IPCA LABORATORIES-Ankleshwar

JOGI

HAZOP STUDY

REPORT NO.:- ZaltoProfen

IPCA
Work Sheet No.: (1):
Work Sheet No.:

Stage No:-

1 (Synthesis of ZaltoProfen Crude)

Process step No:

Reaction

(Design Intent)
Process sub step
No:-

Node No.:

1. Charging of poly-phosphoric acid


2. Charging of DM water
3. Stirring
4. Cooling
5. Charging of Di-acid
6. Charging of Methyl cyclohexane
7. Heating
8. Distillation
9. Cooling
10. Charging Of Toluene
11. Charging Of DM Water
12. Layer Separation
1.1.1 to 1.1.12

Ref. PFD:
1.

ZaltoProfen Crude

Charging of poly-phosphoric acid.


Deviation

Low Temperature

Causes

Human
keeping the
valve Open/
valve passing.

Consequences

errorbrine
brine

Poly-phosphoric
acid Solidifying
in the reactor

Agitator
Jamming

Production

Safeguards

Nothing Temperature
Indicator is provided but
same is not recording
before and during Polyphosphoric acid

Recommendations

1) ----Procedural control-operator to log the reactor


temperature before charging
the Poly-phosphoric acid in
the reactor.
2) Action taken be on low

39

JOGI

IPCA LABORATORIES-Ankleshwar
HAZOP STUDY

REPORT NO.:- ZaltoProfen

IPCA

delay

Contamination

Spillage.

Property
damage motor
damage,
agitator
shaft
Damage

Human error.

Wrong material used


for washing

Material quality
degradation.

Loss
production.

Leakage in reactor

Material loss

temperature by operator
should be documented and
operators to be trained
validated.

3) Low temperature sensor


with automation to shut of
brine
inlet
on
predetermined
low
temperature to be provided

of

Quality
check,
procedural
control exists for
all raw materials

Reactor thickness
survey is carried out
once in 2 years.

Jacket pressure test


is done once in 2
years.

SOPs are available.

Training is imparted
to operational staff.

Personnel vigilance.

PPEs are provided.

SCBA set is available


in plant building.

40

JOGI

IPCA LABORATORIES-Ankleshwar
HAZOP STUDY

REPORT NO.:- ZaltoProfen

IPCA
2-Charging of DM water
High quantity.

Low quantity

Agitator stopped.

Human error.

Human error.

Quality degradation.

Lean slurry formation.

may

be

BMR procedures
followed.

Water
Measured
charging.

BMR procedures
followed.

Dipstick is available to
measure
level
in
drums.

DG set is available.

PM of agitator & motor


carried out periodically.

Power failure.

Agitator jammed.

Less time allowed


for Agitation.

Human error.

Quality degradation.

SOP is available.

No Cooling
available

Power failure

Delayed batch time

SOPs are available.

Steam lined up to
reactor jacket by
mistake.

Degraded quality

Personal vigilance.

Temperature increases.

Improper dissolution.

are

meter/
quantity

water

Reaction
affected.

Exothermic
reaction.

Power failure.

Thick slurry formation.

Manual vigilance.

Agitator jammed.

Improper mixing.

DG set is available.

are

Mechanical lock to be
provided such that only one
utility can be lined up at a
time.

3-Stirring
Agitator stopped.

41

JOGI

IPCA LABORATORIES-Ankleshwar
HAZOP STUDY

REPORT NO.:- ZaltoProfen

IPCA

Less time allowed


for stirring.

High
temperature.

Low temperature

PM of agitator & motor


carried out periodically.

SOP is available.

Human error.

Power Failure.

DG set is available.

Motor Failure.

Agitator jammed.

PM of agitator & motor


carried out periodically.

Power failure.

Undesired reaction.

DG set is available.

No cooling water
available.

Quality degraded.

Faulty
temperature
indication.

PM & calibration of
temperature
indicator is done
periodically.

BMR procedures are


followed.

PPEs shall be worn


by operational staff.

PM & calibration of
temperature
indicator is done
periodically.

Human error.

Chilling or brine
lined
up
to
reactor jacket by
mistake

Faulty
temperature
indication.

Improper dissolution.

Quality degradation.

Redundant temperature
indication with alarm to
be provided.

Redundant temperature
indication
with
low
temperature alarm to be
provided.

