Академический Документы
Профессиональный Документы
Культура Документы
Number:OISD/DOC/2013/172
Page No. I
GUIDELINES
ON
INTERNAL SAFETY AUDITS
(PROCEDURE AND CHECKLISTS)
OISD-GDN-145
Revision - 1
First Edition, July 1995
Amended Edition, September 2001
Sr.Number:OISD/DOC/2013/172
Page No. II
FOR RESTRICTED
CIRCULATION ONLY
GUIDELINES
ON
INTERNAL SAFETY AUDITS
(PROCEDURE AND CHECKLISTS)
Prepared by:
Sr.Number:OISD/DOC/2013/172
Page No. III
Preamble
Indian petroleum industry is the energy lifeline of the nation and its continuous performance is
essential for sovereignty and prosperity of the country. As the industry essentially deals with
inherently inflammable substances throughout its value chain upstream, midstream and
downstream Safety is of paramount importance to this industry as only safe performance at all
times can ensure optimum ROI of these national assets and resources including sustainability.
While statutory organizations were in place all along to oversee safety aspects of Indian petroleum
industry, Oil Industry Safety Directorate (OISD) was set up in 1986 Ministry of Petroleum and Natural
Gas, Government of India as a knowledge centre for formulation of constantly updated world-scale
standards for design, layout and operation of various equipment, facility and activities involved in this
industry. Moreover, OISD was also given responsibility of monitoring implementation status of these
standards through safety audits.
In more than 25 years of its existence, OISD has developed a rigorous, multi-layer, iterative and
participative process of development of standards starting with research by in-house experts and
iterating through seeking & validating inputs from all stake-holders operators, designers, national
level knowledge authorities and public at large with a feedback loop of constant updation based on
ground level experience obtained through audits, incident analysis and environment scanning.
The participative process followed in standard formulation has resulted in excellent level of
compliance by the industry culminating in a safer environment in the industry. OISD except in the
Upstream Petroleum Sector is still a regulatory (and not a statutory) body but that has not affected
implementation of the OISD standards. It also goes to prove the old adage that self-regulation is the
best regulation. The quality and relevance of OISD standards had been further endorsed by their
adoption in various statutory rules of the land.
Petroleum industry in India is significantly globalized at present in terms of technology content
requiring its operation to keep pace with the relevant world scale standards & practices. This
matches the OISD philosophy of continuous improvement keeping pace with the global
developments in its target environment. To this end, OISD keeps track of changes through
participation as member in large number of International and national level Knowledge Organizations
both in the field of standard development and implementation & monitoring in addition to updation
of internal knowledge base through continuous research and application surveillance, thereby
ensuring that this OISD Standard, along with all other extant ones, remains relevant, updated and
effective on a real time basis in the applicable areas.
Together we strive to achieve NIL incidents in the entire Hydrocarbon Value Chain. This, besides
other issues, calls for total engagement from all levels of the stake holder organizations, which we, at
OISD, fervently look forward to.
Jai Hind!!!
Executive Director
Oil Industry Safety Directorate
Sr.Number:OISD/DOC/2013/172
Page No. IV
FOREWORD
Safety Audits have been conducted in the oil/gas industry in one form or other.
Generally, Safety Audits are of two types viz. Internal Safety Audits and External Safety Audits.
While methodology to be adopted for carrying out the External Safety Audits is separately dealt
with, this document contains guidelines for conducting Internal Safety Audits in a professional
manner and is expected to assist the industry further in maintaining and improving the Safety.
Different aspects of the Internal
Safety Audits starting from the need of such
Audits, methodology, preparation
of
reports,
follow
up actions
on
the
recommendation of the Audit Reports have been covered in Section I of this document"Internal Safety Audit Procedures".
In addition, comprehensive Check Lists are given in Section II of the Document
covering typical areas in the oil/ gas industry. These Check Lists would be useful tool for
undertaking in-depth and
systematic
Internal Safety Audits and would go a long way in
accelerating audits to ensure that no aspect is overlooked while carrying out such audits.
The present document on Internal Safety Audits (Procedure and checklists) was revised
by a Functional Committee constituted from amongst members nominated by the industry for
the committee comprising of refining, marketing, pipelines and gas processing disciplines.
It is hoped that the provision of this document, if implemented objectively will go a long way
in improving the safety in the oil & gas industry.
This document will be reviewed periodically for improvements based on the new experiences
and better understanding. Suggestions from users/industry members may be addressed to:
The Co-ordinator
Committee on Internal Safety Audits
Sr.Number:OISD/DOC/2013/172
Page No. V
NOTE
OIL INDUSTRY SAFETY DIRECTORATE publications are prepared for use
in the Oil and gas industry under Ministry of Petroleum and Natural Gas. These
are the property of Ministry of Petroleum and Natural Gas and shall not be
reproduced or copied and loaned or exhibited to others without written consent
from OISD.
Though every effort has been made to assure the accuracy and reliability of
data contained in these documents, OISD hereby expressly disclaims any liability
or responsibility for loss or damage resulting from their use.
These documents are intended only to supplement and not replace the
prevailing statutory requirements.
Sr.Number:OISD/DOC/2013/172
Page No. VI
INTRODUCTION
This is the second edition of the OISD Guidelines on `Internal
Safety Audits' (Procedure and Checklists), first edition of which was
published in October, 1989.
The first edition was prepared by OISD and did not have a regular
Functional Committee. A Functional Committee for the objective of
revising the same was therefore constituted.
The original document has been now revised to include a new
chapter on Internal Audit of cross-country pipelines in order to make
it broad based and thoroughly updated with the experience
gained during the first round of External Safety Audits of refineries,
gas processing plants, Marketing terminals/LPG Bottling Plants etc.
