Вы находитесь на странице: 1из 14

Location

(Please refer to all works following Design Drawing attached)

NO

ACTIVITIE

SITE SURVEY: Site survey shall be performed prior to the start of any appointe
contractor.
Temporary Toilet Construction Works
1.

Floor Works / Pekerjaan Lantai


a.
b.
c.

Bricks work Installation for floor frame works/Pekerjaan pemasan


Plastering works / Pekarjaan plaster

Compacted Sand mix with gravel, thickness 15 cm / Lapisan sirtu

d.

Concrete Floor / Beton Lantai

e.

Floor Tile installation Works size 20x20 cm/Pekerjaan Pemasang

f.

Squatting Toilet Installation Works / Pekerjaan pemasangan Toile

g.

Floor Drain / Floor Drain Lantai


Supply and install Floor Drain, the material from Stainlees stell

h.
2.

Supply and instal drainage grill cover at toilet compound entran


drainase di area masuk toilet ukuran 115 cm x 25 cm

Toilets Wall Installation Works / Pekerjaan Dinding Kamar Mandi

Supply and install wall for Toilet, the frame is made from Hollow bar 40x4

Menyediakan dan memasang dinding untuk toilet, rangka terbuat dari b


dengan ketebalan 0.3 mm
3.

Roofing Installation Works / Pekerjaan Pemasangan Atap


a.

Supply and install the roofing material for Toilet, the roofing struct
corrugated zinc Thickness 0.3 mm

Menyediakan dan memasang material atap untuk toilet. Strukt


penutup atap dari seng gelombang ketebalan 0.3 mm
b.

Supply and install Fascia Board at front of toilet roofing, the mater

menyediakan dan memasang Listplank di bagian depan atap toile


4.

Door Installation Works


a.

Supply and install corrugated zinc Door & Door Frame, the cost
and joining

Page 1 from 14 Pages

Location
(Please refer to all works following Design Drawing attached)

NO

ACTIVITIE

Menyediakan dan memasang pintu seng gelombang dan rangka


yang dibutuhkan untuk pemasangan dan penyambungan.
b.

Supply and install aluminium angle plate size 2 x 2 cm at the door

Menyediakan dan memasang plat siku aluminium pada pintu dan


5.

Wall Border Installation Works / Pekerjaan Pemasangan Pagar bata

Supply and install wall for Toilet, the frame is made from Hollow bar 50x5

Menyediakan dan memasang dinding untuk toilet, rangka terbuat dari b


dengan ketebalan 0.3 mm
6.

Painting works

Supply paint materials and paint all the hollow metal frame toilets and fen

Menyediakan material cat dan cat semua struktur rangka toilet dan paga
7.

Electrical Installation Works / Pekerjaan Pemasangan instalasi Listr


a.

Cable
Supply and install Electrical cable for lighting, cable Supreme 2 x

8.

b.

Light bulb

Supply and install light bulb Philip Genie 11 watt. To include cost f

c.

Lamp Switch / Switch Lampu


Supply and install lamp switch double.

Pipeline installation works / Pepasangan Pemipaan


a.

Clean Water distribution pipe / Pekerjaan Pemasangan Pipa air b

Supply and install pipeline installation works, materials is Galvanis


b.

Water Tap / Keran Air

Supply and install Water Tap 1/2 inc. Material is bronze (recomme
and all accesories that needed for this installtion / Menyediakan
merek onda 1/2 inc). harga termasuk menyediakan fitting galvanis
c.

Back Water Pipe installation Works / Pemasangan pipa air kotor d

Supply and install PVC Pipe dia 4 Inch, to include cost for access
d.

Clean Out pipe/ Clean Out pipe

Page 2 from 14 Pages

Location
(Please refer to all works following Design Drawing attached)

NO

ACTIVITIE

9.

Supply and install clean out PVC pipe diameter 4 inch, including
clean out diameter 5 inchi, termasuk Tee, Dop dan asesorisnya

Drainage installation works / Pekerjaan Pembuatan drainase

Making of drainage at the front and side of toilet as per design drawing.
2 %. Drainage size width 15 cm

Membuat saluran drainase dari pasangan bata di depan dan samping


rapi. Drainase harus memiliki kemiringan minimum 2 %. Lebar besih salu
10.

Accessories installtion / Pekerjaan Pembuatan Septic tanks


a.

Water bucket / Ember Air Plastik


Supply water bucket capacity 80 L / Menyediakan ember plastik k

Page 3 from 14 Pages

Location
(Please refer to all works following Design Drawing attached)

NO

ACTIVITIE
b.

Water Dipper / Gayung

Supply water bucket capacity 80 L / Menyediakan ember plastik k


c.

