JOGI
HAZOP STUDY
IPCA
Work Sheet No.: (1):
Work Sheet No.:
Stage No:-
Reaction
(Design Intent)
Process sub step
No:-
Node No.:
Ref. PFD:
1.
ZaltoProfen Crude
Low Temperature
Causes
Human
keeping the
valve Open/
valve passing.
Consequences
errorbrine
brine
Poly-phosphoric
acid Solidifying
in the reactor
Agitator
Jamming
Production
Safeguards
Nothing Temperature
Indicator is provided but
same is not recording
before and during Polyphosphoric acid
Recommendations
39
JOGI
IPCA LABORATORIES-Ankleshwar
HAZOP STUDY
IPCA
delay
Contamination
Spillage.
Property
damage motor
damage,
agitator
shaft
Damage
Human error.
Material quality
degradation.
Loss
production.
Leakage in reactor
Material loss
temperature by operator
should be documented and
operators to be trained
validated.
of
Quality
check,
procedural
control exists for
all raw materials
Reactor thickness
survey is carried out
once in 2 years.
Training is imparted
to operational staff.
Personnel vigilance.
40
JOGI
IPCA LABORATORIES-Ankleshwar
HAZOP STUDY
IPCA
2-Charging of DM water
High quantity.
Low quantity
Agitator stopped.
Human error.
Human error.
Quality degradation.
may
be
BMR procedures
followed.
Water
Measured
charging.
BMR procedures
followed.
Dipstick is available to
measure
level
in
drums.
DG set is available.
Power failure.
Agitator jammed.
Human error.
Quality degradation.
SOP is available.
No Cooling
available
Power failure
Steam lined up to
reactor jacket by
mistake.
Degraded quality
Personal vigilance.
Temperature increases.
Improper dissolution.
are
meter/
quantity
water
Reaction
affected.
Exothermic
reaction.
Power failure.
Manual vigilance.
Agitator jammed.
Improper mixing.
DG set is available.
are
Mechanical lock to be
provided such that only one
utility can be lined up at a
time.
3-Stirring
Agitator stopped.
41
JOGI
IPCA LABORATORIES-Ankleshwar
HAZOP STUDY
IPCA
High
temperature.
Low temperature
SOP is available.
Human error.
Power Failure.
DG set is available.
Motor Failure.
Agitator jammed.
Power failure.
Undesired reaction.
DG set is available.
No cooling water
available.
Quality degraded.
Faulty
temperature
indication.
PM & calibration of
temperature
indicator is done
periodically.
PM & calibration of
temperature
indicator is done
periodically.
Human error.
Chilling or brine
lined
up
to
reactor jacket by
mistake
Faulty
temperature
indication.
Improper dissolution.
Quality degradation.
Redundant temperature
indication with alarm to
be provided.
Redundant temperature
indication
with
low
temperature alarm to be
provided.
4-Cooling
42
JOGI
IPCA LABORATORIES-Ankleshwar
HAZOP STUDY
IPCA
High temperature
Low temperature
Steam lined up
to reactor jacket
by mistake
No cooling water
available.
No
cause.
Personal vigilance.
SOP is available.
Mechanical lock to be
provided such that only
one utility can be lined
up at a time.
Mechanical
assignable
5- Charging of Diacid
High quantity
Spillage
(During
charging of drums )
Human error
No
cause
Material loss.
Undesired quality.
assignable
6-Charging of Methylcyclohexane
High quantity
Spillage
(During
charging of drums )
Human error
No
cause
Steam lined up to
Material loss.
Undesired quality.
SOP is available.
assignable
7-Heating
High temperature
lock
to
be
43
JOGI
IPCA LABORATORIES-Ankleshwar
HAZOP STUDY
IPCA
reactor jacket
mistake
Low temperature
No cooling
available.
by
Personal vigilance.
water
No
cause.
assignable
8-Distillation
High Temperature
Low Temperature
High pressure
Power failure.
Human error.
High
rate
evaporation..
of
Reactor
pressurization.
over-
Material
froathing
leak
SOP is available.
Temperature indication
is available.
Personnel vigilance.
and
Temperature/flow
control
valve in steam supply to be
provided.
.
9- Cooling
High temperature
Steam lined up
to reactor jacket
by mistake
Personal vigilance.
Mechanical lock to be
provided such that only
one utility can be lined
44
JOGI
IPCA LABORATORIES-Ankleshwar
HAZOP STUDY
IPCA
Low Temperature
up at a time.
No cooling water
available.
No
assignable
cause/ no hazard
High quantity.
Human error.
Human error.
Material
quality
degradation.
Loss of production.
Solvent loss.
Quality degradation.
Quality
check,
procedural
control exists for
all raw materials
BMR procedures
followed.
are
.
