Вы находитесь на странице: 1из 118

Sr.

Number:OISD/DOC/2013/172
Page No. I

OISD - GDN - 145


REVISION - 1
FOR RESTRICTED
CIRCULATION ONLY

GUIDELINES
ON
INTERNAL SAFETY AUDITS
(PROCEDURE AND CHECKLISTS)

OISD-GDN-145
Revision - 1
First Edition, July 1995
Amended Edition, September 2001

Oil Industry Safety Directorate


Government of India
Ministry of Petroleum & Natural Gas
8th Floor, OIDB Bhavan, Plot No. 2, Sector 73, Noida 201301 (U.P.)
Website: www.oisd.gov.in
Tele: 0120-2593800, Fax: 0120-2593802

Sr.Number:OISD/DOC/2013/172
Page No. II

OISD - GDN - 145


Revision I July, 1995
Amended Edition, September 2001

FOR RESTRICTED
CIRCULATION ONLY

GUIDELINES
ON
INTERNAL SAFETY AUDITS
(PROCEDURE AND CHECKLISTS)

Prepared by:

COMMITTEE ON INTERNAL SAFETY AUDITS

OIL INDUSTRY SAFETY DIRECTORATE


8th Floor, OIDB Bhavan,
Plot No. 2, Sector - 73
Noida 201301 (U.P.)

Sr.Number:OISD/DOC/2013/172
Page No. III

Preamble
Indian petroleum industry is the energy lifeline of the nation and its continuous performance is
essential for sovereignty and prosperity of the country. As the industry essentially deals with
inherently inflammable substances throughout its value chain upstream, midstream and
downstream Safety is of paramount importance to this industry as only safe performance at all
times can ensure optimum ROI of these national assets and resources including sustainability.
While statutory organizations were in place all along to oversee safety aspects of Indian petroleum
industry, Oil Industry Safety Directorate (OISD) was set up in 1986 Ministry of Petroleum and Natural
Gas, Government of India as a knowledge centre for formulation of constantly updated world-scale
standards for design, layout and operation of various equipment, facility and activities involved in this
industry. Moreover, OISD was also given responsibility of monitoring implementation status of these
standards through safety audits.
In more than 25 years of its existence, OISD has developed a rigorous, multi-layer, iterative and
participative process of development of standards starting with research by in-house experts and
iterating through seeking & validating inputs from all stake-holders operators, designers, national
level knowledge authorities and public at large with a feedback loop of constant updation based on
ground level experience obtained through audits, incident analysis and environment scanning.
The participative process followed in standard formulation has resulted in excellent level of
compliance by the industry culminating in a safer environment in the industry. OISD except in the
Upstream Petroleum Sector is still a regulatory (and not a statutory) body but that has not affected
implementation of the OISD standards. It also goes to prove the old adage that self-regulation is the
best regulation. The quality and relevance of OISD standards had been further endorsed by their
adoption in various statutory rules of the land.
Petroleum industry in India is significantly globalized at present in terms of technology content
requiring its operation to keep pace with the relevant world scale standards & practices. This
matches the OISD philosophy of continuous improvement keeping pace with the global
developments in its target environment. To this end, OISD keeps track of changes through
participation as member in large number of International and national level Knowledge Organizations
both in the field of standard development and implementation & monitoring in addition to updation
of internal knowledge base through continuous research and application surveillance, thereby
ensuring that this OISD Standard, along with all other extant ones, remains relevant, updated and
effective on a real time basis in the applicable areas.
Together we strive to achieve NIL incidents in the entire Hydrocarbon Value Chain. This, besides
other issues, calls for total engagement from all levels of the stake holder organizations, which we, at
OISD, fervently look forward to.

Jai Hind!!!
Executive Director
Oil Industry Safety Directorate

Sr.Number:OISD/DOC/2013/172
Page No. IV

FOREWORD

Safety Audits have been conducted in the oil/gas industry in one form or other.
Generally, Safety Audits are of two types viz. Internal Safety Audits and External Safety Audits.
While methodology to be adopted for carrying out the External Safety Audits is separately dealt
with, this document contains guidelines for conducting Internal Safety Audits in a professional
manner and is expected to assist the industry further in maintaining and improving the Safety.
Different aspects of the Internal
Safety Audits starting from the need of such
Audits, methodology, preparation
of
reports,
follow
up actions
on
the
recommendation of the Audit Reports have been covered in Section I of this document"Internal Safety Audit Procedures".
In addition, comprehensive Check Lists are given in Section II of the Document
covering typical areas in the oil/ gas industry. These Check Lists would be useful tool for
undertaking in-depth and
systematic
Internal Safety Audits and would go a long way in
accelerating audits to ensure that no aspect is overlooked while carrying out such audits.
The present document on Internal Safety Audits (Procedure and checklists) was revised
by a Functional Committee constituted from amongst members nominated by the industry for
the committee comprising of refining, marketing, pipelines and gas processing disciplines.
It is hoped that the provision of this document, if implemented objectively will go a long way
in improving the safety in the oil & gas industry.
This document will be reviewed periodically for improvements based on the new experiences
and better understanding. Suggestions from users/industry members may be addressed to:
The Co-ordinator
Committee on Internal Safety Audits

OIL INDUSTRY SAFETY DIRECTORATE


8th Floor, OIDB Bhavan,
Plot No. 2, Sector - 73
Noida 201301 (U.P.)
.

Sr.Number:OISD/DOC/2013/172
Page No. V

NOTE
OIL INDUSTRY SAFETY DIRECTORATE publications are prepared for use
in the Oil and gas industry under Ministry of Petroleum and Natural Gas. These
are the property of Ministry of Petroleum and Natural Gas and shall not be
reproduced or copied and loaned or exhibited to others without written consent
from OISD.
Though every effort has been made to assure the accuracy and reliability of
data contained in these documents, OISD hereby expressly disclaims any liability
or responsibility for loss or damage resulting from their use.
These documents are intended only to supplement and not replace the
prevailing statutory requirements.

Note 3 in superscript indicates the modification/changes/addition


based on the amendments approved in the 19th Safety Council
meeting held in September, 2001July, 1999

Sr.Number:OISD/DOC/2013/172
Page No. VI

INTRODUCTION
This is the second edition of the OISD Guidelines on `Internal
Safety Audits' (Procedure and Checklists), first edition of which was
published in October, 1989.
The first edition was prepared by OISD and did not have a regular
Functional Committee. A Functional Committee for the objective of
revising the same was therefore constituted.
The original document has been now revised to include a new
chapter on Internal Audit of cross-country pipelines in order to make
it broad based and thoroughly updated with the experience
gained during the first round of External Safety Audits of refineries,
gas processing plants, Marketing terminals/LPG Bottling Plants etc.
As during the interim period a number of new OISD Standards/
Guidelines have been published, reference to the same has also been
provided wherever required.
With the issuance of this edition, the guidelines contained in
earlier edition stands revised.

Sr.Number:OISD/DOC/2013/172
Page No. VII

SCOPE

These guidelines are applicable for refineries/on-shore gas


processing units(excluding all oil-field operations)/ and marketing
installations. Items which may not be applicable in Marketing have
been separately identified by an asterisk (*) mark. However, it should
be clearly understood that in addition to check points contained in
these guidelines locations may like to further improve the checklist in
order to meet any specific requirements of the respective safety policy
of the concerned organisation.
In the case of terminals where no pipeline transfer is taking place,
chapters 1,2,3,5,6 and 9 would be applicable.
In the case of terminals where pipeline transfer is taking place,
chapters 1,2,3,5,6,9 and 10 will be applicable.
OISD-STD-144 on LPG Bottling Plant Operations has
recommended a periodicity of once a year for Internal Safety Audit of
individual LPG Plant (Marketing). The inspection and Maintenance
System as well as Electrical Safety Audits are to be carried out based on
Internal Audit Checklists as stipulated in OISD-STD-144.
The OISD-145 guidelines are exhaustive and therefore be adopted
for carrying out a comprehensive Internal Safety Audit of LPG Bottling
Plants (Marketing) for which chapters 1,2,3,7,8 will be applicable

Sr.Number:OISD/DOC/2013/172
Page No. VIII

COMMITTEE ON
`INTERNAL SAFETY AUDITS'
REVISION-I
-------------------------------------------------------------------------------------------------------------------------------------NAME
ORGANISATION
-------------------------------------------------------------------------------------------------------------------------------------LEADER
Shri Barath Balan

Hindustan Petroleum Corporation Ltd.


(Marketing)

MEMBERS
Shri M.N. Ahmed

Indian Oil Corporation Ltd.


(R&P Division - Pipelines)

Shri S.K. Ray

Ex-Official Bharat Petroleum Corporation Ltd.


( Marketing )

Shri T.S.Charvethia

Bharat Petroleum Corporation Ltd.


( Refinery )

Shri S.N.Rao

Indian Oil Corporation Ltd.


(Refineries & Pipelines Division)

Shri G.C.Sharma

Bongaigaon Refinery & Petrochemicals Ltd

Shri M.Bhaskar Rao

Hindustan Petroleum Corporation Ltd.


( Refineries )

Shri I.J.Shroff

Hindustan Petroleum Corporation Ltd.


( Refineries )

Shri C.T.Ananthakrishnan

Indian Oil Corporation Ltd.


(Marketing Division)

Shri K.Madhusudanan

Cochin Refineries Ltd.

Shri D.Madhukar Rao

Gas Authority of India Ltd.

MEMBER CO-ORDINATOR
Shri S.C. Gupta

Oil Industry Safety Directorate

-------------------------------------------------------------------------------------------------------------------------------------In addition to the above, several other experts from Industry contributed on the preparation, review
and finalisation of this document.

Sr.Number:OISD/DOC/2013/172
Page No. IX

OISD - GDN - 145


REVISION-I

GUIDELINES
ON
INTERNAL SAFETY AUDITS

SECTION - 1

SECTION - 2

INTERNAL SAFETY AUDIT


PROCEDURE

INTERNAL SAFETY AUDITS


CHECKLISTS

Sr.Number:OISD/DOC/2013/172
Page No. X

SECTION - 1

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------SL. NO.
DESCRIPTION
PAGE NO.
-------------------------------------------------------------------------------------------------------------------------------------1.0
INTRODUCTION
1
2.0

OBJECTIVES OF SAFETY AUDITS

3.0

SCOPE OF SAFETY AUDITS

4.0

TYPES OF SAFETY AUDITS

5.0

METHODOLOGY OF INTERNAL SAFETY AUDITS

5.1 Frequency of Audits


5.2 Formulation of multi-disciplinary

2
Audit Teams

5.3 Duration of Audits

5.4 Use of Safety Audit Check Lists

5.5 Preparation before Site Visits for Safety Audits

5.6 Briefing

5.7 Site Inspections

5.8 Discussions

5.9 Study of Documents

6.0

PREPARATION OF AUDIT REPORTS

7.0

FOLLOW UP OF AUDIT REPORTS

8.0

IMPLEMENTATION OF RECOMMENDATIONS

-----------------------------------------------------------------------------------------------------------------------

Sr.Number:OISD/DOC/2013/172
Page No. 1

OISD GDN 145


INTERNAL SAFETY AUDITS
PROCEDURES

INTERNAL SAFETY AUDITS


PROCEDURES
1.0

INTRODUCTION
Identification of vulnerable areas and specific potential hazards, is one of
the prime
function of loss prevention in oil industry. Safety audit is an important tool in undertaking this
function.

2.0

OBJECTIVES OF SAFETY AUDITS


While the basic aim of safety audits is to identify the areas of weaknesses and strengths,
safety audits are undertaken to meet different specific objectives viz.1.

To identify any design deficiencies and also any weaknesses which might
have cropped up during modifications / additions of facilities.

2.

To ensure that fire protection facilities and safety systems are well maintained.

3.

To ensure that operating / maintenance procedures, work practices are as per


those stipulated in the manuals and standards, which might have degraded
with time.

4.

To check on security, training, preparedness


disaster management etc.

5.

To check the compliance of statutory regulations, standards, codes, etc.

6.

As a social objective to cater to public opinion and concern


environment. This also improves public relation of the organization.

for

handling emergencies and

for safe

3.0 SCOPE OF SAFETY AUDITS


A Safety Audit subjects various areas of a company's activities to a systematic critical
examination with the objective of minimizing loss. This includes all the components of the
system viz. management policy, attitudes, training,
design (Process, Mechanical,
Electrical, etc.)
aspect, layout and construction of the plant, operating Inspection &
Maintenance procedures, emergency plans, personal protection standards, accident records.

4.0 TYPES OF SAFETY AUDITS


Two types of Safety Audits are proposed to be carried out as below :
I) Internal Safety Audit
ii) External Safety Audit
Audit conducted by Internal Audit teams of the organisation is categorized as Internal Safety
Audit.The methodology for carrying out such Internal Safety Audit is described in greater detail
under paras 5.0 to 8.0. Internal Safety Audits will be coordinated by local management under
the overall direction from the Corporate Office.
External Safety Audits will be carried out by outside teams consisting of technical experts from other
organizations in oil industry, professional bodies and statutory authorities under the overall
coordination of OISD.
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

Sr.Number:OISD/DOC/2013/172
Page No. 2

OISD GDN 145


INTERNAL SAFETY AUDITS
PROCEDURES

5.0 METHODOLOGY OF INTERNAL SAFETY AUDITS


5.1 FREQUENCY OF AUDITS:
All the facilities in a particular Refinery/Installation should be covered minimum once every year.
In case of LPG bottling plants the internal safety audit should be conducted minimum once
a year as per OISD-STD-144. However, facilities' design can be audited every 3 years or
after
any major modification or additions. For this purpose, the individual organisation/ installation should
draw up a calendar in advance for carrying such audits for every calendar year which should
be made known to all the Departments and concerned Area Managers. The areas to be audited
should be clearly identified and logically grouped. The suggestive groupings in case of a Refinery
Installation are given below. Similar groupings can be done for other types of Installations.
However, this could be modified depending upon layout and complexity of the individual
installation.
Group -I

All LPG Storage, filling &

dispatch

facilities.

Group II

All dispatch facilities like Tank-Wagon loading Tank - lorry loading, Bitumen
filling and dispatch facilities.

Group - III

Oil Movement & Storage (OM&S)


(Rest of all the facilities other than those covered under Group I & II, including TEL
blending)

Group - IV

PROCESS UNITS :

Sub Groups IV - A Atmospheric / Vacuum Units


IV - B Visbreaking,

Coking,

Bitumen Blowing Units.

IV - C Secondary Processing Unit like FPU /


Units.

FCCU/HCU & H2 along with Treating

IV - D Naphtha HDS, Cat-Reforming, Kero / Diesel HDS etc.


IV - E N2 & Others.
Group - V

Power House, Electrical Sub-stations, Water Block, Utilities, Effluent Treatment.

Group - VI

Miscellaneous other facilities such as Workshops, Warehouse Laboratories etc.

Group - VII

General Audit, Fire Fighting and Safety, Layouts etc.

5.2 FORMATION OF MULTI-DISCIPLINARY AUDIT TEAMS:


The Internal Audits should be carried out through multidisciplinary audits teams. The composition
of the
Internal Safety Audit may vary depending on the Group and
areas to be audited, however,
person(s) concerned should have necessary experience and background to undertake in-depth audit in
a particular discipline. A team of 4 to 5 experienced officers from various disciplines viz. Process /
Production, Maintenance /
Inspection, Electrical, Instrumentation, Fire & Safety and with the
activity involvement of concerned Plant / Area Manager is suggested. One of the team members should be
nominated as the leader of the audit team.
In multi-unit organizations, the team members could also
be drawn from the Head Office / Corporate Office and other operating Units under its control.
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 3

INTERNAL SAFETY AUDITS


PROCEDURES

5.3 DURATION OF AUDIT


Depending on the nature of audit and type / complexity of
the installations in the selected group, the
duration of internal safety Audit can be fixed. This may vary from 2 to 7 working days for facilities under
each group.
5.4 USE OF SAFETY AUDIT CHECK LISTS
Check lists are the most useful tool for undertaking systematic Safety Audit. Even for a skilled and
well qualified engineer a good check list would be necessary as a
guide. Like a code of practice, a
Check List is a means of
pooling the knowledge and hard won experience and ensures that no
important aspect is overlooked or forgotten. Such check lists help maintaining uniformity and speeding up
the audits.
In Section-II of this document, detailed model Checklist covering important areas are given. It is
suggested that
oil industry members should adopt these model check lists
for
carrying
out
Internal Safety Audits.

5.5 PREPARATION BEFORE SITE VISITS FOR INTERNAL SAFETY AUDITS:


Before the safety Audit team visits any particular facility for carrying out Safety Audit, it would be essential
to study all relevant documents as below to get complete picture :
- Layouts
- P & IDs
- Operating Manuals
- Maint. / Inspection Manuals
- Fire and Safety Manuals, etc.
Depending upon the nature of audit more emphasis can be given to study specific documents. All the
audit team members should study these documents in advance to know the
details of the installation.

5.6 BRIEFING:
Before beginning of each audit, all concerned persons of the area/installation be briefed by the team leader
about the purpose of the audit. No impression should be left that audit will throw bad light on them.

5.7 SITE INSPECTIONS:


Most of the information could be gathered through site inspection using ready-made check lists. The
auditors should enter their observations under the remarks column and not simply state "yes" / "no".
Wherever necessary, observations should be recorded in separate sheet. Inspection should be carried out
accompanied by Installation / Plant Manager or the assigned officials.

5.8 DISCUSSIONS:
Further information can also be gathered through discussions (formal & informal), with site personnel and
Installation / Plant Manager, who is in-charge of the area or other site officers. The audit team should
interact with persons from various
disciplines such as
Production,
Maintenance, Electrical,
Instrumentation, etc.. Formal discussions could be in the form of brief periodical sessions while informal
discussions could be over a cup of tea with personnel
working in the area.