As during the interim period a number of new OISD Standards/
Guidelines have been published, reference to the same has also been
provided wherever required.
With the issuance of this edition, the guidelines contained in
earlier edition stands revised.
Sr.Number:OISD/DOC/2013/172
Page No. VII
SCOPE
Sr.Number:OISD/DOC/2013/172
Page No. VIII
COMMITTEE ON
`INTERNAL SAFETY AUDITS'
REVISION-I
-------------------------------------------------------------------------------------------------------------------------------------NAME
ORGANISATION
-------------------------------------------------------------------------------------------------------------------------------------LEADER
Shri Barath Balan
MEMBERS
Shri M.N. Ahmed
Shri T.S.Charvethia
Shri S.N.Rao
Shri G.C.Sharma
Shri I.J.Shroff
Shri C.T.Ananthakrishnan
Shri K.Madhusudanan
MEMBER CO-ORDINATOR
Shri S.C. Gupta
-------------------------------------------------------------------------------------------------------------------------------------In addition to the above, several other experts from Industry contributed on the preparation, review
and finalisation of this document.
Sr.Number:OISD/DOC/2013/172
Page No. IX
GUIDELINES
ON
INTERNAL SAFETY AUDITS
SECTION - 1
SECTION - 2
Sr.Number:OISD/DOC/2013/172
Page No. X
SECTION - 1
-------------------------------------------------------------------------------------------------------------------------------------SL. NO.
DESCRIPTION
PAGE NO.
-------------------------------------------------------------------------------------------------------------------------------------1.0
INTRODUCTION
1
2.0
3.0
4.0
5.0
2
Audit Teams
5.6 Briefing
5.8 Discussions
6.0
7.0
8.0
IMPLEMENTATION OF RECOMMENDATIONS
-----------------------------------------------------------------------------------------------------------------------
Sr.Number:OISD/DOC/2013/172
Page No. 1
INTRODUCTION
Identification of vulnerable areas and specific potential hazards, is one of
the prime
function of loss prevention in oil industry. Safety audit is an important tool in undertaking this
function.
2.0
To identify any design deficiencies and also any weaknesses which might
have cropped up during modifications / additions of facilities.
2.
To ensure that fire protection facilities and safety systems are well maintained.
3.
4.
5.
6.
for
for safe
Sr.Number:OISD/DOC/2013/172
Page No. 2
dispatch
facilities.
Group II
All dispatch facilities like Tank-Wagon loading Tank - lorry loading, Bitumen
filling and dispatch facilities.
Group - III
Group - IV
PROCESS UNITS :
Coking,
Group - VI
Group - VII
Sr.Number:OISD/DOC/2013/172
Page No. 3
5.6 BRIEFING:
Before beginning of each audit, all concerned persons of the area/installation be briefed by the team leader
about the purpose of the audit. No impression should be left that audit will throw bad light on them.
5.8 DISCUSSIONS:
Further information can also be gathered through discussions (formal & informal), with site personnel and
Installation / Plant Manager, who is in-charge of the area or other site officers. The audit team should
interact with persons from various
disciplines such as
Production,
Maintenance, Electrical,
Instrumentation, etc.. Formal discussions could be in the form of brief periodical sessions while informal
discussions could be over a cup of tea with personnel
working in the area.
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 4
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 5
SECTION : 2
INTERNAL SAFETY AUDITS
CHECKLISTS
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 6
SECTION : 2
INTERNAL SAFETY AUDIT
CHECKLIST
CONTENTS
----------------------------------------------------------------------------------------------------------------------Sr.
CHAPTER
SAFETY AUDIT
PAGE NOS.
CHECK LIST NO.
------------------------------------------------------------------------------------------------------------------------------------------------1.
GENERAL SAFETY AUDITS
OISD-GDN-145-01
8
2.
FIRE PROTECTION
OISD-GDN-145-02
16
3.
LAYOUTS
OISD-GDN-145-03
23
4.
PROCESS PLANTS
OISD-GDN-145-04
30
5.
OISD-GDN-145-05
41
6.
OISD-GDN-145-06
57
7.
OISD-GDN-145-07
65
8.
OISD-GDN-145-08
73
9.
ELECTRICAL SYSTEM
OISD-GDN-145-09
84
10.
OISD-GDN-145-10
99
ANNEXURE
108
---------------------------------------------------------------------------------------------------------------------------------------
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 7
OISD-GDN - 145-01
REVISION I
SAFETY AUDIT CHECKLIST No.OISD-GDN-145-01
Management Philosophy
Procedures
Safety Audits
Safety Committee Meetings
Safety consciousness & Propagation
Work Permit System
Contingency/ Disaster Plan
Plant Security
House Keeping
Machine Guarding
General Safety features
Maintenance of Tools and Tackles
Materials handling
Personnel Protective Equipment
Toxic Materials and Occupational Health
8
8
8
8
8
9
9
9
10
10
10
10
10
11
11
11
11
12
12
4.1
4.2
4.3
4.4
4.5
Reporting formats
Reporting Procedures
Follow up of Recommendations
Maintenance of Records & Data
Review of Accidents Data
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
12
12
12
12
13
Sr.Number:OISD/DOC/2013/172
Page No. 8
OISD-GDN-145-01
SAFETY AUDIT CHECKLIST
1.0 GENERAL SAFETY AUDITS
-----------------------------------------------------------------------------------------------------------------------ITEM
AUDITOR REMARKS
------------------------------------------------------------------------------------------------------------------------1.0 ORGANIZATION AND ADMINISTRATION:
1.1 MANAGEMENT PHILOSOPHY
a)
b)
c)
1.2 PROCEDURES
a)
b)
b)
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 9
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------1.5 SAFETY CONSCIOUSNESS & PROPAGATION
a)
- Safety posters/slogans.