Low quantity
Human error.
Reaction
affected.
may
be
BMR procedures
followed.
are
.
Spillage.
Human error in
manual handling of
the containers.
Fire
Personnel injury.
Suffocation.
Training is imparted to
operational staff.
Personnel vigilance.
JOGI
IPCA LABORATORIES-Ankleshwar
HAZOP STUDY
IPCA
High quantity.
Human error.
Solvent loss.
Quality degradation.
BMR procedures
followed.
are
Low quantity
Human error.
may
be
BMR procedures
followed.
Dipstick is available to
measure
level
in
drums.
DG set is available.
Power failure.
Agitator jammed.
Human error.
Quality degradation.
SOP is available.
No Cooling
available
Power failure
Steam lined up to
reactor jacket by
mistake.
Degraded quality
Personal vigilance.
Temperature increases.
Agitator stopped.
water
Reaction
affected.
Improper dissolution.
are
Mechanical lock to be
provided such that only one
utility can be lined up at a
time.
Exothermic
reaction.
Product loss
Personnel vigilance
Mishandling
Quality degradation.
Human error
Sample is checked in
QC Lab.
46
IPCA LABORATORIES-Ankleshwar
JOGI
HAZOP STUDY
IPCA
Stage No:-
(Design Intent)
Process sub step
No:-
Toluene Wash
3. Cake Unloading
4.
Vacuum drying
Node No.:
47
JOGI
IPCA LABORATORIES-Ankleshwar
HAZOP STUDY
IPCA
Ref. PFD:
ZaltoProfen Crude
Causes
Consequences
Improper
Centrifuge
pressurized.
Centrifuge burst.
Property damage.
Damage to cloth.
Material loss.
Exposure of solvent to
operational staff.
Formation of flammable
vapors in plant building.
Damage to centrifuge.
Personnel injury.
Spillage.
Inefficient filtration.
charging.
High Quantity
Low Quantity
Less Time
Miscommunication
High pressure
reactor.
Reactor
passing.
Human error.
in
valve
Miscommunication
Human error.
Human error.
Safeguards
over
Recommendations
Proper
lineup
is
ensured
before
spinning.
Manual operation,
SOP controlled trained
persons
doing
centifusing
Manual vigilance.
BMR
procedure
place.
Completion of filtration
is ensured from sight
glass in mother liquor
line.
in
48
JOGI
IPCA LABORATORIES-Ankleshwar
HAZOP STUDY
IPCA
More Time
Human error.
BMR
procedure
place.
Completion of filtration
is ensured from sight
glass in mother liquor
line.
in
Drive Failure/Stop
Power failure.
DG set is available.
Also
(Centrifuge
cover open during
charging.)
Manual
charging
from centrifuge top
cover.
Formation of flammable
vapor.
Fire.
Limit
switch
to
stop
spinning in case of top
cover
open
to
be
incorporated
in
all
centrifuges.
Formation of flammable
vapor.
Limit
switch
stops
spinning in case of top
cover is open (New
centrifuges).
Fire.
Limit
switch
to
stop
spinning in case of top
cover
open
to
be
incorporated
in
all
centrifuges.
Inefficient filtration.
Speed indication
provided.
Quality degradation.
Also
(Centrifuge
cover open during
spinning).
Low speed
High
Solids
mother liquor)
Wet cake.
Human error.
Failure of latch.
Failure
switch.
(in
of
limit
Loose belt.
Material loss.
Filter
bags
replaced after
eight batches.
to
be
are
every
49
JOGI
IPCA LABORATORIES-Ankleshwar
HAZOP STUDY
IPCA
Low
speed.
Before/After
(charging
done
before
starting
spinning).
Human error.
High vibration
Spillage
liquor)
(Mother
centrifuge
High vibration.
Inefficient filtration.
Centrifuge imbalanced.
Improper charging.
Spark.
Charging
without
spinning.
Fire.
Damage to equipment.
done
starting
Centrifuge
overload.
Fire.
Solvent loss.
ML transfer pump
not working.
Material loss.
Toxic effect.
Material
quality
degradation. No safety
issue
SOP is available.
Automation
(centrifuge
motor shall stop at high
vibration).
2. Toluene Wash
Contamination
Human error.
Wrong
material
used for washing
50
JOGI
IPCA LABORATORIES-Ankleshwar
HAZOP STUDY
IPCA
Spillage /Exposure
Drive stop
Manual activity.
Material loss.
Fire.
Inefficient washing.
SOP control
Health hazard.
Trained persons
by
Power failure
DG set is available.
Human error
Mishandling.
Cloth damage.
BMR
procedure
available.
Manual vigilance.