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 4

INTERNAL SAFETY AUDITS


PROCEDURES

5.9 STUDY OF DOCUMENTS:


In addition to the documents which are already studied
before inspection of the facilities, other
documents, such as Operating Instructions, Standing Orders, Log Books, Log sheets, Accident Records,
Minutes of Safety Committee Meetings etc. may also be studied as required.

6.0 PREPARATION OF AUDIT REPORTS


The work of the Internal Safety Audit item should be presented in the form of a Safety Audit Report for
each group
which should contain observations & recommendations and also in
brief
the
modalities adopted in conducting audit and the names of the audit team members.
Before finalizing the report, the Safety Audit Team can give a presentation as feedback to the Operating /
Management personnel of the Area / Installation. Additions or
deletions could be made in the
draft report based on the discussions and comments received during the presentation. This approach is
always constructive and does not undermine
the technical competence of the audit team.

7.0 FOLLOW UP OF AUDIT REPORTS


Generally, the Internal Safety Audit Reports are submitted to the concerned authority who appoints the
audit team for undertaking needful follow up actions. Only the appointing
authority should exercise
judgement in rejecting any of the recommendations. The appointing authority shall be of senior
management level ( General Manager and above ).
The crux of the safety audits lie in removing the weakness identified during the audit. Sometimes audit
reports identify only the problem / weakness, but not the solution.
In such cases, it would be necessary to undertake a detailed
study of the specific area and to identify the
rectification measures. Wherever the necessary in-house expertise is not available for detailed studies,
help of consultants / professional bodies should be sought for.

8.0 IMPLEMENTATION OF RECOMMENDATIONS


The final and most important phase is the implementation of
recommendations. A senior person should
be nominated for coordinating implementation of all accepted recommendation
under a time bound
program. Senior management should review the progress of implementation of recommendations
periodically through Management Safety Committee meetings and other review meetings.

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 5

INTERNAL SAFETY AUDITS


PROCEDURES

SECTION : 2
INTERNAL SAFETY AUDITS
CHECKLISTS

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

Sr.Number:OISD/DOC/2013/172
Page No. 6

OISD GDN 145


INTERNAL SAFETY AUDITS
PROCEDURES

SECTION : 2
INTERNAL SAFETY AUDIT
CHECKLIST
CONTENTS
----------------------------------------------------------------------------------------------------------------------Sr.

CHAPTER

SAFETY AUDIT
PAGE NOS.
CHECK LIST NO.
------------------------------------------------------------------------------------------------------------------------------------------------1.
GENERAL SAFETY AUDITS
OISD-GDN-145-01
8
2.

FIRE PROTECTION

OISD-GDN-145-02

16

3.

LAYOUTS

OISD-GDN-145-03

23

4.

PROCESS PLANTS

OISD-GDN-145-04

30

5.

OIL STORAGE AND MOVEMENT

OISD-GDN-145-05

41

6.

POL LOADING AND UNLOADING

OISD-GDN-145-06

57

7.

LPG BULK LOADING /


UNLOADING

OISD-GDN-145-07

65

8.

LPG BOTTLING AND DISPATCH

OISD-GDN-145-08

73

9.

ELECTRICAL SYSTEM

OISD-GDN-145-09

84

10.

CROSS - COUNTRY PIPELINES

OISD-GDN-145-10

99

ANNEXURE
108
---------------------------------------------------------------------------------------------------------------------------------------

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

Sr.Number:OISD/DOC/2013/172
Page No. 7

OISD GDN 145


INTERNAL SAFETY AUDITS
PROCEDURES

OISD-GDN - 145-01
REVISION I
SAFETY AUDIT CHECKLIST No.OISD-GDN-145-01

GENERAL SAFETY AUDITS


CONTENTS
--------------------------------------------------------------------------------------------------------------------------SECTION
DESCRIPTION
PAGE NO.
-----------------------------------------------------------------------------------------------------------------------1.0 ORGANISATION AND ADMINISTRATION
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8

Management Philosophy
Procedures
Safety Audits
Safety Committee Meetings
Safety consciousness & Propagation
Work Permit System
Contingency/ Disaster Plan
Plant Security

2.0 INDUSTRIAL HAZARD CONTROL


2.1
2.2
2.3
2.4
2.5
2.6
2.7

House Keeping
Machine Guarding
General Safety features
Maintenance of Tools and Tackles
Materials handling
Personnel Protective Equipment
Toxic Materials and Occupational Health

8
8
8
8
8
9
9
9
10
10
10
10
10
11
11
11
11

3.0 EMPLOYEE TRAINING

12

4.0 FIRES, ACCIDENTS AND NEAR MISSES

12

4.1
4.2
4.3
4.4
4.5

Reporting formats
Reporting Procedures
Follow up of Recommendations
Maintenance of Records & Data
Review of Accidents Data

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

12
12
12
12
13

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 8

INTERNAL SAFETY AUDITS


PROCEDURES

OISD-GDN-145-01
SAFETY AUDIT CHECKLIST
1.0 GENERAL SAFETY AUDITS
-----------------------------------------------------------------------------------------------------------------------ITEM
AUDITOR REMARKS
------------------------------------------------------------------------------------------------------------------------1.0 ORGANIZATION AND ADMINISTRATION:
1.1 MANAGEMENT PHILOSOPHY
a)

Whether the declared safety policy is made


available to all concerned in written form ?

b)

When updated last ?

c)

Does the employees contribution towards safety


form a part of the appraisal system ?

1.2 PROCEDURES
a)

Whether procedures are well defined and


manuals are available & accessible plant /
facility wise for the following functions ?
- Operation
- Inspection and maintenance
- Electrical
- Mechanical
- Instruments
- Civil
- Fire fighting & Safety
- Emergency and disaster management plans

b)

When were these documents updated last ?

1.3 SAFETY AUDITS


a)

When was last External/Internal Safety


Audit carried out ?

b)

Whether accepted safety audit


recommendations are implemented with time
bound schedules ?

1.4 SAFETY COMMITTEE MEETINGS


Whether Safety Committee Meetings are held
regularly ?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 9

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------1.5 SAFETY CONSCIOUSNESS & PROPAGATION
a)

Whether following items have been taken care of ?


Display of (in languages widely understood)
- sequence of operations where critical / batch
operations are performed.

- Safety posters/slogans.
- Safety precautions at strategic points
through sign boards.
b

Whether fire & safety training programs are


conducted periodically and are in line with
OISD-STD-154 ?

c)

Whether Safety awareness competitions


are held periodically ?
- Type
- Frequency
- Participants
Any other Motivation scheme exists ?

1.6 WORK PERMIT SYSTEM


Whether work permit system meet the requirements
of OISD Standards 105/137 ?
1.7 CONTINGENCY/DISASTER PLAN
a)

Whether disaster management plans are


available for different possible types of scenarios?

b) Whether all the concerned personnel are given


their individual copies?
c) Whether these copies are available at
place, for emergency uses?
d)

Whether these
plans
concerned authorities ?

are

central

approved

by

e) Are mock drills being conducted ?


f)

Whether the feed back generated from mock


drills is utilized to improve the plans?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 10

INTERNAL SAFETY AUDITS


PROCEDURES

-----------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------1.8 PLANT SECURITY
a) Whether
installation
has
wall/fence as per prescribed norms?

boundary

b) Whether gates are manned?


c) Whether identity badges/cards are issued and
worn by employees, visitors and contractors
personnel for admission to restricted areas?
d)How it is ensured that visitors/contractor personnel
do not trespass into non permitted areas?
e)Whether
frisking is
done
for
contractor personnel / visitors / employees;
if
so, how
much percentage is covered under
each category?
f) Whether Crisis Management Scheme for BOMB
Threat exists?
g) Whether watch towers exist?
2.0 INDUSTRIAL HAZARD CONTROL
2.1 HOUSE KEEPING

Operating areas
Work shops
Stores / godowns / yards
Loading gantries
Effluent treatment facilities
Tank farms
Storm water channels
Utility block
Electrical substation
Fire water tank
Any other areas

Ratings *
1
2
-

- Rotary equipment in operating


areas
- Workshops
- Others
-

2.2 MACHINE GUARDING

2.3 GENERAL SAFETY FEATURES


Check For:
- unprotected Floor openings
protected
- Slippery defective floors
- Stairway surfaces
-------------------------------------------------------------------------------------------------------------------------------------------------OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 11

INTERNAL SAFETY AUDITS


PROCEDURES

ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------- Inadequate illumination
- Ventilation
- Cross-overs over piping
- Platforms/Hand rails
- Walk ways in tank farm area - All intrinsic safety devices
(For refinery,ref.to 1.7 of OISD145-04)
*Ratings:(Notation Followed)
1: Not meeting requirement
2: Meeting requirements satisfactorily
2.4 MAINTENANCE OF TOOLS AND
TACKLES

Whether all lifting tools and tackles are


tested as per statutory requirements and
record maintained?

2.5 MATERIALS HANDLING( Mechanised/


manual)
Whether safe lifting methods and proper
protective equipment are used?
2.6 PERSONNEL PROTECTIVE EQUIPMENT
a) Whether requirements are identified as per
operating manuals / standards?
b) Are these readily available at the time need?
c) How periodically these are inspected and
records maintained?
d) Whether personnel are trained for effective
use?
2.7 TOXIC MATERIALS AND OCCUPATIONAL
HEALTH
a) Are there any toxic materials in use ?
b) Whether relevant personnel protective
equipment is available (Ref. Section 2.6) as per
requirement?
c) Is storage of toxic materials proper?
d) Is disposal of containers of toxic materials safe ?
-------------------------------------------------------------------------------------------------------------------------------------------------OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 12

INTERNAL SAFETY AUDITS


PROCEDURES

ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------e) Is there display of Do's and Dont's for handling of
toxic chemicals?
f) How the Health monitoring is done. Whether
records are maintained ?
g) Is First Aid available for toxic chemicals handled?
h) Whether proper communication system exists?
i) Is there any monitoring of work environment for
toxic chemicals /gases etc. and records maintained
thereof? Whether material safety data sheet
displayed Note 3
3.0 EMPLOYEE TRAINING
a) Whether the training given for all employees
(operators / technicians / engineers) is in line with
OISD- STD-154 w.r.t following items :
-

syllabi
course materials
class room/field on job training
on job
fire and safety

b) Whether Refresher courses are conducted for


technical personnel?
c) What is the evaluation and qualifying system?
d)

How employees
performance?

are

Motivated

for

safety

e) How the contractor personnel are trained/briefed


w.r.t safety procedures?
f)

Whether the T/T crew are trained as per the


C.M.V.Rule 9 ?

4.0 FIRES, ACCIDENTS AND NEAR MISSES


4.1 REPORTING FORMATS
Whether reporting formats as per OISD-GDN-107
are available for (preferably separate)?
- fires and explosions
- accidents causing injuries to personnel
and damage
to equipments and
products (without the explosion/ fire)
- Near misses
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 13

INTERNAL SAFETY AUDITS


PROCEDURES

------------------------------------------------------------------------------------------------------------------------------------------------4.2 REPORTING PROCEDURES


a) Whether responsibilities are clearly defined as
regards to preparation of the reports?
b) Who receives the reports?
c) Whether all minor incidents and near misses as
reported to Safety Dept/Concerned authority?
4.3 FOLLOW UP OF RECOMMENDATIONS
4.3.1
a)

Implementation

Whether responsibility is assigned


implementing the recommendations?

for

b) Whether the recommendations are implemented


with time bound schedules?
c) How far the recommendations arising out of
previous accidents are implemented?
4.3.2

Dissemination

a)

Whether the
procedures /systems
are
established & streamlined for dissemination of
information?

b)

What is the MIS upto Chief Executives level


w.r.t information on fires, accidents and near
misses?

4.4 MAINTENANCE OF RECORDS & DATA


a) Accident statistics of last how many years
are available ?
b) If required, how fast any case history could
be located?
- w.r.t specific case
- based on particular area/type
4.5 REVIEW OF ACCIDENTS DATA
a) Is there any system to periodically review the
trends
of accidents for taking necessary
actions ?

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 14

INTERNAL SAFETY AUDITS


PROCEDURES

------------------------------------------------------------------------------------------------------------------------------------------------b) Whether any review is under taken at top


management/ corporate level periodically, to
review the safety performance and new goals
are set up?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

Sr.Number:OISD/DOC/2013/172
Page No. 15

OISD GDN 145


INTERNAL SAFETY AUDITS
PROCEDURES

OISD-GDN-145-02
REVISION I

SAFETY AUDIT CHECKLIST


FIRE PROTECTION
CONTENTS
--------------------------------------------------------------------------------------------------------------------------SECTION
DESCRIPTION
PAGE NO.
-----------------------------------------------------------------------------------------------------------------------1.0

PHILOSOPHY AND STANDARDS

16

2.0

FACILITIES

16

2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8

Fire water
Fire Hydrant System
Foam System
Fire Station
Fire Extinguishers
Fire Hoses and Accessories
Protective/ Safety Equipment
Others

16
17
17
18
18
18
19
19

3.0

PROCEDURES

20

3.1
3.2
3.3
3.4
3.5

Organisations
Disaster Management Plan
Inspection and Testing facilities
Training
Checklist for DMP

20
20
21
21
22

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 16

INTERNAL SAFETY AUDITS


PROCEDURES

OISD-GDN-145-02
SAFETY AUDIT CHECKLIST
2. FIRE PROTECTION
-------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITOR'S REMARKS
--------------------------------------------------------------------------------------------------------------------------------------In order to evaluate the adequacy of fire fighting
facilities and procedures, answers should be
obtained for the following four basic queries:
1. Are the facilities adequate
for anticipated fires ?

and

reliable

2.Is manpower available and effectively trained to


handle the fire fighting equipment.
3.Are
emergency control procedures adequately
established.
Since the scope under each query is too broad and it
is difficult to give simple answers, these are divided
into a number of simpler items/ questions which
could be evaluated/answered with reasonable clarity.
1.0

PHILOSOPHY AND STANDARDS

Does basic philosophy for designing the fire fighting


facilities
follow OISD 116 (for Refinery),OISD
117(for Marketing-POL) and OISD 144 (LPG bottling
plants) as necessary ?
2.0

FACILITIES

Whether following facilities are provided


adequately and have the necessary efficacy.
2.1

FIRE WATER

2.1.1

Fire water storage

a. What is the capacity & how was it


determined
b. Is it sufficient ? Is the storage AG/UG or
other wise ?
c. What are replenishment source ? Are they
adequate ?
d. What's the internal replenishment rate ?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 17

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
2.1.2 Fire Water Pump :
a. Is location away (from hazardous area) ?
b. What's the power source ? How many are diesel &
elect driven ?
c. What's the stand by philosophy ?
d. What's the capacity of each pump and at what
head ?
e. What's the priming system?
f. Is there any jockey pump ?
g. What's the capacity ? What's set pressure?
h. What's fire water pump starting system
manual/auto ?
I. What's the condition of battery of diesel engine ?
j. What's the diesel fuel tank capacity (hrs) ?
k How frequently does jockey pump start ? How
long it runs ?
l. Are the fire water pumps/engines started &
observations logged as per OISD Std. 116/
117/144.
2.2

FIRE HYDRANT SYSTEM

Check and comment on the hydrant system layout


design position
of hydrants/monitors, flow rate
pressure at the farthest point, condition of pipeline
etc. Please comment on the system as per the
following.
2.2.1
2.2.2
a.
b.
c.
d.
e.
f.
g.

2.3
a.
b.
c.
d.

Network - Grid type/Closed type/Any other


Mains
What's the material of construction of pipes
?
How corrosion protection is ensured ?
How is the sectionalising of hydrants system
?
How are the spacings between hydrants
Are monitors / hydrants properly distributed
in critical areas and all facilities covered ?
Are
these
hydrants/monitors
easily
accessible and operable ?
Is the layout vulnerable at any points from
fire hazard
FOAM SYSTEM
What are the types of foam available?
What are the dilution potential and the
quantities ?
What are the storage arrangements and its
accessibility
Do the coverage and application rate for
floating roof/fixed roof tanks meet OISD
norms ?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 18

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------e.

Are foam branch pipes, nozzles, wheeled


equipments available and adequate as per
OISD Stnadard ?

f.

Proportioning equipment - suitability proper pick up

2.4
a.

FIRE STATION
Is the location away from hazardous
areas ?
Are the no. and variety of fire vehicles
sufficient ?
Facilities on fire vehicles capacity,
pressure, flow proportioning system etc.
Daily starting of vehicles and other
check logs.?

b.
c.

2.5
a.

FIRE EXTINGUISHERS
Are portable extinguishers meeting OISD
requirements ? Are they BIS approved ?

b.

Whether periodical inspection, maintenance


and testing of fire extinguisher are
promptly carried out and
proper
records maintained in line with OISD Std.?

c.

Are replacement of extinguishers on shell


failure or hydrotest ensured and necessary
records available ?

d.

Are quantity of cartridge and powder


sufficient at work site and spares available
in store in line with OISD Std. ?

e.

What is the monthly


cartridge and product ?

f.

Fire Extinguishers attached to all the


vehicles / position at various sites shall be
numbered and date of testing shall be
written on them Note 3

g.

Fire Extinguishers attached to TTs should


Note 3
.
also bear the TT number

2.6
a.

FIRE HOSES AND ACCESSORIES


Are no of hoses sufficient w.r.t. no. of
hydrants in the system ?
Are the hose boxes strategically placed ?
Are the hoses easily removable during an
emergency ?

b.
c.

consumption

of

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 19

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
----------------------------------------------------------------------------------------------------------------------------------------------d.
Are the hoses periodically tested/ checked
and replaced?
e.
Are the hose boxes painted fire red Note 3 as
per OISD Standard.?
f.
Are adequate sand drums / buckets
available ?
g.
Are all various types of nozzles/foam branch
pipes etc. provided as per OISD STD.?
h.
Are the hoses BIS Approved Note 3 ?
2.7

PROTECTIVE/SAFETY EQUIPMENT
Are safety appliances available in line
with OISD 116/117/144 Standard?
ADDITIONAL ITEMS : FACILITIES AT
PORT

Are the fire fighting facilities (fixed as well


as portable) provided at the port
meeting
requirement as per OISD-STD- 156 ?
2.8

OTHERS
Whether the fire siren and fire alarm are
provided at strategic locations and are
audible up to the desired range ?
Whether siren codes are identified for
different types of fire/emergencies ?