Cloth hanger inside the toilets/ Menyediakan gantungan baju dida

Supply and install stainlees steel clothes hanger inside toilet/Men

Note :

Transportation of all material to the site will be contractor's responsibility th


Catatan:

Semua harga pengangkutan dan penyediaan material ke lapangan akan m

The estimated scope of works, quantitites, unit and total prices in this quot
the specified period of construction, unless a variation is made on the plans

Received by:
IOM Staf

Nama :
Position

Page 4 from 14 Pages

REQUEST FOR QUOTATION


TEMPORARY TOILET CONTRCUTION WORKS
APRIL 2016
: IDC PEKANBARU

lowing Design Drawing attached)

ACTIVITIES

UNIT

y shall be performed prior to the start of any appointed sites and thereby pre determines the possibility of change order or variatio

ction Works

ekerjaan Lantai

k Installation for floor frame works/Pekerjaan pemasangan batu bata untuk frame lantai

m2

works / Pekarjaan plaster

m2

d Sand mix with gravel, thickness 15 cm / Lapisan sirtu yang dipadatkan ketebalan 15 cm

m3

Floor / Beton Lantai

m3

nstallation Works size 20x20 cm/Pekerjaan Pemasangan Keramik Lantai 20x40 cm

m2

Toilet Installation Works / Pekerjaan pemasangan Toilet Jongkok

Unit

n / Floor Drain Lantai

M2

d install Floor Drain, the material from Stainlees stell

d instal drainage grill cover at toilet compound entrance size: 115 x 25 cm / Menyediakan dan memasang penutup
i area masuk toilet ukuran 115 cm x 25 cm

Ls

allation Works / Pekerjaan Dinding Kamar Mandi

l wall for Toilet, the frame is made from Hollow bar 40x40x2 mm and wall cover from corrugated zinc thickness 0.3 mm

n memasang dinding untuk toilet, rangka terbuat dari besi hollow 40x40x2 mm dan seng gelombang sebagai penutup
n 0.3 mm

m2

ion Works / Pekerjaan Pemasangan Atap

d install the roofing material for Toilet, the roofing structure is made from Hollow bar 40x20x2 mm and covered with hot
d zinc Thickness 0.3 mm

kan dan memasang material atap untuk toilet. Struktur atap terbuat dari besi hollow 40x20x2 mm dengan bahan
ap dari seng gelombang ketebalan 0.3 mm

m2

d install Fascia Board at front of toilet roofing, the material is made from Calciboard Thickness 6mm
m1

kan dan memasang Listplank di bagian depan atap toilet, material terbuat dari Kalsiboard 6 mm

n Works

d install corrugated zinc Door & Door Frame, the cost to include Door hinge, door lock, latch and all material for fixing
g
Unit

Page 5 from 14 Pages

REQUEST FOR QUOTATION


TEMPORARY TOILET CONTRCUTION WORKS
APRIL 2016
: IDC PEKANBARU

lowing Design Drawing attached)

ACTIVITIES

UNIT

kan dan memasang pintu seng gelombang dan rangkanya, harga termasuk engsel, kunci, pacok dan semua material
uhkan untuk pemasangan dan penyambungan.

Unit

d install aluminium angle plate size 2 x 2 cm at the door and door opening to cover the end sharp of the metal zinc
m1

kan dan memasang plat siku aluminium pada pintu dan area bukan pintu untuk menutup ujung seng

allation Works / Pekerjaan Pemasangan Pagar batas toilet

l wall for Toilet, the frame is made from Hollow bar 50x50x2 mm and wall cover from corrugated zinc thickness 0.3 mm

n memasang dinding untuk toilet, rangka terbuat dari besi hollow 50x50x2 mm dan seng gelombang sebagai penutup
n 0.3 mm

m2

erials and paint all the hollow metal frame toilets and fence, colour white.
Ls

terial cat dan cat semua struktur rangka toilet dan pagarnya

ation Works / Pekerjaan Pemasangan instalasi Listrik


M1

d install Electrical cable for lighting, cable Supreme 2 x 1.5 mm

Pcs

d install light bulb Philip Genie 11 watt. To include cost for fitting lamp and other installation accessories

ch / Switch Lampu
d install lamp switch double.

Pcs

tion works / Pepasangan Pemipaan

er distribution pipe / Pekerjaan Pemasangan Pipa air bersih

d install pipeline installation works, materials is Galvanis dia 1 inc. to include cost for accessories installation.

M1

/ Keran Air

d install Water Tap 1/2 inc. Material is bronze (recommended brand: Onda 1/2 Inch), the cost to include fitting galvanish
cesories that needed for this installtion / Menyediakan dan memasang keran 1/2 inci material besi (direkomendasikan
a 1/2 inc). harga termasuk menyediakan fitting galvanist dan semua asesoris yang diperlukan untuk pemasangan

er Pipe installation Works / Pemasangan pipa air kotor diameter 4 Inch

d install PVC Pipe dia 4 Inch, to include cost for accessories installation

Unit

M1

pipe/ Clean Out pipe

Page 6 from 14 Pages

REQUEST FOR QUOTATION


TEMPORARY TOILET CONTRCUTION WORKS
APRIL 2016
: IDC PEKANBARU

lowing Design Drawing attached)

ACTIVITIES

UNIT

d install clean out PVC pipe diameter 4 inch, including Tee, Cab and accessories / Menyediakan dan memasang pipa
diameter 5 inchi, termasuk Tee, Dop dan asesorisnya

