Академический Документы
Профессиональный Документы
Культура Документы
We have been getting lot of enquiries from interested customers who would like
to know the process and procedure to setup a 1 MW Solar Plant
Menu
Search
Links
Follow us on Google+
Follow us on Twitter
Like us on Facebook
Solutions
Add Solar to Existing UPS?
How to Reduce Diesel
Bills?
How to Reduce Power
Bills?
Solar Plant Solutions
Solution to Power Cuts
Tools
Grid-Tied Solar Plant Con
figurator
Off-Grid Solar Plant Config
urator
Recent Articles
Grid Tied Solar Rooftop
Net-Metering Awareness
workshop conducted in
Tenali, Andhra Pradesh
India
Grid Tied Rooftop Solar
Net-Metering Awareness
Workshop @ Ongole,
Process to setup solar plant varies by State based on the requirement of the
State Nodal Agency, EB and DISCOM, Below is the step by step process for
Andhra Pradesh and Telangana
Land Selection
It is recommended to select the project site with in 2 km of a Power Substation to
reduce the power excavation charges
State Nodal Agency (NREDCAP) Process
1. Submit Solar Application Form
2. Submit Solar Connectivity Application Form
3. Get the Sanction Letter
DISCOM Department Process For <= 10 MW
1. DISCOM evaluates the Solar project application form and provides feasibil
ity report to the developer for projects less than 10 MW capacity after the
application is approved by State Nodal Agency
2. Developer provide Bank guarantees, signed MOU and other docu
ments, Please see document checklist for list of required documents
3. DISCOM provides evacuation estimation report to Developer
TRANSCO(EB) Department Process For > 10 MW
1. EB (TRANSCO) evaluates the Solar project application form and provides
feasibility report to the developers for projects greater than 10 MW capaci
ty after the application is approved by State Nodal Agency
2. Developer provide Bank guarantees, signed MOU and other documents,
Please see document checklist for list of required documents
3. TRANSCO provides evacuation estimation report to Developer
Document Checklist(Required Documents)
Developer Registration Documents
Andhra Pradesh
How to Create a Passive
Income Stream by Investing
in a Grid Tied Rooftop Solar
Plant in Andhra Pradesh
& Telangana
Grid Connected Solar
Rooftop Net-metering in
AndhraPradesh and Telan
gana
Karnataka Solar Scheme
for Farmers Opportunities
for Developers to Set up 1
MW 3 MW
Most Read Articles
Investment Model for 1 MW
Solar Power Plant
Financial Model for 1 MW
Solar Plant All over India
Cost of setting up a 1MW
Solar Plant in Andhra
Pradesh
How to Setup a 1 MW So
lar Plant in India?
1 MW Solar Power Plant
EPC Cost with Multi Crys
talline Modules
Categories
Andhra Pradesh
EPC
Financing
General
Grid Tied
Guntur
How-To
India
Karnataka
Nellore
NetMetering
Ongole
Prakasam
Products
Projects
Rooftop
Solar Inverter
Solar Panel
Solar Tubular Battery
Subsidy
1.
2.
3.
4.
5.
6.
7.
Consent Form.
Under Taking for Acceptance Terms and Conditions Form.
Bank Guarantee Form.
Memorandum of Understanding Form (MOU).
Bank Challan (DD)
Telangana
SL.NO
AMOUNT
TOTAL
3,00,000.00
15,00,000.00
Stamp Duty
60,000.00
60,000.00
Registration Fee
15,000.00
15,000.00
Facilitation fees
10,00,000.00 10,00,000.00
Land levelling
Extra
Extra
Compound walls
Extra
Extra
Extra
Extra
Extra
Extra
DESCRIPTION
EB Fee
1,12,360.00
1,12,360.00
DISCOM Fee
11,236.00
11,236.00
15,00,000.00 15,00,000.00
SUB-TOTAL (1+2)
51,98,596.00
6,00,00,000.00
TOTAL
1,95,00,000.00
Rate this:
Rate This
9
2
Share this:
Like
Be the first to like this.
Related
Posted on 25/07/2015 by MAC Solar. This entry was posted in EPC, Projects and tagged 1 MW
Solar Plant Budget, 1 MW Solar Plant Cost, 1 MW Solar Plant Invesment, 1 MW Solar Plant Project
Report, 1 MW Solar Plant Setup Process, 1MW Solar Plant, Andhra Pradesh, Andhra Pradesh 1MW
Solar Plant, How to Setup 1 MW Solar Plant In India, Karnataka 1MW Solar Plant, TamilNadu 1MW
Solar Plant. Bookmark the permalink.
Pi
ng
Pi
ng
Powertech's Blog
Leave a Reply