4-Cooling
42

JOGI

IPCA LABORATORIES-Ankleshwar
HAZOP STUDY

REPORT NO.:- ZaltoProfen

IPCA
High temperature

Low temperature

Steam lined up
to reactor jacket
by mistake

No cooling water
available.

No
cause.

Delayed batch time.

SOPs are available.

Personal vigilance.

SOP is available.

Mechanical lock to be
provided such that only
one utility can be lined
up at a time.

Mechanical

assignable

5- Charging of Diacid
High quantity

Spillage
(During
charging of drums )

Human error

No
cause

Material loss.

Undesired quality.

assignable

6-Charging of Methylcyclohexane
High quantity

Spillage
(During
charging of drums )

Human error

No
cause

Steam lined up to

Material loss.

Undesired quality.

Delayed batch time.

SOP is available.

SOPs are available.

assignable

7-Heating
High temperature

lock

to

be

43

JOGI

IPCA LABORATORIES-Ankleshwar
HAZOP STUDY

REPORT NO.:- ZaltoProfen

IPCA
reactor jacket
mistake

Low temperature

No cooling
available.

by

provided such that only one


utility can be lined up at a
time.

Personal vigilance.

water

No
cause.

High steam load in


reactor jacket.

assignable

8-Distillation
High Temperature

Low Temperature

High pressure

Power failure.

Human error.

Heating steam not


available.

High steam load in


reactor jacket

High
rate
evaporation..

of

Reactor
pressurization.

over-

Batch time increases.

Material
froathing

leak

SOP is available.

Temperature indication
is available.

Personnel vigilance.

and

Temperature control valve


in steam supply to be
provided.

Temperature/flow
control
valve in steam supply to be
provided.
.

9- Cooling
High temperature

Steam lined up
to reactor jacket
by mistake

Delayed batch time.

SOPs are available.

Personal vigilance.

Mechanical lock to be
provided such that only
one utility can be lined

44

JOGI

IPCA LABORATORIES-Ankleshwar
HAZOP STUDY

REPORT NO.:- ZaltoProfen

IPCA

Low Temperature

up at a time.

No cooling water
available.
No
assignable
cause/ no hazard

10- Charging Of Toluene


Contamination

High quantity.

Human error.

Human error.

Material
quality
degradation.

Loss of production.

Solvent loss.

Quality degradation.

Quality
check,
procedural
control exists for
all raw materials

BMR procedures
followed.

are

.
Low quantity

Human error.

Reaction
affected.

may

be

BMR procedures
followed.

are

.
Spillage.

Human error in
manual handling of
the containers.

Fire

SOPs are available.

Personnel injury.

Suffocation.

Training is imparted to
operational staff.

Personnel vigilance.

PPEs are provided.

SCBA set is available in


plant building.

11- Charging Of DM Water


45

JOGI

IPCA LABORATORIES-Ankleshwar
HAZOP STUDY

REPORT NO.:- ZaltoProfen

IPCA

High quantity.

Human error.

Solvent loss.

Quality degradation.

BMR procedures
followed.

are

Low quantity

Human error.

may

be

BMR procedures
followed.

Dipstick is available to
measure
level
in
drums.

DG set is available.

PM of agitator & motor


carried out periodically.

Power failure.

Agitator jammed.

Less time allowed


for Agitation.

Human error.

Quality degradation.

SOP is available.

No Cooling
available

Power failure

Delayed batch time

SOPs are available.

Steam lined up to
reactor jacket by
mistake.

Degraded quality

Personal vigilance.

Temperature increases.

Agitator stopped.

water

Reaction
affected.

Improper dissolution.

are

Mechanical lock to be
provided such that only one
utility can be lined up at a
time.

Exothermic
reaction.

12- Layer Separation


Contamination

Less settling time

Product loss

Personnel vigilance

Mishandling

Quality degradation.

Human error

Sample is checked in
QC Lab.

46

IPCA LABORATORIES-Ankleshwar

JOGI

HAZOP STUDY

REPORT NO.:- ZaltoProfen

IPCA

Work Sheet No.: (2):


Work Sheet No.:

Stage No:-

1 (Synthesis of ZaltoProfen Crude

Process step No:

2 (Centrifuging and vacuum drying )

(Design Intent)
Process sub step
No:-

1. Charging & spinning.


2.

