Вы находитесь на странице: 1из 24

Humboldt

Shipmanagement

M/T MERIOM WAVE


Condition Survey Report No. 2008.17,
Date 02.08.2008
Page 1 of 23
PHOTO NO. 1

Ps. along side at Victor Lenac


Shiprepair Yard, Rijeka, Croatia

PHOTO NO. 2

Ps.along side,
Topside coating generally intact,
mechanical damage on bow area
from anchor chains.

PHOTO NO. 3

Ps. shell looking forward.


Areas with bare steel and corrosion.
Antifouling is in general intact, and in
good condition considering 4 years
service.

PBH

Humboldt
Shipmanagement

M/T MERIOM WAVE


Condition Survey Report No. 2008.17,
Date 02.08.2008
Page 2 of 23
PHOTO NO. 4

Rudder and propeller area. Notice


the nozzle Froward of the propeller.

PHOTO NO. 5

Ps. loadline marks. The ship has


three markings.

PHOTO NO. 6

View over cargo deck, seen from aft.

PBH

Humboldt
Shipmanagement

M/T MERIOM WAVE


Condition Survey Report No. 2008.17,
Date 02.08.2008
Page 3 of 23
PHOTO NO. 7

Forecastle deck with Ps. windlass.

PHOTO NO. 8

Windlass with hydraulic piping


equipped with coated canvas for
corrosion protection. Clean drip
tray.

PHOTO NO. 9

Forecastle deck, entrante to bosun


store, and with emergency towing
arrangement at Ps.

PBH

Humboldt
Shipmanagement

M/T MERIOM WAVE


Condition Survey Report No. 2008.17,
Date 02.08.2008
Page 4 of 30
PHOTO NO. 10

Mooring winch on cargo deck,


Froward Sb.

PHOTO NO. 11

One of the three mooring winches


arranged on aft deck.

PHOTO NO. 12

Spare propeller arranged on


foundation, cargo deck Froward Ps.

PBH

Humboldt
Shipmanagement

M/T MERIOM WAVE


Condition Survey Report No. 2008.17,
Date 02.08.2008
Page 5 of 30
PHOTO NO. 13

Carwalk open grating of galvanizad


steel, fitted on supporting structure
with rubber strip for corrosion
protection.

PHOTO NO. 14

High pressure pipes: Carbon steel.


Return pipes: Stainless steel.
Pilot pipes: Duplex steel.
Hydraulic piping is fitted on supports
with special purpose rubber-lined
clamps.
PHOTO NO. 15

Sample of cargo piping and support.


Sliding material between pipe and
support. The sliding material appear
to be of dubious quality, some
deterioration in development.
U-bolts and nuts of mild steel.

PBH

Humboldt
Shipmanagement

M/T MERIOM WAVE


Condition Survey Report No. 2008.17,
Date 02.08.2008
Page 6 of 30
PHOTO NO. 16

Steam piping for slop tanks heating


coils, and cargo tanks deck
heaters. Pipes have pre-installed
insulation fitted with non-metallic
sheeting.

PHOTO NO. 17

Electric cables piping with expansion


bend in bolted steel box.

PHOTO NO. 18

Cargo lines expansion joints.


Existing sliding type expansion joints
in cargo-, inert gas-, and tank
washing lines were now removed,
and replaced by stainless steel
bellow-type expansion joints.

PBH

Humboldt
Shipmanagement

M/T MERIOM WAVE


Condition Survey Report No. 2008.17,
Date 02.08.2008
Page 7 of 30
PHOTO NO. 19

Cargo deck with 250 mm Fishplate.


Fixed mooring equipment and
fittings were marked with SWL for
weld bead parking.

PHOTO NO. 20

Cargo deck with longitudinal


stiffeners and transverse girders.

PHOTO NO. 21

Cargo deck with longitudinal


stiffeners junction to transverse
girders. Note soft-toe vertical
brackets.

PBH

Humboldt
Shipmanagement

M/T MERIOM WAVE


Condition Survey Report No. 2008.17,
Date 02.08.2008
Page 8 of 30
PHOTO NO. 22

Cargo deck.
Cargo tank entry hatch with swingout cover.

