5, October 2012
I. INTRODUCTION
Delays are one of the biggest problems which
construction firms face [1]. The problem of delay in the
construction industry is a global phenomenon [2]. Keeping
construction projects within estimated costs and schedules
requires sound strategies, good practices, and careful
judgment. However, to the dislike of owners, contractors
and consultants, many projects experience extensive delays
and thereby exceed initial time and cost estimates [3]. Assaf
and Al-Hejjei [4], found that 76% of the contractors have
indicated that average of time overrun is between 10% and
30% of original duration, while about 56% of the
consultants specified the same percentage. Time and cost
overruns occur in most construction projects, although, the
magnitude of these delays and cost overruns varies
considerably from project to project [3]. Cost overruns can
III. METHODOLOGY
Delays are one of the biggest problems in construction
projects in developing countries, as cause a negative effects
on the projects. The literature related the field of causes of
delay in construction projects has been reviewed over the
last decade. Summary of causes of delay from literature
review are shown in Table I. A questionnaire survey was
conducted to solicit the causes of delay from consultants
DOI: 10.7763/IJET.2012.V4.441
598
IACSIT International Journal of Engineering and Technology, Vol. 4, No. 5, October 2012
TABLE I: SUMMARY OF CAUSES OF DELAY IN CONSTRUCTION PROJECTS FROM LITERATURE REVIEW
S.
NO
4
5
6
Shortage of labours
Delay in delivery of materials to site
Change orders by client during Construction
7
8
9
10
Inaccurate estimates
11
Bad weather
12
Incompetent subcontractor
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
4
=1
4
=1
=1
(1)
(2)
A. Causes of Delay
Summary of Relative Importance Index and rank for the
causes of delays in Iranian construction projects is shown in
Table II.
599
IACSIT International Journal of Engineering and Technology, Vol. 4, No. 5, October 2012
TABLE II: SUMMARY OF RELATIVE IMPORTANCE INDEX AND RANK FOR THE CAUSES OF DELAY IN IRANIAN CONSTRUCTION PROJECTS
Consultants
Contractors
Overall
S.NO
Causes of Delay in Construction Projects
Index
Rank
Index
Rank
Index
Rank
1
3,38
3,24
3,31
3,32
2,38
19
2,86
3,34
2,76
3,04
Shortage of labours
2,72
11
2,72
10
2,72
12
2,64
14
2,56
14
2,60
19
3,32
3,30
3,34
2,58
15
2,56
14
2,57
21
2,06
21
2,72
10
2,39
24
2,22
18
2,54
15
2,38
25
9
10
Inaccurate estimates
2,12
20
2,44
17
2,28
27
11
Bad weather
2,68
12
2,90
2,79
10
12
Incompetent subcontractor
2,82
2,32
20
2,57
21
13
2,48
17
2,62
12
2,55
22
14
2,96
2,40
18
2,68
15
15
3,24
3,50
3,37
16
3,06
2,72
10
2,89
17
Equipment unavailability
2,66
13
2,58
13
2,62
18
18
2,76
10
2,50
16
2,63
17
19
1,94
23
2,08
21
2,02
28
20
2,68
12
2,70
11
2,69
14
21
1,74
24
3,12
2,43
23
22
2,55
16
2,74
2,65
16
23
3,30
3,26
3,28
24
25
26
27
2,63
2.72
2,16
2,76
15
11
19
10
3,04
2.76
3,26
3,12
6
8
3
5
2,84
2.74
2,71
2,94
9
11
13
6
28
2,78
1,86
22
2,32
26
3,37
3,34
3,31
3,28
3,04
2,94
2,89
2,86
2,84
10
Bad weather
2,79
10
6
7
8
IACSIT International Journal of Engineering and Technology, Vol. 4, No. 5, October 2012
REFERENCES
[1]
[2]
[3]
[4]
[5]
[6]
TABLE IV: RELATIVE IMPORTANCE INDEX AND RANK FOR THE EFFECTS
OF DELAY
Causes of
S.
Delay in
consultants contractors
overall
NO
Construction
Projects
[7]
[8]
1
2
3
4
5
6
Time overrun
Cost overrun
Dispute
Arbitration
Litigation
Total
Abandonment
3,34
3,20
2,70
2,52
2,36
1
2
3
4
6
3,12
3,30
2,58
2,46
2,40
2
1
4
5
6
3,27
3,25
2,64
2,49
2,38
1
2
3
5
6
2,50
2,68
2,59
[9]
S. A.
construction industry in Libya
in Proc. The International Conference on Economics and
Administration, ICEA FAA, Buchares, Romania, 2009, pp. 257-265.
M. Sambasivan and Y. K. Soon,
Malaysian construction industry International Journal of Project
Management, vol. 25, pp. 517 526, 2007.
A. Enshassi, J. Al-Najjar, and M. Kumaraswamy,
overruns in the construction projects in the Gaza Strip Journal of
Financial Management of Property and Construction, vol. 14, pp.
126-151, 2009.
S. A. Assaf and S Alal Journal of Project Management, 24, pp. 349
357, 2006.
A. H. AlInternational Journal of Project Management, vol. 18, pp. 51-59,
2000.
P. A. Koushk, K. AL-RashidA, and N. Kartam,
increases in the construction of private residential projects in Kuwait
Construction Management and Economics, vol. 23, pp. 285 294,
2005.
S. Meeampol, and S.
performance on highway construction projects: evidence from
Thailand Journal of Financial Management of Property and
Construction, vol. 11, pp. 3 20, 2006.
L. Le-Hoai, Y. D. Lee, and J. Y. Lee,
Vietnam large construction Projects: A Comparison with Other
Selected Countries Journal of Civil Engineering, vol. 12, pp. 367377, 2008.
A. M. Odeh, and H.