Reinforcement UK Ltd.
Quality Management
System Manual
For the purchasing,
processing and supply of
Stainless steel
products
Section 1
Approved
Revision date
Revision Number
QAM
1 of 24
Section 1
Section 2
Process Procedures
Section 3
Reference documents
Section 3.1
Section 3.2
Purchasing specifications
Section 3.3
Approved
Revision date
Revision Number
QAM
2 of 24
Contents
Section Title
1
2
3
4
5
6
7
8
Page
Description of Company
Company vision
Overview of the quality management system
Quality Management System
Management responsibility
Resource management
Product realization
Measurement, analysis and improvement
Process procedures
Appendix I - Process flowcharts
Appendix II - Issue authorisation and control
4
5
6
7
9
14
115
18
21
23
24
Authorised by:
General Manager
Date: .....
Approved
Revision date
Revision Number
QAM
3 of 24
Date: .....
The Technical Manager is also responsible for the review of all documents
once a year, amendment as necessary (including revision status), re-approval
and re-issue to those on the distribution lists. The holders of each amended
document shall be responsible for updating their own copies and maintaining
their condition. Withdrawn documents shall be either be destroyed or marked
as superseded and filed.
The Technical Manager shall keep British Standards up to date by monthly
reference to BSI Publications. He/she shall also be responsible for the
distribution and control of British Standards.
4.2.4 Control of Records
Records provide objective evidence of and demonstrate conformance to
specified requirements and the Management System. Defined records shall
be retained for a minimum period of ten years except as required by law.
A list of the records in use is shown in the Process Procedure. Individual users
are responsible for the identification, storage, protection and retrieval of
records, and the Technical Manager is responsible for determining retention
times and controlling disposition.
Appendix II Issue amendment and control identifies the location and/or
holders of documents.
Approved
Revision date
Revision Number
QAM
8 of 24
5.4 Planning
5.4.1 Quality objectives
Cogne Stainless Reinforcement UK Ltd will provide a service better than the
industry norm, by
o Maintaining the promised delivery date or informing the customer of
any variation in writing prior to that delivery date.
o Reduce Complaints year on year.
o Continue to reduce scrap and redundant work.
o Reduce and monitor the late delivery days
All the above will be reviewed annually at the Quality assurance meeting, and
the performance trends monitored to improve the company performance
5.4.2 Quality management system planning
The General Manager has arranged for effective planning of the quality
management system by establishing procedures, instructions and quality
objectives.
Changes to the quality management system shall be reviewed by the General
Manager to ensure that the integrity of the system is maintained. Changes
may be due to continual improvement plans, internal quality audits or
corrective/preventive actions.
Approved
Revision date
Revision Number
QAM
10 of 24
Organizational structure -
General Manager
Technical /
Operations
Manager
Production
Operatives
Finance Manager
Key Responsibilities
The General Manager is responsible for providing the necessary personnel
and resources to ensure the effective and efficient performance of the Core
Business and Support Processes.
Technical / Operations Manager
has the overall responsibility for ensuring that the policies set out in this
manual are understood, implemented and maintained at a levels in the
Company and that the Company works towards achieving its Vision and
key objectives.
has the overall responsibility and authority for ensuring that corrective and
preventive actions for actual or potential process and / or System
deficiencies are implemented.
represents the company in all matters relevant to the Quality Management
System as established by customer, regulatory and ISO 9001
requirements. He/she is responsible for ensuring that the System is
effectively implemented and maintained, and reports on the performance
of the Management System at review meetings.
Sales and Office staff are responsible for maintaining the stock control;
system with information provided by the process operators, providing
customer information in accordance with the process procedures
Process Operators are responsible for ensuring that their processes are
effective in producing the desired results in accordance with defined company
policy as detailed in this Manual.
All employees of the Company are responsible for meeting the requirements
of agreed procedures, plans and controls and for conducting themselves in
accordance with approved practices.
General
Responsibilities and authorities are defined in Job Descriptions for
supervisory and administrative levels and Process Operators. All nonsupervisory staff have authority based on competence to perform various
tasks.
In addition, responsibilities and authorities are defined in
documentation such as Process Procedures.
In the event of personnel absences, authority reverts to the source of
delegation as defined by the organization chart, unless limited authority and
responsibility are delegated to other personnel via memoranda.
5.5.2 Management representative
The General Manager has appointed the Technical and operations manager
as the company management representative.
5.5.3 Internal communication
The General Manager shall ensure, by means of suitable procedures, that
lines of communication are defined and effective.
