Project
Peak
year
Liquids,
1,000 b/d
Gas,
MMscfd
Algeria
El Merk
Ain Tsila
2013
2018
146
IAN/EOR
Bir Seba
Timimoun
2012
2014
2014
15
35
18
Angola
Plutao, Saturna, Venus,
Marte (PSVM)
2012+
150
BP
600
355
Operator
Anadarko
Petroceltic
Sonatrach
Sonatrach
Sonatrach
Development type
Block 208, $3.8 billion oil and condensate, 500-600 boe reserves
Isarene PSC, Illizi basin, 18 initial wells, 106 development wells, 2.1 tcf sales
gas, 67 million bbl condensate, 108 million bbl LPG
Block 212, 80 million bbl of reserves
180 million bbl
37 production wells
2013+
75
BP
Block 31, 500 million bbl of oil, FPSO, 1.8 million bbl storage, 5,900-6,730 ft
water
Block 18, FPSO, 1,600 m water
2013+
150
BP
2014+
2015+
2014+
150
100
95
BP
Chevron
Chevron
Negage
LNG various felds
2014+
2012+
75
63
Cabaca Norte
Sangos, NGoma
Kizomba D satellites
Kizomba Satellites
Cravo-Lirio-Orquidea-Violeta
(CLOV)
Kaombo-Gindungo, Canela,
Mostarda, Salsa, Louro
Cola, Manjericao, Caril.
Caminhos, Colorau, Alho
2014+
2013
2012+
2012
40
85
125
100
Eni
Eni
ExxonMobil
ExxonMobil
Block 31 discoveries
Block 14, 3,940 ft water
Block 0, Southern Malongo development area, 200 ft water, central processing
and wellhead platforms
Block 14, FPSO 1.5 million bbl storage, 1,500 m water
Onshore, one train, 5.2 million LNG tonnes/year, 10 tcf of associated gas from
Blocks 15, 17, 18, 0, and 14, and nonassociated gas from Blocks 1 and 2
Block 15/06, 500 m water
Block 15/06, leased Xikomba FPSO
Block 15, subsea tiebacks to Kizomba C
Block 15, subsea tiebacks to Kizomba A & B FPSOs, 1,000 m water
2013+
160
Total
2012+
120
Total
Total
BHP
100
670
2014+
Australia
Macedon
2013
Parnui
2014+
2014+
Wheatstone, Iago
2014+
200
20
Chevron
Chevron
1,200
BG
2,545
Chevron
1,000
Chevron
40
Kipper-Tuna
2012+
15
Scarborough, Thebe
2013+
Turrum Phase 2
2013
20
2016+
100
1,200
Crux
2012+
35
Gladstone LNG
Arrow LNG
Prelude
2015+
2015+
2017+
35
900
1,000
650
Santos
Shell
Shell
Crux
North Rankin 2
2020+
2012+
39
2,500
Shell
Woodside
2013
2014
2013+
800
800
1,400
Woodside
Woodside
Woodside
$1.25 billion Browse LNG project, 14 tcf gas, 370 million bbl condensate
Azerbaijan
Shah Deniz FF
2017+
2,600
BP
Bangladesh
Bibiyana expansion
2014+
300+
Chevron
$500 million to expand feld production capacity to 1.4 bcfd and 400,000 b/d
of natural gas liquids
Brazil
Frade
Gaviao Azul, Gaviao Real
Waikiki
Waimea
Campos basin shallow water
Aruana test
Aruana
Baleia Azul
2011
2013
2013
2013
2015
2011
2013
2012
100
200
450
15
100
100
Chevron
OGX
OGX
OGX
OGX
Petrobras
Petrobras
Petrobras
Baleia Azul
2014
60
$2.8 billion; production started in 2009, suspended early 2012 at 60,000 b/d
Onshore Parnaiba basin gas felds
BMC-39/40 FPSO connected to well platform, 110 m water
BMC-41, FPSO connected to well platform, 130 m water
FPSOs and TLPs tied back to wellhead platforms