- Safety precautions at strategic points
through sign boards.
b
c)
Whether these
plans
concerned authorities ?
are
central
approved
by
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 10
-----------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------1.8 PLANT SECURITY
a) Whether
installation
has
wall/fence as per prescribed norms?
boundary
Operating areas
Work shops
Stores / godowns / yards
Loading gantries
Effluent treatment facilities
Tank farms
Storm water channels
Utility block
Electrical substation
Fire water tank
Any other areas
Ratings *
1
2
-
Sr.Number:OISD/DOC/2013/172
Page No. 11
ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------- Inadequate illumination
- Ventilation
- Cross-overs over piping
- Platforms/Hand rails
- Walk ways in tank farm area - All intrinsic safety devices
(For refinery,ref.to 1.7 of OISD145-04)
*Ratings:(Notation Followed)
1: Not meeting requirement
2: Meeting requirements satisfactorily
2.4 MAINTENANCE OF TOOLS AND
TACKLES
Sr.Number:OISD/DOC/2013/172
Page No. 12
ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------e) Is there display of Do's and Dont's for handling of
toxic chemicals?
f) How the Health monitoring is done. Whether
records are maintained ?
g) Is First Aid available for toxic chemicals handled?
h) Whether proper communication system exists?
i) Is there any monitoring of work environment for
toxic chemicals /gases etc. and records maintained
thereof? Whether material safety data sheet
displayed Note 3
3.0 EMPLOYEE TRAINING
a) Whether the training given for all employees
(operators / technicians / engineers) is in line with
OISD- STD-154 w.r.t following items :
-
syllabi
course materials
class room/field on job training
on job
fire and safety
How employees
performance?
are
Motivated
for
safety
Sr.Number:OISD/DOC/2013/172
Page No. 13
Implementation
for
Dissemination
a)
Whether the
procedures /systems
are
established & streamlined for dissemination of
information?
b)
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 14
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 15
OISD-GDN-145-02
REVISION I
16
2.0
FACILITIES
16
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
Fire water
Fire Hydrant System
Foam System
Fire Station
Fire Extinguishers
Fire Hoses and Accessories
Protective/ Safety Equipment
Others
16
17
17
18
18
18
19
19
3.0
PROCEDURES
20
3.1
3.2
3.3
3.4
3.5
Organisations
Disaster Management Plan
Inspection and Testing facilities
Training
Checklist for DMP
20
20
21
21
22
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 16
OISD-GDN-145-02
SAFETY AUDIT CHECKLIST
2. FIRE PROTECTION
-------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITOR'S REMARKS
--------------------------------------------------------------------------------------------------------------------------------------In order to evaluate the adequacy of fire fighting
facilities and procedures, answers should be
obtained for the following four basic queries:
1. Are the facilities adequate
for anticipated fires ?
and
reliable
FACILITIES
FIRE WATER
2.1.1
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 17
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
2.1.2 Fire Water Pump :
a. Is location away (from hazardous area) ?
b. What's the power source ? How many are diesel &
elect driven ?
c. What's the stand by philosophy ?
d. What's the capacity of each pump and at what
head ?
e. What's the priming system?
f. Is there any jockey pump ?
g. What's the capacity ? What's set pressure?
h. What's fire water pump starting system
manual/auto ?
I. What's the condition of battery of diesel engine ?
j. What's the diesel fuel tank capacity (hrs) ?
k How frequently does jockey pump start ? How
long it runs ?
l. Are the fire water pumps/engines started &
observations logged as per OISD Std. 116/
117/144.
2.2
2.3
a.
b.
c.
d.
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 18
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------e.
f.
2.4
a.
FIRE STATION
Is the location away from hazardous
areas ?
Are the no. and variety of fire vehicles
sufficient ?
Facilities on fire vehicles capacity,
pressure, flow proportioning system etc.
Daily starting of vehicles and other
check logs.?
b.
c.
2.5
a.
FIRE EXTINGUISHERS
Are portable extinguishers meeting OISD
requirements ? Are they BIS approved ?
b.
c.
d.
e.
f.
g.
2.6
a.
b.
c.
consumption
of
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 19
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
----------------------------------------------------------------------------------------------------------------------------------------------d.
Are the hoses periodically tested/ checked
and replaced?
e.
Are the hose boxes painted fire red Note 3 as
per OISD Standard.?
f.
Are adequate sand drums / buckets
available ?
g.
Are all various types of nozzles/foam branch
pipes etc. provided as per OISD STD.?
h.
Are the hoses BIS Approved Note 3 ?
2.7
PROTECTIVE/SAFETY EQUIPMENT
Are safety appliances available in line
with OISD 116/117/144 Standard?
ADDITIONAL ITEMS : FACILITIES AT
PORT
OTHERS
Whether the fire siren and fire alarm are
provided at strategic locations and are
audible up to the desired range ?
Whether siren codes are identified for
different types of fire/emergencies ?
2.8.1
of
Sr.Number:OISD/DOC/2013/172
Page No. 20
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------- Evacuation, etc.
- First Aid training to personnel on shift.
2.8.4
Availability of
critical areas.
2.8.5
Availability
of
special
fire
fighting
components aprons / suits / emergency
flood lights, power megaphones, etc.
3.0
PROCEDURES
3.1
ORGANIZATION
a.
b.
c.
emergency,
lights
in
d.
e.
f.
3.2
a.
b.
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 21
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------3.3 INSPECTION AND TESTING FACILITIES
Whether periodic inspection and maintenance /
testing is done and proper records maintained for
following :
a. Pumps
- Is flow vs. pressure meeting the
requirement ?