2.8.1

Fire siren and fire alarm network (Electrical/


mechanical/ hand operated) Satisfactory
working.
Differentiation between different types
fires / emergencies.?

of

Check the locn./range and report


- Within and to outside.
- Normal and emergency.
- Condition of radio communication
equipment.
- Availability of alternate power supply
during normal supply failure
- Inspection and maintenance schedule
- Training of the users.
2.8.2

Ambulance/Other means of transport and


First-Aid services with complete kit Note 3.
-

Contingency Plan for medical


emergency.
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 20

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------- Evacuation, etc.
- First Aid training to personnel on shift.
2.8.4

Availability of
critical areas.

2.8.5

Availability
of
special
fire
fighting
components aprons / suits / emergency
flood lights, power megaphones, etc.

3.0

PROCEDURES

3.1

ORGANIZATION

a.

Whether the organogram of fire fighting


and other supporting services well defined
?
Is
periodic
fire
drill
conducted,
shortcomings observed and
necessary
action initiated ?

b.

c.

emergency,

lights

in

Does location have well defined fire order ?


Whether organogram has provision to meet
emergency situation during idle shift /
sundays and holidays.

d.

Whether relevant fire order is displayed at


various work stations indicating station
employees role during fire / emergency ?

e.

Whether following documents are


updated and displayed as reqd.
- Organogram
- Fire hydrants layouts and P & ID
diagrams
- Fire fighting procedures / manual

f.

Whether layouts and organogram


displayed ?

3.2

DISASTER MANAGEMENT PLAN


(Ref.to new checklist for DMP)

a.

Whether mutual aid schemes are made


with neighboring industries, local fire
brigades, etc.

b.

Whether resource requirements are worked


out

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 21

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------3.3 INSPECTION AND TESTING FACILITIES
Whether periodic inspection and maintenance /
testing is done and proper records maintained for
following :
a. Pumps
- Is flow vs. pressure meeting the
requirement ?
- Is lubrication periodically carried out ?
b.

Hydrants
- Are pressure and flow at different
points adequate enough ?
- Are all valves easy to operate ?

c.

How effective is the fire water spray


system ?

d.

Is foam proportioning equipment in


working order ?

e.

Whether hydrotesting and regular


inspection of fire gate mains undertaken
and records maintained ?

f.

Whether various checks & records of


periodical running of Diesel engines
carried out?

g.

FIRE HOSE AND ACCESSORIES


- Are hoses , nozzles, adapters, hose
holders, wrenches etc. inspected
regularly ?

h.

Foam concentrate
- What is the inventory ? Are the
procurement / expiry date
record maintained?
- Whether protein foams churned
regularly and record maintained ?

3.4 TRAINING
Whether training provided fire crew / other
employees / CISF etc. is in line with OISD
std. 154?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 22

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------3.5 CHECKLIST FOR DMP
1. What is the frequency of DMP drill ? When was
it last conducted ? Whether the short comings
observed during drills were analyzed and action
taken to prevent repetition ?
2.Whether mutual aid schemes are planned with
neighboring units local fire brigade etc. ? Is the
scheme periodically discussed with members ?
Are they trained to fight fire in oil / gas
installation /
3. Whether the resources of the operating location
and the mutual aid members properly tabulated ?
Whether assessment of necessary man power
and equipment studied and action taken for the
shortfall ?
4. Whether organogram of various co-ordinators,
succession charts showing alternate persons
and sub-organisation chart well displayed ?
5. Are responsibilities of various neighboring
industrial
units, discussed and recorded ?
Whether the duties of
various coordinators
and team members well defined ?
6. Are the following information included in the DMP
?
Name, address, telephone numbers (Off.and Res.
) of anchorages / key persons are to be clearly
shown.
a.
b.
c.
d.
e.

f.

Mutual aid members


Police, fire and district authorities.
Hospitals and doctors
Medical shops, ambulance, blood bank,
blood donors,
Water supply dept. water transporter, elect.
boards, railways, port trust, telephone
exchange.
Generator hire service, transport hire service
, welfare bodies, social organization
and
catering services.

7.

Is emergency control centre planned and


properly furnished / fitted to meet the
requirement ?

8.

Whether DMP is based on MCA and risk


analysis ?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

Sr.Number:OISD/DOC/2013/172
Page No. 23

OISD GDN 145


INTERNAL SAFETY AUDITS
PROCEDURES

OISD-GDN-145-03
REVISION I

SAFETY AUDIT CHECK LIST No. OISD GDN-145-03

LAYOUTS
CONTENTS
-------------------------------------------------------------------------------------------------------------------------------------SECTION
DESCRIPTION
PAGE NO.
------------------------------------------------------------------------------------------------------------------------------------------

1.0

TOPOGRAPHY OF INSTALLATION

24

2.0

SURROUNDING OF THE INSTALLATION

24

3.0

INTER - DISTANCES

24

4.0

TANKFARMS

24

4.1
4.2
4.3

Grouping of tanks
Dykes
LPG storage

24
24
25

5.0

PROCESS UNITS

25

5.1
5.2
5.3

Location
Control room
Field

25
25
25

6.0

OTHER FACILITIES AND EQUIPMENT

26

6.1
Electrical power lines
26
6.2
Electrical switchgear
26
6.3
Roads
26
6.4
Administrative buildings/ workshops/canteen
26
6.5
Boiler plants
26
6.6
Gantries
27
6.7
Waste water facilities
27
6.8
Water cooling towers
27
6.9
Elevated platforms
27
6.10
Piping
27
6.11
Rail spurs
27
6.12
Fire hydrants/ monitors/ safety showers/ hose etc.
27
6.13
Compressors
28
6.14
Miscellaneous
28
-------------------------------------------------------------------------------------------------------------------------------------------------

OISD-GDN-145-03
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 24

INTERNAL SAFETY AUDITS


PROCEDURES

SAFETY AUDIT CHECKLIST


LAYOUTS
------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITOR'S REMARKS
------------------------------------------------------------------------------------------------------------------------------------------------1.0 TOPOGRAPHY OF INSTALLATION
- Susceptibility for flooding
- Location of process units and tank
farms in undulating areas.
2.0 SURROUNDING OF THE INSTALLATION
- Flammables / Toxics/ Ignition sources
up/ down wind
3.0 INTER-DISTANCES
Code / standard/ regulations followed /deviated
(Ref.OISD-STD-118/144).
- Equipment/block/facility to boundary walls
- Block/facility to block/facility
- Equipment to Equipment switch in a block /
facility.
4.0 TANKFARMS
4.1 GROUPING OF TANKS
- Mixing of different class products in POL
tank farm
-

Accessibility of tanks for fire fighting.

4.2 DYKES
- Aggregate capacity of tanks in each
Dyke / enclosure
- Capacity of Dykes with respect
relevant group

to

- Construction and dimensions of dyke wall


- Routing / Cris- crossing of process /
fire hydrant lines inside dyked tank
farm
- Provision of fire walls.

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 25

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------4.3 LPG STORAGE
- Orientation w.r.t. wind direction
- General state of
terrain without depression /
large ditches
- No of vessels in each group and the
capacities

aggregate

-Provisions of slope and spill collection shallow


pumps.
- Vapour trap
5.0 PROCESS UNITS
5.1 LOCATION
- Consolidated / Scattered
- Separation from tank farm/concentration of people
- Down wind from ignition sources
5.2 CONTROL ROOM
- Design for minimum occupancy
- Electrical area /equipment classification
- Upwind from sources of flammables / toxic
materials
- Easy approach to entrance and to fire fighting
facilities
- Safety of control room from any blast situation
- Emergency Light during power failure at Process
Control room. Note 3
5.3 FIELD
- Positioning of process equipment without stacking
- Segregation of equipment handling hazardous /
materials
- Adequacy of accessways for the movement of
equipment and people.
- Strategic location of fire fighting equipment
- Over head clearances for passage of heavy
equipment like cranes
- Adequate
provision of oily
water sewers and catch pits.

water

and storm

- Packing and grinding of susceptible leaky areas


OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 26

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------6.0 OTHER FACILITIES AND EQUIPMENT
6.1 ELECTRICAL POWER LINES
- Rooting below / above ground
- Passing over critical facilities
- Separation from elevated structures which may
fall across power lines
- Location of power receiving station & layout hazard
6.2 ELECTRICAL SWITCHGEAR
- Upwind from flammable sources
- High ground in flooding areas
- Routes of overhead power cable and
instrument cable trays and their fire protection/
fire proofing
6.3 ROADS
- Road widths and turning radii for movement of
large fire fighting vehicles .
-

Separate entry points


product movement

for

employees

and

- Layout of the roads for minimum truck traffic in


grass
- Accessibilities to each process unit/tank
- Crossing of pipe alleys
- Concreted / asphalted (condition)
- Process Plants and facilities shall have access
roads for fire tenders from at least two sides. Note 3
6.4 ADMINISTRATIVE BUILDINGS /WORKSHOPS/
CANTEENS
-

Peripheral locations
Separation from hazardous areas
Upwind from sources of flammable / toxics

6.5 BOILER PLANTS


Upwind and separation from
flammable materials

sources of

-------------------------------------------------------------------------------------------------------------------------------------------------OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 27

INTERNAL SAFETY AUDITS


PROCEDURES

ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------6.6 GANTRIES
- Peripheral location
- Downwind from ignition sources
- Separation from main line of rail / road
6.7 WASTE WATER FACILITIES
- Peripheral locations
- Down
wind
from
concentrations of people

ignition

sources /

- Any treatment facility to dischargeable water for


pollution control
6.8 WATER COOLING TOWERS
- Down wind from ignition sources/ concentration
of people
6.9 ELEVATED PLATFORMS
- Permanent platforms for all operating points
- Alternate routes for descent
- Landing at grade in safe locations
6.10 PIPING
- Head bumpers, shin splitters and tripping
hazards
- Personnel protection from hot lines
- Fire proofing of pipe racks.
6.11 RAIL SPURS
- Clearance for derailments
- No facility opposite the end of the spur.
6.12 FIRE HYDRANTS / MONITORS / SAFETY
SHOWERS / HOSE ETC.
- No obstruction for approach. Good path for
retreat

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 28

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-----------------------------------------------------------------------------------------------------------------------------------------------6.13 COMPRESSORS
- Not in closed buildings
- Down wind from rest of unit
6.14 MISCELLANEOUS
- Location of fire station and fire pump
- Location of smoke booths
- Display of Layout drawing and display of
P & I DRAWING
-Check piping layout for minimum piping
- Greenscaping area
- Flood light towers & security towers
- Grading of various block facilities
- Storm water drains & easy drainage
- Height of flares is adequate
- TTL gantry and easy exit through the
product movement gate
- Provision of Truck parking area

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

Sr.Number:OISD/DOC/2013/172
Page No. 29

OISD GDN 145


INTERNAL SAFETY AUDITS
PROCEDURES

OISD-GDN-145-04
REVISION I

SAFETY AUDIT CHECKLIST No.OISD GDN-145-04


PROCESS PLANTS
CONTENTS
--------------------------------------------------------------------------------------------------------------SECTION
DESCRIPTION
PAGE NO.
---------------------------------------------------------------------------------------------------------------1.0

GENERAL

30

1.1

Layout and Drainage

30

1.2

Fire Protection facilities

30

1.3

Housekeeping

31

1.4

Training

31

1.5

Inspection & Maintenance

32

1.6

Electrical

32

1.7

Instrumentation

32

2.0

PROCESS SUB-SYSTEMS

33

2.1

Control room

33

2.2

Pump House

33

2.3

Compressor house

34

2.4

Heat exchangers/ condensers/ coolers

35

2.5

Process vessels and columns

35

2.6

Process furnaces

36

2.7

Process piping

37

2.8

Relief and Disposal System

37

2.9

First aid

39

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 30

INTERNAL SAFETY AUDITS


PROCEDURES

SAFETY AUDIT CHECKLIST


4.0 PROCESS PLANTS
----------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARKS
-----------------------------------------------------------------------------------------------------------------------------------------1.0 GENERAL
1.1 LAYOUT AND DRAINAGE
a)

OIDF-STD-118 ? (deviations, if any to be


specified)

b)

Whether the location of the control room


& furnace meets the OISD-STD-118

c)

Whether proper approach roads to the


plant have been provided ?

d)

Whether ladders, platforms provided are


as per standard engineering practices and
can be considered adequate ?

e)

Whether oil water sewers are adequately


sized and the manholes on these sewers
covered properly ?

f)

Whether the plant surface drainage systems


are adequately sized and
properly maintained ?

g)

Whether a closed blow down


been provided for draining of
from the vessels / equipments
pump out arrangement from
tank ?

1.2

FIRE PROTECTION FACILITIES

a)

Whether the fire water network provided


is well designed (Ring type) and covers
all sides of the plant ? refer OISD116.

b)

Whether the hydrants, water monitors are


provided from all sides of the plant ?And are
they located more than 15 meters away from
nearest hazard ?

c)

Whether steam lancers have been provided


and are adequate ?

d)

Whether all hydrants, monitors, hose


boxes are easily accessible ?

e)

Whether adequate number of portable fire


extinguishers have been provided all over
the plant as per the OISD-116 ?

system has
hydrocarbon
with proper
underground

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 31

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------f)

Whether communication systems, fire alarms


and p.a. system have been provided ? Are
they working ?

g)

Whether a copy of fire fighting manual is available


in the plant control room ?

h)

Whether safety committee meetings are


conducted at plant level ? Is the
frequency adequate?

1.3.

HOUSEKEEPING :

a)

Whether the plant floors particularly in


pump house, heat exchanger areas are
regularly washed to avoid Oil Accumulation ?
Any visible Oil Accumulation on the floor, drains found ?

b)

Are redundant pipes/valves/ pump foundations


/insulation debris removed from process area ?

c)

Whether the general housekeeping in the


area can be considered as ;
- adequate
- not adequate

1.4

TRAINING

a)

Are copies of updated operating manual,


fire & safety manual, disaster control
manual, standing instructions available
in the control room ?

b)

Are the working personnel in the area


given thorough training on operations,
safety and fire fighting at the induction
stage ?

c)

Whether subsequent refresher training


programs are organized-periodically?

d)

Whether contractor employees are given


basic training on hazards of petroleum
products & safe practices ?

e)

Whether the workers are using proper


personnel protective clothing such as
hand gloves, safety shoes, helmet, face
shield etc. ?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 32

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------1.5

INSPECTION & MAINTENANCE

a)

Whether inspection of equipments/ tanks


/piping /safety valves etc. are carried
out as per schedules? Are history cards
maintained ? Refer OISD129 / OISD-127.

b)

Whether all the modification works are


undertaken only with approved engineering
drawings ?

c)

Whether a well designed work permit


system exists for the following and is
rigidly followed ;
Refer OISD-105.
- Hot/Cold work
- Energizing and de-energizing of electrical
Equipment.
- Excavation
- Vessel Entry
- Entry of Vehicle into battery area.

1.6. ELECTRICAL
a)

Whether all motors, electrical fittings


in the plant are as per area
classification ? Is area classification
drawing available ?

b)

Whether equipments properly earthed ?


readings taken periodically ? Are
records maintained ?

c)

Whether illumination can be considered


adequate ?

d)

Whether emergency lighting system has


been provided ?

e)

Whether any interlocks bypassed and


recorded ?

1.7

INSTRUMENTATION:

a)

Whether
electronic instrumentation
provided are as per area classification?

b)

Whether minimum safety instrumentation


provided for furnace, vessels,
compressors etc. and is well maintained ?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 33

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------c)
Whether any schedule exists for checking
up of various interlocks, shutdown
systems ? Are such schedules followed
and recorded ?
d)

Whether any process interlock bypassed


and recorded ?

e)

Whether smoke / heat / gas / hydrocarbon


detectors are provided and are working ?

2.0

PROCESS SUB-SYSTEMS

2.1

CONTROL ROOM

a)

Whether
fire protection provided and
considered adequate ?

b)

Whether updated P & I diagram available ?

c)

Whether emergency shutdown controls are


available ?

d)

Whether requisite PPE & first aid kit


available ?

e)

Whether control room is blast proof, if


it is hazardous area ?

f)

Whether the cable entry in the control


room is properly sealed ?

g)

Whether control room pressurization has


been provided and working satisfactorily ?

2.2

PUMP HOUSE :

a)

Whether the location of the pump house


with respect to furnace is as per OISD
118 ?

b)

Whether hot pump have been segregated


from pump handling lighter hydrocarbons ?

c)

Whether hot pumps are properly located


so as to prevent fire due to spillage of
hydrocarbon from over head ?

d)

Whether piping arrangement w.r.t.


personnel's movement satisfactory ?

e)

Whether hot pumps are properly insulated ?


(including the associated piping) ?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 34

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------f)
Whether the hot pumps are provided with
warm up lines ?
g)

Are vents / drains of hot pumps cooled


before discharge ?

h)

Whether reciprocating pumps have proper


safety release system, if discharge is
blocked ?

i)

Are the threaded joints on the pump


vents / drain lines found corroded?

j)

Whether all pump drains are connected to


CBD and OWS ? Any of the drains found
congealed ?

k)

Does the pump house floor drain have a


proper water seal to
prevent
propagation of fire from OWS to pump
house ?

l)

Are the auto start / stop of the pumps


(where applicable) checked as per
schedule and recorded ? Check at random ?