PHOTO NO. 23

Cargo deck.
Framo type cargo pumps hydraulic
connection. Note small bore hole in
top flange for the new vacuum
stripping pipe.

PHOTO NO. 24

Cargo deck.
Cargo deck heater.

PBH

Humboldt
Shipmanagement

M/T MERIOM WAVE


Condition Survey Report No. 2008.17,
Date 02.08.2008
Page 9 of 30
PHOTO NO. 25

Cargo deck.
Auxitrol radar type level gauge.

PHOTO NO. 26

Cargo deck.
Sensor for independent High-High
level alarm, 98 %.

PHOTO NO. 27

Cargo deck.
Bolted hatch for portable tank
washing machine. Blind flaged
connection is indicated by blue
arrow.

PBH

Humboldt
Shipmanagement

M/T MERIOM WAVE


Condition Survey Report No. 2008.17,
Date 02.08.2008
Page 10 of 30
PHOTO NO. 28

Cargo deck.
Tilden pneumatic pump (yellow),
connected to cargo drain system,
with discharge to drain tank Sb.

PHOTO NO. 29

Cargo manifold with presentation


flanges and reducers.
Drip tray with galvanized steel
grating.

PHOTO NO. 30

Cargo manifolds cargo hose


support rail at slip side.

PBH

Humboldt
Shipmanagement

M/T MERIOM WAVE


Condition Survey Report No. 2008.17,
Date 02.08.2008
Page 11 of 30
PHOTO NO. 31

Cargo manifold reducers positioned


on top of Ps. & Sb. deck houses.

PHOTO NO. 32

Inert gas plants deck seal.

PHOTO NO. 33

Inert gas plants PV-breaker.

PBH

Humboldt
Shipmanagement

M/T MERIOM WAVE


Condition Survey Report No. 2008.17,
Date 02.08.2008
Page 12 of 30
PHOTO NO. 34

Hydraulic piston type hose handling


crane.
SWL 10 t, outreach 4.0 20.0 m.
Separate electric hydraulic power
pack is installed in crane column
base.

PHOTO NO. 35

Cargo tanks.
No. 4 Sb.
Longitudinal bulkhead inner bottom,
looking forward.
Drop line with supports mounted on
the bulkhead..

PHOTO NO. 36

Cargo tanks.
No. 4 Sb.
Drop lines forward end.
Coating found fully intact without
defects. No pitting formations
were found on inner bottom. The
coating, originally light grey,
found dis-coloured brown.

PBH

Humboldt
Shipmanagement

M/T MERIOM WAVE


Condition Survey Report No. 2008.17,
Date 02.08.2008
Page 19 of 30
PHOTO NO. 55

Main engine
Foundation with hold-down bolts and
resin casting.

PHOTO NO. 56

Auxiliary engine no. 1


MAN B&W 7L 23/30H, 910 kW at 720
rpm
In course of main overhaul.
PHOTO NO. 57

Auxiliary engine no. 1 in course of


main overhaul, view into crankcase.

PBH

Humboldt
Shipmanagement

M/T MERIOM WAVE


Condition Survey Report No. 2008.17,
Date 02.08.2008
Page 20 of 30
PHOTO NO. 58

Emergency diesel generador.


Sisu Diesel, 6-cylinder, 142 kW at
1,800 rpm,
driving Stamfort generator.
PHOTO NO. 59

Engine control room.

PHOTO NO. 60

Air condition plant for


accommodation.
2 x compressors, 175 m3/hr
Maker: York Refrigeration.

PBH

Humboldt
Shipmanagement

M/T MERIOM WAVE


Condition Survey Report No. 2008.17,
Date 02.08.2008
Page 21 of 30
PHOTO NO. 61

Steam Electric water heater.

PHOTO NO. 62

Incinerator
1 x 40,000 Kcal/hr.
Maker: Nanjing Luzhou Machinery
Works
Now opened for repair of brick work

PHOTO NO. 63

Central coolers.
Alfa Laval, plate type.

PBH

Humboldt
Shipmanagement

M/T MERIOM WAVE


Condition Survey Report No. 2008.17,
Date 02.08.2008
Page 22 of 30
PHOTO NO. 64

Lube oil cooler.


