOVIEMBRE
DICIEMBRE

TRABAJO ESCALONADO ENTREGA FINAL

P (75%)
22,56
31,71
42,48
18,02
4,85
2,14
1,54
1,40
1,24
1,36
1,65
3,10

19

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

La curva de persistencia para cada mes sera:

Curva Persistencia Enero y Febrero


120.00

100.00

80.00

60.00

40.00

20.00

0.00
4

8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96
Enero

Febrero

Curva Persistencia Marzo y Abril


200.00
180.00
160.00
140.00
120.00
100.00
80.00
60.00
40.00
20.00
0.00
4

8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96
Marzo

TRABAJO ESCALONADO ENTREGA FINAL

Abril

20

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Curva Persistencia Mayo y Junio


18.00
16.00
14.00
12.00
10.00
8.00
6.00
4.00
2.00
0.00
4

8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96
Mayo

Junio

Curva Persistencia Julio y Agosto


4.00
3.50
3.00
2.50
2.00
1.50
1.00
0.50
0.00
4

8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96
Julio

TRABAJO ESCALONADO ENTREGA FINAL

Agosto

21

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Curva Persistencia Septiembre y Octubre


14.00
12.00
10.00
8.00
6.00
4.00
2.00
0.00
4

8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96
Septiembre

Octubre

Curva Persistencia Noviembre y Diciembre


50.00
45.00
40.00
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00
4

12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96
Noviembre

TRABAJO ESCALONADO ENTREGA FINAL

Diciembre

22

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

La curva de persistencia para los meses ms extremos:

Curva Persistencia Marzo y Setiembre


200.00
180.00
160.00
140.00
120.00
100.00
80.00
60.00
40.00
20.00
0.00
4

12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96
Marzo

TRABAJO ESCALONADO ENTREGA FINAL

Septiembre

23

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

CAUDALES DE DEMANDA DE RIEGO


Para el clculo de las demandas usaremos el programa CROPWAT, que aplica el mtodo Penman
Monteith. Para lo cual se tuvo ayuda de artculos publicados en la FAO.

La ecuacin anterior mostrada calcula en funcin a la temperatura mxima la humedad relativa,


velocidad del viento y radiacin, la evapotranspiracin que es un factor importante para el
clculo de caudales de demanda.
Lo primero que realizamos fue descargar el programa CROPWAT, de la pgina de la FAO
(Gratuito).

Descargar el programa de la FAO

TRABAJO ESCALONADO ENTREGA FINAL

Programa Cropwat

24

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Para el clculo de la demanda de riego de un cultivo, el programa CROPWAT nos pide valores de
clima, lluvia, suelo y cultivo, siendo estos extrados de distintas pginas como es el SENAMHI.

Pgina del SENAMHI

TRABAJO ESCALONADO ENTREGA FINAL

25

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Los datos obtenidos del SENAMHI son:

Datos de la estacin del SENAMHI


Como podemos observar estos datos son diarios, teniendo nosotros que encontrar los
mensuales ya que son estos datos los que ingresaremos al CROPWAT. Para un mejor manejo de
la
informacin
ingresamos
a
la
pgina
de
la
FAO
(http://www.fao.org/nr/water/aquastat/quickWMS/climcropwebx.htm), donde lo nico que
haremos es ingresar las coordenadas de nuestra estacin y nos mostrar los datos necesarios
para ingresar al CROPWAT.

TRABAJO ESCALONADO ENTREGA FINAL

26

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

DATOS USADOS DATOS PROVENIENTES DE LA FAO

USO DEL CROPWAT


Para poder encontrar la demanda, se tendr que ingresar el climate, rain, crop y soil, con los
cuales obtendremos el caudal de demanda.

EN CLIMATE: En la ventana de climate se tiene que rellenar la zona blanca, pero tenemos
que tomar en cuenta que el Sun (radiacin) no lo tenemos como dato, no
preocupndonos por esto ya que el mismo CROPWAT nos lo genero.

TRABAJO ESCALONADO ENTREGA FINAL

27

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Ventana de CLIMATE

Ventana de CLIMATE con datos

TRABAJO ESCALONADO ENTREGA FINAL

28

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

En RAIN:

Ingresamos los valores obtenidos de lluvia y seleccionamos el mtodo, en nuestro caso usamos
el mtodo DEPENDABLE RAIN.

Mtodo a
usar

Ventana de RAIN

Mtodo usado

Ventana de RAIN- seleccionamos mtodo

TRABAJO ESCALONADO ENTREGA FINAL

29

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Ventana de RAIN con datos

En CROP: CULTIVO

Ahora introducimos datos de cultivo, para ello tenemos que tener en cuenta que estos datos
dependern del tipo de cultivo, en nuestro caso, la ubicacin del rea de sembro es Caete,
siendo los cultivos de frutales las ms importantes destacando los mazanos, vid y ctricos,
adems nuestro suelo en el que sembraremos es un suelo bueno para cultivos permanentes
caracterstica que corresponde a los ctricos, en este caso encontramos varios tipos de ctricos
dependientes de su cobertura, escogeremos ctrico sin cobertura de suelo y 70% de cubierta
vegetativa.

TRABAJO ESCALONADO ENTREGA FINAL

30

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Coeficiente del cultivo


Etapa (das)
Profundidad radicular
Respuesta de productividad
Altura mxima

Ventana de CROP
Los valores sealados, son los que tenemos que encontrar.
o

Coeficiente de cultivo:

Datos obtenidos de Estudio FAO riego y drenaje

TRABAJO ESCALONADO ENTREGA FINAL

31

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Stage: etapa (das):

Datos obtenidos de Estudio FAO riego y drenaje


o

Roothing Depth: La Profundidad radicular.

Datos obtenidos de Estudio FAO riego y drenaje


o

Yield response:Valores de respuesta de productividad:

Datos obtenidos de Estudio FAO riego y drenaje


o

Cropheight:Nuestra altura mxima ser:

Datos obtenidos de Estudio FAO riego y drenaje

TRABAJO ESCALONADO ENTREGA FINAL

32

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Ventana Crop con datos

SOIL: suelo:

Como ya especificamos, en la seccin de ubicacin de rea de cultivo, asumiremos que es un


suelo bueno para sembro, es decir suelo FRANCO.

SOIL- Datos a rellenar

TRABAJO ESCALONADO ENTREGA FINAL

33

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Valores para FC-WP:

FC-WP

Roothing Depth

Ventana SOIL con datos

TRABAJO ESCALONADO ENTREGA FINAL

34

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Ahora una vez ingresados estos valores se podr generar las demandas de riego:

TRABAJO ESCALONADO ENTREGA FINAL

35

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Datos obtenidos donde la ltima columna es la de caudales de demanda en mm/mes.


MES
ENERO
FEBRERO
MARZO
ABRIL
MAYO
JUNIO
JULIO
AGOSTO
SEPTIEMBRE
OCTUBRE
NOVIEMBRE
DICIEMBRE

TRABAJO ESCALONADO ENTREGA FINAL

Q cultivo
m3/mes
7.18
8.69
9.72
6.08
0.30
1.43
0.00
0.16
0.00
0.00
5.20
7.66

36

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

CLCULO DEL VOLUMEN TIL


Para este clculo solo se tiene que tener datos de oferta y demanda, los cuales ya los
tenemos.

MES
ENERO
FEBRERO
MARZO
ABRIL
MAYO
JUNIO
JULIO
AGOSTO
SEPTIEMBRE
OCTUBRE
NOVIEMBRE
DICIEMBRE

Q (75%)

Q cultivo

Volumen oferta

Volumen demanda

Diferencia

m3/s

m3/s

MMC

MMC

V0- Vf

22.56
31.71
42.48
18.02
4.85
2.14
1.54
1.40
1.24
1.36
1.65
3.10

7.18
8.69
9.72
6,08
0,30
1,43
0,00
0,16
0,00
0,00
5,20
7,66

60,44
76,72
113,77
46,71
12,99
5,53
4,12
3,74
3,20
3,65
4,27
8,29

19.23
21.03
26,04
15,77
0,80
3,72
0,00
0,43
0,00
0,00
13,48
20,53

41,21
55,69
87,73
30,94
12,19
1,82
4,12
3,30
3,20
3,65
-9.21
-12.24

Vu=

TRABAJO ESCALONADO ENTREGA FINAL

21.44

MMC

37

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

CLCULO DE LOS CAUDALES DE AVENIDA


1) PERIODO DE RETORNO:
Para determinar el periodo de retorno de la estructura hidrulica tomaremos el periodo de
retorno del siguiente cuadro:

La obra hidrulica a colocarse es una presa derivadora para zona de riego pequea de (menor
de 1000 ha) ya que nuestra rea de riego borda por 114.97 ha entonces verificamos en la tabla
y nos muestra un periodo de retorno entre 50-100 aos.
Para nuestro diseo optaremos un periodo de retorno de 100 aos.
Luego con el periodo de retorno calculamos el riesgo: R que se define como riesgo a la
probabilidad que un caudal determinado ocurre una vez en n aos sucesivos.
Para una vida til de 50 aos tenemos lo siguiente:

= ( ) , reemplazando los datos


= (


) = . %

= . %

TRABAJO ESCALONADO ENTREGA FINAL

38

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

2) CALCULO DEL CAUDAL DE AVENIDA:

PRUEBAS DE BONDAD DE AJUSTE:


Estas pruebas permiten establecer si la serie de caudales analizada se ajusta a una determinada
funcin de probabilidades.
Estas pruebas estadsticas tienen por objeto medir la certidumbre que se tiene al obtener
resultados a partir de suponer que una variable aleatoria (caudal), se distribuye segn una cierta
funcin de probabilidad.
Las funciones de probabilidad aplicables para el estudio de caudales mximos son:

Distribucin Normal
Distribucin Log Normal
Distribucin Pearson III
Distribucin Log Pearson III
Distribucin Gumbel

Con pruebas de bondad de ajuste:


Chi cuadrado
Smirnov Kolmogorov

Donde:
:
:

Para nuestro diseo asumiremos lo siguiente:


=

Para ello contamos con los caudales anuales obtenidos por el SENAHMI, hallaremos el caudal
mximo anual para poder obtener el caudal mximo instantneo y poder trabajar con ello.