2.3

COMPRESSOR HOUSE

a)

Whether the location is well ventilated ?

b)

Whether the following are in working


condition ?
-

Vibration monitoring system


Anti surge device
Speed control system
Shut down system
Lubrication system

c)

Whether various alarms and signaling


systems are in working condition ?

d)

Are the safety valves on the discharge


side of the compressor checked as per
schedule ?

e)

Whether suction strainer is periodically


cleaned ?

f)

Whether the compressor has a proper


depressurising system ? Is venting system proper ?

g)

Whether there is a
condensate collection
system at suction / discharge of the
compressor ? if so, is it functional ?
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 35

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------h)
Whether
the
compressor
has nitrogen
inerting system ? if so,is it functional ?
i)

Do
compressor safety valve
atmospheric
vents have nitrogen / steam purging
especially for hydrogen
rich gases
?

2.4.

HEAT EXCHANGERS/CONDENSERS/COOLERS

a)

Are adequate nos. of high vents / low


points drains with
proper isolation
provided ?

b)

Whether provision for thermal relief/


thermal expansion has been provided ?
Are TSVs on line ?

c)

Whether
the insulation / cladding is
fully covering the exchanger ? Is
earthing proper ? Are supports
fire
proofed ?

d)

Does sacrificial anode exist


for
coolers / condensers where different
metals are in contact ?

e)

Whether
the operating parameters and
test pressures have been tagged on the
equipment and is being operated within that?

f)

Whether the over head condenser platform


is within reach for fire fighting and
does the overhead condenser platform
have two sets of staircases at either end ?

2.5

PROCESS VESSELS AND COLUMNS: (REFER OISD


STD-152)

a)

Whether relief valves are periodically


tested and records maintained ?

b)

Whether all the utility connections are


in working condition ?

c)

Whether the vessel has


been provided
with adequate safety instrumentation ?

d)

Are the nozzles, nipples on idle drains


and vents capped / blinded ?

e)

Whether vessel supports are fire proofed


and it is in proper condition ?

f)

Whether insulation / painting is proper ?


OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 36

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------g)
Do all columns have two sets of level
indicators ?
2.6

PROCESS FURNACES; (REFER OISD-STD-111)

a)

Whether the pass flows are provided with


recorder and controller and are properly
working ?

b)

Whether skin temperature and bridge


temperatures are recorded ?

c)

Whether each main burner has a pilot


burner ?

d)

Whether electric igniters


are
provided for each burner and are they well
maintained?

e)

Whether fuel oil supply header is properly


steam traced and insulated ?

f)

Whether both oil and gas lines have proper


blinding facilities at the battery limit ?

g)

Whether the furnace has a trip system /


flame out protection system ? Whether
on line testing of the same is done ?

h)

Whether furnace has step ladder & monkey


ladders to reach each platform ? Is
alternative escape ladder available from
burner-valves platform ?

i)

Whether safety wears such as safety goggles,


face shield etc. are used by operators regularly
while adjusting / viewing burners ?

j)

Whether the location of the explosion door


can be considered safe ?

k)

Is the snuffing and purging steam valve


manifold easily accessible ? Is it away
from fire radiation
risk zone ?
Is the coil purging steam facility in line
with OISD-111 Annexure -1 ?

l)

Whether the damper control system is


satisfactory ? Is position of damper
readable from ground level ?

m)

Whether the control system for drop out


doors opening can be tested on line ?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 37

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------n)
Whether the location and height of FD fan
air intake can be considered safe ?
o)

Whether the furnace has a decoking system


which is operative ?

p)

Whether noise level near the furnace is


within permissible limit ?
Is
it
monitored atleast once a year ?

q)

Can the condensate draining, OWS line


connection & manhole location for the
furnace be considered safe ?

r)

Whether the support structures are


properly fire proofed ?

2.7

PROCESS PIPING

a)

Whether expansion loops / expansion joints


in working order ?

b)

Whether TSVs provided are periodically


tested, records maintained ?

c)

Whether pipe supports (sliding / spring


supports ) guides and anchors are in order ?

d)

Does the piping slope towards drain points


/ knockout pots ?

e)

Whether all piping above 60 deg. C surface


temperature have safety insulation ?

f)

Whether continuity jumpers provided


between flange joints for LPG, naphtha,
ATF etc, (Refer OISD-STD-106 ).

2.8

RELIEF AND DISPOSAL SYSTEM

a)

Whether the relief valves have been set


at 10% over normal operating pressure ?

b)

Whether difference between set pressure


and the normal operating pressure is
maintained minimum 2.0 kg / sq.cmg ?

c)

Whether safety valve has been installed


directly on the protecting equipment /
on the connected piping without any isolation
valve ?

d)

Whether multiple safety valves have been


used ? if so, whether the set pressure
is within design pressure ?
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 38

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------e)
Whether any spare safety valves have
been used with isolation valves ? if so
what is the safe guard against inadvertent
closing of isolation valves of operating
safety valves ?
f)

Whether any relief valve on hydrocarbon /


toxic gas services relieves to atmosphere ?
if so whether the following points are
considered :
- discharge vertically upward through
individual stack
- minimum exit velocity of 15.0 m/second.
- snuffing steam provided ?

g)

Whether use of common atmosphere vent


stack for several relief valves is
observed ?

h)

Whether any vent stack is observed


discharging at an elevation of less than
3m above the tallest structure, within 15m
radius

i)

Whether
acoustic insulation has been
provided on vents producing excessive
noise ?

j)

Whether toxic vapors like SO2, phenol,


chlorine etc. are disposed through closed
system ?

k)

Whether isolation valves with spectacle


blinds have been provided at the battery
limits of the plant ? if so whether their stems
are pointing downward to avoid
accidental closure ?

l)

Whether unit knock out drums have been


provided ? if so , can it hold liquid discharge
for 5 - 10 minutes from a
single contingency ?

m)

Whether pumps with auto start / stop at


high / low level have been provided to
pump out the contents ?

n)

Whether high / low level alarms for the knock out


pots have been provided in the control room ?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 39

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------o)
Whether vapor depressurising system has
been provided for emergency situations
such as runaway reaction, exposure to
fire etc.?
2.9

FIRST AID

a)

What is the percentage of shift employees


trained in first aid ? how many can provide
artificial resuscitation ?

b)

Does every control room including pump


houses possess a first aid box, water gel
blanket and explosive meter ?

c)

What is the accident record of the last


two years ?

d)

All incidents requiring first aid should be recorded. Note 3

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

Sr.Number:OISD/DOC/2013/172
Page No. 40

OISD GDN 145


INTERNAL SAFETY AUDITS
PROCEDURES

SAFETY AUDIT CHECKLIST No.OISD-GDN-145-05


OIL STORAGE AND MOVEMENT
CONTENTS
-------------------------------------------------------------------------------------------------------------------------------------SECTION
DESCRIPTION
PAGE NO.
-------------------------------------------------------------------------------------------------------------------------------------1.0
TANK FARM
41
2.0

TANKS

42

3.0

PIPING

43

4.0

OPERATING PROCEDURES

44

5.0

INSPECTION & MAINTENANCE

46

6.0

ADDITIONAL CHECK LIST ITEMS

47

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 41

INTERNAL SAFETY AUDITS


PROCEDURES

SAFETY AUDIT CHECKLIST


5.0

OIL STORAGE AND MOVEMENT

----------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITOR'S REMARKS
----------------------------------------------------------------------------------------------------------------------------------------1.0 TANK FARM :
1.1

GENERAL :

a)

Whether
the location, layouts
interspacing in the tank farm meet
OISD-STD-118/statutory requirements?

b)

Whether Dyke / fire walls meet


OISD-118 / statutory requirements ?

c)

Whether
the roads
are
available around the tank farm for
movement for fire tenders ?

d)

Whether piping in the dyke farm is


kept minimum ?

e)

Whether any piping not connected


with the tanks to any individual
dyke is passing through it ?

f)

Whether any hydrocarbon detection


system has been provided ? If so,
is it working satisfactorily ?

g)

Whether house keeping in the area


is satisfactory and it is free of
any dry vegetation.

h)

Whether communication system is


available in the tank farm areas.

i)

Whether illumination in the area is


adequate / inadequate

j)

What is the procedure adopted for


recovery and disposal of the tank
bottom sludges ?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 42

INTERNAL SAFETY AUDITS


PROCEDURES

------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
--------------------------------------------------------------------------------------------------------------------------------------------------

k)

Whether leaded gasoline sludge if


any, buried into the tank farm with
clear demarcation ?

1.2

SEWERS :

a)

Whether the tank farm closed


drains, drains are clear ?

b)

Whether provision exists to divert


tank farm drainage either to storm
water or to oily water sewer ?

2.0

TANKS :

a)

Whether tanks properly painted and


important specifications, are
marked on the tank ?

b)

Whether all nozzles of 2" and above


sizes have been provided with
reinforcing pads with tell - tale
holes ?

c)

Whether all tanks are provided with


circumferential railings ?

d)

Whether the roof drain of floating


roof tanks is provided with a check
valve ?

e)

Whether any alternative arrangement


to read / record level in the tanks
have been provided ?

f)

Whether the tanks with steam heating


/ blanketing are provided with high
temp., high pressure indicator and
alarms ?

g)

Whether any product is stored above


its flash point ? If yes what are
the additional safety consideration?

h)

Whether the breather valves


provided matches the pumping in /
pumping out requirements of the
tank ?

i)

Whether any depression due to tank


settlement observed on the tank pad
along the circumference ?
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 43

INTERNAL SAFETY AUDITS


PROCEDURES

------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------j)

Whether steam coils provided have


any flange connections inside the
tank ? Whether provision exists to
check oil leak through condensate
outlet line ?

k)

Whether the tanks on ATF, Naphtha,


chemicals services are internally
coated ?

l)

Whether fixed/semi-fixed foam system


are provided on all tanks storing A
class and B class products (18 M
and above for floating roofs ) and
also tanks storing C class products
of more than 40 m dia
(floating/fixed roof tanks) ?

m)

Whether sprinkler systems are


provided on all fixed roof tanks as
per OISD norms ?

n)

Whether Halon system is provided on


any tank. If so,
whether
periodically the Halon system is
checked and records maintained ?

o)

Whether the tanks are properly


painted and numbered ?

p)

Whether flame arrestors are provided


on fixed roof storage tanks which
are likely to have explosive
mixture in the vapor space ?

q)

Whether goose neck type vent


connections are provided with
suitable wire mesh to avoid birds
entry /formation of nests ?

r)

Whether oil of proper viscosity is


used in oil breather valves ?

3.0

PIPING :

a)

Whether pipe alleys properly graded


to ensure that no oil/water gets
accumulated below ?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 44

INTERNAL SAFETY AUDITS


PROCEDURES

------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-----------------------------------------------------------------------------------------------------------------------------------------------b)
Whether pipe supports, anchors,
guides are in order ?

c)

Whether pipes carrying heavy


products have been properly heat
traced and insulated ?

d)

Whether proper color codings,


products identification marks have
been provided ?

e)

Whether low point drains and high


point vents have been provided with
proper caps ?

f)

Whether the tanks are having proper


manifolds and are located outside
the dyke ?

g)

Whether Hammer blinds are provided


on the tank manifolds and are operable ?

h)

Whether the floor under the


manifold are paved, have curb walls
and drains connected to OWS ?

i)

Whether steam traps of tracer lines


are functioning properly ?

j)

Whether any bolt is found missing


on flanges of hydrocarbon lines,
particularly of LPG, MS, Naphtha
etc.

k)

Whether the redundant lines are


kept positively isolated with all the ends
plugged/blinded and actions are taken
to get them removed ?

4.0

OPERATING PROCEDURES :

a)

Whether a copy of updated operating


manual with operating instructions,
blending etc. are available to all
concerned and a copy available in
the C/R.

b)

Whether there is any possibility of


product contamination during tank
line up/changeover.

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 45

INTERNAL SAFETY AUDITS


PROCEDURES

------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------c)

Whether the blending pumps, lines


are segregated from other lines
with positive isolation during
blending operation ?

d)

Whether periodical checks are made


for locating any leakage on tank,
floating roof valves, piping etc.
and recorded for rectification.

e)

Whether the roof drain valves of


floating roof tanks are normally kept
open .

f)

Whether pre- monsoon checks are


carried out.

g)

Whether any blending of DP product


and NDP product is resorted to ? If
so, what are the procedures & safety
precautions taken.

h)

Whether cross checking of auto level


gauge is done through manual gauge,
while the tanks are under operation.

i)

Whether it is ensured during initial


filling a flow velocity of maximum
1 m/sec is maintained for products
like SKO, ATF ?

j)

Whether use of nylon rope for


sampling was observed ?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 46

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------k)

How it is ensured that side entry


mixers are operated only when liquid
level is above the blades ?
(Wherever applicable )

5.0

INSPECTION & MAINTENANCE :

a)

What are the schedules of inspection


of tanks (floating / fixed) and
whether records maintained in-line
with OISD STD-129.

b)

What is the frequency of inspection


of PV vents, relief valves, breather
valves, flame arrestors ? Whether
records are maintained in line with
OISD STD-129.

c)

Whether any provision exists for


static electricity discharge ? What
is the frequency of inspection of
earthing connections and whether
records maintained.

d)

Whether the pontoon covers are in


place and are in good condition ?

e)

Whether foam/neoprene seals are


checked regularly for perfect
sealing and record maintained.

f)

Whether any documented procedure


exists for tank cleaning ? What is
the methodology to ensure strict
adherence ?

g)

Whether the ladders, stairways are


in good condition ?

h)

Whether the pipeline relief valves


are kept relieving to tanks or to
outside ?

i)

Whether any inspections are carried


out on repaired tanks before taking
them into operation ? Whether
inspection schedule of radar gauges
provided on storage tanks have been
Note 3
followed.

j)

What are the schedules for painting


of tanks ?
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 47

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------k)
Whether Nitrogen blanketing system
provided on any tank. If
so, what
is the frequency of inspection &
whether records maintained ?

6.0 ADDITIONAL CHECKLIST ITEMS :


For detailed checklist on individual areas refer other OISD checklists as follows :
General Admn. & Organization

OISD-GDN-145-01

Fire Fighting

OISD-GDN-145-02

Layouts

OISD-GDN-145-03

Electrical systems

OISD-GDN-145-09

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 48

INTERNAL SAFETY AUDITS


PROCEDURES

SAFETY AUDIT CHECKLIST No.OISD-GDN-145-06

POL LOADING & UNLOADING


A. TANK WAGONS

CONTENTS
-------------------------------------------------------------------------------------------------------------------------------------------------SECTION
DESCRIPTION
PAGE NO.
-------------------------------------------------------------------------------------------------------------------------------------------------1.0

FACILITIES AND SYSTEMS

49

1.1

Tank Wagon Gantry

49

1.1.1

General

49

1.1.2

Drainage

49

1.1.3

Miscellaneous

49

1.1.4

Electrical

49

2.0

OPERATING PROCEDURES AND PRACTICES

49

2.1

Placement of rakes and loading

49

2.2

Sick wagons

51

2.3

House keeping

51

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

Sr.Number:OISD/DOC/2013/172
Page No. 49

OISD GDN 145


INTERNAL SAFETY AUDITS
PROCEDURES

OISD-GDN-145-06
SAFETY AUDIT CHECKLIST
6.0

POL LOADING & UNLOADING-TANK

WAGONS

A. TANK WAGONS
-------------------------------------------------------------------------------------------------------------------------------------------------AUDITOR'S REMARKS
-------------------------------------------------------------------------------------------------------------------------------------------------1.0 FACILITIES AND SYSTEMS
1.1 TANK WAGON GANTRY
1.1.1 General
a.

Whether proper facilities have been


provided for handling sick wagons ?

b.

Whether the rail sleepers are of concrete


/ metallic construction ?

1.1.2 Drainage
Whether
concrete flooring has been
provided below rail track and with
proper
slope ?
1.1.3 Miscellaneous
Whether No-shunting device / caution
boards are provided to avoid movement of
wagons while filling / decantation is in
progress ?
1.1.4 Electrical
a.

Whether the rail tracks are provided


bonding strips and connected to
maintained earthing system ?

with
well

b.

Whether the diesel shunter used is


equipped with spark arrestors and proper
cooling of engine exhaust ?

2.0 OPERATING PROCEDURES AND PRACTICES


2.1
a.

PLACEMENT OF RAKES AND LOADING


Whether the type
used are :

of

loco

-diesel
-steam
-electric
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 50

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------b.

If steam /diesel loco is used for


placement
/removal of wagons whether safe distance from
first loading point is maintained by use of dummy
wagons ?

c.

Whether replacement check is carried out to


ensure that platform , loading arms/hoses do
not hit the incoming rake ?

d.

Whether the wagons are placed with master valve


closed and bottom sluice valve and cover plate
normally in opened position ?

e.

Whether checks are made for any left


over
materials, previous product &
fitness of wagons
by
operating staff on placement ?

f.

Whether the TXR staff check / inspect each wagon


and issue
a formal
certificate prior to
loading ?

g.

Whether wagons declared defective are shown on tally


sheets and also marked on the wagons ?

h.

Whether Railways are informed in writing about


wagons found defective during loading ?

i.

Whether the tightness of Master valve is checked by


TXR staff during this initial filling and in case of leak
declared as SICK WAGON ?

j.

Whether, in case of open type wagons,pre-fabricated


fill pipes are available for use ?

k.

Whether the following are ensured after completion of


loading :
- fill pipes (if exists) are properly capped
- Top covers are properly closed and sealed
-

Bottom sluice valves fully closed


Bottom cover plates are boxed up with
proper gaskets

Whether any loose shunting is done ?

Whether the shunting speed of 10 kmph


(Max.) is maintained ?