- Is lubrication periodically carried out ?
b.
Hydrants
- Are pressure and flow at different
points adequate enough ?
- Are all valves easy to operate ?
c.
d.
e.
f.
g.
h.
Foam concentrate
- What is the inventory ? Are the
procurement / expiry date
record maintained?
- Whether protein foams churned
regularly and record maintained ?
3.4 TRAINING
Whether training provided fire crew / other
employees / CISF etc. is in line with OISD
std. 154?
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 22
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------3.5 CHECKLIST FOR DMP
1. What is the frequency of DMP drill ? When was
it last conducted ? Whether the short comings
observed during drills were analyzed and action
taken to prevent repetition ?
2.Whether mutual aid schemes are planned with
neighboring units local fire brigade etc. ? Is the
scheme periodically discussed with members ?
Are they trained to fight fire in oil / gas
installation /
3. Whether the resources of the operating location
and the mutual aid members properly tabulated ?
Whether assessment of necessary man power
and equipment studied and action taken for the
shortfall ?
4. Whether organogram of various co-ordinators,
succession charts showing alternate persons
and sub-organisation chart well displayed ?
5. Are responsibilities of various neighboring
industrial
units, discussed and recorded ?
Whether the duties of
various coordinators
and team members well defined ?
6. Are the following information included in the DMP
?
Name, address, telephone numbers (Off.and Res.
) of anchorages / key persons are to be clearly
shown.
a.
b.
c.
d.
e.
f.
7.
8.
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 23
OISD-GDN-145-03
REVISION I
LAYOUTS
CONTENTS
-------------------------------------------------------------------------------------------------------------------------------------SECTION
DESCRIPTION
PAGE NO.
------------------------------------------------------------------------------------------------------------------------------------------
1.0
TOPOGRAPHY OF INSTALLATION
24
2.0
24
3.0
INTER - DISTANCES
24
4.0
TANKFARMS
24
4.1
4.2
4.3
Grouping of tanks
Dykes
LPG storage
24
24
25
5.0
PROCESS UNITS
25
5.1
5.2
5.3
Location
Control room
Field
25
25
25
6.0
26
6.1
Electrical power lines
26
6.2
Electrical switchgear
26
6.3
Roads
26
6.4
Administrative buildings/ workshops/canteen
26
6.5
Boiler plants
26
6.6
Gantries
27
6.7
Waste water facilities
27
6.8
Water cooling towers
27
6.9
Elevated platforms
27
6.10
Piping
27
6.11
Rail spurs
27
6.12
Fire hydrants/ monitors/ safety showers/ hose etc.
27
6.13
Compressors
28
6.14
Miscellaneous
28
-------------------------------------------------------------------------------------------------------------------------------------------------
OISD-GDN-145-03
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 24
4.2 DYKES
- Aggregate capacity of tanks in each
Dyke / enclosure
- Capacity of Dykes with respect
relevant group
to
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 25
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------4.3 LPG STORAGE
- Orientation w.r.t. wind direction
- General state of
terrain without depression /
large ditches
- No of vessels in each group and the
capacities
aggregate
water
and storm
Sr.Number:OISD/DOC/2013/172
Page No. 26
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------6.0 OTHER FACILITIES AND EQUIPMENT
6.1 ELECTRICAL POWER LINES
- Rooting below / above ground
- Passing over critical facilities
- Separation from elevated structures which may
fall across power lines
- Location of power receiving station & layout hazard
6.2 ELECTRICAL SWITCHGEAR
- Upwind from flammable sources
- High ground in flooding areas
- Routes of overhead power cable and
instrument cable trays and their fire protection/
fire proofing
6.3 ROADS
- Road widths and turning radii for movement of
large fire fighting vehicles .
-
for
employees
and
Peripheral locations
Separation from hazardous areas
Upwind from sources of flammable / toxics
sources of
-------------------------------------------------------------------------------------------------------------------------------------------------OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 27
ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------6.6 GANTRIES
- Peripheral location
- Downwind from ignition sources
- Separation from main line of rail / road
6.7 WASTE WATER FACILITIES
- Peripheral locations
- Down
wind
from
concentrations of people
ignition
sources /
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 28
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-----------------------------------------------------------------------------------------------------------------------------------------------6.13 COMPRESSORS
- Not in closed buildings
- Down wind from rest of unit
6.14 MISCELLANEOUS
- Location of fire station and fire pump
- Location of smoke booths
- Display of Layout drawing and display of
P & I DRAWING
-Check piping layout for minimum piping
- Greenscaping area
- Flood light towers & security towers
- Grading of various block facilities
- Storm water drains & easy drainage
- Height of flares is adequate
- TTL gantry and easy exit through the
product movement gate
- Provision of Truck parking area
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 29
OISD-GDN-145-04
REVISION I
GENERAL
30
1.1
30
1.2
30
1.3
Housekeeping
31
1.4
Training
31
1.5
32
1.6
Electrical
32
1.7
Instrumentation
32
2.0
PROCESS SUB-SYSTEMS
33
2.1
Control room
33
2.2
Pump House
33
2.3
Compressor house
34
2.4
35
2.5
35
2.6
Process furnaces
36
2.7
Process piping
37
2.8
37
2.9
First aid
39
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 30
b)
c)
d)
e)
f)
g)
1.2
a)
b)
c)
d)
e)
system has
hydrocarbon
with proper
underground
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 31
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------f)
g)
h)
1.3.