FPSO Cidade Rios das Ostras postsalt
FPSO postsalt
FPSO Cidade de Anchieta, BC-60 heavy oil presalt; started up September
2012
FPSO postsalt
121001ogj_71 71
90
PTTEP
Greater Gorgon 15 million tonnes/year LNG from 3 trains on Barrow Island and
300 MMscfd domestic gas, 40 tcf of gas, subsea wells tied back to shore
Carnarvon basin gas feld in 650 ft water, 4.5 tcf, 4.3 million tonnes/year, two
LNG trains
Blowout on Montara platform has delayed completion of development, FPSO,
subsea wells in 80 m water
$2.8 billion Gippsland basin gas, Kipper includes initially two subsea completed wells tied back to West Tuna platform
$15-20 billion offshore development with onshore LNG plant, 8 tcf, Carnarvon
basin, 900 m of water
$2.7 billion Marlin B piled steel jacket platform set in 58 m water in the Gippsland basin in the Bass Strait
Northwest Shelf, semisubmersible in 230 m water, onshore LNG plant, 8.4
million tonne/year, 200-km fowline, 9.5 tcf gas, 312 million bbl condensate
Development delayed, Browse basin, 75 million bbl, condensate stripping with
gas reinjection, leased FPSO, 190 m water
Queensland coalbed methane, 2 LNG trains, 7.2 million tonne capacity
Queensland coalbed methane, 2 LNG trains, 7.2 million tonne capacity
Floating LNG, 4 million tonnes LNG/year, 3.25 tcf of gas, 120 million bbl
condensate
Gas production from Crux after condensate operation
$5 billion (Aus.), new platform for low-pressure gas from North Rankin and
Perseus gas felds
175
ExxonMobil
1,190
ExxonMobil
200
ExxonMobil
Inpex
Shell
20
200
110
Petrobras
71
9/24/12 2:23 PM
Peak
year
Liquids,
1,000 b/d
Carioca test
Carioca Northeast test
Cernambi test (Iracemea)
Cernambi South
FPSO P-67
FPSO P-66
Franco
Guara (Sapinhoa)
Guara North
Jurua, Araracanga
Lula Northeast pilot
Marimba ESP
Maromba
Papa-Terra
2011
2011
2011
2014
2015
2015
2015
2013
2014
2013
2013
2015
2015
2013+
30
15
15
150
150
150
150
2014
2012
2013
2014
2012
180
180
100
50
80
Presalt production
2015+
2,500
Cambodia
Aspara Phase 1A
2012+
25
Canada
Clearwater pilot
2011
Clearwater
2013+
11
2015+
150
Hangingstone
2014+
12
2011+
2015+
150
2012+
2011+
2012+
2014
2011
2013
2014
2016
2017
2019
2020+
2014
2016
2017
2019
2018+
1
10
40
40
40
40
40
40
40
40
60
30
30
30
25
60
2020+
2016
2020+
2018+
2020+
2020+
2013+
120
130
30
80
60
60
115
Cenovus
Cenovus
Cenovus
Cenovus
Cenovus
Cenovus
Chevron
2013+
2015+
2014+
2016+
2018+
2012+
2012+
2018+
2021+
2023+
2016+
2014+
2013+
2016
2018+
2012
2016+
40
100
72
72
72
70
70
60
60
60
60
135
40
60
30
24
190
Chevron
Chevron
CNOOC
CNOOC
CNOOC
CNOOC
CNOOC
CNRL
CNRL
CNRL
CNRL
CNRL
CNRL
CNRL
CNRL
Connacher
ConocoPhillips
Thermal project
SAGD
SAGD
SAGD
SAGD
SAGD
SAGD
SAGD
SAGD
SAGD, 2014 construction start, 2016 steam injection start
Mine expansion
SAGD, under construction, $1.25 billion (Can.)