Whether necessary caution boards


are displayed while loading / unloading
in progress ?
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 51

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------2.2 Sick wagons
Whether the following are ensured before
removing the defective / sick wagons :
-

Top lid covers closed


bottom cover plate is kept
loose and hanging
Checks made for any left out product

2.3 House keeping


a Whether the gantry floor, drain channels
are well maintained and tracks are regularly
washed to avoid oil accumulation ?
Any visible oil accumulation in the
area ?
b Whether sand spreading is being done on
slippery working areas, railway tracks
etc. ?
c

Whether Rly. tracks / sliding is free from unused


T.W. fittings ?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 52

INTERNAL SAFETY AUDITS


PROCEDURES

SAFETY AUDIT CHECKLIST No. OISD GDN-145-06


POL LOADING & UNLOADING B. TANK TRUCKS
CONTENTS
-------------------------------------------------------------------------------------------------------------------------------------------------SECTION
DESCRIPTION
PAGE NO.
-------------------------------------------------------------------------------------------------------------------------------------------------1.0
FACILITIES & SYSTEMS
53
1.1

Headers & loading hoses

53

2.0

OPERATING PROCEDURES AND PRACTICES

53

2.1

Placement of trucks

53

2.2

Loading operations

53

3.0

VEHICLE CREW AND CHECK

54

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 53

INTERNAL SAFETY AUDITS


PROCEDURES

SAFETY AUDIT CHECKLIST


6.0 POL LOADING & UNLOADING - TANK TRUCKS
B. TANK TRUCKS
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITOR'S REMARKS
-------------------------------------------------------------------------------------------------------------------------------------------------1.0 FACILITIES AND SYSTEM
1.1 HEADERS & LOADING HOSES
Whether proper arrangement has been
provided for securing the hose nozzle
with truck manhole ?
a

Whether facility is provided to


drain overfilled truck to a closed
system with proper pump
out
arrangement ?

2.0 OPERATING PROCEDURES AND PRACTICES

2.1 PLACEMENT OF TRUCK


a

Whether any system exists to


regulate
number of trucks coming at a time to loading
area ?

Whether any parking / place has been


provided for the trucks near the loading area ?

Whether the placement of trucks in the gantry


is allowed only on production of filling advice ?

Whether any safety checks are carried out on the


trucks before issuing loading advice ?

2.2 LOADING OPERATIONS


a

Whether it is ensured that the trucks,


loading hoses are properly connected to
earthing system before commencing
loading ?

Whether decantation of any over filled


truck done to closed system (for DP)
and with close supervision ?

Whether the following are ensured after


completion of loading :

Fill pipes properly capped


Top covers are properly closed and
sealed
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 54

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------3.0 VEHICLE AND CREW CHECK
a

Whether the vehicles design has been


approved by CCE ?

Whether
license and explosives
certificates are available in
the
vehicle ?

Whether the vehicle is in good condition and the


RTO has issued a fitness
certificate?

Whether the vehicle has non-sparking


electrical fitting and external wiring
through
conduits ?

Whether the vehicle has a cut off master


switch for electrical system ?

Whether there is facility to shut off the


drain valves in case of emergency ?

Whether the vehicle has two fire


extinguishers ?

Whether the gross and tare weight painted


on the vehicle tally with the permit

Whether the vehicle has First Aid Box,


Tool Box and Emergency Lighting ?

Whether there are any sources of ignition


like candles, etc in the vehicles ?

Whether the vehicle has atleast a driver


and a cleaner as its crew member ?

Whether the driver has a valid driving


license ?

Whether the crew is trained for hazardous


nature of petroleum products, emergency
procedures, emergency communication etc ?

Whether the driver has a copy of standing


instruction and TREM Card ?

Whether the exhaust is wholly in front


of tank truck and has ample clearance
from Fuel oil system and combustible
material ?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 55

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------p
Whether
approved quality spark
arrestors provided on the engine
exhaust and
Muffler / Silencer is
not cut off from the exhaust ?
q

Whether each compartment of Tank is


fitted with independent PV vents with
minimum opening of 3 sq. cms. ?

Whether vent openings are covered with


two layers of wire-mesh of size not less
than 11 mesh per centimeter ?

Whether Tank Truck is conspicuously


marked on each side and rear, in bold
letters at least 7 cm high and on a
back ground of sharp contrasting
color. (The word "flammable " and name
of product are required to be marked )
as per UN code.

Whether effective spark arrestors fitted


on air intake system of the engine ?

Whether electric wiring is of heavily


insulated quality and adequate carry
maximum loads ?

Whether suitable over current protection


in the form of fuses / automatic circuit
breakers etc. have been provided ?

Whether all junction boxes are sealed


properly ?

Whether electrical equipments like


generator switches, fuses and circuit
breakers are located inside the cabin
or engine compartment ?

Whether battery is in easily accessible


position with a heavy duty switch
close by, to cut off the battery in
emergency ?

Whether battery terminals have protective


rubber covers ?

aa)

Whether vehicle's cabin is checked for


presence of any flammable/explosive
substance being carried by the crew ?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

Sr.Number:OISD/DOC/2013/172
Page No. 56

OISD GDN 145


INTERNAL SAFETY AUDITS
PROCEDURES

OISD-GDN-145-06 REVISION I

SAFETY AUDIT CHECKLIST OISD GDN-145-06


POL LOADING AND UNLOADING
C. COMMON CHECKLIST FOR LOADING AND
UNLOADING OF TWs & TTs
CONTENTS
-------------------------------------------------------------------------------------------------------------------------------------------------SECTION
DESCRIPTION
PAGE NO.
-------------------------------------------------------------------------------------------------------------------------------------------------1.0 FACILITIES & SYSTEMS
57
1.1

Pump house

57

1.2

Structure & platforms

57

1.3

Headers and loading arms

58

1.4

Drainage

59

1.5

Miscellaneous

59

1.6

Electrical

59

2.0

OPERATING PROCEDURES AND PRACTICES

60

2.1

Inspection & maintenance

61

2.2

Work Permit Systems

61

2.3

House keeping

61

2.4

Training

61

2.5

Miscellaneous

62

3.0

FIRE PROTECTION FACILITIES

62

4.0

ADDITIONAL CHECKLIST

63

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 57

INTERNAL SAFETY AUDITS


PROCEDURES

SAFETY AUDIT CHECKLIST


6.0 POL LOADING AND UNLOADING
C. COMMON CHECKLIST FOR LOADING AND
UNLOADING OF TWs & TTs
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITOR'S REMARKS
------------------------------------------------------------------------------------------------------------------------------------------------1.0 FACILITIES AND SYSTEMS
1.1 PUMP HOUSE
a)

Whether the pumps are numbered/name of


product handled written ?

b)

Whether white oil and black oil pumps are


segregated ?

c)

In case of common service pumps whether


these are properly grouped keeping
product quality (flash point) in view ?

d)

Whether the hot pumps and the associated


piping are heat traced and properly
lagged ?

e)

Whether delivery to suction bypass line /


recirculation line to storage tank has been
provided ?

f)

Whether adequate ventilation exists (in case of


covered pump house) ?

g)

What is the system of communication


between pump house, gantry and control
room during normal operation/emergency ?

h)

Whether all the drains are routed to OWS


and the system has water seal to act as
fire barrier ?

i)

Whether the idle loading headers, not in use


for long time, have been blinded off?

j)

Whether P.D. meters (if provided) have


proper electrical fittings as per area classification ?

1.2

STRUCTURE & PLATFORMS

a)

Whether easy access available to the


platform from both sides of the gantry ?

b)

Whether escape ladders provided along


the platforms are adequate ?
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 58

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------c)
Whether the swing ladders are provided
with counter weight, security chain,
rubber pads and other safety features to
avoid frictional spark ? Are these in
good working condition ?
d)

Whether the supporting columns are fire


proofed ?

e)

Whether the gantry shed is covered with


asbestos sheet and has side protection ?

f)

Whether the ladders from platform to the


top of the vehicles are provided with
railings/security chain, rubber pads and
other
safety features to avoid
frictional spark ?

g)

Whether handrails are provided on the


platform ?

1.3
a)

b)

HEADERS & LOADING ARMS


Comment as to how the loading
velocities are maintained within safe
limits ?
Whether shock eliminators are provided on
each header ?

c)

Whether quick isolation valves/MOV provided


for emergency shut off of loading headers ?
Are they operable during emergencies ?

d)

Whether color coding has been provided


for loading headers and individual
loading points?

e)

Whether heavy oil headers are heat traced


and properly insulated up to loading valve ?

f)

Whether product compatibility has been


considered in case of common loading arm ?

g)

Whether any of the loading arms swivel


joints/valves are leaking,
if so how
many ?

h)

i)

Whether proper
arrangement has been
provide for securing the hose nozzle with
manhole and properly secured after loading
(T/T & T/W)?
Whether vacuum breaker is provided on the
loading arm ?
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 59

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------j)

k)

1.4

Whether the rubber hose are of proper


diameter, length, quality and condition & meets
BIS norms?
Whether the idle loading
headers/
loading arms not in use for long time
are blinded off ?
DRAINAGE

a)

Whether oily water drains from the area


are connected to effluent treatment/disposal
facility (OWS)?

b)

Whether a well designed system exists for


draining and transfer of heavy oils like
LSHS to avoid congealing of OWS system ?

c)

Whether the heavy oily drain


collection system is steam traced ?

d)

Whether concrete flooring has been


provided with slope towards drains to
avoid spillage accumulation ?

1.5

MISCELLANEOUS

a)

Whether road barriers have been provided


in the gantry area to restrict entry of
unauthorized persons/vehicles ?

b)

Whether smoking booths with CODE approval


have been provided for the area at safe
locations ?

c)

Whether the electric lighters, installed


the smoking booths, are well
maintained ?

1.6

in

ELECTRICAL

a)

Whether all electrical fittings, welding


apparatus receptacles, lighting provisions,
etc. are
as
per hazard area
classification ?

b)

Whether illumination in the gantry & pump


house is adequate ?

c)

Whether ground level illumination is


provided and found adequate ?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 60

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------d)
Whether the loading arms/hoses are having
proper electrical continuity provision and
earthing connection ?
e)

Whether the loading headers/other pipes


laid on the rack are properly earthed ?

f)

How frequently are the tests of bonding /


earthing carried out ? Any records
maintained ?

g)

Whether the No. of earthing pits are


adequate and they are inter connected ?

h)

Whether condition of FLP fittings are


periodically
checked and records
maintained ?

i)

Whether the motors are provided with


proper earthing.

j)

Whether structure is earthed as per std.


and earth test done every year and
records maintained. Is the catwalk
antiskid ?

k)

Whether earthing bosses with flexible


cable and robust clamping device have
been provided adjacent to loading points ?

2.0 OPERATING PROCEDURES AND PRACTICES


a)

Check and comment on earthing and bonding


practices during loading / unloading.

b)

Whether initial filling is done at a slow rate


for safeguard against hazard off static
charges ?

c)

Whether established communication system


exists between gantry & pump house to
control loading rates / pumping rate ?

d)

Whether the loading operation is done under


the close supervision ?

f)

Whether operator's constant attention is


there while the loading points have been
opened ?

g)

Whether it is ensured that "no vehicle


entry" in the gantry area is permitted
during loading and unloading operations ?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 61

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------h)
Whether initial loading is done at a rate
not exceeding 1 M/Sec, till the filling
pipe is completely submerged and
thereafter at the rate not exceeding 6
M/Sec ?
2.1

INSPECTION & MAINTENANCE

a)

Whether any schedules exist for


lubrication for loading valves/swivel
joints and records are maintained ?

b)

Whether schedules exist for inspection


the loading headers, arms/hoses, etc. ?
Whether records are maintained ?

c)

Whether adequate inventories are


maintained for prompt replacement of
passing valves and damaged hoses ?

c)

Whether all modification jobs are undertaken


only with approved engineering standards ?

2.2

WORK PERMIT SYSTEM

a)

Whether as per OISD 105 (for Hot/Cold works


and OISD 137 for Electrical Equipment being
followed.

b)

Whether display boards have been provided


at strategic locations covering key
safety instructions ?

c)

Whether Emergency and Disaster Control


Plans for the area is available with
written procedures ?

2.3
a)

HOUSE KEEPING
Whether the house keeping in the area can
be considered :
good ?
satisfactory ?
needs improvement ?

b)

Whether hot water points/system points


provided for flushing/washing operations
& house keeping, or light hydrocarbons
are used ?

c)

Whether the gantry floor are regularly


washed to avoid oil accumulation ? Any
visible oil accumulation in the area ?
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 62

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------d)
Whether the drain channels are cleaned &
well maintained ?
2.4

TRAINING (REFER OISD 154 STD.)

a)

Whether subsequent refreshed


training programs are also organized
periodically ?

b)

Whether contract employees (if any) are


given basic training on hazards of
petroleum products and safe
practices ?

c)

Whether the workers are using required


personal protective wears ?

2.5

MISCELLANEOUS

a)

Whether Operating Manuals/Standing


Instructions are available at site ?

3.0

FIRE PROTECTION FACILITIES

a)

Whether the fire water network


Provided is well designed (Ring type)

b)

Whether isolation valves exist for


isolation of each section maintenance

c)

Whether hydrants, long range water/foam


monitors are provided on both sides of
gantry and are they safely located ?

d)

Whether all hydrants, monitors are easily


accessible ?

e)

Whether proper approach roads exist for


Fire Tenders and Fire Fighting Equipment ?

f)

Whether communication system like Fire


Alarms, PA system provided and are
working ?

g)

Whether the communication system,


sprinklers are periodically checked
and records maintained ?

h)

Whether any mock drills are conducted


for fire fighting ?

i)

Whether adequate number of portable


extinguishers have been provided all
along the gantry ?
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 63

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------j)
Whether a copy of Fire Fighting manual is
available in the gantry control room ?
4.0

ADDITIONAL CHECK LIST ITEMS

a)

For comprehensive check lists on


individual areas also refer OISD check
lists as indicated below:

b)

General admn. organization


Fire fighting
Layouts
Electrical Systems

OISD-GDN-145-01
OISD-GDN-144-02
OISD-GDN-145-03
OISD-GDN-145-09

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 64

INTERNAL SAFETY AUDITS


PROCEDURES

SAFETY AUDIT CHECKLIST No.OISD-145-07

LPG BULK LOADING & UNLOADING


CONTENTS
-------------------------------------------------------------------------------------------------------------------------------------------------SECTION
DESCRIPTION
PAGE NO.
-------------------------------------------------------------------------------------------------------------------------------------------------1.0
BULK STORAGE AREA
65
2.0

PUMPS/ COMPRESSORS AREA

67

3.0

TANK WAGON GANTRY AREA

68

4.0

TANK TRUCK GANTRY AREA

70

5.0

TRAINING

72

6.0

ADDITIONAL CHECKLIST ITEMS

72

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 65

INTERNAL SAFETY AUDITS


PROCEDURES

SAFETY AUDIT CHECKLIST


7.0 LPG BULK LOADING & UNLOADING
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITOR'S REMARKS
-------------------------------------------------------------------------------------------------------------------------------------------------1.0 BULK STORAGE AREA:
1.1 GENERAL:
a)

Whether the layout, area classification drawings


have been duly approved by CCE ?

b)

Whether any new facilities (permanent or temporary


natural) have been installed Area they considered to
be safe.

c)

Whether general house keeping in the area is satisfactory ?

d)

Whether storage vessels are insulated. If so, what


is the condition of insulation.

e)

Whether five year hydraulic test records are available ?

f)

Whether any signs of corrosion observed on


pipelines? Whether paintings are done as per
schedule ?

g)

Whether all bolts of proper sizes are put on the


flanges or some are found missing or of smaller
sizes

i)

Whether any portion of pipe length found buried


with soil or undergrowth?

1.2 RELIEF SYSTEM:


a)

Whether relief system is adequately designed ?

b)

Whether minimum two relief valves are provided in


each vessel?

c)

Whether the relief valves are opened to flare /


atmosphere? Any steam connection given? Is
system opened to atmosphere?

d)

Whether the relief valves are provided with isolation valves?If so what is the system/ method to
avoid inadvertent closing of isolation valves ?

e)

Whether the safety valves are periodically tested


and records maintained ?
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 66

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------1.3
DRAINING
a)

Whether water drain chamber has been provided


away from shadow of sphere ?

b)

Whether the area under the sphere is having


concrete pavement with proper slope ?

c)

Whether antifreeze valve provided on the drain line

d)

Whether double block valves have been provided


on water draining line (quick shut off type near
the chamber and the other a globe valve) ?

e)

Whether safety instructions for draining operations


have been prominently displayed?

f)

Whether draining is done under constant


supervision ?

g)

Whether sampling points are provided with duplicate


valves?

1.4

INSTRUMENTATION:

a)

Whether level gauge of two types have been provided


for direct level measurement and counter checking?

b)

Whether monitoring of levels of all the vessels are


done ?

c)

Whether High Level alarms have been provided in


storage vessels and are in working conditions ?

d)

Whether remote operated valves (ROVs) have been


provided on liquid outlets/inlets and are checked
for proper operations ?

1.5

FIRE AND SAFETY:

a)

Whether gas detection system is provided in the


area and is working
satisfactorily?

b)

Whether capacity of fire water pumps and header


are adequately designed?

c)

Whether sprinkler/Deluge system are provided on all


the vessels and are periodically tested for
satisfactory operation ?

d)

Whether the sprinkler/Deluge Valve are remote


operated and are located 15M away from storage
vessels?

e)

Whether the supports of the vessels are fire


OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 67

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------proofed?
f)

Whether periodical checks are done with


explosive meters to detect any gas leaks?

1.6

ELECTRICAL:

a)

Whether bonding strips have been used across the


flanges for electrical continuity ?

b)

Whether all the electrical fittings in the area


meet area classification requirement?

c)

Whether earthing connections are provided and are


properly maintained?

d)

Whether illumination in the area is adequate?

2.0

PUMPS/COMPRESSORS AREA:

2.1

FACILITIES:

a)

Whether the layout of the area meets statutory


requirements in terms of safety distance from
storage vessels, roads and other facilities?

b)

Whether the pumps have double mechanical seals to


minimize leakage? Are the seals in good condition?

c)

Whether recirculation line to storage vessels have


been provided?

d)

Whether the venting is done through high


rise vents? Whether steam connections are
provided for atmospheric vents ?

e)

Whether the drains/vents/sample points have double


isolation valves and are provided with caps?

f)

Whether Gas Detection system has been provided in


the area and working satisfactorily?

