Вы находитесь на странице: 1из 34

Scheduling/Leveling Report - 11-May-16 - PM.

exe
===============================================
Default Project..................................................UP#30-2
Projects:
UP#30-2.........................................................
.Completion Plan 5 August 2015 Rev 02 (Update -06 May 2016)
Scheduling/Leveling Settings:
----------------------------General
------Scheduling ......................................................Yes
Leveling ........................................................No
Ignore relationships to and from other projects .................No
Make open-ended activities critical .............................No
Use Expected Finish Dates .......................................Yes
Schedule automatically when a change affects dates ..............No
Level resources during scheduling ...............................No
Recalculate assignment costs after scheduling ...................No
When scheduling progressed activities use .......................Retaine
d Logic
Calculate start-to-start lag from ...............................Early S
tart
Define critical activities as ...................................Longest
Path
Compute Total Float As ..........................................Finish
Float
Calculate float based on finish date of .........................Each pr
oject
Calendar for scheduling Relationship Lag ........................Predece
ssor Activity Calendar
Advanced
-------Calculate multiple float paths...................................Yes
Calculate multiple float paths using.............................Free Fl
oat
Number of paths to calculate.....................................10
Statistics:
----------# Projects.......................................................1
# Activities.....................................................833
# Not Started....................................................301
# In Progress....................................................72
# Completed......................................................460
# Relationships..................................................1197
# Activities with Constraint.....................................27
Project:
UP#30-2 Activity:
GEN0001020
Receive
Instruction from ADAC to procure additional MJF Pipe fittings & Valves
Project:
UP#30-2 Activity:
GEN0001030
Stage 1
Completion
Project:
UP#30-2 Activity:
GEN0001040
Stage 2
Completion
Project:
UP#30-2 Activity:
GEN0001050
Stage 3
Completion
Project:
UP#30-2 Activity:
GEN0001060
Stage 4
Completion

Project:
UP#30-2 Activity:
o Area (For Remaining Fire Fighting Work)
Project:
UP#30-2 Activity:
n Fuel Farm Control Room
Project:
UP#30-2 Activity:
of VO 37
Project:
UP#30-2 Activity:
ersion by HLG to its final position
Project:
UP#30-2 Activity:
lity of Fuel Farm (Installation of instruments)
Project:
UP#30-2 Activity:
lity of Fuel in Fuel Farm
Project:
UP#30-2 Activity:
o Runways
Project:
UP#30-2 Activity:
o SS 1164
Project:
UP#30-2 Activity:
ct Civil Work Completion Section 2
Project:
UP#30-2 Activity:
ct Civil Works Completion Section 3
Project:
UP#30-2 Activity:
ct Civil Works Completion Section 4
Project:
UP#30-2 Activity:
ct Civil Work Completion (New Aprons)
Project:
UP#30-2 Activity:
ct Civil Work Completion Section 1
Project:
UP#30-2 Activity:
ct Civil Work Completion (VO)
Project:
UP#30-2 Activity:
ct Civil Work Completion Section 5
Project:
UP#30-2 Activity:
ct Civil Work Completion Section 6
Project:
UP#30-2 Activity:
ct Civil Work Completion Section 7
Project:
UP#30-2 Activity:
Trench Civil Work Completion
Project:
UP#30-2 Activity:
Trench Civil Work Completion
Project:
UP#30-2 Activity:
Trench Civil Work Completion
Project:
UP#30-2 Activity:
m and Control Room Availability
Project:
UP#30-2 Activity:
m Availability

GEN0001110

Access t

GEN0001120

Access i

GEN0001160

Approval

GEN0001180

Road div

GEN0001200

Availabi

GEN0001210

Availabi

SEC2S11620

Access t

SEC2S22420

Access t

SEC2S22430

Cable Du

SEC2S22460

Cable Du

SEC2S22490

Cable Du

SEC2S22510

Cable Du

SEC2S22540

Cable Du

SEC2S22560

Cable Du

SEC2S22590

Cable Du

SEC2S22620

Cable Du

SEC2S22640

Cable Du

SEC2S31000

CH101A -

SEC2S31250

CH156 -

SEC2S31550

CH155 -

SEC2S32430

Fuel Far

SEC2S41000

Fuel Far

Errors:
------Warnings:
--------Activities without predecessors..................................1
Project:
UP#30-2 Activity:
GEN0001000
Project
Start
Activities without successors....................................1
Project:
UP#30-2 Activity:
GEN0001060
Stage 4
Completion
Out-of-sequence activities.......................................63
Project:
UP#30-2 Activity:
ASBULT1000
Submissi
on of As Built Drawing for Storm water works

Project:
UP#30-2 Activity:
ASBULT1020
on of As Built Drawing for Electrical works
Project:
UP#30-2 Activity:
ASBULT1040
on of As Built Drawing for Fire Fighting works
Project:
UP#30-2 Activity:
ASBULT1060
on of As Built Drawing for AGL works
Project:
UP#30-2 Activity:
ASBULT1120
on of As Built Drawing for Aprons - Concrete Pavement
Project:
UP#30-2 Activity:
ASBULT1140
on of As Built Drawing for Substations
Project:
UP#30-2 Activity:
ASBULT1150
of As Built Drawing for Substations
Project:
UP#30-2 Activity:
ASBULT1160
on of As Built Drawing for Air Side Road A3
Project:
UP#30-2 Activity:
ASBULT1170
of As Built Drawing for Air Side Road A3
Project:
UP#30-2 Activity:
ASBULT1200
on of As Built Drawing for Taxi ways - Asphalt works
Project:
UP#30-2 Activity:
ASBULT1210
of As Built Drawing for Taxi ways - Asphalt works
Project:
UP#30-2 Activity:
GEN0001220
NOCs
Project:
UP#30-2 Activity:
O&MMNL1000
n and Maintanance Manual for AGL Network - Submission
Project:
UP#30-2 Activity:
O&MMNL1010
n and Maintanance Manual for AGL Network - Approval
Project:
UP#30-2 Activity:
SEC2S11310
Inspection and Handoover -AGL SS
Project:
UP#30-2 Activity:
SEC2S11580
tion of Traffic Signal System
Project:
UP#30-2 Activity:
SEC2S11890
and Desnagging - Taxiway D (West of Taxiway G&H)
Project:
UP#30-2 Activity:
SEC2S12020
and Desnagging - Connecting Taxiway
Project:
UP#30-2 Activity:
SEC2S21090
round - New Apron Loop
Project:
UP#30-2 Activity:
SEC2S21120
ckfilling - New Apron Loop
Project:
UP#30-2 Activity:
SEC2S21630
Top slab installation
Project:
UP#30-2 Activity:
SEC2S21780
Internal finishing
Project:
UP#30-2 Activity:
SEC2S21900
ection pipe installation - West End (CH101A)
Project:
UP#30-2 Activity:
SEC2S22150
Torquing of Bolts/Nuts
Project:
UP#30-2 Activity:
SEC2S22270
HPV-37 & HPV-38 - Installation
Project:
UP#30-2 Activity:
SEC2S22290
orks to CH-22
Project:
UP#30-2 Activity:
SEC2S22500
e Laying in Section 4 (Main Cables)
Project:
UP#30-2 Activity:
SEC2S22630
e Laying in Section 6 (Main Cables)
Project:
UP#30-2 Activity:
SEC2S22650
e Laying in Section 7
Project:
UP#30-2 Activity:
SEC2S22910
Purging Loop 5.1 & 5.2 - T&C Preparation All HPs/LPs
Project:
UP#30-2 Activity:
SEC2S22950
Purging Loop 5.1 & 5.2 - Pneumatic, Air Blowing & Drying - Loop 5.2

Submissi
Submissi
Submissi
Submissi
Submissi
Approval
Submissi
Approval
Submissi
Approval
Project
Opeartio
Opeartio
ADAC AGL
Installa
Snagging
Snagging
Sand sur
Final ba
CH155 CH101A Leak det
CH-143 HPV-36,
Tie-In W
E&I Cabl
E&I Cabl
E&I Cabl
Nitrogen
Nitrogen

Project:
UP#30-2 Activity:
SEC2S22980
Nitrogen
Purging Loop 2.1 & 2.2 - CH-133 T&C Spools Instln RRC
Project:
UP#30-2 Activity:
SEC2S22990
Nitrogen
Purging Loop 2.1 & 2.2 - Pneumatic, Air Blowing & Drying - Loop 2.1
Project:
UP#30-2 Activity:
SEC2S23010
Nitrogen
Purging Loop 2.1 & 2.2 - Pneumatic, Air Blowing & Drying - Loop 2.2
Project:
UP#30-2 Activity:
SEC2S31400
CH156 24" Spool Preparation
Project:
UP#30-2 Activity:
SEC2S31420
CH156 RT Works
Project:
UP#30-2 Activity:
SEC2S31430
CH156 Drain & Vent Installation
Project:
UP#30-2 Activity:
SEC2S31470
CH156 Platform Installation
Project:
UP#30-2 Activity:
SEC2S31590
CH155 24" Pipe Welding
Project:
UP#30-2 Activity:
SEC2S31680
CH155 24" Spool Preparation
Project:
UP#30-2 Activity:
SEC2S31700
CH155 RT Works
Project:
UP#30-2 Activity:
SEC2S31710
CH155 Drain & Vent Installation
Project:
UP#30-2 Activity:
SEC2S31750
CH155 Platform Installation
Project:
UP#30-2 Activity:
SEC2S31940
CH154 Assembly of Flanges with DBB Valves
Project:
UP#30-2 Activity:
SEC2S32010
CH154 24" Welding Works
Project:
UP#30-2 Activity:
VO20
DVOR Monitor Ant
enna Relocation
Project:
UP#30-2 Activity:
VO33
MJF - Security G
ate Obstruction
Project:
UP#30-2 Activity:
VO35
MART AGL Primary
Cable Joints
Project:
UP#30-2 Activity:
VO37
AJF/MJF Interfac
e
Project:
UP#30-2 Activity:
VO38
MJF Hydrant Cont
rol Work Pk. 1
Project:
UP#30-2 Activity:
VO40
B2 Road Underpas
s Fence Removal
Project:
UP#30-2 Activity:
VO43
Surface Protecti
on Omission
Project:
UP#30-2 Activity:
VO48
MV & FOC Modific
ations
Project:
UP#30-2 Activity:
VO50
Taxiway F4 Remar
king
Project:
UP#30-2 Activity:
VO53
Cargo Stands Bar
riers
Project:
UP#30-2 Activity:
VO55
Foreman Dayworks
Project:
UP#30-2 Activity:
VO63
Barrier Preparat
ion for HLG
Project:
UP#30-2 Activity:
VO69
Stop Bar TWY C (
Near TWY H)
Project:
UP#30-2 Activity:
VO76
FATO Additional
Design
Project:
UP#30-2 Activity:
VO85
AGL Primary Cabl
e Laying Constraints
Project:
UP#30-2 Activity:
VO87
Taxiway D6 AGL R
erouting
Project:
UP#30-2 Activity:
VO90-1 Optional Items D

escope
Project:

UP#30-2 Activity:

VO92

Stop bar at Taxi

way D
Activities with Actual
Project:
Project:
Project:

Dates > Data Date.........................5


UP#30-2 Activity:
VO06
FATO Relocation
UP#30-2 Activity:
VO06-1 FATO Relocation
UP#30-2 Activity:
VO14-1 MART MJF Redesig

n
Project:

UP#30-2 Activity:

VO14-2 MART MJF Redesig

Project:

UP#30-2 Activity:

VO28

n
Fire Main Tie -

in Points
Milestone Activities with invalid relationships..................0
Finish milestone and predecessors have different calendars.......43
Project:
UP#30-2 Activity:
GEN0001030
Stage
Completion
Project:
UP#30-2 Activity:
GEN0001030
Stage
Completion
Project:
UP#30-2 Activity:
GEN0001030
Stage
Completion
Project:
UP#30-2 Activity:
GEN0001030
Stage
Completion
Project:
UP#30-2 Activity:
GEN0001030
Stage
Completion
Project:
UP#30-2 Activity:
GEN0001030
Stage
Completion
Project:
UP#30-2 Activity:
GEN0001030
Stage
Completion
Project:
UP#30-2 Activity:
GEN0001030
Stage
Completion
Project:
UP#30-2 Activity:
GEN0001030
Stage
Completion
Project:
UP#30-2 Activity:
GEN0001030
Stage
Completion
Project:
UP#30-2 Activity:
GEN0001030
Stage
Completion
Project:
UP#30-2 Activity:
GEN0001030
Stage
Completion
Project:
UP#30-2 Activity:
GEN0001030
Stage
Completion
Project:
UP#30-2 Activity:
GEN0001030
Stage
Completion
Project:
UP#30-2 Activity:
GEN0001030
Stage
Completion
Project:
UP#30-2 Activity:
GEN0001030
Stage
Completion
Project:
UP#30-2 Activity:
GEN0001030
Stage
Completion
Project:
UP#30-2 Activity:
GEN0001030
Stage
Completion
Project:
UP#30-2 Activity:
GEN0001030
Stage
Completion
Project:
UP#30-2 Activity:
GEN0001030
Stage
Completion
Project:
UP#30-2 Activity:
GEN0001040
Stage
Completion
Project:
UP#30-2 Activity:
GEN0001040
Stage

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2

Completion
Project:

UP#30-2 Activity:

GEN0001040

Stage 2

Project:

UP#30-2 Activity:

GEN0001040

Stage 2

Project:

UP#30-2 Activity:

GEN0001040

Stage 2

Project:

UP#30-2 Activity:

GEN0001040

Stage 2

Project:

UP#30-2 Activity:

GEN0001040

Stage 2

Project:

UP#30-2 Activity:

GEN0001040

Stage 2

Project:

UP#30-2 Activity:

GEN0001040

Stage 2

Project:

UP#30-2 Activity:

GEN0001040

Stage 2

Project:

UP#30-2 Activity:

GEN0001050

Stage 3

Project:

UP#30-2 Activity:

GEN0001050

Stage 3

Project:

UP#30-2 Activity:

GEN0001060

Stage 4

Project:

UP#30-2 Activity:

GEN0001060

Stage 4

Project:

UP#30-2 Activity:

GEN0001060

Stage 4

Project:

UP#30-2 Activity:

GEN0001060

Stage 4

Project:

UP#30-2 Activity:

GEN0001060

Stage 4

Project:

UP#30-2 Activity:

GEN0001060

Stage 4

Project:

UP#30-2 Activity:

GEN0001060

Stage 4

Project:

UP#30-2 Activity:

GEN0001060

Stage 4

Project:

UP#30-2 Activity:

GEN0001060

Stage 4

Project:

UP#30-2 Activity:

SEC2S22420

Access t

Project:

UP#30-2 Activity:

SEC2S41000

Fuel Far

Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
o SS 1164
m Availability
Scheduling/Leveling Results:
---------------------------# Projects Scheduled/Leveled.....................................1
# Activities Scheduled/Leveled...................................833
# Relationships with other projects..............................0
Data Date........................................................06-May16
Earliest Early Start Date........................................06-May16
Latest Early Finish Date.........................................31-Jan17
Number of float paths............................................10
Exceptions:
----------Critical Activities..............................................64
Project:
UP#30-2 Activity:
GEN0001060
Stage 4

Completion
Project:
UP#30-2 Activity:
PRCMT1130
ent 36" DBB Valves
Project:
UP#30-2 Activity:
PRCMT1175
ent 24" DBB Valves
Project:
UP#30-2 Activity:
PRCMTSD1170
ivery 36" DBB valves
Project:
UP#30-2 Activity:
PRCMTSD1175
ivery 24" DBB valves
Project:
UP#30-2 Activity:
SEC2S31410
Piping Installation with DBB valves
Project:
UP#30-2 Activity:
SEC2S31460
Insulation Gasket Kit Installation & Tourquing
Project:
UP#30-2 Activity:
SEC2S31690
Piping Installation with DBB valves
Project:
UP#30-2 Activity:
SEC2S31740
Insulation Gasket Kit Installation & Tourquing
Project:
UP#30-2 Activity:
SEC2S32290
o CH-135 Nitrogen Purging - Setting-up & Preparation
Project:
UP#30-2 Activity:
SEC2S32300
o CH-135 Nitrogen Purging - Pneumatic Testing
Project:
UP#30-2 Activity:
SEC2S32310
o CH-135 Nitrogen Purging - Air Blowing
Project:
UP#30-2 Activity:
SEC2S32320
o CH-135 Nitrogen Purging - Drying
Project:
UP#30-2 Activity:
SEC2S32330
o CH-135 Nitrogen Purging - Nitrogen Purging
Project:
UP#30-2 Activity:
SEC2S41010
- Preparation & Set-up
Project:
UP#30-2 Activity:
SEC2S41020
- Installation of Temporary Flushing Loops in CH-133 & CH-151
Project:
UP#30-2 Activity:
SEC2S41030
- Installation of BFs & Fuel Filling Loop in CH-139
Project:
UP#30-2 Activity:
SEC2S41040
- Installation of Christmas Trees on HPs & LPs
Project:
UP#30-2 Activity:
SEC2S41050
- Installation of Blind Flanges with Goose Neck Connection on HRs
Project:
UP#30-2 Activity:
SEC2S41060
- Fuel Filling in Loop 1B & Loop 1A
Project:
UP#30-2 Activity:
SEC2S41070
- Soak Testing of Loop 1B & Loop 1A
Project:
UP#30-2 Activity:
SEC2S41090
- Soak Test Sample & Approval
Project:
UP#30-2 Activity:
SEC2S41120
- Flushing & Filtration for Mainline & Millipore Test
Project:
UP#30-2 Activity:
SEC2S41130
- Flushing & Filtration of Risers & Millipore Test
Project:
UP#30-2 Activity:
SEC2S41140
- API Filtration
Project:
UP#30-2 Activity:
SEC2S41270
- Flushing & Filtration for Mainline & Millipore Test
Project:
UP#30-2 Activity:
SEC2S41280
- Flushing & Filtration of Risers & Millipore Test
Project:
UP#30-2 Activity:
SEC2S41290
- API Filtration
Project:
UP#30-2 Activity:
SEC2S41330
- Preparation & Set-up
Project:
UP#30-2 Activity:
SEC2S41340
- Installation of Temporary Flushing Loop in CH-110 & CH-113
Project:
UP#30-2 Activity:
SEC2S41350

Procurem
Procurem
Site Del
Site Del
CH156 CH156 CH155 CH155 CH-133 t
CH-133 t
CH-133 t
CH-133 t
CH-133 t
Loop 1B
Loop 1B
Loop 1B
Loop 1B
Loop 1B
Loop 1B
Loop 1B
Loop 1B
Loop 1B
Loop 1B
Loop 1B
Loop 1A
Loop 1A
Loop 1A
Loop 2A
Loop 2A
Loop 2A

- Installation of BFs in CH-112


Project:
UP#30-2 Activity:
SEC2S41360
- Installation of Christmas Trees on HPs & LPs
Project:
UP#30-2 Activity:
SEC2S41370
- Transfer of Fuel from Section Between CH-133 & CH-154 to Loop 2A
Project:
UP#30-2 Activity:
SEC2S41380
- Removal of Temporary Flushing Loop in CH-133 and Installation of BFs
Project:
UP#30-2 Activity:
SEC2S41390
- Installation of Temporary Flushing Loop in CH-133
Project:
UP#30-2 Activity:
SEC2S41400
- Fuel Filling in Loop 2A through Loop 1A
Project:
UP#30-2 Activity:
SEC2S41410
- Soak Testing of Loop 2A
Project:
UP#30-2 Activity:
SEC2S41440
- Soak Test Sample & Approval
Project:
UP#30-2 Activity:
SEC2S41450
- Flushing & Filtration for Mainline & Millipore Test
Project:
UP#30-2 Activity:
SEC2S41460
- Flushing & Filtration of Risers & Millipore Test
Project:
UP#30-2 Activity:
SEC2S41470
- API Filtration
Project:
UP#30-2 Activity:
SEC2S41510
- Preparation & Set-up
Project:
UP#30-2 Activity:
SEC2S41520
- Installation of Christmas Trees on HPs & LPs
Project:
UP#30-2 Activity:
SEC2S41530
- Fuel Filling in Loop 2B & 2C through Loop 2A
Project:
UP#30-2 Activity:
SEC2S41540
- Soak Testing of Loop 2B & 2C
Project:
UP#30-2 Activity:
SEC2S41550
- Pressure Testing of Loop 2B & 2C
Project:
UP#30-2 Activity:
SEC2S41570
- Removal of Blind Flanges in DBB Valve from CH-110
Project:
UP#30-2 Activity:
SEC2S41580
- l of Flushing Loop & Installation permanent connecting Spool between
Project:
UP#30-2 Activity:
SEC2S41590
- Flushing & Filtration for Mainline & Millipore Test
Project:
UP#30-2 Activity:
SEC2S41770
- Fuel Filling
Project:
UP#30-2 Activity:
SEC2S41780
-Soak Testing
Project:
UP#30-2 Activity:
SEC2S41800
- Soak Test Sample Approval
Project:
UP#30-2 Activity:
SEC2S41810
-Draining of Section
Project:
UP#30-2 Activity:
SEC2S41820
-Flip Spectacle Blind, Install Reducer and Valve
Project:
UP#30-2 Activity:
SEC2S41830
-Flushing of Mainline & Millipore Test
Project:
UP#30-2 Activity:
SEC2S41840
-Draining of Section
Project:
UP#30-2 Activity:
SEC2S41850
-Installation of Vents
Project:
UP#30-2 Activity:
SEC2S41860
-Re-Pressurizing to System Pressure
Project:
UP#30-2 Activity:
SEC2S42040
and Commissioning - PAKSCAN/EFSD Software calibration
Project:
UP#30-2 Activity:
SEC2S42050
and Commissioning - Automation of valves
Project:
UP#30-2 Activity:
SEC2S42060

Loop 2A
Loop 2A
Loop 2A
Loop 2A
Loop 2A
Loop 2A
Loop 2A
Loop 2A
Loop 2A
Loop 2A
Loop 2B
Loop 2B
Loop 2B
Loop 2B
Loop 2B
Loop 2B
Loop 2B
2B & 2A
Loop 2B
Loop 3B
Loop 3B
Loop 3B
Loop 3B
Loop 3B
Loop 3B
Loop 3B
Loop 3B
Loop 3B
Testing
Testing
Testing

and Commissioning - Emergency fuel shutdown


Project:
UP#30-2 Activity:
and Commissioning - LDS software set-up
Project:
UP#30-2 Activity:
and Commissioning - Calibration of TCS and LDS
Project:
UP#30-2 Activity:
Desnagging of MJF line

SEC2S42070

Testing

SEC2S42080

Testing

SEC2S42090

Snag and

Activities with unsatisfied constraints..........................11


Project:
UP#30-2 Activity:
GEN0001030
Stage 1
Completion
Project:
UP#30-2 Activity:
GEN0001040
Stage 2
Completion
Project:
UP#30-2 Activity:
GEN0001050
Stage 3
Completion
Project:
UP#30-2 Activity:
GEN0001060
Stage 4
Completion
Project:
UP#30-2 Activity:
GEN0001210
Availabi
lity of Fuel in Fuel Farm
Project:
UP#30-2 Activity:
SEC2S22420
Access t
o SS 1164
Project:
UP#30-2 Activity:
SEC2S22560
Cable Du
ct Civil Work Completion (VO)
Project:
UP#30-2 Activity:
SEC2S22640
Cable Du
ct Civil Work Completion Section 7
Project:
UP#30-2 Activity:
SEC2S31000
CH101A Trench Civil Work Completion
Project:
UP#30-2 Activity:
SEC2S32430
Fuel Far
m and Control Room Availability
Project:
UP#30-2 Activity:
SEC2S41000
Fuel Far
m Availability
Activities with unsatisfied relationships........................0

e
e
e
e
e
e
n

Activities with external dates...................................7


Project:
UP#30-2 Activity:
SEC2S22410
E&I
laying in Section2 - Cables connected to SS 1164
Project:
UP#30-2 Activity:
SEC2S22450
E&I
Laying in Section 3 (Except Main Cables)
Project:
UP#30-2 Activity:
SEC2S22480
E&I
Laying in Section 4 (except new Apron chambers)
Project:
UP#30-2 Activity:
SEC2S22530
E&I
Laying in Section 1 (Except Main Cables)
Project:
UP#30-2 Activity:
SEC2S22580
E&I
Laying in Section 5 (Except Fuel Farm Control Room)
Project:
UP#30-2 Activity:
SEC2S22650
E&I
Laying in Section 7
Project:
UP#30-2 Activity:
SEC2S32120
New
Loop - Continuity & Loop Checking

Cabl
Cabl
Cabl
Cabl
Cabl
Cabl
Apro

Activities that are not on any float paths.......................760


Project:
UP#30-2 Activity:
ASBULT1000
Submissi
on of As Built Drawing for Storm water works
Project:
UP#30-2 Activity:
ASBULT1010
Approval
of As Built Drawing for Storm water works
Project:
UP#30-2 Activity:
ASBULT1020
Submissi
on of As Built Drawing for Electrical works
Project:
UP#30-2 Activity:
ASBULT1030
Approval
of As Built Drawing for Electrical works
Project:
UP#30-2 Activity:
ASBULT1040
Submissi

on of As Built Drawing for Fire Fighting works


Project:
UP#30-2 Activity:
of As Built Drawing for Fire Fighting works
Project:
UP#30-2 Activity:
on of As Built Drawing for AGL works
Project:
UP#30-2 Activity:
of As Built Drawing for AGL works
Project:
UP#30-2 Activity:
on of As Built Drawing for S1 - Section 1
Project:
UP#30-2 Activity:
of As Built Drawing for S1 - Section 1
Project:
UP#30-2 Activity:
on of As Built Drawing for MS1 - Milestone 1
Project:
UP#30-2 Activity:
of As Built Drawing for MS1 - Milestone 1
Project:
UP#30-2 Activity:
on of As Built Drawing for Aprons - Concrete Pavement
Project:
UP#30-2 Activity:
of As Built Drawing for Aprons - Concrete Pavement
Project:
UP#30-2 Activity:
on of As Built Drawing for Substations
Project:
UP#30-2 Activity:
of As Built Drawing for Substations
Project:
UP#30-2 Activity:
on of As Built Drawing for Air Side Road A3
Project:
UP#30-2 Activity:
of As Built Drawing for Air Side Road A3
Project:
UP#30-2 Activity:
on of As Built Drawing for Temporary Road R3
Project:
UP#30-2 Activity:
of As Built Drawing for Temporary Road R3
Project:
UP#30-2 Activity:
on of As Built Drawing for Taxi ways - Asphalt works
Project:
UP#30-2 Activity:
of As Built Drawing for Taxi ways - Asphalt works
Project:
UP#30-2 Activity:
oncept - VO37 (AJF/MJF INterface)
Project:
UP#30-2 Activity:
cuments - VO37 (AJF/MJF INterface)
Project:
UP#30-2 Activity:
Approval of Insulation Gasket kit
Project:
UP#30-2 Activity:
Approval of 24" Ball Valves
Project:
UP#30-2 Activity:
Approval of CNAF Gasket
Project:
UP#30-2 Activity:
Approval of CS Spectacle Blind
Project:
UP#30-2 Activity:
Approval - VO37 (AJF/MJF INterface)
Project:
UP#30-2 Activity:
Submittal of Insulation Gasket kit
Project:
UP#30-2 Activity:
Submittal of 24" Ball Valves
Project:
UP#30-2 Activity:
Submittal of CNAF Gasket
Project:
UP#30-2 Activity:
Submittal of CS Spectacle Blind
Project:
UP#30-2 Activity:
Submittal- VO37 (AJF/MJF INterface)
Project:
UP#30-2 Activity:

ASBULT1050

Approval

ASBULT1060

Submissi

ASBULT1070

Approval

ASBULT1080

Submissi

ASBULT1090

Approval

ASBULT1100

Submissi

ASBULT1110

Approval

ASBULT1120

Submissi

ASBULT1130

Approval

ASBULT1140

Submissi

ASBULT1150

Approval

ASBULT1160

Submissi

ASBULT1170

Approval

ASBULT1180

Submissi

ASBULT1190

Approval

ASBULT1200

Submissi

ASBULT1210

Approval

EN00001000

Design C

EN00001010

QA/QC Do

ENMTAP1000

Material

ENMTAP1010

Material

ENMTAP1020

Material

ENMTAP1030

Material

ENMTAP1040

Material

ENMTSB1000

Material

ENMTSB1010

Material

ENMTSB1020

Material

ENMTSB1030

Material

ENMTSB1040

Material

ENSD001000

Shop Dra

wings Submitted and Approved till 5th August


Project:
UP#30-2 Activity:
ENSDAP1000
wign Approval - Parking & Fencing
Project:
UP#30-2 Activity:
ENSDAP1010
al Design Specification (FDS) Approval - VO37 (AJF/MJF Interface)
Project:
UP#30-2 Activity:
ENSDAP1020
rawings - VO37 (AJF/MJF Interface) - Approval
Project:
UP#30-2 Activity:
ENSDSB1000
wing Submission - Parking & Fencing
Project:
UP#30-2 Activity:
ENSDSB1010
al Design Specification (FDS) Submission
Project:
UP#30-2 Activity:
ENSDSB1020
rawings - VO37 (AJF/MJF Interface) - Submission
Project:
UP#30-2 Activity:
GEN0001000
Start
Project:
UP#30-2 Activity:
GEN0001010
final MJF IFC-06 from ADAC
Project:
UP#30-2 Activity:
GEN0001020
Instruction from ADAC to procure additional MJF Pipe fittings & Valves
Project:
UP#30-2 Activity:
GEN0001030
Completion
Project:
UP#30-2 Activity:
GEN0001040
Completion
Project:
UP#30-2 Activity:
GEN0001050
Completion
Project:
UP#30-2 Activity:
GEN0001070
o F3 in the GCAA Area
Project:
UP#30-2 Activity:
GEN0001080
o CH147 - East end in the GCAA Area
Project:
UP#30-2 Activity:
GEN0001090
o West end
Project:
UP#30-2 Activity:
GEN0001100
o Presidential Flight area
Project:
UP#30-2 Activity:
GEN0001110
o Area (For Remaining Fire Fighting Work)
Project:
UP#30-2 Activity:
GEN0001120
n Fuel Farm Control Room
Project:
UP#30-2 Activity:
GEN0001130
of NTP with Procurement (VO38)
Project:
UP#30-2 Activity:
GEN0001140
l of VO 072 - IFC 33 Cost Proposal
Project:
UP#30-2 Activity:
GEN0001150
of VO 072 - IFC 33 Cost Proposal
Project:
UP#30-2 Activity:
GEN0001160
of VO 37
Project:
UP#30-2 Activity:
GEN0001170
Meeting - VO37 (AJF/MJF INterface)
Project:
UP#30-2 Activity:
GEN0001180
ersion by HLG to its final position
Project:
UP#30-2 Activity:
GEN0001190
on of Substation 1164 by Other Contractor
Project:
UP#30-2 Activity:
GEN0001200
lity of Fuel Farm (Installation of instruments)
Project:
UP#30-2 Activity:
GEN0001210
lity of Fuel in Fuel Farm
Project:
UP#30-2 Activity:
GEN0001220
NOCs
Project:
UP#30-2 Activity:
GEN0001230
ual Submission
Project:
UP#30-2 Activity:
GEN0001240

Shop Dra
Function
Design D
Shop Dra
Function
Design D
Project
Receive
Receive
Stage 1
Stage 2
Stage 3
Access t
Access t
Access t
Access t
Access t
Access i
Receipt
Submitta
Approval
Approval
Kick-off
Road div
Completi
Availabi
Availabi
Project
Contarct
Mobilisa

tion and Demobilisation


Project:
UP#30-2 Activity:
e 1
Project:
UP#30-2 Activity:
n and Maintanance Manual for AGL Network - Submission
Project:
UP#30-2 Activity:
n and Maintanance Manual for AGL Network - Approval
Project:
UP#30-2 Activity:
n and Maintanance Manual for MJF Network - Submission
Project:
UP#30-2 Activity:
n and Maintanance Manual for MJF Network - Approval
Project:
UP#30-2 Activity:
n and Maintanance Manual for Telecommunication Network
Project:
UP#30-2 Activity:
n and Maintanance Manual for Telecommunication Network
Project:
UP#30-2 Activity:
ent Stud Bolts
Project:
UP#30-2 Activity:
ent Heat Shrink Sleeve
Project:
UP#30-2 Activity:
ent Link Seal
Project:
UP#30-2 Activity:
ent End Seal
Project:
UP#30-2 Activity:
ent CS Pipes
Project:
UP#30-2 Activity:
ent CS Fittings
Project:
UP#30-2 Activity:
ent CS WNR Flanges
Project:
UP#30-2 Activity:
ent CS Blind Flanges
Project:
UP#30-2 Activity:
ent HP Vent Assembly
Project:
UP#30-2 Activity:
ent Puddle Flanges
Project:
UP#30-2 Activity:
ent Pipe Supports
Project:
UP#30-2 Activity:
ent Valve Operating Platforms
Project:
UP#30-2 Activity:
ent Manhole Cover
Project:
UP#30-2 Activity:
ent Insulation Gasket Kits
Project:
UP#30-2 Activity:
ent CNAF Gasket
Project:
UP#30-2 Activity:
ent Ball Valves
Project:
UP#30-2 Activity:
ent CS Spectacle Blind
Project:
UP#30-2 Activity:
ent of additional Pipe Fittings (VO-38)
Project:
UP#30-2 Activity:
ent Leak Detection System
Project:
UP#30-2 Activity:
ent Instruments Cables
Project:
UP#30-2 Activity:
ent Earthing Material
Project:
UP#30-2 Activity:
ent Power Cables
Project:
UP#30-2 Activity:

MS10001000

Mileston

O&MMNL1000

Opeartio

O&MMNL1010

Opeartio

O&MMNL1020

Opeartio

O&MMNL1030

Opeartio

O&MMNL1040
- Submission
O&MMNL1050
- Approval
PRCMT1000

Operatio

PRCMT1010

Procurem

PRCMT1020

Procurem

PRCMT1030

Procurem

PRCMT1040

Procurem

PRCMT1050

Procurem

PRCMT1060

Procurem

PRCMT1070

Procurem

PRCMT1080

Procurem

PRCMT1090

Procurem

PRCMT1100

Procurem

PRCMT1110

Procurem

PRCMT1120

Procurem

PRCMT1140

Procurem

PRCMT1150

Procurem

PRCMT1160

Procurem

PRCMT1170

Procurem

PRCMT1180

Procurem

PRCMT1185

Procurem

PRCMT1190

Procurem

PRCMT1200

Procurem

PRCMT1210

Procurem

PRCMT1220

Procurem

Operatio
Procurem

ent Earth Cables


Project:
ent Junction Box
Project:
ent SDB & FDB
Project:
ent Tightness Control System
Project:
ent Temperature Transmitter
Project:
ent Thermowells
Project:
ent Pressure Transmitter
Project:
ent Pressure Gauge
Project:
ent Level Transmitter
Project:
ent MOV Isolator Switch
Project:
ent Cathodic Protection System
Project:
ent Cable Trays & Accessories
Project:
ent Cable Glands, Glands & Ties
Project:
ivery Stud Bolts
Project:
ivery Heat Shrink Sleeve
Project:
ivery Insulation Gasket Kit
Project:
ivery Link Seal
Project:
ivery End Seal
Project:
ivery CNAF Gasket
Project:
ivery CS Pipes
Project:
ivery CS Fittings
Project:
ivery CS WNR Flanges
Project:
ivery CS Blind Flanges
Project:
ivery HP Vent Assembly
Project:
ivery Puddle Flanges
Project:
ivery Pipe Supports
Project:
ivery Valve Operating Platforms
Project:
ivery CS Spectacle Blind
Project:
ivery Manhole Cover
Project:
ivery Ball Valves
Project:

UP#30-2 Activity:

PRCMT1230

Procurem

UP#30-2 Activity:

PRCMT1240

Procurem

UP#30-2 Activity:

PRCMT1250

Procurem

UP#30-2 Activity:

PRCMT1260

Procurem

UP#30-2 Activity:

PRCMT1270

Procurem

UP#30-2 Activity:

PRCMT1280

Procurem

UP#30-2 Activity:

PRCMT1290

Procurem

UP#30-2 Activity:

PRCMT1300

Procurem

UP#30-2 Activity:

PRCMT1310

Procurem

UP#30-2 Activity:

PRCMT1320

Procurem

UP#30-2 Activity:

PRCMT1330

Procurem

UP#30-2 Activity:

PRCMT1340

Procurem

UP#30-2 Activity:

PRCMTSD1000

Site Del

UP#30-2 Activity:

PRCMTSD1010

Site Del

UP#30-2 Activity:

PRCMTSD1020

Site Del

UP#30-2 Activity:

PRCMTSD1030

Site Del

UP#30-2 Activity:

PRCMTSD1040

Site Del

UP#30-2 Activity:

PRCMTSD1050

Site Del

UP#30-2 Activity:

PRCMTSD1060

Site Del

UP#30-2 Activity:

PRCMTSD1070

Site Del

UP#30-2 Activity:

PRCMTSD1080

Site Del

UP#30-2 Activity:

PRCMTSD1090

Site Del

UP#30-2 Activity:

PRCMTSD1100

Site Del

UP#30-2 Activity:

PRCMTSD1110

Site Del

UP#30-2 Activity:

PRCMTSD1120

Site Del

UP#30-2 Activity:

PRCMTSD1130

Site Del

UP#30-2 Activity:

PRCMTSD1140

Site Del

UP#30-2 Activity:

PRCMTSD1150

Site Del

UP#30-2 Activity:

PRCMTSD1160

Site Del

UP#30-2 Activity:

PRCMTSD1180

Site Del

ivery Cable Trays & Accessories


Project:
UP#30-2 Activity:
PRCMTSD1190
ivery Cable Glands, Glands & Ties
Project:
UP#30-2 Activity:
PRCMTSD1200
ivery Leak Detection System
Project:
UP#30-2 Activity:
PRCMTSD1210
ivery Instruments Cables
Project:
UP#30-2 Activity:
PRCMTSD1220
ivery Earthing Material
Project:
UP#30-2 Activity:
PRCMTSD1230
ivery Power Cables
Project:
UP#30-2 Activity:
PRCMTSD1240
ivery Earth Cables
Project:
UP#30-2 Activity:
PRCMTSD1250
ivery Junction Box
Project:
UP#30-2 Activity:
PRCMTSD1260
ivery SDB & FDB
Project:
UP#30-2 Activity:
PRCMTSD1270
ivery Cathodic Protection System
Project:
UP#30-2 Activity:
PRCMTSD1280
ivery Tightness Control System
Project:
UP#30-2 Activity:
PRCMTSD1290
ivery Temperature Transmitter
Project:
UP#30-2 Activity:
PRCMTSD1300
ivery Pressure Transmitter
Project:
UP#30-2 Activity:
PRCMTSD1310
ivery Pressure Gauge
Project:
UP#30-2 Activity:
PRCMTSD1320
ivery Level Transmitter
Project:
UP#30-2 Activity:
PRCMTSD1330
ivery MOV Isolator Switch
Project:
UP#30-2 Activity:
PRCMTSD1340
ivery Thermowells
Project:
UP#30-2 Activity:
PRCMTSD1345
ent and Site Delivery- Required for LV Panel Modification
Project:
UP#30-2 Activity:
PRCMTSD1350
ent and Site Delivery Addtionaol Work - 400Hz Cable
Project:
UP#30-2 Activity:
PRCMTSD1360
ent and Site Delivery Bollard
Project:
UP#30-2 Activity:
PRCMTSD1370
ent and Site Delivery Generators for MV Substations
Project:
UP#30-2 Activity:
PRCMTSD1380
ent and Site Delivery Doors for AGL Substation
Project:
UP#30-2 Activity:
PRCMTSD1390
ent and Site Delivery Windows for AGL Substation
Project:
UP#30-2 Activity:
PRCMTSD1400
ent and Site Delivery Crash Gate - A3 Road
Project:
UP#30-2 Activity:
PRCMTSD1410
ent and Site Delivery Stop Bar Light - A3 Link Road
Project:
UP#30-2 Activity:
PRCMTSD1420
ent and Site Delivery CCTV System - A3 link Road
Project:
UP#30-2 Activity:
PRCMTSD1430
ent and Site Delivery Traffic Signal System - A3 Link Road
Project:
UP#30-2 Activity:
PRCMTSD1440
ent and Site Delivery Guard Rail - A3 Link Road
Project:
UP#30-2 Activity:
PRCMTSD1450
ent and Site Delivery Additional SIgns - Taxiway C
Project:
UP#30-2 Activity:
PRCMTSD1460
ent and Site Delivery Roman Numerals
Project:
UP#30-2 Activity:
PRCMTSD1490

Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Procurem
Procurem
Procurem
Procurem
Procurem
Procurem
Procurem
Procurem
Procurem
Procurem
Procurem
Procurem
Procurem
Procurem

ent and Site Delivery of Fire Extinguishers for Cargo Apron (VO-65)
Project:
UP#30-2 Activity:
PRCMTSD1500
ent and Site Delivery RVR Gantries and Field box (VO-61)
Project:
UP#30-2 Activity:
PRCMTSD1520
ent and Site Delivery (AJF/MJF Interface)
Project:
UP#30-2 Activity:
PRCMTSD1530
ent and Site Delivery of SCADA System (VO-32)
Project:
UP#30-2 Activity:
SEC1001000
1
Project:
UP#30-2 Activity:
SEC2001000
nway And Taxiways (Package 2) as on 5th August 2015
Project:
UP#30-2 Activity:
SEC2001010
field Cargo Apron PAL 2
Project:
UP#30-2 Activity:
SEC2001020
Hydrant System
Project:
UP#30-2 Activity:
SEC2001030
meter Fence
Project:
UP#30-2 Activity:
SEC2S11000
Installation -EMCA
Project:
UP#30-2 Activity:
SEC2S11010
and Desnagging -EMCA
Project:
UP#30-2 Activity:
SEC2S11020
o Work - ATCT Connection
Project:
UP#30-2 Activity:
SEC2S11030
tic Cabling - EMCA
Project:
UP#30-2 Activity:
SEC2S11040
ons and Termination with ATCT
Project:
UP#30-2 Activity:
SEC2S11050
ble Installation - EMCA
Project:
UP#30-2 Activity:
SEC2S11060
and Commissioning of VDGS
Project:
UP#30-2 Activity:
SEC2S11070
and Commissioning of CCTVs
Project:
UP#30-2 Activity:
SEC2S11080
and Commissioning - EMCA
Project:
UP#30-2 Activity:
SEC2S11090
ergisation
Project:
UP#30-2 Activity:
SEC2S11100
g Civil Works - MV SS
Project:
UP#30-2 Activity:
SEC2S11110
and Desnagging - MV SS
Project:
UP#30-2 Activity:
SEC2S11120
r Installation - MV SS
Project:
UP#30-2 Activity:
SEC2S11130
Modification - MV SS
Project:
UP#30-2 Activity:
SEC2S11140
tic Panel Installation - MV SS
Project:
UP#30-2 Activity:
SEC2S11150
tic Connection to ATCT
Project:
UP#30-2 Activity:
SEC2S11160
hting System - Testing and Commissioning - MV SS
Project:
UP#30-2 Activity:
SEC2S11170
Inspection - MV SS
Project:
UP#30-2 Activity:
SEC2S11180
Inspection - MV SS
Project:
UP#30-2 Activity:
SEC2S11190
pection and Handover - MV SS
Project:
UP#30-2 Activity:
SEC2S11200
tion of Door (Remaining) - AGL SS
Project:
UP#30-2 Activity:
SEC2S11210

Procurem
Procurem
Procurem
Section
South Ru
East Mid
New Fuel
AOA Peri
Bollard
Snagging
Permit t
Fiber Op
Connecti
400Hz Ca
Testing
Testing
Testing
Stand En
Remainin
Snagging
Generato
LV Panel
Fiber Op
Fiber Op
Fire Fig
ADDC LV
ADDC MV
ADAC Ins
Installa
Installa

tion of Window (Remaining) - AGL SS


Project:
UP#30-2 Activity:
and Desnagging - AGL SS
Project:
UP#30-2 Activity:
r Installation - AGL SS
Project:
UP#30-2 Activity:
Unit Installation - AGL SS
Project:
UP#30-2 Activity:
tenuator Installation - AGL SS
Project:
UP#30-2 Activity:
tic Connection to ATCT
Project:
UP#30-2 Activity:
hting System - Testing and Commissioning - AGL SS
Project:
UP#30-2 Activity:
r Testing and Commissioning - AGL SS
Project:
UP#30-2 Activity:
Modification - AGL SS
Project:
UP#30-2 Activity:
g from Temporary to Permanent A/C - AGL SS
Project:
UP#30-2 Activity:
and Commissioning of Fire Alarm
Project:
UP#30-2 Activity:
Inspection and Handoover -AGL SS
Project:
UP#30-2 Activity:
pection and Handoover - AGL SS
Project:
UP#30-2 Activity:
Storm Water Chamber - East End - A3 Road
Project:
UP#30-2 Activity:
e East End
Project:
UP#30-2 Activity:
on of Work by HLG
Project:
UP#30-2 Activity:
Bank North of EMCA
Project:
UP#30-2 Activity:
Bank Landside to SS PU-3
Project:
UP#30-2 Activity:
Road Studs
Project:
UP#30-2 Activity:
Parking & Fencing (SS1205)
Project:
UP#30-2 Activity:
te Installation
Project:
UP#30-2 Activity:
Parking & Fencing (SS1204)
Project:
UP#30-2 Activity:
e SS PU-4 to HLG Underpass
Project:
UP#30-2 Activity:
Parking & Fencing (SS1206)
Project:
UP#30-2 Activity:
Gate A2 (by others)
Project:
UP#30-2 Activity:
and Desangging - A3 Road
Project:
UP#30-2 Activity:
pproval of New Insatlled Fence
Project:
UP#30-2 Activity:
into SS PU-5
Project:
UP#30-2 Activity:
into SS PU-4
Project:
UP#30-2 Activity:
ight Cabling - North of EMCA
Project:
UP#30-2 Activity:

SEC2S11220

Snagging

SEC2S11230

Generato

SEC2S11240

Chiller

SEC2S11250

Sound At

SEC2S11260

Fiber Op

SEC2S11270

Fire Fig

SEC2S11280

Generato

SEC2S11290

Software

SEC2S11300

Switchin

SEC2S11305

Testing

SEC2S11310

ADAC AGL

SEC2S11320

GCAA Ins

SEC2S11330

Complete

SEC2S11340

AOA Fenc

SEC2S11350

Completi

SEC2S11360

SL Duct

SEC2S11370

SL Duct

SEC2S11380

Install

SEC2S11390

SS PU-5

SEC2S11400

Crash Ga

SEC2S11410

SS PU-4

SEC2S11420

AOA Fenc

SEC2S11430

SS PU-3

SEC2S11440

Relocate

SEC2S11450

Snagging

SEC2S11460

Police A

SEC2S11470

LV Cable

SEC2S11480

LV Cable

SEC2S11490

Street L

SEC2S11500

Fedder P

illar Installation
Project:
UP#30-2 Activity:
SEC2S11510
into SS PU-3
Project:
UP#30-2 Activity:
SEC2S11520
ter Chamber Internal Finishing - A3 Link Road
Project:
UP#30-2 Activity:
SEC2S11530
il Installation - A3 Link Road
Project:
UP#30-2 Activity:
SEC2S11540
ing Work Completion in Aviation Area
Project:
UP#30-2 Activity:
SEC2S11550
Widening @ Stand 222
Project:
UP#30-2 Activity:
SEC2S11560
ubmission - Traffic Signal System
Project:
UP#30-2 Activity:
SEC2S11570
pproval - Traffic Signal System
Project:
UP#30-2 Activity:
SEC2S11580
tion of Traffic Signal System
Project:
UP#30-2 Activity:
SEC2S11590
tion of Stop Bars F3 - F5
Project:
UP#30-2 Activity:
SEC2S11600
tion of CCTV to F3 & F5
Project:
UP#30-2 Activity:
SEC2S11610
and Commissioning
Project:
UP#30-2 Activity:
SEC2S11620
o Runways
Project:
UP#30-2 Activity:
SEC2S11630
ber Stencilling (Ch 4+100 - Ch2+810) - Taxiway C (East of Taxiway G&H)
Project:
UP#30-2 Activity:
SEC2S11640
merals Installation - Taxiway C (East of Taxiway G&H)
Project:
UP#30-2 Activity:
SEC2S11650
and Desnagging - Taxiway C (East of Taxiway G&H)
Project:
UP#30-2 Activity:
SEC2S11660
pection - Taxiway C (East of Taxiway G&H)
Project:
UP#30-2 Activity:
SEC2S11670
Over - Taxiway C (East of Taxiway G&H)
Project:
UP#30-2 Activity:
SEC2S11680
rea Fence
Project:
UP#30-2 Activity:
SEC2S11690
& Secondary Cabling - West of Taxiway G&H
Project:
UP#30-2 Activity:
SEC2S11700
st Installation - West of Taxiway G&H
Project:
UP#30-2 Activity:
SEC2S11710
ber Stencilling (Ch 2+810 - Ch1+460) - Taxiway C
Project:
UP#30-2 Activity:
SEC2S11720
al Signs Installation - Taxiway C (West of Taxiway G&H)
Project:
UP#30-2 Activity:
SEC2S11730
merals Installation - Taxiway C (West of Taxiway G&H)
Project:
UP#30-2 Activity:
SEC2S11740
and Commissioning - Taxiway C (West of Taxiway G&H)
Project:
UP#30-2 Activity:
SEC2S11750
and Desnagging - Taxiway C (West of Taxiway G&H)
Project:
UP#30-2 Activity:
SEC2S11760
pection - Taxiway C (West of Taxiway G&H)
Project:
UP#30-2 Activity:
SEC2S11770
Over - Taxiway C (West of Taxiway G&H)
Project:
UP#30-2 Activity:
SEC2S11780
ber Stencilling (Ch 4+100 - Ch2+810) - Taxiway D (East of Taxiway G&H)
Project:
UP#30-2 Activity:
SEC2S11790
merals Installation - Taxiway D (East of Taxiway G&H)
Project:
UP#30-2 Activity:
SEC2S11800

LV Cable
Storm Wa
Guard Ra
Backfill
A3 Road
Design S
Design A
Installa
Installa
Installa
Testing
Access t
AGL Cham
Roman Nu
Snagging
GCAA Ins
Handing
Tunnel A
Primary
AGL Ligh
AGL Chma
Addition
Roman Nu
Testing
Snagging
GCAA Ins
Handing
AGL Chma
Roman Nu
Snagging

and Desnagging - Taxiway D (East of Taxiway G&H)


Project:
UP#30-2 Activity:
SEC2S11810
pection - Taxiway D (East of Taxiway G&H)
Project:
UP#30-2 Activity:
SEC2S11820
Over - Taxiway D (East of Taxiway G&H)
Project:
UP#30-2 Activity:
SEC2S11830
g Work - Fire Fighting Duct Constrcution
Project:
UP#30-2 Activity:
SEC2S11840
and Commissioning - Fire Fighting Network
Project:
UP#30-2 Activity:
SEC2S11850
ber Stencilling (Ch 2+810 - Ch1+460) - Taxiway D (West of Taxiway G&H)
Project:
UP#30-2 Activity:
SEC2S11860
Lights Installation - Taxiway D
Project:
UP#30-2 Activity:
SEC2S11870
merals Installation -Taxiway D (West of Taxiway G&H)
Project:
UP#30-2 Activity:
SEC2S11880
and Commissioning -Taxiway D (West of Taxiway G&H)
Project:
UP#30-2 Activity:
SEC2S11890
and Desnagging - Taxiway D (West of Taxiway G&H)
Project:
UP#30-2 Activity:
SEC2S11900
pection -Taxiway D (West of Taxiway G&H)
Project:
UP#30-2 Activity:
SEC2S11910
Over - Taxiway D (West of Taxiway G&H)
Project:
UP#30-2 Activity:
SEC2S11920
Lights and Transformer Installation- Connecting Taxiway D1
Project:
UP#30-2 Activity:
SEC2S11930
Lights and Transformer Installation- Connecting Taxiway D2
Project:
UP#30-2 Activity:
SEC2S11940
and Commissioning - Taxiway D1
Project:
UP#30-2 Activity:
SEC2S11950
Lights and Transformer Installation- Connecting Taxiway D3
Project:
UP#30-2 Activity:
SEC2S11960
and Commissioning - Taxiway D2
Project:
UP#30-2 Activity:
SEC2S11970
Lights and Transformer Installation- Connecting Taxiway D4
Project:
UP#30-2 Activity:
SEC2S11980
and Commissioning - Taxiway D3
Project:
UP#30-2 Activity:
SEC2S11990
Lights and Transformer Installation- Connecting Taxiway D5
Project:
UP#30-2 Activity:
SEC2S12000
and Commissioning - Taxiway D4
Project:
UP#30-2 Activity:
SEC2S12010
and Commissioning - Taxiway D5
Project:
UP#30-2 Activity:
SEC2S12020
and Desnagging - Connecting Taxiway
Project:
UP#30-2 Activity:
SEC2S12030
pection - Connecting Taxiways
Project:
UP#30-2 Activity:
SEC2S12040
Over - Connecting Taxiways
Project:
UP#30-2 Activity:
SEC2S21000
s Installation (MART)
Project:
UP#30-2 Activity:
SEC2S21010
tion of SDB and FDB
Project:
UP#30-2 Activity:
SEC2S21030
ing - West End (CH101A)
Project:
UP#30-2 Activity:
SEC2S21040
P&I Duct banks and EDP chambers installation - West End (CH101A)
Project:
UP#30-2 Activity:
SEC2S21050
ckfilling - West End (CH101A)
Project:
UP#30-2 Activity:
SEC2S21060

GCAA Ins
Handing
Remainin
Testing
AGL Chma
Stop Bar
Roman Nu
Testing
Snagging
GCAA Ins
Handing
Cabling,
Cabling,
Testing
Cabling,
Testing
Cabling,
Testing
Cabling,
Testing
Testing
Snagging
GCAA Ins
Handing
E&I Duct
Modifica
Backfill
Concrete
Final ba
Concrete

P&I Duct banks and EDP chambers installation - Additional Cable Ducts
Depot
Project:
UP#30-2 Activity:
SEC2S21070
ckfilling - Additional Cable Ducts Near Fuel Depot
Project:
UP#30-2 Activity:
SEC2S21080
on - New Apron Loop
Project:
UP#30-2 Activity:
SEC2S21090
round - New Apron Loop
Project:
UP#30-2 Activity:
SEC2S21100
ing - New Apron Loop
Project:
UP#30-2 Activity:
SEC2S21110
P&I Duct banks and EDP chambers installation - New Apron Loop
Project:
UP#30-2 Activity:
SEC2S21120
ckfilling - New Apron Loop
Project:
UP#30-2 Activity:
SEC2S21130
on - CH147 - East End
Project:
UP#30-2 Activity:
SEC2S21140
round - CH147 - East End
Project:
UP#30-2 Activity:
SEC2S21150
ing - CH147 - East End
Project:
UP#30-2 Activity:
SEC2S21160
P&I Duct banks and EDP chambers installation - CH147 - East End
Project:
UP#30-2 Activity:
SEC2S21170
ckfilling - CH147 - East End
Project:
UP#30-2 Activity:
SEC2S21180
reinstatement - CH147 - East End
Project:
UP#30-2 Activity:
SEC2S21190
on - F3 to CH148
Project:
UP#30-2 Activity:
SEC2S21200
round- F3 to CH148
Project:
UP#30-2 Activity:
SEC2S21210
ing - F3 to CH148
Project:
UP#30-2 Activity:
SEC2S21220
P&I Duct banks and EDP chambers installation - F3 to CH148
Project:
UP#30-2 Activity:
SEC2S21230
ckfilling - F3 to CH148
Project:
UP#30-2 Activity:
SEC2S21240
Excavation
Project:
UP#30-2 Activity:
SEC2S21250
Base concreting
Project:
UP#30-2 Activity:
SEC2S21260
Wall -1st Lift concreting
Project:
UP#30-2 Activity:
SEC2S21270
Wall - 2nd Lift concreting
Project:
UP#30-2 Activity:
SEC2S21280
Water proofing
Project:
UP#30-2 Activity:
SEC2S21290
Backfilling
Project:
UP#30-2 Activity:
SEC2S21300
Internal finishing
Project:
UP#30-2 Activity:
SEC2S21310
Top slab installation
Project:
UP#30-2 Activity:
SEC2S21320
Excavation
Project:
UP#30-2 Activity:
SEC2S21330
Base concreting
Project:
UP#30-2 Activity:
SEC2S21340
Wall -1st Lift concreting
Project:
UP#30-2 Activity:
SEC2S21350
Wall - 2nd Lift concreting

Near Fuel
Final ba
Excavati
Sand sur
Backfill
Concrete
Final ba
Excavati
Sand sur
Backfill
Concrete
Final ba
Pavement
Excavati
Sand sur
Backfill
Concrete
Final ba
CH147 CH147 CH147 CH147 CH147 CH147 CH147 CH147 CH148 CH148 CH148 CH148 -

Project:

UP#30-2 Activity:

SEC2S21360

CH148 -

Project:

UP#30-2 Activity:

SEC2S21370

CH148 -

UP#30-2 Activity:

SEC2S21380

CH148 -

UP#30-2 Activity:

SEC2S21390

CH148 -

UP#30-2 Activity:

SEC2S21400

CH149 -

UP#30-2 Activity:

SEC2S21410

CH149 -

UP#30-2 Activity:

SEC2S21420

CH149 -

UP#30-2 Activity:

SEC2S21430

CH149 -

UP#30-2 Activity:

SEC2S21440

CH149 -

UP#30-2 Activity:

SEC2S21450

CH149 -

UP#30-2 Activity:

SEC2S21460

CH149 -

UP#30-2 Activity:

SEC2S21470

CH149 -

UP#30-2 Activity:

SEC2S21480

CH154 -

UP#30-2 Activity:

SEC2S21490

CH154 -

UP#30-2 Activity:

SEC2S21500

CH154 -

UP#30-2 Activity:

SEC2S21510

CH154 -

UP#30-2 Activity:

SEC2S21520

CH154 -

UP#30-2 Activity:

SEC2S21530

CH154 -

UP#30-2 Activity:

SEC2S21540

CH154 -

UP#30-2 Activity:

SEC2S21550

CH154 -

UP#30-2 Activity:

SEC2S21560

CH155 -

UP#30-2 Activity:

SEC2S21570

CH155 -

UP#30-2 Activity:

SEC2S21580

CH155 -

UP#30-2 Activity:

SEC2S21590

CH155 -

UP#30-2 Activity:

SEC2S21600

CH155 -

UP#30-2 Activity:

SEC2S21610

CH155 -

UP#30-2 Activity:

SEC2S21620

CH155 -

UP#30-2 Activity:

SEC2S21630

CH155 -

UP#30-2 Activity:

SEC2S21640

CH156 -

UP#30-2 Activity:

SEC2S21650

CH156 -

Water proofing
Backfilling
Project:
Internal finishing
Project:
Top slab installation
Project:
Excavation
Project:
Base concreting
Project:
Wall -1st Lift concreting
Project:
Wall - 2nd Lift concreting
Project:
Water proofing
Project:
Backfilling
Project:
Internal finishing
Project:
Top slab installation
Project:
Excavation
Project:
Base concreting
Project:
Wall -1st Lift concreting
Project:
Wall - 2nd Lift concreting
Project:
Water proofing
Project:
Backfilling
Project:
Internal finishing
Project:
Top slab installation
Project:
Excavation
Project:
Base concreting
Project:
Wall -1st Lift concreting
Project:
Wall - 2nd Lift concreting
Project:
Water proofing
Project:
Backfilling
Project:
Internal finishing
Project:
Top slab installation
Project:
Excavation
Project:
Base concreting

Project:
UP#30-2 Activity:
SEC2S21660
Wall -1st Lift concreting
Project:
UP#30-2 Activity:
SEC2S21670
Wall - 2nd Lift concreting
Project:
UP#30-2 Activity:
SEC2S21680
Water proofing
Project:
UP#30-2 Activity:
SEC2S21690
Backfilling
Project:
UP#30-2 Activity:
SEC2S21700
Internal finishing
Project:
UP#30-2 Activity:
SEC2S21710
Top slab installation
Project:
UP#30-2 Activity:
SEC2S21720
Excavation
Project:
UP#30-2 Activity:
SEC2S21730
Base concreting
Project:
UP#30-2 Activity:
SEC2S21740
Wall -1st Lift concreting
Project:
UP#30-2 Activity:
SEC2S21750
Wall - 2nd Lift concreting
Project:
UP#30-2 Activity:
SEC2S21760
Water proofing
Project:
UP#30-2 Activity:
SEC2S21770
Backfilling
Project:
UP#30-2 Activity:
SEC2S21780
Internal finishing
Project:
UP#30-2 Activity:
SEC2S21790
Top slab installation
Project:
UP#30-2 Activity:
SEC2S21800
O46) - Additional Wall concreting
Project:
UP#30-2 Activity:
SEC2S21810
O46) - Water proofing
Project:
UP#30-2 Activity:
SEC2S21820
O46) - Backfilling
Project:
UP#30-2 Activity:
SEC2S21830
O46) - Internal finishing
Project:
UP#30-2 Activity:
SEC2S21840
O46) - Top slab installation
Project:
UP#30-2 Activity:
SEC2S21850
tion of Fire Extinguishers
Project:
UP#30-2 Activity:
SEC2S21860
Commissioning and hand over of Fire Extinguishers
Project:
UP#30-2 Activity:
SEC2S21870
tion of Gantries
Project:
UP#30-2 Activity:
SEC2S21880
r of Gantries
Project:
UP#30-2 Activity:
SEC2S21890
pe/fittings installation and welding - West End (CH101A)
Project:
UP#30-2 Activity:
SEC2S21900
ection pipe installation - West End (CH101A)
Project:
UP#30-2 Activity:
SEC2S21910
n Loop - Steel pipe/fittings installation and welding - New Apron Loop
Project:
UP#30-2 Activity:
SEC2S21920
n Loop - Leak detection pipe installation - New Apron Loop
Project:
UP#30-2 Activity:
SEC2S21930
Insulation Gaskets & Torquing
Project:
UP#30-2 Activity:
SEC2S21940
Torquing & Platform Works
Project:
UP#30-2 Activity:
SEC2S21950
Insulation Gaskets & Torquing

CH156 CH156 CH156 CH156 CH156 CH156 CH101A CH101A CH101A CH101A CH101A CH101A CH101A CH101A CH138 (V
CH138 (V
CH138 (V
CH138 (V
CH138 (V
Installa
Testing/
Installa
Hand ove
Steel pi
Leak det
New Apro
New Apro
CH-107 CH-110 CH-108 -

Project:
UP#30-2 Activity:
Mechanical Installation Works
Project:
UP#30-2 Activity:
orquing, Support & Platform Works
Project:
UP#30-2 Activity:
Insulation Gaskets & Torquing
Project:
UP#30-2 Activity:
Insulation Gaskets & Torquing
Project:
UP#30-2 Activity:
LPD-27 Installation
Project:
UP#30-2 Activity:
Insulation Gaskets & Touruing
Project:
UP#30-2 Activity:
Insulation Gaskets & Torquing
Project:
UP#30-2 Activity:
- Insulation Gaskets & Torquing
Project:
UP#30-2 Activity:
Insulation Gaskets & Torquing
Project:
UP#30-2 Activity:
Insulation Gaskets & Torquing & Platform Works
Project:
UP#30-2 Activity:
Torquing & Platform Reinstallation Works
Project:
UP#30-2 Activity:
HPV-10 & HPV-11 - Installation
Project:
UP#30-2 Activity:
LPD-10 - Installation
Project:
UP#30-2 Activity:
LPD-12 - Installation
Project:
UP#30-2 Activity:
Insulation Gaskets & Torquing
Project:
UP#30-2 Activity:
- MOV installation, Insulation Gaskets & Tourquing
Project:
UP#30-2 Activity:
LPD-35 - Installation
Project:
UP#30-2 Activity:
MOV installation, Insulation Gaskets & Tourquing
Project:
UP#30-2 Activity:
8+705 to 8+805 - Pipe Laying and Fitting Installation
Project:
UP#30-2 Activity:
Torquing of Bolts/Nuts
Project:
UP#30-2 Activity:
Torquing of Bolts/Nuts
Project:
UP#30-2 Activity:
8+805 to 8+905 Pipe Laying and Fitting Installation
Project:
UP#30-2 Activity:
9+105 to 9+205 Pipe Laying and Fitting Installation
Project:
UP#30-2 Activity:
8+905 to 9+005 Pipe Laying and Fitting Installation
Project:
UP#30-2 Activity:
Insulation Gaskets & Torquing
Project:
UP#30-2 Activity:
9+205 to 9+250 Pipe Laying and Fitting Installation
Project:
UP#30-2 Activity:
- MOV installation, Insulation Gaskets & Tourquing
Project:
UP#30-2 Activity:
- MOV installation, Insulation Gaskets & Tourquing
Project:
UP#30-2 Activity:
Insulation Gaskets & Torquing
Project:
UP#30-2 Activity:
9+005 to 9+105 Pipe Laying and Fitting Installation

SEC2S21960

CH-150 -

SEC2S21970

CH-151 T

SEC2S21980

CH-134 -

SEC2S21990

CH-135 -

SEC2S22000

LPD-26 &

SEC2S22010

CH-140 -

SEC2S22020

CH-137 -

SEC2S22030

CH-135A

SEC2S22040

CH-136 -

SEC2S22050

CH-138 -

SEC2S22060

CH-139 -

SEC2S22070

HPV-09,

SEC2S22080

LPD-09 &

SEC2S22090

LPD-11 &

SEC2S22100

CH-113 -

SEC2S22110

CH-146

SEC2S22120

LPD-34 &

SEC2S22130

CH-145 -

SEC2S22140

Chainage

SEC2S22150

CH-143 -

SEC2S22160

CH-144 -

SEC2S22170

Chainage

SEC2S22180

Chainage

SEC2S22190

Chainage

SEC2S22200

CH-141 -

SEC2S22210

Chainage

SEC2S22220

CH-147

SEC2S22230

CH-148

SEC2S22240

CH-142 -

SEC2S22250

Chainage

Project:
UP#30-2 Activity:
SEC2S22260
LPD-37 - Installation
Project:
UP#30-2 Activity:
SEC2S22270
HPV-37 & HPV-38 - Installation
Project:
UP#30-2 Activity:
SEC2S22280
orks to CH-21
Project:
UP#30-2 Activity:
SEC2S22290
orks to CH-22
Project:
UP#30-2 Activity:
SEC2S22300
- MOV installation, Insulation Gaskets & Tourquing
Project:
UP#30-2 Activity:
SEC2S22310
Insulation Gaskets & Torquing
Project:
UP#30-2 Activity:
SEC2S22320
LPD-02 - Mechanical Installation Works
Project:
UP#30-2 Activity:
SEC2S22330
Insulating Gasket, Torquing & Platform Works
Project:
UP#30-2 Activity:
SEC2S22340
at Chainage 0+040
Project:
UP#30-2 Activity:
SEC2S22350
HPV-04 - Mechanical Installation Works
Project:
UP#30-2 Activity:
SEC2S22360
l DBB Valves
Project:
UP#30-2 Activity:
SEC2S22370
ation Establishment (SCADA System)
Project:
UP#30-2 Activity:
SEC2S22380
esting, Integration and Modification Works of Existing SCADA System
Project:
UP#30-2 Activity:
SEC2S22390
PTP TEST (SCADA System)
Project:
UP#30-2 Activity:
SEC2S22400
e Laying in Section 2 (except Cables connected to SS 1164)
Project:
UP#30-2 Activity:
SEC2S22410
e laying in Section2 - Cables connected to SS 1164
Project:
UP#30-2 Activity:
SEC2S22420
o SS 1164
Project:
UP#30-2 Activity:
SEC2S22430
ct Civil Work Completion Section 2
Project:
UP#30-2 Activity:
SEC2S22440
e laying in Section 2 - Main Cables
Project:
UP#30-2 Activity:
SEC2S22450
e Laying in Section 3 (Except Main Cables)
Project:
UP#30-2 Activity:
SEC2S22460
ct Civil Works Completion Section 3
Project:
UP#30-2 Activity:
SEC2S22470
e Laying in Section 3 (Main Cables)
Project:
UP#30-2 Activity:
SEC2S22480
e Laying in Section 4 (except new Apron chambers)
Project:
UP#30-2 Activity:
SEC2S22490
ct Civil Works Completion Section 4
Project:
UP#30-2 Activity:
SEC2S22500
e Laying in Section 4 (Main Cables)
Project:
UP#30-2 Activity:
SEC2S22510
ct Civil Work Completion (New Aprons)
Project:
UP#30-2 Activity:
SEC2S22520
e Laying in Section 4 - New Apron Chambers
Project:
UP#30-2 Activity:
SEC2S22530
e Laying in Section 1 (Except Main Cables)
Project:
UP#30-2 Activity:
SEC2S22540
ct Civil Work Completion Section 1
Project:
UP#30-2 Activity:
SEC2S22550
e Laying in Section 1 (Main Cables)

LPD-36 &
HPV-36,
Tie-In W
Tie-In W
CH-149
CH-102 LPD-01 &
CH-104 Blanking
HPV-03 &
Reinstal
Communic
Signal T
SAT and
E&I Cabl
E&I Cabl
Access t
Cable Du
E&I Cabl
E&I Cabl
Cable Du
E&I Cabl
E&I Cabl
Cable Du
E&I Cabl
Cable Du
E&I Cabl
E&I Cabl
Cable Du
E&I Cabl

Project:
UP#30-2 Activity:
SEC2S22560
ct Civil Work Completion (VO)
Project:
UP#30-2 Activity:
SEC2S22570
e Laying in Section 1 (VO)
Project:
UP#30-2 Activity:
SEC2S22580
e Laying in Section 5 (Except Fuel Farm Control Room)
Project:
UP#30-2 Activity:
SEC2S22590
ct Civil Work Completion Section 5
Project:
UP#30-2 Activity:
SEC2S22600
e Laying in Section 5 (Fuel Farm Control Room)
Project:
UP#30-2 Activity:
SEC2S22610
e Laying in Section 6
Project:
UP#30-2 Activity:
SEC2S22620
ct Civil Work Completion Section 6
Project:
UP#30-2 Activity:
SEC2S22630
e Laying in Section 6 (Main Cables)
Project:
UP#30-2 Activity:
SEC2S22640
ct Civil Work Completion Section 7
Project:
UP#30-2 Activity:
SEC2S22650
e Laying in Section 7
Project:
UP#30-2 Activity:
SEC2S22660
e Laying in Section 7 (Main Cables)
Project:
UP#30-2 Activity:
SEC2S22670
Purging Loop 4.1 & 4.2 - T&C Preparation All HPs/LPs/VCs
Project:
UP#30-2 Activity:
SEC2S22680
Purging Loop 4.1 & 4.2 - CH-103 T&C Spools Instln RRC
Project:
UP#30-2 Activity:
SEC2S22690
Purging Loop 4.1 & 4.2 - Pneumatic, Air Blowing & Drying - Loop 4.1
Project:
UP#30-2 Activity:
SEC2S22700
Purging Loop 4.1 & 4.2 - Nitrogen Filling - Loop 4.1
Project:
UP#30-2 Activity:
SEC2S22710
Purging Loop 4.1 & 4.2 - Pneumatic, Air Blowing & Drying - Loop 4.2
Project:
UP#30-2 Activity:
SEC2S22720
Purging Loop 4.1 & 4.2 - Nitrogen Filling - Loop 4.2
Project:
UP#30-2 Activity:
SEC2S22730
Purging Loop 3.1 & 3.2 -T&C Preparation All HPs/LPs
Project:
UP#30-2 Activity:
SEC2S22740
Purging Loop 3.1 & 3.2 - CH-103 T&C Spools Instln RRC
Project:
UP#30-2 Activity:
SEC2S22750
Purging Loop 3.1 & 3.2 - Pneumatic, Air Blowing & Drying - Loop 3.1
Project:
UP#30-2 Activity:
SEC2S22760
Purging Loop 3.1 & 3.2 - Nitrogen Filling - Loop 3.1
Project:
UP#30-2 Activity:
SEC2S22770
Purging Loop 3.1 & 3.2 - Pneumatic, Air Blowing & Drying - Loop 3.2
Project:
UP#30-2 Activity:
SEC2S22780
Purging Loop 3.1 & 3.2 - Nitrogen Filling - Loop 3.2
Project:
UP#30-2 Activity:
SEC2S22790
Purging Loop 1.3 & 1.4 - T&C Preparation All HPs/LPs
Project:
UP#30-2 Activity:
SEC2S22800
Purging Loop 1.3 & 1.4 - CH-133 T&C Spools Instln RRC
Project:
UP#30-2 Activity:
SEC2S22810
Purging Loop 1.3 & 1.4 - Pneumatic, Air Blowing & Drying - Loop 1.3
Project:
UP#30-2 Activity:
SEC2S22820
Purging Loop 1.3 & 1.4 - Nitrogen Filling - Loop 1.3
Project:
UP#30-2 Activity:
SEC2S22830
Purging Loop 1.3 & 1.4 - Pneumatic, Air Blowing & Drying - Loop 1.4
Project:
UP#30-2 Activity:
SEC2S22840
Purging Loop 1.3 & 1.4 - Nitrogen Filling - Loop 1.4
Project:
UP#30-2 Activity:
SEC2S22850
Purging Loop 1.1 & 1.2 - T&C Preparation All HPs/LPs/VCs

Cable Du
E&I Cabl
E&I Cabl
Cable Du
E&I Cabl
E&I Cabl
Cable Du
E&I Cabl
Cable Du
E&I Cabl
E&I Cabl
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen

Project:
UP#30-2 Activity:
SEC2S22860
Purging Loop 1.1 & 1.2 - CH-139 T&C Spools Instln RRC
Project:
UP#30-2 Activity:
SEC2S22870
Purging Loop 1.1 & 1.2 - Pneumatic, Air Blowing & Drying - Loop 1.1
Project:
UP#30-2 Activity:
SEC2S22880
Purging Loop 1.1 & 1.2 - Nitrogen Filling - Loop 1.1
Project:
UP#30-2 Activity:
SEC2S22890
Purging Loop 1.1 & 1.2 - Pneumatic, Air Blowing & Drying - Loop 1.2
Project:
UP#30-2 Activity:
SEC2S22900
Purging Loop 1.1 & 1.2 - Nitrogen Filling - Loop 1.2
Project:
UP#30-2 Activity:
SEC2S22910
Purging Loop 5.1 & 5.2 - T&C Preparation All HPs/LPs
Project:
UP#30-2 Activity:
SEC2S22920
Purging Loop 5.1 & 5.2 - CH-140 T&C Spools Instln RRC
Project:
UP#30-2 Activity:
SEC2S22930
Purging Loop 5.1 & 5.2 - Pneumatic, Air Blowing & Drying - Loop 5.1
Project:
UP#30-2 Activity:
SEC2S22940
Purging Loop 5.1 & 5.2 - Nitrogen Filling - Loop 5.1
Project:
UP#30-2 Activity:
SEC2S22950
Purging Loop 5.1 & 5.2 - Pneumatic, Air Blowing & Drying - Loop 5.2
Project:
UP#30-2 Activity:
SEC2S22960
Purging Loop 5.1 & 5.2 - Nitrogen Filling - Loop 5.2
Project:
UP#30-2 Activity:
SEC2S22970
Purging Loop 2.1 & 2.2 - T&C Preparation All HPs/LPs
Project:
UP#30-2 Activity:
SEC2S22980
Purging Loop 2.1 & 2.2 - CH-133 T&C Spools Instln RRC
Project:
UP#30-2 Activity:
SEC2S22990
Purging Loop 2.1 & 2.2 - Pneumatic, Air Blowing & Drying - Loop 2.1
Project:
UP#30-2 Activity:
SEC2S23000
Purging Loop 2.1 & 2.2 - Nitrogen Filling - Loop 2.1
Project:
UP#30-2 Activity:
SEC2S23010
Purging Loop 2.1 & 2.2 - Pneumatic, Air Blowing & Drying - Loop 2.2
Project:
UP#30-2 Activity:
SEC2S23020
Purging Loop 2.1 & 2.2 - Nitrogen Filling - Loop 2.2
Project:
UP#30-2 Activity:
SEC2S31000
Trench Civil Work Completion
Project:
UP#30-2 Activity:
SEC2S31010
Main Pipe Line Laying & Fit Up
Project:
UP#30-2 Activity:
SEC2S31020
Main Pipe Line Welding
Project:
UP#30-2 Activity:
SEC2S31030
RT Works / Painting/Wrap
Project:
UP#30-2 Activity:
SEC2S31040
Puddle Flange & Link Seal Insulation
Project:
UP#30-2 Activity:
SEC2S31050
Concrete Casting Surrounding the Puddle Flange
Project:
UP#30-2 Activity:
SEC2S31060
LDS conduit Installation
Project:
UP#30-2 Activity:
SEC2S31070
Installation of End Seal
Project:
UP#30-2 Activity:
SEC2S31080
Chamber Backfilling
Project:
UP#30-2 Activity:
SEC2S31090
Chamber Handover for Mechanical Work
Project:
UP#30-2 Activity:
SEC2S31100
Pipe Fabrication & Installation of DBB Valves
Project:
UP#30-2 Activity:
SEC2S31110
Pipe Welding
Project:
UP#30-2 Activity:
SEC2S31120
RT Works

Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
CH101A CH101A CH101A CH101A CH101A CH101A CH101A CH101A CH101A CH101A CH101A CH101A CH101A -

Project:
UP#30-2 Activity:
Drain / Vent Installation
Project:
UP#30-2 Activity:
Painting/Wrap
Project:
UP#30-2 Activity:
Pipe Support Installation & Anchor Bolts
Project:
UP#30-2 Activity:
Insulation Gasket Kit Installation & Tourquing
Project:
UP#30-2 Activity:
Platform Installation
Project:
UP#30-2 Activity:
Grating Installation
Project:
UP#30-2 Activity:
Manhole Cover installation with Top Slab Cover
Project:
UP#30-2 Activity:
Cable Tray & Support Installation
Project:
UP#30-2 Activity:
Installation of Junction Boxes
Project:
UP#30-2 Activity:
Instruments Installation
Project:
UP#30-2 Activity:
Installation of Earthling Material
Project:
UP#30-2 Activity:
MOV Isolator Installation
Project:
UP#30-2 Activity:
Trench Civil Work Completion
Project:
UP#30-2 Activity:
36" Tee Installation
Project:
UP#30-2 Activity:
36" Tee Welding
Project:
UP#30-2 Activity:
24" Pipe Fit-up
Project:
UP#30-2 Activity:
6" Weldolet Joints Fit-up
Project:
UP#30-2 Activity:
24" Pipe Welding
Project:
UP#30-2 Activity:
RT Works
Project:
UP#30-2 Activity:
6" Weldolet Joints Welding
Project:
UP#30-2 Activity:
Painting/Wrap
Project:
UP#30-2 Activity:
Puddle Flange & Link Seal Insulation
Project:
UP#30-2 Activity:
Concrete Casting Surrounding the Puddle Flange
Project:
UP#30-2 Activity:
LDS conduit Installation
Project:
UP#30-2 Activity:
Installation of End Seal
Project:
UP#30-2 Activity:
Chamber FInal Backfilling
Project:
UP#30-2 Activity:
Chamber Handover for Mechanical Works
Project:
UP#30-2 Activity:
RT Works
Project:
UP#30-2 Activity:
Painting/Wrap
Project:
UP#30-2 Activity:
Pipe Support Installation & Anchor Bolts

SEC2S31130

CH101A -

SEC2S31140

CH101A -

SEC2S31150

CH101A -

SEC2S31160

CH101A -

SEC2S31170

CH101A -

SEC2S31180

CH101A -

SEC2S31190

CH101A -

SEC2S31200

CH101A -

SEC2S31210

CH101A -

SEC2S31220

CH101A -

SEC2S31230

CH101A -

SEC2S31240

CH101A -

SEC2S31250

CH156 -

SEC2S31260

CH156 -

SEC2S31270

CH156 -

SEC2S31280

CH156 -

SEC2S31290

CH156 -

SEC2S31300

CH156 -

SEC2S31310

CH156 -

SEC2S31320

CH156 -

SEC2S31330

CH156 -

SEC2S31340

CH156 -

SEC2S31350

CH156 -

SEC2S31360

CH156 -

SEC2S31370

CH156 -

SEC2S31380

CH156 -

SEC2S31390

CH156 -

SEC2S31420

CH156 -

SEC2S31440

CH156 -

SEC2S31450

CH156 -

Project:
UP#30-2 Activity:
Platform Installation
Project:
UP#30-2 Activity:
Grating Installation
Project:
UP#30-2 Activity:
Manhole Cover installation with Top Slab Cover
Project:
UP#30-2 Activity:
Cable Tray & Support Installation
Project:
UP#30-2 Activity:
Installation of Junction Boxes
Project:
UP#30-2 Activity:
Instruments Installation
Project:
UP#30-2 Activity:
Installation of Earthling Material
Project:
UP#30-2 Activity:
MOV Isolator Installation
Project:
UP#30-2 Activity:
Trench Civil Work Completion
Project:
UP#30-2 Activity:
36" Tee Installation
Project:
UP#30-2 Activity:
24" Pipe Fit-up
Project:
UP#30-2 Activity:
36" Tee Welding
Project:
UP#30-2 Activity:
24" Pipe Welding
Project:
UP#30-2 Activity:
RT Works
Project:
UP#30-2 Activity:
Painting/Wrap
Project:
UP#30-2 Activity:
Puddle Flange & Link Seal Insulation
Project:
UP#30-2 Activity:
Concrete Casting Surrounding the Puddle Flange
Project:
UP#30-2 Activity:
LDS conduit Installation
Project:
UP#30-2 Activity:
Installation of End Seal
Project:
UP#30-2 Activity:
Chamber Final Backfilling
Project:
UP#30-2 Activity:
Chamber Handover for Mechanical Work
Project:
UP#30-2 Activity:
RT Works
Project:
UP#30-2 Activity:
Painting/Wrap
Project:
UP#30-2 Activity:
Pipe Support Installation & Anchor Bolts
Project:
UP#30-2 Activity:
Platform Installation
Project:
UP#30-2 Activity:
Grating Installation
Project:
UP#30-2 Activity:
Manhole Cover installation with Top Slab Cover
Project:
UP#30-2 Activity:
Cable Tray & Support Installation
Project:
UP#30-2 Activity:
Installation of Junction Boxes
Project:
UP#30-2 Activity:
Instruments Installation

SEC2S31470

CH156 -

SEC2S31480

CH156 -

SEC2S31490

CH156 -

SEC2S31500

CH156 -

SEC2S31510

CH156 -

SEC2S31520

CH156 -

SEC2S31530

CH156 -

SEC2S31540

CH156 -

SEC2S31550

CH155 -

SEC2S31560

CH155 -

SEC2S31570

CH155 -

SEC2S31580

CH155 -

SEC2S31590

CH155 -

SEC2S31600

CH155 -

SEC2S31610

CH155 -

SEC2S31620

CH155 -

SEC2S31630

CH155 -

SEC2S31640

CH155 -

SEC2S31650

CH155 -

SEC2S31660

CH155 -

SEC2S31670

CH155 -

SEC2S31700

CH155 -

SEC2S31720

CH155 -

SEC2S31730

CH155 -

SEC2S31750

CH155 -

SEC2S31760

CH155 -

SEC2S31770

CH155 -

SEC2S31780

CH155 -

SEC2S31790

CH155 -

SEC2S31800

CH155 -

Project:
UP#30-2 Activity:
Installation of Earthling Material
Project:
UP#30-2 Activity:
MOV Isolator Installation
Project:
UP#30-2 Activity:
Chamber Handover for Mechanical Work
Project:
UP#30-2 Activity:
Cutting of Pipes
Project:
UP#30-2 Activity:
Installation of Link Seal
Project:
UP#30-2 Activity:
Puddle Flange Installation
Project:
UP#30-2 Activity:
Tempoaray Installation of Spool Piece
Project:
UP#30-2 Activity:
Concrete Casting Surrounding the Puddle Flange
Project:
UP#30-2 Activity:
Installation of End Seal
Project:
UP#30-2 Activity:
Anchor Bolts for Pipe Support
Project:
UP#30-2 Activity:
Final Backfilling
Project:
UP#30-2 Activity:
Pipe Support Installation
Project:
UP#30-2 Activity:
PIpe Spool Preparation
Project:
UP#30-2 Activity:
Assembly of Flanges with DBB Valves
Project:
UP#30-2 Activity:
36" Piping Installation with DBB Valves Installation
Project:
UP#30-2 Activity:
36" Welding Works
Project:
UP#30-2 Activity:
Radiography Testing
Project:
UP#30-2 Activity:
Installation of Ball Valve With Flanges
Project:
UP#30-2 Activity:
Drain/Vent Installation
Project:
UP#30-2 Activity:
24" Pipe Installation
Project:
UP#30-2 Activity:
24" Welding Works
Project:
UP#30-2 Activity:
Painting/Wrap
Project:
UP#30-2 Activity:
Insulation Gasket Kit Installation
Project:
UP#30-2 Activity:
Torquing
Project:
UP#30-2 Activity:
Platform Installation
Project:
UP#30-2 Activity:
Manhole Cover installation with Top Slab Cover
Project:
UP#30-2 Activity:
Cable Tray & Support Installation
Project:
UP#30-2 Activity:
Installation of Junction Boxes
Project:
UP#30-2 Activity:
Instruments Installation
Project:
UP#30-2 Activity:
Installation of Earthling Material

SEC2S31810

CH155 -

SEC2S31820

CH155 -

SEC2S31830

CH154 -

SEC2S31840

CH154 -

SEC2S31850

CH154 -

SEC2S31860

CH154 -

SEC2S31870

CH154 -

SEC2S31880

CH154 -

SEC2S31890

CH154 -

SEC2S31900

CH154 -

SEC2S31910

CH154 -

SEC2S31920

CH154 -

SEC2S31930

CH154 -

SEC2S31940

CH154 -

SEC2S31950

CH154 -

SEC2S31960

CH154 -

SEC2S31970

CH154 -

SEC2S31980

CH154 -

SEC2S31990

CH154 -

SEC2S32000

CH154 -

SEC2S32010

CH154 -

SEC2S32020

CH154 -

SEC2S32030

CH154 -

SEC2S32040

CH154 -

SEC2S32050

CH154 -

SEC2S32060

CH154 -

SEC2S32070

CH154 -

SEC2S32080

CH154 -

SEC2S32090

CH154 -

SEC2S32100

CH154 -

Project:
UP#30-2 Activity:
SEC2S32110
CH154 MOV Isolator Installation
Project:
UP#30-2 Activity:
SEC2S32120
New Apro
n Loop - Continuity & Loop Checking
Project:
UP#30-2 Activity:
SEC2S32130
New Apro
n Loop - Installation of Earthing Material
Project:
UP#30-2 Activity:
SEC2S32140
New Apro
n Loop - Cathodic Protection System Works
Project:
UP#30-2 Activity:
SEC2S32150
New Apro
n Loop - FDB & SDB Installation
Project:
UP#30-2 Activity:
SEC2S32160
New Apro
n Loop - Cable Ducts Civil Work Completion
Project:
UP#30-2 Activity:
SEC2S32170
New Apro
n Loop - LD Sensor Cable Laying
Project:
UP#30-2 Activity:
SEC2S32180
New Apro
n Loop - LDS Sensor Cable termination
Project:
UP#30-2 Activity:
SEC2S32190
New Apro
n Loop - LD Jumper Cable Laying
Project:
UP#30-2 Activity:
SEC2S32200
New Apro
n Loop - LDS Jumper Cable termination
Project:
UP#30-2 Activity:
SEC2S32210
New Apro
n Loop - Instrument & Control Cable Laying
Project:
UP#30-2 Activity:
SEC2S32220
New Apro
n Loop - Instrument & Control Cable Termination
Project:
UP#30-2 Activity:
SEC2S32230
New Apro
n Loop - Power Cable Laying
Project:
UP#30-2 Activity:
SEC2S32240
New Apro
n Loop - Earth Cable Laying
Project:
UP#30-2 Activity:
SEC2S32250
New Apro
n Loop - Power Cable Termination
Project:
UP#30-2 Activity:
SEC2S32260
New Apro
n Loop - Earth Cable Termination
Project:
UP#30-2 Activity:
SEC2S32270
New Apro
n Loop - Instrument & Control Cable Loop Testing
Project:
UP#30-2 Activity:
SEC2S32280
New Apro
n Loop - Testing and Commissioning of Field Instruments, ESD and MOV after Fiel
d Modification
Project:
UP#30-2 Activity:
SEC2S32340
CH-102 t
o CH-101 Nitrogen Purging - Setting-up & Preparation
Project:
UP#30-2 Activity:
SEC2S32350
CH-102 t
o CH-101 Nitrogen Purging - Pneumatic Testing
Project:
UP#30-2 Activity:
SEC2S32360
CH-102 t
o CH-101 Nitrogen Purging - Air Blowing
Project:
UP#30-2 Activity:
SEC2S32370
CH-102 t
o CH-101 Nitrogen Purging - Drying
Project:
UP#30-2 Activity:
SEC2S32380
CH-102 t
o CH-101 Nitrogen Purging - Nitrogen Purging
Project:
UP#30-2 Activity:
SEC2S32390
Software
Development - VO37 (AJF/MJF INterface)
Project:
UP#30-2 Activity:
SEC2S32400
System B
uilt - VO37 (AJF/MJF INterface)
Project:
UP#30-2 Activity:
SEC2S32410
Sytem Te
sting - VO37 (AJF/MJF INterface)
Project:
UP#30-2 Activity:
SEC2S32420
Integrat
ed FAT- VO37 (AJF/MJF INterface)
Project:
UP#30-2 Activity:
SEC2S32430
Fuel Far
m and Control Room Availability
Project:
UP#30-2 Activity:
SEC2S32440
Installa
tion and Testing Works Related to AJF/MJF Interface
Project:
UP#30-2 Activity:
SEC2S32450
Pre-Comm

issioning - VO37 (AJF/MJF INterface)


Project:
UP#30-2 Activity:
SEC2S32460
Commissi
oning - VO37 (AJF/MJF INterface)
Project:
UP#30-2 Activity:
SEC2S41000
Fuel Far
m Availability
Project:
UP#30-2 Activity:
SEC2S41080
Loop 1B
- Pressure Testing of Loop 1B & Loop 1A
Project:
UP#30-2 Activity:
SEC2S41100
Loop 1B
- Removal of BFs from DBB in CH-139 & Connection to Pump Skid
Project:
UP#30-2 Activity:
SEC2S41110
Loop 1B
- Rearrangements as part of 1B Flushing Commencement
Project:
UP#30-2 Activity:
SEC2S41150
Loop 1B
- Draining of Sections Between VCs & Installation of HP/LP Assemblies
Project:
UP#30-2 Activity:
SEC2S41160
Loop 1A
- Preparation & Set-up
Project:
UP#30-2 Activity:
SEC2S41170
Loop 1A
- Installation of Christmas Trees on HPs & LPs
Project:
UP#30-2 Activity:
SEC2S41180
Loop 1A
- Fuel Filling in Loop 1B & Loop 1A
Project:
UP#30-2 Activity:
SEC2S41190
Loop 1A
- Soak Testing of Loop 1B & Loop 1A
Project:
UP#30-2 Activity:
SEC2S41200
Loop 1A
- Pressure Testing of Loop 1B & Loop 1A
Project:
UP#30-2 Activity:
SEC2S41210
Loop 1A
- Soak Test Sample & Approval
Project:
UP#30-2 Activity:
SEC2S41220
Loop 1A
- Partial Draining between CH-134 & CH135A
Project:
UP#30-2 Activity:
SEC2S41230
Loop 1A
- Removal of BFs from Hydrant Risers & Installation of 6x4 Isolation Valve
Project:
UP#30-2 Activity:
SEC2S41240
Loop 1A
- Partial Draining between CH-136 & CH137
Project:
UP#30-2 Activity:
SEC2S41250
Loop 1A
- Removal of BFs from Hydrant Risers & Installation of 6x4 Isolation Valve
Project:
UP#30-2 Activity:
SEC2S41260
Loop 1A
- Installation Christmas Trees on All HRs at 2 Cargo Loops
Project:
UP#30-2 Activity:
SEC2S41310
Loop 1A
- Removal & Relocation of Flushing Equipments from CH-139 to CH-112
Project:
UP#30-2 Activity:
SEC2S41420
Loop 2A
- Pressure Testing of Loop 2A
Project:
UP#30-2 Activity:
SEC2S41430
Loop 2A
- Removal of Blind Flanges in DBB from CH-112 & Connection to Pump Skid
Project:
UP#30-2 Activity:
SEC2S41480
Loop 2A
- Partial Draining of Sections Between CH-111 & CH-133
Project:
UP#30-2 Activity:
SEC2S41490
Loop 2A
- Removal of Christmas Trees Between CH-111 & CH-133
Project:
UP#30-2 Activity:
SEC2S41500
Loop 2A
- Installation of HP/LP Assemblies Between CH-111 & CH-133
Project:
UP#30-2 Activity:
SEC2S41600
Loop 2B
- Flushing & Filtration of Risers & Millipore Test
Project:
UP#30-2 Activity:
SEC2S41610
Loop 2B
- API Filtration
Project:
UP#30-2 Activity:
SEC2S41620
Loop 2B
- Partial Draining of Sections Between CH-111 & CH-133
Project:
UP#30-2 Activity:
SEC2S41630
Loop 2B
- Removal of Christmas Trees Between CH-111 & CH-133
Project:
UP#30-2 Activity:
SEC2S41640
Loop 2B
- Installation of HP/LP Assemblies Between CH-111 & CH-133
Project:
UP#30-2 Activity:
SEC2S41650
Loop 2C
- Preparation & Set-up
Project:
UP#30-2 Activity:
SEC2S41660
Loop 2C

- Installation of Christmas Trees on HPs & LPs


Project:
UP#30-2 Activity:
- Fuel Filling in Loop 2B & 2C through Loop 2A
Project:
UP#30-2 Activity:
- Soak Testing of Loop 2B & 2C
Project:
UP#30-2 Activity:
- Pressure Testing of Loop 2B & 2C
Project:
UP#30-2 Activity:
- Soak Test Sample & Approval
Project:
UP#30-2 Activity:
- Flushing & Filtration for Mainline & Millipore Test
Project:
UP#30-2 Activity:
- Flushing & Filtration of Risers & Millipore Test
Project:
UP#30-2 Activity:
- API Filtration
Project:
UP#30-2 Activity:
- Partial Draining of Sections
Project:
UP#30-2 Activity:
- Removal of Christmas Trees
Project:
UP#30-2 Activity:
- Installation of HP/LP Assemblies
Project:
UP#30-2 Activity:
- Fuel Filling
Project:
UP#30-2 Activity:
- Soak Testing
Project:
UP#30-2 Activity:
- Pressure Testing
Project:
UP#30-2 Activity:
- Soak Test Sample Approval
Project:
UP#30-2 Activity:
- Draining of Line 1
Project:
UP#30-2 Activity:
- Flip Spectacle Blind and Install Flushing Manifold
Project:
UP#30-2 Activity:
- Flushing of Mainline & Millipore Test of Line 1
Project:
UP#30-2 Activity:
- Draining of Line 1
Project:
UP#30-2 Activity:
- Flip Spectacle Blind and Remove Flushing Manifold
Project:
UP#30-2 Activity:
- Install Permanent Piping
Project:
UP#30-2 Activity:
- Draining of Line 2
Project:
UP#30-2 Activity:
- Flip Spectacle Blind and Install Flushing Manifold
Project:
UP#30-2 Activity:
- Flushing of Mainline & Millipore Test of Line 2
Project:
UP#30-2 Activity:
- Draining of Line 2
Project:
UP#30-2 Activity:
- Flip Spectacle Blind and Remove Flushing Manifold
Project:
UP#30-2 Activity:
- Install Permanent Piping
Project:
UP#30-2 Activity:
- Re-Pressurizing to System Pressure
Project:
UP#30-2 Activity:
s MV & FO East & West LinesNew Activity
Project:
UP#30-2 Activity:
escope
Project:
UP#30-2 Activity:

SEC2S41670

Loop 2C

SEC2S41680

Loop 2C

SEC2S41690

Loop 2C

SEC2S41700

Loop 2C

SEC2S41710

Loop 2C

SEC2S41720

Loop 2C

SEC2S41730

Loop 2C

SEC2S41740

Loop 2C

SEC2S41750

Loop 2C

SEC2S41760

Loop 2C

SEC2S41870

Loop 3A

SEC2S41880

Loop 3A

SEC2S41890

Loop 3A

SEC2S41900

Loop 3A

SEC2S41910

Loop 3A

SEC2S41920

Loop 3A

SEC2S41930

Loop 3A

SEC2S41940

Loop 3A

SEC2S41950

Loop 3A

SEC2S41960

Loop 3A

SEC2S41970

Loop 3A

SEC2S41980

Loop 3A

SEC2S41990

Loop 3A

SEC2S42000

Loop 3A

SEC2S42010

Loop 3A

SEC2S42020

Loop 3A

SEC2S42030

Loop 3A

VO01

Backfill Trenche

VO02

Code E Islands D

VO03

Hydrant Fuel Cas

ings
Project:
Project:

UP#30-2 Activity:
UP#30-2 Activity:

VO04
VO05

AGL Transformers
MV substations R

Project:
Project:
Project:

UP#30-2 Activity:
UP#30-2 Activity:
UP#30-2 Activity:

VO06
FATO Relocation
VO06-1 FATO Relocation
VO07
Zones 1 & 2 Leve

Project:

UP#30-2 Activity:

VO08

Fire Hydrant Pit

UP#30-2 Activity:

VO09

EMCA - RC Pipe C

UP#30-2 Activity:

VO10

Primary Cable Co

UP#30-2 Activity:

VO11

2 Additional CCR

UP#30-2 Activity:

VO12

AGL F900 Chamber

UP#30-2 Activity:

VO13

AGL Pits Type 1

UP#30-2 Activity:

VO14-1 MART MJF Redesig

UP#30-2 Activity:

VO14-2 MART MJF Redesig

UP#30-2
UP#30-2
UP#30-2
UP#30-2
UP#30-2

VO15
VO15-1
VO16
VO17
VO18

AOA Gate House


AOA Gate House
AGL CATIIIB
Site Ambulances
MJF Control Room

UP#30-2 Activity:
UP#30-2 Activity:

VO19
VO20

Not Used
DVOR Monitor Ant

UP#30-2 Activity:

VO22

MART Stormwater

UP#30-2 Activity:
UP#30-2 Activity:

VO23
VO24

Flush Kerb
MJF Concrete Col

UP#30-2 Activity:

VO25

AOA Temp Fence -

UP#30-2 Activity:

VO26

Taxiway F - AGL

UP#30-2 Activity:
UP#30-2 Activity:

VO27
VO28

A-SMGCS Descope
Fire Main Tie -

UP#30-2 Activity:

VO29

Fire Fighting at

UP#30-2 Activity:

VO30

MV Network & Sta

UP#30-2 Activity:

VO31

Optional Item -

UP#30-2 Activity:

VO32-1 SCADA System - A

UP#30-2 Activity:

VO32-2 SCADA System - A

UP#30-2 Activity:

VO33

MJF - Security G

UP#30-2 Activity:

VO34

External Access

UP#30-2 Activity:

VO35

MART AGL Primary

esize

l Differences
s
Project:
oncrete Surround Reinforcement
Project:
nnectors
Project:
rated 30kW
Project:
s
Project:
- 1000x1000mm
Project:
n
Project:
n
Project:
Project:
Project:
Project:
Project:
& TMS
Project:
Project:
enna Relocation
Project:
& Firefighting Lines
Project:
Project:
lars
Project:
Patrol Road
Project:
Lights Replacement
Project:
Project:
in Points
Project:
D4
Project:
ndby Power
Project:
Bill 3 - Fencing Barriers
Project:
dditional Budget
Project:
dditional Budget
Project:
ate Obstruction
Project:
Roads - Substations
Project:

Activity:
Activity:
Activity:
Activity:
Activity:

Cable Joints
Project:
Project:

UP#30-2 Activity:
UP#30-2 Activity:

VO36
VO37

Not Used
AJF/MJF Interfac

Project:

UP#30-2 Activity:

VO38

MJF Hydrant Cont

Project:
Project:

UP#30-2 Activity:
UP#30-2 Activity:

VO39
VO40

Not Used
B2 Road Underpas

UP#30-2 Activity:

VO41

Pavement Marking

UP#30-2 Activity:
UP#30-2 Activity:

VO42
VO43

Not Used
Surface Protecti

UP#30-2 Activity:

VO44

Step Irons AGL C

UP#30-2 Activity:

VO45

Generators 4 Sta

UP#30-2 Activity:

VO46

MJF CH-0138 Wall

UP#30-2 Activity:
UP#30-2 Activity:

VO47
VO48

Not Used
MV & FOC Modific

UP#30-2 Activity:
UP#30-2 Activity:

VO49
VO50

Not Used
Taxiway F4 Remar

UP#30-2 Activity:
UP#30-2 Activity:
UP#30-2 Activity:

VO51
VO52
VO53

Earthworks - 31L
Not Used
Cargo Stands Bar

UP#30-2 Activity:

VO54

Leak Detection C

UP#30-2 Activity:
UP#30-2 Activity:

VO55
VO56

Foreman Dayworks
Cable Ducts Near

UP#30-2 Activity:

VO57

Pavement Marking

UP#30-2 Activity:

VO58

Signage Addition

UP#30-2 Activity:

VO59

Signage Amendmen

UP#30-2 Activity:

VO60

Earthworks at Ta

UP#30-2 Activity:
UP#30-2 Activity:
UP#30-2 Activity:

VO61
VO62
VO63

RVR Gantry Tower


Not Used
Barrier Preparat

UP#30-2 Activity:

VO64

Generators 9 Sta

UP#30-2 Activity:

VO65

Fire Extinguishe

UP#30-2
UP#30-2
UP#30-2
UP#30-2

Activity:
Activity:
Activity:
Activity:

VO66
VO67
VO68
VO69

Not Used
Not Used
Not Used
Stop Bar TWY C (

UP#30-2 Activity:

VO70

A3 Road Stormwat

UP#30-2 Activity:
UP#30-2 Activity:

VO71
VO72

Not Used
MJF Hydrant Cont

e
rol Work Pk. 1
s Fence Removal
Project:
s - Thermoplastic
Project:
Project:
on Omission
Project:
hambers
Project:
nds
Project:
Modifications
Project:
Project:
ations
Project:
Project:
king
Project:
Project:
Project:
riers
Project:
able Redundancy Works
Project:
Project:
New Fuel Depot
Project:
s
Project:
al
Project:
ts
Project:
xiways E13 & E14
Project:
Project:
Project:
ion for HLG
Project:
nds
Project:
rs for Cargo Apron Stands
Project:
Project:
Project:
Project:
Near TWY H)
Project:
er line realignment
Project:
Project:

rol Work CH101, CH21, CH22 & 700 Stands


Project:
UP#30-2 Activity:
Project:
UP#30-2 Activity:
Project:
UP#30-2 Activity:
Project:
UP#30-2 Activity:
Design
Project:
UP#30-2 Activity:
s 12 Stands (MAY - AUG)
Project:
UP#30-2 Activity:
Crossing
Project:
UP#30-2 Activity:
Work
Project:
UP#30-2 Activity:
Taxiway D9
Project:
UP#30-2 Activity:
Project:
UP#30-2 Activity:
s
Project:
UP#30-2 Activity:
n
Project:
UP#30-2 Activity:
Project:
UP#30-2 Activity:
e Laying Constraints
Project:
UP#30-2 Activity:
Project:
UP#30-2 Activity:
erouting
Project:
UP#30-2 Activity:
ification
Project:
UP#30-2 Activity:
es Relocation
Project:
UP#30-2 Activity:
escope
Project:
UP#30-2 Activity:
escope
Project:
UP#30-2 Activity:
escope
Project:
UP#30-2 Activity:
Project:
UP#30-2 Activity:
way D
Project:
UP#30-2 Activity:
e Duct Rerouting
Project:
UP#30-2 Activity:

VO73
VO74
VO75
VO76

Not Used
Not Used
Not Used
FATO Additional

VO77

EMCA - Generator

VO78

TWY G&H AGL Duct

VO79

ADAC Stoppage of

VO80

Lead-on Lighting

VO81
VO82

TWY H AGL
TWY H CL Marking

VO83

A3 Road Formatio

VO84
VO85

Not Used
AGL Primary Cabl

VO86
VO87

Not Used
Taxiway D6 AGL R

VO88

11kV Cable Ident

VO89

Distribution Box

VO90-1 Optional Items D


VO90-2 Optional Items D
VO90-3 Optional Items D
VO91
VO92

Not Used
Stop bar at Taxi

VO93

AGL Primary Cabl

VO94

400 Hz Cable

Вам также может понравиться