TRABAJO ESCALONADO ENTREGA FINAL

39

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

DATOS DE CAUDALES ANUALES (SENAMHI)


ENERO FEBRERO MARZO ABRIL
Ao Fuente
1939 SENAMHI 19.48
45.74
74.11
38.16
1940 SENAMHI 41.42
32.11
56.94
21.72
1941 SENAMHI 39.89
37.52
41.28
2.89

MAYO JUNIO JULIO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE

1942 SENAMHI 33.90


1943 SENAMHI 31.05

50.76

41.08

74.48

1944 SENAMHI 38.86


1945 SENAMHI 25.59

51.73

10.59

4.59

3.56

2.78

2.56

3.14

3.72

10.93

5.89

3.15

2.46

2.21

2.29

2.69

4.18

3.91

2.82

1.97

1.67

1.43

1.25

1.44

1.80

8.43

11.34

12.59

2.09

1.27

1.15

0.95

1.44

1.52

4.63

47.80

35.97

4.11

2.27

1.50

1.39

1.46

2.13

2.81

8.56

70.30

19.84

7.36

2.81

2.50

2.01

1.78

1.82

2.00

5.10

28.03

63.05

27.12

5.40

2.61

1.91

1.48

1.31

1.27

6.45

20.32

1946 SENAMHI 76.14


1947 SENAMHI 32.93

110.86

179.14

67.31

10.34

3.30

2.27

1.85

1.71

2.66

6.42

21.36

27.42

56.43

21.75

8.20

2.58

1.92

1.58

1.51

3.46

2.03

6.08

1948 SENAMHI 46.77


1949 SENAMHI 28.59

32.04

32.80

23.84

10.06

3.38

1.84

1.47

1.23

13.26

11.21

2.82

28.39

47.64

28.34

5.57

3.83

2.79

1.66

1.52

1.85

1.35

0.92

1950 SENAMHI 25.90


1951 SENAMHI 38.47

41.47

47.44

43.45

5.39

2.61

2.13

1.46

1.47

1.66

2.60

47.27

53.58

80.19

25.34

5.88

2.63

2.13

1.43

1.35

2.94

26.84

28.59

1952 SENAMHI 58.65


1953 SENAMHI 51.76

63.21

70.56

23.00

9.38

1.60

1.31

1.54

1.26

1.27

2.78

27.62

108.95

121.48

35.68

16.22

5.29

3.42

1.85

1.47

1.67

16.11

18.19

1954 SENAMHI 39.88


1955 SENAMHI 62.29

83.66

87.21

16.09

5.09

2.73

2.29

2.04

1.70

1.74

28.92

15.34

31.60

32.32

17.41

6.86

2.84

1.98

1.66

1.38

3.53

1.53

4.38

1956 SENAMHI 14.26


1957 SENAMHI 10.43

79.36

57.42

22.54

4.35

2.32

1.83

1.81

2.09

2.03

1.84

1.64

48.31

48.74

25.70

7.00

1.82

1.34

1.33

1.11

1.19

1.38

2.11

1958 SENAMHI 9.29


1959 SENAMHI 1.74

13.31

24.89

14.84

2.07

1.39

1.12

1.42

1.26

1.49

1.87

2.19

37.03

78.07

21.56

5.26

2.74

1.64

1.29

1.14

1.91

1.60

6.78

1960 SENAMHI 25.26


1961 SENAMHI 21.67

21.70

13.36

5.21

3.95

1.53

1.07

0.99

1.22

1.34

1.82

2.15

39.24

46.05

30.27

7.96

2.36

1.87

1.30

1.07

1.06

9.77

40.15

1962 SENAMHI 50.86

49.28

62.13

27.52

4.77

3.86

2.11

1.48

1.38

1.29

1.49

5.90

TRABAJO ESCALONADO ENTREGA FINAL

40

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Hallamos el caudal mximo anual (QMA) y con ello el caudal mximo instantneo (QMI)
obteniendo la siguiente tabla:
Ao
1939

Fuente
SENAMHI

Q MA(m3/s)

QMI(m3/s)

74.11

741.15

1940

SENAMHI

56.94

569.45

1941

SENAMHI

41.28

412.83

1942

SENAMHI

50.76

507.64

1943

SENAMHI

74.48

744.81

1944

SENAMHI

70.30

702.95

1945

SENAMHI

63.05

630.47

1946

SENAMHI

179.14

1791.35

1947

SENAMHI

56.43

564.25

1948

SENAMHI

46.77

467.73

1949

SENAMHI

47.64

476.45

1950

SENAMHI

47.44

474.35

1951

SENAMHI

80.19

801.88

1952

SENAMHI

70.56

705.56

1953

SENAMHI

121.48

1214.78

1954

SENAMHI

87.21

872.14

1955

SENAMHI

62.29

622.89

1956

SENAMHI

79.36

793.57

1957

SENAMHI

48.74

487.41

1958

SENAMHI

24.89

248.90

1959

SENAMHI

78.07

780.70

1960

SENAMHI

25.26

252.59

1961

SENAMHI

46.05

460.53

1962

SENAMHI

62.13

621.34

Utilizaremos la prueba de bondad de ajuste SMIRNOV-KOLMOGOROV


Esta prueba consiste en comparar el mximo valor absoluto de la diferencia entre la funcin de
distribucin de probabilidad observada: c, con un valor terico (t) que depende del nmero
de datos y el nivel de significacin .
= |() ()|
Donde:
c: Estadstico de Smirnov calculado
(): Funcin de distribucin de probabilidad de ajuste
(): Funcin de distribucin de probabilidad observada

TRABAJO ESCALONADO ENTREGA FINAL

41

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

1) Entonces a partir del registro de caudales mximos instantneos, ordenamos los datos de mayor
a menor:
2) Se calcula la probabilidad emprica de los caudales ,aplicando : () =

3) Se calcula la variable estandarizada (Z),como paso previo para el clculo de la funcin de


distribucin normal de probabilidades =

()

, =

4) Luego de la tabla se obtiene la funcin de distribucin normal de probabilidades F (Z).

5) Se calcula el estadstico de Smirnov aplicando: c=mx.|F(Q)-P(Q)|


Tabla 1: Valores de t

: NIVEL DE SIGNIFICACION
0.2

0.1

0.05

0.01

0.45

0.51

0.56

0.67

10

0.32

0.37

0.41

0.49

15

0.27

0.3

0.34

0.4

20

0.23

0.26

0.29

0.36

25

0.21

0.24

0.27

0.32

30

0.19

0.22

0.24

0.29

35

0.18

0.2

0.23

0.27

40

0.17

0.19

0.21

0.25

45

0.16

0.18

0.2

0.24

50

0.15

0.17

0.19

0.23

Se muestra los
valores de t con el
nivel de significacin
de ajuste.

>50

TRABAJO ESCALONADO ENTREGA FINAL

42

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Ao
1939

QMIQi
(m3/s)
741.15

741.15

5888.78

P(Q)

F(Z)

Abs(F-P)

1940

569.45

569.45

9017.71

1791.35

0.9600

3.550

0.999

0.039

1941

412.83

412.83

63292.99

1214.78

0.9200

1.734

0.958

0.038

1942

507.64

507.64

24577.05

872.14

0.8800

0.654

0.742

0.138

1943

744.81

744.81

6464.27

801.88

0.8400

0.433

0.666

0.174

1944

702.95

702.95

1485.70

793.57

0.8000

0.407

0.655

0.145

(Qi-Qm)^2

1945

630.47

630.47

1151.64

780.70

0.7600

0.366

0.644

0.116

1946

1791.35

1791.35

1270004.65

744.81

0.7200

0.253

0.598

0.122

1947

564.25

564.25

10031.06

741.15

0.6800

0.242

0.594

0.086

1948

467.73

467.73

38682.11

705.56

0.6400

0.130

0.551

0.089

1949

476.45

476.45

35330.77

10

702.95

0.6000

0.121

0.547

0.053

1950

474.35

474.35

36120.99

11

630.47

0.5600

-0.107

0.460

0.100

1951

801.88

801.88

18897.28

12

622.89

0.5200

-0.131

0.448

0.072

1952

705.56

705.56

1693.43

13

621.34

0.4800

-0.136

0.444

0.036

1953

1214.78

1214.78

302904.25

14

569.45

0.4400

-0.299

0.385

0.055

1954

872.14

872.14

43152.53

15

564.25

0.4000

-0.316

0.378

0.022

1955

622.89

622.89

1723.62

16

507.64

0.3600

-0.494

0.312

0.048

1956

793.57

793.57

16682.92

17

487.41

0.3200

-0.558

0.291

0.029

1957

487.41

487.41

31329.10

18

476.45

0.2800

-0.592

0.277

0.003

1958

248.90

248.90

172651.21

19

474.35

0.2400

-0.599

0.277

0.037

1959

780.70

780.70

13524.11

20

467.73

0.2000

-0.620

0.268

0.068

1960

252.59

252.59

169592.83

21

460.53

0.1600

-0.642

0.261

0.101

1961

460.53

460.53

41567.47

22

412.83

0.1200

-0.793

0.215

0.095

1962

621.34

621.34

1855.41

23

252.59

0.0800

-1.297

0.098

0.018

2317621.88

24

248.90

0.0400

-1.309

0.097

0.057

Qm

664.41

TRABAJO ESCALONADO ENTREGA FINAL

Por Tablas
Estadsticas

43

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Obteniendo los siguientes resultados:


Nro. de datos
Qm
S
c
t
c < t

24
664.41
317.44
0.174
0.274

El registro de caudales se
ajusta a la distribucin
normal de probabilidades
con un nivel de significacin
del 5%.