HOUSEKEEPING :
a)
b)
c)
1.4
TRAINING
a)
b)
c)
d)
e)
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 32
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------1.5
a)
b)
c)
1.6. ELECTRICAL
a)
b)
c)
d)
e)
1.7
INSTRUMENTATION:
a)
Whether
electronic instrumentation
provided are as per area classification?
b)
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 33
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------c)
Whether any schedule exists for checking
up of various interlocks, shutdown
systems ? Are such schedules followed
and recorded ?
d)
e)
2.0
PROCESS SUB-SYSTEMS
2.1
CONTROL ROOM
a)
Whether
fire protection provided and
considered adequate ?
b)
c)
d)
e)
f)
g)
2.2
PUMP HOUSE :
a)
b)
c)
d)
e)
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 34
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------f)
Whether the hot pumps are provided with
warm up lines ?
g)
h)
i)
j)
k)
l)
2.3
COMPRESSOR HOUSE
a)
b)
c)
d)
e)
f)
g)
Whether there is a
condensate collection
system at suction / discharge of the
compressor ? if so, is it functional ?
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 35
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------h)
Whether
the
compressor
has nitrogen
inerting system ? if so,is it functional ?
i)
Do
compressor safety valve
atmospheric
vents have nitrogen / steam purging
especially for hydrogen
rich gases
?
2.4.
HEAT EXCHANGERS/CONDENSERS/COOLERS
a)
b)
c)
Whether
the insulation / cladding is
fully covering the exchanger ? Is
earthing proper ? Are supports
fire
proofed ?
d)
e)
Whether
the operating parameters and
test pressures have been tagged on the
equipment and is being operated within that?
f)
2.5
a)
b)
c)
d)
e)
f)
Sr.Number:OISD/DOC/2013/172
Page No. 36
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------g)
Do all columns have two sets of level
indicators ?
2.6
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
m)
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 37
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------n)
Whether the location and height of FD fan
air intake can be considered safe ?
o)
p)
q)
r)
2.7
PROCESS PIPING
a)
b)
c)
d)
e)
f)
2.8
a)
b)
c)
d)
Sr.Number:OISD/DOC/2013/172
Page No. 38
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------e)
Whether any spare safety valves have
been used with isolation valves ? if so
what is the safe guard against inadvertent
closing of isolation valves of operating
safety valves ?
f)
g)
h)
i)
Whether
acoustic insulation has been
provided on vents producing excessive
noise ?
j)
k)
l)
m)
n)
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 39
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------o)
Whether vapor depressurising system has
been provided for emergency situations
such as runaway reaction, exposure to
fire etc.?
2.9
FIRST AID
a)
b)
c)
d)
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 40
TANKS
42
3.0
PIPING
43
4.0
OPERATING PROCEDURES
44
5.0
46
6.0
47
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 41
----------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITOR'S REMARKS
----------------------------------------------------------------------------------------------------------------------------------------1.0 TANK FARM :
1.1
GENERAL :
a)
Whether
the location, layouts
interspacing in the tank farm meet
OISD-STD-118/statutory requirements?
b)
c)
Whether
the roads
are
available around the tank farm for
movement for fire tenders ?
d)
e)
f)
g)
h)
i)
j)
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 42
------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
--------------------------------------------------------------------------------------------------------------------------------------------------
k)
1.2
SEWERS :
a)
b)
2.0
TANKS :
a)
b)
c)
d)
e)
f)
g)
h)
i)
Sr.Number:OISD/DOC/2013/172
Page No. 43
------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------j)
k)
l)
m)
n)
o)
p)
q)
r)
3.0
PIPING :
a)
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 44
------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-----------------------------------------------------------------------------------------------------------------------------------------------b)
Whether pipe supports, anchors,
guides are in order ?
c)
d)
e)
f)
g)
h)
i)
j)
k)
4.0
OPERATING PROCEDURES :
a)
b)
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 45
------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------c)
d)
e)
f)
g)
h)
i)
j)
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 46
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------k)
5.0
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
Sr.Number:OISD/DOC/2013/172
Page No. 47
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------k)
Whether Nitrogen blanketing system
provided on any tank. If
so, what
is the frequency of inspection &
whether records maintained ?
OISD-GDN-145-01
Fire Fighting
OISD-GDN-145-02
Layouts
OISD-GDN-145-03
Electrical systems
OISD-GDN-145-09
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 48
CONTENTS
-------------------------------------------------------------------------------------------------------------------------------------------------SECTION
DESCRIPTION
PAGE NO.
-------------------------------------------------------------------------------------------------------------------------------------------------1.0
49
1.1
49
1.1.1
General
49
1.1.2
Drainage
49
1.1.3
Miscellaneous
49
1.1.4
Electrical
49
2.0
49
2.1
49
2.2
Sick wagons
51
2.3
House keeping
51
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 49
OISD-GDN-145-06
SAFETY AUDIT CHECKLIST
6.0
WAGONS
A. TANK WAGONS
-------------------------------------------------------------------------------------------------------------------------------------------------AUDITOR'S REMARKS
-------------------------------------------------------------------------------------------------------------------------------------------------1.0 FACILITIES AND SYSTEMS
1.1 TANK WAGON GANTRY
1.1.1 General
a.
b.
1.1.2 Drainage
Whether
concrete flooring has been
provided below rail track and with
proper
slope ?
1.1.3 Miscellaneous
Whether No-shunting device / caution
boards are provided to avoid movement of
wagons while filling / decantation is in
progress ?
1.1.4 Electrical
a.
with
well
b.
of
loco
-diesel
-steam
-electric
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 50
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
Sr.Number:OISD/DOC/2013/172
Page No. 51
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------2.2 Sick wagons
Whether the following are ensured before
removing the defective / sick wagons :
-
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 52
53
2.0
53
2.1
Placement of trucks
53
2.2
Loading operations
53
3.0
54
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 53
Sr.Number:OISD/DOC/2013/172
Page No. 54
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------3.0 VEHICLE AND CREW CHECK
a
Whether
license and explosives
certificates are available in
the
vehicle ?
