Вы находитесь на странице: 1из 3

Page: 1/3

Industry & Facilities Division

Interim
Final

INSPECTION
REPORT Nr 01
BV Job nr: IQ.2306308
PROJECT: IQ.2306308

Ref nr: IQ.2306308

BV Client: MSK Group

P/o n: N/A
(client to BV)
Manufacturer: N/A
n/a
Inspection requested by: Mr.Hakkem Qaddori
P/o nr: n/a
(client to Manufacturer)
SUPPLY / SUBJECT OF
ITEM / TAG Nr
INSPECTION
MSK-PWPS-001
MSK-PQR-004

1- PQR/WPS

QTY
ONE

DOCUMENTS OF REFERENCE : See continuation sheet for additional documents:


Yes
Title
Reference n Rev. Approved by
Date
N/A
INSPECTIONS :
Inspection place & Date or
Period:
-Iraq, Hammar Mishrif, Basra-Iraq @
03rd Feb. 2016

Stage of inspection :
Before manufacturing
During manufacturing
Final
Packing
In service
Kind of inspection:
Pre-inspection meeting
Witnessing tests
Final inspection
Document review
Expediting & vendor
assessment
Packing
In-Service inspection
(for details see continuation
sheet)
Stamping :
No

INSP 002 En

Results of inspection :

Satisfactory

No

Unsatisfactory

Non Conformities Reports (NCR):


NCRs issued during reported period : N/A
List of outstanding NCRs : N/A
Main Conclusions & Remarks: (for details see continuation
sheet)
Visual inspection has been carried out for the PQR and
found Unsatisfactory at the time of inspection.

Next visit scheduled:


N/A

1/3

Page: 2/3

Industry & Facilities Division

Interim
Final

INSPECTION REPORT Nr 01
(Continued)
BV Job nr: IQ.2224214
Description of the inspections carried out:
At the request of(), BV inspectors attended Inspection at Hammar Mishrif in 03rd Jan. 2016 within Bureau Veritas general terms
& condition and the details are as below:Attendees:

Scope of Inspection:
- PQR Visual Inspection
- PQR Documents Review
- Witnessing PQR Tests
- Issuance an Inspection Report
Reference Documents:
N.A.
Findings:

Visual inspection has been carried out for the PQR and found Unsatisfactory at the time of inspection.

Documents associated with PQR are reviewed as below:


Title
Reference n
Reviewed by
Date
Attachment
PWPS
MSK-PWPS-001
SAMER S.B.
03 Feb.2016
Annex #2
Electrode Inspection Certificate
EC24131298
SAMER S.B.
03 Feb.2016
Annex #2
Filler Inspection Certificate
EC24131288
SAMER S.B.
03 Feb.2016
Annex #2
Electrode Oven ZHC-50 Cert.
14April2015
SAMER S.B.
03 Feb.2016
Annex #2
Welding Machine Arc-400
5070814
SAMER S.B.
03 Feb.2016
Annex #2
Cert.
Welder ID
MSK-T-WD-0001
SAMER S.B.
03 Feb.2016
Annex #2
Electrode Baking Register
03 Fed 2016
SAMER S.B.
03 Feb.2016
Annex #2

PQR tests had been carried on the Test coupon as below:


1- Root pass by welder ID MSK-T-WD-0001 with SMAW process as per PWPS 001
2- Filling and Cap by welder ID WQT-49 with SAW process as per PWPS 001
And the Test coupon visually shows high reinforcement. And the Tests found not acceptable.
Title
Reference n
Witnessed by
Date
Attachment
Welder Parameter Sheet
3-Fed 2016/1
SAMER S.B.
03 Feb.2016
Annex #2
Welder Parameter Sheet
3-Fed 2016/2
SAMER S.B.
03 Feb.2016
Annex #2
Welder Parameter Sheet
3-Fed 2016/3
SAMER S.B.
03 Feb.2016
Annex #2

ANNEXES

Yes (Total number of pages: 13)

No

Inspected by:
Name: Ammar A. Hashim
Signature:
Date of issue: 22th Jan. 2016

Checked By:
Name: Talha S. Rasheed
Signature:

Inspection centre: Bureau Veritas S.A., Dubai


Distribution:

CLIENT

INSP 002 En

MANUFACTURER

BV Dubai

2/3

Page: 3/3

Industry & Facilities Division

INSPECTION REPORT Nr 01
(Continued)

BV Job nr:

Annex #1: Photos


Photo #1

Photo #2

Photo #3

Photo #4

Annex #2: Attachments

INSP 002 En

3/3

Interim
Final

Вам также может понравиться