Toluene Wash

3. Cake Unloading
4.

Vacuum drying

Node No.:

47

JOGI

IPCA LABORATORIES-Ankleshwar
HAZOP STUDY

REPORT NO.:- ZaltoProfen

IPCA
Ref. PFD:

ZaltoProfen Crude

1. Charging & spinning.


Deviation
High Pressure

Causes

Consequences

Improper

Centrifuge
pressurized.

Centrifuge burst.

Property damage.

Damage to cloth.

Material loss.

Exposure of solvent to
operational staff.

Formation of flammable
vapors in plant building.

Damage to centrifuge.

Personnel injury.

Spillage.

Inefficient filtration.

Delayed batch time.

Wet cake formation.

charging.

High Quantity

Low Quantity

Less Time

Miscommunication

High pressure
reactor.

Reactor
passing.

Human error.

in

valve

Miscommunication

Human error.

Human error.

Safeguards
over

Recommendations

Proper
lineup
is
ensured
before
spinning.

Manual operation,
SOP controlled trained
persons
doing
centifusing

Manual vigilance.

BMR
procedure
place.

Completion of filtration
is ensured from sight
glass in mother liquor
line.

in

48

JOGI

IPCA LABORATORIES-Ankleshwar
HAZOP STUDY

REPORT NO.:- ZaltoProfen

IPCA
More Time

Human error.

Delayed batch time.

BMR
procedure
place.

Completion of filtration
is ensured from sight
glass in mother liquor
line.

in

Drive Failure/Stop

Power failure.

Delayed batch time.

DG set is available.

Also
(Centrifuge
cover open during
charging.)

Manual
charging
from centrifuge top
cover.

Solvent vapor expose to


operational staff.

PPEs are provided to


operational staff.

Formation of flammable
vapor.

Fire.

Limit
switch
to
stop
spinning in case of top
cover
open
to
be
incorporated
in
all
centrifuges.

Solvent vapor expose to


operational staff.

Formation of flammable
vapor.

Limit
switch
stops
spinning in case of top
cover is open (New
centrifuges).

Fire.

Limit
switch
to
stop
spinning in case of top
cover
open
to
be
incorporated
in
all
centrifuges.

Inefficient filtration.

Delayed batch time.

Speed indication
provided.

Wet cake formation.

Quality degradation.

Also
(Centrifuge
cover open during
spinning).

Low speed

High
Solids
mother liquor)

Wet cake.

Human error.

Failure of latch.

Failure
switch.

(in

of

limit

Loose belt.

Filter bag leakage.

Filter bag passing.

Filter bag choking.

Delayed batch time.

Mother liquor line


chocking.

Material loss.

SOPs are available.

Filter
bags
replaced after
eight batches.

SOP is available for


usage of centrifuge
bag.

to

be

are
every

49

JOGI

IPCA LABORATORIES-Ankleshwar
HAZOP STUDY

REPORT NO.:- ZaltoProfen

IPCA

Low
speed.

Before/After
(charging
done
before
starting
spinning).

Human error.

High vibration

Spillage
liquor)

(Mother

centrifuge

High vibration.

Inefficient filtration.

Centrifuge imbalanced.

Improper charging.

Spark.

Charging
without
spinning.

Fire.

Damage to equipment.

done
starting

Centrifuge
overload.

Mother liquor line


chocked.

ML catch pot (ML


tank) over flow.

Fire.

Solvent loss.

ML transfer pump
not working.

Material loss.

Toxic effect.

Material
quality
degradation. No safety
issue

SOP is available.

Different speed selection to


be
provided
during
charging & spinning.

Automation (charging block


valve shall open only when
centrifuge is at appropriate
RPM).

Automation
(centrifuge
motor shall stop at high
vibration).

ML catch pot capacity to be


reviewed.

Level gauge to be provided


to ML tank.

Dump tank to be provided


to
store
ML
during
centrifuging in case of ML
pump failure.

2. Toluene Wash
Contamination

Human error.

Wrong
material
used for washing

50

JOGI

IPCA LABORATORIES-Ankleshwar
HAZOP STUDY

REPORT NO.:- ZaltoProfen

IPCA

Spillage /Exposure

Drive stop

Manual activity.

Material loss.

Fire.

Inefficient washing.

SOP control

Health hazard.

Trained persons

PPEs are worn


operational staff.

by

Fire extinguishers are


provided.

Power failure

Delayed batch time.

DG set is available.