SAGD, 2014 construction start, 2016 steam injection start
SAGD
SAGD
72
121001ogj_72 72
Gas,
MMscfd
Operator
Petrobras
Petrobras
Petrobras
Petrobras
Petrobras
Petrobras
Petrobras
Petrobras
Petrobras
Petrobras
Petrobras
Petrobras
Petrobras
Petrobras
150
120
40
100
150
20
Development type
BM-S-09, FPSO Dynamic Producer, Santos basin presalt, 2,140 m water
Petrobras
Chevron
Petrobras
Petrobras
Petrobras
Petrobras
Petrobras
Alberta
Oilsands
Alberta
Oilsands
Athabasca
Oil Sands
Athabasca
Oil Sands
Athabasca
Oil Sands
Athabasca
Oil Sands
Andora
BP
BP
BP
Cenovus
Cenovus
Cenovus
Cenovus
Cenovus
Cenovus
Cenovus
Cenovus
Cenovus
Cenovus
Cenovus
Cenovus
9/24/12 2:23 PM
Peak
year
Parsons Lake
2018+
50
Surmont Phase 2
Jackfsh Phase 2
Jackfsh Phase 3
Jackfsh East
Pike 1A
Pike 1B
Pike 1C
Pike 2
Deep Panuke
Poplar Creek
Poplar Creek expansion
Aspen
Firebag
Hebron
Hibernia South expansion
Kearl Phase 1
2015+
2011
2014+
2018+
2017+
2018+
2019+
2023+
2011+
2014
2017
2015+
2015+
2015+
2012+
2012+
83
35
35
25
35
35
35
35
200
10
40
80
280
130
55
170
Kearl Phase 2
Mackenzie gas project
2015+
2018+
170
10
Sable satellites
Algar Phases 1-2
BlackGold Phase 1
BlackGold Phase 2
Caribou
McMullen Pilot
Pikes Peak
Sunrise Phase 1
Sunrise Phase 2
Cold Lake LASER expansion
Cold Lake Nabiye expansion
Taglu
2013+
2013+
2012
2015+
2011+
2011+
2012
2014+
2016+
2013+
2015+
2015+
5
10
10
20
10
1
9
60
70
20
40
Tamarack Phase 1
Tamarack Phase 2
Hangingstone Phase 1
Gemini pilot
Gemini
Germain pilot
Germain Phase 1
Saleski pilot
Saleski Phase 1
Christina Lake Phase 2B
Christina Lake Phase 3A
Christina Lake Phase 3B
Axe Lake
Taiga Phase 1
Ells River
Lindbergh pilot
Lindbergh
May River Phase 1
May River additional phases
Whitesand expansion
Carmon Creek Phase 1
2018+
2015+
2014+
2011+
2012+
2011+
2012+
2011
2012+
2013+
2015+
2017+
2013+
2014+
2012+
2012+
2014+
2012+
2014+
2011+
2014+
20
30
35
1
10
2
10
2
10
35
75
75
10
25
10
2
12
10
90
2
80
2012+
2014+
2013+
2015+
100
100
115
Orion Phase 2
Pierre River Phase 1
Pierre River Phase 2
Leismer pilot
Leismer commercial
Leismer expansion
Comer
Thornbury
Comer expansion
Hangingstone
Thornbury expansion
Northwest Leismer
South Leismer
Red Earth pilot expansion
2012+
2016+
2016+
2011
2012+
2012+
2012+
2013+
2014+
2016+
2017+
2018+
2020+
2011+
60
100
100
10
10
20
40
40
40
20
20
20
20
3
2013+
10
121001ogj_73 73
Liquids,
1,000 b/d
Gas,
MMscfd
1,700
190
Operator
Development type
ConocoPhillips Northwest Territories, 1.8 tcf gas, awaiting $7.8 billion (Can.) 760-mile, 1.2
bcfd Mackenzie Delta pipeline, $3.5 billion (Can.) gas gathering system,
$4.9 billion (Can.) anchor felds
ConocoPhillips SAGD, $1.1 billion (Can.), four phases, Phase 2 under construction
Devon
SAGD, $1 billion (Can.), 300 million bbl
Devon
SAGD, 2012 construction start, 300 million bbl
Devon
SAGD, 2016 construction start
Devon
SAGD, 2016 construction start
Devon
SAGD, 2017 construction start
Devon
SAGD, 2017 construction start
Devon
SAGD, 2021 construction start
Encana
Platform and 4 producing wells, 250 km southeast of Halifax
E-T
Electrothermal heating
E-T
Electrothermal heating
ExxonMobil
ExxonMobil
ExxonMobil
ExxonMobil
ExxonMobil
$10.9 billion (Can.) Phase 1 mine, 4.6 billion bbl over 40 years, Phase 1
under construction
ExxonMobil
Mine
ExxonMobil