Unit

ation works / Pekerjaan Pembuatan drainase

ge at the front and side of toilet as per design drawing. The drainage surface is plastered and tidy, The slope minimum
e width 15 cm

drainase dari pasangan bata di depan dan samping toilets seperti gambar rencana. Permukaan drainase di plaster
rus memiliki kemiringan minimum 2 %. Lebar besih saluran 15 cm

m1

talltion / Pekerjaan Pembuatan Septic tanks

ket / Ember Air Plastik


ter bucket capacity 80 L / Menyediakan ember plastik kapasitas 80 Liter

M2

Page 7 from 14 Pages

REQUEST FOR QUOTATION


TEMPORARY TOILET CONTRCUTION WORKS
APRIL 2016
: IDC PEKANBARU

lowing Design Drawing attached)

ACTIVITIES

UNIT

per / Gayung

M2

ter bucket capacity 80 L / Menyediakan ember plastik kapasitas 80 Liter

ger inside the toilets/ Menyediakan gantungan baju didalam kamar mandi

d install stainlees steel clothes hanger inside toilet/Menyediakan dan memasang gantungan baju stainlees steel

Unit

COUNTED :Tujuh Puluh Dua Juta Enam Ratus Dua Puluh Enam Ribu Rupia

erial to the site will be contractor's responsibility thus all prices for supply of materials should include cost of transportation to

utan dan penyediaan material ke lapangan akan menjadi tanggung jawab kontraktor.

works, quantitites, unit and total prices in this quotation are prepared by the undersigned contractor and certify that it is true
onstruction, unless a variation is made on the plans or specifications by the IOM Engineer in charge of theseworks.

Page 8 from 14 Pages

ATION
UTION WORKS

VOLUME

UNIT
PRICE
( IDR )

PRICE

(IDR)

of change order or variation, shall be attended by IOM representative, Immigration Representative and the

24.54

94,050.00

2,307,987.00

10.68

71,500.00

763,620.00

9.57

101,200.00

968,484.00

2.39

511,500.00

1,223,763.75

58.25

137,550.00

8,012,287.50

4.00

412,500.00

1,650,000.00

8.00

25,575.00

204,600.00

1.00

577,500.00

577,500.00

90.00

97,350.00

8,761,500.00

27.09

97,350.00

2,637,211.50

27.00

29,975.00

809,325.00

8.00

2,035,000.00

16,280,000.00

Page 9 from 14 Pages

ATION
UTION WORKS

8.00

UNIT
PRICE
( IDR )
2,035,000.00

43.20

15,950.00

689,040.00

53.04

127,325.00

6,753,318.00

1.00

7,425,000.00

7,425,000.00

75.00

15,950.00

1,196,250.00

12.00

49,500.00

594,000.00

12

24,750.00

297,000.00

45.00

18,150.00

816,750.00

8.00

96,250.00

770,000.00

35.00

126,500.00

4,427,500.00

VOLUME

PRICE

(IDR)
16,280,000.00

Page 10 from 14 Pages

ATION
UTION WORKS

VOLUME

2.00

18.00

8.00

UNIT
PRICE
( IDR )

PRICE

137,500.00

148,500.00

175,000.00

(IDR)

275,000.00

2,673,000.00

1,400,000.00

Page 11 from 14 Pages

ATION
UTION WORKS

VOLUME

UNIT
PRICE
( IDR )

PRICE

(IDR)

8.00

108,950.00

871,600.00

8.00

30,250.00

242,000.00

Grand Total

72,626,736.75

Rounded

72,626,000.00

ua Puluh Enam Ribu Rupiah

de cost of transportation to the construction site

or and certify that it is true and correct and shall not claim for extra quantities or price increase during
ge of theseworks.

Name of company: CV. Nikita Jaya


Date: 20 April 2016

Nama
: Viktor Mamosi Napitupulu
Jabatan : Direktur

Page 12 from 14 Pages

Volume Calculation
No.

Works Description
1 Floor works
a. Brick works
b. Plastered
b. Compacted sand and gravel
c. Concrete works
d. Floor tile installation
e. Squating toilets
f. Floor drain
g. Drainage grill cover
2 Toilets Wall Installation Works
3 a. Roofing installtion
b. Fascia board
4 Door Installation works
a. Door installtion works
b. Aluminium angle plate
5 Wall border installtion works
6 Painting works
7 Electrical Installation Works
a. Cable
b. Light bulb
c. Lamp Switch
8 pipeline installation
a. Clean water distribution pipe
b. Water pipe installation
c. Black water pipe
d. Clean out
9 Drainage installtion works
10 Accessories installtion works
a. Ember
b. Gayung
c. Gantungan baju

Panjang

Lebar

81.8
35.6
14.5
14.5
14.5

0.3
0.3
3.3
3.3
3.3

37.5
12.6

2.4
2.15

4.8
22.1

9
2.4

18

tinggi

0.2
0.05

24.54
10.68
9.57
2.39
58.25
4.00
8.00
1.00
90.00
27.09
27.00
8.00
43.20
53.04
1.00
75.00
12.00
12.00
50.00
12.00
35.00
2.00
18.00
8.00
8.00
8.00