Human error

Toxic vapor exposure.

Mishandling.

PPEs (Organic vapor


mask) are provided to
operational personnel.

Use of hard tools


to scrap out hard
cake.

Cloth damage.

BMR
procedure
available.

Manual vigilance.

PPEs are available


to
operational
staff.

3.Cake Unloading
Spillage

Also (Damage
filter cloth)

to

is

3. vacuum drying
Spillage

High
Temperature

Human error.

Vapor exposure.

Improper
handling.

Material loss.

Suffocation.

Temperature

control system
failure.

Low
Temperature

Temperature

control system

Material
degraded.

quality

Material loss.

Temperature
indication
available.

is

Fire.
Material
degraded.

quality

Temperature
indication

is
51

IPCA LABORATORIES-Ankleshwar

JOGI

HAZOP STUDY

REPORT NO.:- ZaltoProfen

IPCA
failure.

available.

Manual sampling
is
done
for
ensuring moisture
content.

High
Flow
(drying air)

No assignable
cause.

Powder carry over


with drying air

Low/No
Flow
(drying air)

Chocking of air
filter.

Delayed batch time.

Manual sampling
is
done
for
ensuring moisture
content.

Power failure.

Blower failure.

Less Time

Human error.

High
content.

moisture

Manual sampling
is
done
for
ensuring moisture
content.

More Time

Human error.

Delayed batch time.

BMR procedure inline.

Spillage/Dustin
g.

Manual activity

Poor
housekeeping

Exposure
dust

PPEs are available


to
operational
staff.

to

toxic

52

JOGI

IPCA LABORATORIES-Ankleshwar
HAZOP STUDY

REPORT NO.:- ZaltoProfen

IPCA
Work Sheet No.: (3):
Work Sheet No.:

Stage No:-

Process step No:

(BZB-B) Purification of Zaltopren crude

Reaction

(Design Intent)
Process sub step
No:-

1.

Charging of Zaltopren crude

2.

Charging of Acetone

3. Charging of Carbon slurry


4.

Node No.:
Ref. PFD:

Heating and stirring

1.3.1 to 1.3.5
Purification of Zaltopren crude

1-Charging of Zaltopren crude

Deviation

Contamination

Causes

Human error.

Consequences

Material
quality
degradation.

Loss of production.

Safeguards

Quality
procedural
exists
for
materials

Recommendations

check,
control
all
raw

SOP control.

Security by device
control.

No
entry.

unauthorized

53

IPCA LABORATORIES-Ankleshwar

JOGI

HAZOP STUDY

REPORT NO.:- ZaltoProfen

IPCA

Best Housekeeping
practices

2-Charging of Acetone
Deviation
High quantity

Causes

Spillage

Human error

No
assignable
cause, only error
during
manual
handling

Consequences

Material loss.

Undesired quality.

Vapor exposure

Safeguards

Recommendations

SOP is available.

SOP, PPE

3-Charging of Carbon Slurry Heating and stirring


Deviation
High quantity

Causes

Spillage

4-

Human error

No
cause,

assignable

Consequences

Material loss.

Undesired quality.

No
hazard

Safeguards

Recommendations

SOP is available.

considerable

Heating and stirring

Deviation
Agitator stopped.

Less time allowed


for stirring.

Causes

Consequences

Safeguards

Power failure.

Thick slurry formation.

Manual vigilance.

Agitator jammed.

Improper mixing.

DG set is available.

PM of agitator & motor


carried out periodically.

SOP is available.

DG set is available.

Human error.

Power Failure.

Improper dissolution.

Recommendations

54

JOGI

IPCA LABORATORIES-Ankleshwar
HAZOP STUDY

REPORT NO.:- ZaltoProfen

IPCA

High temperature

Motor Failure.

Agitator jammed.

Steam lined up to
reactor jacket by
mistake

Delayed batch time.

No cooling
available.

Low temperature

No
cause.

Work Sheet No.:

Stage No:-

2 (BZB-B) Purification of Zaltopren crude

Process step No:

PM of agitator & motor


carried out periodically.

SOPs are available.