Northwest Territories, awaiting $7.8 billion (Can.) 750-mile, 1.7 bcfd Mackenzie Delta pipeline, $3.5 billion (Can.) gas gathering system, $4.9 billion
(Can.) anchor felds
ExxonMobil
Subsea tieback to Sable platform off Nova Scotia
Grizzly
$500 million (Can.) SAGD
Harvest
$300 million (Can.) SAGD
Harvest
$540 million (Can.) SAGD, 2013 construction start, 2015 steam injection start
Husky
SAGD, Cold Lake area
Husky
SAGD
Husky
Saskatchewan thermal
Husky
$1.9 billion (Can.) SAGD, 49 well pairs
Husky
$1.9 billion (Can.) SAGD
Imperial Oil
Liquid addition to steam for enhanced recovery
Imperial Oil
$1.3 billion (Can.) Cold Lake Phases 14-16, cyclic steam, horizontal wells
Imperial Oil
Northwest Territories, 3 tcf gas, awaiting $7.8 billion (Can.) 750-mile, 1.2 bcfd
Mackenzie Delta pipeline, $3.5 billion (Can.) gas gathering system,
$4.9 billion (Can.) anchor felds
Ivanhoe
SAGD, $1.25 billion (Can.), 2012 construction start, 2013 steam injection start
Ivanhoe
SAGD
JACOS
$1.2 billion (Can.) SAGD, 1.7 billion bbl, construction start in late 2011
Koch
SAGD, Cold Lake area
Koch
SAGD, Cold Lake area
Laricina
SAGD, Cold Lake area
Laricina
SAGD, Cold Lake area
Laricina
SAGD in carbonates, under construction
Laricina
SAGD in carbonates
MEG
$1.4 billion (Can.) SAGD under construction
MEG
SAGD
MEG
SAGD
Oilsands Quest SAGD, Northwest Saskatchewan
Osum
SAGD-CSS, Cold Lake area
Patch
SAGD
Pengrowth
SAGD pilot, Cold Lake area
Pengrowth
SAGD
Petrobank
Toe-to-heel air injection (THAI)
Petrobank
Toe-to-heel air injection (THAI)
Petrobank
Toe-to-heel air injection (THAI)
Shell
$3.45 billion (Can.) cyclic steam, Peace River area, 2011 construction start,
2014 steam injection start
Shell
Mine
Shell
Mine
Shell
Mine
Shell
Northwest Territories, 1.8 tcf gas, awaiting $7.8 billion (Can.) 760-mile, 1.2
bcfd Mackenzie Delta pipeline, $3.5 billion (Can.) gas gathering system,
$4.9 billion (Can.) anchor felds
Shell
SAGD, Cold Lake area
Shell
Mine
Shell
Mine
Statoil
SAGD pilot, start production January 2011
Statoil
SAGD with upgrader
Statoil
SAGD with upgrader
Statoil
SAGD with upgrader
Statoil
SAGD with upgrader
Statoil
SAGD
Statoil
SAGD
Statoil
SAGD
Statoil
SAGD
Statoil
SAGD
Southern
Pacifc
Cyclic steam, Peace River area
Southern
Pacifc
Cyclic steam, Peace River area
73
9/24/12 2:23 PM
Peak
year
STP-McKay
2012+
24
Chard Phase 1
Firebag Phase 3
Firebag Phase 4
Firebag Phase 5
Firebag Phase 6
Fort Hills Phase 1
Fort Hills debottlenecking
Lewis Phase 1
Lewis Phase 2
MacKay River expansion
Meadow Creek Phase 1
Meadow Creek Phase 2
Voyageur South
Harper pilot
Legend Lake Phase 1
Legend Lake Phase 2
West Ellis Phase 1
West Ellis Phase 2
West Ellis Phase 3
Thickwood Phase 1
Thickwood additional phases
Syncrude expansion Stage 3
Syncrude Stage 4
Equinox
Frontier Phase 1
Frontier Phase 2
Frontier Phase 3
Northern Lights Phase 1
Northern Lights Phase 2
Joslyn North
2012+
2013
2014
2016+
2014+
2016+
2018+
2012+
2012+
2012+
2012+
2012+
2012+
2011+
2013+
2015+
2012+
2014+
2016+
2013+
2015+
2012+
2015+
2020+
2016+
2019+
2022+
2016+
2018+
2018+
40
68
68
62
68
165
25
40
40
40
40
40
120
1
10
40
10
40
30
10
40
46
140
37
80
80
80
57
57
100
Southern
Pacifc
Suncor
Suncor
Suncor
Suncor
Suncor
Suncor
Suncor
Suncor
Suncor
Suncor
Suncor
Suncor
Suncor
Sunshine
Sunshine
Sunshine
Sunshine
Sunshine
Sunshine