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 55
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------p
Whether
approved quality spark
arrestors provided on the engine
exhaust and
Muffler / Silencer is
not cut off from the exhaust ?
q
aa)
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 56
OISD-GDN-145-06 REVISION I
Pump house
57
1.2
57
1.3
58
1.4
Drainage
59
1.5
Miscellaneous
59
1.6
Electrical
59
2.0
60
2.1
61
2.2
61
2.3
House keeping
61
2.4
Training
61
2.5
Miscellaneous
62
3.0
62
4.0
ADDITIONAL CHECKLIST
63
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 57
b)
c)
d)
e)
f)
g)
h)
i)
j)
1.2
a)
b)
Sr.Number:OISD/DOC/2013/172
Page No. 58
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------c)
Whether the swing ladders are provided
with counter weight, security chain,
rubber pads and other safety features to
avoid frictional spark ? Are these in
good working condition ?
d)
e)
f)
g)
1.3
a)
b)
c)
d)
e)
f)
g)
h)
i)
Whether proper
arrangement has been
provide for securing the hose nozzle with
manhole and properly secured after loading
(T/T & T/W)?
Whether vacuum breaker is provided on the
loading arm ?
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 59
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------j)
k)
1.4
a)
b)
c)
d)
1.5
MISCELLANEOUS
a)
b)
c)
1.6
in
ELECTRICAL
a)
b)
c)
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 60
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------d)
Whether the loading arms/hoses are having
proper electrical continuity provision and
earthing connection ?
e)
f)
g)
h)
i)
j)
k)
b)
c)
d)
f)
g)
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 61
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------h)
Whether initial loading is done at a rate
not exceeding 1 M/Sec, till the filling
pipe is completely submerged and
thereafter at the rate not exceeding 6
M/Sec ?
2.1
a)
b)
c)
c)
2.2
a)
b)
c)
2.3
a)
HOUSE KEEPING
Whether the house keeping in the area can
be considered :
good ?
satisfactory ?
needs improvement ?
b)
c)
Sr.Number:OISD/DOC/2013/172
Page No. 62
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------d)
Whether the drain channels are cleaned &
well maintained ?
2.4
a)
b)
c)
2.5
MISCELLANEOUS
a)
3.0
a)
b)
c)
d)
e)
f)
g)
h)
i)
Sr.Number:OISD/DOC/2013/172
Page No. 63
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------j)
Whether a copy of Fire Fighting manual is
available in the gantry control room ?
4.0
a)
b)
OISD-GDN-145-01
OISD-GDN-144-02
OISD-GDN-145-03
OISD-GDN-145-09
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 64
67
3.0
68
4.0
70
5.0
TRAINING
72
6.0
72
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 65
b)
c)
d)
e)
f)
g)
i)
b)
c)
d)
Whether the relief valves are provided with isolation valves?If so what is the system/ method to
avoid inadvertent closing of isolation valves ?
e)
Sr.Number:OISD/DOC/2013/172
Page No. 66
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------1.3
DRAINING
a)
b)
c)
d)
e)
f)
g)
1.4
INSTRUMENTATION:
a)
b)
c)
d)
1.5
a)
b)
c)
d)
e)
Sr.Number:OISD/DOC/2013/172
Page No. 67
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------proofed?
f)
1.6
ELECTRICAL:
a)
b)
c)
d)
2.0
PUMPS/COMPRESSORS AREA:
2.1
FACILITIES:
a)
b)
c)
d)
e)
f)
2.2
ELECTRICAL:
a)
b)
c)
Sr.Number:OISD/DOC/2013/172
Page No. 68
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------2.3
GENERAL:
a)
b)
c)
d)
2.4
FIRE PROTECTION:
a)
b)
3.0
3.1
FACILITIES:
a)
b)
c)
d)
e)
f)
3.2
a)
b)
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 69
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
m)
3.3
a)
b)
c)
-------------------------------------------------------------------------------------------------------------------------------------------------OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 70
ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------3.4
OPERATING PROCEDURE AND PRACTICES :
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
4.0
4.1
FACILITIES
a)
b)
c)
d)
Sr.Number:OISD/DOC/2013/172
Page No. 71
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------e)
Whether facility available for evacuation/
decantation of defective/leaky trucks with
necessary high point vents with steam
connections?
f)
g)
4.2
OPERATION
a)
b)
c)
g)
4.3
a)
b)
c)
d)
Whether
provision to start water sprinklers
from loading gantry/Control Room / Weigh
Bridge exists?
e)
f)
Sr.Number:OISD/DOC/2013/172
Page No. 72
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------5.0
TRAINING
a)
b)
c)
d)
e)
6.0
OISD-GDN-145-01
Fire fighting
OISD-GDN-145-02
Layouts
OISD-GDN-145-03
Gantry Operations
OISD-GDN-145-06
Electrical
OISD-GDN-145-09
BULK TT CHECKING :
How it is made sure that only TT fit for loading
are taken up for filling?(w.r.t. oxygen content
etc.)
For detailed checklist for loading TT pl .ref.to
OISD-STD-144.