Personal vigilance.

water

Mechanical lock to be provided


such that only one utility can be
lined up at a time.
.

assignable

Pressure filtering, distilling and seeding of the mass

55

JOGI

IPCA LABORATORIES-Ankleshwar
HAZOP STUDY

REPORT NO.:- ZaltoProfen

IPCA
(Design Intent)
Process sub step
No:-

1- Pressure filtering
2- Distilling
3-Seeding

Node No.:

1.3.1 to 1.3.5

Ref. PFD:

Purification of Zaltopren crude

1- Pressure filtering
Deviation
Choking
filter

of

Causes
the

Consequences

No safety Hazard

Spillage

Leakage
filter

in

Safeguards

Production delay

the
contamination,
hazard

Atmosphere
heath

SOP control

SOP/ PPE

Recommendations

2- Distilling
Deviation
High Temperature

Low Temperature

Causes

High steam load in


reactor jacket.

Power failure.

Human error.

Consequences

Safeguards

High
rate
evaporation..

of

Reactor
pressurization.

over-

SOP is available.

Temperature indication
is available.

Personnel vigilance.

Recommendations

Temperature control valve


in steam supply to be
provided.

Batch time increases.

56

JOGI

IPCA LABORATORIES-Ankleshwar
HAZOP STUDY

REPORT NO.:- ZaltoProfen

IPCA

Heating steam not


available.

2- Seeding
Deviation

Causes

No
considerable
hazard
in
any
deviation only process
delay- No safety Issue

No
considerable
hazard
in
any
deviation
only
process delay- No
safety Issue

Consequences
No considerable hazard in
any deviation only process
delay- No safety Issue

Safeguards
SOP
control
for
process- this is process
quality critical activity
with no safety related
safe guards required.

Recommendations

Work Sheet No.: (4):


Work Sheet No.:

Stage No:-

2 Purification of Zaltopran crude (BZB-B)

Process step No:

Centrifuging and vacuum drying

(Design Intent)

57

JOGI

IPCA LABORATORIES-Ankleshwar
HAZOP STUDY

REPORT NO.:- ZaltoProfen

IPCA
Process sub step
No:-

1- Charging & spinning.


2- Acetone Wash
3-Cake Unloading
4-

Vacuum drying

Node No.:

1.4.1 to 1.4.4

Ref. PFD:

MPCR/BZB-B/05 Dated:30/09/13

4. Charging & spinning.


Deviation
High Pressure

Causes

Consequences

Improper

Centrifuge
pressurized.

Centrifuge burst.

Property damage.

Damage to cloth.

Material loss.

Exposure of solvent to
operational staff.

Formation of flammable
vapors in plant building.

Damage to centrifuge.

Personnel injury.

Spillage.

Inefficient filtration.

Delayed batch time.

Wet cake formation.

charging.

High Quantity

Low Quantity

Less Time

Miscommunication

High pressure
reactor.

Reactor
passing.

Human error.

in

valve

Miscommunication

Human error.

Human error.

Safeguards
over

Recommendations

Proper
lineup
is
ensured
before
spinning.

Manual operation,
SOP controlled trained
persons
doing
centrifuging

Manual vigilance.

BMR

procedure

As above.

in

58

JOGI

IPCA LABORATORIES-Ankleshwar
HAZOP STUDY

REPORT NO.:- ZaltoProfen

IPCA

place.

More Time

Human error.

Delayed batch time.

Completion of filtration
is ensured from sight
glass in mother liquor
line.

BMR
procedure
place.

Completion of filtration
is ensured from sight
glass in mother liquor
line.

in

Drive Failure/Stop

Power failure.

Delayed batch time.

DG set is available.

Also
(Centrifuge
cover open during
charging.)

Manual
charging
from centrifuge top
cover.

Solvent vapor expose to


operational staff.

PPEs are provided to


operational staff.

Formation of flammable
vapor.

Fire.

Limit
switch
to
stop
spinning in case of top
cover
open
to
be
incorporated
in
all
centrifuges.

Solvent vapor expose to


operational staff.

Formation of flammable
vapor.

Limit
switch
stops
spinning in case of top
cover is open (New
centrifuges).

Fire.

Limit
switch
to
stop
spinning in case of top
cover
open
to
be
incorporated
in
all
centrifuges.

Inefficient filtration.

Delayed batch time.

Speed indication
provided.

Wet cake formation.

Also
(Centrifuge
cover open during
spinning).

Low speed

Wet cake.

Human error.

Failure of latch.

Failure
switch.

of

limit

Loose belt.

Filter bag choking.

Delayed batch time.

Mother liquor line


chocking.