Revision date
Revision Number
QAM
12 of 24
o
o
o
o
o
o
o
o
o
Approved
Revision date
Revision Number
QAM
13 of 24
7.4 Purchasing
7.4.1 Purchasing process
Purchasing is the responsibility of the General Manager. Reinforcing steel
shall only be purchased from CARES approved firms; non-reinforcing steel
products will be purchased from companies on the approved suppliers list.
A current copy of the CARES approved firms booklet shall be maintained.
In the event cut and bent work is subcontracted, the subcontractor shall hold a
valid CARES approval and supply details of the deliveries made to site on
behalf of the company.
7.4.2 Purchasing information
Purchase orders for reinforcing steel shall specify the relevant British
Standard, the type and size of product required and the need for CARES
approval, together with works test certificate, identification and delivery
requirements.
Where deliveries of steel are made directly to the customer on behalf of the
company the supplier must supply details of each consignment, including
traceability requirements.
7.4.3 Verification of purchased product
Goods shall be inspected on receipt, cast or batch numbers checked against
the supplier's delivery note (or recorded if not advised by the supplier) and
confirmed as CARES approved where appropriate, to the correct specification
as shown on the purchase order. Details shall be recorded in a goods receipt
log, and the records endorsed to show that, where relevant, works test
certificates have been received and filed.
If the company or the customer wishes to verify product/service at the
supplier's premises, the intended arrangements shall be described in the
purchase order.
Revision date
Revision Number
QAM
16 of 24
The outputs from the processes operated by the company are all capable of
being verified by subsequent monitoring and measurement, and this section
of EN ISO 9001:2000 is therefore excluded from the quality management
system.
7.5.3 Identification and traceability
Steel reinforcement in stock shall be identified, including split bundles or coils,
and traceable to goods receipt records and, where relevant, works test
certificates.
Product in process shall be identified and traceable to production/quality
records.
Completed cut and bent orders shall be traceable to the cast numbers of the
steel used in their manufacture.
7.5.4 Customer property
Where free issue goods are being processed, they will be marked by a simple
label identifying the customer, the order that it is required for and detailed
description of the goods, including the original and current quantity.
7.5.5 Preservation of product
Product conformity is preserved during processing and delivery by
maintaining
Identity, storing in suitable areas and using approved handling methods.
Approved
Revision date
Revision Number
QAM
17 of 24
Approved
Revision date
Revision Number
QAM
18 of 24
Final inspection comprises checking the product during loading to ensure that
it is properly identified, undamaged and accompanied by the correct
documentation.
Records showing the authority for release shall be kept for all inspections
(Section 4.2.4).
8.5 Improvement
8.5.1 Continual improvement
The company aims to continually improve the effectiveness of the quality
management system, by the use of data analysis, quality objectives and the
results of internal audits. This information shall be analysed, and
improvements implemented, refer to the management review meetings
(Section 5.6).
8.5.2 Corrective action
Corrective actions taken shall be appropriate to the effects of the
nonconformities identified.
The Technical Manager is responsible for
recording all nonconformities and evaluating and monitoring the corrective
actions taken, demonstrating their effectiveness.
8.5.3 Preventive action
Approved
Revision date
Revision Number
QAM
19 of 24
Approved
Revision date
Revision Number
QAM
20 of 24
Process procedures
1. Processing customer orders
2. Purchasing
3. Inspection and testing
4. Stocking
5. Cutting reinforcement
6. Bending reinforcement
7. Threading
8. Welding
9. Despatch
10. Defective material
11. Amendments
12. Concessions
13. Complaints
14. List of records
15. Maintenance schedules
16. Internal audits
17. Training
18. Direct Delivery
British Standards
British Standard number
BS EN ISO 9001
BS 4466
BS 8666
BS6744
Location
General Office
General Office
General Office
General Office
Date
Section
15/9/05
Page
number
6
Rev.
No.
1
30/9/05
30/9/05
10
5.4.1
30/9/05
18
8.2.3
30/9/05
21
PP
30/9/05
23
App 1
Review of Schedule
30/9/05
22
Training
Audits
Complaints
Concessions
Purchasing
Processing
of Customer
orders
Management
responsibility
Customers
Customers
Measurement,
analysis and
improvement
Resource
management
Product
realisation
Requirements
Product
Revision date
Threading
Cut and
bend
Output
Calibratio
n
Inspection
Maintenan
ce
Input
Approved
Satisfaction
Revision Number
QAM
23 of 24
Holder
General Office
Technical
manager
CARES
Rev. Status
1
1
1
Date of Issue