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 73
75
3.0
75
4.0
BOTTLING SHED
76
5.0
78
6.0
CYLINDER LOADING
79
7.0
79
8.0
81
9.0
82
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 74
b)
c)
d)
e)
f)
g)
h)
i)
k)
l)
Sr.Number:OISD/DOC/2013/172
Page No. 75
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------2.0 MANPOWER & PLANNING
a)
b)
c)
d)
e)
f)
3.0
a)
b)
c)
d)
Sr.Number:OISD/DOC/2013/172
Page No. 76
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------e)
Whether stacking discipline with small
lots of 4 rows and 25 cylinder lengths
followed with a minimum access path of
1 M maintained on both sides of 4 rows.
f)
g)
i)
j)
4.0
BOTTLING SHED
a)
b)
Whether filling/loading/unloading/storage
areas are adequately covered with mastic
coating on floors and pillars to avoid
accidental sparks?
c)
d)
e)
f)
g)
h)
i)
Sr.Number:OISD/DOC/2013/172
Page No. 77
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------recess/pits in the area with the
explosimeter
k)
l)
m)
n)
o)
p)
q)
r)
s)
t)
u)
v)
w)
x)
Sr.Number:OISD/DOC/2013/172
Page No. 78
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------y)
Whether Movement of cylinders is done
through floor conveyers/trolleys?
statistical checks include
- Total No, of cylinders filled.
- Total No. of cylinders checked at
random.
- No. of cyls. found defective.
- % of cyls. found defective. in last
month
- Weight variation (Over filling)
- Weight variation (under filling)
- Valve leak
- Bung leak
- "O" Ring missing
- Defective "O" Ring (by CVT Test)
- 'Pressure Control valve' Filling
procedure
- Cyls. due for retesting
- Other minor defects
- Remarks if any.
5.0
NEW/DEFECTIVE/LEAKY CYLINDERS
a)
b)
c)
d)
e)
f)
g)
h)
i)
Sr.Number:OISD/DOC/2013/172
Page No. 79
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------j)
k)
l)
m)
Whether records of
leaky /defective
cylinders (company wise) detected during
filling/are maintained on daily basis with
following particulars:
-
Cylinders filled
Valve leak
Bung leak
Body leak
"O" ring defect
Spurious cylinders
n)
o)
6.0
a)
b)
c)
d)
e)
7.0
a)
vertically
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 80
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------b)
Whether fire organisation chart is
prepared upto date and displayed?
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
m)
Sr.Number:OISD/DOC/2013/172
Page No. 81
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------change shed provided? if so:
- Whether working satisfactorily?
- Whether periodically inspected and
records maintained?
n)
o)
p)
q)
OISD-GDN-145-01
Fire Fighting
OISD-GDN-145-02
Layouts
OISD-GDN-145-03
Gantry Operations
OISD-GDN-145-06
Electrical
OISD-GDN-145-09
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 82
----------------------------------------------------------------------------------------------------------------------ITEMS
AUDITORS REMARKS
-------------------------------------------------------------------------------------------------------------------------------------------
DAILY MAINTENANCE
a)
b)
c)
d)
e)
f)
Calibrations/Adjustments of devices
indicated in above.
g)
h)
9.2.
WEEKLY MAINTENANCE
a)
b)
c)
d)
e)
Greasing/lubrication of :
- Central column
- Carousel Driving unit.
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 83
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------9.3
QUARTERLY MAINTENANCE
a)
b)
c)
d)
e)
f)
9.4
ANNUAL MAINTENANCE
a)
b)
c)
d)
e)
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 84
CONTENTS
-------------------------------------------------------------------------------------------------------------------------------------------------SECTION
DESCRIPTION
PAGE NO.
-----------------------------------------------------------------------------------------------------------------------------------------------1.0 SPECIAL REQUIREMENTS
85
2.0 SUBSTATION (EQUIPMENT & BUILDING)
86
89
89
91
92
92
94
95
96
97
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 85
b)
c)
d)
e)
f)
g)
h)
i)
Sr.Number:OISD/DOC/2013/172
Page No. 86
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------k)
Whether approved work Permit System
is being followed?
l)
m)
n)
o)
p)
q)
r)
s)
t)
2.0
a)
b)
c)
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 87
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------d)
e)
f)
g)
h)
i)
j)
k)
l)
m)
n)
o)
p)
q)
Sr.Number:OISD/DOC/2013/172
Page No. 88
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------r)
Are all the power (H.T. & L.T) and
control cables in trenches properly
segregated?
s)
t)
u)
v)
w)
x)
y)
z)
aa)
bb)
cc)
dd)
ee)
ff)
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 89
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------3.0 SWITCHYARD AND OUTDOOR EQUIPMENT.
a)
Metal Frameworks
A.B. Switches and circuit breakers
D/O and H/G Fuses
Poles/switches/insulator pins/stay
clamps
- Operating handle of the A.B. switch
b)
c)
the
d)
e)
f)
g)
h)
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 90
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------b)
Whether the underground cables in
excavated trenches are laid at designed
depth with sand filling, brick
protection? (check at on Random trial
pit basis) Is u/g cable exposed at any
location?
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 91
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------m)
Road crossings
Railway installations
Cathodically protected u/g piping
Water logged areas
Drainage & other u/g facilities
RCC structures/brick walls
Where cables rise above ground
n)
What are
the fire protection arrangements
adopted for cables laid above ground?
o)
p)
5.0
a)
b)
c)
d)
Is there any
unauthorized modification
carried out ( by way of local
fabrication etc.)
on the flameproof motors/control stations /
terminal boxes? ( to accommodate XLPE cable
termination etc.)
e)
f)
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 92
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------g)
h)
i)
j)
k)
l)
6.0
LIGHTING INSTALLATIONS
a)
b)
c)
d)
7.