3.Cake Unloading
Spillage
Also (Damage
filter cloth)
to
is
3. vacuum drying
Spillage
High
Temperature
Human error.
Vapor exposure.
Improper
handling.
Material loss.
Suffocation.
Temperature
control system
failure.
Low
Temperature
Temperature
control system
Material
degraded.
quality
Material loss.
Temperature
indication
available.
is
Fire.
Material
degraded.
quality
Temperature
indication
is
51
IPCA LABORATORIES-Ankleshwar
JOGI
HAZOP STUDY
IPCA
failure.
available.
Manual sampling
is
done
for
ensuring moisture
content.
High
Flow
(drying air)
No assignable
cause.
Low/No
Flow
(drying air)
Chocking of air
filter.
Manual sampling
is
done
for
ensuring moisture
content.
Power failure.
Blower failure.
Less Time
Human error.
High
content.
moisture
Manual sampling
is
done
for
ensuring moisture
content.
More Time
Human error.
Spillage/Dustin
g.
Manual activity
Poor
housekeeping
Exposure
dust
to
toxic
52
JOGI
IPCA LABORATORIES-Ankleshwar
HAZOP STUDY
IPCA
Work Sheet No.: (3):
Work Sheet No.:
Stage No:-
Reaction
(Design Intent)
Process sub step
No:-
1.
2.
Charging of Acetone
Node No.:
Ref. PFD:
1.3.1 to 1.3.5
Purification of Zaltopren crude
Deviation
Contamination
Causes
Human error.
Consequences
Material
quality
degradation.
Loss of production.
Safeguards
Quality
procedural
exists
for
materials
Recommendations
check,
control
all
raw
SOP control.
Security by device
control.
No
entry.
unauthorized
53
IPCA LABORATORIES-Ankleshwar
JOGI
HAZOP STUDY
IPCA
Best Housekeeping
practices
2-Charging of Acetone
Deviation
High quantity
Causes
Spillage
Human error
No
assignable
cause, only error
during
manual
handling
Consequences
Material loss.
Undesired quality.
Vapor exposure
Safeguards
Recommendations
SOP is available.
SOP, PPE
Causes
Spillage
4-
Human error
No
cause,
assignable
Consequences
Material loss.
Undesired quality.
No
hazard
Safeguards
Recommendations
SOP is available.
considerable
Deviation
Agitator stopped.
Causes
Consequences
Safeguards
Power failure.
Manual vigilance.
Agitator jammed.
Improper mixing.
DG set is available.
SOP is available.
DG set is available.
Human error.
Power Failure.
Improper dissolution.
Recommendations
54
JOGI
IPCA LABORATORIES-Ankleshwar
HAZOP STUDY
IPCA
High temperature
Motor Failure.
Agitator jammed.
Steam lined up to
reactor jacket by
mistake
No cooling
available.
Low temperature
No
cause.
Stage No:-
Personal vigilance.
water
assignable
55
JOGI
IPCA LABORATORIES-Ankleshwar
HAZOP STUDY
IPCA
(Design Intent)
Process sub step
No:-
1- Pressure filtering
2- Distilling
3-Seeding
Node No.:
1.3.1 to 1.3.5
Ref. PFD:
1- Pressure filtering
Deviation
Choking
filter
of
Causes
the
Consequences
No safety Hazard
Spillage
Leakage
filter
in
Safeguards
Production delay
the
contamination,
hazard
Atmosphere
heath
SOP control
SOP/ PPE
Recommendations
2- Distilling
Deviation
High Temperature
Low Temperature
Causes
Power failure.
Human error.
Consequences
Safeguards
High
rate
evaporation..
of
Reactor
pressurization.
over-
SOP is available.
Temperature indication
is available.
Personnel vigilance.
Recommendations
56
JOGI
IPCA LABORATORIES-Ankleshwar
HAZOP STUDY
IPCA
2- Seeding
Deviation
Causes
No
considerable
hazard
in
any
deviation only process
delay- No safety Issue
No
considerable
hazard
in
any
deviation
only
process delay- No
safety Issue
Consequences
No considerable hazard in
any deviation only process
delay- No safety Issue
Safeguards
SOP
control
for
process- this is process
quality critical activity
with no safety related
safe guards required.
Recommendations
Stage No:-
(Design Intent)
57
JOGI
IPCA LABORATORIES-Ankleshwar
HAZOP STUDY
IPCA
Process sub step
No:-
Vacuum drying
Node No.:
1.4.1 to 1.4.4
Ref. PFD:
MPCR/BZB-B/05 Dated:30/09/13
Causes
Consequences
Improper
Centrifuge
pressurized.
Centrifuge burst.
Property damage.
Damage to cloth.
Material loss.
