Norms for
Rural Roads
Construction,
Rehabilitation and
Maintenance
Work Norms
for Construction, Rehabilitation and Maintenance
of Rural Roads
For Hill Area
S.
No.
1.
2.
Respecti
ve
Clause
of
Specifica
tions
Description
1-1.5(a),
1-1.5(b),
and 1-1.6
Site Clearance
1-1.5(c)
and 1-1.6
Clearing and grubbing including the cutting of trees (only if necessary) having girth
of less than 30 cm when measured at 1 m above the ground.
I.
II.
III.
IV.
V.
VI.
3.
17.
1- 2
above 30 cm to 60 cm girth
above 60 cm to 90 cm girth
above 90 cm to 180 cm girth
above 180 cm to 270 cm girth
above 270 cm to 450 cm girth
above 450 cm girth
Unit
1 m2
Each
Each
Each
Each
Each
Each
Unskille
d
Labour
(persond
ay)
0.4
0.30
0.40
1.50
3.00
10.00
extrapolate
Skilled
Labour
(persond
ay)
0.30
0.40
1.50
3.00
10.00
extrapolate
Materials and
Tools/Equipment
1.
2.
3.
4.
Picks
Kodalo
Shovels
Doko/Baskets
5.
6.
7.
8.
9.
Axes
Khukuri
Saws
Crowbars
Wheel barrows or bullock carts
10. Pickaxes
11. Spades
12. Crowbars
13. Shovels
14. Hammers and chisels
15. Doko/Baskets
16. Wheel barrows or bullock carts
Skilled
Labour
(personda
y)
1 m3
1 m3
1 m3
1.50
2.00
3.00
1.50
2.00
3.00
Respecti
ve
Clause
of
Specifica
tions
Description
2.00
0.50
Unskille
d
Labour
(persond
ay)
4.00
5.00
1.00
0.10
0.20
0.16
1.00
0.10
0.20
0.16
1 m3
0.80
0.80
5.
2-1.2.2,
2-1.8
and 2-1.9
2-1.6,
2-1.7,
2-1.8
and 2-1.9
Skilled
Labour
(persond
ay)
1 m3
1m
each
1 m3
2-1.3.2,
2-1.8
and 2-1.9.5
6.
1 m3
1 tonne
Unskille
d
Labour
(persond
ay)
4.00
5.00
28.
Unit
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
0.50
0.60
2.00
4.00
2.00
17.00
1.00
1 m2
0.10
0.10
1m
1 m3
1 m2
1 m3
1.00
1.00
0.80
1.00
1.00
0.80
1 m2
0.04
0.04
0.05
(blaster)
0.60
0.70
2.00
4.00
2.00
17.00
1.00
Skilled
Labour
(personda
y)
Materials and
Tools/Equipment
2.00
0.50
18. Picks
19. Shovels
20. Kodalo
21. Doko/Baskets
22. Wheel barrows or Bullock carts
0.05
(blaster)
23. Picks
24. Shovels
25. Kodalo
26. Doko/Baskets
27. Wheel barrows
29. Crowbars
30. Drilling machines
31. Petrol for plants
32. Blasting materials required for (d):
33. gelatine = 0.25 kg
34. detonator = 2 nos.
35. fuse wire = 2 m
36. Picks
37. Shovels
38. Kodalo
39. Doko/Baskets/Wheel barrows
40. Roller 8-10 ton;
1.5 ton vibrator roller;
animal drawn or tractor drawn
concrete roller; or
hand tampers, as available.
7.
8.
Respecti
ve
Clause
of
Specifica
tions
G-13.2,
2-1.3.10,
2-1.9.6
and 2-5.7.2
2- 3
Description
Unit
2- 4
Skilled
Labour
(persond
ay)
Unskille
d
Labour
(persond
ay)
Skilled
Labour
(personda
y)
1m
1 m3
0.50
1.50
1 m2
0.50
0.02
0.02
0.01
1 m3
2.00
0.05
2.00
0.05
1 m3
1 m3
1 m3
1 m3
1 m3
1 m2
1 m3
1 m3
1.00
2.00
4.00
8.00
6.00
30.00
0.50
3.00
0.40
1.20
0.10
(blaster)
1.00
2.00
4.00
8.00
6.00
30.00
0.50
3.00
Materials and
Tools/Equipment
41. Shovel
42. Doko/Baskets/Wheel barrows
43. Picks
Pre-splitting work
XXXVI.For the establishment of a specified excavation slope in rock by employing
the pre-splitting technique (with a blaster as skilled labour).
XXXVII.Additional work for extracting the quantity of rock material through the presplitting operation (with a blaster as skilled labour).
9.
Unskille
d
Labour
(persond
ay)
0.10
(blaster)
10.
2- 5
1 m3
0.25
0.25
50. Picks
51. Shovels
52. Doko/Baskets
53. Wheel barrows
54. Rollers as specified in S. No. 6.
11.
2-5.7.2
1 m3
0.50
0.40
55. Picks
56. Shovels
57. Doko/Baskets
58. Wheel barrows
12.
2-5.7.3
59. Picks
Respecti
ve
Clause
of
Specifica
tions
Description
Unit
2-5.3.3,
2-5.3.5
and 2-5.7.4
14.
2-5.7.5
the
embankment
Unskille
d
Labour
(persond
ay)
Skilled
Labour
(persond
ay)
1 m3
0.80
0.80
1 m3
1 m2
0.80
0.04
0.80
0.04
1 m2
0.10
0.10
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
0.50
0.60
2.00
4.00
2.00
17.00
1.00
0.05
(blaster)
0.60
0.70
2.00
4.00
2.00
17.00
1.00
Skilled
Labour
(personda
y)
Materials and
Tools/Equipment
60. Kodalo
61. Shovels
62. Doko/Baskets
63. Wheel barrows
64. Picks
65. Kodalo
66. Shovels
67. Doko/Baskets
68. Wheel barrows
69. Picks
70. Kodalo
71. Shovels
72. Doko/Baskets
73. Wheel barrows
0.05
(blaster)
15.
2-5.7.6
and 2-5.4.3
1 m2
0.20
0.20
74. Harrows
75. Picks
76. Shovels
77. Doko/Baskets
78. Wheel barrows or Bullock carts or
Tractor trailer
16.
2-5.7.7
1 m3
3.00
3.00
79. Harrows
80. Pickaxes
81. Shovels
82. Doko/Baskets
83. Wheel barrows or Bullock carts or
Tractor trailer
17.
Respecti
ve
Clause
of
Specifica
tions
2-5.7.8
Description
Unit
1 m3
Unskille
d
Labour
(persond
ay)
2.00
Skilled
Labour
(persond
ay)
Skilled
Labour
(personda
y)
Materials and
Tools/Equipment