En conclusin haremos uso de la DISTRIBUCIN NORMAL para realizar el clculo del caudal de
avenida Y
Entonces de los caudales mximos instantneos determinaremos el caudal de avenidas para un
periodo de retorno de 50 aos y 100 aos.
Ao
1939

QMI (m3/s)

Qi

(Qi-Qm)^2

741.15

741.15

5888.78

1940

569.45

569.45

9017.71

1941

412.83

412.83

63292.99

1942

507.64

507.64

24577.05

1943

744.81

744.81

6464.27

1944

702.95

702.95

1485.70

1945

630.47

630.47

1151.64

1946

1791.35

1791.35

1270004.65

1947

564.25

564.25

10031.06

1948

467.73

467.73

38682.11

1949

476.45

476.45

35330.77

1950

474.35

474.35

36120.99

1951

801.88

801.88

18897.28

1952

705.56

705.56

1693.43

1953

1214.78

1214.78

302904.25

1954

872.14

872.14

43152.53

1955

622.89

622.89

1723.62

1956

793.57

793.57

16682.92

1957

487.41

487.41

31329.10

1958

248.90

248.90

172651.21

1959

780.70

780.70

13524.11

1960

252.59

252.59

169592.83

1961

460.53

460.53

41567.47

1962

621.34

621.34

1855.41

Qm

664.41

TRABAJO ESCALONADO ENTREGA FINAL

2317621.88

44

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Sabemos que:
=

Para T=50 aos


P=0.98= F (Z50)
De las tablas estadsticas de distribucin normal: Z50=2.06
Reemplazando en:
=

Hallamos

Q50= 1318.54 m3/s

Para T=100 aos


P=0.99 = F (Z100)
De las tablas estadsticas de distribucin normal: Z100=2.33
Reemplazando en:
=

Hallamos

Q100= 1404.25 m3/s

TRABAJO ESCALONADO ENTREGA FINAL

45

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Ahora realizando la distribucin GUMBEL tambin llamada distribucin extrema tipo I. La


funcin de probabilidades viene dado por:

Ahora considerando que el registro de caudales se


ajusta a la distribucin de probabilidades GUMBEL:
Sabemos que:

TRABAJO ESCALONADO ENTREGA FINAL

46

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Hallando la funcin de probabilidad Gumbel y evaluando obtenemos lo siguiente:


1

P(Q)

F(Q)

Abs(F-P)

1791.35

0.9600

0.9876

0.0276

1214.78

0.9200

0.9142

0.0058

872.14

0.8800

0.7487

0.1313

801.88

0.8400

0.6921

0.1479

793.57

0.8000

0.6848

0.1152

780.70

0.7600

0.6732

0.0868

744.81

0.7200

0.6393

0.0807

741.15

0.6800

0.6357

0.0443

705.56

0.6400

0.5995

0.0405

10

702.95

0.6000

0.5968

0.0032

11

630.47

0.5600

0.5161

0.0439

12

622.89

0.5200

0.5072

0.0128

13

621.34

0.4800

0.5054

0.0254

14

569.45

0.4400

0.4427

0.0027

15

564.25

0.4000

0.4362

0.0362

16

507.64

0.3600

0.3654

0.0054

17

487.41

0.3200

0.3400

0.0200

18

476.45

0.2800

0.3262

0.0462

19

474.35

0.2400

0.3236

0.0836

20

467.73

0.2000

0.3154

0.1154

21

460.53

0.1600

0.3064

0.1464

22

412.83

0.1200

0.2485

0.1285

23

252.59

0.0800

0.0899

0.0099

24

248.90

0.0400

0.0872

0.0472

Qm

664.41

c
t

0.1479
0.274

c < t
El registro de caudales se
ajusta a la distribucion
Gumbel de probabilidades
con un nivel de significacion
del 5%

OK

Como N=24 se trata de una muestra pequea, hallando y; y de la tabla mostrada para ello
interpolamos obteniendo lo siguiente:
y= 0.5294
y= 1.0857

Luego hallando los parmetros de la funcin gumbel y :

.
=
= .

.
= .
= .

TRABAJO ESCALONADO ENTREGA FINAL

47

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Hallando el Q 50 Y Q100:
Sabemos que:
1

Para T=50: = 1 = 0.98


( < 50) = 0.98 =

0.0034201(50509.62)

Despejando:

Q50=1650.55 m3/s

Para T=100: = 1 = 0.99


( < 100) = 0.99 =

0.0034201(100509.62)

Despejando:

Q100=1854.64 m3/s

De ambas distribuciones notamos que la funcin que mejor se asemeja a nuestros datos es la
distribucin de Gumbel. Por lo tanto tomaremos Q100 = 1854.64 m3/s.

TRABAJO ESCALONADO ENTREGA FINAL

48

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

UBICACIN DE LA REPRESA
La ubicacin de la represa se hizo en funcin a la topografa. Del primer informe se posea
informacin del mapa de pendientes, obtenidas en el software ArcGis, al ver este mapa
observamos que nuestro ro (El ro Mala) est rodeado en su mayora por pendientes altas,
adems que en casi todo el trayecto del ro se posee zonas angostas, lo cual har que nuestra
represa tenga mayor altura y en planta se vea alargada. Tambin se trat de ubicar la zona ms
angosta el eje de la represa.

MAPA DE PENDIENTES: H (estacin hidrogrfica), R (represa)


Coordenadas de la ubicacin de la presa:
Zona:

18L

Coordenada Norte:

8 615 446.14 m

Coordenada Este:

339 861.77 m

Sistema de coordenadas:

UTM-WGS-1984

TRABAJO ESCALONADO ENTREGA FINAL

49

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Ubicacin del
embalse
Ubicacin en el software Google Earth

Imagen de cmo quedara el embalse

Para poder determinar las curvas caractersticas: rea vs altitud, Fetch vs altitud y volumen vs
altitud, se tuvo que obtener las curvas de nivel cada metro. Para ello utilizaron el software
GOOGLE EARTH, AUTOCAD, y GLOBAL MAPPER.

TRABAJO ESCALONADO ENTREGA FINAL

50

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Lo que se hizo primero fue delimitar un rea, en nuestro caso es la zona de nuestro embalse.

Trazar una
referencia sobre
nuestra zona

Google earth
En el google earth se traza un polgono que abarca toda la zona del embalse, es de esta zona y
un poco ms que se obtiene las curvas de nivel, lo ms recomendable es que la zona
seleccionada, adems de envolver la zona del embalse deber ser grande ya que as podremos
obtener mayor cantidad de curvas de nivel.

TRABAJO ESCALONADO ENTREGA FINAL

51

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

rea de abarca zona del embalse

Se guard esta ZONA, para luego poder trabajar con el GLOBAL MAPPER, el formato en el que
se guarda es formato Kmz.
Una vez en el GLOBAL MAPPER, se actualizar la pantalla con las unidades respectivas, para ello
hacemos click en Display setting projection, actualizamos el sistema en el que trabajamos
(UTM) y la zona (18).

Programa GLOBAL MAPPER- actualizamos datos de pantalla

TRABAJO ESCALONADO ENTREGA FINAL

52

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Ahora abriremos nuestro archivo referencia, obtenido del google earth.

Programa GLOBAL MAPPER- abrimos archivo

CLICK

Programa GLOBAL MAPPER- archivo ZONA

TRABAJO ESCALONADO ENTREGA FINAL

53

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Programa GLOBAL MAPPER- generando la superficie

Programa GLOBAL MAPPER- superficie generada

Ahora generaremos las curvas de nivel.

TRABAJO ESCALONADO ENTREGA FINAL

54

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Programa GLOBAL MAPPER- Generando curvas de nivel

Programa GLOBAL MAPPER- datos de curvas (especificamos cada 1 m

TRABAJO ESCALONADO ENTREGA FINAL

55

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Programa GLOBAL MAPPER- guardaremos las curvas en formato DWG.

Ya estas curvas de nivel las escalaremos y las referenciaremos en el AUTOCAD.

TRABAJO ESCALONADO ENTREGA FINAL

56

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Curvas de nivel generadas en Autocad

Imagen georeferenciada

TRABAJO ESCALONADO ENTREGA FINAL

57

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

En funcin a estas curvas de nivel se obtuvo las grficas: rea vs Altitud, Volumen vs. Altitud y
Fetch vs. Altitud.

El siguiente cuadro muestra los valores obtenidos de la medicin del Autocad, as como de la
aplicacin de la formula siguiente, para el clculo del volumen.
=

( + + )
3

FORMULA PARA EL VOLUMEN

Z
(m.s.n.m)
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484

A
(Km2)
0.0049
0.0087
0.0128
0.0174
0.0226
0.0273
0.0318
0.0369
0.0415
0.0461
0.0506
0.0552
0.0600
0.0647
0.0741
0.0833
0.0931
0.1022
0.1104
0.1185
0.1274
0.1363
0.1445
0.1680
0.1815
0.1935

V
(MMC)

V(MMC)

0.0067
0.0107
0.0151
0.0199
0.0249
0.0295
0.0343
0.0392
0.0438
0.0483
0.0529
0.0576
0.0623
0.0693
0.0786
0.0882
0.0976
0.1062
0.1144
0.1230
0.1318
0.1404
0.1561
0.1747
0.1875

0.0067
0.0174
0.0325
0.0524
0.0773
0.1068
0.1411
0.1803
0.2241
0.2724
0.3253
0.3829
0.4452
0.5145
0.5931
0.6813
0.7789
0.8851
0.9996
1.1225
1.2544
1.3947
1.5508
1.7255
1.9129

TRABAJO ESCALONADO ENTREGA FINAL

FETCH
(m)
169.3552
179.6680
210.3030
248.2696
284.5616
311.0490
330.9506
357.7706
375.3552
395.5154
406.9093
427.9210
448.2196
475.3773
577.9620
635.6629
675.0019
698.1202
720.8975
738.8442
772.7705
804.2690
830.6139
1137.8162
1169.1091
1195.8294