Sunshine
Sunshine
Syncrude
Syncrude
Teck
Teck
Teck
Teck
Total
Total
Total
China
Chuandongbei, Tieshanpo,
Dukouhe-Qilibei,
and Luojiazhai
2011
558
Chevron
2013+
2015
300
200
320
Husky
Husky
Shell
Sichuan Province processing plants and gas felds with 5 tcf of gas, 8-17%
H2S, 5-10% CO2; second phase to start production in 2013
$6.5 billion, 4-6 tcf discovery, 1,345 m water South China Sea Block 29/26
Block 29/29
Horizontal and multilateral tight gas development in Ordos basin, Inner Mongolia; started up March 2007
Shell
Total
Develop more tight gas sands and increase plateau output beyond 320 MMcfd
Unconventional tight gas sands, Ordos Block, Inner Mongolia, 18.85 tcf gas,
discovered 2002, production started in 2002
Pacifc
Rubiales
Eni
Total
Total
Chevron
2012
Colombia
Rubiales expansion
2011+
Liquids,
1,000 b/d
Gas,
MMscfd
3,000
50
Congo (Brazzaville)
Tar sands project
Libondo
Moho North
Lianzi
2012
2011
2012
2015+
39
8
2011
40
Sunrise, Troubadour
2016
30
Ecuador
Pungarayacu
2013
100
Egypt
Seth
2012
Equatorial Guinea
Alen (Belinda)
Aseng
46
3,000
Operator
Woodside
JPDA Block 06-105, Timor Sea, FPSO, 3 subsea wells, 1,000 ft water, 30-40
million bbl of oil; started up October 2011
Floating LNG, 4 million tonnes/year LNG, 5.13 tcf of gas, 250 million bbl of
condensate, 90-550 m of water, foating LNG, 7 subsea wells at start-up with
26 wells at full development
Ivanhoe
27
Eni
Phase 1 started up June 2012 toward 170 MMcfd from 2 wells to develop 240
bcf; Phase 2 to add 2 wells to top 250 MMcfd by end-2012
2013
30
Noble
2012
80
Noble
$1.1-1.5 billion, 247 million boe, gas recycling, fxed platform in 25 ft water,
use Aseng FPSO for liquids
220 million boe, two four-slot subsea manifolds tied back to FPSO in 3,000 ft
water, 1.6 million bbl storage
Falkland Islands
Sea Lion
2016+
120
Rockhopper
$2 billion, FPSO in 450 m water, 350 million bbl of 29.2 gravity oil
Gabon
Anguille redevelopment
2011
30
Total
$2 billion, new wells and facilities to add 150 million bbl, feld on production
since 1966
74
121001ogj_74 74
Eni
Development type
580
9/24/12 2:23 PM
Peak
year
Liquids,
1,000 b/d
Ghana
Jubilee
2011
120
India
Bhagyam
2012
40
Indonesia
Gendalo, Gehem
2013+
31
Caltex 3
South Belut
Suban 3
Coalbed methane
Pagerungan Utara
Terang, Sirasun, Batur
2013+
2013+
2013+
2013
2011
2012
35
15
15
6
300
Banyu Urip
2013
165
15
Cepu gas
East Natuna
Abadi
Senoro-Toili
Ruby
2015+
2019+
2016+
2014+
2013
13
8
210
1,100
650
250
100
Matindok
Jambaran-Tiung Biru
2014+
2015+
23
290
Iran
Azadegan North Phase 2
Yadavaran
2014
2013
30
85
NIOC
NIOC
Heavy oil
Medium oil
Iraq
Rumaila expansion
Al-Ahdab
2013+
2020+
1,850
120
BP
CNPC
Halfaya expansion
Tawke
West Qurna expansion
Badra
West Qurna 2
Hamrin
Subba-Luhais expansion
Gharraf
2013+
2012+
2015+
2013+
2013+
2012+
2012+
2012+
500
200
2,045
170
1,800
60
240
230
CNPC
DNO
ExxonMobil
Gazprom
Lukoil
OGI
Petrel
Petronas
Majnoun expansion
Najima
Qayara
2013+
2013+
2013+
1,750
110
120
Shell
Sonangol
Sonangol
Ireland
Corrib
2013+
320
Shell
Subsea wells in 350-m water tied back to shore with 83-km, 20-in. fowline
Israel
Tamar
2013+
850
Noble
Dalit
Leviathan
2016
350
Noble
Noble
$2.8 billion, subsea wells tied to dual 160-mile, 16-in. fowlines to shore, 9 tcf,
5,000 ft water; development drilling under way
Tamar Phase 2