Alfa Laval, plate type.

PHOTO NO. 65

Lube oil filter, Alfa Laval.

PHOTO NO. 66

Cooling water pumps with electric


motors dismantled for overhaul.

PBH

Humboldt
Shipmanagement

M/T MERIOM WAVE


Condition Survey Report No. 2008.17,
Date 02.08.2008
Page 23 of 30
PHOTO NO. 67

Oily water separator


B+V Industrietechnik, 5 m3/hr

PHOTO NO. 68

View in aft part engine room lower


floor.
Lifting beam for shafting is
arranged above.
A high pressure washing machine
is installed, right side in photo.
PHOTO NO. 69

View under floor plates in way of


shafting, at aft part of engine room.

PBH

Humboldt
Shipmanagement

M/T MERIOM WAVE


Condition Survey Report No. 2008.17,
Date 02.08.2008
Page 24 of 30
PHOTO NO. 70

Framo power packs, arranged in


separate compartment in engine
room. High pressure pumps and
electric motors are not separated by
enclosure.
The hydraulic power packs serves
cargo pumps, ballast pumps plus all
hydraulic winches.

PHOTO NO. 71

Steering gear Porsgrunn.


Type: Rotary vane electric
hydraulic. 2 pump units.

PHOTO NO. 72

Spare propeller shaft, preserved and


stored in steering gear room.

PBH

Humboldt
Shipmanagement

M/T MERIOM WAVE


Condition Survey Report No. 2008.17,
Date 02.08.2008
Page 25 of 30
PHOTO NO. 73

Ballast pump room, Framo type


hydraulic driven ballast pumas, 2 x
1,000 m3/hr.

PHOTO NO. 74

Ballast pump room, Framo type


hydraulic driven ballast pumas, 2 x
1,000 m3/hr.
PHOTO NO. 75

Accommkodation.
Constructed of good materials, fair
workmanship. Clean and well
maintained

PBH

Humboldt
Shipmanagement

M/T MERIOM WAVE


Condition Survey Report No. 2008.17,
Date 02.08.2008
Page 26 of 30
PHOTO NO. 76

Accommodation
View of Cargo Control Room, seen
from Ship Office part.

PHOTO NO. 77

Accommodation
View of Cargo Control Room.
Computers for cargo plant
operations and monitoring.
PHOTO NO. 78

Navigation Bridge

PBH

Humboldt
Shipmanagement

M/T MERIOM WAVE


Condition Survey Report No. 2008.17,
Date 02.08.2008
Page 27 of 30
PHOTO NO. 79

Navigation Bridge with


Communication room at aft part, Ps.

PHOTO NO. 80

Accommodation.
View of Officers mess room.
PHOTO NO. 81

Accommodation.
View of Crews mess room.

PBH

Humboldt
Shipmanagement

M/T MERIOM WAVE


Condition Survey Report No. 2008.17,
Date 02.08.2008
Page 28 of 30
PHOTO NO. 82

Accommodation
View of Galley. Walls and cieling of
stainless steel panels.

PHOTO NO. 83

Accommodation
View of provision reefer spaces.
Walls and cieling of stainless steel
panels.
PHOTO NO. 84

Accommodation
View of Masters office.

PBH

Humboldt
Shipmanagement

M/T MERIOM WAVE


Condition Survey Report No. 2008.17,
Date 02.08.2008
Page 29 of 30
PHOTO NO. 85

Accommodation
View of Conference room.

PHOTO NO. 86

Accommodation.
View of Gym room.
PHOTO NO. 87

Accommodation.
View of ships laundry. Well equipped
with Electrolux type machines.

PBH

Humboldt
Shipmanagement

M/T MERIOM WAVE


Condition Survey Report No. 2008.17,
Date 02.08.2008
Page 30 of 30
PHOTO NO. 88

Accommodation
Fire zone doors are equipped with
magnetic release in event of FIRE
alarm.

PHOTO NO. 89

Accommodation.
View of Hospital.
PHOTO NO. 90

Accommodation.
View of typical officers cabin.

PBH