FETCH
(KM)
0.1694
0.1797
0.2103
0.2483
0.2846
0.3110
0.3310
0.3578
0.3754
0.3955
0.4069
0.4279
0.4482
0.4754
0.5780
0.6357
0.6750
0.6981
0.7209
0.7388
0.7728
0.8043
0.8306
1.1378
1.1691
1.1958

58

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527

0.2052
0.2162
0.2274
0.2378
0.2489
0.2592
0.2704
0.2808
0.2914
0.3021
0.3118
0.3220
0.3326
0.3433
0.3649
0.3813
0.3959
0.4119
0.4258
0.4492
0.4662
0.4813
0.4974
0.5114
0.5253
0.5428
0.5627
0.5787
0.5952
0.6121
0.6288
0.6450
0.6591
0.6751
0.6916
0.7105
0.7269
0.7443
0.7599
0.7759
0.7915
0.8062
0.8213

0.1993
0.2107
0.2218
0.2326
0.2433
0.2541
0.2648
0.2756
0.2861
0.2967
0.3069
0.3169
0.3273
0.3379
0.3540
0.3731
0.3885
0.4038
0.4188
0.4374
0.4577
0.4737
0.4893
0.5044
0.5183
0.5341
0.5527
0.5707
0.5870
0.6036
0.6204
0.6369
0.6520
0.6671
0.6833
0.7010
0.7187
0.7356
0.7521
0.7679
0.7837
0.7989
0.8137

TRABAJO ESCALONADO ENTREGA FINAL

2.1122
2.3229
2.5447
2.7772
3.0206
3.2746
3.5395
3.8151
4.1012
4.3979
4.7048
5.0217
5.3490
5.6869
6.0409
6.4140
6.8025
7.2064
7.6252
8.0626
8.5203
8.9940
9.4833
9.9877
10.5060
11.0401
11.5929
12.1636
12.7505
13.3541
13.9745
14.6114
15.2634
15.9305
16.6138
17.3149
18.0335
18.7691
19.5212
20.2891
21.0728
21.8717
22.6854

1220.5738
1240.9684
1264.3267
1290.6603
1316.3371
1345.9675
1372.2752
1391.7552
1413.9414
1432.7005
1451.8634
1472.1659
1494.8448
1521.2697
1751.2502
1778.1156
1815.0243
1876.0376
1897.0603
2122.1029
2143.1359
2166.9947
2188.1098
2206.2648
2232.8168
2276.8569
2398.4098
2423.4319
2451.9360
2552.3757
2567.4761
2587.5799
2603.8221
2635.7907
2717.4394
2759.6824
2799.8517
2839.7018
2864.0368
2884.5010
2898.4047
2914.6080
2932.5986

1.2206
1.2410
1.2643
1.2907
1.3163
1.3460
1.3723
1.3918
1.4139
1.4327
1.4519
1.4722
1.4948
1.5213
1.7513
1.7781
1.8150
1.8760
1.8971
2.1221
2.1431
2.1670
2.1881
2.2063
2.2328
2.2769
2.3984
2.4234
2.4519
2.5524
2.5675
2.5876
2.6038
2.6358
2.7174
2.7597
2.7999
2.8397
2.8640
2.8845
2.8984
2.9146
2.9326

59

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

528
529
530
531
532
533
534
535

0.8354
0.8503
0.8650
0.8808
0.8947
0.9167
0.9324
0.9486

0.8283
0.8428
0.8576
0.8729
0.8877
0.9057
0.9246
0.9405

23.5137
24.3566
25.2142
26.0870
26.9748
27.8804
28.8050
29.7455

2941.9440
2966.1615
2994.5921
3020.9828
3054.5078
3234.3198
3240.6161
3267.9171

2.9419
2.9662
2.9946
3.0210
3.0545
3.2343
3.2406
3.2679

Cuadro de valores obtenidos del Autocad

Se procede a realizar los grficos respectivos con los resultados de la tabla anterior:

REA VS ALTITUD
540
530

ALTITUD m.s.n.m)

520
510
500
490
480
470
460
450
0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

1.00

REA (KM2)

TRABAJO ESCALONADO ENTREGA FINAL

60

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

VOLUMEN VS ALTITUD
540
530

ALTITUD (m.s.n.m)

520
510
500
490
480
470
460
450
0

10

15

20

25

30

35

2.5

3.0

3.5

VOLUMEN (MMC)

FETCH VS ALTITUD
540
530

ALTITUD (m.s.n.m)

520
510
500
490
480
470
460
450
0.0

0.5

1.0

1.5

2.0

FETCH (KM)

TRABAJO ESCALONADO ENTREGA FINAL

61

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

DETERMINACIN DEL VOLUMEN DE LA PRESA (Vp)


Para determinar el volumen de la presa se tomaron en cuenta los siguientes puntos:
TALUD:
Para la determinacin de los taludes de nuestra presa de tierra, se utilizaron las siguientes
tablas:

Esta primera tabla se nos hace difcil utilizar ya que no contamos con la informacin acerca del
tipo de suelo predominante en la zona de la presa.

Esta segunda tabla est en funcin de la altura de la presa, la cual presenta un inconveniente:
nuestra presa supera los 60m de altura. Sin embargo, se decidi asignar los siguientes taludes:

TRABAJO ESCALONADO ENTREGA FINAL

62

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Talud aguas arriba:


Talud aguas abajo:

3
2.5

ANCHO DE CORONACIN:
Para determinar el ancho de coronacin de nuestra presa, se utiliz la siguiente tabla:

Se observa que debido a la altura estimada de nuestra presa, no es posible utilizar las
recomendaciones de USA ni de Italia ya que solo son para presas de hasta 45 metros de altura.
Utilizaremos los criterios de Knappen y de Preece.
Mtodo Knappen:
b = 1.65 x H1/2
Aproximadamente, nuestra presa tendr una altura de 70 metros.
b = 13.80 m
Mtodo Preece:
b = 1.1 x H1/2 + 1
b = 10.20 m

Teniendo en cuenta estos dos mtodos para determinar el ancho de coronacin, se determin
utilizar un valor intermedio para la corona.
Por lo tanto consideraremos un ancho de coronacin b = 12m.

TRABAJO ESCALONADO ENTREGA FINAL

63

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Una vez ya identificada nuestras pendientes, aguas arriba 3 y aguas abajo 2.5, trabajamos con
las curvas de nivel en el Autocad y en 3D usaremos el comando mirror 3D para poder
encontrar los lmites de la presa con el terreno.

La imagen muestra lmites del terreno con la presa, respetando sus pendientes.
Calcularemos reas cada metro y segn la frmula que sigue calcularemos el volumen.
=

( + + )
3

TRABAJO ESCALONADO ENTREGA FINAL

64

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Clculo del rea cada metro con el comando AREA.

El siguiente cuadro nos muestra las reas cada metro y el volumen final encontrado de la presa.

ALTURA

REA (M2)

70
69
68
67
66
65
64
63
62
61
60
59
58
57
56
55
54
53
52
51

26452.0564
28234.7331
30021.8824
31686.0171
33335.5648
34930.2444
36483.6794
38263.6127
39808.9338
41331.0927
42759.555
44119.1985
45538.8424
46663.9855
48135.4285
49520.8121
50968.5007
51920.4192
53134.4714
54351.3428

TRABAJO ESCALONADO ENTREGA FINAL

REA
(KM2)
0.02645
0.02823
0.03002
0.03169
0.03334
0.03493
0.03648
0.03826
0.03981
0.04133
0.04276
0.04412
0.04554
0.04666
0.04814
0.04952
0.05097
0.05192
0.05313
0.05435

V
MMC

VOLUMEN
MMC

0.01823
0.01942
0.02057
0.02167
0.02276
0.02381
0.02492
0.02602
0.02705
0.02803
0.02896
0.02989
0.03074
0.03160
0.03255
0.03350
0.03430
0.03502
0.03583

0.01823
0.03765
0.05822
0.07989
0.10265
0.12645
0.15137
0.17739
0.20444
0.23247
0.26143
0.29132
0.32206
0.35366
0.38621
0.41971
0.45401
0.48903
0.52486

65

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

50
49
48
47
46
45
44
43
41
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7

55569.1697
56626.5135
57767.4585
58709.2084
59977.969
61008.9171
61996.072
62567.7483
64575.8676
65443.713
66281.1317
67092.6623
67870.4468
68227.8647
69005.5059
69441.313
69732.0624
70168.4568
70536.3981
71052.0235
71092.7669
71240.2548
71161.768
70836.4485
70844.3957
70883.1002
70704.9023
70121.1167
69683.2096
69460.9611
68826.2239
67993.4569
66704.8728
65787.6864
64754.6109
63519.3779
61744.9175
59797.2124
57766.068
55878.8813
52422.3242
49837.6668
46228.1687

TRABAJO ESCALONADO ENTREGA FINAL

0.05557
0.05663
0.05777
0.05871
0.05998
0.06101
0.06200
0.06257
0.06458
0.06544
0.06628
0.06709
0.06787
0.06823
0.06901
0.06944
0.06973
0.07017
0.07054
0.07105
0.07109
0.07124
0.07116
0.07084
0.07084
0.07088
0.07070
0.07012
0.06968
0.06946
0.06883
0.06799
0.06670
0.06579
0.06475
0.06352
0.06174
0.05980
0.05777
0.05588
0.05242
0.04984
0.04623

0.03664
0.03740
0.03813
0.03883
0.03957
0.04033
0.04101
0.04153
0.08477
0.04335
0.04391
0.04446
0.04499
0.04537
0.04575
0.04616
0.04640
0.04664
0.04691
0.04720
0.04739
0.04745
0.04748
0.04734
0.04724
0.04725
0.04720
0.04695
0.04661
0.04639
0.04610
0.04561
0.04491
0.04417
0.04352
0.04276
0.04176
0.04052
0.03919
0.03789
0.03610
0.03409
0.03202

0.56151
0.59891
0.63704
0.67587
0.71544
0.75577
0.79678
0.83830
0.92308
0.96642
1.01034
1.05480
1.09980
1.14517
1.19092
1.23708
1.28348
1.33012
1.37703
1.42423
1.47162
1.51908
1.56655
1.61389
1.66113
1.70838
1.75558
1.80253
1.84914
1.89553
1.94164
1.98725
2.03216
2.07633
2.11985
2.16261
2.20437
2.24489
2.28408
2.32197
2.35807
2.39216
2.42418