a)
b)
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 93
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------c)
d)
e)
f)
g)
h)
I)
j)
k)
l)
m)
n)
o)
p)
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 94
------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------q)
r)
s)
t)
u)
v)
w)
8.0
CAPTIVE GENERATION
a)
b)
c)
d)
Sr.Number:OISD/DOC/2013/172
Page No. 95
------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------e)
f)
g)
h)
i)
j)
k)
l)
m)
n)
9.0
BATTERY / CHARGER/UPS
a)
b)
c)
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 96
------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------d)
e)
f)
g)
h)
10.0
a)
b)
c)
d)
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 97
------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------11.0
a)
b)
c)
d)
e)
f)
g)
h)
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 98
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
--------------------------------------------------------------------------------------------------------------------------------------------i)
j)
k)
l)
m)
n)
o)
p)
by
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 99
COATING CONDITION
100
2)
CATHODIC PROTECTION
100
3)
101
4)
101
5)
INTERNAL CORROSION
102
6)
PIGGING
102
7)
INHIBITOR INJECTION
102
8)
CPL/EWP SURVEY
103
9)
SOIL TESTING
103
10)
MAINLINE VALVE
103
11)
HYDROSTATIC TESTING
103
12)
PIPELINE PATROLLING
103
13)
104
14)
106
15)
CONTINGENCY PLANS
107
16)
DOCUMENTATION
107
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 100
Yes/No
Yes/No
Satisfactory /
not Satisfactory
.....
Yes/No
Yes/No
.....Nos.
Satisfactory/
Not satisfactory
Yes/No
..... Nos.
Good/Bad
Yes/No
Satisfactory/
Not Satisfactory
Yes/No
Yes/No
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 101
------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------2.13 If 'YES' any action taken/plan drawn
for correcting the deficiencies
Yes/No
2.14 Is the C.P. unit connected with
the earthing electrode ?
2.15 Is the earthing resistance of
C.P. earthing electrode taken & record
maintained
Yes/No
Yes/No
Yes/No
Yes/No
-------
Yes/No
Yes/No
3.0
.....
........hrs./day
Satisfactory/
Not Satisfactory
4.1.1
Yes/No
4.1.2
Yes/No
4.2
Yes/No
Yes/No
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 102
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------5.0 INTERNAL CORROSION
5.1 Whether coupons are installed
Yes/No
Yes/No
.....
6.0 PIGGING
6.1.0
Descaling
6.1.1
Yes/No
6.1.2
And,is followed
Yes/No
6.1.3
Yes/No
.....
.....
.....
.....
6.1.4
6.1.5
6.2.0
Intelligent Pigging
6.2.1
Yes/No
Yes/No
6.2.2
6.2.3
6.2.4
Satisfactory/Not satisfactory
Yes/No
Yes/No
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 103
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------7.2. Average dosing of corrosion
inhibitor injection
...PPM/day
Yes/No
Yes/No
Satisfactory/Not Satisfactory
Yes/No
Yes/No
Yes/No
Yes/No
.....
Yes/No
Yes/No
Yes/No
Locally/Remotely
HYDROSTATIC TESTING
Yes/No
Yes/No
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 104
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------12.0 PIPELINE PATROLLING
(Total length of Pipeline .....km)
12.1
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
12.2
...
Yes/No
13.2
Yes/No
Yes/No
Yes/No
13.5
Yes/No
13.6
13.3
13.4
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 105
------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------format are being checked
Yes/No
13.7
Yes/No
13.8
... Nos.
13.9
Yes/No
Yes/No
Yes/No
13.10
13.11
13.12
13.13
Yes/No
Yes/No
Yes/No
Yes/No
13.17
Yes/No
13.18
Yes/No
13.19
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
13.14
13.15
13.16
13.20
13.21
13.22
13.23
13.24
13.25
Sr.Number:OISD/DOC/2013/172
Page No. 106
------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------arrestor (better than 2 ohms)
13.26
13.27
13.28
13.29
13.30
13.31
13.32
Yes/No
Yes/No
Yes/No
Telecommunication / Telemetry
equipments are being inspected
as per manufacturer's recommendations
Yes/No
Pressure/Temperature/Flow recorder
charts are in working order and
are being checked for its safe limits
Yes/No
Yes/No
Yes/No
14.0
14.1
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 107
------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------Draft of buoys
Yes/No
Hose configuration
Yes/No
Hose with respect to PLEM
Yes/No
Sacrificial anodes
Yes/No
Swivel joints and turn tables
Yes/No
14.5 Whether following items are being
inspected annually ?
-
Expansion joints
Oil swivel seals
Yes/No
Yes/No
Yes/No
Installations
Mainlines
Off-shore facilities
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
16.0 DOCUMENTATION
16.1 Whether the basic datas and parameters
of the Pipelines/SBM system layout,
length, diameter etc. are available in
Pipeline installation ?
Yes/No
Yes/No
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.
Sr.Number:OISD/DOC/2013/172
Page No. 108
ANNEXURE
CHECKLIST FOR SAFETY IN LABORATORIES
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------1. Whether fire extinguishers are adequately positioned.
2. Whether important instructions, emergency procedures
displayed.
3. Whether fittings in storehouse for returnable petroleum samples
are of flameproof nature.
4. Whether ELCB/ECB installed in the main power switch board.
5. Whether samples of Class 'A' petroleum products in air
tight containers.
6. Whether emergency lighting available.
7. Whether the switches/plug sockets for various equipments
intrinsically safe.(Lab bench or near ground level)
8. Whether system exists for switching off all equipments at
the end of the day.
9. Whether any emergency siren button provided in the Lab.
10. Whether the on-site emergency plan includes possibility of
a fire in the Lab.
11. Whether the drainage system has been provided with a
oil trap.
12. Whether proper ventilation/exhaust system exists in the
fume chamber area.
13. Whether the height of the chimney in the fume chamber is
sufficient.
14. Whether entry to the Laboratory area is restricted.
15. Check the condition of Test benches & cupboards.
16. Is vacuum system adequate and working properly.
17. Are all Gas Cylinders kept outside buildings and kept
properly secured.
18. Is the condition of the utility lines healthy.
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting