Accept - Willing to take advantage of it, if it comes along but not actively pursuing it.
2 - 95.46
3 - 99.73
4 - 99.99
4. Float / Slack = LS - ES / LF - EF
-------------------------------------------------------------------Early Start (ES) and Early Finish (EF) use the forward pass technique.
To determine the Early Start of an activity, factor in all its dependencies and see its earliest start date.
Consider the following simple diagram (durations are in weeks):
23. Ishikawa's seven basic tools of quality Cause and effect diagrams, also called fish-bone or ishikawa diagrams
Control Charts - Control charts are used to determine whether a process is stable or has
predictable performance. Upper and lower specification limits are based on contract requirements. They
represent the maximum and minimum values allowed. Upper and Lower control limits are set by the
project manager and appropirate stakeholders. For repetitive processes the control limits are generally +
or - 3 Sigma.
Flowcharting
Histogram
Pareto Chart - This is a histogram ordered by frequency of Occurence of defects. Pareto's law
states that less causes produce more defects. 80/20 rule.
Run chart - Shows history and pattern of variation. Trend analysis is performed using run charts
and involves mathematical techniques to forecast outcomes based on historical results. It is used to
monitor 1. Technical Performance and 2. Cost and Schedule performance.