Required lead is calculated based on the motor max. speed and Maximum Speed Requirement.
Nut Selection
(1) Axial Load Calculation
Axial Load calculation of P.1897, 6-2 is applied.
Deceleration Phase: Axial Load (Pc) = W - Wg = 50 x 6.67 - 0.02 x 50 x 9.8 324 (N)
(2) Profile Times Per 1 Cycle
The Duty Cycle Model Graph results as below.
Motion Profile
Acceleration
Low Speed
Deceleration
Total Time
Time
0.60
0.84
0.60
2.04
(3) Summary of: Axial Loads, Rotational Speeds, Motion Time per each profile.
Motion Profile
Acceleration
Low Speed
Deceleration
Axial Direction
343N
10N
324N
Rotational Speed
1500min-1
3000min-1
1500min-1
Time Ratio
29.4
41.2
29.4
Confirming Accuracy
(1) Evaluation of Accuracy Grade and Axial Clearance
Shaft Ends: 72
Ball Screw Length (L) = 720 + 62 + 60 + 72 = 914mm
* Extra Margin is for over-run countermeasure, and is normally 1.5~2 times the screw lead.
Lead 20 x 1.5 x 2 (both ends) = 60
(2) Evaluating Allowable Axial Load
Since the Load Applicable Span Length 1 is 820mm, Allowable Axial Load (P) according to the formula on P.1895
4. Allowable Axial Load would be,
Max. Applied Axial Load is 343N which is less than 3660N and suitability is confirmed.
(3) Evaluating Allowable Rotational Speed
Since the supported span distance is 790mm, Allowable Rotational Speed according to the formula on P.1896 5-1.
Critical Speed would be,
Max. Operational Speed of 3000min-1 is less than the Allowable Rotational Speed of 3024min-1 and the suitability
is confirmed.
Additionally, the DmN Value according to the formula on P.1896 5-2 DmN Value is DmN = (Screw Dia. + A Value)
x Max. Rotational Speed = 15.8 x 3000 = 47400 70000, and the suitability is confirmed.
Selection Result
From the above evaluations, suitable ball screw would be BSS1520-914.