2.2

ELECTRICAL:

a)

Whether all the motors and other electrical


equipments such as terminal/junction boxes,
lighting fittings
etc. are weather proof/
flameproof and are as per hazard area
classification requirements?

b)

Whether the motors are provided with proper


earthing?

c)

Whether illumination is adequate in the area ?


OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 68

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------2.3
GENERAL:
a)

Whether all the equipments in the area are properly


painted?

b)

Whether an established communication system exists


between the loading area and the pump area during
normal operation/emergency?

c)

Whether safety instructions have been displayed?


(e.g. `NO SMOKING', `MEN AT WORK' etc.)

d)

Whether all maintenance tools used in the area


are non sparking type?

2.4

FIRE PROTECTION:

a)

Whether long range monitors/sprinkler system have


been installed to cover the area and are in good
working condition?

b)

Whether adequate nos. of fire extinguishers have


been provided?

3.0

TANK WAGON GANTRY AREAS:

3.1

FACILITIES:

a)

Whether the layout of the gantry meets statutory


requirements?

b)

Whether the design, material selection and


installation of the gantry platform, loading
header, loading hoses etc. have been done as
per standard engineering norms adopting
proper safety guidelines of established norms.

c)

Whether loading arm swivel joint gas seals are


periodically greased and maintained properly?

d)

Whether high vent flame arrestors are cleaned


periodically?

e)

Whether facilities have been provided to handle


leaky wagons in situ (Evacuation of T/Wagons)?

f)

Whether emergency stop push button for loading


pumps exists in the gantry?

3.2

LOADING HEADERS AND ARMS:

a)

Whether quick isolation valve/MOV has been provided


on the loading header and is operative?
Whether independent isolation valve provided on each
loading point?

b)

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 69

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------c)

Whether loading velocities are maintained within


safe limits by providing restriction orifice on
each loading point ?

d)

Whether loading headers are provided with proper


earthing/bonding connections?

e)

Whether loading hoses not in use are stored


properly and open end is kept blinded?

f)

Whether loading hoses are having any sign of


kinks/wears etc.?

g)

Whether the following facilities are available on


each loading point ?
Excess flow check valve on the filling line

vapor return line with check valve back to


storage vessel
flexible hoses on filling vapor return line

h)

Whether depressurising system has been provided


on the gantry header discharging to high vents/flare?

i)

Whether temperature and pressure gauges have been


provided at convenient points ?

j)

Whether the loading header is provided with ISV


relieving to high point vent ?

k)

Whether proper capacity weigh bridge has been


provided on each spur of the gantry Any risk of
gas accumulation observed in the pit ?

l)

Whether bonding strips as provided for


continuity of rail tracks ?

m)

Whether bonding connectors (copper strips/wires


are provided for piping ?)

3.3

FIRE PROTECTION AND SAFETY :

a)

Whether water sprinkler system has been provided


and working satisfactorily ?

b)

Whether adequate nos. fire hydrants, long range


water monitors have been provided ?

c)

Whether gas detector system have been provided


with alarm in the control room ?

-------------------------------------------------------------------------------------------------------------------------------------------------OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 70

INTERNAL SAFETY AUDITS


PROCEDURES

ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------3.4
OPERATING PROCEDURE AND PRACTICES :
a)

Whether updated operating manual


with loading/unloading procedures is available
In the control room and is well understood
by the operating crew ?

b)

Whether the TXR staff check and issue fitness


certificates in writing for fitness of tank wagons ?

c)

Whether checks are done for gaskets. "O" rings,


physical damage, any corrosion
on tanker,
safety valve, thermometer etc. before commencement
of loading operation?

d)

Whether the following are ensured before loading ?


- All engines nearby are switched off
- All hot jobs in the area are stopped
- Proper earthing connection are made
- All wagons are secured by hand brake

e)

Whether it is ensured that non sparking tools


are used for connecting/disconnecting the hoses?

f)

Whether used of any synthetic fiber material


was observed?

g)

Whether loading hoses are periodically hydraulic


tested, discarded/replaced and records maintained?

h)

Whether all hoses carry test code & date?

i)

Whether constant supervision is ensured during


loading/unloading operation?

j)

For detailed checklist for loading T/W pl.


refer to OISD-STD-144?

4.0

TANK TRUCK GANTRY AREAS

4.1

FACILITIES

a)

Whether the truck loading facilities have


been installed as per CCE approved drawings?

b)

Whether separate entry/exit gates exist for


the tank trucks?

c)

Whether weigh bridge is available within the


Installation and is calibrated periodically
and maintained?

d)

Whether the no. of trucks parked at the


gantry area is restricted?
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 71

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------e)
Whether facility available for evacuation/
decantation of defective/leaky trucks with
necessary high point vents with steam
connections?
f)

Whether the following random checks are done


the tank trucks?
- Valid licenses
- fittings as per CCE such as flame arrestor,
fire screen etc.
- safety instruction booklet

g)

Elimination of ignition sources like


loose wires, uncovered battery terminals etc.
Whether gas detection system has been
provided in the area & working satisfactory

4.2

OPERATION

a)

Whether the vehicle engine is always shut


off during loading operations?

b)

Whether it is ensured that earthing connection is


properly checked before connecting hoses to tank
truck?

c)

Whether blank flanges are fitted on the truck


inlet flange and to the end of hoses when not in
use?

g)

Whether loading arm open and is blinded when


not in use?

4.3

FIRE PROTECTION AND SAFETY

a)

Whether water sprinkler system has been


provided
and working satisfactorily?

b)

Whether adequate nos. fire hydrants, long range


water monitors have been provided?

c)

Whether gas detector system has been provided


with alarm in the control room?

d)

Whether
provision to start water sprinklers
from loading gantry/Control Room / Weigh
Bridge exists?

e)

Whether water sprinkler system adequately covers


T/T bullet ?

f)

Provision to stop pump from loading gantry / WB


Cabin ?
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 72

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------5.0

TRAINING

a)

Whether pocket size instruction booklets/manuals in


widely understood languages, have been issued to
all concerned employees ?

b)

How it is ensured that loading operations such as


hose connection etc. are always done by plant
operators rather than tank truck crew ?

c)

Whether operating procedures have been displayed


in vicinity of the tank loading bays ?

d)

Whether protective gloves are being used by the


operating crew ?

e)

Whether the vehicle crew has been trained on


hazardous nature of LPG and to handle emergency
situation ?

6.0

ADDITIONAL CHECKLIST ITEMS


For detailed checklist on specific areas refer
other OISD check lists as follows :

General (Organization Admn.


Training etc )

OISD-GDN-145-01

Fire fighting

OISD-GDN-145-02

Layouts

OISD-GDN-145-03

Gantry Operations

OISD-GDN-145-06

Electrical

OISD-GDN-145-09

BULK TT CHECKING :
How it is made sure that only TT fit for loading
are taken up for filling?(w.r.t. oxygen content
etc.)
For detailed checklist for loading TT pl .ref.to
OISD-STD-144.

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

Sr.Number:OISD/DOC/2013/172
Page No. 73

OISD GDN 145


INTERNAL SAFETY AUDITS
PROCEDURES

SAFETY AUDIT CHECKLIST No.OISD GDN-145-08


LPG BOTTLING AND DISPATCH
CONTENTS
-------------------------------------------------------------------------------------------------------------------------------------------------SECTION
DESCRIPTION
PAGE NO.
-------------------------------------------------------------------------------------------------------------------------------------------------1.0
GENERAL ORGANISATION AND ADMINISTRATION
74
2.0

MANPOWER AND TRAINING

75

3.0

CYLINDER STORAGE AREA

75

4.0

BOTTLING SHED

76

5.0

NEW AND DEFECTIVE CYCLINDERS

78

6.0

CYLINDER LOADING

79

7.0

SAFETY AND FIRE PROTECTION

79

8.0

ADDITIONAL CHECKLIST ITEMS

81

9.0

SUGGESTED INSPECTIONS MAINTENANCE CHECKS

82

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 74

INTERNAL SAFETY AUDITS


PROCEDURES

SAFETY AUDIT CHECKLIST


LPG BOTTLING AND DISPATCH
-------------------------------------------------------------------------------------------------------------------------------------------------AUDITOR'S REMARKS
-------------------------------------------------------------------------------------------------------------------------------------------------1.0 GENERAL ORGANISATION AND ADMINISTRATION
a)

Check for valid licenses of CCE pertaining


to the locations.
- Storage of LPG
- Storage of LPG cylinders
- Filling of LPG cylinders

b)

Whether inter distances from/to admn. offices,


maintenance offices, check & change rooms,
smoking booths etc. are meeting safety
requirement.

c)

Whether plant approach/access roads are well


maintained & at least one emergency exit
is provided.

d)

Whether adequate no. of escape routes/staircases


available around each of the facilities viz.,
filling shed, cylinder storage area?

e)

Whether fencing/boundary wall around the Plant


is in proper condition?

f)

Whether truck parking area has been provided as


per OISD-STD-144.

g)

Whether frisking of employees, contractor,


personnel and visitors ensured?

h)

Whether work permit/clearance (for hot & cold


jobs) procedures followed as per approval?

i)

Whether following manual/documents are


available and updated.
-

LPG Operations Manual


S&EP Manual
Emergency/Disaster Control Plan
Operation/Inspection/Repair Manual of
epuipment supplied by vendor.
- OISD Standards.
j)

k)

l)

Whether updated P&ID drawings & layouts &


other facilities available?
Whether records of Daily Safety Check reports
are reviewed and corrective action taken?
Is the general housekeeping okay?
Any specific comments.
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 75

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------2.0 MANPOWER & PLANNING
a)

Whether supervisory/managerial cadre


staff fully trained in all aspects of LPG
Plant operations, Disaster Control/
Emergency handling?

b)

Whether Safety Officer is available and


duly designated as safety officer.
Does he possess fire/safety engineering
qualifications and his duty list drawn
clearly?

c)

Whether Training Programs are organized


periodically in LPG Operations fire
fighting/emergency handling etc. for:
- Regular Staff
- Tank Truck Operators/drivers
- Contractor Workmen
- Security Staff.

d)

Whether operating manuals and standing


instructions are provided to working
personnel?

e)

Whether safety booklets distributed to


all including contractor employees.
(English/Hindi/local language)?

f)

Whether important Do's and Dont's


displayed prominently in operating areas?

3.0

CYLINDER STORAGE AREA

a)

Whether Transfer of cylinders from/to


truck is done through
- Telescopic Conveyer/ Trolleys /Conveyers?
Any dropping, rolling, mishandling
noticed?

b)

Whether Inspection/visual checks are done


to detect leaky/defective cylinders to
segregate spurious leaky/defective
cylinder?

c)

Whether storage is segregated and marked


for?
- Spurious cylinders
- 5 year testing due cylinders
- Other defective cylinders

d)

Whether cylinders stacked in vertical


position in tiers as per the norms?
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 76

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------e)
Whether stacking discipline with small
lots of 4 rows and 25 cylinder lengths
followed with a minimum access path of
1 M maintained on both sides of 4 rows.
f)

Whether cylinders stacking areas are


periodically inspected for leakage with
explosimeter or probable leak detector?

g)

Whether cylinder offload bay platform


provided with proper buffers?

i)

Whether stacks of cylinder are identified


by markers to show empties, filed and
gas free cylinders?

j)

Whether the daily stocks of cylinders


(empty/filled/defective) are displayed?

4.0

BOTTLING SHED

a)

Whether cylinder washing facility


provided?

b)

Whether filling/loading/unloading/storage
areas are adequately covered with mastic
coating on floors and pillars to avoid
accidental sparks?

c)

Check for condition of mastic flooring.

d)

Whether tare weight of the body is marked


distinctly on the body of the cylinder?

e)

Whether empty cylinders are checked for


'o' ring presence?

f)

Whether filling is done based on gross


weight?

g)

Whether AUTO CUT OFF facility exists on


filling machines?

h)

Whether filling head gun hoses are of


approved quality and periodically tested?

i)

Whether proper earthing provided to?


a. Conveyers
b. Carousel units (bonding of filling
guns).
c. Unit filling Machines.
d. Evacuation units.

j) Check for accumulation of vapors in


OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 77

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------recess/pits in the area with the
explosimeter
k)

Whether vapor extraction system with


suction points at carousel, evacuation
unit, valve change shed is provided and
in working condition?
- Whether standby blower is available?
- Whether carousel unit is interlocked
with vapor extraction system?

l)

Whether accuracy of check scales being


checked daily and records maintained?

m)

Whether filling machine check scales are


calibrated periodically and records
maintained?

n)

Whether facilities are provided for


100% cross checking of weight of filled
cylinders? Are they in use?

o)

Whether check weigh scales are calibrated periodically?

p)

Whether CVT checks done after filling


for`O' ring and valve defects?

q)

Check for facilities:


- To check for conveyors
- To check defective cylinders
- To check 'O' Ring
- To check weight correction.

r)

Whether bung leak/body leak checks are


done through in-line water bath for both
14.2. Kg. and 19 Kg. cylinders?

s)

Whether capping/sealing facilities are


provided - Al foil/PVC seal?

t)

Check for neck labels plastic/paper.

u)

Whether tagging of overfilled/underfilled


cylinders done?

v)

Check for leakage from carousel filling guns.

w)

Whether persons working on carousel wear


hand gloves & safety shoes?

x)

Whether Statistical Quality Control


checks (SQC) carried out & records
maintained? (See foot notes)
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 78

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------y)
Whether Movement of cylinders is done
through floor conveyers/trolleys?
statistical checks include
- Total No, of cylinders filled.
- Total No. of cylinders checked at
random.
- No. of cyls. found defective.
- % of cyls. found defective. in last
month
- Weight variation (Over filling)
- Weight variation (under filling)
- Valve leak
- Bung leak
- "O" Ring missing
- Defective "O" Ring (by CVT Test)
- 'Pressure Control valve' Filling
procedure
- Cyls. due for retesting
- Other minor defects
- Remarks if any.
5.0

NEW/DEFECTIVE/LEAKY CYLINDERS

a)

Whether Purging facilities are available


for new/retested cylinders?

b)

Whether Facilities provided for evacuation


of leaky/partially filled cylinder are
working satisfactorily?

c)

Whether venting/cold flaring of LPG is


done at safe height - 2 meter above the
roof edge?

d)

Whether Cold Repair facilities are


available? If so, are they at
appropriate location?

e)

Whether wire mesh provided on cold flare


line?

f)

Whether degassing facility provided in


cold repair shed? Is it 15 M away?

g)

Whether cylinder repairs/valve change


etc are supervised?

h)

Whether stock of leaky cylinders is below


the stipulated limits?

i)

Whether Torque wrenches with proper


settings are used for valve removal
replacement (20 +/- 2 kg. Mt.)?
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 79

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------j)

Whether PTFE tape/paste used while fixing


valves?

k)

Whether cylinders are checked for denting


are declared defective?

l)

Whether records of defective cylinders


maintained supplierwise?

m)

Whether records of
leaky /defective
cylinders (company wise) detected during
filling/are maintained on daily basis with
following particulars:
-

Cylinders filled
Valve leak
Bung leak
Body leak
"O" ring defect
Spurious cylinders

n)

Whether record of defective cylinders


returned by distributors is maintained on
daily basis?

o)

Whether spurious cylinders and cylinders


declared as scrapes are destroyed by
crushing properly and records maintained?

6.0

CYLINDERS LOADING INTO TRUCK

a)

Whether covered facilities/sheds provided


for positioning of trucks 15 M away from
storage shed for receipts / loading of
cylinders with sprinkler protection and
lighting?

b)

Whether cylinders are loaded into trucks


through conveyers?

c)

Whether cylinders stacked


without protrusions?

d)

Whether explosimeter checks are done


before releasing the truck?

e)

Whether Loading/unloading of cylinders is


done in safe manner?

7.0

SAFETY & FIRE PROTECTION

a)

Whether Contingency Plans are available


and updated for tackling major emergencies?

vertically

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 80

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------b)
Whether fire organisation chart is
prepared upto date and displayed?
c)

Whether important telephone nos. of state


Fire Services/Police/Dist. Admn.
/
Hospitals / other offices etc. are displayed?

d)

Whether Fire/Emergency mock drills


conducted periodically?

e)

Whether Fire Water Network provided


around the facilities is as per prescribed
norms and adequate?

f)

Whether Pressure and flow are adequate at


farthest end?

g)

Is system painted as per standard norms


(Hydrant pipelines - Red; risers/monitors
-yellow; & sprinkler system- Blue)

h)

Whether hydrants/monitors are provided at


a minimum distance of 15 meters from the
sheds and provided for every 30 meters
distance?

i)

Whether adequate No. of hydrants, long


range monitors etc. are provided and
periodically
inspected and records
maintained?

j)

Whether MV Spray Sprinkler System having


remote / local operated deluge valves
provided in the storage shed and in
working condition. Also whether in
critical areas like carousel evacuation
unit, valve change shed, automatic
detection of heat / flame for automatic
operation of sprinkler system provided?

k)

Whether deluge valves are located 15


meters away from the limits of sheds and
protected by fire walls (One deluge valve
to cover an area of about 520 Sq. meters)?

l)

Whether portable DCP Fire Extinguishers


are provided at appropriate location?
-2 Nos. 10 Kg. DCP FE per 200 Sq. Meters
area.
- 1 No. 100/70 Kg. DCP Mobile unit per
shed.

m)

Whether gas monitoring system having


sensors to monitor gas leak near
carousel, evacuation unit, valve
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 81

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------change shed provided? if so:
- Whether working satisfactorily?
- Whether periodically inspected and
records maintained?
n)

Whether fire alarm/manually operated fire


siren and communication system consisting
paging system / flameproof telephones is
available & adequate?

o)

Whether 'No smoking' and other cautions


sign in Hindi/English/local language
displayed at prominent places?

p)

Whether Emergency lighting system


provided in strategic locations and is
working satisfactorily?

q)

Whether Flame proof torches available?