66

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

6
5
4
3
2
1

42473.1741
36449.9756
29745.1257
22927.1852
15587.3076
340.3175

0.04247
0.03645
0.02975
0.02293
0.01559
0.00034

Volumen presa

0.02957
0.02631
0.02207
0.01756
0.01284
0.00531

2.45375
2.48006
2.50212
2.51968
2.53252
2.53783

2.54 MMC

DETERMINACIN DEL COCIENTE Ve / Vp


Para el nivel de volumen til tenemos que el volumen de la presa es igual a: 2.54 MMC adems
tenemos que nuestro volumen til es 21.44 MMC, entonces tenemos:

21.44
=
= 8.44

2.54

TRABAJO ESCALONADO ENTREGA FINAL

67

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

TRNSITO DE AVENIDAS PARA EL CAUDAL CORRESPONDIENTE A


UN PERIODO DE RETORNO DE 100 AOS
La funcin de los vertedores de demasas en la presas de almacenamiento y en las reguladoras
es dejar escapar el agua excedente o de avenidas que no cabe en el espacio destinado para
almacenamiento, y en las presas derivadores dejar pasar los excedentes que se envan al sistema
de derivacin. Ordinariamente, los volmenes en exceso se toman de la parte superior del
embalse creado por la presa y se conducen por un conducto artificial de nuevo al rio o algn
canal de drenaje natural. En la figura muestra un vertedor pequeo en operacin. La importancia
que tiene un vertedor seguro no se puede exagerar, muchas de las fallas de las presas se ha
debido a vertedores mal proyectados o de capacidad insuficiente. La amplitud de la capacidad
insuficiente. La amplitud de la capacidad es extraordinaria importancia en las presas de tierra y
en la de enrocamiento, que tienen riesgo de ser destruidas si son rebasadas, mientras que las
presas de concreto pueden soportar un rebasamiento moderado. Generalmente, el aumento en
el costo no es directamente proporcional al aumento de capacidad. Con frecuencia el costo de
un vertedor de amplia capacidad es solo un poco mayor que el de uno que evidentemente es
muy pequeo.

Imagen referencial

El trnsito de avenidas es un procedimiento que sirve para determinar el hidrograma de salida


en embalses y cauces naturales a partir de un hidrograma de entrada.
Entre sus aplicaciones podemos mencionar:

Conocer las variaciones de nivel de agua en un embalse y los caudales de salida por el
vertedero de excedencias, de modo que al presentarse una avenida no se ponga en
peligro la estabilidad de la presa, bienes materiales o vidas humanas ubicadas aguas
abajo de esta.
Dimensionar el vertedero de excedencias.
Verificar el borde libre en cauces naturales

TRABAJO ESCALONADO ENTREGA FINAL

68

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

La relacin entre elevacin del agua y caudal de salida se obtiene de la ecuacin de descarga del
vertedero que relaciona la carga de agua y caudal, por ejemplo, la ecuacin de descarga de un
vertedero tipo Creager viene dado por la siguiente expresin:

Donde:
Q: Caudal de descarga por el vertedero, en m3/s, en este caso lo denominamos Caudal de
Salida.
C: Coeficiente de descarga del vertedero, usualmente vara entre 1,8 a 2,2. Para nuestro
trabajo C=2.
L: Longitud de la cresta del vertedero, en m.
H: Carga de agua sobre la cresta del vertedero incluyendo la carga de velocidad, en m.

De la primera parte del trabajo escalonado, se obtuvo el caudal mximo para un perodo de
retorno de 100 aos. La distribucin que mejor se ajusta a nuestros datos fue la distribucin de
Gumbel.
Por lo tanto:

Qmx: 1854.64 m3/s

TRABAJO ESCALONADO ENTREGA FINAL

69

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Obtenemos el siguiente hidrograma de entrada:


t (min)
0
20
40
60
80
100
120
140
160
180
200
220
240

Q (m3/s)
185.464
370.928
741.856
1112.784
1483.712
1669.176
1854.64
1483.712
1298.248
1112.784
927.32
741.856
556.392

Realizando los clculos necesarios para el trnsito de avenida:


H
66,5
67
68
69
70
71

t
0
20
40
60
80
100
120
140
160
180
200
220
240

Z(msnm)
525,5
526
527
528
529
530

IJ (m3/s)
185,464
370,928
741,856
1112,784
1483,712
1669,176
1854,64
1483,712
1298,248
1112,784
927,32
741,856
556,392

Vacu
21,44
21,8717
22,6854
23,5137
24,3566
25,2142

J
1
2
3
4
5
6
7
8
9
10
11
12
13

TRABAJO ESCALONADO ENTREGA FINAL

Q(m3/s)
0,00
233,35
1212,50
2608,88
4321,61
6300,32

Ij + I j+1
556,392
1112,784
1854,64
2596,496
3152,888
3523,816
3338,352
2781,96
2411,032
2040,104
1669,176
1298,248

2S/t + Q
35733,3333
36686,1360
39021,5225
41798,4503
44915,8783
48323,9377

2Sj/t-Qj
35733,3333
36017,20003
36291,11127
36455,12166
36596,35604
36592,3778
36590,28526
36591,35481
36594,52155
36593,94924
36533,96511
36464,38808
36393,26214

Q(m3/s)
0,00
233,35
1212,50
2608,88
4321,61
6300,32

2SJ+1/t+QJ+1
36289,7253
37129,9840
38145,7513
39051,6177
39749,2440
40116,1938
39928,6373
39373,3148
39005,5535
38634,0532
38203,1411
37762,6361

QJ (m3/s)
0
136,263
419,436
845,315
1227,631
1578,433
1762,954
1668,641
1389,397
1205,802
1050,044
869,377
684,687

70

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

De esta manera se obtienen los caudales de salida, los cuales se observan de una mejor
manera en el siguiente hidrograma.

los caudales de entrada (I) y salida (Q) versus


el tiempo (t):
I(m3/s)

Q(m3/s)

2000
1800
1600
1400
1200
1000
800
600
400
200
0
0

10

12

14

Se consider h0=0, porque se calcul:

TRABAJO ESCALONADO ENTREGA FINAL

71

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Qmax de
salida =
C=
L(m)=

1762,64
2,2
300

h=

1,924921946

q=2,2*1,92493/2=5,875
Va=

ha=

5,875
66,5+0
5,8752

29,81(66,5+0)2

Resolviendo:

5,8752
h0+

29,81(66,5+0)2

-1,9249=0

Se obtuvo que h0=1,9249 mientras ha aproximadamente igual a cero.

TRABAJO ESCALONADO ENTREGA FINAL

72

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

CLCULO DE NIVELES CARACTERSTICOS DEL EMBALSE


1. Clculo del Volumen til

Qreg= 9,72 m3/s

Q75%
(m3/s)

Qcultivo
(m3/s)

Vol MMC

Vol. Embal.

Dif

22,56

7,18

60,44

19,23

41,21

31,71

8,69

76,72

21,03

55,69

42,48

9,72

113,77

26,04

87,73

18,02

6,08

46,71

15,77

30,94

4,85

0,30

12,99

0,80

12,19

2,14

1,43

5,53

3,72

1,82

1,54

0,00

4,12

0,00

4,12

1,40

0,16

3,74

0,43

3,30

1,24

0,00

3,20

0,00

3,20

10

1,36

0,00

3,65

0,00

3,65

11

1,65

5,20

4,27

13,48

-9,21

12

3,10

7,66

8,29

20,53

-12,24

Vol. Util=

21,44 MMC

TRABAJO ESCALONADO ENTREGA FINAL

-21,44

73

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

2. Altitud vs Area vs Vol Acumulado


Z
(msnm)

A
(km2)

459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499

0,005
0,009
0,013
0,017
0,023
0,027
0,032
0,037
0,042
0,046
0,051
0,055
0,060
0,065
0,074
0,083
0,093
0,102
0,110
0,119
0,127
0,136
0,144
0,168
0,182
0,193
0,205
0,216
0,227
0,238
0,249
0,259
0,270
0,281
0,291
0,302
0,312
0,322
0,333
0,343
0,365

V.
Acumulado
(MMC)
0,00
0,01
0,02
0,03
0,05
0,08
0,11
0,14
0,18
0,22
0,27
0,33
0,38
0,45
0,51
0,59
0,68
0,78
0,89
1,00
1,12
1,25
1,39
1,55
1,73
1,91
2,11
2,32
2,54
2,78
3,02
3,27
3,54
3,82
4,10
4,40
4,70
5,02
5,35
5,69
6,04

TRABAJO ESCALONADO ENTREGA FINAL

500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535

0,381
0,396
0,412
0,426
0,449
0,466
0,481
0,497
0,511
0,525
0,543
0,563
0,579
0,595
0,612
0,629
0,645
0,659
0,675
0,692
0,710
0,727
0,744
0,760
0,776
0,792
0,806
0,821
0,835
0,850
0,865
0,881
0,895
0,917
0,932
0,949

6,41
6,80
7,21
7,63
8,06
8,52
8,99
9,48
9,99
10,51
11,04
11,59
12,16
12,75
13,35
13,97
14,61
15,26
15,93
16,61
17,31
18,03
18,77
19,52
20,29
21,07
21,87
22,69
23,51
24,36
25,21
26,09
26,97
27,88
28,80
29,75

74

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

3. Calculo del NEM

VU= 21,44 MMC


VM=VNEM=10%Vu= 2,14 MMC

INTERPOLANDO:

NEM= 485,15 msnm


Z
(msnm)
485
486

V. Acumulado
(MMC)
2,11
2,32

CURVA
ALTITUD VS VOL. ACUMULADO
539
529
519
509
499
489
479
469
459

Curva Altitud vs Vol

TRABAJO ESCALONADO PRIMERA ENTREGA

NEM

75

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

4. Primera Aproximacin
4.1. Calculo del NMOE:
Para la primera aproximacin se debe asumir un valor inicial para la cota de la cresta de la presa.
Cota de Cresta(Cc):
Altura de Presa(P):

Cc= 530.00 msnm


P= 71.0 m

<------------VALOR ASUMIDO

Dimensionamiento:

b=
D=
Z1=
Z2=

12.00 m
0.60 m
3
2.5

L= 257 m
Calculo del H
Para el clculo de H se tuvo en cuenta el valor de rugosidad absoluta de la tubera de la siguiente
tabla:

TRABAJO ESCALONADO PRIMERA ENTREGA

76

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Se consider tubera de fundicin nueva con = 0.25 mm


Calculando H
Qreg=V*A=

9.72 m3/s
V= 34.39 m/s
Qmax= 0.57 m3/s
Numero de tuberias:
Velocidad media:

> Vmax= 2.00 m/s


n= 17.19
Vmed=Qreg/n*A= 1.91 m/s

=
Re=
=
f=
H=

NMOE = NEM + H + D/2 =

TRABAJO ESCALONADO PRIMERA ENTREGA

18

1.0E-6 m2/s
1146177.6
0.25 mm
0.016
1.47 m

486.92 msnm

77

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Z
(msnm)

V. Acumulado
(MMC)

486

2.32

487

2.54

VNMOE= 2.53 MMC

CURVA
ALTITUD VS VOL. ACUMULADO
539
529
519
509
499
489
479
469
459

Curva Altitud vs Vol

NEM

NMOE

4.2. Calculo del NAMO


1 ITERACION
VNAMO= 23.97 MMC
Z
(msnm)
528
529

V. Acumulado
(MMC)
23.51
24.36

NAMO= 528.54 msnm

TRABAJO ESCALONADO PRIMERA ENTREGA

78

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

2 ITERACION
Perdida por evaporacion(Ve)

NAMO= 528.54 msnm


Z
(msnm)
528
529

NMOE= 486.92 msnm

A
(km2)
0.835
0.850

Z
(msnm)
486
487

ANAMO= 0.84 Km2

A
(km2)
0.216
0.227

ANMOE= 0.23 Km2


A= 0.53 Km2
200.00
Ev=
mm/mes
C= 2
Ve= 0.21 MMC

Perdida por Infiltracin(Vi)

K=
Vu=
C=
Vi=

0.016
21.44 MMC
2
0.69 MMC

VNAMO= 24.87 MMC


CUADRO DE ITERACIONES
ITERACION(i)
1
2
3
4
5
6

Ve(i) MMC
0.00000
0.21399
0.21717
0.21718
0.21718
0.21718

VI(i) MMC
0.00000
0.68622
0.68622
0.68622
0.68622
0.68622

VNAMO(i) MMC
23.97169
24.87190
24.87508
24.87509
24.87509
24.87509

FINALMENTE

TRABAJO ESCALONADO PRIMERA ENTREGA

79

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

VNAMO= 24.88 MMC


Z
(msnm)
529
530

V. Acumulado
(MMC)
24.36
25.21

NAMO= 529.60 snm

CURVA
ALTITUD VS VOL. ACUMULADO
539
529
519
509
499
489
479
469
459

Curva Altitud vs Vol

NEM

NMOE

NAMO

4.3. Calculo del NAME

Qs= 1.762,6 m3/s

<--------- Caudal de avenida laminada o Caudal de salida

C= 2,2
L= 300,0 m
H0= 1,92 m

V^2/2g= 0
h0= 1,92 m
NAME= NAMO+h0= 531.53 msnm

TRABAJO ESCALONADO PRIMERA ENTREGA

80

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Z
(msnm)

V.
Acumulado
(MMC)

531
532

26.09
26.97

VNAME= 26.56 MMC

CURVA
ALTITUD VS VOL. ACUMULADO
539
529
519
509
499
489
479
469
459

Curva Altitud vs Vol

NEM

NMOE

NAMO

NAME

4.4. Clculo de la Cota de Coronacin


Para calcular la cota de cresta debemos tener en cuenta:

TRABAJO ESCALONADO PRIMERA ENTREGA

81

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Mapa elico del Per


Por lo tanto:
Fetch:
Velocidad del viento:

F= 3 Km
V= 100 Km/h

Calculo de Altura de Ola(h0) :


1. Formula de Diakon

Fetch:
Velocidad de Viento:
Altura de la Presa:

F= 3 Km
V= 27.8 m/s
P= 71.0 m

TRABAJO ESCALONADO PRIMERA ENTREGA

82

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

2.Formula de Stevenson-Molitor

Fetch:
Velocidad de Viento:

F= 3 Km
V= 100 Km/h

3.Bureau of Reclamation 1987-USBR


Fetch(Km)
<1.6
1.6
4.0
8.0
16.0

Borde Libre(m)
Normal
Minimo
1.2
0.9
1.5
1.2
1.8
1.5
2.4
1.8
3
2.1

4.ASCE

Fetch(Km)
1.6
4.0
8.0
16.0

METODO
Diakom
Stevenson
USBR
ASCE
Usar el mayor:

Velicidad dek Viento(Km/h)


80
120
160
h0 (m)
0.82
0.92
----0.98
1.10
1.20
1.13
1.31
1.47
1.37
1.65
1.86

h0 (m)
2.56
0.96
1.68
0.97
h0= 2.56 m
Be=2*h0= 5.13 m

TRABAJO ESCALONADO PRIMERA ENTREGA

83

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Finalmente:
C.C= 536.66 msnm
5. Segunda Aproximacin
5.1. Clculo del NMOE
En la segunda aproximacin se har el mismo clculo para aproximar ms el valor de la cota de la
cresta de nuestra presa.
Cota de Cresta(Cc):
Altura de Presa(P):

Cc= 536.66 msnm


P= 77.7 m

TRABAJO ESCALONADO PRIMERA ENTREGA

<------------VALOR CALCULADO DE LA 1 ITERACION

84

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

b=

12.00 m
D= 0.60 m
Z1= 3
Z2= 2.5
L= 294 m
Calculando H

Qreg=V*A=

9.72 m3/s
V= 34.39 m/s
Qmax= 0.57 m3/s
Numero de tuberias:
Velocidad media:

> Vmax= 2.00 m/s


n= 17.19
Vmed=Qreg/n*A= 1.91 m/s

=
Re=
=
f=
H=

NMOE = NEM + H + D/2 =


Z
(msnm)
487
488

18

1.0E-6 m2/s
1146177.6
0.25 mm
0.016
1.65 m

487.11 msnm

V. Acumulado
(MMC)
2.54
2.78

VNMOE= 2.57 MMC


5.2. Clculo del NAMO
1 ITERACION
VNAMO= 24.01 MMC
Z
(msnm)

TRABAJO ESCALONADO PRIMERA ENTREGA

V. Acumulado
(MMC)

85

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

528
529

23.51
24.36

NAMO= 528.59 msnm

2 ITERACION
Prdida por evaporacin(Ve)

NAMO= 528.59 msnm


Z
(msnm)
528
529

NMOE= 487.11 msnm

A
(km2)
0.835
0.850

Z
(msnm)
487
488

ANAMO= 0.84 Km2

A
(km2)
0.227
0.238

ANMOE= 0.23 Km2


A= 0.54 Km2
200.00
Ev=
mm/mes
C= 2
Ve= 0.21 MMC

Prdida por Infiltracin(Vi)

K=
Vu=
C=
Vi=

0.016
21.44 MMC
2
0.69 MMC

VNAMO= 24.91 MMC


CUADRO DE ITERACIONES
ITERACION(i)
1
2
3

Ve(i) MMC
0
0.2145383
0.2177163

TRABAJO ESCALONADO PRIMERA ENTREGA

VI(i) MMC
0
0.6862209
0.6862209

VNAMO(i) MMC
23.9716852
24.9145419
24.9177200

86

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

4
5
6

0.2177275
0.2177276
0.2177276

0.6862209
0.6862209
0.6862209

24.9177312
24.9177312
24.9177312

FINALMENTE

VNAMO= 24.88 MMC


Z
(msnm)
529
530

V. Acumulado
(MMC)
24.36
25.21

NAMO= 529.60 msnm


5.3. Calculo de NAME
NAME= NAMO+h0= 531.58 msnm
Z
(msnm)

V.
Acumulado
(MMC)

531
532

26.09
26.97

VNAME= 26.60 MMC

TRABAJO ESCALONADO PRIMERA ENTREGA

87

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

CURVA
ALTITUD VS VOL. ACUMULADO
539
529
519
509
499
489
479
469
459

Curva Altitud vs Vol

NEM

NMOE

NAMO

NAME

5.4. Clculo de Cota de Cresta


METODO
Diakom
Stevenson
USBR
ASCE
Usar el mayor:

h0 (m)
2.56
0.96
1.68
0.97
h0= 2.56 m
Be=2*h0= 5.13 m

Finalmente:
C.C= 536.66 msnm

TRABAJO ESCALONADO PRIMERA ENTREGA

88

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

6. Tercera Aproximacin
6.1. Clculo NMOE
Cota de Cresta(Cc):
Altura de Presa(P):
b=
D=
Z1=
Z2=

Cc= 536.96 msnm


P= 78.0 m

<------------VALOR CALCULADO DE LA 2 ITERACION

12.00 m
0.60 m
3
2.5

L= 295 m
Calculando H
Qreg=V*A=

9.72 m3/s
V= 34.39 m/s
Qmax= 0.57 m3/s
Numero de tuberias:
Velocidad media:

> Vmax= 2.00 m/s


n= 17.19
Vmed=Qreg/n*A= 1.91 m/s

=
Re=
=
f=
H=

NMOE = NEM + H + D/2 =

Z
(msnm)