17 tcf resource; drilled successful appraisal well in 2011
Italy
Tempa Rossa
2015
50
20
Total
Kazakhstan
Karachaganak Expansion III
Aktote
Kashagan Phase 1
2012+
2015+
2012+
50
360
BG
Eni
Eni
2013
1,260
$8 billion expansion
Coventure operated
$29 billion, 3.6 billion bbl of oil, carbonate reef, 10-30 ft water, 45 gravity oil,
19% H2S, production start in 2011, 1.2 million bo/d from all phases
12 billion bbl
Kuwait
Kuwait North redevelopment
2012
450
Libya
Area 47
2014+
50-100
2012+
200
Malaysia
Damar gas
Teluk
Gumusut-Kakap
Malikai
2012+
2012+
2013+
2012+
150
150
76
121001ogj_76 76
Gas,
MMscfd
160
1,100
600
1,600
850
Operator
Development type
Tullow
Cairn
Chevron
Kutei basin, Makassar Strait off East Kalimantan, 6,000 ft water, two FPUs,
subsea drill centers, domestic gas and gas to Bontang LNG for export
ConocoPhillips
ConocoPhillips
ConocoPhillips
Eni
ENRG
Oil development off Kangean Island
ENRG
Gas felds off Kangean Island, spread-moored FPSO with 340 MMscfd gas
processing capacity and 700,000 bbl storage in 100 m water
ExxonMobil
$2.6 billion, Cepu block, onshore Java, 50 wells drilled from four well pads,
60-mile pipeline to 2 million bbl FSO moored off Tuban, initial production of
20,000 b/d started in 2009
ExxonMobil
ExxonMobil
46 tcf of gas, 70% carbon dioxide, South China Sea, former Natuna D Alpha
Inpex
Crude-condensate, Masela block, foating LNG, 4.5 million tonnes/year
Medco
Central Sulawesi gas for $2.8 billion Donggi-Senoro LNG, 2 million tonnes/year
Pearl Energy
$500 million, Sebuku PSC in Makassar Strait, 50-200 m of water, wellhead
platform bridge linked to production platform, 315 km 14-in. pipeline to
Totals Senipah onshore gas plant, gas sales to fertilizer plant
Pertamina
Central Sulawesi gas for Donggi-Senoro LNG, 2 million tonnes/year
Pertamina
Cepu block gas
Eni
KPC
Medco
Oxy
200
350
ExxonMobil
ExxonMobil
Shell
Shell
Develop 18 oil discoveries with 588 million boe contingent resource in Ghadames basin
$5 billion over 5 years, increase to 300,000 bo/d from 100,000 bo/d, develop
2.5 billion bbl of oil
9/24/12 2:23 PM
Peak
year
Liquids,
1,000 b/d
Gas,
MMscfd
Operator
Development type
2019+
Anadarko
Anadarko
Eni
Myanmar
Shwe, Shwe Phyu, Mya
2014
Daewoo
Develop 5+ tcf of Rakhine basin gas for transport via 770-km pipeline to
Kunming, China
Namibia
Kudu
2014+
Tullow
$7 billion, PL 003, 170 m water, 1.8 tcf gas reserves for power plants
Niger
Agadem block
2011
20
CNPC
Nigeria
Ebok
2011
35
Afren
OML 67, 55 km off Nigeria in 140 ft water, 12-slot wellhead platform, mobile
jack up production unit and FSO. Production started March 2011, 24 gravity
oil
Agbami 2
Nigeria GTL
Nsiko
Brass LNG
Bosi
2011+
2011+
2012+
2012+
2013+
100
33
100
135
Chevron
Chevron
Chevron
Eni
ExxonMobil
2013+
50
ExxonMobil
2012+
2013+
2011+
2013+
2013+
2013+
2013+
50
70
300
110
50
150
Bonga Southwest
Gbaran Ubie Phase 1
NLNG 7
Egina
Usan
2013+
2012+
2012
2012
2012
140
70
1,600
200
180
105
1,000
175
Shell
Shell
Shell
Total
Total
Norway
Skarv-Idun
2011
90
665
BP
Valhall redevelopment
Eko sk South
Eld sk II
Goliat
Edvard Grieg (Luno)-Draupne
Brynhild
Dagny
Gullfaks South
Luva
Marulk
Trestakk
Valemon
Visund South
Hild
2011
2013+
2013+
2013
2016
2014
2015+
2014
2013
2012
2013
2015
2012
2016
150
70
70
100
130
12
65
175
BP
ConocoPhillips
ConocoPhillips
Eni
Lundin