Material loss.

to

be

SOP is available for


usage of centrifuge
bag.

59

JOGI

IPCA LABORATORIES-Ankleshwar
HAZOP STUDY

REPORT NO.:- ZaltoProfen

IPCA

Low
speed.

Before/After
(charging
done
before
starting
spinning).

Human error.

High vibration

Spillage
liquor)

(Mother

centrifuge

High vibration.

Inefficient filtration.

Centrifuge imbalanced.

Improper charging.

Spark.

Charging
without
spinning.

Fire.

Damage to equipment.

done
starting

Centrifuge
overload.

Mother liquor line


chocked.

ML catch pot (ML


tank) over flow.

Fire.

Solvent loss.

ML transfer pump
not working.

Material loss.

Toxic effect.

Material
quality
degradation. No safety
issue

SOP is available.

Different speed selection to


be
provided
during
charging & spinning.

Automation (charging block


valve shall open only when
centrifuge is at appropriate
RPM).

Automation
(centrifuge
motor shall stop at high
vibration).

ML catch pot capacity to be


reviewed.

Level gauge to be provided


to ML tank.

Dump tank to be provided


to
store
ML
during
centrifuging in case of ML
pump failure.

5. Acetone Wash
Contamination

Human error.

Wrong
material
used for washing

60

JOGI

IPCA LABORATORIES-Ankleshwar
HAZOP STUDY

REPORT NO.:- ZaltoProfen

IPCA

Spillage /Exposure

Drive stop

Manual activity.

Material loss.

Fire.

Inefficient washing.

SOP control

Health hazard.

Trained persons

PPEs are worn


operational staff.

by

Fire extinguishers are


provided.

Power failure

Delayed batch time.

DG set is available.

Human error

Toxic vapor exposure.

Mishandling.

PPEs (Organic vapor


mask) are provided to
operational personnel.

Use of hard tools


to scrap out hard
cake.

Cloth damage.

BMR
procedure
available.

Manual vigilance.

PPEs are available


to
operational
staff.

3.Cake Unloading
Spillage

Also (Damage
filter cloth)

to

is

6. vacuum drying
Spillage

High
Temperature

Human error.

Vapor exposure.

Improper
handling.

Material loss.

Suffocation.

Temperature

control system
failure.

Low
Temperature

Temperature

control system

Material
degraded.

quality

Material loss.

Temperature
indication
available.

is

Fire.
Material
degraded.

quality

Temperature
indication

is
61

IPCA LABORATORIES-Ankleshwar

JOGI

HAZOP STUDY

REPORT NO.:- ZaltoProfen

IPCA
failure.

available.

Manual sampling
is
done
for
ensuring moisture
content.

High
Flow
(drying air)

No assignable
cause.

Powder carry over


with drying air

Low/No
Flow
(drying air)

Chocking of air
filter.

Delayed batch time.

Manual sampling
is
done
for
ensuring moisture
content.

Power failure.

Blower failure.

Less Time

Human error.

High
content.

moisture

Manual sampling
is
done
for
ensuring moisture
content.

More Time

Human error.

Delayed batch time.

BMR procedure inline.

Spillage/Dustin
g.

Manual activity

Poor
housekeeping

Exposure
dust

PPEs are available


to
operational
staff.

to

toxic

62

IPCA LABORATORIES-Ankleshwar

JOGI

HAZOP STUDY

REPORT NO.:- ZaltoProfen

IPCA

Work Sheet No.: (5):


Work Sheet No.:

Stage No:-

2 Purification of zaltopofren crude (BZB-B)

Process step No:

Pulverization & bag filling

(Design Intent)
Process sub step
No:-

1.

Node No.:

1.4.1 to 1.4.4

Ref. PFD:

MPCR/BZB-B/05 Dated:30/09/13

Pulverization
Deviation

Causes

Consequences

Safeguards

Recommendations

63

JOGI

IPCA LABORATORIES-Ankleshwar
HAZOP STUDY

REPORT NO.:- ZaltoProfen

IPCA
Static build

Pulverization

Explosion in the
equipment

Earthing

Nitrogen
blanketing with trip
of pulverizer on low
Nitrogen pressure.

Dust collectors

Explosion in the
equipment

Nil

Metallic strips in
dust collector and
connected to earth
pit.

Bag filling

Fire

Antistatic bags are


used in operationconnected to metallic
chute.

64