V. Acumulado
(MMC)

487
488

2.54
2.78

18

1.0E-6 m2/s
1146177.6
0.25 mm
0.016
1.66 m

487.11 msnm

VNMOE= 2.57 MMC

TRABAJO ESCALONADO PRIMERA ENTREGA

89

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

6.2. Clculo de NAMO


1 ITERACION
VNAMO= 24.01 MMC
Z
(msnm)
528
529

V. Acumulado
(MMC)
23.51
24.36

NAMO= 528.59 msnm

2 ITERACION
Prdida por evaporacin(Ve)

NAMO= 528.59 msnm

NMOE= 487.11 msnm

Z
(msnm)

A
(km2)

Z
(msnm)

A
(km2)

528
529

0.835
0.850

487
488

0.227
0.238

ANAMO= 0.84 Km2

ANMOE= 0.23 Km2


A= 0.54 Km2
200.00
Ev=
mm/mes
C= 2
Ve= 0.21 MMC

Prdida por Infiltracin(Vi)

K=
Vu=
C=
Vi=

TRABAJO ESCALONADO PRIMERA ENTREGA

0.016
21.44 MMC
2
0.69 MMC

90

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

VNAMO= 24.92 MMC


CUADRO DE ITERACIONES
ITERACION(i)
1
2
3
4
5
6

Ve(i) MMC
0
0.2145527
0.2177268
0.2177380
0.2177380
0.2177380

VI(i) MMC
0
0.6862209
0.6862209
0.6862209
0.6862209
0.6862209

VNAMO(i) MMC
23.9716852
24.9145564
24.9177304
24.9177416
24.9177416
24.9177416

FINALMENTE

VNAMO= 24.92 MMC


Z
(msnm)
529
530

V. Acumulado
(MMC)
24.36
25.21

NAMO= 529.65 msnm


6.3. Clculo del NAME
NAME= NAMO+h0= 531.58 msnm
Z
(msnm)

V.
Acumulado
(MMC)

531
532

26.09
26.97

VNAME= 26.60 MMC

TRABAJO ESCALONADO PRIMERA ENTREGA

91

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

CURVA
ALTITUD VS VOL. ACUMULADO
539
529
519
509
499
489
479
469
459

Curva Altitud vs Vol

NEM

NMOE

NAMO

NAME

6.4. Clculo de la Cota de Cresta


METODO
Diakom
Stevenson
USBR
ASCE

h0 (m)
2.70
0.96
1.68
0.97
h0= 2.70 m

Usar el mayor:

Be=2*h0= 5.39 m
Finalmente:
C.C= 536.97 msnm

RESPUESTA FINAL DE CC

Por lo tanto la altura de la presa es: 536.97 459 = 77.97 m

TRABAJO ESCALONADO PRIMERA ENTREGA

92

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

TRABAJO ESCALONADO PRIMERA ENTREGA

93

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

PLANTEAMIENTO DEL SISTEMA DE RIEGO


El sistema de riego que se plante para la irrigacin fue un sistema de riego por gravedad.

Esquema del planteamiento de la irrigacin


Para el canal principal se cuenta con los siguientes datos:
Inicio:
Coordenada este:

337209.77 m

Coordenada norte:

8615106.90 m

Coordenada este:

327072.45 m

Coordenada norte:

8610656.83 m

Fin:

Longitud total:

12 585.94 m

Desnivel:

75 m

Pendiente del canal:

75/12585.94 s=0.006

TRABAJO ESCALONADO PRIMERA ENTREGA

94

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

En la distribucin se consider plantear lotes de 5 Ha cada uno dispuestos a ambos lados de 4


canales secundarios.

Esquema de la distribucin de los lotes en el rea de riego


De esta manera se tenan que ubicar 42 lotes para cubrir las 210 Ha de la zona de riego.
Debe notarse al ver las curvas de nivel que el canal principal se encuentra ubicado en ladera, criterio
que se utilizar para el posterior diseo del mismo.
El primer canal secundario abastece 40 Ha.
El segundo canal secundario abastece 50 Ha.
El tercer y cuarto canal secundario abastece 60 Ha cada uno.

TRABAJO ESCALONADO PRIMERA ENTREGA

95

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

DISEO DEL DESARENADOR


1. Dimetro de las partculas a sedimentar
En este caso el material slido a sedimentar consiste en partculas de arena fina:
Arena fina - gruesa d = 0.2 mm.
2. Clculo de la velocidad del flujo en el tanque:
Utilizamos la frmula de Camp:
= a*
Donde: d = Dimetro (mm)
a = constante en funcin del dimetro

Para: d = 0.2 mm
a = 44
Luego: = 44*0.2
= 19.67 cm/s = 0.2 m/s
De acuerdo a lo anterior vemos que la velocidad del flujo determinada es adecuada.

De la velocidad se obtiene el valor del parmetro: K=1,25


3. Clculo de la velocidad de cada w
Para este aspecto existen varias frmulas empricas, tablas y nomogramas, entre las cuales
consideramos:
- Arkhangelski
Tabla en la cual determinamos w (cm/s) en funcin del dimetro de partculas d (mm).
Para un dimetro de d = 0.2 mm.

TRABAJO ESCALONADO PRIMERA ENTREGA

96

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

El w ser (segn la tabla mostrada):


w = 2.16 cm/s = 0.0216 m/s

Velocidades de sedimentacin w calculado por Arkhangelski (1935) en funcin del


Dimetro de partculas

Nomograma Sudry
Permite calcular w (cm/s) en funcin del dimetro d (mm)

Segn Sudry: w = 3 cm/s = 0.03 m/s aprox


Owens
Propone la frmula:
w = k*[d*(s 1)] ^0.5
TRABAJO ESCALONADO PRIMERA ENTREGA

97

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Donde:
s = 1.65 gr./cm3
k = Constante que vara de acuerdo con la forma y naturaleza de los granos se tomar un
valor ubicado entre 9.35 y 1.28 ; para un dimetro de 2mm k = 4.8
Luego:
w = 4.8*[0.0002*(1.65 1)] ^0.5
w = 0.0547 m/s.

- Scotti
Calculamos w a partir de la frmula:
w = 3.8*d^0.5 + 8.3*d
w = 3.8*0.0002^0.5
w = 0.0554 m/s
- Guicciardi:
d= 0,005*w^1,3; d en m
w= 0.084 m/s
De acuerdo al MANUAL DE DISEO DEL ANA consideraremos el promedio de los resultados
Se tomar el promedio de los w obtenidos
-> w = 4.914 cm/s = 0.04914m/s

Calculamos:
Profundidad del desarenador, en m. Depende del espacio disponible y del tipo de suelo de
fundacin. Se recomienda que su valor se encuentre entre 1,5 m y 4 m.
Asumiremos una altura de 4 metros para que nuestro ancho nos salga un valor razonable.
Ancho del desarenador
Q = (B*h)*
B = Q/ (h* )
B = 9.72/ (4*0.2)
B = 12.15 m B = 12.2 m
TRABAJO ESCALONADO PRIMERA ENTREGA

98

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Por esta razn se construirn 3 naves de ancho 6.1 m cada uno. En este caso 2 funcionan y el otro
funcionara cuando se haga mantenimiento a las otras.
Longitud del desarenador
L = (K*h* )/ w
L = (1.25*4*0.2)/ 0.04914
L = 20.35 m.. Longitud mnima
Pero se recomienda que la relacin de B/L este entre 1/3 y 1/6
Entonces escogemos que L=3B=3*12.2=36.6
Tiempo de sedimentacin
t = h/w
t = 4/ 0.04914
t = 81.40 s t = 81.5 s
Volumen de agua conducido en ese tiempo
V = Q*t
V = 9.72*81.5
V = 792.18 m3
Verificando la capacidad del tanque
V = b*h*L
V = 12.2*4*36.6
V = 1786.08 m3
Se verifica que VTANQUE > VAGUA..CUMPLE!!!
Clculo del borde libre
El valor del borde libre ser similar al utilizado en canales. Para tal caso usaremos:
BL = Y/3 BL = 4/3 = 1.333 m o BL=Y/5 BL = 4/5 =0.8
Tomando un valor promedio: BL = 1 m

TRABAJO ESCALONADO PRIMERA ENTREGA

99

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Esquema del diseo del desarenador

TRABAJO ESCALONADO PRIMERA ENTREGA

100

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

DISEO DE LOS CANALES PRINCIPALES Y SECUNDARIOS


A) DISEO DEL CANAL PRINCIPAL:
Para el diseo del canal principal se realizara el siguiente planteamiento:

Se tendr 1 canal principal y 4 canales secundarios en donde se distribuirn los lotes de 5 ha de la


siguiente manera:
1er canal secundario: 8 lotes
2do canal secundario: 10 lotes
3er canal secundario: 12 lotes
4to canal secundario: 12 lotes
Tener en cuenta que el terreno por donde se van a colocar los canales es en ladera por lo que se
utilizara el mtodo de la infiltracin para poder disear la geometra de los canales.
Entonces teniendo el caudal que proviene de la captacin y la pendiente procederemos a disear:
Q = 9.72 m3/s
S = 0.006
Al utilizar el mtodo por infiltracin el canal ser sin revestimiento, considerando que es tierra
arenosa se obtiene el siguiente coeficiente de rugosidad y el siguiente talud:

TRABAJO ESCALONADO PRIMERA ENTREGA

101

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

n=0.016
Z=1.5

TRABAJO ESCALONADO PRIMERA ENTREGA

102

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Utilizando el programa H CANALES obtenemos lo siguiente:

Teniendo en cuenta para una seccin de mnima infiltracin se obtiene la siguiente geometra para
el canal principal:
Tirante (Y)
Ancho de solera (b)
Permetro (P)
rea hidrulica (A)
Radio hidrulico (R)
Espejo de Agua (T)
Velocidad (V)
Nro. de Froude (F)

1.03
1.25
4.97
2.88
0.58
4.34
3.37
1.32

m
m
m
m2
m
m
m/s

Clculo del borde libre:


Para canales sin revestimiento: BL = y/3
BL = 1.03/3 BL = 0.35 m
TIPO DE FLUJO: SUPERCRTICO

TRABAJO ESCALONADO PRIMERA ENTREGA

103

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Seccin transversal
B) DISEO DE LOS CANALES SECUNDARIOS:
Teniendo en cuenta el riego por gravedad:
Dotacin: 1lt/s equivale a 1ha
Diseo del 1er canal secundario:
Tenemos lotes de 5 Ha entonces equivale a 5 lt/s por lote teniendo 40lt/s en el 1er canal
Q = 0.04 m3/s
S=0.006
n= 0.016
Z=1.5

TRABAJO ESCALONADO PRIMERA ENTREGA

104

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Tirante (Y)
Ancho de solera (b)
Permetro (P)
rea hidrulica (A)
Radio hidrulico (R)
Espejo de Agua (T)
Velocidad (V)
Nro. de Froude (F)

0.13
0.15
0.63
0.05
0.07
0.55
0.85
0.94

m
m
m
m2
m
m
m/s

Clculo del borde libre:


Para canales sin revestimiento: BL = y/3
BL = 0.13/3 BL = 0.05 m Usamos BL= 0.10m
TIPO DE FLUJO: SUBCRTICO

Seccin transversal

TRABAJO ESCALONADO PRIMERA ENTREGA

105

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Diseo del 2do canal secundario:


Tenemos 10 lotes de 5Ha que equivale a 50lt/s
Q = 0.05 m3/s
S=0.006
n= 0.016
Z=1.5

Tirante (Y)
Ancho de solera (b)
Permetro (P)
rea hidrulica (A)
Radio hidrulico (R)
Espejo de Agua (T)
Velocidad (V)
Nro. de Froude (F)

0.14
0.17
0.69
0.055
0.081
0.6
0.9
0.95

m
m
m
m2
m
m
m/s

Clculo del borde libre:


Para canales sin revestimiento: BL = y/3
BL = 0.14/3 BL = 0.05 m Usamos BL= 0.10m

TIPO DE FLUJO: SUBCRTICO

TRABAJO ESCALONADO PRIMERA ENTREGA

106

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Seccin transversal

Diseo del 3er canal y 4to canal secundario:


Tenemos 12 lotes de 5Ha que equivale a 60lt/s tanto para el 3er canal y el 4to canal entonces de
los datos obtendremos los siguientes resultados:

Q = 0.06 m3/s
S=0.006
n= 0.016
Z=1.5

TRABAJO ESCALONADO PRIMERA ENTREGA

107

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

Tirante (Y)
Ancho de solera (b)
Permetro (P)
rea hidrulica (A)
Radio hidrulico (R)
Espejo de Agua (T)
Velocidad (V)
Nro. de Froude (F)

0.15
0.18
0.73
0.064
0.086
0.64
0.94
0.96

m
m
m
m2
m
m
m/s

Clculo del borde libre:


Para canales sin revestimiento: BL = y/3
BL = 0.15/3 BL = 0.05 m Usamos BL= 0.10m

TIPO DE FLUJO: SUBCRTICO

Seccin transversal

TRABAJO ESCALONADO PRIMERA ENTREGA

108

UNIVERSIDAD NACIONAL DE INGENIERIA

IRRIGACION

FACULTAD DE INGENIERIA CIVIL

HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

CLCULO DE LA LONGITUD DE TRANSICIN


Teniendo los siguientes datos:
Ancho de canal principal (b):

b = 1.25 m

Ancho de desarenador (B):

B = 18.3 m

Tipo de flujo en el canal:

Supercrtico ; Fr = 1.32

Como tenemos un flujo supercrtico:


= arctan(

1
)
3.

Entonces, de la ecuacin obtenemos :


= 14.17
Adems:

Obtenemos:

Lt = 33.76 m

Esquema de la zona de transicin

TRABAJO ESCALONADO PRIMERA ENTREGA

109

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

CONCLUSIONES
o
o
o

Los datos tomados del ANA no tuvieron problemas, ms que la falta de datos, ya que segn
los anlisis estos no presentaron tendencia ni informacin inconsistente.
Los valores asumidos en el clculo de la demanda de riego no son exactos, ya que muestran
intervalos de valores, que hacen que al asumir nuestros clculos sean variados.
Podemos observar que para el riego de frutos ctricos necesitamos regar especialmente en
los meses de Noviembre Abril, siendo nuestros requerimientos (demanda) en su mayora
mayor a los que ro trae (oferta).
Como podemos ver la demanda tambin tiene relacin con la precipitacin, teniendo en los
meses de Noviembre Abril la mayor cantidad de precipitacin, que coincide con la los
meses de mayor demanda.
El volumen til necesario es un nmero grande ya que, como mencionamos anteriormente,
la demanda del cultivo est en el rango de la oferta teniendo meses donde la demanda es
mayor que la oferta.
Para la seleccin y ubicacin de nuestra zona de riego, lo ideal es que tanto las pendientes
mximas de 10% y el mapa de capacidad de uso de suelos del Per sean compatibles. En
nuestro caso no result como se espera pero por fines acadmicos continuaremos con la
zona indicada.
Para el clculo de caudales de avenidas es importante identificar la prueba de bondad de
ajuste ya que dependiendo a ello nosotros podemos obtener un mejor ajuste
aproximndonos a lo real. En nuestro trabajo se realizaron dos distribuciones, la distribucin
normal y la distribucin de Gumbel, resultando con mejor ajuste la distribucin de Gumbel.
Se hace uso de la prueba de bondad de SMIRNOV KOLMOGOROV ya que este es aplicable a
datos no agrupados, no requiere de intervalos de clase y es aplicable a cualquier distribucin
de probabilidades.
Nuestro embalse tiene una altura de 78.04 m, esto se debe a que la topografa del lugar
hace que cuando trazamos la curva Altitud VS Volumen acumulado se obtengan volmenes
bajos por su forma angosta a alrededor del ro. Como consecuencia, se obtiene un embalse
de forma alargada.
La relacin Vc/Vp result ser de 8.44. Esto no es conveniente ya que para presas pequeas
debera ser mayor que 10. Notamos que este problema se debe fundamentalmente a la
topografa de la zona, el ser muy estrecho en gran parte del embalse hizo que la presa tenga
una altura elevada y que aumentemos ms los taludes en cada lado de la presa para lograr
la estabilidad deseada.
Para tratar de solucionar el problema de la relacin Ve/Vp se tendra que:
1. Plantear nuevamente la ubicacin de la presa, de modo que se localice una zona
ms angosta para su colocacin. Se tendra que revisar minuciosamente la
topografa en zonas ms alejadas de aguas arriba.
2. Cambiar el tipo de presa, cambiar la presa de tierra por una presa de arco. Al
ser nuestra presa de concreto tendramos la posibilidad de disminuir el volumen
de nuestra presa pero a un mayor costo.

TRABAJO ESCALONADO PRIMERA ENTREGA

110

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

o
o
o

A la altura de 537.04 msnm como se calcul que sera la cota de cresta se obtiene una
longitud de presa de 398 m.
Para calcular la cota de cresta de la presa se hicieron 4 iteraciones para lograr un error de
0.01m.
El diseo del vertedero de demasas result una longitud de L=300 m, lo cual ocupa gran
parte de la presa (teniendo en cuenta que la longitud de la presa es de398 m). Esto se debe
a que se limit la altura del vertedero a 2 m. Si no se hubiera limitado tanto la altura, hubiese
sido posible obtener una longitud menor.
Para realizar el planteamiento del sistema de riego se debe tener en cuenta la topografa de
la zona ya que se debe evitar excesivos cortes al terreno lo cual generara ms gasto en el
proyecto. Por esa razn es que se ubic el canal principal en ladera, este factor es muy
importante para el diseo prximo del canal.
Para el clculo de las longitudes del desarenador: La velocidad de sedimentacin se calcul
haciendo un promedio de los resultados obtenidos de las diferentes teoras disponibles ya
que eran cercanos. Para el clculo del borde libre se tom como referencia el mtodo de
clculo del borde libre de los canales (siendo y/3 para canales sin revestimiento y y/5 para
canales revestidos), se tom como resultado final del borde libre un promedio de ambos
valores.
Se consider ubicar 3 naves en el desarenador para lograr hacer el mantenimiento sin
necesidad de parar el funcionamiento del mismo. Adems la altura H del desarenador se
consider 4 metros para que de esta manera nos salga un B moderado y as disminuir los
cortes excesivos en el terreno.

TRABAJO ESCALONADO PRIMERA ENTREGA

111

UNIVERSIDAD NACIONAL DE INGENIERIA


FACULTAD DE INGENIERIA CIVIL

IRRIGACION
HH413-I

DEPARTAMENTO ACADEMICO DE HIDRAULICA E HIDROLOGIA

BIBLIOGRAFA
o
o
o
o
o
o
o

o
o
o
o
o

Hidrologa. MAXIMO VILLON BEJAR.


Irrigacin. CESAR ARTURO ROSELL CALDERON.
Las irrigaciones Planeamiento y Gua para el diseo hidrulico de las Obras MayoresCORONADO DEL AGUILA, Francisco.
http://www.fao.org/home/es/
http://www.fao.org/nr/water/aquastat/quickWMS/climcropwebx.htm - Pagina para bajar
datos de estacin deseada.
http://www.youtube.com/watch?v=ViKVB3jZMNg TUTORIAL DE CROPWAT
Descarga
de
cartas
nacionales
en
formato
shape
para
ArcGis:
http://mapasplanosperu.blogspot.com/2011/03/mapa-de-clasificacion-de-tierras-porsu.html
Crear perfil longitudinal en ArcGis: http://www.youtube.com/watch?v=1Fi95WVQbvo
http://www.youtube.com/watch?v=VZmUt7WG4qw
http://geogpsperu.blogspot.com/2013/09/cuadro-de-empalme-de-la-cartografia.html
Generar curvas de nivel con google earth, autocad y global mapper:
http://www.youtube.com/watch?v=HjJh-F7r7A4
Apuntes de clase 2014-II

TRABAJO ESCALONADO PRIMERA ENTREGA

112

Вам также может понравиться