Lundin
Statoil
Statoil
Statoil
Statoil
Statoil
Statoil
Statoil
Total
2014
30
Stanley condensate
2014
Horizon
$10-11 billion, gas from elds in Southern Highlands to 6.6 million tonne/year
LNG plant at Port Moresby
$300 million project to recover condensate from gas cycled from Cretaceous
Elevala sandstone at 3,060 m
Peru
Paiche, Dorado, Pirana
2018
60
Perenco
Block 67, Maranon basin, 12-21 gravity oil, 248-mile pipeline, 190 directional
wells from 18 pads; production to start in 2013
Qatar
Barzan Phase 1
2013
85
1,400
ExxonMobil
Russia
Sakhalin-1 Arkutun-Dagi
Sakhalin-1 Gas
2013+
2013
90
30
800
ExxonMobil
ExxonMobil
Kovykta
2015+
Offshore platform
Gas pipeline from Chayvo, Odoptu, and Arkutun-Dagi offshore elds totaling
17 tcf
70 tcf gas, awaiting pipelines for regional sales and sales to China
78
121001ogj_78 78
1,300
700
20
80
135
4
185
600
35
40
120
940
2,500
ExxonMobil
ExxonMobil
ExxonMobil
ExxonMobil
ExxonMobil
ExxonMobil
Shell
ExxonMobil
Gazprom
$2.9 billion
OPL 249
$7 billion, 2 trains LNG associated gas and gas from OML 60 and 61 gas elds
$2 billion, FPSO, 2 million bbl storage, 1,700 m water, 500 million bbl of oil,
2.5 tcf gas
Subsea tieback to Erha FPSO
PL 40 and 43, develop 1978 discovery in 100-120 m water, 190 million boe
recoverable
9/24/12 2:23 PM
Peak
year
Liquids,
1,000 b/d
Gas,
MMscfd
Shtokman
2016+
2,400
Gazprom
2019
2013+
2016
6,600
Gazprom
Gazprom
Lukoil
Vankor
West Salym, Western Siberia
Verkhnechonskoye
Kharyaga Phase 3
2013
2013
2015
2011
Saudi Arabia
Arabiyah
Hasbah
Karan
2015+
2015+
2013
Manifa
2013+
900
Thailand
Platong II
2011
18
Manora
2014
15
Bongkot South
2012
330
PTTEP
2011
280
BHP
2012
UAE
ADCO expansions
Shah sour gas
2012+
2014+
1,000
120
143
100
30
Rosneft
Shell
TNK-BP
Total
1,000
800
1,800
560
50
Operator
Aramco
Aramco
Aramco
Aramco
330
Chevron
Pearl Energy
BP
ADCO
ADCO
On indefnite hold; 130 tcf, Barents Sea, Phase 1 includes 3 subsea templates
with 20 producers fowing to a FPSO and 36-in. pipelines tied to a 7.5 million
tonne/year LNG plant
On indefnite hold
2nd pipeline to Germany completed
Caspian Sea, 25 m water, 12 tcf gas, 265 million bbl oil, and 148 million bbl
NGL
900 million bbl proved and probable; Krasnoyarsk Kray, western East Siberia
Started production in late 2004
1 billion bbl resource, 2010 production start
Yamal-Nenets, feld under production since 1986
High sulfur gas
High sulfur gas
$8 billion, offshore 9 tcf Khuff gas feld, 110-km pipeline to Khursaniyah gas
plant, 5 production platform complexes in 40-60 m water, started producing
July 2011 at 120 MMscfd
$1 billion, Arab heavy (cover image of this issue)
$3.1 billion, processing platform, 12,000 ton topsides, 5 wellhead platforms,
320 km from shore, 200 ft water
Central production and processing platform with FSO in 50 m water, 1,6002,200 m reservoir depth
$1 billion, 17,000-tonne topsides and 5,000-tonne steel jacket for central
processing platform. High H2S gas. Started in April 2012
$400 million new platform in Greater Angostura gas feld in Block 2c, May
2011 production start
Gas felds, platform or subsea completions in 360 ft water
750
ExxonMobil
Onshore 1 bcfd gas gathering facilities for 23% H2S and 10% CO2 gas to
produce 500 MMcfd methane, 33,000 b/d condensate, 4,400 tons/day NGL,
and 9.200 tons/day of elemental sulfur