8.0 ADDITIONAL CHECK LIST ITEMS


For detailed checklist on specific areas
refer other OISD check lists as follows:
General (Organisation
Admn. Training etc)

OISD-GDN-145-01

Fire Fighting

OISD-GDN-145-02

Layouts

OISD-GDN-145-03

Gantry Operations

OISD-GDN-145-06

Electrical

OISD-GDN-145-09

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 82

INTERNAL SAFETY AUDITS


PROCEDURES

----------------------------------------------------------------------------------------------------------------------ITEMS
AUDITORS REMARKS
-------------------------------------------------------------------------------------------------------------------------------------------

SUGGESTED INSPECTION & MAINTENANCE CHECKS


9.1

DAILY MAINTENANCE

a)

Cleaning the cover plate of introduction device,


ejction device, air service units, filling guns, CVT
etc.

b)

Water draining from filters of check


scales & filling gun.

c)

Air leak control from check scale.

d)

Checking/control of oil level in check


scale & filling gun.

e)

Zero checking of Introduction


Device/Ejection Device, Air Service
Units, CVT etc.

f)

Calibrations/Adjustments of devices
indicated in above.

g)

Checking the sensitivity of check scales

h)

Conducting test run/test filling to see


the performance of filling-gun, check
scales, introduction/ejection devices,
CVT etc.

9.2.

WEEKLY MAINTENANCE

a)

Oil topping in Air service unit/cleaning


of Air Filters.

b)

Oil topping in dampers of in-line check


scales and calibration with standard
weights.

c)

Cleaning of the bearings and suspensions


of Filling machines

d)

Greasing & leakage control of


Introduction system & Ejection System.

e)

Greasing/lubrication of :
- Central column
- Carousel Driving unit.

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 83

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------9.3
QUARTERLY MAINTENANCE
a)

Earthing strip tightness of equipment


like in-line control Check Scale & Filling
Machine.

b)

Checking the filling hoses for stiffness


and replacement, if necessary.

c)

Inspection of Gun hanger, ropes & pulley


inspections.

d)

Inspection of wear & tear for knife edges


& bearing.

e)

Calibration of filling machines with


standard weights.

f)

Checking the level of Introduction system


& Ejection system.

9.4

ANNUAL MAINTENANCE

a)

Overhauling of machines & replacement of


defective parts of filling machines,
check scales, introduction/ejection
system, central column & driving units.

b)

Inspection of power cylinder of


introduction system & cleaning.

c)

Inspection of ejection system for wear &


tear.

d)

Inspection of rails of conveyer system


for setting &tightening of fish plate.

e)

Inspection & adjustment for proper


functioning of Differential Pressure
valve.

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

Sr.Number:OISD/DOC/2013/172
Page No. 84

OISD GDN 145


INTERNAL SAFETY AUDITS
PROCEDURES

SAFETY AUDIT CHECKLIST NO. OISD GDN-145-09


ELECTRICAL SYSTEM

CONTENTS
-------------------------------------------------------------------------------------------------------------------------------------------------SECTION
DESCRIPTION
PAGE NO.
-----------------------------------------------------------------------------------------------------------------------------------------------1.0 SPECIAL REQUIREMENTS
85
2.0 SUBSTATION (EQUIPMENT & BUILDING)

86

3.0 SWITCHYARD AND OUTDOOR EQUIPMENT

89

4.0 CABLE NETWORK TERMINATIONS & JOINTS

89

5.0 MOTORS CONTROL STATIONS

91

6.0 LIGHTING INSTALLATIONS

92

7.0 EARTHING & BONDING

92

8.0 CAPTIVE GENERATION

94

9.0 BATTERY CHARGER/ UPS

95

10.0 ELECTRICAL HEAT TRACING

96

11.0 PORTABLE APPARATUS/ MOBILE


EQUIPMENT (ELECTRICAL /BATTERY OPERATED)

97

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 85

INTERNAL SAFETY AUDITS


PROCEDURES

SAFETY AUDIT CHECKLIST


ELECTRICAL SYSTEM
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITOR'S REMARKS
-------------------------------------------------------------------------------------------------------------------------------------------------1.0 SPECIAL REQUIREMENTS
a)

Whether main single line diagrams of


Electrical Power Distribution
"updated" and "As-built"?

b)

Whether the Installations are duly


approved by the Chief Electrical
Inspectorate to Govt. for
energisation? (DGMS for Oil Field
Installations)

c)

Is there any unauthorized


installation in operation including
temporary construction power
installations?

d)

Whether action taken on IE inspector


visit report?

e)

Whether electrical installations/repairs to


existing installations are being carried out
through licensed electrical contractors under
the supervision of Licensed Electrical
Supervisor (approved by State Govt.) As per
I.E. Rule No. 45)?

f)

Are the electrical equipment installed conforming


to the Area Classification (IS:5572) approved by
CCE?

g)

Whether there has been revision in


the hazardous area classification
from the original (due to
modifications/expansions etc.) and
the electrical equipment was
accordingly replaced to conform to
revised classification?

h)

Whether the suggested remedial


measures given in the Accident Investigation
Reports, if any, have been implemented?
(Review the Accident Report of the last 5
years)?

i)

Whether the list of electrical "authorized persons"


is being maintained (I.E. Rule No. 3) and
displayed?
j)

Whether inspection of electrical equipment is


carried out, as per approved schedule (Review
the inspection records)?
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 86

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------k)
Whether approved work Permit System
is being followed?
l)

Are the installations generally


rust/corrosion protected effectively?
(such as by using cadmium plated
Bolts/nuts, painting at regular
intervals etc)

m)

Whether the substations / power


plant rooms/control room /MCC rooms
etc. are used as storage area for
scraps,oil drums, clothes, spares and such
other foreign materials

n)

Are the flameproof features maintained intact


for flameproof equipment? (Any damages or missing
bolts /nut in the junction boxes/panel covers /terminal
boxes etc. convert the equipment to non-flameproof)

o)

Whether flameproof telephones are used in the


classified hazardous areas?

p)

Whether the Transformer & Switchyards are free


of vegetation/dry grass?

q)

Whether all the electrical equipment( switchboards,


Relays, Motors, Transformers & Busducts etc.)
and junction / terminal boxes etc. are vermin proof?

r)

Whether preventive Maintenance Schedules as


per OISD-STD-137 etc. carried out?

s)

Whether CO2 fire


electric fires?

t)

Whether sand-buckets provided?

extinguishers provided for

2.0

SUBSTATION (EQUIPMENT & BUILDINGS)

a)

Is the substation equipment freely


accessible for Operation, Inspection
and Maintenance?

b)

Are the minimum clearances around


the equipment maintained as per I.E.
Rule 51?

c)

Are all the substation equipment


provided with double earthing
connections?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 87

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------d)

Are the live parts of equipment made


inaccessible from
inadvertent
contacts? (by barriers/shrouds)?

e)

Whether the rubber glove and mats


with voltage test seals are provided
in front of the switchboards and are
in good condition?

f)

Whether the switchboards are


dust / verminproof? Is pest control
treatment given for substations?

g)

Are any unused cable entries left open?

h)

Have the protective relays been set


at the recommended values (as per the
design)?

i)

Whether the fuses used are of HRC


Type and of ratings specified in the
single line diagrams ?

j)

Whether each outgoing distinct


circuit from the switchboard
is
separately controlled by a suitable
linked switch fuse or circuit breaker
of required capacity?

k)

Whether circuit identification marks/


tags are provided or not?

l)

Are the relays and meters tested for


proper functioning/calibration as per
approved schedule?

m)

Whether the bus bars are provided with


distinct color identification ( Red,
Yellow, Blue and Black)?

n)

Whether the conduits used for cable


entry are sealed and earthed?

o)

Are the energized electrical equipment


provided with caution notices?

p)

Is the substation building made


water tight and all the openings in
walls ( such as cable trench entry/
bus duct entry) sealed?

q)

Whether any water stagnation is there


inside the cable trenches?
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 88

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------r)
Are all the power (H.T. & L.T) and
control cables in trenches properly
segregated?
s)

Are the cables near the terminations


clamped?

t)

Is there any combustible material


used for construction of substation
building?

u)

Whether the cable trenches are


provided with concrete slabs /
chequered plates?

v)

Are the earth electrodes periodically


tested and maintained properly?

w)

Are the earth resistance of the grid


measured, checked and recorded
periodically?

x)

Is the substation provided with


Emergency Lighting?

y)

Is the substation provided with


telephone?

z)

Is the trench sump pump ( for


dewatering ) in working condition
( wherever provided ) ?

aa)

Are floors kept clean,free of tripping


hazards?

bb)

Whether the switchgear rooms located


in the hazardous area are pressurized?
(if not, are these provided with
flameproof equipment)?

cc)

Whether all panel doors are kept closed?

dd)

Whether all the indicating lamps in


the Panel are in operating condition
(i.e. not fused)?

ee)

Are the oil immersed starters filled


with oil to the required level and of
required dielectric strength?

ff)

Whether shock restoration chart & First Aid Box provided?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 89

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------3.0 SWITCHYARD AND OUTDOOR EQUIPMENT.
a)

Are the following components individually


earthed with two separate earthleads
( No. 8 SWG copper or equivalent)?
-

Metal Frameworks
A.B. Switches and circuit breakers
D/O and H/G Fuses
Poles/switches/insulator pins/stay
clamps
- Operating handle of the A.B. switch
b)

Whether the vertical and horizontal


clearances from O.H. conductors are
maintained as per I.E. Rule (79)?

c)

Are the earth electrodes provided in


sufficient number?
Whether
earth pits are properly maintained and
tests carried out as per schedule?

the

d)

Whether the lightning arrestors are


connected after the A.B.switch, for
the protection of transformer/circuit
breaker?

e)

Whether a separate earth electrode of


proper size is provided properly for
the lightning arrestors?

f)

Is there O.H. shielding for lightning


protection and whether it is properly
maintained?

g)

Whether there is locking arrangement


for the Transformer bay to prevent
entry to the yard by unauthorized
persons? If so, is it being followed?

h)

Whether the doors of the gate are rusted


and need to be painted?

4.0 CABLE NETWORK/TERMINATIONS & JOINTS


a)

Have the route markers and joint


location indicators been provided in
a permanent way throughout the Plant
and Off site areas?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 90

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------b)
Whether the underground cables in
excavated trenches are laid at designed
depth with sand filling, brick
protection? (check at on Random trial
pit basis) Is u/g cable exposed at any
location?
c)

Are the cables provided with


identification tags at intervals of
every 30 mts? (On Random Trial Pit
basis)

d)

Whether all the cables throughout


their route protected mechanically
from any external damages?

e)

Are the flameproof type terminations


for cables carried out in the
classified (Zone 1) areas?

f)

Are the cable joints staggered and


having identification marks (when 2
or more cables laid in the same
trench)?

g)

Is the oil seepage from process units


getting drained through or collected
in the cable trench/manholes?

h)

Whether the armour of cables exposed at


the termination?

i)

Are the cables directly taken to the


terminals without suitable
cable
glands/clamps/armour earthing?

j)

Are the cables above ground supported


with proper clamps?

k)

Whether the cables :


(telephone/ power /
lighting cables) are
taken through overhead system? (inside
Refinery / Process / Areas)? If so, what
is the arrangement?

l)

Whether one run of earthing strip


fixed through the entire length of
cable Tray (wherever cable tray is
used) ?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 91

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------m)

Whether proper mechanical protection


and water sealing arrangement
provided to cables especially at the
following locations:
-

Road crossings
Railway installations
Cathodically protected u/g piping
Water logged areas
Drainage & other u/g facilities
RCC structures/brick walls
Where cables rise above ground

n)

What are
the fire protection arrangements
adopted for cables laid above ground?

o)

Are the G.I. pipes (conduits) used for cable


entries (sleeves) sealed at both ends, and
conduits earthed?

p)

Are all conduit ends for cables sealed at both


ends?

5.0

MOTORS CONTROL STATIONS

a)

Whether there is annunciation facility in


case of failure of air supply ( wherever air
purging is used for flame proofness )? Is it
in working condition and
monitored
regularly?

b)

Is the approved inspection schedule


followed ? Records maintained?

c)

Whether Terminal / junction Box properly


sealed / covered?

d)

Is there any
unauthorized modification
carried out ( by way of local
fabrication etc.)
on the flameproof motors/control stations /
terminal boxes? ( to accommodate XLPE cable
termination etc.)

e)

Whether the insulation resistance


values between phases and between
phases and earth of the motors are
within acceptable limits ? ( Select
a few critical motors at random)

f)

Whether Emergency Isolating device


for the motor is installed near the
motor?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 92

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------g)

Whether the double earthing provided


are from two separate distinct earth
connections of the grid?

h)

Are the motors (75KW) provided with


spaceheater and local ammeters.

i)

Whether painting of motor body


control station and supporting
structure are in good condition?

j)

Whether there are


motor guards
provided to prevent inadvertent
contact over the moving shaft?

k)

Are the nameplates of Motors worn


out? Whether the inscriptions are
visible?

l)

Whether the drive belts are


antistatic fire resistant type?

6.0

LIGHTING INSTALLATIONS

a)

Whether separate distribution for


lighting system adopted from main
switchboard, through subdistribution/
fuse distribution & lighting panel final circuit boards?

b)

Whether lighting provided


is sufficient?
( compare with IES chart
for required
levels
of illumination at selected locations)?

c)

Is there auto changeover system


provided for normal to emergency
system and if so, is it functioning
satisfactorily? (test this)

d)

Whether the body of lighting fixtures


are separately earthed in addition to
cable armor earthing?

7.

EARTHING & BONDING

a)

Is the earthing carried out as per


IS:3043?

b)

Is the earth leakage protection


wherever provided functioning
satisfactorily?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 93

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------c)

Are the earth electrodes being tested


periodically? (Check the test records)

d)

What is the grid resistance (in ohms)?


Is this periodically measured and recorded?

e)

Whether all 3 phase equipments double


earthed and single phase equipment
single earthed?

f)

Are all the loading arms earthed?

g)

Is there earth continuity between the


flexible hoses and loading arms ?

h)

Are the tanks, vessels, process


piping, steel columns, metallic
structures / sheds and buildings and
fencing etc. earthed?

I)

Are the hardware used free from rust


or corrosion?

j)

Are the Rail Tracks within the gantry


premises earthed and bonded?

k)

Are the earthing


connections to
lighting protection and electrical
system protection ( Neutral earthing
and body earthing) provided separately?

l)

Whether there is any discontinuity of


earthing connections?

m)

Whether the flexible wire used for


tanker body earthing ( TTL Gantry ) is
soldered to crocodile clips?

n)

Whether crocodile clips have lost the


spring action causing improper grip
with the surface?

o)

Whether earth jumpers across the pipe


flanges (of gantry piping) are provided?

p)

Is the buried underground earth


conductors getting exposed at any
location?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 94

INTERNAL SAFETY AUDITS


PROCEDURES

------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------q)

Whether the earth pits with chambers


are exposed and visible or is
embedded inside the loose earth?

r)

Whether the earth strip connections


on the earth electrode are loose /
sheared off / tight?

s)

Are the weigh bridge (truck) platforms


earthed?

t)

Whether the earth strip joints are


having an overlapping equivalent to
the width of the strip (minimum) and
all the four sides are welded?

u)

Whether all product and utility


pipelines earthed at every 25 meters
apart and also at the point where it
enters and leaves a shed, where
volatile liquids and vapors are handled?

v)

Whether the earth strip runs


continuously through conveyers and
are the supporting structures also
earthed?

w)

Whether all electronic equipments


which stores electrical energy are
properly earthed?

8.0

CAPTIVE GENERATION

a)

Is the neutral of the generator


provided with an isolator?

b)

Whether the neutral of the generator


is earthed by not
less than two
separate and distinct earth
connections and whether the earthing
is after the isolator?

c)

In case of High Voltage Generators


(Voltage above 650 V) whether the
neutral point is earthed by two
separate and distinct connections
with earth each having its own
electrode?

d)

Whether the exposed wires near the


Generator/Generator to switch board
is in metallic conduit and the
conduit earthed?
OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 95

INTERNAL SAFETY AUDITS


PROCEDURES

------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------e)

Whether the control panel for the


generator is earthed with two
separate and distinct connections with
earth?

f)

Whether the generator panels are made


vermin proof?

g)

Whether more than one generator is


provided, whether provision of
individual breakers are kept for
paralleling arrangement?

h)

Whether danger notice is provided for


the generator enclosure?

i)

Whether location (where generator is


installed ) is dry and dust free and
nearer to the loads?

j)

Whether provided with fire and weather


proof enclosure
with ventilation?

k)

Whether the exhaust provision


provided is away from the enclosure?

l)

Whether control panel is available


near to the generator, equipped with all
protections ( short circuit, overcurrent,
and earthfault)?

m)

If synchronized with grid, whether


effective measures are available to
prevent backfeeding?

n)

For Prime Mover where fuels like


Naphtha, LSHS are used additional
safety precautions should be taken.

9.0

BATTERY / CHARGER/UPS

a)

What is the type of battery used?

b)

Whether the Battery room is clean and


well ventilated? Are the floors acid
proof?

c)

Whether exhaust fans provided ?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 96

INTERNAL SAFETY AUDITS


PROCEDURES

------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------d)

Are the cell voltage, specific


gravity of cell, and level of the
electrolyte being checked and
recorded as per approved schedules?

e)

Is there any corrosion on terminals /


connectors?

f)

Whether all the safety equipment


(Rubber apron, goggles, acid proof
hand gloves etc.) are available?

g)

Is the operation of UPS satisfactory?


(Test for critical services)

h)

Whether trickle charger working and


checked properly.