Exposure of solvent to
operational staff.
Formation of flammable
vapors in plant building.
Damage to centrifuge.
Personnel injury.
Spillage.
Inefficient filtration.
charging.
High Quantity
Low Quantity
Less Time
Miscommunication
High pressure
reactor.
Reactor
passing.
Human error.
in
valve
Miscommunication
Human error.
Human error.
Safeguards
over
Recommendations
Proper
lineup
is
ensured
before
spinning.
Manual operation,
SOP controlled trained
persons
doing
centrifuging
Manual vigilance.
BMR
procedure
As above.
in
58
JOGI
IPCA LABORATORIES-Ankleshwar
HAZOP STUDY
IPCA
place.
More Time
Human error.
Completion of filtration
is ensured from sight
glass in mother liquor
line.
BMR
procedure
place.
Completion of filtration
is ensured from sight
glass in mother liquor
line.
in
Drive Failure/Stop
Power failure.
DG set is available.
Also
(Centrifuge
cover open during
charging.)
Manual
charging
from centrifuge top
cover.
Formation of flammable
vapor.
Fire.
Limit
switch
to
stop
spinning in case of top
cover
open
to
be
incorporated
in
all
centrifuges.
Formation of flammable
vapor.
Limit
switch
stops
spinning in case of top
cover is open (New
centrifuges).
Fire.
Limit
switch
to
stop
spinning in case of top
cover
open
to
be
incorporated
in
all
centrifuges.
Inefficient filtration.
Speed indication
provided.
Also
(Centrifuge
cover open during
spinning).
Low speed
Wet cake.
Human error.
Failure of latch.
Failure
switch.
of
limit
Loose belt.
Material loss.
to
be
59
JOGI
IPCA LABORATORIES-Ankleshwar
HAZOP STUDY
IPCA
Low
speed.
Before/After
(charging
done
before
starting
spinning).
Human error.
High vibration
Spillage
liquor)
(Mother
centrifuge
High vibration.
Inefficient filtration.
Centrifuge imbalanced.
Improper charging.
Spark.
Charging
without
spinning.
Fire.
Damage to equipment.
done
starting
Centrifuge
overload.
Fire.
Solvent loss.
ML transfer pump
not working.
Material loss.
Toxic effect.
Material
quality
degradation. No safety
issue
SOP is available.
Automation
(centrifuge
motor shall stop at high
vibration).
5. Acetone Wash
Contamination
Human error.
Wrong
material
used for washing
60
JOGI
IPCA LABORATORIES-Ankleshwar
HAZOP STUDY
IPCA
Spillage /Exposure
Drive stop
Manual activity.
Material loss.
Fire.
Inefficient washing.
SOP control
Health hazard.
Trained persons
by
Power failure
DG set is available.
Human error
Mishandling.
Cloth damage.
BMR
procedure
available.
Manual vigilance.
3.Cake Unloading
Spillage
Also (Damage
filter cloth)
to
is
6. vacuum drying
Spillage
High
Temperature
Human error.
Vapor exposure.
Improper
handling.
Material loss.
Suffocation.
Temperature
control system
failure.
Low
Temperature
Temperature
control system
Material
degraded.
quality
Material loss.
Temperature
indication
available.
is
Fire.
Material
degraded.
quality
Temperature
indication
is
61
IPCA LABORATORIES-Ankleshwar
JOGI
HAZOP STUDY
IPCA
failure.
available.
Manual sampling
is
done
for
ensuring moisture
content.
High
Flow
(drying air)
No assignable
cause.
Low/No
Flow
(drying air)
Chocking of air
filter.
Manual sampling
is
done
for
ensuring moisture
content.
Power failure.
Blower failure.
Less Time
Human error.
High
content.
moisture
Manual sampling
is
done
for
ensuring moisture
content.
More Time
Human error.
Spillage/Dustin
g.
Manual activity
Poor
housekeeping
Exposure
dust
to
toxic
62
IPCA LABORATORIES-Ankleshwar
JOGI
HAZOP STUDY
IPCA
Stage No:-
(Design Intent)
Process sub step
No:-
1.
Node No.:
1.4.1 to 1.4.4
Ref. PFD:
MPCR/BZB-B/05 Dated:30/09/13
Pulverization
Deviation
Causes
Consequences
Safeguards
Recommendations
63
JOGI
IPCA LABORATORIES-Ankleshwar
HAZOP STUDY
IPCA
Static build
Pulverization
Explosion in the
equipment
Earthing
Nitrogen
blanketing with trip
of pulverizer on low
Nitrogen pressure.
Dust collectors
Explosion in the
equipment
Nil
Metallic strips in
dust collector and
connected to earth
pit.
Bag filling
Fire
64