$2 billion, light oil, 50 billion bbl with only 10% recovered to date
Uganda
Lake Albert rift basin
2015+
200
Tullow
UK
Fyne
2013
19
Antrim
Kinnoull
2013
35
30
BP
Cheviot
2013
25
50
ATP
Schiehallion, Loyal
redevelopment
Alder
Rosebank
2016
2014
2015+
130
9
125
80
2014+
2014
70
70
CNOOC
ConocoPhillips
Eldfsk II
Jasmin
2015
2013
70
86
ConocoPhillips
ConocoPhillips
Huntington
2012
27
60
Fram
Laggan-Tormore
2015+
2011
20
90
140
US
Caesar, Tonga
2012+
44
Lucius
2014
80
Galapagos (Isabela,
Santiago, Santa Cruz)
Kaskida
Liberty
2012+
2015
2012
50
Mad Dog 2
Big Foot
Jack, St. Malo
2014+
2014+
2013+
100
63
150
2013+
2013+
2015+
2012+
10
15
100
80
121001ogj_80 80
500
Development type
BP
Chevron
Chevron
E.On Ruhrgas
Shell
Total
Anadarko
450
Anadarko
BP
BP
BP
15
BP
Chevron
Chevron
100
300
ConocoPhillips
ConocoPhillips
ExxonMobil
ExxonMobil
9/24/12 2:23 PM
Peak
year
Julia Phase 1
Point Thomson/Alaska gas
2015+
2014+
2013+
2013
2014+
2012
2011+
5
60
10
15
Gunfint-Freedom
Cascade, Chinook
2015
2012
140
80
Cardamom
2014
50
Shell
Olympus
2015+
100
Shell
Stones
Vito
2013+
2015+
80
100
Shell
Shell
Venezuela
Loran
Junin 5
Perla
2012+
2018
2013
240
140
Chevron
Eni
Eni
Junin 6
Junin 2
Junin 4
Carabobo 1
Carabobo 3
Corocoro
San Cristobal
Plataforma Deltana
Dragon, Patao
Mariscal Sucre
Mariscal Sucre expansion
Yucal Placer expansion
2014+
2014+
2015+
2014+
2014+
2012+
2012+
2012+
2012+
2012+
2013+
2012+
450
200
400
400
400
70
Vietnam
Vietnam gas project
Chim Sao
2013+
2011
4
25
82
121001ogj_82 82
Liquids,
1,000 b/d
30
70
Gas,
MMscfd
Operator
4,500
ExxonMobil
ExxonMobil
2,060
ExxonMobil
780
12
ExxonMobil
Hess
Marathon
LLOG
16
Noble Energy
Petrobras
600
600
600
300
Gazprom
Pdvsa
Pdvsa
Pdvsa
Pdvsa
Pdvsa
Pdvsa
Pdvsa
Pdvsa
Pdvsa
Pdvsa
Ypergas
490
25
Chevron
Premier
400
Development type
Initial condensate production, gas awaiting the $20-41 billion, 4.6-bcfd Alaska
gas pipeline
La Barge expansion Wyoming gas
Colorado tight gas sands
Mississippi Canyon Block 726, 4,334 ft water
Garden Banks Block 515, 3,000 ft water, single-well tieback
Mississippi Canyon Block 199, 3 wells tied back to Matterhorn TLP, 10-30
million boe
Mississippi Canyon Blocks 948 and 949, seven subsea wells, 250 million boe
FPSO, 600,000 bbl storage, Walker Ridge 206 and 469, 8,300 ft water, startups Chinook September 2012, Cascade February 2012
Recover 140 million boe from a reservoir below 25,000 ft TVD in 2,700 ft
water on Garden Banks 427
Mississippi Canyon Blocks 762-764, 805-807, 850, and 851 TLP, 900 m
water, former Mars B
Walker Ridge Block 508, 9,576 ft water
Mississippi Canyon Blocks 984 and 985, 4,240 ft water, 200 million boe
5 tcf of gas
Orinoco heavy oil
14+ tcf in 70 m water, Gulf of Venezuela, countrys largest gas-condensate
discovery
$24 billion Orinoco heavy oil, 40,000 b/d target in 2013
Orinoco heavy oil
Orinoco heavy oil
9 billion bbl of heavy oil
Orinoco heavy oil
West Paria Gulf
Block 2, Manatee area, 6 tcf LNG project
38 tcf off Venezuela and 21 tcf off Trinidad and Tobago
Offshore gas felds in 130 m water
Offshore gas
Offshore gas
Guarico state; further develop high-pressure gas and carbon dioxide reservoir
to triple mid-2012 output of 100 MMcfd
$4.3 billion, Block B
Unmanned well platforms 115 m water, FPSO; averaged 30,000 b/d and 30
MMcfd in frst half 2012