10.0

ELECTRIC HEAT TRACING

a)

Whether all indication lamps are


functioning properly in the panel to
ensure healthiness of tracer circuits.

b)

What is the automatic control or


protection provided for temperature
raising above allowable limit?
(Especially at hazardous areas) Is
this being tested periodically for
proper functioning.

c)

Are there damages to insulation /


traces?

d)

Is the system water tight?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 97

INTERNAL SAFETY AUDITS


PROCEDURES

------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------11.0

PORTABLE APPARATUS/MOBILE EQUIPMENT


(ELECTRICAL BATTERY OPERATED)

a)

Is the electrical system of the


portable apparatus/mobile equipment
provided with Intrinsically safe /
flameproof features when required
to be taken to the classified hazardous
areas? ( check test certificates)

b)

Are safe voltage (24 volts) being


maintained for use of portable
appliances
such as hand lamps, torches,
etc. (used for inspection / testing) especially
in classified areas?

c)

Whether the flexible cables used for


portable tools are free from damages
and consisting of too many joints?
Are the cables protected from
mechanical
damages ( by providing
metallic sleeves etc.)?

d)

Whether the cables used for portable


tools/equipment are 3 core for single
phase and four core for three phase
equipment respectively? Whether the 3rd /
4th core is used to earth the metallic
body/screen covering of the cable?

e)

Are the power cables used for


portable equipment such as welding
machines, generators, switchboards
etc., provided with 'armoring' and
`gland' type terminations? Is the
armoring bonded to earth?

f)

Are the portable tools/equipment


being checked every time before use
that there is no earth leakage? Is it
ensured safe to use, by a "competent"
person before issuing.

g)

Whether ELCB provided for portable


equipment?

h)

Are the portable equipment, including


the electrical system in the mobile
equipment / vehicles (Battery Operated),
and test instruments and tools
inspected regularly?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 98

INTERNAL SAFETY AUDITS


PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
--------------------------------------------------------------------------------------------------------------------------------------------i)

Whether all wiring and current carrying parts


of an industrial electric truck, so constructed
and enclosed as to protect from mechanical
damages?

j)

Whether any uninsulated current carrying part is


exposed especially on the outer surface of the truck?

k)

Whether all the components are accessible for


maintenance/repairs?

l)

Whether the battery has the protection


means of a non combustible enclosure?

m)

Are the Battery terminals provided with protective


rubber gloves?

n)

Whether the battery enclosure is provided with


sufficient ventilation to minimize the possibility of
accumulation of explosive hydrogen air mixtures
above the battery?

o)

Are there reported accidents due to improper


maintenance / the wrong use/wrong selection etc.
of Portable tools/Mobile equipment (Electrically
operated) in the last 2 years? (if so, verify the
accident investigation reports and
compliance of recommendations)

p)

Whether connecting a welding machine


the return path of the welding
machine is directly connected to the work
piece with proper insulation?

by

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

Sr.Number:OISD/DOC/2013/172
Page No. 99

OISD GDN 145


INTERNAL SAFETY AUDITS
PROCEDURES

SAFETY AUDIT CHECKLIST


10.0 CROSS-COUNTRY PIPELINE
CONTENTS
-------------------------------------------------------------------------------------------------------------------------------------------------SECTION
DESCRIPTION
PAGE NO.
-------------------------------------------------------------------------------------------------------------------------------------------------1)

COATING CONDITION

100

2)

CATHODIC PROTECTION

100

3)

POWER SUPPLY TO CP STATION

101

4)

ULTRASONIC THICKNESS SURVEY

101

5)

INTERNAL CORROSION

102

6)

PIGGING

102

7)

INHIBITOR INJECTION

102

8)

CPL/EWP SURVEY

103

9)

SOIL TESTING

103

10)

MAINLINE VALVE

103

11)

HYDROSTATIC TESTING

103

12)

PIPELINE PATROLLING

103

13)

TELECOMMUNICATION & TELEMETRY

104

14)

SINGLE BUOY MOORING SYSTEM

106

15)

CONTINGENCY PLANS

107

16)

DOCUMENTATION

107

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

Sr.Number:OISD/DOC/2013/172
Page No. 100

OISD GDN 145


INTERNAL SAFETY AUDITS
PROCEDURES

SAFETY AUDIT CHECKLIST


ELECTRICAL SYSTEM
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITOR'S REMARKS
-------------------------------------------------------------------------------------------------------------------------------------------------1.0 COATING CONDITIONS:
1.1 Is rolling plan for pearson, coating conductance
and current drainage surveys made?

Yes/No

1.2 If 'yes' is the schedule maintained

Yes/No

1.3 Coating Condition (Survey report


to be checked

Satisfactory /
not Satisfactory

1.4 Type of coating and its application method

.....

2.0 CATHODIC PROTECTION:


(No. of C.P. Stations .....Nos.)
2.1 After revisioning of coating whether PSP
readings are recorded and monitored to
observe improvements

Yes/No

2.2 Periodic calibration of AC & DC volt


meter/Ammeter and PSP Meter of CP Units

Yes/No

2.3 Number of insulating joints

.....Nos.

2.4 Dielectric strength of Insulation Joints

Satisfactory/
Not satisfactory

2.5 Is schedule made for inspection of


insulation joints/couplings (yearly)

Yes/No

2.6 No. of test lead points for PSP Survey

..... Nos.

2.7 Condition of test led points


2.8 Is schedule made for PSP survey
(PSP readings at feeding points) (PSP readings at
Test lead points quarterly)
2.9 If 'yes' the findings
2.10 If 'not satisfactory, any action plan
drawn for correcting the deficiencies
on short term and long term basis?
2.11 (a) Effectiveness of C.P. (To check
PSP profile graphs in conjunction
with CP station reports)
(b) Is any stretch of pipeline left
cathodically unprotected for a period more
than one year

Good/Bad
Yes/No
Satisfactory/
Not Satisfactory

Yes/No

Satisfactory / Not Satisfactory


Not Satisfactory

Yes/No

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

Sr.Number:OISD/DOC/2013/172
Page No. 101

OISD GDN 145


INTERNAL SAFETY AUDITS
PROCEDURES

------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------2.13 If 'YES' any action taken/plan drawn
for correcting the deficiencies
Yes/No
2.14 Is the C.P. unit connected with
the earthing electrode ?
2.15 Is the earthing resistance of
C.P. earthing electrode taken & record
maintained

Yes/No

Yes/No

2.16 Are all the C.P. units provided


with the lightening arrestors

Yes/No

2.17 Whether Lightening arrestor grid and


Equipment Earthing grids are segregated

Yes/No

2.18 Safety aspects for fault condition


due to AC/DC power system

-------

2.19 Is the ground bed circuit resistance


record maintained ?

Yes/No

2.20 Is the di-electric strength of C.P. transformer


oil checked ?

Yes/No

3.0

POWER SUPPLY TO CP STATION


3.1 Inspection of source
3.2 Power availability of CP
stations, average
3.3 Condition of back up power
supply, if any.

.....

........hrs./day
Satisfactory/
Not Satisfactory

4.0 ULTRASONIC THICKNESS SURVEY


4.1

Is schedule made and followed for


thickness survey of mainline at :

4.1.1

Exposed section of Pipelines

Yes/No

4.1.2

Sharp pipe bends/Riser bends

Yes/No

4.2

If 'Yes", the findings

Satisfactory/ Not satisfactory

4.3 If 'NOT SATISFACTORY', any


action plan for correcting
the deficiencies drawn

Yes/No

4.4. Is two yearly schedule made for


thickness survey of unprotected
pipeline section from I/F to
scrapper launcher/receiver

Yes/No

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

Sr.Number:OISD/DOC/2013/172
Page No. 102

OISD GDN 145


INTERNAL SAFETY AUDITS
PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------5.0 INTERNAL CORROSION
5.1 Whether coupons are installed

Yes/No

5.2 If yes, corrosion rate < 1 MPY 1 to 4.9 MPY/


> 4.9 MPY
5.3 Whether Electrical Resistance
probes are installed

Yes/No

5.4 If yes, corrosion rate ?

.....

6.0 PIGGING
6.1.0

Descaling

6.1.1

Is schedule made for pigging ?

Yes/No

6.1.2

And,is followed

Yes/No

6.1.3

Is pig residue/dirty product


analysis carried out?

Yes/No

If yes, what is the value of


a)
Fe 0 % by mass
b)
Water, % by mass
c)
pH value
d)
Acidity, mg KOH/gm,

.....
.....
.....
.....

6.1.4

6.1.5

Based on pig residue analysis


internal condition of pipeline

6.2.0

Intelligent Pigging

6.2.1

Is any IPS survey carried


out ?

Yes/No

If no, any schedule made for


carrying out the survey (once in
five years).

Yes/No

6.2.2

6.2.3

6.2.4

If the survey has been carried


out, findings of the survey,
(To check the reports).
If not satisfactory, any
action plan has been drawn
to implement the recommendations

Satisfactory/Not satisfactory

Satisfactory /Not satisfactory

Yes/No

7.0 INHIBITOR INJECTION


7.1 Is inhibitor injection being
done and records maintained

Yes/No

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

Sr.Number:OISD/DOC/2013/172
Page No. 103

OISD GDN 145


INTERNAL SAFETY AUDITS
PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------7.2. Average dosing of corrosion
inhibitor injection

...PPM/day

8.0 CPL/EWP SURVEY


8.1 Is any CPL/EWP SURVEYS CARRIED OUT

Yes/No

8.2 If No, any schedule made for


Carrying out the survey
(once in five years)

Yes/No

8.3 If the survey has been carried out,


what are the findings (To check the report)

Satisfactory/Not Satisfactory

8.4 If not satisfactory, any action plan has been


drawn to implement the recommendations.

Yes/No

9.0 SOIL TESTING


9.1 Soil samples within ROW being
tested once in five years.

Yes/No

9.2 Is there any industrial affluent


flowing over the ROW

Yes/No

9.3 If `yes', said sample tested to


determine the efficacy of the
existing coating of the pipe lines.

Yes/No

9.4 Variations observed in soil resistivity

.....

10.0 MAINLINE VALVE


(NO. OF MAINLINE VALVES .... NOS.)
10.1 Is schedule made for maintenance
of mainline valve

Yes/No

10.2 If `yes', schedule followed and


valves operating freely.

Yes/No

10.3 Supply to Motor Operated Valves


(MOV) available

Yes/No

10.4 MOV working


11.0

Locally/Remotely

HYDROSTATIC TESTING

11.1 Whether all repaired piping system are being


tested in accordance with OISD - 141&API 1110
11.2 Whether sufficient number of pipe lengths, pretested
and kept at vulnerable locations for
replacement
if required

Yes/No

Yes/No

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

Sr.Number:OISD/DOC/2013/172
Page No. 104

OISD GDN 145


INTERNAL SAFETY AUDITS
PROCEDURES

-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------12.0 PIPELINE PATROLLING
(Total length of Pipeline .....km)
12.1

Is the schedule made for

12.1.1 Ground Patrolling by Patrolman


each segment twice in a week
by physical walking.
12.1.2 Helicopter surveillance
once in a month
12.1.3 Right of way inspection and
maintenance of above ground
structures along ROW once
in a year

Yes/No

Yes/No

Yes/No

12.1.4 Inspection of Pipeline crossings at


12.1.4.a Rail/Road Bridge and suspended
crossing (exposed pipeline)
quarterly

Yes/No

12.1.4.b Road/Highway crossing


quarterly

Yes/No

12.1.4.c Submerged river crossing


before and after monsoon

Yes/No

12.2

If reply to the above is yes,


whether various reports filled/
monitored regularly and proper
checks on line patrolman
exercised

...

13.0 TELECOMMUNICATION & TELEMETRY


(NO.OF REPEATER STN...NOS)
13.1

Availability of Power supply

Yes/No

13.2

If no, (other than load shedding)


corrective action taken

Yes/No

Whether all the lights and


fans are working ?

Yes/No

State Electricity Board Energy


Meter working ?

Yes/No

13.5

Energy Meter Readings being noted

Yes/No

13.6

All the Radio Parameters as per

13.3

13.4

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

Sr.Number:OISD/DOC/2013/172
Page No. 105

OISD GDN 145


INTERNAL SAFETY AUDITS
PROCEDURES

------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------format are being checked
Yes/No
13.7

Whether all the Radio Units are


in working condition ?

Yes/No

13.8

If no, number of faulty units

... Nos.

13.9

Whether Engineering order wire


(E.O.W) working.

Yes/No

Whether Rooms are in dust


free condition

Yes/No

Whether all the parameters of


charger are properly working.

Yes/No

13.10

13.11

13.12

Whether all the Battery voltages are


(should be above 2 volts)being checked Yes/No

13.13

Sick cells, if any, are being


identified and corrective action taken

Yes/No

Whether specific Gravity of all the


cells recorded in a register

Yes/No

Sufficient reserve of distilled


water available

Yes/No

Check for the proper running


of D.G. Set carried out.

Yes/No

13.17

Auto change over working ?

Yes/No

13.18

Is it free from leakages ?

Yes/No

13.19

Whether Diesel Tank of DG


set is full

Yes/No

Whether all the alarms are


in working order ?

Yes/No

Whether no. of fire buckets/


extinguishers adequate and
in working order ?

Yes/No

Whether aviation tower lights


are in working condition ?

Yes/No

Whether twilight switches


are in working condition ?

Yes/No

Whether the tower painting is


done as per rolling plan ?

Yes/No

13.14

13.15

13.16

13.20

13.21

13.22

13.23

13.24

13.25

Check the resistance of lightning


OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

Sr.Number:OISD/DOC/2013/172
Page No. 106

OISD GDN 145


INTERNAL SAFETY AUDITS
PROCEDURES

------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------arrestor (better than 2 ohms)
13.26

13.27

13.28

13.29

13.30

13.31

13.32

Whether Telecommunication link


VHF/UHF/Microwave/Fiber optics
is available ?

Yes/No

Whether all the desired telesupervisory


signals are passed on to master control
station through remote terminal Unit
(RTU) and data monitored?

Yes/No

Functional test of telecommunication/


telemetry system are being carried
out daily

Yes/No

Telecommunication / Telemetry
equipments are being inspected
as per manufacturer's recommendations

Yes/No

Pressure/Temperature/Flow recorder
charts are in working order and
are being checked for its safe limits

Yes/No

Maintenance and inspection of


safety instrumentation are being followed
as per OISD-153.

Yes/No

Whether Unauthorized Entry Alarm /


Signal system is in working condition?

Yes/No

14.0

SINGLE BUOY MOORING SYSTEM

14.1

Whether the following items are being


inspected daily and records kept ?
Free floatation of buoys
Draft
Free movement of rotating assembly

Yes/No
Yes/No
Yes/No

14.2 Whether following items are being inspected


weekly and records kept ?
- Mooring ropes and ancillary equipments
- Batteries
- Navigational aids

Yes/No
Yes/No
Yes/No

14.3 Whether visual inspection of buoys


and equipments for external corrosion
is carried out on monthly basis ?

Yes/No

14.4 Whether following item are being inspected


on quarterly basis ?
-

Anchor chains of buoys for wear


tear and tension
Fenders for damage

Yes/No
Yes/No

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

Sr.Number:OISD/DOC/2013/172
Page No. 107

OISD GDN 145


INTERNAL SAFETY AUDITS
PROCEDURES

------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
------------------------------------------------------------------------------------------------------------------------------------------------Draft of buoys
Yes/No
Hose configuration
Yes/No
Hose with respect to PLEM
Yes/No
Sacrificial anodes
Yes/No
Swivel joints and turn tables
Yes/No
14.5 Whether following items are being
inspected annually ?
-

Expansion joints
Oil swivel seals

Yes/No
Yes/No

14.6 Whether inspection of Hoses are


being done as per the requirements
of OISD-STD-135

Yes/No

15.0 CONTINGENCY PLANS:


15.1 Is there updated contingency
plans for emergencies at ?
-

Installations
Mainlines
Off-shore facilities

Yes/No
Yes/No
Yes/No

15.2 Is the contingency plans(s)


displayed in conspicuous place ?

Yes/No

15.3 Are all the employees familiar


with it ?

Yes/No

15.4 Is the list of Mainline emergency


equipments/tools available ?

Yes/No

15.5 Are the mainline emergency equipments/


tools stacked separately and marked for
easy identification ?

Yes/No

16.0 DOCUMENTATION
16.1 Whether the basic datas and parameters
of the Pipelines/SBM system layout,
length, diameter etc. are available in
Pipeline installation ?

Yes/No

16.2 Whether complete route strip map


showing all the details of the
passage of the pipeline and all
isolation M/L valve locations
are available on record in
Pipeline installation?

Yes/No

16.3 Whether list of various codes to


which Pipeline and SBM systems ?

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.

OISD GDN 145

Sr.Number:OISD/DOC/2013/172
Page No. 108

INTERNAL SAFETY AUDITS


PROCEDURES

ANNEXURE
CHECKLIST FOR SAFETY IN LABORATORIES
-------------------------------------------------------------------------------------------------------------------------------------------------ITEM
AUDITORS REMARK
-------------------------------------------------------------------------------------------------------------------------------------------------1. Whether fire extinguishers are adequately positioned.
2. Whether important instructions, emergency procedures
displayed.
3. Whether fittings in storehouse for returnable petroleum samples
are of flameproof nature.
4. Whether ELCB/ECB installed in the main power switch board.
5. Whether samples of Class 'A' petroleum products in air
tight containers.
6. Whether emergency lighting available.
7. Whether the switches/plug sockets for various equipments
intrinsically safe.(Lab bench or near ground level)
8. Whether system exists for switching off all equipments at
the end of the day.
9. Whether any emergency siren button provided in the Lab.
10. Whether the on-site emergency plan includes possibility of
a fire in the Lab.
11. Whether the drainage system has been provided with a
oil trap.
12. Whether proper ventilation/exhaust system exists in the
fume chamber area.
13. Whether the height of the chimney in the fume chamber is
sufficient.
14. Whether entry to the Laboratory area is restricted.
15. Check the condition of Test benches & cupboards.
16. Is vacuum system adequate and working properly.
17. Are all Gas Cylinders kept outside buildings and kept
properly secured.
18. Is the condition of the utility lines healthy.

OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting